JP2003111233A - Wiring/piping material laying tool and the laying method - Google Patents

Wiring/piping material laying tool and the laying method

Info

Publication number
JP2003111233A
JP2003111233A JP2001299196A JP2001299196A JP2003111233A JP 2003111233 A JP2003111233 A JP 2003111233A JP 2001299196 A JP2001299196 A JP 2001299196A JP 2001299196 A JP2001299196 A JP 2001299196A JP 2003111233 A JP2003111233 A JP 2003111233A
Authority
JP
Japan
Prior art keywords
shuttle
rope
wiring
laying
piping material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001299196A
Other languages
Japanese (ja)
Other versions
JP3643911B2 (en
Inventor
Akihiro Sakai
昭弘 酒井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mirai Industry Co Ltd
Original Assignee
Mirai Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mirai Industry Co Ltd filed Critical Mirai Industry Co Ltd
Priority to JP2001299196A priority Critical patent/JP3643911B2/en
Publication of JP2003111233A publication Critical patent/JP2003111233A/en
Application granted granted Critical
Publication of JP3643911B2 publication Critical patent/JP3643911B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)
  • Details Of Indoor Wiring (AREA)

Abstract

PROBLEM TO BE SOLVED: To simply and surely lay wiring/piping material along a laying route, by smoothly feeding it into inside a chuter disposed on a receiving device such as a cable rack, and a pipe. SOLUTION: A shuttle 12 in which a connecting plate 15 to connect a pull-in rope R is disposed, and a rope 14 having a rigidity to allow feeding the shuttle 12 into the chuter of the receiving device and the breaking strength to allow pulling the pull-in rope R, are provided. The connecting plate 15 is stored inside a storing part 13 by slide-contacting inside the chuter, and is turnably fixed to the shuttle 12, using a pin 16 at the tip side of the shuttle 12 as the fulcrum, and is allowed protruding the sides of the shuttle 12 so as to connect the shuttle 12 inside the chuter with the pull-in rope R outside the shooter, via a slit formed on the chuter.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、配線・配管材の布
設具及びその布設方法に関するものであり、特に、配線
・配管材を布設路に円滑に布設するのに適した配線・配
管材の布設具及びその布設方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a wiring / piping material laying tool and a method for laying the wiring / piping material, and more particularly to a wiring / piping material suitable for smoothly laying the wiring / piping material on a laying path. The present invention relates to a laying tool and a laying method thereof.

【0002】[0002]

【従来の技術】従来、ケーブルラックなどの受具や管等
に配線・配管材を布設する際には前記配線・配管材また
はこれを引込むための引込ロープを布設するための布設
具を使用して行なわれている。この布設具としては、例
えば、特公平7−34615号に記載された技術が開示
されている。
2. Description of the Related Art Conventionally, when laying wiring / piping materials on receivers or pipes of cable racks, etc., a laying tool for laying the wiring / piping material or a pulling rope for pulling the wiring / piping material has been used. Is being carried out. As this laying tool, for example, the technique described in Japanese Patent Publication No. 7-34615 is disclosed.

【0003】従来の配線・配管材の布設具を図22及び
図23に示す。図において、受具1は布設方向に沿って
左右一対に立設された親桁2に布設方向に適宜間隔をお
いて子桁3が架設され、全体が梯子状に形成されたもの
である。前記親桁2には布設具11を布設路全体に至っ
て挿通可能な中空状のシュータ4が一体に設けられてお
り、前記シュータ4の側壁には布設方向に連続するスリ
ット5が形成されている。
22 and 23 show conventional wiring and piping material laying tools. In the figure, the receiving tool 1 is a ladder girder 3 erected on a pair of left and right standing girders 2 along the laying direction at appropriate intervals in the laying direction, and is entirely formed in a ladder shape. The main girder 2 is integrally provided with a hollow shooter 4 through which a laying tool 11 can be inserted all over the laying path, and a side wall of the shooter 4 is formed with a slit 5 continuous in the laying direction. .

【0004】前記布設具11は先端部が紡錘状をなして
前記シュータ4内を挿通可能なシャトル12と、その後
端に接続されたロープ14とで構成されている。前記ロ
ープ14は前記シャトル12を布設路に送り込み可能な
剛性と、配線・配管材であるケーブルCまたはこれを引
込む際に使用する引込ロープを引込み可能な破断強度と
を有している。また、前記シャトル12にはその側壁に
前記ケーブルCまたは引込ロープを連結するための連結
板15が側方に突設されている。
The laying tool 11 is composed of a shuttle 12 having a spindle-shaped tip and capable of being inserted through the shooter 4, and a rope 14 connected to the rear end thereof. The rope 14 has a rigidity that allows the shuttle 12 to be fed into the laying path, and a breaking strength that allows the cable C, which is a wiring / piping material, or the pull-in rope used when pulling in the cable C to be drawn. In addition, a connecting plate 15 for connecting the cable C or the pull-in rope is provided on the side wall of the shuttle 12 so as to project laterally.

【0005】この布設具11を使用して前記受具1にケ
ーブルCを布設するには、連結板15をシュータ4のス
リット5から前記シュータ4の外方に突出させた状態で
布設始点から前記布設具11を前記シュータ4内に送り
込む。そして、布設終端まで布設具11のシャトル12
を送り込んだら、布設具11の連結板15の連結孔15
cにケーブルCまたは引込ロープの先端部を連結して布
設始点に引戻し、これによってケーブルCを直接または
引込ロープを介して受具1に布設する。なお、前記引込
ロープを介してケーブルCを布設するには、まず、上記
手順に従って布設路全長に至って受具1に引込ロープを
載置し、次に、前記引込ロープの端部にケーブルCを接
続し、この引込ロープを引戻すことによって行なってい
る。
In order to lay the cable C on the receiver 1 using the laying tool 11, the connecting plate 15 is projected from the slit 5 of the shooter 4 to the outside of the shooter 4, and the laying start point is set to the above. The urging tool 11 is fed into the shooter 4. And the shuttle 12 of the installation tool 11 to the end of the installation
After feeding, the connecting hole 15 of the connecting plate 15 of the erection tool 11
The cable C or the leading end of the pull-in rope is connected to c and pulled back to the starting point of the laying, whereby the cable C is laid on the receiver 1 directly or via the pull-in rope. In order to lay the cable C through the pulling rope, first, the pulling rope is placed on the receiving tool 1 to reach the entire length of the laying path according to the above procedure, and then the cable C is placed at the end of the pulling rope. This is done by connecting and pulling back this pull-in rope.

【0006】[0006]

【発明が解決しようとする課題】しかし、上記のような
従来の配線・配管材の布設具においては、連結板15を
受具1のシュータ4のスリット5からシュータ4の外方
に突出させた状態で、布設具11のシャトル12を前記
受具1のシュータ4内に送り込む際に、シャトル12の
側方に突出する前記連結板15がシュータ4のスリット
5の上下縁部と摺接し、送り込みの抵抗となってかなり
の力を要する場合があった。
However, in the conventional wiring / piping material laying tool as described above, the connecting plate 15 is projected from the slit 5 of the shooter 4 of the receiver 1 to the outside of the shooter 4. In this state, when the shuttle 12 of the installation tool 11 is fed into the shooter 4 of the receiving tool 1, the connecting plate 15 protruding laterally of the shuttle 12 is slidably contacted with the upper and lower edges of the slit 5 of the shooter 4 and fed. There was a case where it became a resistance of and required considerable power.

【0007】また、従来の布設具11を布設方向に連続
するスリット5を有するシュータ4内に送り込む際に
は、スリット5に連結板15を通過させるための位置合
わせが必要となるとともに、途中で布設具が引掛かるこ
とがあり、作業に手間がかかっていた。
Further, when the conventional laying tool 11 is fed into the shooter 4 having the slit 5 which is continuous in the laying direction, it is necessary to align the slit 5 to allow the connecting plate 15 to pass therethrough. The erection tool was sometimes caught, which took time and effort.

【0008】そこで、本発明は、ケーブルラックなどの
受具や管等に設けたシュータの内部に円滑に送り込んで
簡単かつ確実に配線・配管材を布設路に沿って布設でき
る布設具を提供することを課題とする。
[0008] Therefore, the present invention provides a laying tool that can be easily and reliably laid wiring and piping materials along a laying path by smoothly feeding into a receiver such as a cable rack or a shooter provided in a pipe or the like. This is an issue.

【0009】[0009]

【課題を解決するための手段】請求項1に係る配線・配
管材の布設具は、布設方向に連続するスリットを備える
とともに配線・配管材の布設路に沿って設置された中空
状のシュータ内を往復動することにより、前記布設路に
前記配線・配管材を直接または引込ロープを介して布設
するものであって、前記配線・配管材または引込ロープ
を連結する連結部が設けられたシャトルと、前記シャト
ルを前記シュータ内に送り込み可能な剛性及び前記配線
・配管材または前記引込ロープを引き込み可能な破断強
度を有するロープとを備え、前記連結部が、前記シャト
ルに収納されるとともに前記シュータ内のシャトルと前
記シュータ外の前記配線・配管材または引込ロープとを
前記スリットを介して連結すべく前記シャトルの側方に
突出可能に形成されたものである。
According to a first aspect of the present invention, there is provided a wiring / piping material laying tool having a slit which is continuous in a laying direction, and is provided inside a hollow shooter installed along a wiring / piping material laying path. By reciprocating, the wiring / piping material is laid in the laying path directly or via a pulling rope, and a shuttle provided with a connecting portion for connecting the wiring / piping material or the pulling rope. And a rope having a rigidity capable of sending the shuttle into the shooter and a breaking strength capable of pulling the wiring / piping material or the pull-in rope, and the connecting portion is housed in the shuttle and in the shooter. The shuttle and the wiring / piping material outside the shooter or the pull-in rope are formed to be able to project to the side of the shuttle so as to be connected via the slit. Those were.

【0010】請求項2に係る配線・配管材の布設具は、
請求項1に記載の連結部が、シャトルの先端側を支点と
して前記シャトルに回動可能に取付けられ、シュータ内
壁に送り込まれるときに、前記シュータ内に摺接するこ
とによってシャトル内に収納され、前記シャトルの外方
に突出しないように形成されたものである。
The wiring / piping material installation tool according to claim 2 is
The connecting part according to claim 1 is rotatably attached to the shuttle with the tip end side of the shuttle as a fulcrum, and when the connecting part is sent to the inner wall of the shooter, the connecting part is slidably brought into contact with the inside of the shuttle to be housed in the shuttle. It is formed so as not to project to the outside of the shuttle.

【0011】請求項3に係る配線・配管材の布設方法
は、布設方向に連続するスリットを備えるとともに配線
・配管材の布設路に沿って設置された中空状のシュータ
内に、前記配線・配管材またはこれを引込むための引込
ロープを連結するための連結部をシャトル内に収納した
状態で送り込み、終端でシャトルに収納されている前記
連結部を前記シャトルの側方に突出させて前記連結部に
前記配線・配管材または引込ロープを連結し、次いで、
シャトルを引き戻すことにより、配線・配管材を直接ま
たは引込ロープを介して布設路に布設するものである。
According to a third aspect of the present invention, there is provided a wiring / piping material laying method, wherein the wiring / piping material is provided in a hollow shooter provided along a laying path of the wiring / piping material, the slit being continuous in the laying direction. The connecting portion for connecting the material or the pull-in rope for pulling in the material is sent in a state of being housed in the shuttle, and the connecting portion housed in the shuttle at the terminal end is projected to the side of the shuttle to form the connecting portion. Connect the wiring / piping material or drop-in rope to
By pulling back the shuttle, wiring and piping materials are laid in the laying path directly or through the pull-in rope.

【0012】[0012]

【発明の実施の形態】本発明の実施例の配線・配管材の
布設具について図1乃至図8に基づいて説明する。図に
おいて、受具1は布設方向に沿って左右一対に立設され
た親桁2に布設方向に適宜間隔をおいて子桁3が架設さ
れ、全体が梯子状に形成されたものである。前記親桁2
には布設具11を布設路全体に至って挿通可能な中空状
のシュータ4が一体に設けられており、前記シュータ4
の側壁には布設方向に連続するスリット5が形成されて
いる。前記親桁2及び子桁3はアルミニウム等の金属或
いは合成樹脂によって一体成形することができる。
BEST MODE FOR CARRYING OUT THE INVENTION A wiring / piping material laying tool according to an embodiment of the present invention will be described with reference to FIGS. In the figure, the receiving tool 1 is a ladder girder 3 erected on a pair of left and right standing girders 2 along the laying direction at appropriate intervals in the laying direction, and is entirely formed in a ladder shape. The parent girder 2
Is integrally provided with a hollow shooter 4 through which the laying tool 11 can be inserted all over the laying path.
A slit 5 is formed on the side wall of the same in the laying direction. The parent girder 2 and the child girder 3 can be integrally formed of a metal such as aluminum or a synthetic resin.

【0013】前記布設具11は先端部が紡錘状をなして
前記シュータ4内を挿通可能なシャトル12と、その後
端に接続されたロープ14とで構成されている。前記ロ
ープ14は前記シャトル12を布設路に送り込み可能な
剛性と、配線・配管材であるケーブルCまたはこれを引
込む際に使用する引込ロープRを引込み可能な破断強度
とを有している。
The urging tool 11 is composed of a shuttle 12 having a spindle-shaped tip and capable of being inserted through the shooter 4, and a rope 14 connected to the rear end thereof. The rope 14 has a rigidity that allows the shuttle 12 to be fed into the laying path, and a breaking strength that allows the cable C, which is a wiring / piping material, or the retracting rope R used when retracting the cable C to be retracted.

【0014】前記シャトル12の胴体部12aには収納
部13が設けられており、この収納部13に連結板15
が収納できるようになっている。前記連結板15は板状
に形成され、前記シャトル12の収納部13に収納され
るとともに、ケーブルCまたは引込ロープRを引き戻す
際には前記シュータ4内のシャトル12と前記シュータ
4外のケーブルCまたは引込ロープRとをスリット5を
介して連結すべく、前記シャトル12の側方に突出可能
に形成されている。
A storage portion 13 is provided in the body portion 12a of the shuttle 12, and a connecting plate 15 is provided in the storage portion 13.
Can be stored. The connecting plate 15 is formed in a plate shape and is housed in the housing portion 13 of the shuttle 12. When the cable C or the pull-in rope R is pulled back, the shuttle 12 inside the shooter 4 and the cable C outside the shooter 4 are connected. Alternatively, it is formed so as to be able to project to the side of the shuttle 12 so as to connect with the pull-in rope R via the slit 5.

【0015】具体的には、図3及び図4に示すように、
収納部13は前記連結板15の板厚より僅かに大きい幅
と長さを有して前記シャトル12の胴体部12aを貫通
しており、前記連結板15は一端部がピン16を介して
前記シャトル12の先端側を支点に前記シャトル12に
対して回動可能に取付けられている。また、前記連結板
15の先端の左右両角部は弧状のアールが形成されてい
る。したがって、前記布設具11の連結板15は、シュ
ータ4内に送り込む際には、前記シュータ4の内壁と摺
接することによって前記シャトル12の収納部13内に
収納され、前記シャトル12の外方に突出しないように
なっている。
Specifically, as shown in FIGS. 3 and 4,
The accommodating portion 13 has a width and a length slightly larger than the plate thickness of the connecting plate 15 and penetrates the body portion 12a of the shuttle 12, and one end of the connecting plate 15 has a pin 16 interposed therebetween. The shuttle 12 is rotatably attached to the shuttle 12 with the tip side of the shuttle 12 as a fulcrum. The left and right corners of the tip of the connecting plate 15 are formed with arcuate rounds. Therefore, when the connecting plate 15 of the laying tool 11 is fed into the shooter 4, the connecting plate 15 is slidably brought into contact with the inner wall of the shooter 4 to be housed in the housing part 13 of the shuttle 12 and to the outside of the shuttle 12. It does not stick out.

【0016】また、前記連結板15は収納部13が貫通
しているから、左右いずれの方向にも回動でき、略90
度外方に回動すると、前記連結板15の前端面15aが
収納部13の先端側の内壁と当接し、それ以上に回動す
るのが阻止される。但し、前記収納部13は貫通させる
ことなく、底壁を有するものとすることもでき、この場
合は一方のみに回動する。
Further, since the connecting plate 15 has the accommodating portion 13 penetrating therethrough, it can be rotated in any of the left and right directions, and is approximately 90.
When it is rotated outward, the front end surface 15a of the connecting plate 15 comes into contact with the inner wall on the front end side of the storage portion 13 and is prevented from rotating further. However, the accommodating portion 13 may have a bottom wall without penetrating it, and in this case, it rotates only to one side.

【0017】ここで、前記連結板15の後端面15b
を、図5に示すように、外方に湾曲状に膨出させた面取
り加工をしてもよい。この場合は、ケーブルC又は引込
ロープRを連結板15に連結して引き戻すときに、シュ
ータ4のスリット5への前記連結板15の挿通を円滑に
行なうことができる。なお、前記連結板15は請求項の
連結部に相当するものである。
Here, the rear end surface 15b of the connecting plate 15
May be chamfered by bulging outward in a curved shape as shown in FIG. In this case, when the cable C or the pull-in rope R is connected to the connecting plate 15 and pulled back, the connecting plate 15 can be smoothly inserted into the slit 5 of the shooter 4. The connecting plate 15 corresponds to the connecting portion in the claims.

【0018】次に、上記のように構成された本発明の実
施例の配線・配管材の布設具を使用してケーブルを布設
する方法について図6乃至図8に基づいて説明する。な
お、ここでは、ケーブルCを引込ロープRを介して布設
する場合について説明する。この引込ロープRを使用す
るのはケーブルCの重量が大きい場合に、布設具11の
連結板15に連結して直接引込むことは重量的に無理で
あるので、この引込ロープRを引張ることによってケー
ブルCを布設するためである。したがって、ケーブルC
の重量が小さい場合には直接ケーブルCを布設具11の
連結板15に連結し、前記布設具11を引き戻して布設
することもできる。
Next, a method of laying a cable using the wiring / piping material laying tool of the embodiment of the present invention constructed as described above will be described with reference to FIGS. 6 to 8. Note that, here, a case where the cable C is laid via the pull-in rope R will be described. When the weight of the cable C is large, it is not possible to directly use the pull-in rope R by connecting it to the connecting plate 15 of the installation tool 11. Therefore, by pulling the pull-in rope R, it is possible to pull the cable. This is for laying C. Therefore, the cable C
When the weight is small, the cable C can be directly connected to the connecting plate 15 of the laying tool 11 and the laying tool 11 can be pulled back to be laid.

【0019】本発明の布設具を使用してケーブルCを布
設するには、まず、図6に示すように、連結板15をシ
ャトル12の収納部13内に収納した状態で、受具1の
シュータ4に布設具11を送り込む。ここで、ロープ1
4はシャトル12を送り込み可能な剛性を有しているの
で、布設始点から前記ロープ14を押込みながら布設具
11をシュータ4内に送り込むことができる。そして、
収納部13内に収納されている連結板15はシュータ4
内に挿通されていくときに、前記シュータ4の内壁と摺
接することによってシャトル12の胴体部12aから外
方に飛び出すのが防止される。また、先端側にピン16
による支点が設けられているため、連結板15が自然に
収納部13内に回動するように作用する。これにより、
シャトル12は円滑に布設終点に向かって送り込まれ
る。
In order to lay the cable C using the laying tool of the present invention, first, as shown in FIG. 6, the connecting plate 15 is housed in the housing portion 13 of the shuttle 12 and the receiving tool 1 is installed. The installation tool 11 is fed into the shooter 4. Where the rope 1
Since 4 has such a rigidity that the shuttle 12 can be fed, the laying tool 11 can be fed into the shooter 4 while pushing the rope 14 from the laying start point. And
The connecting plate 15 housed in the housing 13 is a shooter 4
By slidingly contacting the inner wall of the shooter 4 when it is inserted into the inside, it is prevented from jumping out from the body portion 12a of the shuttle 12. Also, pin 16 on the tip side
Since the fulcrum is provided, the connecting plate 15 acts so as to naturally rotate in the storage portion 13. This allows
The shuttle 12 is smoothly sent toward the laying end point.

【0020】次に、このように布設具11を送り込むこ
とによってシャトル12が布設終点に達したら、布設具
11のシャトル12から前記連結板15をピン16を中
心に収納部13から略90度回動させて前記シャトル1
2の側方に突出させる。そして、シャトル12の外方へ
引き出された連結板15の連結孔15cに引込ロープR
を連結し、次いで、図2及び図7に示すように、ロープ
14を引いてシャトル12を布設始点側に引き戻す。こ
れにより、引込ロープRを受具1の子桁3に載置し、布
設することができる。このとき、連結板15は布設終点
側に引張られることになるが、略90度以上の回動は阻
止されるので、引込ロープRに引張られ、略90度回動
して突出した一定の状態でスリット5内を移動する。
Next, when the shuttle 12 reaches the laying end point by feeding the laying tool 11 in this way, the connecting plate 15 is rotated from the shuttle 12 of the laying tool 11 about the pin 16 from the storage portion 13 by about 90 degrees. Move the shuttle 1
2 project to the side. Then, the pull-in rope R is inserted into the connecting hole 15c of the connecting plate 15 pulled out of the shuttle 12.
2 and 7, and then pull the rope 14 to pull the shuttle 12 back to the laying start point side, as shown in FIGS. As a result, the pull-in rope R can be placed and laid on the sub-beam 3 of the receiving tool 1. At this time, the connecting plate 15 is pulled toward the laying end point, but since it is prevented from rotating more than about 90 degrees, it is pulled by the retracting rope R and rotates about 90 degrees to project in a certain state. Move in the slit 5 with.

【0021】このようにして引込ロープRを受具1上に
引込んだら、前記引込ロープRの後端にケーブルCの先
端を接続し、図8に示すように、前記引込ロープRを図
8の右方向に引張ってケーブルCを右方向に引込む。こ
れにより、引込ロープRを介してケーブルCを布設路に
沿って布設することができる。なお、引込ロープRを引
込んだ後は、図においては、前記ケーブルCを前記引込
ロープRの後端に連結して右方向に引張るものを示して
いるが、逆に、前記引込ロープRの先端にケーブルCの
先端を接続し、前記引込ロープRを図8の左方向に引張
って前記ケーブルCを布設することもできる。
After the pull-in rope R has been pulled onto the receiving member 1 in this manner, the tip of the cable C is connected to the rear end of the pull-in rope R, and as shown in FIG. And pull the cable C to the right. Accordingly, the cable C can be laid along the laying path via the pull-in rope R. After the pull-in rope R is pulled in, in the figure, the cable C is connected to the rear end of the pull-in rope R and pulled rightward. It is also possible to connect the tip of the cable C to the tip and pull the pull-in rope R to the left in FIG. 8 to lay the cable C.

【0022】このように、本実施例の配線・配管材の布
設具は、ケーブルCまたは引込ロープRを連結する連結
板15が設けられたシャトル12と、前記シャトル12
を受具1のシュータ4内に送り込み可能な剛性及び前記
引込ロープRを引き込み可能な破断強度を有するロープ
14とを備え、前記連結板15が、前記シュータ内に摺
接して収納部13内に収納され、かつ、シャトル12の
先端側を支点として前記シャトル12に回動可能に取付
けられているとともに、前記シュータ4内のシャトル1
2と前記シュータ4外の引込ロープRとをスリット5を
介して連結すべく前記シャトル12の側方に突出可能に
形成されたものである。
As described above, in the wiring / piping material laying tool of this embodiment, the shuttle 12 provided with the connecting plate 15 for connecting the cable C or the pull-in rope R, and the shuttle 12 described above.
And a rope 14 having a rigidity capable of feeding the pulling rope R into the shooter 4 of the receiving tool 1 and a breaking strength capable of pulling the pull-in rope R. The shuttle 1 is housed and rotatably attached to the shuttle 12 with the tip end side of the shuttle 12 as a fulcrum.
2 and the pull-in rope R outside the shooter 4 are connected to each other via the slit 5 so as to project laterally of the shuttle 12.

【0023】したがって、シュータ4内に挿通される際
には、連結板15がシャトル12の収納部13内に自然
に収納されるように回動し、シャトル12の収納部13
に収納された状態としておくことにより、シャトル12
の外方に突出しているものが存在しないため、シュータ
4内を円滑に移動させることができる。そして、シュー
タ4内の連結板15とシュータ4外の引込ロープRとを
スリット5を介して連結する際にのみ、連結板15をシ
ャトル12の側方に突出させることができる。その結
果、簡単かつ確実にケーブルCを布設路に布設すること
ができる。
Therefore, when it is inserted into the shooter 4, the connecting plate 15 is rotated so as to be naturally accommodated in the accommodation portion 13 of the shuttle 12, and the accommodation portion 13 of the shuttle 12 is rotated.
Shuttle 12 by keeping it stored in
Since there is nothing that protrudes outward, the inside of the shooter 4 can be smoothly moved. The connecting plate 15 can be projected to the side of the shuttle 12 only when the connecting plate 15 inside the shooter 4 and the pull-in rope R outside the shooter 4 are connected via the slit 5. As a result, the cable C can be installed in the installation path easily and reliably.

【0024】次に、本発明の別の実施例における配線・
配管材の布設具を図9乃至図16に基づいて説明する。
図9乃至図12において、シャトル12の胴体部12a
には収納部13が設けられており、この収納部13に連
結板15が収納できるようになっている。前記連結板1
5は前記収納部13から側方に突出しない大きさの板材
で形成され、略中央部にはシャトル12の幅方向に長孔
15dが設けられている。前記収納部13は前記連結板
15の板厚より僅かに大きい幅と長さを有して前記シャ
トル12の胴体部12aを貫通しており、前記連結板1
5が内部を左右側方に平行に往復動できるようになって
いる。更に、前記シャトル12の上面略中央部にねじ2
1が上下方向に螺着されており、そのねじ部の先端は少
なくとも前記収納部13内に突出し、前記連結板15の
長孔15d内に嵌入して前記連結板15の抜脱を防止し
ている。また、前記ねじ21の頭部は前記シャトル12
の胴体部12aに埋設され、前記胴体部12aの外方に
突出しないようになっている。
Next, the wiring and wiring in another embodiment of the present invention will be described.
The plumbing installation tool will be described with reference to FIGS. 9 to 16.
9 to 12, the body portion 12a of the shuttle 12 is shown.
A storage section 13 is provided in the storage section 13, and the connecting plate 15 can be stored in the storage section 13. The connecting plate 1
5 is formed of a plate material having a size that does not laterally protrude from the storage portion 13, and an elongated hole 15d is provided in the width direction of the shuttle 12 in the substantially central portion. The accommodating portion 13 has a width and a length slightly larger than the plate thickness of the connecting plate 15 and penetrates the body portion 12a of the shuttle 12.
5 can reciprocate inside in parallel to the left and right sides. Further, a screw 2 is provided on the upper surface of the shuttle 12 substantially in the center thereof.
1 is screwed in the vertical direction, and the tip of the threaded portion thereof projects into at least the housing portion 13 and is fitted into the elongated hole 15d of the connecting plate 15 to prevent the connecting plate 15 from being pulled out. There is. Further, the head of the screw 21 is the shuttle 12
It is embedded in the body portion 12a of the body so as not to project to the outside of the body portion 12a.

【0025】前記連結板15は収納部13が貫通してい
るから、ケーブルCまたは引込ロープRを連結して引戻
すときに、左右側方のいずれの方向にも突出させること
ができる。但し、前記収納部13は貫通させることな
く、底壁を有するものとすることもでき、この場合は一
方のみに突出させることができる。
Since the accommodating portion 13 penetrates through the connecting plate 15, when the cable C or the pull-in rope R is connected and pulled back, the connecting plate 15 can be projected in any of the left and right sides. However, the accommodating portion 13 may have a bottom wall without penetrating it, and in this case, it can be projected to only one side.

【0026】この実施例においてケーブルCを布設する
には、前述の実施例と同様にして、布設具11のシャト
ル12の収納部13に前記連結板15を収納した状態で
シュータ4に前記布設具11を送り込む。このとき、収
納部13内に収納されている連結板15は前記シュータ
4の内壁と摺接してシャトル12の胴体部12aから外
方に飛び出すのが防止される。
In order to lay the cable C in this embodiment, in the same manner as the above-mentioned embodiment, the connection tool 15 is stored in the storage portion 13 of the shuttle 12 of the laying tool 11 and the laying tool is attached to the shooter 4. Send in 11. At this time, the connecting plate 15 accommodated in the accommodating portion 13 is prevented from sliding out of the body portion 12a of the shuttle 12 by sliding contact with the inner wall of the shooter 4.

【0027】次に、シャトル12を布設路の終端まで送
り込んだら、布設具11のシャトル12の収納凹部13
から前記連結部15をシャトル12の幅方向に平行移動
して引出して一部を外方に突出させる。以下、前述の回
動する連結板15を用いた実施例と同様にして、連結板
15の長孔15dにケーブルCまたは引込ロープRを連
結し、次いで、布設具11のロープ14を引いてシャト
ル12を引き戻すことにより、ケーブルCまたは引込ロ
ープRを布設路に布設することができる。なお、この実
施例においては、引込ロープRを布設具11の連結板1
5に連結して一旦引込ロープRを布設した後、この引込
ロープRでケーブルCを布設する場合を示す。
Next, when the shuttle 12 has been sent to the end of the installation path, the storage recess 13 of the shuttle 12 of the installation tool 11
From the above, the connecting portion 15 is moved in parallel in the width direction of the shuttle 12 and is withdrawn so that a part thereof is projected outward. Hereinafter, in the same manner as in the embodiment using the rotating connecting plate 15, the cable C or the pull-in rope R is connected to the elongated hole 15d of the connecting plate 15, and then the rope 14 of the erection tool 11 is pulled to shuttle. By pulling back 12 the cable C or the pull-in rope R can be laid in the laying path. In this embodiment, the pull-in rope R is connected to the connecting plate 1 of the installation tool 11.
The case where the cable C is laid by the pulling rope R after being connected to the cable 5 and once laying the pulling rope R is shown.

【0028】この実施例においても、前述の連結板15
を回動してシャトル12の外方に突出させる布設具と同
様の作用効果を奏する。
Also in this embodiment, the connecting plate 15 described above is used.
The same operation and effect as those of the urging tool for rotating the tongue to project to the outside of the shuttle 12 are exhibited.

【0029】ところで、この実施例においては、連結板
15に長孔15dを設け、この長孔15dにねじ21の
ねじ先端部を嵌入させ、シャトル12の幅方向に前記連
結板15を平行移動させるものを示したが、この変形例
として、連結板15は、図13乃至図16に示すよう
に、ねじ21のねじ先端部を連結板15の上面に当接
し、連結板15を押圧することによって一定位置に保持
させるものとすることもできる。
By the way, in this embodiment, the connecting plate 15 is provided with a long hole 15d, and the tip end of the screw 21 is fitted into the long hole 15d to move the connecting plate 15 in parallel in the width direction of the shuttle 12. As shown in FIGS. 13 to 16, as a modification, the connecting plate 15 is formed by abutting the screw tip of the screw 21 on the upper surface of the connecting plate 15 and pressing the connecting plate 15. It may be held in a fixed position.

【0030】即ち、図13乃至図16において、シャト
ル12の胴体部12aには収納部13が設けられてお
り、この収納部13に連結板15が収納できるようにな
っている。前記連結板15は前記収納部13から側方に
突出しない大きさの板材で形成され、両端部にケーブル
Cまたは引込ロープRを連結するための連結孔15cが
設けられている。前記収納部13は前記シャトル12の
胴体部12aを貫通しており、前記連結板15が内部を
左右側方に平行に往復動できるようになっている。更
に、前記シャトル12の上面略中央部にねじ21が上下
方向に螺着されており、そのねじ部の先端は前記連結板
15の上面に当接し、この連結板15を押圧して一定位
置に保持している。なお、前記連結孔15cはねじ21
のねじ先端が当接する位置をずらして設けられている。
That is, in FIGS. 13 to 16, a storage portion 13 is provided in the body portion 12a of the shuttle 12, and the connecting plate 15 can be stored in the storage portion 13. The connecting plate 15 is formed of a plate material having a size that does not laterally project from the housing portion 13, and has connecting holes 15c for connecting the cable C or the pull-in rope R at both ends. The storage portion 13 penetrates the body portion 12a of the shuttle 12, and the connecting plate 15 can reciprocate inside in parallel to the left and right sides. Further, a screw 21 is vertically screwed to a substantially central portion of the upper surface of the shuttle 12, and the tip of the screw portion abuts the upper surface of the connecting plate 15, and presses the connecting plate 15 to a fixed position. keeping. In addition, the connecting hole 15c has a screw 21
The position where the screw tips of the abutting contact each other is shifted.

【0031】なお、この実施例においても、前記連結板
15は収納部13が貫通しているから、ケーブルCまた
は引込ロープRを連結して引戻すときに、左右側方のい
ずれの方向にも引出して突出させることができる。但
し、前記収納部13は貫通させることなく、底壁を有す
るものとすることもでき、この場合は一方のみに突出さ
せることができる。
Also in this embodiment, since the housing 13 penetrates the connecting plate 15, when the cable C or the pull-in rope R is connected and pulled back, the connecting plate 15 can be moved in either the left or right direction. It can be pulled out and projected. However, the accommodating portion 13 may have a bottom wall without penetrating it, and in this case, it can be projected to only one side.

【0032】この実施例においては、特に、ねじ21の
ねじ先端が連結板15の上面を押圧するので、布設具1
1の送り込み時、引き戻し時のいずれにおいても、連結
板を一定位置に安定して保持することができる。
In this embodiment, in particular, since the screw tip of the screw 21 presses the upper surface of the connecting plate 15, the installation tool 1
It is possible to stably hold the connecting plate at a fixed position both when feeding 1 and pulling back 1.

【0033】なお、前述の長孔15dを設けた連結板1
5においても、長孔15dの位置を前後いずれかにずら
すことによってねじ21のねじ先端が前記連結板15の
上面を押圧するようにしてもよく、この場合には、この
両端部に連結孔15cを設けて側方に引出すようにした
前記連結板15と同様の作用を奏する。
The connecting plate 1 provided with the aforementioned long hole 15d.
Also in FIG. 5, the screw tip of the screw 21 may press the upper surface of the connecting plate 15 by shifting the position of the elongated hole 15d to the front or rear, and in this case, the connecting holes 15c are provided at both ends thereof. The same action as that of the connecting plate 15 which is provided with and is drawn out to the side.

【0034】次に、本発明の更に別の実施例における配
線・配管材の布設具を図17乃至図20に基づいて説明
する。図17乃至図20において、布設具11のシャト
ル12の胴体部12aには矩形板状の連結板17を着脱
自在に収納する収納凹部18が設けられており、前記収
納凹部18の立壁18aには前記連結板17を保持する
ための板ばね19が取付けられている。また、前記収納
凹部18の左右一対の側壁18bの中央部には前記収納
凹部18内に収納された前記連結板17を摘み出すため
の切欠窓18cが形成されている。
Next, a wiring / piping material laying tool according to still another embodiment of the present invention will be described with reference to FIGS. 17 to 20. 17 to 20, the body 12a of the shuttle 12 of the erection tool 11 is provided with a storage recess 18 for detachably storing the rectangular plate-shaped connecting plate 17, and the standing wall 18a of the storage recess 18 is provided in the storage wall 18. A leaf spring 19 for holding the connecting plate 17 is attached. Further, a cutout window 18c for picking out the connecting plate 17 housed in the housing recess 18 is formed at the center of the pair of left and right side walls 18b of the housing recess 18.

【0035】一方、前記連結板17はその板厚が胴体部
12aから外方に突出しない大きさに形成されており、
また、端部にはケーブルCまたは引込ロープRを連結す
るための連結孔17aが穿設されている。前記収納凹部
18の下方には、図19に示すように、前記連結板17
をその長手方向に取付けるための取着部20が設けられ
ており、この取着部20は断面形状一定の四角孔に形成
され、その深さは前記連結板17を保持し得る大きさに
形成されている。この状態では、前記連結板17は布設
方向と直交して保持され、連結板17にケーブルCまた
は引込ロープRを連結することができる。更に、前記収
納凹部18の底壁18dには前記取着部20と連通する
ねじ孔18eが設けられており、前記連結板17を前記
取着部20に挿入した後、前記底壁18dのねじ孔18
eにねじ21を螺着することにより、前記ねじ21の先
端が前記連結板17の上面を押圧し、前記連結板17の
抜け外れを防止することができる。
On the other hand, the connecting plate 17 is formed such that the plate thickness thereof does not project outward from the body portion 12a.
In addition, a connection hole 17a for connecting the cable C or the pull-in rope R is formed in the end portion. Below the storage recess 18, as shown in FIG.
There is provided an attaching portion 20 for attaching the connecting plate 17 in the longitudinal direction thereof. The attaching portion 20 is formed into a square hole having a constant cross-sectional shape, and the depth thereof is formed to a size capable of holding the connecting plate 17. Has been done. In this state, the connecting plate 17 is held orthogonal to the laying direction, and the cable C or the pull-in rope R can be connected to the connecting plate 17. Further, the bottom wall 18d of the storage recess 18 is provided with a screw hole 18e communicating with the attaching portion 20, and after the connecting plate 17 is inserted into the attaching portion 20, the screw of the bottom wall 18d is screwed. Hole 18
By screwing the screw 21 to e, the tip of the screw 21 presses the upper surface of the connecting plate 17, and the connecting plate 17 can be prevented from coming off.

【0036】なお、前記連結板17はこれにねじ孔を形
成し、前記ねじ21を前記連結板17のねじ孔に螺着す
ることによって固定するようにしてもよい。また、図2
1に示すように、取着部20の内壁に複数の小さいリブ
20aを一体に設け、連結板17を前記取着部20に強
制的に挿入して前記リブ20aとの間で弾性的に保持さ
せるようにしてもよい。更には、前記取着部20の内部
に向かうに従って四角孔の断面積を僅かに小さくしてい
き、強制的に連結板17を押込んで前記取着部20に弾
性的に保持させるようにしてもよい。同様に、収納凹部
18についても、立壁18a及び側壁18bに底壁18
dに向けてテーパを設け、布設具11の送り込み時に、
前記連結板17を押込むことによって弾性的に収納凹部
18内に保持させることもできる。
The connecting plate 17 may be formed with a screw hole, and the screw 21 may be fixed by screwing the screw 21 into the screw hole of the connecting plate 17. Also, FIG.
As shown in FIG. 1, a plurality of small ribs 20a are integrally provided on the inner wall of the attachment portion 20, and the connecting plate 17 is forcibly inserted into the attachment portion 20 and elastically held between the ribs 20a. You may allow it. Furthermore, the cross-sectional area of the square hole may be made slightly smaller toward the inside of the attachment portion 20, and the connecting plate 17 may be forcibly pushed to elastically hold the attachment portion 20. Good. Similarly, with respect to the storage recess 18, the bottom wall 18 is formed on the standing wall 18a and the side wall 18b.
A taper is provided toward d, and when the laying tool 11 is fed in,
It is also possible to elastically hold the connecting plate 17 in the storage recess 18 by pushing it in.

【0037】この実施例においてケーブルCを布設する
には、前述の実施例と同様にして、布設具11のシャト
ル12の収納凹部18に前記連結板17を収納したまま
の状態でシュータ4に前記布設具11を送り込む。その
後、シュータ4の終端で布設具11のシャトル12の収
納凹部18から前記連結部17を取り外す。
In order to lay the cable C in this embodiment, in the same manner as in the above-described embodiment, the connecting plate 17 is stored in the storage recess 18 of the shuttle 12 of the laying tool 11 and the shooter 4 is installed. Send the laying tool 11. Then, at the end of the shooter 4, the connecting portion 17 is removed from the storage recess 18 of the shuttle 12 of the erection tool 11.

【0038】次に、シャトル12の胴体部12aに設け
た取着部20に連結板17の一端部を挿入してねじ21
を螺着して固定し、連結板17の他端部はシャトル12
の側方に突出させる。
Next, one end of the connecting plate 17 is inserted into the attaching portion 20 provided on the body portion 12a of the shuttle 12 and the screw 21 is inserted.
Is fixed by screwing, and the other end of the connecting plate 17 is attached to the shuttle 12.
To the side of.

【0039】以下、前述の実施例と同様に、前記シャト
12の外方に引き出された連結板17の連結孔17aに
ケーブルCまたは引込ロープRを連結し、次いで、布設
具11のロープ14を引いてシャトル12を引き戻すこ
とにより、ケーブルCまたは引込ロープRを布設路に布
設することができる。なお、この実施例においては、図
20に示すように、引込ロープRを使用することなく布
設具11にケーブルCを直接連結してロープ14を引き
戻して布設する場合を示す。
In the same manner as in the above-mentioned embodiment, the cable C or the pull-in rope R is connected to the connecting hole 17a of the connecting plate 17 pulled out of the shutt 12, and then the rope 14 of the erection tool 11 is connected. By pulling and pulling back the shuttle 12, the cable C or the pull-in rope R can be laid in the laying path. In this embodiment, as shown in FIG. 20, the cable C is directly connected to the laying tool 11 and the rope 14 is pulled back for laying without using the pull-in rope R.

【0040】この実施例においては、前述の連結板15
をシャトル12の外方に突出させる布設具と同様の作用
効果を奏する。
In this embodiment, the connecting plate 15 described above is used.
The same operational effect as that of the urging tool for projecting the outside of the shuttle 12 is achieved.

【0041】ところで、本発明は、上記実施形態に限定
されるものではなく、本発明の趣旨を逸脱しない範囲
で、シャトル、収納部、収納凹部、連結孔、ロープなど
の形状、材質、大きさ、取付位置、取付方法などを適宜
変更して実施してもよい。
By the way, the present invention is not limited to the above-mentioned embodiment, and the shape, material, and size of the shuttle, the storage portion, the storage recess, the connection hole, the rope, etc. are within the scope of the present invention. The mounting position, the mounting method, and the like may be changed as appropriate.

【0042】また、上記実施例では、ケーブルCは受具
1に設けたシュータ4に布設具11を挿通して布設する
場合を示しているが、配線用の管などに設けたシュータ
に布設具11を挿通してケーブルCを布設する場合にも
適用することができる。更に、上記実施例では、配線・
配管材としてケーブルCを布設する場合を示している
が、給水管など各種の配線・配管材を布設路に沿って布
設する場合に適用することもできる。
In the above embodiment, the cable C is installed by inserting the laying tool 11 into the shooter 4 provided in the receiving tool 1. However, the laying tool is installed in the shooter provided in the pipe for wiring. It can also be applied to the case where the cable C is laid by inserting the cable 11. Furthermore, in the above embodiment,
Although the case where the cable C is laid as the piping material is shown, the invention can be applied to the case where various wiring and piping materials such as a water supply pipe are laid along the laying path.

【0043】[0043]

【発明の効果】以上のように、請求項1の配線・配管材
の布設具は、配線・配管材または引込ロープを連結する
連結部が設けられたシャトルと、前記シャトルを前記シ
ュータ内に送り込み可能な剛性及び前記配線・配管材ま
たは前記引込ロープを引き込み可能な破断強度を有する
ロープとを備え、前記連結部が、前記シャトルに収納さ
れるとともに前記シュータ内のシャトルと前記シュータ
外の前記配線・配管材または引込ロープとを前記スリッ
トを介して連結すべく前記シャトルの側方に突出可能に
形成されたものである。したがって、シュータ内に挿通
される際には、連結部をシャトルに収納された状態とし
ておくことで、シャトルの外方へ突出しているものが存
在しないため、シュータ内を円滑に移動させることがで
きる。そして、シャトルとシュータ外の配線・配管材ま
たは引込ロープとをスリットを介して連結する際にの
み、連結具をシャトルの側方に突出させることができ
る。その結果、簡単かつ確実に配線・配管材を布設路に
布設することができる。
As described above, the wiring / piping material installation tool according to the first aspect of the present invention is such that the shuttle provided with the connecting portion for connecting the wiring / piping material or the pull-in rope and the shuttle is fed into the shooter. A rope having a sufficient rigidity and a breaking strength capable of pulling the wiring / piping material or the pull-in rope, and the connecting portion is housed in the shuttle and the shuttle inside the shooter and the wiring outside the shooter. -It is formed so that it can project to the side of the shuttle so as to connect the piping material or the pull-in rope through the slit. Therefore, when the shuttle is inserted into the shooter, the connecting part is kept in the shuttle, so that there is no one protruding to the outside of the shuttle, so that the shooter can be smoothly moved. . Then, only when the shuttle is connected to the wiring / piping material outside the shooter or the pull-in rope through the slit, the connecting tool can be projected to the side of the shuttle. As a result, the wiring / piping material can be laid in the laying path easily and reliably.

【0044】また、請求項2の配線・配管材の布設具
は、請求項1に記載の連結部が、シャトルの先端側を支
点として前記シャトルに回動可能に取付けられ、シュー
タ内に送り込まれるときに、前記シュータ内に摺接する
ことによってシャトル内に収納され、前記シャトルの外
方に突出しないように形成されたものである。したがっ
て、特に、布設具をシュータ内に送り込むときに、連結
部がシャトル内に自然に収納されるように回動するた
め、布設具をシュータ内に円滑に挿通させることができ
る。
According to a second aspect of the present invention, in the wiring / piping material installation tool, the connecting portion according to the first aspect is rotatably attached to the shuttle with the tip end side of the shuttle as a fulcrum, and is fed into the shooter. At this time, it is housed in the shuttle by slidingly contacting the inside of the shooter, and is formed so as not to project to the outside of the shuttle. Therefore, in particular, when the fitting tool is fed into the shooter, the connecting portion rotates so as to be naturally accommodated in the shuttle, so that the fitting tool can be smoothly inserted into the shooter.

【0045】請求項3の配線・配管材の布設方法は、布
設方向に連続するスリットを備えるとともに配線・配管
材の布設路に沿って設置された中空状のシュータ内に、
前記配線・配管材またはこれを引込むための引込ロープ
を連結するための連結部をシャトル内に収納した状態で
送り込み、終端でシャトルに収納されている前記連結部
を前記シャトルの側方に突出させて前記連結部に前記配
線・配管材または引込ロープを連結し、次いで、シャト
ルを引き戻すことにより、配線・配管材を直接または引
込ロープを介して布設路に布設するものである。したが
って、請求項1と同様の効果を奏する。
According to a third aspect of the present invention, there is provided a wiring / piping material laying method, wherein a hollow shooter provided with a slit continuous in a laying direction is installed along a wiring / piping material laying path.
The wiring / piping material or the connecting portion for connecting the pull-in rope for pulling in the wiring / piping material is sent in a state of being stored in the shuttle, and the connecting portion stored in the shuttle is projected to the side of the shuttle at the end. The wiring / piping material or the pull-in rope is connected to the connecting portion and then the shuttle is pulled back to lay the wiring / piping material in the laying path directly or via the pull-in rope. Therefore, the same effect as that of claim 1 is achieved.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の実施例の配線・配管材の布設具を受
具のシュータ内に送り込む状態を示す斜視図である。
FIG. 1 is a perspective view showing a state in which a wiring / piping material installation tool according to an embodiment of the present invention is fed into a shooter of a receiver.

【図2】 図1の布設具に引込ロープを連結して引き戻
す状態を示す斜視図である。
FIG. 2 is a perspective view showing a state in which a pull-in rope is connected to and pulled back from the installation tool in FIG.

【図3】 図1の布設具の収納部内に連結板を収納した
状態を示す斜視図である。
FIG. 3 is a perspective view showing a state in which a connecting plate is housed in a housing portion of the installation tool of FIG. 1.

【図4】 図1の布設具の収納部から連結板を回動して
側方に突出させた状態を示す斜視図である。
FIG. 4 is a perspective view showing a state in which a connecting plate is pivoted and laterally protruded from an accommodating portion of the ware of FIG.

【図5】 図4の連結板の変形例を示す斜視図である。5 is a perspective view showing a modified example of the connecting plate of FIG.

【図6】 図1の受具のシュータ内に布設具を送り込む
状態を示す側面図である。
FIG. 6 is a side view showing a state in which the laying tool is fed into the shooter of the receiving tool of FIG.

【図7】 図6の受具の連結板に引込ロープを連結して
引き戻す状態を示す側面図である。
FIG. 7 is a side view showing a state in which the pull-in rope is connected to the connecting plate of the receiver of FIG. 6 and pulled back.

【図8】 図6の引込ロープにケーブルを連結して受具
に布設する状態を示す側面図である。
8 is a side view showing a state in which a cable is connected to the pull-in rope of FIG. 6 and laid on a receiving tool.

【図9】 本発明の別の実施例における配線・配管材の
布設具を示す斜視図である。
FIG. 9 is a perspective view showing a wiring / piping material installation tool according to another embodiment of the present invention.

【図10】 図9の布設具の収納部から連結板を側方に
突出させた状態を示す斜視図である。
FIG. 10 is a perspective view showing a state in which the connecting plate is laterally projected from the storage portion of the ware of FIG.

【図11】 図9のA−A切断線による断面図である。11 is a cross-sectional view taken along the line AA of FIG.

【図12】 図9のB−B切断線による断面図である。12 is a cross-sectional view taken along the line BB of FIG.

【図13】 図9の連結板の変形例を示す斜視図であ
る。
FIG. 13 is a perspective view showing a modification of the connecting plate of FIG.

【図14】 図13の布設具の収納部から連結板を側方
に突出させた状態を示す斜視図である。
FIG. 14 is a perspective view showing a state in which the connecting plate is laterally projected from the storage portion of the ware of FIG.

【図15】 図13のC−C切断線による断面図であ
る。
15 is a cross-sectional view taken along the line C-C in FIG.

【図16】 図13のD−D切断線による断面図であ
る。
16 is a cross-sectional view taken along the line DD of FIG.

【図17】 本発明の更に別の実施例における配線・配
管材の布設具を示す斜視図である。
FIG. 17 is a perspective view showing a wiring / piping material laying tool according to still another embodiment of the present invention.

【図18】 図17の布設具の分解斜視図である。FIG. 18 is an exploded perspective view of the installation tool of FIG. 17.

【図19】 図17のシャトルの取着部に連結板を取付
ける状態を示す斜視図である。
19 is a perspective view showing a state in which a connecting plate is attached to the attaching portion of the shuttle shown in FIG.

【図20】 図19のシャトルの取着部に取付けた連結
板にケーブルを連結して引き戻す状態を示す斜視図であ
る。
20 is a perspective view showing a state in which the cable is connected to the connecting plate attached to the attaching portion of the shuttle shown in FIG. 19 and pulled back.

【図21】 図17の布設具の変形例を示す側面図であ
る。
FIG. 21 is a side view showing a modified example of the installation tool of FIG. 17.

【図22】 従来の配線・配管材の布設具を受具のシュ
ータ内に送り込む状態を示す斜視図である。
FIG. 22 is a perspective view showing a state where a conventional wiring / piping material installation tool is fed into the shooter of the receiving tool.

【図23】 図22の布設具の連結板に直接ケーブルを
連結して引き戻す状態を示す斜視図である。
23 is a perspective view showing a state in which the cable is directly connected to the connecting plate of the installation tool in FIG. 22 and pulled back. FIG.

【符号の説明】[Explanation of symbols]

1 受具 4 シュータ 5 スリット 11 布設具 12 シャトル 13 収納部 14 ロープ 15、17 連結板 16 ピン 18 収納凹部 20 取着部 C ケーブル R 引込ロープ 1 receiver 4 Shooter 5 slits 11 Laying tools 12 shuttle 13 Storage 14 rope 15, 17 Connection plate 16 pin 18 Storage recess 20 Attachment C cable R retractable rope

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 布設方向に連続するスリットを備えると
ともに配線・配管材の布設路に沿って設置された中空状
のシュータ内を往復動することにより、前記布設路に前
記配線・配管材を直接または引込ロープを介して布設す
る配線・配管材の布設具であって、 前記配線・配管材または引込ロープを連結する連結部が
設けられたシャトルと、 前記シャトルを前記シュータ内に送り込み可能な剛性及
び前記配線・配管材または前記引込ロープを引き込み可
能な破断強度を有するロープとを備え、 前記連結部は、前記シャトルに収納されるとともに前記
シュータ内のシャトルと前記シュータ外の前記配線・配
管材または引込ロープとを前記スリットを介して連結す
べく前記シャトルの側方に突出可能に形成されているこ
とを特徴とする配線・配管材の布設具。
1. The wiring / piping material is directly provided in the laying path by reciprocating in a hollow shooter installed along the laying path of the wiring / piping material and having a continuous slit in the laying direction. Or a wiring / piping material laying tool laid via a pull-in rope, wherein a shuttle provided with a connecting portion for connecting the wiring / piping material or the pull-in rope, and a rigidity capable of sending the shuttle into the shooter And a rope having a breaking strength capable of pulling in the wiring / piping material or the pull-in rope, wherein the connecting portion is housed in the shuttle and the shuttle in the shooter and the wiring / piping material outside the shooter. Alternatively, the wiring / piping material is formed so as to project laterally of the shuttle so as to connect with the pull-in rope through the slit. Erection equipment.
【請求項2】 前記連結部は、シャトルの先端側を支点
として前記シャトルに回動可能に取付けられ、シュータ
内に送り込まれるときに、前記シュータの内壁と摺接し
て前記シャトル内に収納され、前記シャトルの外方に突
出しないように形成されていることを特徴とする請求項
1に記載の配線・配管材の布設具。
2. The connecting portion is rotatably attached to the shuttle with the tip end side of the shuttle as a fulcrum, and is slidably contacted with an inner wall of the shooter and stored in the shuttle when fed into the shooter. The wiring / piping material laying tool according to claim 1, characterized in that it is formed so as not to project to the outside of the shuttle.
【請求項3】 布設方向に連続するスリットを備えると
ともに配線・配管材の布設路に沿って設置された中空状
のシュータ内に、前記配線・配管材またはこれを引込む
ための引込ロープを連結するための連結部をシャトル内
に収納した状態で送り込み、終端でシャトルに収納され
ている前記連結部を前記シャトルの側方に突出させて前
記連結部に前記配線・配管材または引込ロープを連結
し、次いで、前記シャトルを引き戻すことにより、前記
配線・配管材を直接または引込ロープを介して布設路に
布設することを特徴とする配線・配管材の布設方法。
3. The wiring / piping material or a lead-in rope for drawing the wiring / piping material into a hollow shooter provided with a continuous slit in the laying direction and installed along a wiring path of the wiring / piping material. For connecting the wiring / piping material or the pull-in rope to the connecting portion by projecting the connecting portion housed in the shuttle at the end to project to the side of the shuttle. Then, by pulling back the shuttle, the wiring / piping material is laid on the laying path directly or via a pull-in rope.
JP2001299196A 2001-09-28 2001-09-28 Wiring and piping material laying tool and its laying method Expired - Fee Related JP3643911B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001299196A JP3643911B2 (en) 2001-09-28 2001-09-28 Wiring and piping material laying tool and its laying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001299196A JP3643911B2 (en) 2001-09-28 2001-09-28 Wiring and piping material laying tool and its laying method

Publications (2)

Publication Number Publication Date
JP2003111233A true JP2003111233A (en) 2003-04-11
JP3643911B2 JP3643911B2 (en) 2005-04-27

Family

ID=19119986

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001299196A Expired - Fee Related JP3643911B2 (en) 2001-09-28 2001-09-28 Wiring and piping material laying tool and its laying method

Country Status (1)

Country Link
JP (1) JP3643911B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101389425B1 (en) * 2012-11-27 2014-04-28 석재화 Cable tray
CN105811322A (en) * 2016-05-19 2016-07-27 攀钢集团工程技术有限公司 Traction connector used in cable laying

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101389425B1 (en) * 2012-11-27 2014-04-28 석재화 Cable tray
CN105811322A (en) * 2016-05-19 2016-07-27 攀钢集团工程技术有限公司 Traction connector used in cable laying

Also Published As

Publication number Publication date
JP3643911B2 (en) 2005-04-27

Similar Documents

Publication Publication Date Title
CA1068923A (en) Coupling means
US10465729B2 (en) Toggle fixing and method of mounting a toggle fixing
US6321622B1 (en) Structure for attaching a suspending device to an electric power tool
US20140124717A1 (en) Fishing adapter
JP2011222638A (en) Rack
JP2003111233A (en) Wiring/piping material laying tool and the laying method
KR20200000326A (en) Screw feeding apparatus of screw gun
US9133873B2 (en) Engagement member with fastening pin and method for interconnecting two components
US20040013483A1 (en) Device and method for installing an elongated member through a partition element
EP2574415A1 (en) Fishing adapter
KR200339737Y1 (en) Wrap case attached slide for catting
US7037154B1 (en) Method for fixing or removing surfboard fin, and surfboard fin
US4017050A (en) Fishing rod holder apparatus
KR101599346B1 (en) Cable laying device
GB2473473A (en) Device to aid the passage of an elongate member through a drilled hole
JP3208884U (en) Mounting bracket for optical cable retractor
US20050173854A1 (en) Door clamp
JP2003290694A (en) Discharge fixture for two-pack type mixed adhesive
KR101004346B1 (en) Separate type MuLti-Tap
CN217406882U (en) Sliding unlocking type pulling-assistant device and case
JP4238790B2 (en) Simple building
KR200454624Y1 (en) connector
JP2003070122A (en) Wiring box and wiring box device
JP3957108B2 (en) Metal construction material fixing structure
JP3122042B2 (en) Bulk picking cutter

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040129

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040301

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040414

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20040831

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040929

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20041111

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050111

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050114

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080210

Year of fee payment: 3

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090210

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090210

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100210

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100210

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100210

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110210

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110210

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees