JP2003056067A JP2001240250A JP2001240250A JP2003056067A JP 2003056067 A JP2003056067 A JP 2003056067A JP 2001240250 A JP2001240250 A JP 2001240250A JP 2001240250 A JP2001240250 A JP 2001240250A JP 2003056067 A JP2003056067 A JP 2003056067A
Authority
JP
Japan
Prior art keywords
opening
unit
floor
building unit
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001240250A
Other languages
Japanese (ja)
Other versions
JP4782954B2 (en
Inventor
Hirochika Nakashiyouya
博規 中庄谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP2001240250A priority Critical patent/JP4782954B2/en
Publication of JP2003056067A publication Critical patent/JP2003056067A/en
Application granted granted Critical
Publication of JP4782954B2 publication Critical patent/JP4782954B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a unit type residence capable of further restraining the effect of deflection generated by removing a column from an indoor space. SOLUTION: In the unit type residence in which a plurality of building units 20B in which temporary columns are mounted temporarily at one corners 20D are connected centering around the temporary columns and the indoor space with no column is ensured by removing the temporary columns from the corner sections 20D as the connecting sections, an opening section 82 extending over sections among each building unit 20B and 20B is formed to at least one of the ceiling surfaces 80 and floor faces of the connecting sections 20D in which the temporary columns are installed temporarily, and a joint panel 83 closing the opening section 82 is secured in the opening section 82.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、ユニット式住宅に
関し、より詳しくは、一角に仮柱が仮設された複数の建
物ユニットを該仮柱を中心に組み合わせて室内空間が確
保されるユニット式住宅に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a unit-type house, and more particularly, to a unit-type house in which a plurality of building units, each having a temporary column in one corner, are combined around the temporary column to secure an indoor space. Regarding

【0002】[0002]

【背景技術】従来より、箱状に形成された複数の建物ユ
ニットを組み合わせて建築されるユニット式住宅が知ら
れている。また、このユニット式住宅を建築する工法の
一つとして、本来、室内空間の中央に配置すべき柱を取
り除くことによって、より広い室内空間を確保する工法
がある。より詳しくは、一角に仮柱が仮設された複数の
建物ユニットを該仮柱を中心に連結した後、その連結部
たる角部から仮柱を取り除いて柱のない室内空間を確保
する。
BACKGROUND ART A unit-type house constructed by combining a plurality of box-shaped building units has been conventionally known. Further, as one of the construction methods for constructing this unit-type house, there is a construction method that secures a wider indoor space by removing a pillar that should originally be arranged in the center of the indoor space. More specifically, after a plurality of building units in which temporary columns are temporarily installed in one corner are connected around the temporary columns, the temporary columns are removed from the corners that are the connecting portions to secure an indoor space without columns.

【0003】[0003]

【発明が解決しようとする課題】ところで、この工法に
て施工される住宅は、その構造上、仮柱が仮設されてい
た連結部において撓み(応力)が生じる。このため、そ
の連結部に生じる撓みを抑制すべく各建物ユニットに跨
る補強梁などを設けてその撓みの原因となる応力の集中
を回避するといった種々の対策が講じられている。本発
明は、室内空間から柱を取り除くことによって生じる撓
みによる影響をさらに抑制できるユニット式住宅を提供
することを課題とする。
By the way, in a house constructed by this construction method, due to its structure, a bending (stress) occurs at the connecting portion where the temporary column is temporarily installed. Therefore, various measures have been taken to prevent the concentration of stress that causes the bending by providing a reinforcing beam or the like that straddles each building unit in order to suppress the bending that occurs in the connecting portion. An object of the present invention is to provide a unit-type house that can further suppress the influence of bending caused by removing columns from the indoor space.

【0004】[0004]

【課題を解決するための手段】上記した課題を解決する
ため本発明では、以下の構成とした。すなわち、本発明
のユニット式住宅は、一角に仮柱が仮設された複数の建
物ユニットを、該仮柱を中心に連結した後、その連結部
たる角部から仮柱を取り除いて柱のない室内空間を確保
したユニット式住宅であって、前記仮柱が仮設されてい
た連結部の天井面及び床面の少なくとも一方には、前記
各建物ユニット間に跨る開口部が形成され、その開口部
には、該開口部を塞ぐパネルが設けらていることを特徴
とする。
In order to solve the above problems, the present invention has the following configuration. That is, the unit-type house of the present invention is a room without a pillar formed by connecting a plurality of building units in which a temporary pillar is temporarily installed at one corner around the temporary pillar, and then removing the temporary pillar from the corner portion that is the connecting portion. In a unit-type house that secures a space, at least one of the ceiling surface and the floor surface of the connection portion where the temporary columns are temporarily installed has an opening portion formed between the building units, and the opening portion is formed in the opening portion. Is characterized in that a panel for closing the opening is provided.

【0005】また、開口部の大きさは、その内部に前記
各建物ユニットの梁が臨む大きさに設定するとよい。ま
た、開口部の縁には、前記各建物ユニットの梁にて支持
される木枠を設け、前記パネルは、その木枠を介して開
口部内に固定される構成としてもよい。
The size of the opening may be set so that the beam of each building unit faces the inside thereof. A wooden frame supported by the beams of the building units may be provided at the edge of the opening, and the panel may be fixed in the opening through the wooden frame.

【0006】また、前記開口部に前記パネルが設けられ
た状態で、その開口部とパネルとの境界上には、補強テ
ープが貼着されている構成としてもよい。さらに、前記
パネルの表面側には、壁紙を設けるようにしてもよい。
Further, it is possible to adopt a structure in which a reinforcing tape is attached to the boundary between the opening and the panel in a state where the panel is provided in the opening. Further, a wallpaper may be provided on the front surface side of the panel.

