JP2003072555A - Altered shunting plan preparing information, storage medium and altered shunting plan preparing system - Google Patents

Altered shunting plan preparing information, storage medium and altered shunting plan preparing system

Info

Publication number
JP2003072555A
JP2003072555A JP2001267544A JP2001267544A JP2003072555A JP 2003072555 A JP2003072555 A JP 2003072555A JP 2001267544 A JP2001267544 A JP 2001267544A JP 2001267544 A JP2001267544 A JP 2001267544A JP 2003072555 A JP2003072555 A JP 2003072555A
Authority
JP
Japan
Prior art keywords
train
replacement plan
change
temporary
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001267544A
Other languages
Japanese (ja)
Other versions
JP4571349B2 (en
Inventor
Norio Tomii
規雄 富井
Riken Shu
利剣 周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Railway Technical Research Institute
JR Souken Information Systems Co Ltd
Original Assignee
Railway Technical Research Institute
JR Souken Information Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Technical Research Institute, JR Souken Information Systems Co Ltd filed Critical Railway Technical Research Institute
Priority to JP2001267544A priority Critical patent/JP4571349B2/en
Publication of JP2003072555A publication Critical patent/JP2003072555A/en
Application granted granted Critical
Publication of JP4571349B2 publication Critical patent/JP4571349B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To automatically prepare an altered shunting plan. SOLUTION: Case data which meet the prescribed conditions are retrieved from the case data on the shunting plans which were previously carried out, on the basis of special train data. A new altered shunting plan is prepared according to the retrieved case data and the special train operation data. When the new altered shunting plan is inconsistent with the prescribed operable conditions, the new altered shunting plan is amended.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、変更入換計画を自
動作成する変更入換計画作成情報、当該変更入換計画作
成情報を記憶する記憶媒体、および変更入換計画作成シ
ステムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a change replacement plan creation information for automatically creating a change replacement plan, a storage medium for storing the change replacement plan creation information, and a change replacement plan creation system.

【0002】[0002]

【従来の技術】定期列車は列車ダイヤにしたがって、日
々運行される。定期列車の他に、季節的な輸送需要の増
加や修学旅行の団体等の個別の輸送需要に対応するため
に、臨時列車が運行されることがある。
2. Description of the Related Art Regular trains run daily according to the train schedule. In addition to regular trains, temporary trains are sometimes operated to meet seasonal transport demand and individual transport demands such as groups on school excursions.

【0003】臨時列車は、定期列車の運行計画に極力影
響を与えないように設定されるのが原則であるが、定期
列車の運行密度が高いなどの理由でそれが不可能である
場合は、定期列車の着発時刻や着発番線を変更すること
がある。このとき、駅構内入換計画(以下、「構内入換
計画」とする。)においても、変更を必要とする。
In principle, temporary trains are set so as not to affect the operation schedule of regular trains as much as possible. However, if it is impossible due to the high operating density of regular trains, etc., Arrival / departure times and arrival / departure numbers of regular trains may be changed. At this time, the station premises replacement plan (hereinafter referred to as the “premises replacement plan”) also needs to be changed.

【0004】構内入換計画とは、列車の着発時刻、着発
番線、列車の折返し計画などの列車ダイヤを入力とし、
駅の配線などの設備に関わる条件を制約として、入換が
必要な列車に対して、他の列車との番線や進路の競合を
避けるように、入換の時刻と使用する引上線を決定し、
鉄道の駅における車両の入換作業のスケジュールを定め
たものを言う。
[0004] The yard replacement plan uses train schedules such as arrival and departure times of trains, arrival and departure numbers, and train turnback plans as inputs.
For trains that need to be replaced, determine the time of replacement and the pull-up line to be used so that trains that need to be replaced do not conflict with other trains and routes, with constraints related to equipment such as station wiring. ,
It is defined as a schedule for replacing vehicles at railway stations.

【0005】構内入換計画には、基本入換計画と変更入
換計画が存在する。基本入換計画は、ダイヤ改正にあわ
せて作成され、駅における定期列車の入換作業のスケジ
ュールを定めたものである。変更入換計画は、当該日の
入換計画について、臨時列車の運転にあわせて基本入換
計画に変更を加えて作成されるものである。
The premises replacement plan includes a basic replacement plan and a modified replacement plan. The basic replacement plan is created in accordance with the timetable revision and defines the schedule for the replacement work of regular trains at stations. The modified replacement plan is created by modifying the basic replacement plan of the replacement plan of the day according to the operation of the temporary train.

【0006】従来、これらの構内入換計画のほとんど
は、人間が主体となって作成し、コンピュータは、作成
した構内入換計画をダイヤ図などに描画し、矛盾の有無
を確認するなどというシステムに留まっている。
Conventionally, most of these premises replacement plans are created mainly by humans, and a computer draws the created premises replacement plan on a diagram or the like to check whether or not there is a contradiction. Stays in.

【0007】また、確率的局所探索とPERT(日程計
画法)を組み合わせた構内入換計画作成アルゴリズム
(特開2000−177590号公報)によって、基本
入換計画をコンピュータにより自動作成する方法が提案
されているが、変更入換計画に対しては、自動作成アル
ゴリズムが存在せず、現時点では、全て人手によって作
成されている。
[0007] Further, a method for automatically creating a basic replacement plan by a computer is proposed by an on-site replacement plan creation algorithm (Japanese Unexamined Patent Publication No. 2000-177590) that combines probabilistic local search and PERT (scheduling method). However, there is no automatic creation algorithm for the change replacement plan, and at present, it is created by hand.

【0008】[0008]

【発明が解決しようとする課題】しかしながら、臨時列
車の運行頻度は極めて高いため、その度に変更入換計画
を作成することは多大な労力を必要とする。一方で、変
更入換計画をコンピュータで自動作成することは、非常
に困難である。つまり、定期列車の着発番線は、乗り換
えの利便性(移動に必要な時間、移動距離など)や他の
列車との接続などを考慮して決定されるが、臨時列車の
運行によって定期列車の運行計画を変更すると、どの程
度の利用者にどの程度の不便が生じるのかという情報は
コンピュータには格納されていないため、定期列車の運
行計画の変更をコンピュータが評価して決定することは
不可能である。また、仮にその情報が格納されていたと
しても、定期列車の運行計画の変更については、どの方
策を採用するのが最良であるかをコンピュータが判断す
ることは、評価基準が曖昧であるため、非常に困難であ
る。
However, since the frequency of operation of temporary trains is extremely high, it requires a great deal of labor to create a change replacement plan each time. On the other hand, it is very difficult to automatically create a change replacement plan by computer. In other words, the arrival and departure number line of the regular train is determined in consideration of the convenience of transfer (time required for movement, moving distance, etc.) and connection with other trains. Computers do not store information about how much inconvenience will be caused to users if the operation plan is changed, so it is impossible for the computer to evaluate and determine changes in the operation plan of regular trains. Is. Further, even if the information is stored, it is unclear that the evaluation criteria are ambiguous because the computer determines which method should be adopted when changing the operation plan of a regular train. Very difficult.

【0009】そして、例えば、定期列車の着発時刻の変
更が可能であるかどうかは、変更入換計画の作成対象と
なっている当該駅の事情だけでは、判断不可能である。
例えば、ある駅で着時刻あるいは発時刻を変更すると、
通常は近隣の駅の時刻も変更する必要があり、その駅に
関係する全ての駅における時刻変更の妥当性を検証し、
時刻の変更が可能かどうか判断しなければならない。
[0009] For example, whether or not the arrival / departure time of a regular train can be changed cannot be determined only by the circumstances of the station in question for which a change / exchange plan is created.
For example, if you change the arrival time or departure time at a certain station,
Normally, it is also necessary to change the time at nearby stations, verify the validity of time changes at all stations related to that station,
You must decide if you can change the time.

【0010】このように、変更入換計画のコンピュータ
による自動作成は、情報の不足、判断基準の曖昧さ、当
該駅を対象とするだけでは判断できない等の理由により
実現されなかった
As described above, the automatic creation of the change replacement plan by the computer has not been realized because of lack of information, ambiguity of the judgment standard, and the fact that the target station cannot be judged only.

【0011】本発明の課題は、変更入換計画を人手によ
らず、変更入換計画を自動的に作成するための変更入換
計画作成情報、当該変更入換計画作成情報を記憶する記
憶媒体、および変更入換計画作成システムを提供するこ
とである。
An object of the present invention is to store change replacement plan creation information for automatically creating a change replacement plan without manually modifying the replacement replacement plan, and a storage medium for storing the change replacement plan creation information. , And to provide a change replacement plan creation system.

【0012】[0012]

【課題を解決するための手段】以上の課題を解決するた
め、請求項1記載の発明は、基本入換計画データを記憶
する第1の記憶手段(例えば、図3の基本入換計画DB
34)と、実施済みの変更入換計画に係る事例データを
累積記憶する第2の記憶手段(例えば、図3の変更入換
計画事例DB33)とを備えるコンピュータ(例えば、
図3の変更入換計画作成システム)に対して、臨時列車
の運転データを入力する入力手段(例えば、図2のCP
U30;図7のステップS11)と、前記入力手段によ
り入力された臨時列車の運転データ(例えば、図4の臨
時列車運転データ)に基づいて、所定の検索条件に合致
する事例データを前記第2の記憶手段に記憶された複数
の事例データの中から検索する検索手段(例えば、図2
のCPU30;図7および図8のステップS12〜ステ
ップS21)と、前記検索手段により検索された事例デ
ータと、前記運転データとに基づいて、新規変更入換計
画を仮作成する仮作成手段(例えば、図2のCPU3
0;図8のステップS23)と、所定の実施可能条件に
従って、前記仮作成された新規変更入換計画の矛盾の有
無を判別し、矛盾無しと判別した場合に、前記仮作成し
た新規変更入換計画を本決定する本決定手段(例えば、
図2のCPU30;図9のステップS28)と、を機能
させるための変更入換計画作成情報である。
In order to solve the above problems, the invention according to claim 1 relates to a first storage means for storing basic replacement plan data (for example, basic replacement plan DB in FIG. 3).
34) and a second storage unit (eg, the change replacement plan case DB 33 in FIG. 3) that cumulatively stores the case data related to the executed change replacement plan (eg, the change replacement plan case DB 33).
Input means (for example, CP of FIG. 2) for inputting operation data of the temporary train to the change replacement plan creation system of FIG.
U30; step S11 in FIG. 7) and case data that matches a predetermined search condition based on the operation data of the temporary train input by the input means (for example, the temporary train operation data in FIG. 4). Search means for searching from a plurality of case data stored in the storage means (for example, FIG.
CPU 30; step S12 to step S21 in FIGS. 7 and 8, temporary data creating means for temporarily creating a new change replacement plan based on the case data searched by the searching means, and the operation data (for example, a temporary creating means). , CPU3 in FIG.
0; step S23 in FIG. 8) and whether or not there is a contradiction in the temporarily created new change replacement plan according to a predetermined enablement condition. When it is determined that there is no contradiction, the temporarily created new change replacement plan is determined. Main decision means for finalizing the replacement plan (for example,
CPU30 of FIG. 2; step S28 of FIG. 9) and change replacement plan creation information for making the functions.

【0013】また、請求項7記載の発明は、基本入換計
画データを記憶する第1の記憶手段(例えば、図3の基
本入換計画DB34)と、実施済みの変更入換計画に係
る事例データを累積記憶する第2の記憶手段(例えば、
図3の変更入換計画事例DB33)とを備える変更入換
計画作成システム(例えば図3の変更入換計画作成シス
テム)であって、臨時列車の運転データを入力する入力
手段(例えば、図2のCPU30;図7のステップS1
1)と、前記入力手段により入力された臨時列車の運転
データ(例えば、図4の臨時列車運転データ)に基づい
て、所定の検索条件に合致する事例データを前記第2の
記憶手段に記憶された複数の事例データの中から検索す
る検索手段(例えば、図2のCPU30;図7および図
8のステップS12〜ステップS21)と、前記検索手
段により検索された事例データと、前記運転データとに
基づいて、新規変更入換計画を仮作成する仮作成手段
(例えば、図2のCPU30;図8のステップS23)
と、所定の実施可能条件に従って、前記仮作成された新
規変更入換計画の矛盾の有無を判別し、矛盾無しと判別
した場合に、前記仮作成した新規変更入換計画を本決定
する本決定手段(例えば、図2のCPU30;図9のス
テップS28)と、を備えることを特徴としている。
The invention according to claim 7 relates to a first storage means for storing basic replacement plan data (for example, the basic replacement plan DB 34 in FIG. 3) and a case relating to an already executed change replacement plan. Second storage means for accumulating data (for example,
A change replacement plan creation system (for example, the change replacement plan creation system of FIG. 3) including the change replacement plan case DB 33 of FIG. 3 and input means (eg, FIG. 2) for inputting operation data of a temporary train. CPU 30; step S1 in FIG.
1) and operation data of the temporary train (for example, the temporary train operation data of FIG. 4) input by the input means, case data matching a predetermined search condition is stored in the second storage means. A search means (for example, the CPU 30 in FIG. 2; steps S12 to S21 in FIGS. 7 and 8) for searching from the plurality of case data, the case data searched by the search means, and the operation data. Temporary creating means for temporarily creating a new change replacement plan based on this (for example, CPU 30 in FIG. 2; step S23 in FIG. 8)
According to a predetermined enablement condition, it is determined whether or not there is a contradiction in the temporarily created new change replacement plan, and when it is determined that there is no contradiction, the final decision is made to make a final decision on the temporarily created new change replacement plan. Means (for example, the CPU 30 in FIG. 2; step S28 in FIG. 9).

【0014】この請求項1、7記載の発明によれば、入
力された臨時列車の運転データと類似する事例データ
を、実施済みの変更入換計画の事例データから所定の検
索条件に従って検索し、検索された実施済みの事例デー
タと入力された臨時列車の運転データから、新規変更入
換計画を仮作成する。その仮作成された新規変更入換計
画に列車の運行上の矛盾が存在しなければ、その新規変
更入換計画を実行可能な変更入換計画と判断する。これ
により、臨時列車の運行に対する変更入換計画の作成を
人手によらず、自動的に作成することができ、変更入換
計画を作成するための労力が軽減される。
According to the first and seventh aspects of the present invention, the case data similar to the input operation data of the temporary train is searched from the case data of the executed change replacement plan according to a predetermined search condition, A new change replacement plan is provisionally created from the retrieved case data that has been executed and the input operation data of the temporary train. If there is no contradiction in train operation in the provisionally created new change replacement plan, the new change replacement plan is determined to be a feasible change replacement plan. As a result, it is possible to automatically create a change replacement plan for the operation of the temporary train without human intervention, and the labor for creating the change replacement plan is reduced.

【0015】請求項2記載の発明は、請求項1記載の変
更入換計画作成情報において、前記本決定手段が、矛盾
有りと判別した場合に、少なくとも1回、前記仮作成さ
れた新規変更入換計画の修正(例えば、図2のCPU3
0;図9のステップS25)、および、当該修正後の新
規変更入換計画に対する矛盾有無の再判別(例えば図2
のCPU30;図9のステップS26)、を行うように
機能させるための情報を含むことを特徴としている。
According to a second aspect of the present invention, in the change / replacement plan creation information according to the first aspect, when the final decision means determines that there is a contradiction, the temporarily created new change entry is at least once. Modification of replacement plan (for example, CPU3 in FIG. 2)
0; step S25 in FIG. 9) and re-determination of the contradiction with respect to the corrected new change replacement plan (for example, FIG. 2).
CPU 30 of FIG. 9; step S26 in FIG. 9) is included.

【0016】この請求項2記載の発明によれば、新規変
更入換計画を仮作成するために用いた事例データと入力
された臨時列車の運転データとにおいて、例えば、時刻
などが少し異なったり、番線や進路の競合などの矛盾が
存在した場合であっても、少なくとも1回、仮作成され
た新規変更入換計画が修正される。そして、修正後の新
規変更入換計画について、矛盾の有無が再判別される。
従って、同一の事例データが存在しない場合であって
も、修正によって矛盾のない変更入換計画を作成するこ
とができる。
According to the second aspect of the present invention, the case data used for temporarily creating the new change replacement plan and the input operation data of the temporary train have, for example, slightly different times, Even if there is a contradiction such as a numbered line or a route conflict, the temporarily created new change replacement plan is corrected at least once. Then, with respect to the new change replacement plan after the correction, the presence or absence of contradiction is discriminated again.
Therefore, even if the same case data does not exist, it is possible to create a consistent change replacement plan by correction.

【0017】また請求項3記載の発明のように、請求項
1または2記載の変更入換計画作成情報において、前記
検索手段が、前記入力された臨時列車の運転データと、
前記第2の記憶手段に記憶された各事例データの臨時列
車の運転データとの一致度を検索条件として、前記検索
を実行するように機能させるための情報を含む変更入換
計画作成情報としてもよい。
According to a third aspect of the present invention, in the change replacement plan creation information according to the first or second aspect, the searching means includes the input temporary train operation data.
Also as change replacement plan creation information including information for causing the function to execute the search, with the degree of coincidence between each case data stored in the second storage means and the operation data of the temporary train as a search condition. Good.

【0018】また、請求項4記載の発明のように、請求
項1〜3の何れか記載の変更入換計画作成情報におい
て、前記検索手段が、臨時列車の、着列車番号、発
列車番号、着列車の番線競合列車番号、発列車の競
合列車番号、着列車のパターン列車番号、発列車の
パターン列車番号、着列車の番線競合列車のパターン
列車番号、および発列車の番線競合列車のパターン列
車番号、の内の少なくとも1つが一致することを検索条
件として、前記検索を実行するように機能させるための
情報を含む変更入換計画作成情報を実現することとして
もよい。
Further, as in the invention described in claim 4, in the change replacement plan creation information according to any one of claims 1 to 3, the search means is the temporary train arrival number, departure train number, Arrival train number competing train number, departure train competing train number, arrival train pattern train number, departure train pattern train number, arrival train number line competing train pattern train number, and departure train number line competing train pattern train The change replacement plan creation information including the information for causing the search to be executed may be realized with the search condition that at least one of the numbers matches.

【0019】この請求項3、4記載の発明によれば、入
力された臨時列車の運転データと類似する事例データ
を、実施済みの変更入換計画の事例データから検索する
ことができる。即ち、例えば、請求項4記載の発明によ
れば、の検索条件として、着列車番号、発列車番
号、着列車の番線競合列車番号、発列車の競合列車
番号、着列車のパターン列車番号、発列車のパター
ン列車番号、着列車の番線競合列車のパターン列車番
号、および発列車の番線競合列車のパターン列車番
号、の内の少なくとも1つが一致することが条件とされ
るため、入力された臨時列車の運転データに対して、着
発列車番号が一致する事例データの他に、時刻等は同じ
であるが列車番号が異なる場合の事例データをおよび
の検索条件で検索するといったことができる。また、
入力された臨時列車の運転データに対して、列車番号や
時刻は異なるが、同じ変更パターンである事例データを
、、およびの検索条件で検索することができ
る。
According to the invention described in claims 3 and 4, it is possible to retrieve the case data similar to the input operation data of the temporary train from the case data of the executed change replacement plan. That is, for example, according to the invention of claim 4, as the search condition of, the arrival train number, the departure train number, the number of competing trains of the arrival train, the number of competing trains of the departure train, the pattern train number of the arrival train, Since the condition is that at least one of the train pattern train number, the arriving train lane competing train pattern train number, and the departing train lane competing train pattern train number matches, the entered temporary train In addition to the case data in which the arrival and departure train numbers match, the case data in which the time and the like are the same but the train numbers are different from the operation data of 1 can be searched under the search conditions of and. Also,
With respect to the input temporary train operation data, it is possible to search for case data having different train numbers and times but having the same change pattern under the search conditions of and.

【0020】請求項5記載の発明のように、請求項4記
載の変更入換計画作成情報において、前記検索手段が、
前記〜の事項の内、優先度の高い事項に合致する事
例データから順に検索するように機能させるための情報
を含む変更入換計画作成情報としてもよい。
According to the invention of claim 5, in the change replacement plan creation information of claim 4, the search means is
Among the items (1) to (3) above, the change replacement plan creation information may include information for causing the case data that matches the item having the highest priority to be searched in order.

【0021】この請求項5記載の発明によれば、事例デ
ータを実施済みの変更入換計画の事例データから検索す
る際に、前記〜の事項について、優先度の高い事項
に合致する事例データから検索する。即ち、入力された
臨時列車の運転データと一致度の高い事例データから検
索することができる。これにより、例えば、高い優先度
の事項に合致した事例データと、入力された臨時列車の
運転データから新規変更入換計画を仮作成する際に、列
車の運行上の矛盾が発生する可能性の低い新規変更入換
計画を仮作成することができる。
According to the invention of claim 5, when the case data is searched from the case data of the executed change replacement plan, the items (1) to (3) are selected from the case data which match the items of high priority. Search for. That is, it is possible to search from case data having a high degree of coincidence with the input temporary train operation data. As a result, for example, when temporarily creating a new change replacement plan from case data that matches high-priority items and the input operation data of a temporary train, inconsistencies in train operation may occur. A low new change replacement plan can be provisionally created.

【0022】請求項6記載の発明は、請求項1〜5の何
れか記載の変更入換計画作成情報を記憶する記憶媒体
(例えば、図2の記憶媒体32)とすることを特徴とし
ている。
The invention according to claim 6 is characterized in that it is a storage medium (for example, the storage medium 32 in FIG. 2) for storing the change replacement plan creation information according to any one of claims 1 to 5.

【0023】この請求項6記載の発明によれば、請求項
1〜5の何れか記載の発明の効果を奏する記憶媒体を実
現できる。
According to the invention described in claim 6, it is possible to realize a storage medium having the effect of the invention described in any one of claims 1 to 5.

【0024】[0024]

【発明の実施の形態】以下、図面を参照して、まず基本
入換計画と変更入換計画の関係について説明した後、本
発明を適用した変更入換計画作成システムについて詳細
に説明する。
BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, with reference to the drawings, first, a relationship between a basic replacement plan and a modified replacement plan will be described, and then a modified replacement plan creation system to which the present invention is applied will be described in detail.

【0025】[基本入換計画と変更入換計画の関係]図
1は、ある駅における線路の配線の一例を示した図であ
る。この図において、プラットホームP1、P2および
P3は、乗客が列車に乗降するプラットホームである。
番線0、1、2、・・・、7は、列車が駅外から直接停
車することのできる番線である。上り引上線8および下
り引上線9は、番線に到着した列車が折り返して運転さ
れる場合、一時的に列車を留置するために使用される。
駅の線路は、U方面、V方面およびW方面へ配線されて
いる。線路の配線上の矢印は、それぞれ列車の進む方向
を示しており、二つの矢印が向き合って表示されている
線路(例えば、W方向へ向かう線路)は単線であること
を示している。
[Relationship between Basic Replacement Plan and Change Replacement Plan] FIG. 1 is a diagram showing an example of wiring of a line at a certain station. In this figure, platforms P1, P2 and P3 are platforms on which passengers get on and off the train.
Tracks 0, 1, 2, ..., 7 are trains that can be stopped directly from outside the station. The ascending pull-up line 8 and the descending pull-up line 9 are used for temporarily detaining the train when the train arriving at the track is operated by turning back.
The train tracks at the station are routed in the U, V and W directions. The arrows on the wiring of the tracks indicate the traveling direction of the train, respectively, and the track displayed with the two arrows facing each other (for example, the track toward the W direction) is a single track.

【0026】図2(a)は、図1の駅を運行する定期列
車の基本入換計画の一例であり、さらに臨時列車Xの運
転データを加えた場合を示している。図2(b)は、臨
時列車Xの運転を可能にするために、図2(a)に対し
て必要な変更を行って作成された変更入換計画の例を示
している。図2(a)および(b)は、作業ダイヤ図と
呼ばれる。
FIG. 2 (a) is an example of a basic replacement plan for a regular train operating at the station shown in FIG. 1, and shows a case where the operation data of the temporary train X is further added. FIG. 2B shows an example of a change replacement plan created by making necessary changes to FIG. 2A in order to enable the operation of the temporary train X. 2A and 2B are referred to as a working diagram.

【0027】図2(a)および(b)は縦軸を番線、横
軸を時間として、番線0〜番線6と下り引上線9の間の
列車の移動を表している。番線7および上り引上線8の
情報も通常図示されるが、本入換作業には使用しないた
め省略する。図2(a)および(b)の図中の四角形
は、列車がその時間、その番線に停車していることを表
している。また、四角形の左上に付された線分は、その
列車が上り方面(U方面)から到着することを示し、右
下の線分は、その列車が下り方面(V方面またはW方
面)に向けて発車することを示している。同様に、左下
の線分は下り方面からの到着、右上の線分は上り方面へ
の発車を表している。
2 (a) and 2 (b) show the movement of the train between the number 0 to number 6 and the down pulling line 9 with the vertical axis as the number line and the horizontal axis as the time. The information on the number line 7 and the upward pulling line 8 is also shown in the figure, but is omitted because it is not used for this replacement work. The squares in FIGS. 2 (a) and 2 (b) indicate that the train is stopped at the track for that time. Also, the line segment attached to the upper left of the square indicates that the train arrives from the upward direction (U direction), and the lower right line segment directs the train to the downward direction (V direction or W direction). It indicates that it will start. Similarly, the lower left line segment represents arrival from the downward direction, and the upper right line segment represents departure from the upward direction.

【0028】図2(a)において、臨時列車Xの運行を
示す平行四辺形は、変更入換計画の入力となる臨時列車
の運転データに対応している。即ち、臨時列車Xは、1
0時9分にU方面から番線3に到着し、10時31分に
V方面あるいはW方面へ番線1から発車する。この場
合、着番線と発番線が異なるため、臨時列車Xに対し
て、入換作業を行う必要がある。
In FIG. 2 (a), the parallelogram indicating the operation of the temporary train X corresponds to the operating data of the temporary train which is the input of the change replacement plan. That is, the temporary train X is 1
At 0:09, arrive at U.S. No. 3 and at 10:31 depart for V or W towards No. 1 In this case, since the arrival number line and the departure number line are different, it is necessary to replace the temporary train X.

【0029】図2(a)の基本入換計画と臨時列車Xの
運転データに基づいて、図2(b)の変更入換計画を作
成する段階において、臨時列車Xの運行によって他の定
期列車(図2(a)の列車A、列車B、列車Cおよび列
車D)の運行に矛盾が発生しないかどうか判別する。ま
ず、列車Aの発時刻と臨時列車Xの着時刻との間に、十
分な時間の確保ができていないため、列車Aと臨時列車
Xの番線が競合していると判断される。また、臨時列車
Xの入換作業と、列車Aから列車Bへの入換作業が、下
り引上線9で競合する。
At the stage of creating the change replacement plan of FIG. 2B based on the basic replacement plan of FIG. 2A and the operation data of the temporary train X, another regular train is operated by the operation of the temporary train X. It is determined whether or not there is a contradiction in the operation of the train A, train B, train C, and train D in FIG. 2A. First, since the sufficient time cannot be secured between the departure time of the train A and the arrival time of the temporary train X, it is determined that the number lines of the train A and the temporary train X are in conflict with each other. Further, the replacement work of the temporary train X and the replacement work of the train A to the train B compete on the down pulling line 9.

【0030】このような、臨時列車Xの入換作業によっ
て発生する定期列車の運行の矛盾に対して、図2(a)
の基本入換計画を変更する。臨時列車Xと列車Aの番線
競合において、臨時列車Xの着時刻や着番線を変更でき
ない場合、列車Aの発時刻もしくは着番線を変更する必
要がある。図2(b)の場合、列車Aの着番線を番線3
から番線6に変更している。これにより、列車Aの入換
作業が不要となったので、入換作業を中止とするため、
臨時列車Xと列車Aによる下り引上線9の競合も消滅す
る。
In contrast to such a contradiction in the operation of the regular train caused by the replacement work of the temporary train X, as shown in FIG.
Change the basic replacement plan of. When the arrival time or arrival line of the temporary train X cannot be changed in the numbered race between the temporary train X and the train A, it is necessary to change the departure time or the arrival number line of the train A. In the case of FIG. 2B, the arrival number line of train A is number 3
It has been changed from No. 6 to No. 6. As a result, the replacement work for train A is no longer necessary, so the replacement work is canceled.
The conflict between the temporary train X and the train A on the down line 9 also disappears.

【0031】さらに、列車Dが番線1を発車して一定時
刻経過してから、臨時列車Xが下り引上線9から発番線
である番線1に移動する時、列車CがV方面から番線6
に到着するため、進路競合が発生する可能性が高い。線
路の分岐点では、分岐器によってどちらか一方の線路の
進行が決定されるため、上述のような進路競合が発生し
た場合、列車Cの着時刻、あるいは臨時列車Xの入換時
刻が遅延し、列車ダイヤの乱れに繋がる。したがって、
列車Cの着時刻を2分ほど遅らせて臨時列車Xを先に番
線1に移動させることにより、進路競合の発生を防止し
ている。
Furthermore, when the temporary train X moves from the descending pull-up line 9 to the numbering line 1 which is the numbering line after the train D departs from the numbering line 1 for a certain time, the train C moves from the direction V to the numbered line 6.
There is a high possibility that a route conflict will occur because the vehicle arrives at. At the branch point of the track, the turnout determines the progress of either one of the tracks. Therefore, when the above-mentioned route competition occurs, the arrival time of the train C or the replacement time of the temporary train X is delayed. , It leads to the disorder of the train schedule. Therefore,
By delaying the arrival time of the train C by about 2 minutes and moving the temporary train X to the track 1 first, the occurrence of route competition is prevented.

【0032】以上のように、定期列車A、B、Cおよび
Dと臨時列車Xとの運行上の競合を判断し、競合を回避
するスケジュールに調整することによって、図2(b)
のような変更入換計画が作成される。
As described above, by determining the operational conflict between the regular trains A, B, C and D and the temporary train X, and adjusting the schedule to avoid the conflict, FIG.
A change replacement plan such as

【0033】[構成]次に、本発明を適用した変更入換
計画作成システムの構成を説明する。図3は、変更入換
計画作成システムの内部構成を示したブロック図であ
る。変更入換計画作成システムは、CPU(中央演算装
置:Central Processing Unit)30、RAM(Random
Access Memory)31、記憶媒体32、変更入換計画事
例データベース(以下、「変更入換計画事例DB」とす
る。)33、基本入換計画データベース(以下、「基本
入換計画DB」とする。)34、入力部35、表示部3
6を備え、各部はバス37により接続されている。
[Structure] Next, the structure of the change replacement plan creation system to which the present invention is applied will be described. FIG. 3 is a block diagram showing the internal configuration of the change replacement plan creation system. The change replacement plan creation system includes a CPU (Central Processing Unit) 30, a RAM (Random
Access memory) 31, storage medium 32, change replacement plan case database (hereinafter referred to as “change replacement plan case DB”) 33, basic replacement plan database (hereinafter referred to as “basic replacement plan DB”). ) 34, input unit 35, display unit 3
6, and each unit is connected by a bus 37.

【0034】CPU30は、記憶媒体32に記憶されて
いる変更入換計画作成システムに対応する各種アプリケ
ーションプログラムの中から指定されたアプリケーショ
ンプログラムや、入力部35から入力される各種指示信
号に応じた各種データ等をRAM31内に格納し、この
入力指示および入力データに応じて、RAM31内に格
納したアプリケーションプログラムに従って各種処理を
実行し、その処理結果をRAM31内に格納するととも
に、表示部36に表示する。そして、CPU30は、R
AM31内に格納した処理結果を入力部35から入力指
示される記憶媒体32の保存先に保存する。
The CPU 30 has various application programs designated from among various application programs corresponding to the change replacement plan creation system stored in the storage medium 32, and various types corresponding to various instruction signals input from the input unit 35. Data and the like are stored in the RAM 31, various processes are executed in accordance with the application program stored in the RAM 31 according to the input instruction and the input data, and the processing result is stored in the RAM 31 and displayed on the display unit 36. . Then, the CPU 30
The processing result stored in the AM 31 is stored in the storage destination of the storage medium 32 input from the input unit 35.

【0035】またCPU30は、入力部35から入力さ
れる指示信号に応じて、記憶媒体32に格納されている
変更入換計画作成処理(図7〜図9参照)に係る変更入
換計画作成プログラム321、あるいは、変更入換計画
判別処理(図10参照)に係る変更入換計画判別プログ
ラム322、あるいは、基本入換計画作成処理に係る基
本入換計画作成プログラム323を読み出して、読み出
したプログラムに従って、各処理を実行する。
Further, the CPU 30 responds to the instruction signal input from the input unit 35, and stores the change replacement plan creating program (see FIGS. 7 to 9) stored in the storage medium 32. 321 or the change replacement plan determination program 322 related to the change replacement plan determination processing (see FIG. 10) or the basic replacement plan creation program 323 related to the basic replacement plan creation processing is read, and according to the read program. , Execute each process.

【0036】各処理の詳細な説明は後述するが、CPU
30は変更入換計画作成処理(図7〜図9参照)を実行
して、臨時列車運転データ記憶領域311に記憶されて
いる臨時列車の運転データに基づいて、所定の検索条件
により変更入換計画事例DB33より事例データを検索
し、新規変更入換計画を決定する。また、CPU30が
変更入換計画作成処理を実行する過程で読み出して実行
する変更入換計画判別処理(図10参照)は、臨時列車
運転データ記憶領域311に記憶されている臨時列車の
運転データと、類似事例データ記憶領域312に記憶さ
れている事例データとに基づいて新規変更入換計画を仮
作成し、矛盾の有無を判別する。なお、CPU30が変
更入換計画判別処理を実行する過程で読み出して実行す
る基本入換計画作成処理は、例えば特開2000―17
7590号公報記載の公知の技術を用いており、仮作成
された新規変更入換計画の矛盾を修正する。
Although a detailed description of each processing will be given later, the CPU
30 executes a change replacement plan creation process (see FIG. 7 to FIG. 9), and based on the operation data of the temporary train stored in the temporary train operation data storage area 311, the change replacement is performed according to a predetermined search condition. The case data is retrieved from the planned case DB 33 to determine a new change replacement plan. Further, the change replacement plan determination processing (see FIG. 10) read and executed by the CPU 30 in the process of executing the change replacement plan creation processing is performed by using the operation data of the temporary train stored in the temporary train operation data storage area 311. A new change replacement plan is provisionally created based on the case data stored in the similar case data storage area 312, and it is determined whether or not there is a contradiction. The basic replacement plan creation process that is read and executed by the CPU 30 in the process of executing the change replacement plan determination process is described in, for example, Japanese Patent Laid-Open No. 2000-17
The known technique described in Japanese Patent No. 7590 is used to correct the contradiction of the temporarily created new change replacement plan.

【0037】RAM31は、CPU30の作業領域とし
て用いられ、プログラムや数値を一時的に記憶する。本
実施の形態においては、その領域として、特に、臨時列
車運転データ記憶領域311、類似事例データ記憶領域
312および変更入換計画データ記憶領域313を備え
る。
The RAM 31 is used as a work area of the CPU 30, and temporarily stores programs and numerical values. In the present embodiment, as the areas, in particular, a temporary train operation data storage area 311, a similar case data storage area 312, and a change replacement plan data storage area 313 are provided.

【0038】臨時列車運転データ記憶領域311は、入
力部35から入力された臨時列車の運転データを記憶す
る。類似事例データ記憶領域312は、臨時列車運転デ
ータ記憶領域311に記憶された臨時列車の運転データ
に基づいて検索された変更入換計画事例DB33のデー
タを記憶する。変更入換計画データ記憶領域313は、
決定された新規変更入換計画を記憶する。
The temporary train operation data storage area 311 stores the operation data of the temporary train input from the input unit 35. The similar case data storage area 312 stores the data of the change replacement plan case DB 33 searched based on the operation data of the temporary train stored in the temporary train operation data storage area 311. The change replacement plan data storage area 313 is
The determined new change replacement plan is stored.

【0039】記憶媒体32には、変更入換計画作成シス
テムを実現させるためのプログラムが記憶されており、
記憶媒体32はハードディスクやCD−ROM等により
構成される。本実施の形態においては、記憶媒体32
は、変更入換計画作成プログラム321、変更入換計画
判別プログラム322および基本入換計画作成プログラ
ム323を記憶する。なお、図示していないが、変更入
換計画作成システムには、この記憶媒体32を読み出す
記憶媒体読取装置等が具備されている。
The storage medium 32 stores a program for realizing the change replacement plan creation system,
The storage medium 32 is composed of a hard disk, a CD-ROM or the like. In the present embodiment, the storage medium 32
Stores a change replacement plan creation program 321, a change replacement plan determination program 322, and a basic replacement plan creation program 323. Although not shown, the change replacement plan creation system is provided with a storage medium reading device for reading the storage medium 32.

【0040】変更入換計画事例DB33には、例えば図
2(b)で示したような、過去に実施された、運行に矛
盾のない変更入換計画のデータが蓄積して格納されてい
The change-replacement plan case DB 33 stores and stores data of change-replacement plans that have been implemented in the past and are consistent with the operation as shown in FIG. 2B, for example.

【0041】基本入換計画DB34は、例えば、図2
(a)で示したような、ダイヤ改正によって作成された
基本入換計画に関するデータが格納されている。
The basic replacement plan DB 34 is, for example, as shown in FIG.
Data regarding the basic replacement plan created by the timetable revision as shown in (a) is stored.

【0042】入力部35には、例えば、キーボードなど
で構成され、オペレータによって入力される臨時列車の
運転データなどをCPU30へ出力する。
The input unit 35 is composed of, for example, a keyboard, and outputs the temporary train operation data input by the operator to the CPU 30.

【0043】表示部36は、例えば、CRT(ブラウン
管:Cathode Ray Tube)あるいはLCD(液晶画面:Li
quid Crystal Display)などで構成され、変更入換計画
作成システムの動作に必要なデータや動作結果を表示す
る。
The display unit 36 is, for example, a CRT (Cathode Ray Tube) or LCD (Liquid Crystal Screen: Li).
quid Crystal Display), etc., and displays the data and operation results necessary for the operation of the change replacement plan creation system.

【0044】図4は、臨時列車運転データ記憶領域31
1に格納される、臨時列車運転データのデータ構造を示
した図である。項目として、列車番号、着発時刻、着発
番線、入換番線、入換時刻、番線競合列車、パターン列
車、進路競合列車および折返し列車があり、オペレータ
による入力部35の操作によって各項目に対応したデー
タが列車番号ごとに入力される。そのデータはCPU3
0によって、臨時列車運転データ記憶領域311に記憶
される。
FIG. 4 shows the temporary train operation data storage area 31.
It is a figure showing the data structure of temporary train operation data stored in 1. Items include train numbers, arrival / departure times, arrival / departure numbers, interchange numbers, interchange times, numbered trains, pattern trains, route-competitive trains, and return trains, and each item can be handled by the operator operating the input unit 35. The entered data is entered for each train number. The data is CPU3
The value 0 is stored in the temporary train operation data storage area 311.

【0045】当該項目の種類は一例であり、臨時列車の
運転計画が把握できる項目が存在していれば、これに限
らず、例えば項目として、始発駅、終着駅、車種および
両数などを含んでもよい。
The type of the item is an example, and the present invention is not limited to this as long as there is an item for which the operation plan of the temporary train can be grasped. For example, the item includes the starting station, the ending station, the type of vehicle and the number of cars. But it's okay.

【0046】図4において、各項目のデータは、図2
(a)に示した臨時列車Xの運転データを例としてお
り、着列車である列車Xと、発列車である列車Yに関す
る運転データである。
In FIG. 4, the data of each item is shown in FIG.
The operation data of the temporary train X shown in (a) is taken as an example, and is the operation data regarding the train X that is the arrival train and the train Y that is the departure train.

【0047】まず、列車番号の項目には、運行される臨
時列車の列車番号が記憶される。着発時刻の項目には、
その臨時列車が着列車の場合は駅に到着する時刻が記憶
され、その臨時列車が発列車の場合は駅を発車する時刻
が記憶される。着発番線の項目には、その臨時列車が着
列車の場合は到着する番線番号が記憶され、その臨時列
車が発列車の場合は発車する番線番号が記憶される。
First, the train number field stores the train number of the temporary train to be operated. In the item of arrival and departure time,
When the temporary train is the arrival train, the time of arrival at the station is stored, and when the temporary train is the departure train, the time of departure from the station is stored. In the item of arrival / departure number line, the number of the arriving train is stored when the special train is the arrival train, and the number of the departure train is stored when the special train is the departure train.

【0048】入換番線の項目には、その臨時列車に入換
作業が必要なとき、入換作業に使用する番線番号が記憶
される。入換時刻の項目には、その臨時列車が着列車の
場合には入換作業を開始する時間が記憶され、その臨時
列車が発列車の場合は発番線に移動する時間が記憶され
る。番線競合列車の項目には、その臨時列車の運行にお
いて、使用する番線が競合する列車の列車番号が記憶さ
れる。パターン列車の項目には、その臨時列車におい
て、一定の周期(例えば、1時間、2時間など。)だけ
遅れて運転される列車の列車番号が記憶される。進路競
合列車の項目には、その臨時列車の到着、入換作業およ
び発車の際に進路が競合する列車の列車番号が記憶され
る。
In the item of the replacement number line, the number of the number line used for the replacement work when the temporary train requires the replacement work is stored. The item of the replacement time stores the time to start the replacement work when the temporary train is the arrival train, and the time to move to the departure line when the temporary train is the departure train. The line number competing train item stores the train numbers of the trains with which the numbered line is used in the operation of the temporary train. The pattern train item stores the train numbers of trains that are operated with a delay of a certain period (for example, 1 hour, 2 hours, etc.) in the temporary train. The item of the route competing train stores the train numbers of the trains whose routes compete at the time of arrival, replacement work, and departure of the temporary train.

【0049】折返し列車の項目には、その臨時列車が着
列車の場合には発列車の列車番号を、またその臨時列車
が発列車の場合には着列車の列車番号を記憶する。ここ
で、列車番号は、列車を入換作業する場合、入換作業前
(列車が到着したとき)の列車番号と入換作業後(列車
が発車するとき)の列車番号が異なる。
The return train item stores the train number of the departure train when the temporary train is the arrival train and the train number of the arrival train when the temporary train is the departure train. Here, the train number is different between the train number before the replacement work (when the train arrives) and the train number after the replacement work (when the train departs) when the train is replaced.

【0050】図5は、基本入換計画DB34に含まれる
各列車の入換計画のデータ構造を示した図である。項目
として、各列車に対して、列車番号、入換番線、入換時
刻、パターン列車および折返し列車があり、ダイヤ改正
などで基本入換計画が作成され、その基本入換計画がデ
ータ化されたものが基本入換計画DB34である。
FIG. 5 is a diagram showing the data structure of the replacement plan of each train contained in the basic replacement plan DB 34. For each train, there are train numbers, interchange lines, interchange times, pattern trains and return trains for each train, and a basic interchange plan was created by timetable revision, etc., and the basic interchange plan was converted into data. The item is the basic replacement plan DB 34.

【0051】図5において、各項目に対応して記載され
ているデータは、図2(a)の列車A、BおよびCの運
転データを例としている。列車番号の項目には列車番号
が記憶され、入換番線には、列車番号に記憶されている
番号の列車に入換作業が必要であれば、入換作業で使用
する番線の番号が記憶される。入換時刻は、列車番号に
記憶されている番号の列車の入換作業の開始時刻が記憶
される。パターン列車の項目には、列車番号に記憶され
ている番号の列車において、一定の周期(例えば、1時
間、2時間など)だけ離れて運転される列車の列車番号
が記憶される。折返し列車の項目には、列車番号に記憶
されている番号の列車が着列車の場合には発列車の列車
番号を、またその列車が発列車の場合には着列車の列車
番号が記憶される。
In FIG. 5, the data described in correspondence with each item exemplify the operation data of the trains A, B and C of FIG. 2 (a). The train number is stored in the item of train number, and the number of the line used in the exchange work is stored in the exchange number line if the train of the number stored in the train number needs to be replaced. It As the replacement time, the start time of the replacement work of the train with the number stored in the train number is stored. The item of pattern train stores the train number of the train having the number stored in the train number, which is operated with a constant cycle (for example, one hour, two hours, etc.). In the return train item, the train number of the departure train is stored when the train with the number stored in the train number is the arrival train, and the train number of the arrival train is stored when the train is the departure train. .

【0052】図6は、変更入換計画事例DB33に含ま
れる事例データのデータ構造を示した図である。項目は
大きく3つに分かれ、事象部、条件部および変更部があ
る。本図において、各項目に対応して記載されているデ
ータは、図2(b)の変更入換計画と同一の変更入換計
画についてのものである。
FIG. 6 is a diagram showing the data structure of the case data included in the change replacement plan case DB 33. The items are roughly divided into three parts: an event part, a condition part and a change part. In this figure, the data described in correspondence with each item are for the same replacement replacement plan as the replacement replacement plan of FIG.

【0053】事象部には、臨時列車の運転データが記憶
されており、項目として、着列車番号、着時刻、着番
線、発列車番号、発時刻および発番線がある。着列車番
号の項目には、臨時列車が駅に到着したときの列車番号
が記憶され、着時刻の項目には、その臨時列車が駅に到
着した時刻が記憶される。着番線の項目には、その臨時
列車が到着した番線番号が記憶される。発列車番号の項
目には、その臨時列車が駅を発車したときの列車番号が
記憶される。発時刻の項目には、その臨時列車が駅を発
車した時刻が記憶され、発番線の項目には、その臨時列
車が発車した番線番号が記憶される。
In the event section, operation data of a temporary train is stored, and items include arrival train number, arrival time, arrival line, departure train number, departure time and departure line. The arrival train number item stores the train number when the temporary train arrived at the station, and the arrival time item stores the time when the temporary train arrived at the station. The item of the numbered line stores the number of the line on which the temporary train arrived. The departure train number item stores the train number when the temporary train leaves the station. The departure time item stores the time when the temporary train leaves the station, and the departure line item stores the number of the departure line of the temporary train.

【0054】条件部は、変更入換計画が行われた運転日
が平日であるか、あるいは休日であるかを記憶する。こ
れは、平日の列車ダイヤと休日の列車ダイヤが異なるた
め、変更入換計画の1つのデータとして記憶される。
The condition section stores whether the operating day on which the change replacement plan is performed is a weekday or a holiday. This is stored as one piece of data of the change replacement plan because the weekday train schedule and the holiday train schedule are different.

【0055】変更部は、変更入換計画の作成によって変
更された基本入換計画の変更内容を記憶する。変更部の
項目として、運休、入換中止、入換設定、入換時刻変
更、入換番線変更、番線変更、時刻変更、併合作業生
成、分割作業生成、併合作業中止および分割作業中止が
ある。
The changing unit stores the change contents of the basic replacement plan changed by the creation of the replacement replacement plan. The items of the change unit include suspension, replacement cancellation, replacement setting, replacement time change, replacement number change, number change, time change, merge work generation, divided work generation, merge work cancellation, and divided work cancellation.

【0056】運休の項目には、着列車番号の項目に記憶
されている番号の臨時列車の運行によって、運休される
こととなった定期列車の列車番号が記憶される。入換中
止の項目には、着列車番号の項目に記憶されている番号
の臨時列車の運行によって、入換作業が中止となる定期
列車の着列車番号および発列車番号が記憶される。入換
設定の項目には、着列車番号の項目に記憶されている番
号の臨時列車に入換作業が必要な場合の入換作業の内容
が記憶される。本項目に記憶される内容は、発着列車番
号と、使用する引上線の名称と、留置される引上線に移
動する時刻と発番線に移動する時刻である。
In the suspension item, the train number of the regular train that has been suspended due to the operation of the temporary train having the number stored in the destination train number item is stored. In the item of replacement stop, the arrival train number and the departure train number of the regular train whose replacement work is canceled due to the operation of the temporary train having the number stored in the arrival train number item are stored. The item of the replacement setting stores the contents of the replacement work when the replacement work is required for the temporary train of the number stored in the item of the arrival train number. The contents stored in this item are the departure / arrival train number, the name of the pulling line to be used, the time to move to the detention line to be detained, and the time to move to the numbering line.

【0057】入換時刻変更の項目には、着列車番号の項
目に記憶されている番号の臨時列車の運行によって、入
換時刻が変更となる定期列車の列車番号と入換時刻が記
憶され、入換番線変更の項目には、着列車番号の項目に
記憶されている番号の臨時列車の運行によって、入換番
線が変更となる定期列車の列車番号と入換番線が記憶さ
れる。
In the item of change time of replacement, the train number and the time of change of the regular train whose change time is changed by the operation of the temporary train having the number stored in the item of the arrival train number are stored, The replacement number line change item stores the train number and the replacement number line of the regular train whose replacement number line is changed by the operation of the temporary train whose number is stored in the destination train number item.

【0058】番線変更の項目には、着列車番号の項目に
記憶されている番号の臨時列車の運行によって、番線が
変更となった定期列車の列車番号および番線番号が記憶
される。時刻変更の項目には、着列車番号の項目に記憶
されている番号の臨時列車の運行によって、着発時刻が
変更となった定期列車の列車番号と変更後の時刻が記憶
される。
In the track number change item, the train number and track number of the regular train whose track number has been changed by the operation of the temporary train having the number stored in the item of the arrival train number are stored. In the item of time change, the train number of the regular train whose arrival and departure time has been changed by the operation of the temporary train having the number stored in the item of the arrival train number and the time after the change are stored.

【0059】併合作業生成および分割作業生成のそれぞ
れの項目には、着列車番号の項目に記憶されている番号
の臨時列車の運行によって、定期列車の車両の併合(連
結)あるいは分割が行われた場合の定期列車の列車番
号、作業する番線番号および併合、分割の作業実施時刻
がそれぞれ記憶される。併合作業中止および分割作業中
止のそれぞれの項目には、着列車番号の項目に記憶され
ている番号の臨時列車の運行によって、計画されていた
定期列車の車両の併合あるいは分割が中止となった場合
のその定期列車の列車番号がそれぞれ記憶される。
In the respective items of the combined work generation and the divided work generation, the trains of the regular trains are merged (connected) or divided by the operation of the temporary train having the number stored in the item of the arrival train number. In this case, the train number of the regular train, the number of the working track number, the merging, and the work execution time of the division are stored. When the merger or division of the planned scheduled train is canceled due to the operation of the temporary train with the number stored in the item of the arrival train number The train numbers of the regular trains are stored.

【0060】[動作]次に変更入換計画作成システムの
動作について説明する。図7、図8および図9は、変更
入換計画作成プログラム321の実行に係る、変更入換
計画作成処理の動作を示すフローチャートである。まず
オペレータは入力部35の操作により、臨時列車の運転
データを入力する(ステップS11)。入力する内容
は、図4の臨時列車運転データのデータ構造に示した各
項目に従う。入力されたデータは、CPU30によって
臨時列車運転データ記憶領域311に記憶され、以降の
処理に利用される。
[Operation] Next, the operation of the change replacement plan creation system will be described. FIG. 7, FIG. 8 and FIG. 9 are flowcharts showing the operation of the change replacement plan creation processing relating to the execution of the change replacement plan creation program 321. First, the operator operates the input unit 35 to input the operation data of the temporary train (step S11). The contents to be input follow the items shown in the data structure of the temporary train operation data in FIG. The input data is stored in the temporary train operation data storage area 311 by the CPU 30 and used for the subsequent processing.

【0061】次にCPU30は、変更入換計画事例DB
33に格納されている全ての事例データの中から、ステ
ップS11で入力された臨時列車運転データの着列車番
号を事象部に含む事例データを検索する(ステップS1
2)。臨時列車運転データの着列車番号を事象部に含む
事例データがあった場合(ステップS12:有)、CP
U30はその事例データを類似事例データ記憶領域31
2に記憶し、変更入換計画判別プログラム322を読み
出して変更入換計画判別処理を実行する(ステップS1
3)。
Next, the CPU 30 determines the change replacement plan case DB.
Of all the case data stored in 33, the case data including the arrival train number of the temporary train operation data input in step S11 in the event part is searched (step S1).
2). If there is case data that includes the arrival train number of the temporary train operation data in the event part (step S12: Yes), CP
U30 stores the case data in the similar case data storage area 31.
2 and reads the change replacement plan determination program 322 to execute the change replacement plan determination process (step S1).
3).

【0062】次にCPU30は、変更入換計画判別処理
の戻り値を判別する(ステップS14)。戻り値がf=
1の場合(ステップS14:Yes)、CPU30はス
テップS39へ処理を移行する。
Next, the CPU 30 determines the return value of the change replacement plan determination process (step S14). The return value is f =
In the case of 1 (step S14: Yes), the CPU 30 shifts the processing to step S39.

【0063】一方、臨時列車運転データの着列車番号を
事象部に含む事例データがない場合(ステップS12:
無)、また、変更入換計画判別処理の戻り値がf=1で
はない場合(ステップS14:No)、CPU30は、
変更入換計画事例DB33に格納されている全ての事例
データの中から、ステップS11で入力された臨時列車
運転データの発列車番号を事象部に含む事例データを検
索する(ステップS15)。臨時列車運転データの発列
車番号を事象部に含む事例データがあった場合(ステッ
プS15:有)、CPU30はその事例データを類似事
例データ記憶領域312に記憶し、変更入換計画判別処
理を実行する(ステップS16)。
On the other hand, when there is no case data including the arrival train number of the temporary train operation data in the event part (step S12:
No), and when the return value of the change replacement plan determination process is not f = 1 (step S14: No), the CPU 30
From all the case data stored in the change replacement plan case DB 33, the case data including the departure train number of the temporary train operation data input in step S11 in the event part is searched (step S15). When there is case data including the departure train number of the temporary train operation data in the event part (step S15: Yes), the CPU 30 stores the case data in the similar case data storage area 312 and executes the change replacement plan determination process. Yes (step S16).

【0064】次にCPU30は、変更入換計画判別処理
の戻り値を判別する(ステップS17)。戻り値がf=
1の場合(ステップS17:Yes)、CPU30はス
テップS39へ処理を移行する。
Next, the CPU 30 determines the return value of the change replacement plan determination process (step S17). The return value is f =
In the case of 1 (step S17: Yes), the CPU 30 shifts the processing to step S39.

【0065】一方、臨時列車運転データの発列車番号を
事象部に含む事例データがない場合(ステップS15:
無)、また、変更入換計画判別処理の戻り値がf=1で
はない場合(ステップS17:No)、CPU30は、
変更入換計画事例DB33に格納されている全ての事例
データの中から、ステップS11で入力された臨時列車
運転データの着列車の番線競合列車の列車番号を変更部
に含む事例データを検索する(ステップS18)。臨時
列車運転データの着列車の番線競合列車の列車番号を変
更部に含む事例データがあった場合(ステップS18:
有)、CPU30はその事例データを類似事例データ記
憶領域312に記憶し、変更入換計画判別処理を実行す
る(ステップS19)。
On the other hand, when there is no case data including the departure train number of the temporary train operation data in the event part (step S15:
None), and when the return value of the change replacement plan determination process is not f = 1 (step S17: No), the CPU 30
From all of the case data stored in the change / exchange plan case DB 33, the case data including the train number of the competing train on the numbered line of the arriving train of the temporary train operation data input in step S11 is searched for ( Step S18). When there is case data that includes the train number of the competing train of the arriving train in the temporary train operation data in the change unit (step S18:
Yes), the CPU 30 stores the case data in the similar case data storage area 312, and executes the change replacement plan determination process (step S19).

【0066】次にCPU30は、変更入換計画判別処理
の戻り値を判別する(ステップS20)。戻り値がf=
1の場合(ステップS20:Yes)、CPU30はス
テップS39へ処理を移行する。
Next, the CPU 30 determines the return value of the change replacement plan determination process (step S20). The return value is f =
In the case of 1 (step S20: Yes), the CPU 30 shifts the processing to step S39.

【0067】一方、臨時列車運転データの着列車の番線
競合列車の列車番号を変更部に含む事例データがない場
合(ステップS18:無)、また、変更入換計画判別処
理の戻り値がf=1ではない場合(ステップS20:N
o)、CPU30は、変更入換計画事例DB33に格納
されている全ての事例データの中から、ステップS11
で入力された臨時列車運転データの発列車の番線競合列
車の列車番号を変更部に含む事例データを検索する(ス
テップS21)。臨時列車運転データの発列車の番線競
合列車の列車番号を変更部に含む事例データがあった場
合(ステップS21:有)、CPU30はその事例デー
タを類似事例データ記憶領域312に記憶し、変更入換
計画判別処理を実行する(ステップS22)。
On the other hand, when there is no case data including the train number of the competing train of the arriving train in the temporary train operation data in the change section (step S18: No), the return value of the change replacement plan determination process is f = If not 1 (step S20: N
o), the CPU 30 selects step S11 from all the case data stored in the change replacement plan case DB33.
The case data including the train number of the departing train competing train of the departure train of the temporary train operation data input in step S21 is searched (step S21). If there is case data that includes the train number of the starting line competing train of the departure train of the temporary train operation data in the change unit (step S21: Yes), the CPU 30 stores the case data in the similar case data storage area 312 and inputs the change. The replacement plan determination process is executed (step S22).

【0068】次にCPU30は、変更入換計画判別処理
の戻り値を判別する(ステップS23)。戻り値がf=
1の場合(ステップS23:Yes)、CPU30はス
テップS39へ処理を移行する。
Next, the CPU 30 determines the return value of the change replacement plan determination process (step S23). The return value is f =
In the case of 1 (step S23: Yes), the CPU 30 shifts the processing to step S39.

【0069】一方、臨時列車運転データの発列車の番線
競合列車の列車番号を変更部に含む事例データがない場
合(ステップS21:無)、また、変更入換計画判別処
理の戻り値がf=1ではない場合(ステップS23:N
o)、CPU30は、変更入換計画事例DB33に格納
されている全ての事例データの中から、ステップS11
で入力された臨時列車運転データの着列車のパターン列
車の列車番号を事象部に含む事例データを検索する(ス
テップS24)。臨時列車運転データの着列車のパター
ン列車の列車番号を事象部に含む事例データがあった場
合(ステップS24:有)、CPU30はその事例デー
タを類似事例データ記憶領域312に記憶し、変更入換
計画判別処理を実行する(ステップS25)。
On the other hand, when there is no case data including the train number of the competing train of the departure train of the temporary train operation data in the change section (step S21: No), the return value of the change replacement plan determination process is f = If not 1 (step S23: N
o), the CPU 30 selects step S11 from all the case data stored in the change replacement plan case DB33.
Pattern of arrival train of temporary train operation data input in step S24 is searched for case data including the train number of the train in the event part (step S24). Pattern of arrival train of temporary train operation data When there is case data including the train number of the train in the event part (step S24: Yes), the CPU 30 stores the case data in the similar case data storage area 312 and replaces it with another. A plan determination process is executed (step S25).

【0070】次にCPU30は、変更入換計画判別処理
の戻り値を判別する(ステップS26)。戻り値がf=
1の場合(ステップS26:Yes)、CPU30はス
テップS39へ処理を移行する。
Next, the CPU 30 determines the return value of the change replacement plan determination process (step S26). The return value is f =
In the case of 1 (step S26: Yes), the CPU 30 shifts the processing to step S39.

【0071】一方、臨時列車運転データの着列車のパタ
ーン列車の列車番号を事象部に含む事例データがない場
合(ステップS24:無)、また、変更入換計画判別処
理の戻り値がf=1ではない場合(ステップS26:N
o)、CPU30は、変更入換計画事例DB33に格納
されている全ての事例データの中から、ステップS11
で入力された臨時列車運転データの発列車のパターン列
車の列車番号を事象部に含む事例データを検索する(ス
テップS27)。臨時列車運転データの発列車のパター
ン列車の列車番号を事象部に含む事例データがあった場
合(ステップS27:有)、CPU30はその事例デー
タを類似事例データ記憶領域312に記憶し、変更入換
計画判別処理を実行する(ステップS28)。
On the other hand, if there is no case data including the train number of the arriving train of the temporary train operation data in the event part (step S24: none), the return value of the change replacement plan determination process is f = 1. If not (step S26: N
o), the CPU 30 selects step S11 from all the case data stored in the change replacement plan case DB33.
Pattern of departure train of temporary train operation data input in step S1 is searched for case data including the train number of the train in the event part (step S27). Pattern of departure train of temporary train operation data When there is case data including the train number of the train in the event portion (step S27: Yes), the CPU 30 stores the case data in the similar case data storage area 312 and replaces it with another. A plan determination process is executed (step S28).

【0072】次にCPU30は、変更入換計画判別処理
の戻り値を判別する(ステップS29)。戻り値がf=
1の場合(ステップS29:Yes)、CPU30はス
テップS39へ処理を移行する。
Next, the CPU 30 determines the return value of the change replacement plan determination process (step S29). The return value is f =
In the case of 1 (step S29: Yes), the CPU 30 shifts the processing to step S39.

【0073】一方、臨時列車運転データの発列車のパタ
ーン列車の列車番号を事象部に含む事例データがない場
合(ステップS27:無)、また、変更入換計画判別処
理の戻り値がf=1ではない場合(ステップS29:N
o)、CPU30は、臨時列車運転データの着列車の番
線競合列車の運転データを基本入換計画DB34から取
得し(ステップS30)、変更入換計画事例DB33に
格納されている全ての事例データの中から、ステップS
30で取得した運転データに基づいて、臨時列車運転デ
ータの着列車の番線競合列車のパターン列車の列車番号
を変更部に含む事例データを検索する(ステップS3
1)。臨時列車運転データの着列車の番線競合列車のパ
ターン列車の列車番号を変更部に含む事例データがあっ
た場合(ステップS31:有)、CPU30はその事例
データを類似事例データ記憶領域312に記憶し、変更
入換計画判別処理を実行する(ステップS32)。
On the other hand, if there is no case data that includes the train number of the departure train of the temporary train operation data in the event part (step S27: No), the return value of the change replacement plan determination process is f = 1. If not (step S29: N
o), the CPU 30 obtains the operation data of the numbered train competing train of the arrival train of the temporary train operation data from the basic replacement plan DB 34 (step S30), and of all the case data stored in the change replacement plan case DB 33. From inside, step S
Based on the operation data acquired in 30, the pattern data of the competing train of the arriving train of the temporary train operation data is searched for the case data including the train number of the change train (step S3).
1). When there is case data that includes the train number of the arriving train and the pattern of the competing train of the arriving train in the temporary train operation data (step S31: Yes), the CPU 30 stores the case data in the similar case data storage area 312. The change replacement plan determination process is executed (step S32).

【0074】次にCPU30は、変更入換計画判別処理
の戻り値を判別する(ステップS33)。戻り値がf=
1の場合(ステップS33:Yes)、CPU30はス
テップS39へ処理を移行する。
Next, the CPU 30 determines the return value of the change replacement plan determination process (step S33). The return value is f =
In the case of 1 (step S33: Yes), the CPU 30 shifts the processing to step S39.

【0075】一方、臨時列車運転データの着列車の番線
競合列車のパターン列車の列車番号を変更部に含む事例
データがない場合(ステップS31:無)、また、変更
入換計画判別処理の戻り値がf=1ではない場合(ステ
ップS33:No)、CPU30は、臨時列車運転デー
タの発列車の番線競合列車の運転データを基本入換計画
DB34から取得し(ステップS34)、変更入換計画
事例DB33に格納されている全ての事例データの中か
ら、ステップS34で取得した運転データに基づいて、
臨時列車運転データの発列車の番線競合列車のパターン
列車の列車番号を変更部に含む事例データを検索する
(ステップS35)。臨時列車運転データの発列車の番
線競合列車のパターン列車の列車番号を変更部に含む事
例データがあった場合(ステップS35:有)、CPU
30はその事例データを類似事例データ記憶領域312
に記憶し、変更入換計画判別処理を実行する(ステップ
S36)。
On the other hand, when there is no case data that includes the train number of the arriving train and the pattern train of the competing train in the temporary train operation data in the change section (step S31: No), the return value of the change replacement plan determination process Is not f = 1 (step S33: No), the CPU 30 acquires the operation data of the numbered train competing train of the departure train of the temporary train operation data from the basic replacement plan DB 34 (step S34), and the change replacement plan example Based on the operation data acquired in step S34 from all the case data stored in DB33,
Pattern of the lane competing train of the departure train of the temporary train operation data The case data including the train number of the train in the change unit is searched (step S35). If there is case data that includes the train number of the departing train of the departure train of the temporary train operation data in the change unit (step S35: Yes), the CPU
30 stores the case data in the similar case data storage area 312.
Then, the change replacement plan determination process is executed (step S36).

【0076】次にCPU30は、変更入換計画判別処理
の戻り値を判別する(ステップS37)。戻り値がf=
1の場合(ステップS37:Yes)、CPU30はス
テップS39へ処理を移行する。
Next, the CPU 30 determines the return value of the change replacement plan determination process (step S37). The return value is f =
In the case of 1 (step S37: Yes), the CPU 30 shifts the processing to step S39.

【0077】一方、臨時列車運転データの発列車の番線
競合列車のパターン列車の列車番号を変更部に含む事例
データがない場合(ステップS35:無)、また、変更
入換計画判別処理の戻り値がf=1ではない場合(ステ
ップS37:No)、CPU30はステップS11で入
力された臨時列車の運転データに類似した事例データが
変更入換計画事例DB33に存在しない、あるいは実行
可能な新規変更入換計画を作成できなかったと判断し、
表示部36にエラーメッセージを表示させ(ステップS
38)、プログラムを終了する。
On the other hand, if there is no case data that includes the train number of the departing train of the departure train of the temporary train operation data and the train number of the train in the change section (step S35: No), the return value of the change replacement plan determination process Is not f = 1 (step S37: No), the CPU 30 does not have case data similar to the operation data of the temporary train input in step S11 in the change replacement plan case DB 33 or can execute a new change input. Judging that the replacement plan could not be created,
Display an error message on the display unit 36 (step S
38), the program ends.

【0078】一方、CPU30は、ステップS39にお
いて、実行可能な新規変更入換計画が作成できたとし
て、変更入換計画データ記憶領域313に記憶されてい
るデータを表示部36に表示させ、プログラムを終了す
る。
On the other hand, in step S39, the CPU 30 displays on the display unit 36 the data stored in the change replacement plan data storage area 313, assuming that the new executable change replacement plan has been created. finish.

【0079】図10は、変更入換計画判別プログラム3
22の実行に係る、変更入換計画判別処理の動作を示す
フローチャートである。
FIG. 10 shows the change replacement plan determination program 3
22 is a flowchart showing an operation of a change replacement plan determination process related to execution of 22.

【0080】まずCPU30は、判別フラグfに0を代
入し(ステップS101)、臨時列車運転データ記憶領
域311と類似事例データ記憶領域312に記憶されて
いるデータに基づいて、新規変更入換計画を仮作成し、
変更入換計画データ記憶領域313に記憶する(ステッ
プS102)。
First, the CPU 30 substitutes 0 into the discrimination flag f (step S101), and creates a new change replacement plan based on the data stored in the temporary train operation data storage area 311 and the similar case data storage area 312. Temporarily created,
The data is stored in the change replacement plan data storage area 313 (step S102).

【0081】次にCPU30は、仮作成された新規変更
入換計画において、矛盾の有無を判別する(ステップS
103)。矛盾があった場合(ステップS103:
有)、CPU30は新規変更入換計画に対して基本入換
計画作成プログラム323を読み出して基本入換計画作
成処理を実行し、新規変更入換計画の矛盾を修正する
(ステップS104)。
Next, the CPU 30 determines whether or not there is a contradiction in the temporarily created new change replacement plan (step S).
103). If there is a contradiction (step S103:
Yes, the CPU 30 reads the basic replacement plan creation program 323 for the new replacement replacement plan and executes the basic replacement plan creation process to correct the contradiction of the new replacement replacement plan (step S104).

【0082】そしてCPU30は、修正された新規変更
入換計画に対して、再度矛盾の有無を判別する(ステッ
プS105)。矛盾があった場合(ステップS105:
有)、CPU30は戻り値をf=0として、変更入換計
画判別処理を終了する。
Then, the CPU 30 determines again whether or not there is a contradiction in the corrected new change replacement plan (step S105). If there is a contradiction (step S105:
Yes), the CPU 30 sets the return value to f = 0, and ends the change replacement plan determination process.

【0083】一方、ステップS103において、仮作成
された新規変更入換計画に矛盾がない場合(ステップS
103:無)、また、ステップS104で修正された新
規変更入換計画に矛盾がない場合(ステップS105:
無)、CPU30はfに1を代入し(ステップS10
6)、戻り値をf=1として、変更入換計画判別処理を
終了する。
On the other hand, if there is no contradiction in the temporarily created new change replacement plan in step S103 (step S).
103: None), and when there is no contradiction in the new change replacement plan corrected in step S104 (step S105:
No), the CPU 30 substitutes 1 into f (step S10).
6) Then, the return value is set to f = 1 and the change replacement plan determination process is ended.

【0084】ここで、変更入換計画判別処理において、
CPU30が仮作成された新規変更入換計画に矛盾があ
ると判別した場合、基本入換計画作成処理による新規変
更入換計画の矛盾の修正を1回行うとしているが、複数
回行ってもよい。
Here, in the change replacement plan determination process,
If the CPU 30 determines that there is a contradiction in the temporarily created new change replacement plan, the basic change plan creation process corrects the contradiction in the new change replacement plan once, but it may be performed multiple times. .

【0085】また、臨時列車の運転データに基づいて、
所定の検索条件に従って変更入換計画事例DB34より
事例データを検索するが、検索条件は上記検索条件に限
らない。同様に、臨時列車の運転データに基づいて、所
定の検索条件に優先度を付して変更入換計画事例DB3
4より事例データを検索するが、検索条件の優先度は上
記の優先度に限らない。
Further, based on the operation data of the temporary train,
The case data is searched from the change replacement plan case DB 34 according to a predetermined search condition, but the search condition is not limited to the above search condition. Similarly, based on the operation data of the temporary train, the priority is attached to a predetermined search condition and the change is made.
The case data is searched from No. 4, but the priority of the search condition is not limited to the above priority.

【0086】図11は、図1に示した駅において、ある
所定の期間に発生した臨時列車の列車番号、その運転日
数、臨時列車一本あたりの入換作業変更件数および所定
の期間内の入換作業の総変更件数を示した図である。臨
時列車一本あたりの入換作業変更件数は、例えば、臨時
列車の運行に伴い発生した入換作業の中止、入換時刻の
変更などと、それらの変更作業に関連して発生した定期
列車の番線変更、時刻変更などの変更件数を示してい
る。
FIG. 11 shows the train numbers of temporary trains that have occurred in a predetermined period at the station shown in FIG. 1, the number of operating days, the number of replacement work changes per temporary train, and the number of transfers within a predetermined period. It is a figure showing the total number of changes of replacement work. The number of replacement work changes per temporary train is, for example, the cancellation of replacement work that occurred due to the operation of temporary trains, the change of replacement time, and the number of regular trains that occurred in connection with these change work. It shows the number of changes such as number change and time change.

【0087】図11において、全体の変更件数924件
に対して、例えば臨時列車9531M、9627Dな
ど、少数の臨時列車の運転による変更件数が大きな割合
を占めていることが分かる。また、これらの入換作業の
変更内容は、臨時列車の列車番号が同じであれば、入換
作業の変更内容も同じであったことから、過去に実施さ
れた変更入換計画を事例データとして変更入換計画事例
DB34に蓄積して格納し、新たに運転する臨時列車に
対する変更入換計画を作成する際に、臨時列車の運転デ
ータに基づいて、所定の検索条件で蓄積された事例デー
タを検索し、検索された事例データに基づいて変更入換
計画を作成する方法は効果的である。
In FIG. 11, it can be seen that the number of changes due to the operation of a small number of temporary trains, such as the temporary trains 9531M and 9627D, accounts for a large proportion of the total number of changes of 924. In addition, the change contents of these replacement works were the same as the change contents of the replacement work if the train number of the temporary train was the same, so the change replacement plan carried out in the past is used as case data. When the change replacement plan case DB 34 is stored and stored, and when a change replacement plan for a newly operated temporary train is created, the case data accumulated under predetermined search conditions is stored based on the operation data of the temporary train. A method of searching and creating a change replacement plan based on the searched case data is effective.

【0088】図12は、図1に示した駅において、ある
所定の期間に実施された変更入換計画から事例データを
蓄積し、別のある所定の期間に発生した臨時列車の運行
に対する変更入換計画を、本実施の形態の変更入換計画
作成システムを適用して作成したときの評価結果を示し
た図である。
FIG. 12 shows that the station shown in FIG. 1 accumulates case data from the change and replacement plan carried out in a certain predetermined period, and changes and changes to the operation of the temporary train occurred in another predetermined period. It is the figure which showed the evaluation result at the time of creating a replacement plan by applying the change replacement plan creation system of this Embodiment.

【0089】図12によると、臨時列車の列車番号に基
づいて検索した事例データを新規変更入換計画の作成に
適用した件数が80件、臨時列車の番線競合列車の列車
番号に基づいて検索した事例データを新規変更入換計画
の作成に適用した件数が11件、臨時列車のパターン列
車の列車番号に基づいて検索した事例データを新規変更
入換計画の作成に適用した件数が6件、仮作成された新
規変更入換計画に矛盾が発生し、基本入換計画作成処理
で矛盾の修正を行った新規変更入換計画は0件であっ
た。即ち、実施された変更入換計画の事例データに基づ
いて、新たに実施可能な新規変更入換計画を作成するこ
とができた件数は合計で97件であった。
According to FIG. 12, the case data searched based on the train number of the temporary train was applied to the creation of the new change replacement plan at 80 cases, and the search was performed based on the train number of the conflicting train on the temporary train. 11 cases were applied to create the new change replacement plan, and 6 cases were applied to create the new change replacement plan based on the train number of the temporary train pattern train. A contradiction occurred in the created new change replacement plan, and the number of new change replacement plans in which the contradiction was corrected in the basic replacement plan creation process was 0. That is, the total number of cases in which a new feasible change replacement plan could be created based on the case data of the implemented change replacement plan was 97 in total.

【0090】適用できる変更入換計画の事例データが存
在しないなどの理由で、新規変更入換計画の作成ができ
なかった件数は11件であり、臨時列車の運行に伴って
発生した入換作業の発生および中止、番線変更などの変
更件数は108件であった。
The number of cases in which a new change replacement plan could not be created was 11 due to the absence of applicable change replacement plan case data, and the replacement work that occurred with the operation of the temporary train The number of changes such as the occurrence and cancellation of, and number change was 108.

【0091】結果として、新規変更入換計画の作成成功
比率は89.8%であった。これより、本発明を適用し
た新規変更入換計画の作成において、約90%の確率で
実施可能な新規変更入換計画を自動作成することがで
き、変更入換計画を作成する際の労力を削減することが
できる。
As a result, the success rate of creation of the new change replacement plan was 89.8%. From this, in creating a new change replacement plan to which the present invention is applied, a new change replacement plan that can be executed with a probability of about 90% can be automatically created, and the effort in creating the change replacement plan can be increased. Can be reduced.

【0092】また、臨時列車の運転データに基づいて、
実施された変更入換計画の事例データを検索する検索条
件として、例えば臨時列車の番線競合列車の列車番号な
ど、臨時列車の列車番号以外の各種項目を加えて検索す
ることは、新規変更入換計画の作成に有効な事例データ
を検索するために効果的である。
Further, based on the operation data of the temporary train,
As a search condition for searching the case data of the implemented change replacement plan, for example, adding various items other than the train number of the temporary train, such as the train number of the temporary train competing train, is a new change replacement. It is effective for retrieving case data that is effective in making plans.

【0093】[0093]

【発明の効果】請求項1、7記載の発明によれば、入力
された臨時列車の運転データと類似する事例データを、
実施済みの変更入換計画の事例データから所定の検索条
件に従って検索し、検索された実施済みの事例データと
入力された臨時列車の運転データから、新規変更入換計
画を仮作成する。その仮作成された新規変更入換計画に
列車の運行上の矛盾が存在しなければ、その新規変更入
換計画を実行可能な変更入換計画と判断する。これによ
り、臨時列車の運行に対する変更入換計画の作成を人手
によらず、自動的に作成することができ、変更入換計画
を作成するための労力が軽減される。
According to the invention described in claims 1 and 7, the case data similar to the input operation data of the temporary train is input,
The case data of the executed change replacement plan is searched according to a predetermined search condition, and a new change replacement plan is provisionally created from the searched executed case data and the input temporary train operation data. If there is no contradiction in train operation in the provisionally created new change replacement plan, the new change replacement plan is determined to be a feasible change replacement plan. As a result, it is possible to automatically create a change replacement plan for the operation of the temporary train without human intervention, and the labor for creating the change replacement plan is reduced.

【0094】請求項2記載の発明によれば、新規変更入
換計画を仮作成するために用いた事例データと入力され
た臨時列車の運転データとにおいて、例えば、時刻など
が少し異なったり、番線や進路の競合などの矛盾が存在
した場合であっても、少なくとも1回、仮作成された新
規変更入換計画が修正される。そして、修正後の新規変
更入換計画について、矛盾の有無が再判別される。従っ
て、同一の事例データが存在しない場合でもあっても、
修正によって矛盾のない変更入換計画を作成することが
できる。
According to the second aspect of the present invention, the case data used for temporarily creating the new change replacement plan and the input operation data of the temporary train have, for example, a slight difference in time or the like, or a track number. Even if there is a contradiction such as a conflict in the path or a route, the temporarily created new change replacement plan is corrected at least once. Then, with respect to the new change replacement plan after the correction, the presence or absence of contradiction is discriminated again. Therefore, even if the same case data does not exist,
The modifications can create a consistent change replacement plan.

【0095】請求項3、4記載の発明によれば、入力さ
れた臨時列車の運転データと類似する事例データを、実
施済みの変更入換計画の事例データから検索することが
できる。即ち、例えば請求項4記載の発明によれば、検
索条件として、着列車番号、発列車番号、着列車
の番線競合列車番号、発列車の競合列車番号、着列
車のパターン列車番号、発列車のパターン列車番号、
着列車の番線競合列車のパターン列車番号、および
発列車の番線競合列車のパターン列車番号、の内の少な
くとも1つが一致することが条件とされるため、入力さ
れた臨時列車の運転データに対して、着発列車番号が一
致する事例データの他に、時刻等は同じであるが列車番
号が異なる場合の事例データをおよびの検索条件で
検索するといったことができる。また、入力された臨時
列車の運転データに対して、列車番号や時刻は異なる
が、同じ変更パターンである事例データを、、お
よびの検索条件で検索することができる。
According to the invention described in claims 3 and 4, it is possible to retrieve the case data similar to the input operation data of the temporary train from the case data of the executed change replacement plan. That is, for example, according to the invention as set forth in claim 4, as the search condition, the arrival train number, the departure train number, the numbered competing train number of the arrival train, the competition train number of the departure train, the pattern train number of the arrival train, and the departure train Pattern train number,
Since at least one of the pattern train number of the arriving train's lane competing train and the pattern train number of the departing train's lane competing train must match, the input temporary train operation data In addition to the case data in which the arrival and departure train numbers are the same, the case data in which the time and the like are the same but the train numbers are different can be searched under the search conditions of and. In addition, with respect to the input temporary train operation data, it is possible to search for case data having different train numbers and times but having the same change pattern under the search conditions of and.

【0096】請求項5記載の発明によれば、事例データ
を実施済みの変更入換計画の事例データから検索する際
に、前記〜の事項について、優先度の高い事項に合
致する事例データから検索する。即ち、入力された臨時
列車の運転データと一致度の高い事例データから検索す
ることができる。これにより、例えば、高い優先度の事
項に合致した事例データと、入力された臨時列車の運転
データから新規変更入換計画を仮作成する際に、列車の
運行上の矛盾が発生する可能性の低い新規変更入換計画
を仮作成することができる。
According to the invention of claim 5, when the case data is searched from the case data of the executed change replacement plan, the items (1) to (3) are searched from the case data which matches the high priority items. To do. That is, it is possible to search from case data having a high degree of coincidence with the input temporary train operation data. As a result, for example, when temporarily creating a new change replacement plan from case data that matches high-priority items and the input operation data of a temporary train, inconsistencies in train operation may occur. A low new change replacement plan can be provisionally created.

【0097】請求項6記載の発明によれば、請求項1〜
5の何れか記載の発明の効果を奏する記憶媒体を実現で
きる。
According to the invention of claim 6, claims 1 to
It is possible to realize a storage medium that achieves the effect of the invention described in any one of 5 above.

【図面の簡単な説明】[Brief description of drawings]

【図1】駅の線路の配線を示した図。FIG. 1 is a diagram showing wiring of a railway line of a station.

【図2】基本入換計画に対するダイヤ図、および変更入
換計画に対するダイヤ図を示した図。
FIG. 2 is a diagram showing a diagram of a basic replacement plan and a diagram of a modified replacement plan.

【図3】変更入換計画作成システムの内部構成を示した
ブロック図。
FIG. 3 is a block diagram showing an internal configuration of a change replacement plan creation system.

【図4】臨時列車運転データ記憶領域のデータ構造を示
した図。
FIG. 4 is a diagram showing a data structure of a temporary train operation data storage area.

【図5】基本入換計画DBのデータ構造を示した図。FIG. 5 is a diagram showing a data structure of a basic replacement plan DB.

【図6】変更入換計画事例DBのデータ構造を示した
図。
FIG. 6 is a diagram showing a data structure of a change replacement plan case DB.

【図7】変更入換計画作成処理の動作を示すフローチャ
ート。
FIG. 7 is a flowchart showing the operation of a change replacement plan creation process.

【図8】図7に続く、変更入換計画作成処理の動作を示
すフローチャート。
FIG. 8 is a flowchart showing the operation of a change replacement plan creation process subsequent to FIG. 7;

【図9】図8に続く、変更入換計画作成処理の動作を示
すフローチャート。
9 is a flowchart showing the operation of a change replacement plan creation process following FIG. 8. FIG.

【図10】変更入換計画判別処理の動作を示すフローチ
ャート。
FIG. 10 is a flowchart showing the operation of a change replacement plan determination process.

【図11】臨時列車の運行状況および運行に伴った変更
件数を示した図。
FIG. 11 is a diagram showing the operating status of a temporary train and the number of changes accompanying the operation.

【図12】本発明を適用して変更入換計画を作成した際
の評価を示した図。
FIG. 12 is a diagram showing evaluation when a change replacement plan is created by applying the present invention.

【符号の説明】[Explanation of symbols]

30 CPU 31 RAM 311 臨時列車運転データ記憶領域 312 類似事例データ記憶領域 313 変更入換計画データ記憶領域 32 記憶媒体 321 変更入換計画作成プログラム 322 基本入換計画作成プログラム 33 変更入換計画事例DB 34 基本入換計画DB 35 入力部 36 表示部 37 バス 30 CPU 31 RAM 311 Temporary train operation data storage area 312 Similar case data storage area 313 Change Replacement Plan Data Storage Area 32 storage media 321 Change Replacement Plan Creation Program 322 Basic replacement plan creation program 33 Change Replacement Plan Case DB 34 Basic replacement plan DB 35 Input section 36 Display 37 bus

───────────────────────────────────────────────────── フロントページの続き (72)発明者 周 利剣 東京都国立市北1−7−23 国立ビル3F 株式会社ジェイアール総研情報システム 内 Fターム(参考) 5H161 AA01 JJ31 JJ40    ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Zhou Riken             1-7-23 Kita, Kunitachi, Tokyo 3F National Building               JR Research Institute, Inc. Information System             Within F-term (reference) 5H161 AA01 JJ31 JJ40

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】基本入換計画データを記憶する第1の記憶
手段と、実施済みの変更入換計画に係る事例データを累
積記憶する第2の記憶手段とを備えるコンピュータに対
して、 臨時列車の運転データを入力する入力手段と、 前記入力手段により入力された臨時列車の運転データに
基づいて、所定の検索条件に合致する事例データを前記
第2の記憶手段に記憶された複数の事例データの中から
検索する検索手段と、 前記検索手段により検索された事例データと、前記運転
データとに基づいて、新規変更入換計画を仮作成する仮
作成手段と、 所定の実施可能条件に従って、前記仮作成された新規変
更 入換計画の矛盾の有無を判別し、矛盾無しと判別し
た場合に、前記仮作成した新規変更入換計画を本決定す
る本決定手段と、 を機能させるための変更入換計画作成情報。
Claim: What is claimed is: 1. A temporary train for a computer, comprising: a first storage means for storing basic replacement plan data; and a second storage means for cumulatively storing case data related to an executed change replacement plan. A plurality of case data stored in the second storage means based on the operation data of the temporary train input by the input means Search means for searching from among, the case data searched by the search means, the temporary creation means for temporarily creating a new change replacement plan based on the operation data, according to a predetermined enablement condition, To determine whether or not there is a contradiction in the provisionally created new change replacement plan, and when it is determined that there is no contradiction, the deciding means for making the final decision of the tentatively created new change replacement plan, and Further replacement planning information.
【請求項2】請求項1記載の変更入換計画作成情報にお
いて、 前記本決定手段が、 矛盾有りと判別した場合に、少なくとも1回、前記仮作
成された新規変更入換計画の修正、および、当該修正後
の新規変更入換計画に対する矛盾有無の再判別、を行う
ように機能させるための情報を含む変更入換計画作成情
報。
2. The change replacement plan creation information according to claim 1, wherein when the main determination unit determines that there is a contradiction, the temporary replacement newly created replacement replacement plan is corrected at least once, and , Change replacement plan creation information including information for causing the function to perform re-determination of the presence or absence of inconsistency with respect to the new change replacement plan after the correction.
【請求項3】請求項1または2記載の変更入換計画作成
情報において、 前記検索手段が、前記入力された臨時列車の運転データ
と、前記第2の記憶手段に記憶された各事例データの臨
時列車の運転データとの一致度を検索条件として、前記
検索を実行するように機能させるための情報を含む変更
入換計画作成情報。
3. The change replacement plan creation information according to claim 1 or 2, wherein the search means stores the input operation data of the temporary train and the case data stored in the second storage means. Change replacement plan creation information including information for causing the search to function by using the degree of coincidence with the operation data of the temporary train as a search condition.
【請求項4】請求項1〜3の何れか記載の変更入換計画
作成情報において、 前記検索手段が、臨時列車の、着列車番号、発列車
番号、着列車の番線競合列車番号、発列車の競合列
車番号、着列車のパターン列車番号、発列車のパタ
ーン列車番号、着列車の番線競合列車のパターン列車
番号、および発列車の番線競合列車のパターン列車番
号、の内の少なくとも1つが一致することを検索条件と
して、前記検索を実行するように機能させるための情報
を含む変更入換計画作成情報。
4. The change replacement plan creation information according to any one of claims 1 to 3, wherein the search means includes an arrival train number, a departure train number, a numbered train competing train number of the arrival train, and a departure train. At least one of the competing train number, the arrival train pattern train number, the departure train pattern train number, the arrival train number line competing train pattern train number, and the departure train number line competing train pattern train number Change replacement plan creation information including information for causing the function to execute the search, with the above as a search condition.
【請求項5】請求項4記載の変更入換計画作成情報にお
いて、 前記検索手段が、前記〜の事項の内、優先度の高い
事項に合致する事例データから順に検索するように機能
させるための情報を含む変更入換計画作成情報。
5. The change-replacement plan creation information according to claim 4, wherein the search means functions to search in order from case data that matches a higher priority item among the items from to. Change replacement plan creation information including information.
【請求項6】請求項1〜5の何れか記載の変更入換計画
作成情報を記憶する記憶媒体。
6. A storage medium for storing the change replacement plan creation information according to claim 1.
【請求項7】基本入換計画データを記憶する第1の記憶
手段と、実施済みの変更入換計画に係る事例データを累
積記憶する第2の記憶手段とを備える変更入換計画作成
システムであって、 臨時列車の運転データを入力する入力手段と、 前記入力手段により入力された臨時列車の運転データに
基づいて、所定の検索条件に合致する事例データを前記
第2の記憶手段に記憶された複数の事例データの中から
検索する検索手段と、 前記検索手段により検索された事例データと、前記運転
データとに基づいて、新規変更入換計画を仮作成する仮
作成手段と、 所定の実施可能条件に従って、前記仮作成された新規変
更入換計画の矛盾の有無を判別し、矛盾無しと判別した
場合に、前記仮作成した新規変更入換計画を本決定する
本決定手段と、 を備えることを特徴とする変更入換計画作成システム。
7. A change replacement plan creation system comprising: a first storage means for storing basic replacement plan data; and a second storage means for cumulatively storing case data relating to an executed change replacement plan. There is input means for inputting operation data of the temporary train, and case data matching a predetermined search condition is stored in the second storage means based on the operation data of the temporary train input by the input means. A searching means for searching from a plurality of case data, a temporary creating means for temporarily creating a new change replacement plan based on the case data searched by the searching means, and the operation data; According to a possible condition, it is determined whether or not there is a contradiction in the temporarily created new change replacement plan, and if it is determined that there is no contradiction, a final determination means for making a final determination of the temporarily created new change replacement plan is provided. Change replacement planning system, characterized in that.
JP2001267544A 2001-09-04 2001-09-04 Change replacement plan creation program, storage medium, and change replacement plan creation system Expired - Fee Related JP4571349B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001267544A JP4571349B2 (en) 2001-09-04 2001-09-04 Change replacement plan creation program, storage medium, and change replacement plan creation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001267544A JP4571349B2 (en) 2001-09-04 2001-09-04 Change replacement plan creation program, storage medium, and change replacement plan creation system

Publications (2)

Publication Number Publication Date
JP2003072555A true JP2003072555A (en) 2003-03-12
JP4571349B2 JP4571349B2 (en) 2010-10-27

Family

ID=19093659

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001267544A Expired - Fee Related JP4571349B2 (en) 2001-09-04 2001-09-04 Change replacement plan creation program, storage medium, and change replacement plan creation system

Country Status (1)

Country Link
JP (1) JP4571349B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005007483A1 (en) * 2003-07-18 2005-01-27 Hitachi, Ltd. Device for supporting vehicle replacement schedule generation
JP2006176058A (en) * 2004-12-24 2006-07-06 Hitachi Ltd On-track train display unit for train operation control
JP2009051444A (en) * 2007-08-29 2009-03-12 Mitsubishi Electric Corp In-yard schedule preparation device
JP2016006555A (en) * 2014-06-20 2016-01-14 株式会社日立製作所 Planning business support method and system
CN113619653A (en) * 2021-06-29 2021-11-09 卡斯柯信号有限公司 Automatic generation method of shunting operation plan, electronic equipment and medium
CN113788054A (en) * 2021-09-27 2021-12-14 卡斯柯信号有限公司 Automatic straight-through route management method for train on-line connection
CN114475726A (en) * 2022-02-15 2022-05-13 北京交通大学 Automatic train operation adjusting method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59195052U (en) * 1983-06-15 1984-12-25 株式会社日立製作所 Automatic shunting control device
JPH0692237A (en) * 1992-07-24 1994-04-05 Hitachi Ltd Method and system for solving problem
JPH09188255A (en) * 1996-01-09 1997-07-22 Hitachi Ltd Train schedule formation supporting device
JPH11344927A (en) * 1998-05-29 1999-12-14 Hitachi Information Systems Ltd Train schedule system and recording medium stored with program realizing this system
JP2000177590A (en) * 1998-12-16 2000-06-27 Railway Technical Res Inst Station yard shunting plan making device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59195052U (en) * 1983-06-15 1984-12-25 株式会社日立製作所 Automatic shunting control device
JPH0692237A (en) * 1992-07-24 1994-04-05 Hitachi Ltd Method and system for solving problem
JPH09188255A (en) * 1996-01-09 1997-07-22 Hitachi Ltd Train schedule formation supporting device
JPH11344927A (en) * 1998-05-29 1999-12-14 Hitachi Information Systems Ltd Train schedule system and recording medium stored with program realizing this system
JP2000177590A (en) * 1998-12-16 2000-06-27 Railway Technical Res Inst Station yard shunting plan making device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005007483A1 (en) * 2003-07-18 2005-01-27 Hitachi, Ltd. Device for supporting vehicle replacement schedule generation
JP2006176058A (en) * 2004-12-24 2006-07-06 Hitachi Ltd On-track train display unit for train operation control
JP2009051444A (en) * 2007-08-29 2009-03-12 Mitsubishi Electric Corp In-yard schedule preparation device
JP2016006555A (en) * 2014-06-20 2016-01-14 株式会社日立製作所 Planning business support method and system
CN113619653A (en) * 2021-06-29 2021-11-09 卡斯柯信号有限公司 Automatic generation method of shunting operation plan, electronic equipment and medium
CN113788054A (en) * 2021-09-27 2021-12-14 卡斯柯信号有限公司 Automatic straight-through route management method for train on-line connection
CN113788054B (en) * 2021-09-27 2023-10-13 卡斯柯信号有限公司 Automatic straight-through access management method for train on-line connection and hanging
CN114475726A (en) * 2022-02-15 2022-05-13 北京交通大学 Automatic train operation adjusting method

Also Published As

Publication number Publication date
JP4571349B2 (en) 2010-10-27

Similar Documents

Publication Publication Date Title
CN109532960B (en) Automatic dispatching system for marshalling station
AU2018353633B2 (en) Timetable modification device and automatic train control system
US5177684A (en) Method for analyzing and generating optimal transportation schedules for vehicles such as trains and controlling the movement of vehicles in response thereto
AU2003300354B2 (en) Dynamic optimizing traffic planning method and system
JP4670081B2 (en) Operation planning plan creation device
JP5330308B2 (en) Operation arrangement support system and apparatus, and train operation plan calculation processing method
JP2001278052A (en) Train planned schedule preparation method and preparation support device
CN113919650A (en) Train operation scheme optimization compilation method and system
Al Chami et al. A lexicographic approach for the bi-objective selective pickup and delivery problem with time windows and paired demands
JP4863933B2 (en) Maintenance work planning system and maintenance work plan creation method
JP2003072555A (en) Altered shunting plan preparing information, storage medium and altered shunting plan preparing system
JP5019240B2 (en) Diamond evaluation device
JP2011111058A (en) Operation arrangement support device and operation arrangement system using the device
JPWO2016143606A1 (en) Operation arrangement plan automatic creation device and operation arrangement plan automatic creation method
JPH08295238A (en) Train diagram plotter
JP2018062249A (en) Vehicle operation business assistance system
CN114611871A (en) Automatic compilation method and system for railway operation diagram
JPH04118358A (en) Train operational regulating system
JPH10236310A (en) Train operating schedule modification system
JPH0692237A (en) Method and system for solving problem
JPH0764257B2 (en) Train rescheduling plan creation device
JP7449192B2 (en) Timetable information management system, timetable information management method, and operation guidance system
Chiang et al. Cycle detection in repair-based railway scheduling system
WO2023286425A1 (en) Device for assisting with changing operation plan, method for assisting with changing operation plan, and train operation management system
JP2000095111A (en) Unit for creating train schedules for thinned out operation and automatic train course control unit

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071128

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100225

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100330

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100521

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100727

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100812

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130820

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4571349

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130820

Year of fee payment: 3

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130820

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees