Method of housing foundation concrete placement and its foundation structure

Info

Publication number
JP2003064696A
JP2003064696A JP2001304175A JP2001304175A JP2003064696A JP 2003064696 A JP2003064696 A JP 2003064696A JP 2001304175 A JP2001304175 A JP 2001304175A JP 2001304175 A JP2001304175 A JP 2001304175A JP 2003064696 A JP2003064696 A JP 2003064696A
Authority
JP
Japan
Prior art keywords
foundation
concrete
housing
base
rising
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001304175A
Other languages
Japanese (ja)
Inventor
Fumio Akiyama
文夫 秋山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2001304175A priority Critical patent/JP2003064696A/en
Publication of JP2003064696A publication Critical patent/JP2003064696A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide the cut-off foundation structure to prevent water from entering below floors without using any spacer metals when housing concrete foundation work is executed. SOLUTION: When concrete base (1) is placed during the work execution of housing concrete foundation, some protrusions (3), depressions (5) or step differences (4) are formed beforehand at the area where external base foundation concrete is to be placed, and concrete for the external base foundation is placed in these parts (3), (5) and (4).

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は住宅基礎施工時にお
いて住宅基礎コンクリートの打設方法及び基礎構造に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for placing concrete for housing foundation and a foundation structure during construction of housing foundation.

【0002】[0002]

【従来の技術】従来の住宅コンクリート基礎は、布基
礎、ベタ基礎、布基礎一体打ち基礎、ベタ基礎一体打ち
基礎の四種類あるが、まず該布基礎もベタ基礎もコンク
リートベースと立ち上がり基礎のコンクリート打設は日
にちを置いて別々に打設しており、立ち上がり基礎打設
箇所の前記コンクリートベースはコテで平らにし、該コ
ンクリートベース固定後、前記立ち上がり基礎の型枠を
型枠巾止め金具で組み上げ、前記立ち上がり基礎の型枠
内にコンクリートを打設していた。
2. Description of the Related Art There are four types of conventional residential concrete foundations: cloth foundations, solid foundations, cloth foundation integrated casting foundations, and solid foundation integrated foundations. The casting is done separately with a certain date.The concrete base at the place where the rising foundation is set is flattened with a trowel, and after the concrete base is fixed, the standing foundation formwork is assembled with formwork width stop fittings. The concrete was placed in the formwork of the rising foundation.

【0003】また、コンクリートベースと立ち上がり基
礎のコンクリートを一体とする布基礎一体打ち基礎及び
ベタ基礎一体打ち基礎は、コンクリート打設を一回で済
ませ、その日の内に打設するのである。
Further, the cloth foundation solid foundation and the solid foundation solid foundation, which are made by integrating the concrete base and the rising concrete, are required to be placed in a single time and then to be placed within the same day.

【0004】また、前記布基礎一体打ち基礎もベタ基礎
一体打ち基礎も立ち上がり基礎の型枠を浮かせて組むた
めに、該型枠を浮かせるための通称馬と言う金具やプラ
スチック製品と型枠巾止め金具で該型枠を組み上げてい
た。(例えば特開平9−324538、特開平7−24
7684、特開平3−90776参照)。
Further, in order to assemble both the cloth foundation one-piece foundation and the solid foundation one-piece foundation to float and assemble the form of the foundation, a metal fitting called plastic horse for lifting the form or a plastic product and a form width stopper. I had assembled the formwork. (For example, JP-A-9-324538 and JP-A-7-24
7684, JP-A-3-90776).

【0005】[0005]

【発明が解決しようとする課題】布基礎やベタ基礎また
は布基礎一体打ち基礎及びベタ基礎一体打ち基礎が従来
の住宅基礎工法と基礎構造であるが、基礎の半分以上が
地中に埋められているにもかかわらず水が床下に入るこ
とを防ぐ止水構造基礎になっていない問題点があった。
[Problems to be Solved by the Invention] A cloth foundation, a solid foundation, or a cloth foundation solid foundation and a solid foundation solid foundation are conventional housing foundation construction methods and foundation structures, but more than half of the foundation is buried in the ground. However, there is a problem that it is not the foundation of the waterproof structure that prevents water from entering under the floor.

【0006】次に、布基礎一体打ち基礎とベタ基礎一体
打ち基礎は、立ち上がり基礎の型枠を浮かせて組み上げ
るための通称馬と言う金具やプラスチック製品が基礎中
に異物として残る問題点があった。
Next, the cloth foundation solid foundation and the solid foundation solid foundation have a problem that metal fittings called plastic horses for assembling the standing foundation mold by floating it and plastic products remain as foreign matter in the foundation. .

【0007】また、布基礎やベタ基礎または布基礎一体
打ち基礎及びベタ基礎一体打ち基礎も、立ち上がり基礎
の型枠下に使い捨てとし基礎中に残る型枠巾止め金具が
使われているので、長い間に該型枠巾止め金具から水が
伝わって床下に入ったり、さらには該型枠巾止め金具が
水や湿気で錆びて爆裂し、基礎にクラツクを引き起こす
これらの問題点があった。
Further, the cloth foundation, the solid foundation, the cloth foundation one-in-one foundation and the solid foundation one-in-one foundation use a formwork width stop fitting which is disposable under the formwork of the rising foundation and remains in the foundation, which is long. In the meantime, there has been such a problem that water is transmitted from the mold width stopper to the underfloor, and further the mold width stopper is rusted and explodes due to water or moisture, which causes a crack on the foundation.

【0008】本発明は、このような従来の住宅基礎に存
在する問題点に着目してなされたものであり、その目的
とするところは基礎中に残る型枠巾止め金具や通称馬と
言う金具またはプラスチック製品を使わず、床下に水が
入ることを防ぎ、さらに作業の簡便さ、熟練性の不要、
且つ震災等に強く高品質で、構造的に強固なコンクリー
ト基礎止水構造体を提供することにある。
The present invention has been made by paying attention to the problems existing in such a conventional housing foundation, and the purpose thereof is a metal fitting for holding a formwork width or a fitting commonly known as a horse. Or without using plastic products, to prevent water from entering under the floor, easy work, no need for skill,
Moreover, it is to provide a concrete foundation water-stop structure that is strong in structural strength and strong against earthquakes and the like.

【0009】[0009]

【課題を解決するための手段】上記の目的を達成するた
めに最良の方法が、本発明住宅コンクリートの打設方法
と基礎構造であり、住宅基礎コンクリートベース打設時
に、予め外回り立ち上がり基礎のコンクリート打設箇所
に適宜形状の凸部や凹部または段差を形成しておき、前
記外回り立ち上がり基礎のコンクリートを打設すること
により止水構造基礎になるのである。
The best method for achieving the above object is the method of placing concrete of the present invention and the foundation structure thereof. When placing the concrete foundation of the house foundation, the concrete of the outer rise foundation is preliminarily set. By forming a convex portion, a concave portion or a step having an appropriate shape at the place where the material is to be placed and then placing the concrete of the outer circumference rising foundation to form a waterproof structure foundation.

【0010】そして、住宅基礎のコンクリートベース打
設時に、予め外回り立ち上がり基礎のコンクリート打設
箇所に適宜形状の凸部や凹部または段差を形成すること
により、使い捨てとして基礎中に残る型枠巾止め金具が
使えないコンクリートの打設方法と基礎構造がよい。
Then, when the concrete base of the housing foundation is cast, a convex portion, a concave portion or a step having an appropriate shape is formed in advance at the place where the concrete is cast on the outer circumference so as to be disposable so that the formwork width retaining metal fitting remains in the foundation. The concrete pouring method and foundation structure that can not be used are good.

【0011】[0011]

【発明の実施の形態】発明の実施の形態を実施例に基づ
き図面を参照して説明する。図1は布基礎の本発明住宅
基礎コンクリートの打設方法と基礎構造の断面図であ
り、図2は図1のコンクリートベース1を示す工事途中
の断面図である。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described based on examples with reference to the drawings. FIG. 1 is a cross-sectional view of a method of placing a concrete foundation of the present invention for a cloth foundation and a foundation structure, and FIG. 2 is a cross-sectional view of the concrete base 1 of FIG. 1 during construction.

【0012】まず、図1、図2で示す布基礎の採石8工
事終了後、捨てコンクリート9を打設し、その後ベース
鉄筋10と立ち上がり鉄筋11を組んだ後、図2で示す
ベース枠12、13を組み上げコンクリートベース1を
バイブレーターを使いながら打設したが、その際該コン
クリートベース1の天端をコテでならしながら図1で示
す外回り立ち上がり基礎2のコンクリート打設箇所の中
央に、図2で示すように前記コテで巾約40mm高さ3
0mm位のコンクリートを盛り上げ、凸部3を前記コン
クリートベース1に形成した。
First, after the construction of the stone 8 for the cloth foundation shown in FIGS. 1 and 2 is completed, a waste concrete 9 is placed, then the base rebar 10 and the rising rebar 11 are assembled, and then the base frame 12 shown in FIG. 13 was assembled and the concrete base 1 was placed using a vibrator. At that time, the top end of the concrete base 1 was leveled with a trowel, and the concrete was placed at the center of the concrete placing portion of the outer rise stand foundation 2 shown in FIG. Width of about 40 mm and height of 3
The concrete of about 0 mm was piled up, and the convex portion 3 was formed on the concrete base 1.

【0013】そして、前記凸部3を形成したコンクリー
トベース1固定後、図2で示すベース枠12、13をば
らし、前記凸部3の両側に立ち上がり基礎芯から75m
mずつの基礎巾150mmの地墨を出し、該地墨に合わ
せて図1の立ち上がり基礎2の型枠6、7を配置しその
上部を型枠巾止め金具15で止め仮組みした。
After fixing the concrete base 1 on which the convex portions 3 are formed, the base frames 12 and 13 shown in FIG. 2 are disassembled, and both sides of the convex portions 3 rise to 75 m from the foundation core.
A piece of ground ink with a base width of 150 mm was taken out for each m, and the molds 6 and 7 of the rising foundation 2 shown in FIG. 1 were arranged in accordance with the ground ink, and the upper portion thereof was temporarily fixed by the mold width stopper 15.

【0014】続いて、前記型枠6、7の下部が該地墨に
合っている事を再確認しながらパネルキャッチ金具14
を該型枠6、7の下部に嵌め込みコンクリート釘で止
め、該型枠6、7を固定し組み上げ、該型枠6、7内に
前記立ち上がり基礎2のコンクリートをバイブレーター
を使いながら打設し、続いて天端決めのレベラーを流
し、中四日おいて前記型枠6、7をばらした。
Next, while confirming again that the lower parts of the formwork 6 and 7 fit the ground ink, the panel catch fitting 14
Is fixed to the lower parts of the molds 6, 7 with concrete nails, the molds 6, 7 are fixed and assembled, and the concrete of the rising foundation 2 is placed in the molds 6, 7 while using a vibrator, Subsequently, a leveler for determining the top was poured, and the molds 6 and 7 were separated after four days in the middle.

【0015】次に図3は、ベタ基礎で段差4を持つ本発
明住宅基礎コンクリートの打設方法と基礎構造の断面図
であり、図4は図3のコンクリートベース1を示す工事
途中の断面図である。
Next, FIG. 3 is a cross-sectional view of a method of placing a concrete foundation of the present invention having a step 4 on a solid foundation and a foundation structure. FIG. 4 is a cross-sectional view showing the concrete base 1 of FIG. 3 during construction. Is.

【0016】図3、図4において採石8工事終了後、捨
てコンクリート9を打設し、図4に示すようにコンクリ
ートベース1を形成する外側に外側型枠17を組み上
げ、該外側型枠17内にベース鉄筋10と立ち上がり鉄
筋11を組んだ後、まず前記外側型枠17から前記立ち
上がり鉄筋11までの間を150mmの厚みで前記コン
クリートベース1のコンクリートを打設した。
In FIGS. 3 and 4, after the construction of the quarry 8 is completed, waste concrete 9 is placed, and as shown in FIG. 4, the outer form 17 is assembled to the outside forming the concrete base 1, and the inside of the outer form 17 is closed. After assembling the base rebar 10 and the rising rebar 11, the concrete of the concrete base 1 was first placed between the outer formwork 17 and the rising rebar 11 with a thickness of 150 mm.

【0017】続いて、図4に示すように前記立ち上がり
鉄筋11近傍のコンクリートベース1上にたて30mm
よこ20mm、長さ4mの木製粗材16を配置し、該木
製粗材16のたて30mmの高さと前記コンクリートベ
ース1の150mmの高さを加えた180mmの厚みに
コンクリートを打設し、前記コンクリートベース1に段
差4をつけた。
Subsequently, as shown in FIG. 4, a height of 30 mm is placed on the concrete base 1 near the rising rebar 11.
A wooden rough material 16 having a width of 20 mm and a length of 4 m is arranged, and concrete is poured to a thickness of 180 mm, which is the sum of the vertical height of the wooden rough material 16 of 30 mm and the height of the concrete base 1 of 150 mm. A step 4 was added to the concrete base 1.

【0018】そして、前記コンクリートベース1固定
後、まず木製粗材16を取り外し、更に外側型枠17も
取り外した。続いて図3で示す立ち上がり基礎2のコン
クリート打設箇所の両側に立ち上がり基礎巾150mm
の地墨を出し、該地墨に合わせて図4で示す前記外側型
枠17を図3で示す前記立ち上がり基礎2の型枠6とし
て使い、該型枠6、7の上部を段差用型枠巾止め金具1
8で止め仮組した。
After fixing the concrete base 1, the wooden rough material 16 was first removed, and the outer mold 17 was also removed. Subsequently, the standing foundation width of 150 mm is set on both sides of the concrete placing portion of the rising foundation 2 shown in FIG.
4 is used, and the outer formwork 17 shown in FIG. 4 is used as the formwork 6 of the rising foundation 2 shown in FIG. 3 in accordance with the groundwork, and the upper parts of the formwork 6 and 7 are used as step formwork. Width stopper metal fitting 1
Stopped at 8 and tentatively assembled.

【0019】次に、前記型枠6、7が上記地墨に合って
いる事を再確認しながらパネルキャッチ金具14を該型
枠6、7の下部に嵌め込みコンクリート釘で止め該型枠
6、7を組み上げ、該型枠6、7内に前記立ち上がり基
礎2のコンクリートをバイブレーターを使いながら打設
し、続いて天端決めのレベラーを流し、中四日おいて前
記型枠6、7をばらした。
Next, while reconfirming that the molds 6 and 7 match the above ground ink, the panel catch metal fitting 14 is fitted into the lower part of the molds 6 and 7 and fixed with concrete nails. 7 is assembled, and the concrete of the rising foundation 2 is placed in the molds 6 and 7 using a vibrator, then a leveler for determining the top end is poured, and the molds 6 and 7 are separated after four days in the middle. did.

【0020】図5は、布基礎の本発明住宅基礎コンクリ
ートの打設方法と基礎構造の凹部5を表した打設方法と
基礎構造であり、図6は図5のコンクリートベース1を
示した工事途中の断面図である。
FIG. 5 shows a method of placing a concrete foundation of the present invention using a cloth foundation and a method of placing the concave portion 5 of the foundation structure and the foundation structure. FIG. 6 shows the construction of the concrete base 1 shown in FIG. It is a sectional view in the middle.

【0021】図7布基礎、図8ベタ基礎、図9ベタ基礎
は本発明住宅基礎コンクリートの打設方法と基礎構造の
基礎変形構造の断面図である。
FIG. 7 is a cloth foundation, FIG. 8 is a solid foundation, and FIG. 9 is a solid foundation, which are cross-sectional views of a method for placing concrete for a residential foundation of the present invention and a foundation deformation structure of the foundation structure.

【0022】[0022]

【発明の効果】本発明は、以上説明したように構成され
ているので、以下に記載されるような効果を奏する。
Since the present invention is constructed as described above, it has the following effects.

【0023】本発明は、コンクリートベース打設時に、
予め外回り立ち上がり基礎のコンクリート打設箇所に適
宜形状の凸部や凹部または適切な段差を形成する基礎構
造であり、基礎が止水構造になっているので床下に水が
入らない。
The present invention, when placing a concrete base,
It is a foundation structure that rises outside and forms a convex or concave portion or an appropriate step in an appropriate shape at the place where concrete is placed on the foundation in advance. Since the foundation is a waterproof structure, water does not enter under the floor.

【0024】本発明は、従来使い捨てとして基礎中に異
物として残る型枠巾止め金具を使わない事により、該型
枠巾止め金具が長い間に水や湿気で錆びて爆裂し、クラ
ックを引き起こす等の起因を回避できる。
The present invention does not use a formwork width stop metal fitting which remains as a foreign substance in the foundation as a conventional disposable, so that the formwork width stop metal fitting is rusted by water or moisture for a long time and explodes to cause cracks, etc. The cause of can be avoided.

【0025】また、本発明の凸部及び凹部を持つ基礎構
造はコンクリートベースと立ち上がり基礎が臍形状にな
り基礎が内外に移動しにくく、段差を持つ基礎と共に強
度的に期待できる。
Further, in the foundation structure having the convex portions and the concave portions according to the present invention, the concrete base and the rising foundation are umbilicus-shaped so that the foundation is hard to move in and out, and it can be expected to be strong together with the foundation having the step.

【0026】本発明は、基礎の型枠組みに使う消耗品で
ある型枠巾止め金具や通称馬と言う金具及びプラスチッ
ク製品を不要とし、コストに付いても削減できる。
The present invention does not require a metal mold width stop metal fitting, a metal fitting commonly called a horse, and a plastic product, which are consumables used for the basic mold framework, and can be reduced in cost.

【図面の簡単な説明】[Brief description of drawings]

【図1】布基礎で凸部を持つコンクリート基礎構造の断
面図である。
FIG. 1 is a cross-sectional view of a concrete foundation structure having a convex portion on a cloth foundation.

【図2】布基礎で図1のコンクリートベースを示す工事
途中の断面図である。
FIG. 2 is a cross-sectional view showing the concrete base of FIG. 1 on a cloth foundation during construction.

【図3】ベタ基礎で段差を持つコンクリート基礎構造の
断面図である。
FIG. 3 is a cross-sectional view of a concrete foundation structure having steps on a solid foundation.

【図4】ベタ基礎で図3のコンクリートベースを示す工
事途中の断面図である。
FIG. 4 is a sectional view of a solid foundation showing the concrete base of FIG. 3 during construction.

【図5】布基礎で凹部を持つコンクリート基礎構造の断
面図である。
FIG. 5 is a cross-sectional view of a concrete foundation structure having a recess on a cloth foundation.

【図6】布基礎で図5のコンクリートベースを示す工事
途中の断面図である。
FIG. 6 is a cross-sectional view of the cloth foundation showing the concrete base of FIG. 5 during construction.

【図7】布基礎で凹部を持つコンクリート基礎変形構造
の断面図である。
FIG. 7 is a cross-sectional view of a concrete foundation deforming structure having a concave portion on a cloth foundation.

【図8】ベタ基礎で凹部を持つコンクリート基礎変形構
造の断面図である。
FIG. 8 is a cross-sectional view of a concrete foundation deforming structure having a solid foundation and a concave portion.

【図9】ベタ基礎で段差を持つコンクリート基礎変形構
造の断面図である。
FIG. 9 is a cross-sectional view of a concrete foundation deformable structure having a solid foundation and a step.

【図10】型枠の下部を止めるパネルキャッチの参考図
である。
FIG. 10 is a reference view of a panel catch for stopping the lower part of the formwork.

【符号の説明】[Explanation of symbols]

1 コンクリートベース 2 外回り立ち上がり基礎 3 凸部 4 段差 5 凹部 6、7 型枠 8 採石 9 捨てコンクリート 10 ベース鉄筋 11 立ち上がり鉄筋 12、13 ベース枠 14 パネルキャッチ金具 15 型枠巾止め金具 16 木製粗材 17 外側型枠 18 段差用型枠巾止め金具 1 concrete base 2 Outer rotation rising foundation 3 convex 4 steps 5 recess 6,7 formwork 8 quarry 9 Discarded concrete 10 Base rebar 11 Stand-up rebar 12, 13 Base frame 14 panel catch metal fittings 15 Formwork width stopper 16 wooden rough wood 17 Outer formwork 18 Formwork width stopper for step

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 住宅基礎施工時において、コンクリート
ベース(1)打設時に、予め外回り立ち上がり基礎
(2)のコンクリート打設箇所に適宜形状の凸部(3)
を形成しておき、前記凸部(3)に前記外回り立ち上が
り基礎(2)のコンクリートを打設することを特徴とす
る住宅基礎コンクリートの打設方法と基礎構造。
1. A projecting portion (3) having an appropriate shape is preliminarily formed on an outer rising edge of the foundation (2) when the concrete base (1) is cast during the construction of a housing foundation.
Is formed and the concrete of the outer rising stand-up foundation (2) is placed on the convex portion (3), and a method for placing a concrete foundation for a house and a foundation structure.
【請求項2】 住宅基礎施工時において、コンクリート
ベース(1)打設時に、予め外回り立ち上がり基礎
(2)のコンクリート打設箇所に適宜形状の凹部(5)
を形成しておき、前記凹部(5)に前記外回り立ち上が
り基礎(2)のコンクリートを打設することを特徴とす
る住宅基礎コンクリートの打設方法と基礎構造。
2. When a concrete foundation (1) is placed during the construction of a house foundation, a concave portion (5) having an appropriate shape is preliminarily provided at the place where the concrete is placed on the outer rise foundation (2) in advance.
Is formed, and the concrete of the outer circumference rising foundation (2) is poured into the concave portion (5), and a method and a foundation structure for housing foundation concrete.
【請求項3】 住宅基礎施工時において、コンクリート
ベース(1)打設時に、予め外回り立ち上がり基礎
(2)のコンクリート打設箇所に適切な寸法の段差
(4)を形成しておき、前記段差(4)に前記外回り立
ち上がり基礎(2)のコンクリートを打設することを特
徴とする住宅基礎コンクリートの打設方法と基礎構造。
3. A step (4) having an appropriate size is formed in advance at the place where concrete is cast on the outer rise foundation (2) when the concrete base (1) is cast during the construction of a housing foundation. 4) The method for placing concrete for housing foundation and the foundation structure, wherein the concrete of the outer rising foundation (2) is placed in 4).
JP2001304175A 2001-08-25 2001-08-25 Method of housing foundation concrete placement and its foundation structure Pending JP2003064696A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001304175A JP2003064696A (en) 2001-08-25 2001-08-25 Method of housing foundation concrete placement and its foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001304175A JP2003064696A (en) 2001-08-25 2001-08-25 Method of housing foundation concrete placement and its foundation structure

Publications (1)

Publication Number Publication Date
JP2003064696A true JP2003064696A (en) 2003-03-05

Family

ID=19124135

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001304175A Pending JP2003064696A (en) 2001-08-25 2001-08-25 Method of housing foundation concrete placement and its foundation structure

Country Status (1)

Country Link
JP (1) JP2003064696A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016089509A (en) * 2014-11-06 2016-05-23 株式会社グランデージ Precast concrete foundation beam member, height adjustment member for precast concrete foundation beam member, foundation structure and construction method for foundation structure
JP2017203354A (en) * 2016-05-13 2017-11-16 有限会社わたなべ Form presser tool
JP2018040208A (en) * 2016-09-09 2018-03-15 鹿島建設株式会社 Construction method for concrete placing joint of concrete structure
CN115387601A (en) * 2022-09-01 2022-11-25 中建四局第五建筑工程有限公司 Reverse ridge hanging formwork support and method for constructing reverse ridge by utilizing same

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016089509A (en) * 2014-11-06 2016-05-23 株式会社グランデージ Precast concrete foundation beam member, height adjustment member for precast concrete foundation beam member, foundation structure and construction method for foundation structure
JP2017203354A (en) * 2016-05-13 2017-11-16 有限会社わたなべ Form presser tool
JP2018040208A (en) * 2016-09-09 2018-03-15 鹿島建設株式会社 Construction method for concrete placing joint of concrete structure
CN115387601A (en) * 2022-09-01 2022-11-25 中建四局第五建筑工程有限公司 Reverse ridge hanging formwork support and method for constructing reverse ridge by utilizing same

Similar Documents

Publication Publication Date Title
JP2003064696A (en) Method of housing foundation concrete placement and its foundation structure
JP3029343U (en) Form tool for mortar material injection in exposed elastic fixed column base method
TW200540319A (en) Method for manufacturing pre-cast hollow shell column and forming device thereof
JP2884440B2 (en) Formwork for construction of concrete prism and construction method of column using it
JP3051674B2 (en) Method of manufacturing concrete skeleton for housing
JP3649663B2 (en) Residential foundation
JP2946728B2 (en) Beam formwork PC plate and its manufacturing method
JP3182053B2 (en) Formwork
JP2543752Y2 (en) Formwork connection bracket
JPH0324676Y2 (en)
JP2846937B2 (en) Manufacturing method of composite concrete columns
JP2003025320A (en) Method for manufacturing precast concrete member and molding frame used in the manufacturing method
JPH0540195Y2 (en)
JPH0688342A (en) Constructing method of post
JP3069496U (en) Steel net to stop concrete spouting
JP2002242296A (en) Precast concrete u-shaped beam outside member forming method and forming method of beam
JPH0617626B2 (en) Reverse winding concrete construction method
JPH02229337A (en) Constructing technique for concrete column
JPS6257788B2 (en)
CN109025279A (en) A kind of sealing mold method of the floor prepared hole of standpipe
JPH0625418U (en) Precast concrete members for building concrete columns
JPH09111859A (en) Pc placing execution work method of concrete balcony
JPH07217199A (en) Trap-constructing method and form structure thereof
JPH1037380A (en) Molded concrete building panel
JPH03202557A (en) Execution method of opening section of concrete slab