【0007】このように構成された本発明のユニット式
住宅によれば、仮柱が仮設されていた連結部の天井面及
び床面の少なくとも一方に、各建物ユニットに跨る開口
部が形成されるため、その開口部によって連結部たる天
井面若しく床面に作用する応力の集中が回避される。ま
た、その開口部にはパネルが設けられるため、各建物ユ
ニット間の段差すなわち施工誤差が見かけ上最小のもの
となる。さらに壁紙(クロス)を貼着した場合には、そ
の連結部における壁紙の延びも抑制される。
According to the unit-type house of the present invention thus constructed, an opening extending over each building unit is formed on at least one of the ceiling surface and the floor surface of the connecting portion where the temporary columns are temporarily installed. Therefore, the concentration of stress acting on the ceiling surface or the floor surface, which is the connecting portion, is avoided by the opening. Moreover, since the panel is provided in the opening, the step between the building units, that is, the construction error is apparently minimized. Further, when the wallpaper (cloth) is attached, the extension of the wallpaper at the connecting portion is also suppressed.

【0008】また、各建物ユニットの梁や、その梁にて
支持される木枠を介してパネルを固定すれば、その開口
部内にてより確実にパネルを支持できる。また、パネル
と開口部との境界上に補強テープを貼着すれば、パネル
と開口部との継ぎ目が該補強テープにて覆われるため、
パネルと天井面、又はパネルと床面との一体感が得られ
やすくなる。また、境界線上における壁紙の延びも補強
テープによって抑制される。
Further, if the panel is fixed via the beam of each building unit and the wooden frame supported by the beam, the panel can be more surely supported in the opening. Further, if a reinforcing tape is attached on the boundary between the panel and the opening, the joint between the panel and the opening is covered with the reinforcing tape,
It is easy to obtain a sense of unity between the panel and the ceiling surface or the panel and the floor surface. Further, the extension of the wallpaper on the boundary line is also suppressed by the reinforcing tape.

【0009】[0009]

【発明の実施の形態】以下、本発明の一実施形態を図面
に基づき説明する。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of the present invention will be described below with reference to the drawings.

【0010】本実施形態に示すユニット式住宅10は、
図1に示すように箱状の建物ユニットを複数組み合わせ
て形成されている。より詳しくは、下側建物ユニットと
しての1階建物ユニット20と、上側建物ユニットとし
ての2階建物ユニット30とを備えている。
The unit type house 10 shown in this embodiment is
As shown in FIG. 1, it is formed by combining a plurality of box-shaped building units. More specifically, the first floor building unit 20 as a lower building unit and the second floor building unit 30 as an upper building unit are provided.

【0011】1階建物ユニット20は、図2に示すよう
に建物の外周縁に沿ってL字形状に配置された5個の通
常建物ユニット20Aと、一点鎖線のハッチングで示す
ように、建物の手前側に配置された4個の大空間用建物
ユニット20Bとで構成されている。
The first-floor building unit 20 includes five normal building units 20A arranged in an L shape along the outer peripheral edge of the building as shown in FIG. It is composed of four large space building units 20B arranged on the front side.

【0012】また、2階建物ユニット30も同様に、建
物の外周縁に沿ってL字形状に配置された5個の通常建
物ユニット30Aと、建物の手前側に配置された4個の
大空間用建物ユニット30Bとで構成されている。すな
わち、2階建物ユニット30の配置は、建物1階部分と
同様になっている。
Similarly, the second-floor building unit 30 also has five normal building units 30A arranged in an L shape along the outer peripheral edge of the building and four large spaces arranged on the front side of the building. It is composed of a building unit 30B. That is, the arrangement of the second-floor building unit 30 is similar to that of the first-floor portion of the building.

【0013】通常建物ユニット20A、30Aは、図3
に示すように、四隅の柱41の上下端を連結する天井梁
42および床梁43を有する箱状のフレーム40を備え
ている。このうち、柱41と天井梁42とは、柱41の
柱頭側に配置された柱頭接合部材45を介して連結さ
れ、柱41と床梁43とは、柱41の柱脚側に配置され
た柱脚接合部材46を介して連結されている。
The normal building units 20A and 30A are shown in FIG.
As shown in, the box-shaped frame 40 having a ceiling beam 42 and a floor beam 43 that connect the upper and lower ends of the pillars 41 at the four corners is provided. Among these, the pillar 41 and the ceiling beam 42 are connected via a stigma joining member 45 arranged on the stigma side of the pillar 41, and the pillar 41 and the floor beam 43 are arranged on the pillar pedestal side of the pillar 41. They are connected via a column base joining member 46.

【0014】天井梁42としては、長さの異なる短辺天
井梁42Aおよび長辺天井梁42Bの二種類が設けら
れ、床梁43としては、長さの異なる短辺床梁43Aお
よび長辺床梁43Bの二種類が設けられている。また、
対向する長辺天井梁42Bの間には、天井面材を支持す
るための天井小梁(図示せず)が掛け渡され、対向する
長辺床梁43Bの間には、床面材を支持するための根太
(図示せず)が複数架け渡されている。
Two types of ceiling beams 42 are provided, short side ceiling beams 42A and long side ceiling beams 42B having different lengths, and floor beams 43 are short side floor beams 43A and long side floor beams having different lengths. Two types of beams 43B are provided. Also,
A ceiling beam (not shown) for supporting the ceiling surface material is hung between the facing long side ceiling beams 42B, and a floor material is supported between the facing long side floor beams 43B. There are multiple joists (not shown) for doing this.

【0015】図4には、一階建物ユニット20A同士の
連結構造、及びその一階建物ユニット20Aとその上部
に載置される2階建物ユニット30Aとの連結構造につ
いて図示している。これら各建物ユニット20A、20
A、30Aの連結構造について説明すると、まず、一階
建物ユニット20Aの柱頭接合部材45の上面には、位
置決めピン45Aと、挿通孔45Bとが設けられ、通常
建物ユニット30Aの柱脚接合部材46の下面には、図
示しない位置決め孔と、挿通孔46Bとが設けられてい
る。
FIG. 4 shows a connecting structure between the first-floor building units 20A and a connecting structure between the first-floor building unit 20A and the second-floor building unit 30A placed on the upper part thereof. Each of these building units 20A, 20
Explaining the connection structure of A and 30A, first, a positioning pin 45A and an insertion hole 45B are provided on the upper surface of the stigma connecting member 45 of the first-floor building unit 20A, and the pedestal connecting member 46 of the normal building unit 30A is provided. On the lower surface of, a positioning hole (not shown) and an insertion hole 46B are provided.

【0016】また、その連結には、平板状のシアプレー
ト60が用いられている。そして、そのシアプレート6
0が、隣接配置された1階建物ユニット20Aの柱頭接
合部材45、45と、これら柱頭接合部材45、45の
上に配置される2階建物ユニット30Aの柱脚接合部材
46、46との間に介在することにより、上下方向及び
水平方向に隣接する建物ユニット20A、30A同士が
連結される。
A flat shear plate 60 is used for the connection. And that shear plate 6
0 is between the stigma connecting members 45, 45 of the first-floor building unit 20A, which are arranged adjacent to each other, and the pedestal connection members 46, 46 of the second-floor building unit 30A, which are arranged on the stigma connecting members 45, 45. The building units 20A and 30A that are adjacent to each other in the vertical direction and the horizontal direction are connected to each other by interposing.

【0017】より詳しく説明すると、シアプレート60
には、位置決め孔60Aと挿通孔60Bとが設けられて
いる。そして、1階建物ユニット20Aにおける柱頭接
合部材45の位置決めピン45Aが、シアプレート60
における対応した位置決め孔60Aに挿通され、2階建
物ユニット30Aの柱脚接合部材46の位置決め孔に嵌
合されることにより、各建物ユニット20A、30A同
士の位置決めがなされる。
More specifically, the shear plate 60
The positioning hole 60A and the insertion hole 60B are provided in the. The positioning pin 45A of the stigma connecting member 45 in the first-floor building unit 20A is attached to the shear plate 60.
Each of the building units 20A and 30A is positioned by being inserted into the corresponding positioning hole 60A in and fitted into the positioning hole of the column base joint member 46 of the second-floor building unit 30A.

【0018】そして、2階建物ユニット30Aの柱脚接
合部材46の挿通孔46B→シアプレート60の挿通孔
60B→1階建物ユニット20Aの柱頭接合部材45の
挿通孔45Bの順にボルト11が挿通され、このボルト
11にその下方からナット12が螺合されて緊締される
ことにより、建物ユニット20A、30A同士が連結さ
れる。
Then, the bolt 11 is inserted in the order of the insertion hole 46B of the column base connection member 46 of the second-floor building unit 30A, the insertion hole 60B of the shear plate 60, and the insertion hole 45B of the stigma connection member 45 of the first-floor building unit 20A. The nuts 12 are screwed onto the bolts 11 from below to tighten the bolts 11 so that the building units 20A and 30A are connected to each other.

【0019】図5には、大空間建物ユニット20B、2
0B同士の連結構造について図示している。大空間用建
物ユニット20Bは、上記した通常建物ユニット20A
とは異なり、その一角20Dには後に取り外し可能な仮
柱41aが仮設されている。そして、その仮柱41aを
中心に各建物ユニット20Bを連結した後、その連結部
たる角部20Dから仮柱41aを取り除いて柱のない室
内空間を確保している。
FIG. 5 shows large space building units 20B, 2
The connection structure of OBs is illustrated. The large space building unit 20B is the normal building unit 20A described above.
Unlike the above, a temporary column 41a that can be removed later is temporarily installed at the corner 20D. Then, after each building unit 20B is connected around the temporary column 41a, the temporary column 41a is removed from the corner portion 20D that is the connection portion to secure a column-free indoor space.

【0020】また、大空間用建物ユニット20Bには、
仮柱41aが仮設された角部20Dを中心として、その
短辺方向両側に角隅部20Cを備えており、この角隅部
20Cに配置される柱41を利用して、各建物ユニット
20B間に跨る補強梁70が架け渡されている。
In addition, in the large space building unit 20B,
The temporary column 41a is provided with the corners 20C on both sides in the short side direction around the corner 20D where the temporary is provided, and the columns 41 arranged in the corners 20C are used to connect between the building units 20B. A reinforcing beam 70 is spanned over.

【0021】図6には、補強梁70の全体斜視図が示さ
れている。補強梁70は、断面縦長の長方形であって、
継目なく一体成形された直線状の筒状部材である梁本体
71と、この梁本体71の高さ方向中間の所定位置に設
けられた平板状の接続部72とを備えている。接続部7
2は、角隅部20Dに対応した位置であって梁本体71
の中央に設けられた中央接続部73と、角隅部20Dの
両側の角隅部20Cに対応した位置であって梁本体71
の端部に設けられた端部接続部74とを含んで構成され
ている。
FIG. 6 shows an overall perspective view of the reinforcing beam 70. The reinforcing beam 70 has a rectangular shape with a vertically long cross section,
A beam main body 71, which is a linear tubular member integrally formed without a seam, and a flat plate-shaped connecting portion 72 provided at a predetermined position in the middle of the beam main body 71 in the height direction are provided. Connection 7
2 is a position corresponding to the corner portion 20D and is the beam main body 71.
Of the beam main body 71 at positions corresponding to the central connecting portion 73 provided at the center of the corner and the corners 20C on both sides of the corner 20D.
And an end connecting portion 74 provided at the end of the.

【0022】中央接続部73は、梁本体71の上端から
高さ寸法Xだけ下がった箇所にスリットが設けられ、こ
のスリットにシアプレート60が挿通されて溶接固定さ
れることによって形成されている。また、中央接続部7
3は、梁本体71に接続される梁本体接続部分731
と、この梁本体接続部分731の両端部であって、1階
建物ユニット20Bおよび2階建物ユニット30Bに接
続されるユニット接続部分732とを備えている。ユニ
ット接続部分732には、複数の位置決め孔73Aおよ
び挿通孔73Bが設けられている。
The central connecting portion 73 is formed by providing a slit at a position lower by the height dimension X from the upper end of the beam main body 71, and inserting the sear plate 60 into this slit and fixing it by welding. Also, the central connecting portion 7
3 is a beam main body connecting portion 731 connected to the beam main body 71.
And unit connection portions 732 which are both ends of the beam main body connection portion 731 and which are connected to the first floor building unit 20B and the second floor building unit 30B. The unit connecting portion 732 is provided with a plurality of positioning holes 73A and insertion holes 73B.

【0023】端部接続部74は、梁本体71の上端から
高さ寸法Yだけ下がった箇所にスリットが設けられ、こ
のスリットにシアプレート60が挿通されて溶接固定さ
れることによって形成されている。また、端部接続部7
4は、梁本体71に接続される梁本体接続部分741
と、この梁本体接続部分741の両端部であって、1階
建物ユニット20Bおよび2階建物ユニット30Bに接
続されるユニット接続部分742とを備えている。ユニ
ット接続部分742には、複数の位置決め孔74Aおよ
び挿通孔74Bが設けられている。
The end connecting portion 74 is formed by providing a slit at a position lower by the height dimension Y from the upper end of the beam main body 71, and inserting the sear plate 60 into this slit and fixing it by welding. . Also, the end connecting portion 7
4 is a beam body connecting portion 741 connected to the beam body 71
And unit connection portions 742 which are both ends of the beam main body connection portion 741 and which are connected to the first-floor building unit 20B and the second-floor building unit 30B. The unit connection portion 742 is provided with a plurality of positioning holes 74A and insertion holes 74B.

【0024】ここで、高さ寸法Xは高さ寸法Yより小さ
い値に設定されている。つまり、中央接続部73の梁本
体接続部分731が、端部接続部74の梁本体接続部分
741より、梁本体71に対して高さ寸法の差Y−Xだ
け高い位置となっている。よって、各接続部72は平板
状であるから、中央接続部73のユニット接続部分73
2と、端部接続部74のユニット接続部分742との高
さ寸法の差もY−Xとなっている。なお、高さ寸法の差
Y−Xは、補強梁70の中央の撓みに等しく設定され、
実験等により適宜決められてよい。
Here, the height dimension X is set to a value smaller than the height dimension Y. That is, the beam main body connecting portion 731 of the central connecting portion 73 is located at a position higher than the beam main body connecting portion 741 of the end connecting portion 74 with respect to the beam main body 71 by the height difference Y-X. Therefore, since each connecting portion 72 is flat, the unit connecting portion 73 of the central connecting portion 73 is
2 and the unit connecting portion 742 of the end connecting portion 74 also have a height difference of Y-X. Note that the height difference Y-X is set equal to the bending of the center of the reinforcing beam 70,
It may be appropriately determined by experiments or the like.

【0025】図7には、補強梁70の中央接続部73の
拡大断面図が示され、図8には、補強梁70と大空間用
建物ユニット20Bとの連結部分の分解斜視図が示され
ている。
FIG. 7 shows an enlarged sectional view of the central connecting portion 73 of the reinforcing beam 70, and FIG. 8 shows an exploded perspective view of a connecting portion between the reinforcing beam 70 and the large space building unit 20B. ing.

【0026】梁本体71の梁幅Wは、隣接する2階建物
ユニット30Bの間に形成される隙間より僅かに狭くな
っている。また、梁本体71の梁背Hは、補強梁70に
必要な剛性によって適宜決められている。
The beam width W of the beam body 71 is slightly narrower than the gap formed between the adjacent second floor building units 30B. Further, the beam back H of the beam body 71 is appropriately determined by the rigidity required for the reinforcing beam 70.

【0027】中央接続部73のユニット接続部分732
は、シアプレート60と同様に、1階建物ユニット20
Bの隣接する複数の柱頭接合部材45、45と、これら
の柱頭接合部材45上に配置される2階建物ユニット3
0Bの隣接する複数の柱脚接合部材46、46との間に
介在されて連結されている。
The unit connecting portion 732 of the central connecting portion 73
Is the first-floor building unit 20 as well as the sheer plate 60
B adjacent plural stigma joining members 45, 45, and the second-floor building unit 3 arranged on these stigma joining members 45
The column base joint members 46, 46 adjacent to each other of 0B are interposed and connected.

【0028】具体的には、1階建物ユニット20Bに設
けられた柱頭接合部材45の位置決めピン45Aが中央
接続部73の位置決め孔73Aに挿通され、2階建物ユ
ニット30Bの柱脚接合部材46の位置決め孔に嵌合し
ている。また、2階建物ユニット30Bにおける柱脚接
合部材46の挿通孔46B→中央接続部73の挿通孔7
3B→1階建物ユニット20Bにおける柱頭接合部材4
5の挿通孔45Bの順にボルト11が挿通されて、その
下方からナット12によって緊締される。
Specifically, the positioning pin 45A of the stigma connecting member 45 provided in the first-floor building unit 20B is inserted into the positioning hole 73A of the central connecting portion 73, and the column base connecting member 46 of the second-floor building unit 30B is inserted. It fits into the positioning hole. Further, the insertion hole 46B of the column base joining member 46 in the second-floor building unit 30B → the insertion hole 7 of the central connecting portion 73.
3B → stigma connecting member 4 in the first floor building unit 20B
The bolt 11 is inserted in the order of the insertion hole 45B of No. 5 and tightened by the nut 12 from below.

【0029】端部接続部74のユニット接続部分742
は、中央接続部73のユニット接続部分732と同様
に、1階建物ユニット20Bおよび2階建物ユニット3
0Bに連結されている。具体的には、1階建物ユニット
20Bに設けられた柱頭接合部材45の位置決めピン4
5Aが、端部接続部74の位置決め孔74Aに挿通さ
れ、2階建物ユニット30Bにおける柱脚接合部材46
の位置決め孔に嵌合されている。また、2階建物ユニッ
ト30Bにおける柱脚接合部材46の挿通孔46B→端
部接続部74の挿通孔74B→1階建物ユニット20B
における柱頭接合部材45の挿通孔45Bの順にボルト
11が挿通されて、その下方からナット12によって緊
締される。
A unit connecting portion 742 of the end connecting portion 74
Is similar to the unit connecting portion 732 of the central connecting portion 73, the first floor building unit 20B and the second floor building unit 3
It is connected to OB. Specifically, the positioning pin 4 of the stigma connecting member 45 provided in the first-floor building unit 20B
5A is inserted into the positioning hole 74A of the end connecting portion 74, and the column base joining member 46 in the second-floor building unit 30B.
It is fitted in the positioning hole of. In addition, the insertion hole 46B of the column base joining member 46 in the second-floor building unit 30B → the insertion hole 74B of the end connection portion 74 → the first-floor building unit 20B.
The bolt 11 is inserted in the order of the insertion hole 45B of the stigma joining member 45 in FIG.

【0030】次に、柱等の突出物が何ら存在しない大空
間の組立手順を説明する。なお、建物の2階部分も、1
階部分と同様の構成であるため、その連結部分の構造お
よび施工手順は、下記の説明に殉ずる。
Next, a procedure for assembling a large space in which there are no protrusions such as columns will be described. The 1st floor of the building is also 1
Since the structure is the same as the floor part, the structure and construction procedure of the connecting part will be described below.

【0031】まず、大空間用建物ユニット20Bを、建
物ユニット20A、30Aおよび補強梁70と同様に工
場で製作した後、建築現場に運搬する。運搬の際、建物
ユニット20Bの変形を防止するために、角隅部20D
には仮柱41aを仮に設けておく、なお、仮柱41a
は、柱脚接合部材46と柱頭接合部材45とに着脱可能
に連結されている。そして、図5に示すように、4つの
大空間用建物ユニット20Bの、その仮柱41aが設け
られている角隅部20Dを衷心に寄せ合わせるように隣
接配置する。
First, the large space building unit 20B is manufactured in a factory in the same manner as the building units 20A and 30A and the reinforcing beam 70, and then transported to a construction site. In order to prevent the deformation of the building unit 20B during transportation, the corner portion 20D
Temporary columns 41a are provisionally provided in the
Is detachably connected to the pedestal joint member 46 and the stigma joint member 45. Then, as shown in FIG. 5, the corner portions 20D of the four large space building units 20B, in which the temporary columns 41a are provided, are arranged adjacent to each other so as to come close to each other.

【0032】その後、角隅部20C、20Cに配置され
る柱41、41間に補強梁70を架け渡し、柱頭接合部
材45の位置決めピン45Aを端部接続部74の位置決
め孔74aに挿通して、補強梁70の位置決めを行う。
この時、中央接続部73のユニット接続部分732は、
梁本体71に対して、端部接続部74のユニット接続部
分742よりY−Xだけ高い位置にあるから、角隅部2
0Dの柱頭接合部材45の上方に僅かに離れて位置して
いる。
After that, the reinforcing beam 70 is bridged between the columns 41, 41 arranged in the corner portions 20C, 20C, and the positioning pin 45A of the stigma connecting member 45 is inserted into the positioning hole 74a of the end connecting portion 74. The reinforcing beam 70 is positioned.
At this time, the unit connecting portion 732 of the central connecting portion 73 is
Since it is higher than the unit connecting portion 742 of the end connecting portion 74 by Y-X with respect to the beam main body 71, the corner portion 2
It is located slightly above the 0D stigma joining member 45.

【0033】それから、2階建物ユニット30Bを大空
間用建物ユニット20Bの上に積層する。すると、中央
接続部73が2階建物ユニット30Bの加重により下方
に押し下げられ、それに伴い補強梁70の中央部分も撓
んで、各ユニット接続部分732、742の2階建物ユ
ニット30Bに対する高さが一定になる。そして、中央
接続部73が角隅部20Dの柱頭接合部材45にほぼ当
接する位まで押し下げられた位置で、大空間用建物ユニ
ット20Bの荷重と補強梁70に生じる内部応力とがほ
ぼ釣り合う。この状態で、2階建物ユニット30B、大
空間用建物ユニット20Bおよび補強梁70を緊締具8
1で連結して一体化させる。
Then, the second floor building unit 30B is stacked on the large space building unit 20B. Then, the central connecting portion 73 is pushed downward by the weight of the second-floor building unit 30B, and the central portion of the reinforcing beam 70 is also bent accordingly, and the height of each unit connecting portion 732, 742 with respect to the second-floor building unit 30B is constant. become. Then, the load of the large space building unit 20B and the internal stress generated in the reinforcing beam 70 are substantially balanced at the position where the central connecting portion 73 is pushed down to a position where it is substantially in contact with the stigma connecting member 45 of the corner portion 20D. In this state, the second-floor building unit 30B, the large space building unit 20B, and the reinforcing beam 70 are attached to the tightening tool 8
Connect with 1 to integrate.

【0034】そして、この後に仮柱41aを取り外す
と、天井および床との間に柱等の突出物が何ら存在しな
い大空間が形成される。そして、その天井には、図9に
示されるように石膏ボード等の天井面材81が貼り付け
られて天井面80が形成され、床には、図19に示され
るようにパーチクルボード等の床面材91が貼り付けら
れて床面90が形成される。
Then, when the temporary columns 41a are removed after this, a large space is formed between the ceiling and the floor without any protrusions such as columns. Then, as shown in FIG. 9, a ceiling surface material 81 such as a plaster board is attached to the ceiling to form a ceiling surface 80, and a floor surface such as a particle board as shown in FIG. 19 is formed on the floor. The material 91 is attached to form the floor surface 90.

【0035】また、本実施の形態では、図9及び図15
に示すように、角隅部20Dにおける段差すなわち各ユ
ニット20B間における施工誤差を吸収すべく、その角
隅部20Dに対応した天井面80Aには、大きな開口部
82を形成し、その開口部81には、ジョイントパネル
83を取り付けている。一方、床面90側においても同
様に、その角隅部20Dに対応した床面90Aに、大き
な開口部92を設け、その開口部92には、ジョイント
パネル93を設けている。
Further, in this embodiment, FIG. 9 and FIG.
As shown in FIG. 7, a large opening 82 is formed in the ceiling surface 80A corresponding to the corner 20D in order to absorb a step in the corner 20D, that is, a construction error between the units 20B. A joint panel 83 is attached to the. On the other hand, similarly, on the floor surface 90 side, a large opening portion 92 is provided in the floor surface 90A corresponding to the corner portion 20D, and a joint panel 93 is provided in the opening portion 92.

【0036】以下、この角隅部20Dに設けられた開口
部82、92及びジョイントパネル83,93について
説明する。なお、以下の説明では、まず先に天井面80
側に形成された開口部83について、その施工手順を踏
まえながら説明する。
The openings 82, 92 and the joint panels 83, 93 provided in the corner portion 20D will be described below. In the following description, first, the ceiling surface 80
The opening 83 formed on the side will be described based on the construction procedure.

【0037】天井面80に設けられる開口部82は、図
9に示されるように、仮柱41aが設けられていた角隅
部20Dを露出させるように各建物ユニット20Bに跨
って形成されている。
As shown in FIG. 9, the opening 82 provided on the ceiling surface 80 is formed so as to straddle each building unit 20B so as to expose the corner portion 20D where the temporary column 41a was provided. .

【0038】また、その大きさは、図11に示されるよ
うに、その内方に各建物ユニット20Bの短辺天井梁4
2A及び、長辺天井梁42B、柱頭接合部材45が臨む
大きさとされている。より具体的には、長辺方向に約
1.1m、短辺方向に0.9mの寸法でその開口部83
が形成されている。
As shown in FIG. 11, the size of the short side ceiling beam 4 of each building unit 20B is inward.
2A, the long side ceiling beam 42B, and the stigma connecting member 45. More specifically, the opening 83 has a dimension of about 1.1 m in the long side direction and 0.9 m in the short side direction.
Are formed.

【0039】また、その開口部82には、ジョイントパ
ネル83を固定するために、木枠84が設けられてい
る。この木枠84は、図12に示されるように開口部8
2内にて臨む各梁42A、42B及び天井小梁42Cに
て支持されており、開口部82の縁および、各梁42
A、42Bに沿って設けられている。また、長辺天井梁
42Bに沿う木枠84に関しては、長辺天井梁42Bに
て保持された合板84aを介してその木枠84が支持さ
れている。そして、ジョイントパネル83は、その木枠
84の下面側にビス85などを用いて固定されている
(図13参照)。
A wooden frame 84 is provided in the opening 82 for fixing the joint panel 83. The wooden frame 84 has openings 8 as shown in FIG.
It is supported by each of the beams 42A and 42B and the ceiling beam 42C that face the inside of 2, and the edge of the opening 82 and each beam 42.
It is provided along A and 42B. Regarding the wooden frame 84 along the long side ceiling beam 42B, the wooden frame 84 is supported via the plywood 84a held by the long side ceiling beam 42B. The joint panel 83 is fixed to the lower surface side of the wooden frame 84 with screws 85 or the like (see FIG. 13).

【0040】なお、ジョイントパネル83は、強化プラ
ッスチックボード(強化PB)等にて形成されており、
その厚みは、図10に示されるように開口部82内に固
定した状態で、天井面80(天井面材81)と面一とな
るようにその厚みの設定がなされている。
The joint panel 83 is made of a reinforced plastic board (reinforced PB) or the like,
The thickness is set so as to be flush with the ceiling surface 80 (ceiling surface material 81) in a state of being fixed in the opening 82 as shown in FIG.

【0041】そして、ジョイントパネル83の取り付け
後、図14に示すようにジョイントパネル83と開口部
82との継ぎ目Lにメッシュテープ86(補強テープ)
などを貼り付け、その継ぎ目Lを覆い隠す。その後、ジ
ョイントパネル83上を覆うように壁紙(クロス)を貼
り付け天井面80の施工を終える。
After the joint panel 83 is attached, a mesh tape 86 (reinforcing tape) is attached to the joint L between the joint panel 83 and the opening 82 as shown in FIG.
Etc. are attached and the seam L is covered. After that, wallpaper (cloth) is attached so as to cover the joint panel 83, and the construction of the ceiling surface 80 is completed.

【0042】続いて、床面90側に形成された開口部9
2について説明する。床面90側に形成される開口部9
2は、図15に示されるように、比較的小さなものとな
っている。この理由としては、先に説明した天井80側
の撓みに比べ、床面90側に生じる撓みは小さなもので
あり、その各建物ユニット20B間にて生じる段差(施
工誤差)が少なくなっているためである。なお、本実施
の形態では、約0.3m×0.3mの寸法でその開口部
92を形成している。
Next, the opening 9 formed on the floor surface 90 side
2 will be described. Opening 9 formed on the floor 90 side
2 is relatively small, as shown in FIG. The reason for this is that the flexure generated on the floor surface 90 side is smaller than the flexure on the ceiling 80 side described above, and the level difference (construction error) generated between the building units 20B is small. Is. In this embodiment, the opening 92 is formed with a size of about 0.3 m × 0.3 m.

【0043】また、その内部には、柱脚接合部材46の
上面側が臨んでいる。そして、その開口部91内に、パ
ーチクルボードにて形成されたジョイントパネル93を
取り付け、その上から床用ボードなどを貼り付けて床面
90の施工を終える。なお、開口部91内に取り付けら
れるジョイントパネル93の厚みは、勿論、その取り付
け状態において、床面材91の表面と面一となる厚みに
設定されている。
Further, the upper surface side of the column base joining member 46 faces the inside thereof. Then, a joint panel 93 formed of a particle board is attached to the inside of the opening 91, and a floor board or the like is attached on the joint panel 93 to finish the construction of the floor surface 90. The thickness of the joint panel 93 mounted in the opening 91 is, of course, set to a thickness that is flush with the surface of the floor covering 91 in the mounted state.

【0044】このように施工された本実施の形態に示す
ユニット式住宅10によれば、仮柱41aが仮設されて
いた角隅部20Dの天井面80及び床面90の少なくと
も一方に、各建物ユニット20B、20B間に跨る開口
部82、92が形成されるため、その開口部82、92
によって連結部たる角隅部20Dに作用する応力の集中
が回避される。また、各開口部82,92にはジョイン
トパネル83、93が設けられるため、各建物ユニット
20B、20B間の段差すなわち施工誤差が見かけ上最
小のものとなる。さらに、貼着した壁紙(クロス)の延
びも抑制され、角隅部20Dにおける壁紙の破れなどを
未然に阻止できる。
According to the unit-type house 10 shown in this embodiment constructed in this manner, each building is provided on at least one of the ceiling surface 80 and the floor surface 90 of the corner portion 20D where the temporary columns 41a were temporarily installed. Since the openings 82 and 92 are formed so as to extend between the units 20B and 20B, the openings 82 and 92 are formed.
Thereby, concentration of stress acting on the corner portion 20D serving as the connecting portion is avoided. Moreover, since the joint panels 83 and 93 are provided in the openings 82 and 92, the step between the building units 20B and 20B, that is, the construction error is apparently minimized. Further, the extension of the attached wallpaper (cloth) is also suppressed, and it is possible to prevent the wallpaper from breaking at the corners 20D.

【0045】また、天井80側の開口部82に関してい
えば、各建物ユニット20Bの梁42A、42Bや、そ
の梁42A、42Bにて支持される木枠84を介してジ
ョイントパネル83を固定すれば、その開口部82内に
てより確実にジョイントパネル83を支持できる。ま
た、ジョイントパネル83と開口部82との境界上にメ
ッシュテープ86を貼着すれば、ジョイントパネル83
と開口部82との継ぎ目が覆われ、ジョイントパネル8
3と天井面80との一体感がさらに得られやすくなる。
また、境界線L上における壁紙の延びも抑制される。
Regarding the opening 82 on the ceiling 80 side, if the joint panel 83 is fixed via the beams 42A and 42B of each building unit 20B and the wooden frame 84 supported by the beams 42A and 42B. The joint panel 83 can be supported more reliably in the opening 82. If a mesh tape 86 is attached on the boundary between the joint panel 83 and the opening 82, the joint panel 83
And the joint between the opening 82 and the joint panel 8 is covered.
3 and the ceiling surface 80 can be more easily obtained.
Further, the extension of the wallpaper on the boundary line L is also suppressed.

【0046】なお、上記した各ジョイントパネル83,
93の固定方法は、あくまでも本発明の一実施例であ
り、例えば、接着剤などを用いて固定するなど、その固
定方法は所望に応じて変更してもよい。また、上記した
実施形態では、連結部たる角隅部20Dに開口部82、
92を設けて撓みを吸収しているが、勿論、開口部は、
角部20Cなどにおいても有用である。さらに、本実施
の形態では、開口部82、93を、その建物ユニット2
0B製造時において予め形成しておくが、施工現場にて
開口部82、92を形成するようにしてもよい。
The joint panels 83,
The fixing method of 93 is merely an embodiment of the present invention, and the fixing method may be changed as desired, for example, by using an adhesive or the like. Further, in the above-described embodiment, the opening portion 82 is formed in the corner portion 20D that is the connecting portion.
92 is provided to absorb the bending, but of course the opening is
It is also useful in the corner portion 20C and the like. Furthermore, in the present embodiment, the openings 82 and 93 are provided in the building unit 2
The openings 82 and 92 may be formed at the construction site although they are formed in advance during the 0B manufacturing.

【0047】[0047]

【発明の効果】以上のように本発明によれば、室内空間
から柱を取り除くことによって生じる撓みの影響をさら
に抑制できるユニット式住宅を提供できる。
As described above, according to the present invention, it is possible to provide a unit-type house capable of further suppressing the influence of bending caused by removing the pillar from the indoor space.

【図面の簡単な説明】[Brief description of drawings]

【図1】本実施の形態に係るユニット式住宅を示す全体
斜視図である。
FIG. 1 is an overall perspective view showing a unit-type house according to the present embodiment.

【図2】本実施の形態に係るユニット式住宅の1階概略
平面図である。
FIG. 2 is a schematic plan view of the first floor of the unit-type house according to the present embodiment.

【図3】本実施の形態に係る通常建物ユニットのフレー
ムを示す斜視図である。
FIG. 3 is a perspective view showing a frame of a normal building unit according to the present embodiment.

【図4】本実施の形態に係る一階建物ユニット同士の連
結構造、及びその一階建物ユニットとその上部に載置さ
れる2階建物ユニットとの連結構造を示す分解斜視図で
ある。
FIG. 4 is an exploded perspective view showing a connection structure between first-floor building units according to the present embodiment, and a connection structure between the first-floor building unit and a second-floor building unit placed above the first-floor building unit.

【図5】本実施の形態に係る大空間用建物ユニットを示
す分解斜視図である。
FIG. 5 is an exploded perspective view showing a large space building unit according to the present embodiment.

【図6】本実施の形態に係る補強梁を示す全体斜視図で
ある。
FIG. 6 is an overall perspective view showing a reinforcing beam according to the present embodiment.

【図7】本実施の形態に係るユニット式住宅の1階部分
における補強梁と大空間用建物ユニットとの連結部分を
示す断面図である。
FIG. 7 is a cross-sectional view showing a connecting portion between a reinforcing beam and a large space building unit in the first floor portion of the unit-type house according to the present embodiment.

【図8】本実施の形態に係る補強梁と大空間用建物ユニ
ットとの連結部分を示す分解斜視図である。
FIG. 8 is an exploded perspective view showing a connecting portion between a reinforcing beam and a large space building unit according to the present embodiment.

【図9】本実施の形態に係る天井面に形成された開口部
を示す図である。
FIG. 9 is a diagram showing an opening formed on the ceiling surface according to the present embodiment.

【図10】図9のA−A’断面図である。10 is a cross-sectional view taken along the line A-A ′ of FIG.

【図11】本実施の形態に係る天井面に形成された開口
部の拡大図である。
FIG. 11 is an enlarged view of an opening formed on the ceiling surface according to the present embodiment.

【図12】本実施形態に係る天井面側の開口部における
の木枠の取り付け状態を示す図である。
FIG. 12 is a view showing a mounting state of the wooden frame in the opening portion on the ceiling surface side according to the present embodiment.

【図13】天井面側の開口部にジョイントパネルが取り
付けられた状態を示す図である。
FIG. 13 is a view showing a state in which a joint panel is attached to an opening on the ceiling surface side.

【図14】開口部とジョイントパネルの境界上に補強テ
ープを貼り付けた状態を示す図である。
FIG. 14 is a diagram showing a state in which a reinforcing tape is attached on the boundary between the opening and the joint panel.

【図15】本実施の形態に係る床面に形成された開口部
を示す図である。
FIG. 15 is a diagram showing an opening formed on the floor surface according to the present embodiment.

【図16】本実施の形態に係る床面に形成された開口部
の拡大図である。
FIG. 16 is an enlarged view of an opening formed on the floor surface according to the present embodiment.

【符号の説明】[Explanation of symbols]

10 ユニット式住宅 11 ボルト 12 ナット 20 下側建物ユニットとしての1階建物ユニット 20A、30A 通常建物ユニット 20B、30B 大空間用建物ユニット 20D 仮柱が仮設される角隅部 30 上側建物ユニットとしての2階建物ユニット 41 柱 41a 仮柱 42 天井梁 43 床梁 70 補強梁 71 梁本体 72 接続部 73 中央接続部 74 端部接続部 80 天井面(天井) 81 天井面材 82 天井側に形成された開口部 83 ジョイントパネル 84 木枠 84a 合板 85 ビス 86 メッシュテープ(補強テープ) 90 床面 91 床面材 92 床面側に形成された開口部 93 ジョイントパネル L 継ぎ目(境界線) H 梁背 W 梁幅 10 unit type house 11 Volts 12 nuts 20 First floor building unit as lower building unit 20A, 30A Normal building unit 20B, 30B Large space building unit 20D Corners where temporary columns are temporarily installed 30 2nd floor building unit as upper building unit 41 pillars 41a temporary column 42 ceiling beams 43 floor beams 70 Reinforcement beam 71 Beam body 72 Connection 73 Central connection 74 End connection 80 Ceiling surface (ceiling) 81 Ceiling material 82 Openings formed on the ceiling side 83 joint panel 84 wooden frame 84a plywood 85 screws 86 mesh tape (reinforcing tape) 90 floor 91 Floor material 92 Openings formed on the floor side 93 joint panel L seam (boundary) H beam back W beam width

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 一角に仮柱が仮設された複数の建物ユニ
ットを、該仮柱を中心に連結した後、その連結部たる角
部から仮柱を取り除いて柱のない室内空間を確保したユ
ニット式住宅であって、 前記仮柱が仮設されていた連結部の天井面及び床面の少
なくとも一方には、前記各建物ユニット間にまたがる開
口部が形成され、その開口部には、該開口部を塞ぐパネ
ルが設けらていることを特徴とするユニット式住宅。
1. A unit in which a plurality of building units, each having a temporary column temporarily installed in one corner, are connected to each other around the temporary column, and then the temporary column is removed from the corners that are the connecting portions to secure a column-free indoor space. An opening extending over the building units is formed on at least one of the ceiling surface and the floor surface of the connecting portion where the temporary columns are temporarily provided, and the opening portion is provided with the opening portion. A unit-type house characterized by having a panel that closes the
【請求項2】 前記開口部の大きさは、その内部に前記
各建物ユニットの梁が臨む大きさに設定されていること
を特徴とする請求項1に記載のユニット式住宅。
2. The unit-type house according to claim 1, wherein a size of the opening is set so that a beam of each of the building units faces the opening.
【請求項3】 前記開口部の縁には、前記各建物ユニッ
トの梁にて支持される木枠が設けられ、前記パネルは、
前記木枠を介して前記開口部内に固定されていることを
特徴とする請求項1又は2に記載のユニット式住宅。
3. A wooden frame supported by a beam of each of the building units is provided on an edge of the opening, and the panel includes:
The unit type house according to claim 1 or 2, wherein the unit type house is fixed in the opening through the wooden frame.
【請求項4】 前記開口部に前記パネルが設けられた状
態で、その開口部とパネルとの境界上には、補強テープ
が貼着されていることを特徴とする請求項1から3の何
れかに記載のユニット式住宅。
4. The reinforcing tape is adhered to a boundary between the opening and the panel in a state where the panel is provided in the opening, and the reinforcing tape is attached to the boundary between the opening and the panel. The unit type house described in Crab.
【請求項5】 前記パネルの表面側には、壁紙が設けら
ていることを特徴とする請求項1から4の何れかに記載
のユニット式住宅。
5. The unit-type house according to claim 1, wherein a wallpaper is provided on the front surface side of the panel.
JP2001240250A 2001-08-08 2001-08-08 Unit housing Expired - Fee Related JP4782954B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001240250A JP4782954B2 (en) 2001-08-08 2001-08-08 Unit housing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001240250A JP4782954B2 (en) 2001-08-08 2001-08-08 Unit housing

Publications (2)

Publication Number Publication Date
JP2003056067A true JP2003056067A (en) 2003-02-26
JP4782954B2 JP4782954B2 (en) 2011-09-28

Family

ID=19070895

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001240250A Expired - Fee Related JP4782954B2 (en) 2001-08-08 2001-08-08 Unit housing

Country Status (1)

Country Link
JP (1) JP4782954B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101463070B1 (en) 2013-02-04 2014-11-18 주식회사 포스코에이앤씨건축사사무소 Modular structure for large space

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001003454A (en) * 1998-05-29 2001-01-09 Sekisui Chem Co Ltd Building

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001003454A (en) * 1998-05-29 2001-01-09 Sekisui Chem Co Ltd Building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101463070B1 (en) 2013-02-04 2014-11-18 주식회사 포스코에이앤씨건축사사무소 Modular structure for large space

Also Published As

Publication number Publication date
JP4782954B2 (en) 2011-09-28

Similar Documents

Publication Publication Date Title
JP3581426B2 (en) Structural materials and floor and roof structures of wooden buildings and construction methods using them
JP4503982B2 (en) Reinforced beams and unit buildings with the reinforced beams
JPH07180228A (en) Building unit connecting tool
JP2002097722A (en) Unit type building and corner reinforcing material therefor
JP5172604B2 (en) Construction method of unit type building
JP4328455B2 (en) Unit building
JP3831545B2 (en) Unit building
JP2003056067A (en) Unit type residence
JP4717245B2 (en) Unit buildings and corner reinforcements for unit buildings
JP2001164658A (en) Beam joining structure and unit building
JP4749611B2 (en) Unit type building and its construction method
JP3887233B2 (en) Unit building
JP4394310B2 (en) Roof structure of unit house
JP4700178B2 (en) Unit building
JP3877421B2 (en) Floor panels and building units
JP3766774B2 (en) Reinforced beams and unit buildings
JPH05148907A (en) Building composed of dwelling unit
JP7393224B2 (en) Box-shaped building units and buildings using them
JP4801856B2 (en) Unit building
JP3771782B2 (en) Unit building
JP2002021189A (en) Unit building
JP3780278B2 (en) Reinforced beams and unit buildings
JP2713800B2 (en) Building unit frames
JPH08120787A (en) Stabilizing metal fitting and frame assembly structure
JP4381631B2 (en) Unit building shed structure

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20071226

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20080116

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20080205

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080730

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110210

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110301

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110421

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110705

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110708

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140715

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4782954

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees