JP2003052982A - Game machine - Google Patents

Game machine

Info

Publication number
JP2003052982A
JP2003052982A JP2001243130A JP2001243130A JP2003052982A JP 2003052982 A JP2003052982 A JP 2003052982A JP 2001243130 A JP2001243130 A JP 2001243130A JP 2001243130 A JP2001243130 A JP 2001243130A JP 2003052982 A JP2003052982 A JP 2003052982A
Authority
JP
Japan
Prior art keywords
ball
passage
game
pachinko
balls
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001243130A
Other languages
Japanese (ja)
Other versions
JP2003052982A5 (en
Inventor
Makoto Nakamura
誠 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanyo Bussan Co Ltd
Original Assignee
Sanyo Bussan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanyo Bussan Co Ltd filed Critical Sanyo Bussan Co Ltd
Priority to JP2001243130A priority Critical patent/JP2003052982A/en
Publication of JP2003052982A publication Critical patent/JP2003052982A/en
Publication of JP2003052982A5 publication Critical patent/JP2003052982A5/ja
Pending legal-status Critical Current

Links

Landscapes

  • Pinball Game Machines (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a game machine simplified in a path structure for allowing losing and winning balls to fall in predetermined directions. SOLUTION: This game machine comprises a game machine body 4 having a game board and supported by an outer frame 1, a hinged door frame supported in front of the game board by the game machine body 4 to be openable and closable with respect thereto, upper and lower trays for storing game balls supplied thereto from a mechanical board through the game machine body 4, and a launcher for launching game balls supplied from the upper tray toward the upper portion of the game board through the operation of a game player, wherein winning and losing balls are conducted together without discrimination to the discharging path 122 of a discharging path unit 46 provided on the rear surface of the game machine body 4.

Description

【発明の詳細な説明】 【0001】 【発明の属する技術分野】本発明は、パチンコ遊技機や
パチロット等のパチンコ球を使用する遊技機に関し、特
に遊技が終了したいわゆるセーフ球とアウト球を回収す
るための通路を備えた遊技機に関するものである。 【0002】 【従来の技術】例えばパチンコ球を使用する遊技機の一
種であるパチンコ遊技機では遊技者が発射操作機構の一
部としてのハンドルを操作してパチンコ球(このパチン
コ球を遊技球という)を遊技面に打ち出し、その遊技球
が遊技面に植設された釘等の障害物に干渉されながら下
降し、途中に設けられた入賞口に入賞することでパチン
コ球を得られるようになっている(このパチンコ球を賞
球という)。遊技面上に打ち出された遊技球はあるもの
は下降しながら入賞口に入っていわゆるセーフ球とな
り、あるものは入賞口に入らずにいわゆるアウト球とな
る。これらセーフ球及びアウト球をもって遊技を終了し
たパチンコ球とする。ここに遊技を終了したパチンコ球
をどのように回収するかで機種分類が可能である。これ
にはセーフ球及びアウト球ともパチンコ球を機外に排出
するとともに常時新たなパチンコ球を上部位置に配設さ
れたタンクに供給する排出タイプと、機外に排出される
ことなく機内のみでパチンコ球を循環させる循環タイプ
がある。主流は排出タイプである。例えば排出タイプに
おいて従来のセーフ球処理装置を備えたパチンコ遊技機
ではセーフ球をアウト球とは別コースを辿って排出口に
導くようにされていた。これはセーフ球を一旦セーフ球
処理装置に導いて払い出し装置からの賞球の放出に寄与
させる必要があったからである。具体的な従来のパチン
コ球の流路について図31に基づいて簡単に説明する。
機構盤150のほぼ中央位置にはアウト球の出口151
に対応してアウト球の落下する落下スペース152が形
成されている。尚、出口151は遊技機本体側となる遊
技盤(遊技面の裏側)に形成されている。落下スペース
152の下方にはアウト球を外部に導く排出マス153
が配設されている。一方、セーフ球は左右に延出された
集球枠154上に落下するようになっており、落下後図
上左方向に導かれてセーフ球処理装置155内に導入さ
れる。セーフ球処理装置155から下流に流下したセー
フ球は最後に排出マス153に至ってアウト球と同様外
部に導かれる。また、機構盤150にはこのようなアウ
ト球とセーフ球の排出機構の他に下受け皿にオーバーフ
ローしたパチンコ球を導くオーバーフロー通路156が
形成されている。オーバーフロー通路156は払い出し
ユニット157の下部のオーバーフロー分岐機構158
からセーフ球処理装置155の背後及び落下スペース1
52の背後を通って下受け皿に連通されている。また、
タンク内のパチンコ球を機種交換等によって強制的に排
出させために球抜き機構を作動させた際には球抜き通路
159をすべての残ったパチンコ球は流下する。球抜き
通路159はセーフ球処理装置155の外方及び下方を
迂回しながら排出マス153に至って外部に導かれる。 【0003】 【発明が解決しようとする課題】しかし、このような排
出機構においてはいくつかの問題があった。 1)セーフ球処理装置155は遊技台としての遊技機本
体の裏面側に配置された機構盤150に形成されてい
る。一方遊技面での遊技は遊技機本体側で行われてい
る。従って、セーフ球は遊技機本体側から必然的に一旦
裏面側の機構盤150側に移動しなくてはならず構造が
複雑化していた。 2)アウト球とセーフ球とは別ルートを辿るものの最後
には機構盤155下部の排出マス153につながること
となっている。すなわち、出口が同じにも関わらず2種
類のルートを配設することとなっていたため、他の構成
部材を圧迫することとなっていた。特に従来ではオーバ
ーフロー通路156や球抜き通路158も上記セーフ球
処理装置155や落下スペース152と一緒にまとめて
機構盤に配設されていたため極めて複雑化していた。 3)アウト球は本来遊技機本体から直接外部に排出させ
るルートも考えられるのにセーフ球がセーフ球処理装置
155に一旦送られることから敢えて機構盤155側の
排出マス153に送ることとなってしまっている。すな
わち、アウト球にとっては無用な機構盤155側への移
動がなされており、構造をいたずらに複雑化するもので
あった。 4)遊技者の興趣をより盛り上げるために従来のパチン
コ遊技機に比べて大型化した遊技面を備えたものが求め
られている。そのためには全体的にパチンコ遊技機の下
部寄りに配設された部材の取り付けスペースがより制約
されることとなっている。しかし、上記のように排出機
構周辺は複雑化しているため、このような構成では従来
に比べて大型化した遊技面を備えたパチンコ遊技機を実
現するのは困難であった。 5)上記従来の機種ではパチンコ球の排出機構は機構盤
150と一体化しているため、これら排出機構に不具合
が生じた場合にその部分だけ交換することが困難な場合
があった。また、部品交換が可能な場合であっても機構
が複雑なため作業に時間と熟練を要する場合があった。
本発明は、このような従来の技術に存在する問題点に着
目してなされたものである。その目的とするところは、
アウト球及びセーフ球を所定方向に向かって流下させる
ための通路構造を簡単にした遊技機を提供することにあ
る。 【0004】 【課題を解決するための手段】上記の目的を達成するた
めに請求項1に記載の発明では、支持枠体に支持され遊
技者が対面して遊技を行う遊技面を備えた遊技台と、同
遊技台に対して開閉可能に支持され同遊技面の前方に配
置される扉枠と、同扉枠の下方に配置され、同扉枠と一
体化してあるいは単独で前記遊技台に対して開閉可能に
支持され払い出し機構から供給されるパチンコ球を貯留
するパチンコ球受け皿と、同パチンコ球受け皿から供給
されるパチンコ球を遊技者の操作によって前記遊技面上
部に向かって発射させる発射操作機構とを備えた遊技機
において、前記遊技面での遊技が終了して前記遊技台の
裏面に誘導されて落下するすべてのパチンコ球を受け止
めて所定方向に向かって流下させる通路を同遊技台裏面
に配設したことをその要旨とする。 【0005】請求項1の発明のような構成では、従来の
ようにアウト球とセーフ球を別々のルートで流下させる
必要がなく、更に機構盤に通路を設けるのではなく遊技
台裏面に設けるようにしたため遊技が終了したパチンコ
球を処理する構造が簡単となる。 【0006】 【発明の効果】 請求項1に記載の発明では、従来のよ
うにアウト球とセーフ球を別々のルートで流下させる必
要がなく、更に機構盤に通路を設けるのではなく遊技台
裏面に設けるようにしたため遊技が終了したパチンコ球
を処理する構造が簡単となる。 【0007】 【発明の実施の形態】以下、本発明をパチンコ遊技機に
応用した実施の形態について図面に基づいて説明する。
特に本実施の形態では従来に比べて遊技面を大型化した
パチンコ遊技機に本発明を化体させて説明する。ここに
「従来に比べて大型化した遊技面を備えたパチンコ遊技
機」とは遊技者の興趣をより盛り上げるために遊技面を
大型化した機種であり、遊技面が大型化することにより
遊技面中央に配置される表示装置の液晶画面を大きくす
ることが可能となり、迫力ある大画面を遊技者は享受で
き遊技者に対するアピール度が増すことができる機種で
ある。更に、同機種では遊技面が大きくなるため左右方
向への遊技球(パチンコ球)の拡散度が大きくなり遊技
自体の視覚的な刺激が増すこととなり、落下する遊技球
の落下距離も長くなるため遊技球が入賞口に入賞するか
どうかの期待感も増すこととなるものである。尚、以下
の説明においては前面、前方或いは表面側とは遊技者が
正対する側をいい、後面、後方或いは背面側とはそれら
正対する側の反対側をいう。また、特記なき限り左右と
は前面からみた左右方向をいう。 【0008】図1及び図5に示すように、パチンコ遊技
機の支持枠体としての外枠1は上下左右の各枠板1a〜
1dによって四角形に枠組みされた木製の枠体とされて
いる。下部枠板1b上面には幕板2が配設されている。
外枠1には遊技台としての遊技機本体4が装着されてい
る。遊技機本体4はパチンコ遊技機の構造的な中核を形
成するパネル状の構成部材であってヒンジ金具6の回動
軸6aを中心に回動し外枠1に対して図2に示す開閉用
金具4aによって開閉可能にかつ着脱可能に装着されて
いる。図2に示すように、遊技機本体4を中心としてそ
の他のパネル状の構成部材がその前後方向に積層状に配
置されている。まず図2に基づいて各構成部材の概略の
配置状態とそれらに付随する主要構成部材について説明
し、次いで個々の構成部材について詳述する。遊技機本
体4の上半身に形成された遊技盤取り付けスペース9に
は遊技盤5が嵌合されている。遊技盤5の前方には扉枠
7が配設されている。扉枠7の上方位置にはガラス窓G
が嵌合されており、同ガラス窓Gの下方位置にはパチン
コ球受け皿としての上受け皿8が形成されている。遊技
盤5の後方位置には遊技盤5を背面から覆うように機構
盤10が配設されている。機構盤10の直下には基板取
り付けベース11が配設されている。遊技盤5の下方位
置にはカバープレート13が配設されている。カバープ
レート13は遊技機本体4に対して固着されている。カ
バープレート13には前方に突出形成した下受け皿14
が形成されている。カバープレート13は従来の機種に
おける下部カバープレートに相当する。単にカバープレ
ート13としたのは本実施の形態では上受け皿8の扉枠
7側への移動に伴って本来上受け皿8が配設される上部
カバープレートが不要となっているからである。下受け
皿14の右側方には操作ハンドル15が取付けられてい
る。 【0009】まず、遊技機本体4及び遊技盤5について
詳しく説明する。図1、図7及び図8に示すように、遊
技機本体4の上半身には横架フレーム18及び左右の縦
フレーム19によって額縁状に縁取られた遊技盤取り付
けスペース9が形成されている。遊技盤取り付けスペー
ス9の下方は図10に示すようにパチンコ球処理領域2
1とされ、同パチンコ球処理領域21の下方には更にパ
チンコ球発射機構23及び音響機構24が配設されてい
る。遊技盤5はパチンコ球処理領域21の天板22上に
載置され遊技盤取り付けスペース9に嵌合されている。
図6に示すように、遊技盤5は略正方形のパネル体であ
って、遊技盤5の前面にほぼ垂直に配置された遊技面2
0上には内レール25及び外レール26によって包囲さ
れた略円形の遊技領域27が形成されている。遊技領域
27内には入賞口28及び可変表示装置29等が所定位
置に配設されている。内レール25の最下部位置にはア
ウト球回収口30が形成されている。遊技が終了して入
賞口28に入賞しなかったパチンコ球(遊技球)はアウ
ト球としてアウト球回収口30から後方に退場する。
尚、釘については図示が省略されている。図7及び図8
に示すように、遊技盤取り付けスペース9前面には前記
遊技領域27に応じた形状に縁取られた幕板31が形成
されている。幕板31は天板22上に載置された遊技盤
5を保持するとともに前方への脱落を防止する機能を有
する。図3及び図5に示すように遊技領域27は出願人
の従来の機種(上受け皿が遊技機本体側に配設されてい
るもの)と比較して大径とされるとともに、可変表示装
置29の表示画面29aも大型化して遊技領域27内に
おいてかなり大きな面積を占めている。これは上受け皿
を遊技盤の下方位置に移動させることで上受け皿に関す
る機構を分散でき、その結果遊技盤を上下方向により長
く構成することができるようになったことが主たる理由
である。 【0010】図11に示すように、遊技盤5の裏面であ
って可変表示装置29の下方位置には3箇所にセーフ球
集合樋32が配設されている。セーフ球集合樋32の下
方にはセーフ球集合板34が配設されている。セーフ球
集合樋32は入賞したパチンコ球(セーフ球)が遊技領
域27から退場後に通過する背面側の通路であって、セ
ーフ球集合樋32に導かれたセーフ球はセーフ球集合板
34の内部(遊技盤5との間でなす隙間)を通過して下
方に落下する。図9〜図11に示すように、セーフ球集
合樋32及びセーフ球集合板34の背面にはメイン基板
33が配設されている。メイン基板33には遊技内容に
応じたプログラムやこれを起動させるためのプログラム
等が個々の機種に応じて封印されて配設されている。 【0011】次に遊技盤5のパチンコ球処理領域21の
周辺の構造について説明する。パチンコ球処理領域21
には後述する払い出し機構40から供給されるパチンコ
球を前面(遊技者側)に導く導入通路45とパチンコ球
を外部に導く排出通路ユニット46とが配設されてい
る。まず導入通路45について説明する。導入通路45
は上受け皿8にパチンコ球を導く主通路47と上受け皿
8が一杯になった場合に下受け皿14方向にオーバーフ
ローしたパチンコ球を導くバイパス通路49とを備えて
いる。図9〜図11に示すように主通路47は遊技機本
体4の裏面側に導入口50を備え、図1、図5等に示す
ように遊技機本体4の表面側の導出口51に連通されて
いる。図13、図14及び図16に示すように、主通路
47内には導入口50から導入したパチンコ球を前方に
流下させる流下面47aが形成されている。流下面47
aには前方に向かって緩やかな傾斜が設けられている。
流下面47aはその途中で途切れており、導出口51は
空間を隔てた流下面47a前方に配置される。 【0012】図9〜図11並びに図15及び図16に示
すようにバイパス通路49は遊技機本体4の裏面側に導
入口52を備え遊技機本体4前面に配設されたオーバー
フロー通路としての下受け皿用通路53内に連通されて
いる。バイパス通路49内には導入口52から導入した
パチンコ球が前方に流下する流下面49aが形成されて
いる。流下面49aには前方に向かって緩やかな傾斜が
設けられている。主通路47及びバイパス通路49は図
10及び図11に示すように遊技盤5が載置されている
天板22位置よりも下方位置であって左方(同図では右
方)に形成されている。図1、図5、図9〜図11及び
図16に示すように下受け皿用通路53は遊技機本体4
前面左側から右方向に横行して前記下受け皿14の流入
口14aに連通されている。下受け皿用通路53はパチ
ンコ球処理領域21の前面左方向においてバイパス通路
49の流下面49aから流下するパチンコ球を下方に落
下させる第1の通路53aと落下するパチンコ球をスム
ーズに略90度右方に方向転換させる曲面に形成された
案内部53bとパチンコ球を斜め右下方に案内する第2
の通路53cから構成される。第2の通路53cは遊技
機本体4の左右方向の略中央位置において下受け皿14
の流入口14aに接続されている。図16に示すよう
に、第2の通路53cの起点位置の上方は開放空間54
とされて前記主通路47の流下面47aの下端部が現れ
ている。 【0013】図1、図5、図13及び図14に示すよう
に、導出口51にはフラップ55が立設されている。フ
ラップ55は回動軸55aによって回動可能に軸支され
るとともに図示しないバネによって付勢されている。図
14に示すように、扉枠7を閉鎖させることで後述する
差し込み受け皿57が導出口51から開放空間54に差
し込まれることとなる。差し込み受け皿57の流下面5
7aは開放空間54に差し込まれた状態で主通路47の
流下面47aよりも若干低い位置に配設され、同流下面
47aを流下するパチンコ球をさらにすみやかに下流に
流下させるために前方に向かって緩やかな傾斜が設けら
れている。差し込み受け皿57の差し込みに伴ってフラ
ップ55は開放空間54側に倒伏させられるとともに、
開放空間54によって途切れた流下面49aの下流位置
に導出口51方向への橋が架けられることとなる。この
状態で主通路47の流下面47aを流下してきたパチン
コ球は差し込み受け皿57上に流入し、更に導出口51
から上受け皿8に導かれることとなる。一方、扉枠7を
開放した際には図13に示すようにフラップ55はバネ
の付勢力によって起立位置に復帰する。この状態ではパ
チンコ球は導出口51には導かれない。すなわち、扉枠
7と一体的に開放されてしまった上受け皿8にパチンコ
球を導くことはできないため上流から流下するパチンコ
球を下受け皿14に導く必要がある。すなわち、差し込
み受け皿57がなくなるためパチンコ球は開放空間54
から下方の第2の通路53c方向に落下し下受け皿14
に流入することとなる。このとき、勢いよく流下面49
aを流下してきたパチンコ球はフラップ55によって導
出口51からの外部への飛び出しが防止される。図16
に示すように、開放空間54と隣接する第1の通路53
aとはその途中に隔壁がなく連通状態とされている。そ
のため、主通路47に導かれるパチンコ球が多すぎて流
下できなくなった場合にはそのオーバーフローしたパチ
ンコ球は主通路47から差し込み受け皿57に至る途中
で開放空間54から第1の通路53aの方向に移動して
下受け皿用通路53に導かれる(つまり下受け皿14に
流入する)ようになっている。つまり、バイパス通路4
9を通らないで主通路47に導かれたパチンコ球が遊技
機本体4前面に至った段階でオーバーフロー状態となる
と、下受け皿14方向に迂回することとなっている。 【0014】ここに、図30に示すように、従来の機種
においては機構盤から連絡通路を通って上受け皿方向に
パチンコ球を供給する際に、扉枠を開放すると上受け皿
への通路が遮断されてしまうためパチンコ球がこぼれな
いように下受け皿へパチンコ球を導く通路160が遊技
機本体に形成されていた(通路160は本実施の形態の
下受け皿用通路53のように周囲が完全に覆われた通路
ではなく上方が開放されたレール状部材に過ぎない)。
しかし、この通路160はオーバフローしたパチンコ球
を下受け皿に導く機能は全くなく、あくまで上受け皿の
開放によって本来上受け皿方向へ流下すべきパチンコ球
の逃げ道として下受け皿に導く機能を有するに過ぎな
い。この点で、本実施の形態の下受け皿用通路53はオ
ーバフローしたパチンコ球を下受け皿に導く機能と扉枠
開放に伴う上受け皿への通路遮断によりパチンコ球を下
受け皿に導く機能の両方の機能を兼ね備えていることと
なる。尚、差し込み受け皿57は扉枠7の閉塞時に開放
空間54からパチンコ球が下受け皿14方向に流れてし
まわないように設けられているものであって、この機構
によって下受け皿用通路53が両方の機能を兼ね備える
ことが可能となっている。図1、図5及び図12に示す
ように、下受け皿用通路53の第2の通路53c下方に
はセンサ収納部66が併設されている。センサ収納部6
6内には図示しないリミットスイッチが配設されてお
り、下受け皿14がパチンコ球で一杯になり第2の通路
53c側に溢れた際にこれを検出して後述する払い出し
装置96からの賞球(パチンコ)の放出を休止させる。
センサ収納部66の右方には後述する迂回通路89(図
1参照)と接続され上受け皿8からのパチンコ球を下受
け皿14に回避させるための連絡通路104が形成され
ている。 【0015】次に排出通路ユニット46について説明す
る。図9〜図11に示すように、排出通路ユニット46
はパチンコ球処理領域21の裏面側(つまり遊技機本体
4の背面側)に形成された取り付け面120に配設され
ている。図26に示すように、排出通路ユニット46は
ベース板121と、その前面に突出形成された排出通路
122とにより構成されている。排出通路122は複数
の部分から構成されており、上部から順に集球枠12
3、第1の傾斜通路124、第2の傾斜通路125、垂
直通路126及び排出マス127とされている。図27
に示すように、取り付け面120には第1の傾斜通路1
24、第2の傾斜通路125及び垂直通路126を合成
した外郭形状に対応した第1の補強リブ128が突設形
成され、その周囲に強度を向上させるための通常の第2
の補強リブ129が突設形成されている。図10、図2
6及び図28に示すように、集球枠123は左右方向に
延出され上方が大きく開口された球受け用の枠部材であ
って、取り付け面120と前面及び左右の壁面123a
〜123cによって包囲されている。集球枠123はア
ウト球回収口30から落下してくるアウト球及びセーフ
球集合板34から落下してくるセーフ球を集球して下方
の第1の傾斜通路124内に導く役割をし、パチンコ球
を受け止め易くするために第1の傾斜通路124よりも
前後方向に幅広に構成されている。図28に示すよう
に、集球枠123内には左右方向に延びる緩衝部材とし
ての案内板131が形成されている。案内板131には
上記遊技を終了したパチンコ球が落下して第1の傾斜通
路124に至る前にその勢いを削いで排出通路122か
ら跳ね出さないようにするためにベース板120方向を
向いた傾斜が設けられている。 【0016】第1の傾斜通路124は取り付け面120
と前面壁124aと底板124bとによって樋状に形成
され、その底板124bは前記第1の補強リブ128に
突き合わされている。底板124bには図10において
パチンコ球が右方向に流下するように傾斜が設けられて
いる。また、図10及び図26に示すように、底板13
2bの前方角部には複数箇所に内部の埃を排出するため
のスリット133が形成されている。第1の傾斜通路1
24の下流側は第2の傾斜通路125に連通されてい
る。第2の傾斜通路125は取り付け面120と前面壁
125aと底板125bとによって樋状に形成され、そ
の底板125bは前記第1の補強リブ128に突き合わ
されている。底板125bには図10においてパチンコ
球が左方向に流下するように傾斜が設けられている。図
10及び図26に示すように、底板124bの前方角部
には複数箇所に内部の埃を排出するためのスリット13
3が形成されている。第2の傾斜通路125の下流側は
徐々に湾曲形成され垂直通路126に連通されている。
垂直通路126はチューブ状に周囲が包囲された空間を
形成している。垂直通路126の下端位置には排出マス
127が連結され、ここから上記遊技を終了したパチン
コ球が外部に排出されるようになっている。図25、図
27及び図29に示すように、第2の傾斜通路125の
上流側には機構盤10側に形成された後述する球抜き流
路99から流下するパチンコ球が当接する流下パチンコ
球当接面135が形成されている。流下パチンコ球当接
面135及びその周辺の構成については後述する。この
ように構成される排出通路ユニット46は取り付け面1
37にビスによって交換可能に装着されている。 【0017】ところで、従来のパチンコ遊技機では機構
盤の下部に大型のセーフ球処理装置が配設されていた。
そして、セーフ球は機構盤に形成された誘導通路を介し
て一旦すべてセーフ球処理装置に送られて保留され、セ
ーフ球の機械的なカウントによって払い出し装置を駆動
させるようになっていた。主としてこのセーフ球処理装
置を配置するスペース的な余裕のなさから従来では払い
出し装置から払い出されるパチンコ球(賞球)の払い出
し位置(後述する分岐機構61に相当する)は上方に配
置せざるを得ず、一部遊技盤を切り欠いて通路を設ける
ような構成とされていた。従って、セーフ球はこのセー
フ球処理装置方向に送る必要があることからこのような
排出通路ユニット46は従来の機種には設けられていな
かった。また、スペース的にも配置する余裕はなかっ
た。 【0018】これに対して、本実施の形態ではセーフ球
処理装置を廃し、排出通路ユニット46が設けられてい
る。これは機械的に払い出し装置を駆動させるのではな
く、上記基板取り付けベース11に配設される払い出し
基板(図示せず)による電気的な制御によって払い出し
装置96を駆動させるようにしたものである。より具体
的には払い出し装置96は次のように作動させられる。
まず、入賞口には図示しない検出手段(センサ)が併設
され入賞があった旨はこの検出手段で検出される。その
ため以後はセーフ球は不要であり上記のようにセーフ球
集合板34に落下させてアウト球と同様に排出処理して
も構わなくなる。検出信号によって入賞数がカウントさ
れ払い出し基板の制御装置はこのカウント数に基づいて
後述する払い出し装置96を駆動させることとなる。従
って、セーフ球処理装置が不要であるため機構盤10の
下部のスペースに余裕ができ排出通路ユニット46を設
けることが可能となりアウト球とともにセーフ球も排出
可能となった。この結果セーフ球処理装置によるスペー
スの余裕のなさが解消されることとなって払い出し位置
の限定も解除されることとなる。すなわち、わざわざ遊
技盤5の一部を切り欠いて通路を設けるような遊技盤5
の設計に影響を与えるような構造にする必要がなくな
り、遊技盤5の下部位置に分岐機構61を配置すること
が可能となっている。また、セーフ球処理装置とともに
セーフ球を誘導する誘導通路も不要となるため機構盤1
0との機構的な関連は完全に解消されることとなる。更
に、セーフ球処理装置が不要であるため分岐機構61は
機構的に簡単な構造となっている。これらの理由から敢
えて機構盤側に設けずとも本実施の形態のように基板取
り付けベース11を介して遊技機本体4側に設けること
が可能となっている。分岐機構61の詳しい構造につい
ては後述する。 【0019】次に、パチンコ球発射機構23について説
明する。図1、図9〜図12に示すように、遊技機本体
4の右下方寄り(裏面から見ると左下方寄り)にはパチ
ンコ球発射機構23が配設されている。パチンコ球発射
機構23は前記操作ハンドル15、発射ハンマ63、モ
ータ装置64、図示しない発射カム,図示しないコイル
バネ等から構成されている。モータ装置64は遊技者が
操作ハンドル15のハンドルリング15aに触れている
ことを条件に所定タイミング(本実施の形態では一分間
に100回の割合)で回転する。モータ装置64の回転
軸には発射カムが固着され、発射カムが回転することに
よりコイルバネの付勢力に抗して 発射ハンマ63を回
動させる。発射ハンマ63は回転した発射カムと非係合
となることによってコイルバネの付勢力によって一瞬に
元の位置に戻ることとなる。この時の勢いによって遊技
球が発射される。操作ハンドル15のハンドルリング1
5aを回動させることでコイルバネの付勢力を制御し、
発射ハンマ63のパチンコ球(遊技球)への当接速度を
調節するようになっている。 【0020】図1及び図12に示すように、前記下受け
皿用通路53の右方には発射案内レール65が配設され
ている。発射案内レール65の下端(右端)は前記発射
ハンマ63の側方に配置され、発射ハンマ63の進退方
向と重複して左斜め上方に向かって延出されている。発
射案内レール65上端から先は発射されたパチンコ球
(遊技球)がジャンプして飛び越えるジャンプ領域67
が形成されている。ジャンプ領域67の下方には前記下
受け皿用通路53の第2の通路53cを構成する天板6
8が配置されている。天板68上面は右下方に向かって
下がる傾斜面とされているため、発射されても遊技面2
0に至らず戻ってきてしまった勢いのないパチンコ球が
ジャンプ領域67から天板68上に落下し、そのパチン
コ球は天板68上を右方向に流下して発射案内レール6
5の下方から返却通路69内に導入されるようになって
いる。返却通路69は本実施の形態では前記下受け皿用
通路53上部の開放空間54に連通されている。発射案
内レール65の取り付けリブ65aには発射案内レール
65上にセットされた遊技球を下方から支持するストッ
パ79が固着されている。 【0021】ここに図5に示すように、前方から発射案
内レール65を正視した場合発射案内レール45の下端
寄りはカバープレート13の上端よりも下方位置に配置
される。つまり、前方からでは正視できない隠れた位置
に配置されることとなっている。これは遊技盤5の上下
幅が上記のように拡張され従来の機種に比べて下方位置
まで進出するようになったことに伴い発射案内レール6
5を全体に下方位置にずらしたことによるものである。
本来ならば発射案内レール65が下がると操作ハンドル
15位置も下げることでこのように発射案内レール65
の下部が隠れた状態になることはない。しかし、パチン
コ遊技機において操作ハンドル15の位置は遊技者が操
作しやすい位置に配置されるよう人間工学的に決まって
しまっている。そのため、操作ハンドル15位置を下げ
ることはできない。しかし、遊技球の発射後の助走距離
として所定長さの発射案内レール65は必要である。そ
こで、このように構成したものである。ここに、発射案
内レール65の最下端位置(発射準備位置)には次々と
打ち出される遊技球が流入してくるため遊技球が確実に
保持される必要がある。従来の機種では発射案内レール
65はその前面に配置される上部カバープレートに隣接
していたため上部カバープレートからの遊技球の排出口
をちょうど発射準備位置に面するような設計が可能であ
った。ところが、本実施の形態のようなカバープレート
13の上端から下方に隠れてしまっている発射準備位置
ではこのような設計は困難である。すなわち、発射準備
位置にセットされた遊技球(発射待機球)を前方から支
持する手段がなくなってしまうこととなる。そこで、本
実施の形態では図12及び図17に示すように発射案内
レール65の最下端位置に隣接して遊技球案内プレート
70が配設されている。遊技球案内プレート70は扉枠
7側の上受け皿8から発射案内レール65上に供給され
た遊技球を前方から支持する。すなわち、図12及び図
17に示すように、発射準備位置に隣接した位置(前方
位置)における同プレート70の配置位置はその位置に
おける発射案内レール65よりも若干高い位置に配設さ
れる。これによって、発射案内レール65の発射準備位
置に配置される遊技球は同プレート70よりも一段下が
った位置において遊技球案内プレート70によって前方
から保持されることとなり正確な発射が可能となる。カ
バープレート13の下受け皿14の左方には灰皿72が
配設されている。本実施の形態ではこの灰皿72の裏面
に前記音響機構24の図示しないスピーカが配設されて
いる。図1、図5及び図12に示すように、発射案内レ
ール65の右方には鍵穴73が形成されている。この鍵
穴73は遊技機本体4に対する扉枠7の開閉をつかさど
るものである。 【0022】次に、扉枠7について詳述する。図1〜図
4に示すように、遊技盤5の前面には扉枠7が配設され
ている。扉枠7はヒンジ金具6の回動軸6aを中心に回
動し(つまり遊技機本体4の回動軸と同軸で)遊技機本
体4に対して開閉可能にかつ着脱可能に装着されてい
る。扉枠7は略長方形の外形を有し、中央にほぼ円形の
大型の窓穴75が形成されている。窓穴75を円形とし
たのは遊技盤5の遊技面9の前記遊技領域27に対応さ
せたものである。窓穴75には遊技盤5の遊技面9を露
出させるためのガラスGがはめ込まれている。扉枠7の
後面側であって窓穴75周縁には補強フレーム74が配
設されている。扉枠7の前面側であって窓穴75の周縁
には装飾用の装飾パネル76が所定位置に配設されてい
る。各装飾パネル76内には図示しないランプが配設さ
れメイン基板33による制御に基づいて点滅させられ
る。窓穴75の下方位置には球貸し用の操作ボタン77
とカードの残量を表示する7セグ表示の表示パネル78
が配設されている。 【0023】操作ボタン77及び表示パネル78の下方
には上受け皿8が配設されている。図18及び図19に
示すように、上受け皿8は導入されてきたパチンコ球が
プールされる流下面81と流下面81を包囲する包囲壁
82を備えている。流下面81には図示しないパチンコ
球貸し出し装置の配球ノズルから放出されたパチンコ球
が落下当接する。流下面81は右側下がりの傾斜に形成
されるとともに、下流側(右側)が徐々に狭くなってパ
チンコ球が縦列配置されるような狭窄通路84が形成さ
れている。上受け皿8には上流側(左側)の扉枠7壁面
に形成されたパチンコ球導入口83から導入されたパチ
ンコ球がプールされると同時に徐々に下流側に流下して
狭窄通路84に至り、更に狭窄通路84最下流に配置さ
れた供給口85から扉枠7の背面側に導かれる。図1に
示すように、供給口85の扉枠7の対応する背面位置に
は前記遊技球案内プレート70に遊技球を導く遊技球案
内通路87が配設されている。遊技球案内装置87は上
受け皿8の供給口85から流下するパチンコ球を前記発
射案内レール65上に落下させる装置である。遊技球案
内装置87の側方には上受け皿8に溜まったパチンコ球
を遊技者の操作で自主的に下受け皿14に回避させる際
の迂回通路89が形成されている。図1及び図14に示
すように、パチンコ球導入口83の扉枠7の対応する背
面位置には前記差し込み受け皿57が後方に向かって突
設形成されている。差し込み受け皿57は扉枠7が遊技
機本体4前面に装着された状態で前記導出口51から開
放空間54に差し込まれパチンコ球処理領域21から供
給されたパチンコ球をパチンコ球導入口83から上受け
皿8に導く。前記操作ボタン77及び表示パネル78の
裏面側には球貸し用基板が内蔵された球貸し用基板ボッ
クス88が配設されている。 【0024】図18及び図19に示すように、上受け皿
8の流下面81を包囲する包囲壁82はパチンコ球導入
口83の周囲が他の部分よりも高く形成された高壁部8
2aとされている。高壁部82aの上端はパチンコ球導
入口83の上端位置よりも高い位置とされており、正面
から正視した状態でパチンコ球導入口83は包囲壁82
及び高壁部82aによって完全に覆われている。高壁部
82a(及び扉枠7の壁面)で包囲された流下面81の
左方位置(パチンコ球導入口83の前方)はパチンコ球
貸し出し装置の配球ノズルからパチンコ球が落下当接す
る位置である。従って、遊技盤5のサイズが大きくなっ
て従来の機種に比べて上受け皿8が下方に配置されるこ
ととなり配球ノズルから流下面81までの距離が長くな
ったとしても、高壁部82aによって配球ノズルから放
出されたパチンコ球が飛び出すことがない。ここに、従
来の機種では上受け皿は扉枠とは別体に上部カバープレ
ートに配設されていた。上部カバープレートは扉枠の下
方位置に配設される部材である。そのため、扉枠を開放
した際に上部カバープレートに設けられた上受け皿の壁
の高さは扉枠の開放の邪魔とならないように(干渉しな
いように)高さに制限を設けざるを得なかった。そのた
めパチンコ球貸し出し装置の配球ノズルから上受け皿ま
での距離が長いと上受け皿に落下したパチンコ球が壁を
乗り越えて外に飛び出してしまう可能性があった。従っ
て、配球ノズルの位置はできる限り低くなるように設定
されていた。また、壁が余り高くなりすぎないように配
慮しながら上部カバープレートをデザインしなければな
らずデザイン上の制限があった。ところが、本実施の形
態では上受け皿8は扉枠7側にあって扉枠7と一体とな
って開放されるため、高壁部82aの高さには制限はな
い(実際には遊技盤5の遊技面20にかからない程度に
する必要がある)。 【0025】次に、機構盤10について説明する。図
2、図4及び図9に示すように、遊技盤5の背面側には
機構盤10が遊技機本体4に対して開閉可能に装着され
ている。機構盤10は上下に配設されたヒンジ部90
(本実施の形態では下側のみ表示)によって遊技機本体
4に支持されており、盤面に散点的に配置された開閉ピ
ン91の引き出し及び押し込みによって遊技機本体4に
対して着脱可能とされる。機構盤10の中央付近には大
型開口部10aが形成されている。大型開口部10aの
上半分はカバー92によって背面から覆われている。図
9に示すように、遊技機本体4に対して機構盤10が閉
塞された状態で同大型開口部10aから遊技盤5の背面
に配設された可変表示装置29及びメイン基板33が露
出される。可変表示装置29はカバー92によって背面
から覆われるが、メイン基板33は目視確認のために覆
われない。機構盤10の上部にはタンクTが配設されて
いる。タンクTの下方にはタンクレール93が配設され
ている。タンクレール93はタンクTから導入されたパ
チンコ球を図9において左方から右方に移動させる。本
実施の形態では従来の機種に比べて遊技盤5が上方にも
拡張されているためタンクTは従来の機種に比べて若干
浅めに形成されている。タンクレール93の右方には下
方に向かって払い出し機構としての払い出しユニット9
5が配設されている。払い出しユニット95は払い出し
装置96と、パチンコ球を払い出し装置96に導く第1
の流路97と、パチンコ機の廃棄等によってパチンコ機
を島から取り外す際に同第1の流路97内の球抜きを行
うための球抜き機構98と、球抜きを行う際にパチンコ
球が排出される球抜き流路99と、払い出し装置96の
下流の第2の流路100と、ベル101と、ベル101
の下流の第3の流路103とより構成されている。本実
施の形態では2基の払い出し装置96はセーフ球の発生
に基づいて所定量のパチンコ球(賞球)を払い出す。パ
チンコ球は第2の流路100を流下し途中ベル101に
当接する。ベル101に当接したパチンコ球は第3の流
路103を斜め下方(図9において左斜め下方)に導か
れる。第3の流路103を流下したパチンコ球は基板取
り付けベース11内に至る。機構盤10の背面を流下し
てきたパチンコ球はこの基板取り付けベース11におい
て前方に方向転換させられる。 【0026】図2、図4及び図9に示すように、機構盤
10の下方には基板取り付けベース11が配設されてい
る。基板取り付けベース11は上下に配設されたヒンジ
部105によって遊技機本体4に開閉可能に支持されて
おり、図9において左方に配置された開閉ピン107の
引き出し及び押し込みによって遊技機本体4に対して着
脱可能とされている。図9、図20及び図21に示すよ
うに、基板取り付けベース11には発射基板が収納され
る発射基板ボックス11aと、電源基板が収納される電
源基板ボックス11bが固着されている。図21に示す
ように、払い出し基板が収納される払い出し基板ボック
ス11cは着脱可能とされている。これは、不正防止の
点から払い出し基板ボックス11cのみを別途ユーザに
供給する必要のためである。 【0027】図9、図20〜図24に示すように、基板
取り付けベース11の払い出し基板ボックス11cの装
着位置前面側には分岐機構としての分岐ユニット61が
着脱可能に配設されている。分岐ユニット61は払い出
し装置96から流下するパチンコ球を遊技機本体4方向
に導く際に上受け皿8方向と下受け皿14と方向とのい
ずれかに分岐させる最初の分岐機構である。図24に示
すように、分岐ユニット61は中空の全体として略方形
の箱体として構成されており、内部に空間を仕切る第1
の遮蔽板66が配設されている。分岐ユニット61は基
板取り付けベース11に対して固定片106を介してビ
ス108によって固着されている。分岐ユニット61は
水平位置において図9に示すように遊技盤5が載置され
ている天板22位置よりも下方に配置されている。すな
わち、分岐ユニット61は遊技盤5最下端位置よりも下
方位置に配設されることとなり、基板取り付けベース1
1を介して遊技機本体4側に装着されることとなる。分
岐ユニット61内は3つの通路に仕切られている。図2
3において右方から順に主通路用中間通路109、バイ
パス通路用中間通路110及び球抜き流路用通路111
とされている。各通路109,110,111は水平に
並んで配置されている。主通路用中間通路109及びバ
イパス通路用中間通路110は第1の遮蔽板66によっ
て区画され、バイパス通路用中間通路110と球抜き流
路用通路111とは第2の遮蔽板71によって区画され
ている。図22及び図24に示すように、第1の遮蔽板
66は略直角三角形の外観とされ、第1の遮蔽板66は
ビス112によって着脱可能に固定されている。第1の
遮蔽板66は三角形の斜辺部分が若干湾曲した湾曲傾斜
面66aとされており、この湾曲傾斜面66aが主通路
用中間通路109側を向くように配設されている。分岐
ユニット61の背面壁61aはこの第1の遮蔽板66の
着脱のためにビス113にて着脱可能とされている。主
通路用中間通路109の上方には第1の入球口114が
開口されており、前面には第1の出球口115が開口さ
れている。バイパス通路用中間通路110の上方には第
2の入球口116が開口されており、前面には第2の出
球口117が開口されている。球抜き流路用通路111
の上方には第3の入球口118が開口されており、前面
には第3の出球口119が開口されている。図22に示
すように、第1の入球口114は前記第3の流路103
の斜め下方位置(すなわち流下するパチンコ球の流下方
向の下流位置)に開口されており、第1の出球口115
は主通路47に接続されている。第2の入球口116は
第3の流路103の主流下位置から外れた側方位置に開
口されており、第2の出球口117はバイパス通路49
に接続されている。第3の入球口118は球抜き流路9
9の下端出口と接続されており、第3の出球口119は
前記流下パチンコ球当接面135に正対している。図2
9に示すように球抜きされて流下してきたパチンコ球は
第3の出球口119から下方に落下しあるいは流下パチ
ンコ球当接面135に当接してから落下する。落下した
パチンコ球は排出通路ユニット46の第2の傾斜通路1
25に導かれ最終的に外部に排出されることとなってい
る。すなわち、主通路用中間通路109及びバイパス通
路用中間通路110を通過するパチンコ球はこれから遊
技に供されるパチンコ球であって遊技機本体4前面の際
に上受け皿8又は下受け皿14に導かれるのであるが、
球抜き流路用通路111を通過するパチンコ球はいわば
不要となったパチンコ球であるため排出させる必要があ
る。そのため第3の出球口119は排出通路ユニット4
6(排出通路122)に連通させているわけである。 【0028】ここに、基板取り付けベース11は機構盤
10とは別体に構成されている。従来の機種では発射基
板、電源基板及び払い出し基板は機構盤に配設されてお
り、かつ必ずしもこのようにまとまってチェックしやす
い下方位置に配置されているわけではない。本実施の形
態でこのように基板取り付けベース11を機構盤10と
別体に構成するようになった理由は主として1)従来の
機構盤が大型化、重量化してきたこと、2)別体とする
ことでパチンコ遊技機の組み立て作業が迅速化するこ
と、3)逆に再利用する際の取り外しの容易さ等の理由
からである。更に、本実施の形態ではパチンコ遊技機と
してゲーム内容に関わらず共通性のある基板を基板取り
付けベース11に機構盤10とは別体としてまとめるこ
とで、保守・点検がしやすくなった。また、このように
基板取り付けベース11を設けることができるのは上記
のようにセーフ球処理装置を廃したことから遊技機本体
4のパチンコ球処理領域21に排出通路ユニット46を
移動させることができることになって機構盤10位置の
スペースに余裕ができたことによるものでもある。図9
〜図11に示すように、機構盤10の上下幅は遊技盤5
の上下幅とほぼ同等に構成されているため、機構盤10
を開放することによって基板取り付けベース11は開放
あるいは取り外しをしなくとも遊技盤5の保守・点検更
に交換等の作業を行うことができる。また、発射基板ボ
ックス11a、電源基板ボックス11b及び払い出し基
板ボックス11cを排出通路ユニット46から隔絶する
ことによってパチンコ球同士が接触する際に発生する静
電気由来のノイズ(電気的信号)の影響を受け難くする
ことも基板取り付けベース11を別体で構成する理由で
ある。 【0029】次に、このように構成された本実施の形態
の排出通路ユニット46周辺の作用について説明する。
遊技盤5の遊技面9で遊技を終えたパチンコ球のうち入
賞口28に入賞したセーフ球はセーフ球集合板34から
後方に落下する。このとき上記のように入賞は図示しな
い検出手段(センサ)にて検出される。また、入賞しな
かったパチンコ球はアウト球回収口30から後方に落下
する。これら遊技を終了したパチンコ球はすべて本実施
の形態の排出通路ユニット46の集球枠123の案内板
131によって受け止められながら更に下方の第1の傾
斜通路124に至る。パチンコ球は底板124b上を右
方向に流下して下流側の第2の傾斜通路125に至る。
第第2の傾斜通路125は流下してくるパチンコ球の方
向転換をするとともに、パチンコ球の流下する勢いを逆
傾斜とすることで緩和する機能を持っている。パチンコ
球は更に垂直通路126から排出マス127に至り排出
される。また、主通路用中間通路109にパチンコ球の
渋滞(例えばパチンコ球の入賞による払い出し量が多く
なって)が生じて主通路47からあふれ出したパチンコ
球が主通路用中間通路109に充満すると、パチンコ球
は第1の遮蔽板66を越えて第2の入球口116からバ
イパス通路用中間通路110内に導かれるようになる。
バイパス通路用中間通路110内に導入されたパチンコ
球は90度前方に方向転換して第2の出球口117から
バイパス通路49方向に導入される。このパチンコ球は
遊技機本体4前面のオーバーフロー通路としての下受け
皿用通路53から下受け皿14に至る。すなわち、従来
機構盤側に配設されていたオーバーフロー通路が分離さ
れて排出通路ユニット46と遊技機本体4を挟んで表裏
に配設されることとなる。また、機種の取り替えなどで
一旦タンクT内のパチンコ球をすべて排出させる場合、
つまり球抜き作業においては球抜き機構98を作動させ
て球抜き流路99から球を抜くことになる。このときの
パチンコ球は球抜き流路99を流下して第3の入球口1
18から分岐ユニット61内に導入される。分岐ユニッ
ト61においてパチンコ球は第3の入球口118から球
抜き流路用通路111に導入される。球抜き流路用通路
111内に導入されたパチンコ球は90度前方に方向転
換して第3の出球口119から流下パチンコ球当接面1
35に当接し、下方の第2の傾斜通路125に落下し上
記の他のパチンコ球と同様に垂直通路126から排出マ
ス127に至り外部に排出される。このような本実施の
形態の排出通路ユニット46は図9及び図25に示すよ
うに基板取り付けベース11によって覆われている。そ
して、基板取り付けベース11をヒンジ部105を中心
に回動させたり、あるいは取り外す(図10及び図11
の状態)ことで機構盤10を開放しなくとも後方側に露
出させられることとなる。 【0030】このように構成することで本実施の形態で
は次のような効果を奏する。 (1)従来のパチンコ遊技機では図31のように一旦機
構盤に移動させていたセーフ球及びアウト球をすべて遊
技機本体側にて処理することができるようになった。こ
れは上記のように本実施の形態ではセーフ球処理装置を
不要としたため、敢えてセーフ球を機構盤10側に送る
必要がなくなったためである。更に、セーフ球処理装置
を不要としたため機構盤10下部位置におけるスペース
の余裕が生まれ、排出通路ユニット46を配設すること
が可能となったという相乗的な機構的改良があったから
である。これによって、セーフ球及びアウト球の排出機
構が簡略化され、結果としてコスト削減に寄与する。ま
た、構造が簡略化され機構盤10との連結もなくなった
ためパチンコ球の排出途中での球詰まり等の不具合が生
じにくくなった。また、セーフ球及びアウト球を区別せ
ずに同じ排出通路ユニット46を使用して排出させるこ
とができるため、この点でも構造が簡略化してコストの
削減に寄与する。 (2)セーフ球及びアウト球をすべて遊技機本体側にて
処理することができるようになり機構盤10との連結が
なくなったため構造が簡単になっている。更に、従来機
構盤側に配設されていたオーバーフロー通路は上記のよ
うに本実施の形態では遊技機本体4の前面側に下受け皿
用通路53として配設されている。つまり、排出通路ユ
ニット46は単純にセーフ球及びアウト球(及び球抜き
時のパチンコ球の)の排出機能のみを担うため、従来の
ようにオーバーフロー通路とセーフ球及びアウト球の排
出用の通路が重複して機構盤に配設されることから構造
が複雑化したり、厚くなったりすることがない。そのた
め、排出通路ユニット46背面には基板取り付けベース
11を取着するための余裕が十分取れることとなってい
る。 (3)従来の機種においては球抜き通路159はアウト
球やセーフ球用の排出通路とは別個独立した通路を設け
て機構盤155側の排出マス153に接続させていた。
わざわざ球抜き通路159を排出マス153に接続させ
るのはパチンコ遊技機が設置される島側の排出されるパ
チンコ球を回収する回収機構(バケツ等)の配置の問題
が大きい。球抜き通路159の直下に別個の排出口を設
けることは島側にも複数の回収機構の設置を求めること
となるため、従来では通路が複雑化し排出されるまでの
総延長も長くなるにも関わらず球抜き通路159を排出
マス153に接続させるような構造を採っていた。しか
し、本実施の形態では球抜き流路99から流下してきた
球抜きされたパチンコ球は特に排出マス127に至るた
めの特別な通路を設けることを要しない。上記構成のよ
うに第3の入球口118から分岐ユニット61の球抜き
流路用通路111に導かれ第3の出球口119から下方
の第2の傾斜通路125に導かれるような構成とされて
いる。第2の傾斜通路125は上方が広く左右方向に開
けており、第3の出球口119から落下してくるパチン
コ球は格別な通路を設けなくとも第2の傾斜通路125
に導かれ底板125b上に落下することができる。従っ
て、本実施の形態では球抜き通路159から流下するパ
チンコ球を格別複雑な構造の機構も設けることなく、ま
た特に通路総延長も長くすることなく速やかに外部に導
くことが可能となっている。この結果、単一の排出通路
ユニット46(排出通路122)によってセーフ球、ア
ウト球及び球抜きされたパチンコ球のすべてを外部に排
出できることとなっている。 (4)従来の機種ではパチンコ球の排出機構は機構盤の
内部に密封された状態で機構盤を開放しても容易には排
出機構は目視したり不具合を調整したりすることが困難
であった。本実施の形態では基板取り付けベース11を
ヒンジ部105を中心に回動させたり、あるいは取り外
す(図10及び図11の状態)ことでパチンコ球の流下
する通路を正面から目視できるため、不具合を調整や点
検を極めて容易に行うことができる。また、機構盤10
とは別体の基板取り付けベース11によって覆われてい
るため機構盤10を開放しなくとも後方側に露出させら
れることとなる。 (5)排出通路ユニット46は基板取り付けベース11
をヒンジ部105を中心に回動させたり、あるいは取り
外す(図10及び図11の状態)ことで露出できて排出
通路ユニット46単独で容易に交換ができるため、従来
のような機構盤一体型の排出機構に比べて有利である。 (6)従来と異なりセーフ球は遊技面9の前記遊技領域
27に散在する入賞口28の後方位置から遊技盤5の裏
面側に導かれてそのまま落下することとなっている。す
なわち、遊技盤5の裏面側からみればセーフ球は左右方
向においてまんべんなく通路に落下してくることとな
る。本実施の形態では排出マス127はこのように広い
範囲から流れてくるパチンコ球をもっとも効率よく排出
するため左右方向ほぼ中央位置に配置されている。 【0031】尚、この発明は、次のように変更して具体
化することも可能である。 ・上記実施の形態では排出通路ユニット46は別体とし
て遊技機本体4のパチンコ球処理領域21に装着されて
いた。しかし、遊技機本体4と一体(つまり交換できな
いように)としてもよい。 ・上記実施の形態では排出通路ユニット46は別体とし
て遊技機本体4のパチンコ球処理領域21に装着されて
いた。これを基板取り付けベース11の正面側に配設す
るようにしてもよい。この場合に基板取り付けベース1
1と一体に構成しても、交換可能に装着するようにして
もよい。 ・排出通路ユニット46の形状は一例であって、上記に
限定されるものではない。 ・上記実施の形態では第1の遮蔽板66を交換すること
が可能であったが、交換できない分岐ユニット61であ
っても構わない。 ・遊技機本体4を金属製素材より構成し、長期間使用可
能とした機種に応用するようにしてもよい。 ・分岐ユニット61の形状は一例であって上記実施の形
態に限定されるものではない。 ・上記実施の形態では第1の傾斜通路124との第2の
傾斜通路125を設けて最終的に中央付近に排出マス1
27を配置するようにしていたが、設計によってはこの
ような傾斜通路124,125を1つにしたり3つ以上
にすることも可能であり、排出マス127も中央に配置
しなければいけないわけではない。 ・分岐ユニット61の一部あるいは全部にアース部材と
しての導電性金属板を配設してもよい。一部とは例えば
最もパチンコ球が多く接する案内板131,124b、
125bが挙げられる。このような構成では流下する際
に周囲のパチンコ球同士が接触して生じる静電気が除電
されるため静電気を原因とするノイズが防止できる。ア
ース部材としてはその他遮蔽部材自体を導電性金属で構
成したり、導電性金属の薄膜を蒸着させたりしてもよ
い。また、導電性樹脂を使用してもよい。 ・本実施の形態は遊技が終了したパチンコ球を外部に排
出する例であったが、循環タイプのパチンコ遊技機に応
用するようにしてもよい。 ・本実施の形態はいわゆる現金機以外のCR機にも応用
可能である。 ・本発明はいわゆるパチロットと呼称されるパチンコ球
を使ってのスロットマシンに応用するようにしてもよ
い。その他、本発明の趣旨を逸脱しない態様で実施する
ことは自由である。 【0032】本発明の目的を達成するために上記実施の
形態から把握できるその他の技術的思想について下記に
付記として説明する。 (1)前記通路は前記遊技台と一体に構成されているこ
とを特徴とする請求項1に記載の遊技機。 (2)前記通路はユニット化されて前記遊技台と交換可
能に別体に構成されていることを特徴とする請求項1に
記載の遊技機。このように構成すれば通路に交換を必要
とする不具合が生じた場合にユニット化した通路のみを
交換することができる。 (3)前記遊技台には各種制御基板を搭載する基板取り
付けベースを配設し、前記通路を同ベースに配設したこ
とを特徴とする請求項1に記載の遊技機。 (4)前記通路は前記基板取り付けベースに交換可能に
配設されていることを特徴とする付記3に記載の遊技
機。 (5)前記通路はパチンコ球を機外に排出させる排出通
路であることを特徴とする請求項1若しくは付記1〜4
のいずれかに記載の遊技機。 (6)前記通路には左右方向に延びる落下するパチンコ
球を集球するための集球枠が形成されていることを特徴
とする請求項1若しくは付記1〜5のいずれかに記載の
遊技機。この集球枠はパチンコ球を受け止めやすくする
ために下流側のパチンコ球を通過させる通路に比較して
開口部が広く構成されていることが好ましい。 (7)前記集球枠には落下するパチンコ球を受け止めて
落下する勢いを削ぐ緩衝部材が配設されていることを特
徴とする付記6に記載の遊技機。これによって、上方か
ら落下してきた遊技を終了したパチンコ球が集球枠から
跳ね出してしまうことが防止され、速やかに下方の通路
にパチンコ球を導くことができる。 (8)前記通路を流下する回収されたパチンコ球は前記
遊技台の左右方向ほぼ中央に排出口が形成されているこ
とを特徴とする請求項1若しくは付記1〜7のいずれか
に記載の遊技機。従来と異なりセーフ球は遊技面9の前
記遊技領域27に散在する入賞口28の後方位置から遊
技盤5の裏面側に導かれてそのまま落下するため、遊技
盤5の裏面側からみればセーフ球は左右方向においてま
んべんなく通路に落下してくることとなっている。従っ
て、このように広い範囲から流れてくるパチンコ球をも
っとも効率よく排出するには排出口は左右方向ほぼ中央
位置に配置することが好ましい。 (9)前記通路はタンクの球抜きを行う際にパチンコ球
が排出される球抜き通路から流下したパチンコ球を併せ
て受け止めることを特徴とする請求項1若しくは付記1
〜8のいずれかに記載の遊技機。上記実施の形態では排
出通路122の傾斜通路125がその機能を有する。こ
の結果、単一の通路によってセーフ球、アウト球及び球
抜きされたパチンコ球のすべての処理が可能となった。 (10)セーフ球の数を入賞に伴って電気的にカウント
し、このカウント数に基づいて払い出し基板の制御下に
て払い出し装置に賞球の払い出しを命ずるようにするこ
とでアウト球と同じ通路を使用することができることを
特徴とする請求項1若しくは付記1〜9のいずれかに記
載の遊技機。つまり従来のセーフ球処理装置を必要とし
ないので、セーフ球処理装置を経由させる必要がないた
めセーフ球もアウト球と同じ通路を使用することが可能
となった。 (11)前記パチンコ球受け皿は上受け皿であって、同
上受け皿に供給されるパチンコ球が供給通路側にオーバ
ーフローした場合に下受け皿へオーバーフローしたパチ
ンコ球を迂回させるオーバーフロー通路を遊技台の前面
に配設したことを特徴とする請求項1若しくは付記1〜
10のいずれかに記載の遊技機。これによってオーバー
フロー通路と遊技が終了したパチンコ球を誘導する通路
を遊技台の表裏に別個に配設することができ、通路の複
雑化を防止できる。 (12)前記通路はタンクの球抜きを行う際にパチンコ
球が排出される球抜き流路から流下するパチンコ球を受
け止めることを特徴とする請求項1若しくは付記1〜1
1のいずれかに記載の遊技機。このように構成すること
によって、球抜き流路から流下するパチンコ球を誘導す
る別途の通路をわざわざ設けなくともよくなる。 (13)前記球抜き流路は払い出し装置から流下するパ
チンコ球を常時は上受け皿に導くとともに同上受け皿に
供給されるパチンコ球が供給通路側にオーバーフローし
た場合に下受け皿方向に方向を転換させる分岐機構に接
続され、同球抜き流路を流下するパチンコ球は同分岐機
構を経由して前記通路方向に導かれることを特徴とする
請求項1若しくは付記1〜12のいずれかに記載の遊技
機。 【0033】
Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pachinko game machine,
Regarding gaming machines that use pachinko balls such as
Collect the so-called safe ball and out ball that have been played
Gaming machine provided with a passage for the game machine. 2. Description of the Related Art For example, a game machine using a pachinko ball is disclosed.
In pachinko gaming machines, which are seeds, the player
Operate the handle as a pachinko ball (this pachinko ball)
The ball is called a game ball) and the game ball
While being interfered by obstacles such as nails
Get down and win the prize hole provided on the way
You can get a ball (you can win this pachinko ball)
Sphere). There are game balls launched on the game surface
Descends into the winning opening and becomes a so-called safe ball
Some are so-called out balls without entering the winning opening.
You. End the game with these safe balls and out balls
Pachinko balls. Pachinko balls that have finished playing here
Can be classified according to the collection method. this
Ejects pachinko balls outside the safe and out balls
And a new pachinko ball is always placed in the upper position.
Discharge type to supply to the tank, and discharged outside the machine
Circulation type that circulates pachinko balls only in the aircraft without using
There is. The mainstream is the discharge type. For example, for emission type
Pachinko machines equipped with conventional safe ball processing equipment
Then the safe ball follows the course different from the out ball and becomes the outlet
Had to be guided. This is a safe ball once a safe ball
Contributes to the release of prize balls from the payout device by leading to the processing device
It was necessary to make it. Concrete traditional snap
The flow path of the ball will be briefly described with reference to FIG.
At an almost center position of the mechanical panel 150, an exit 151 of an out ball is provided.
The falling space 152 where the out ball falls in response to
Has been established. In addition, the exit 151 is a game machine side
It is formed on the game board (the back side of the game surface). Falling space
A discharge mass 153 that guides the out ball to the outside below 152
Are arranged. Meanwhile, the safe ball extended left and right
It is designed to fall on the collecting frame 154,
It is guided to the upper left and introduced into the safe ball processing device 155.
It is. A stream that has flowed downstream from the safe ball processing unit 155
The ball finally reaches the discharge mass 153 and is out of the same manner as the out ball.
Led to the department. In addition, such an outboard is
In addition to the discharge mechanism for ball and safe ball, overflow
The overflow passage 156 that leads the lowered pachinko ball is
Is formed. Overflow passage 156 is paid out
Overflow branching mechanism 158 at the bottom of unit 157
From behind safe ball processing unit 155 and falling space 1
52, it is connected to the lower tray through the back. Also,
Forcibly eject the pachinko balls in the tank by changing models, etc.
When the ball removal mechanism is activated to take out, the ball removal passage
159 down all remaining pachinko balls. Without ball
The passage 159 extends outside and below the safe ball processing device 155.
The detour is led to the outside through the discharge mass 153. [0003] However, such an exhaustion is required.
There were several problems with the delivery mechanism. 1) The safe ball processing device 155 is a gaming machine book as a gaming table.
It is formed on a mechanism board 150 arranged on the back side of the body.
You. On the other hand, games on the gaming side are performed on the gaming machine itself.
You. Therefore, the safe ball must be
The structure must be moved to the mechanism panel 150 side on the back side.
It was complicated. 2) The last of the out ball and the safe ball that follow different routes
Must be connected to the discharge mass 153 below the mechanism panel 155
It has become. In other words, two exits despite the same exit
Because other routes were to be arranged, other configurations
The members were to be pressed. Especially in the past,
-The flow passage 156 and the ball removal passage 158 are also safe balls.
Together with the processing unit 155 and the falling space 152
It was extremely complicated because it was installed on the mechanical panel. 3) The out ball should be discharged directly from the gaming machine to the outside.
Safe sphere is a safe sphere processing device
155 once sent to the mechanism board 155 side
It has to be sent to the discharge mass 153. sand
In other words, transfer to the mechanism board 155 side which is unnecessary for the out ball
Movement, which unnecessarily complicates the structure.
there were. 4) Conventional snaps to enhance the interest of the players
What is required is a machine with a gaming surface that is larger than
Have been. To do this, under the pachinko machine
Mounting space for members arranged closer to the part is more restricted
Is to be done. However, as described above,
Because the surroundings of the structure are becoming more complicated,
Pachinko machines with a larger gaming surface than
It was difficult to show. 5) In the above-mentioned conventional model, the pachinko ball discharging mechanism is a mechanical panel
150, and these discharge mechanisms are defective.
When it is difficult to replace only that part when it occurs
was there. Also, even if parts can be replaced,
In some cases, the work required time and skill because of the complexity.
The present invention addresses the problems existing in such prior art.
It was done with your eyes. The purpose is to
Let the out ball and the safe ball flow down in the predetermined direction
To provide a gaming machine with a simplified passage structure for
You. [0004] To achieve the above object,
According to the first aspect of the present invention, the play is supported by the support frame.
A gaming table equipped with a gaming surface in which the players face each other
It is supported to be able to open and close with respect to the gaming table and is arranged in front of the gaming surface.
Door frame that is placed below the door frame
Can be opened or closed independently for the game console
Stores pachinko balls that are supported and supplied from the dispensing mechanism
Pachinko ball saucer and supplied from the same pachinko ball saucer
The pachinko ball to be played on the game surface by the operation of the player
Machine equipped with a launch operation mechanism for launching toward a part
At the end of the game on the gaming side,
Catches all pachinko balls that are guided to the back and fall
The back of the gaming table
It is the gist that it was arranged in. [0005] In a configuration such as the invention of claim 1, the conventional
To let the out ball and the safe ball flow down different routes
No need to play games
Pachinko machines that have finished playing because they are installed on the back of the table
The structure for processing the sphere is simplified. According to the first aspect of the present invention, the conventional
It is necessary to let the out ball and the safe ball flow down different routes.
No need, furthermore, a game table instead of providing a passage in the mechanism panel
Pachinko balls that have finished playing because they are provided on the back
Is simplified. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, the present invention is applied to a pachinko game machine.
An applied embodiment will be described with reference to the drawings.
In particular, in this embodiment, the game surface is enlarged compared to the conventional one.
The present invention will be described in a pachinko gaming machine. here
"Pachinko games with a larger gaming surface than before
The game machine is a game machine to enhance the interest of the player.
It is a larger model, and as the gaming surface becomes larger,
Enlarge the LCD screen of the display device placed in the center of the game
Players can enjoy the powerful large screen
A model that can increase the level of appeal to players
is there. In addition, the same model has a larger playing surface, so
The degree of diffusion of game balls (pachinko balls) toward
A game ball that falls due to increased visual stimulation of itself
Game ball will enter the winning opening because the falling distance of
The expectation of whether will increase. The following
In the description of the front, front or front side
Opposite side means rear, rear or back side
The opposite side of the opposite side. Also, left and right unless otherwise specified
Means the left-right direction as viewed from the front. As shown in FIGS. 1 and 5, a pachinko game
The outer frame 1 as a support frame of the machine includes upper, lower, left and right frame plates 1a to 1c.
Wooden frame framed in a square by 1d
I have. A curtain plate 2 is provided on the upper surface of the lower frame plate 1b.
A gaming machine body 4 as a gaming table is mounted on the outer frame 1.
You. The gaming machine body 4 forms the structural core of a pachinko gaming machine
A panel-shaped component member to be formed, and rotation of the hinge fitting 6
Opening and closing as shown in FIG. 2 with respect to the outer frame 1 by rotating about the shaft 6a.
It is attached so that it can be opened and closed and detachable by the metal fitting 4a
I have. As shown in FIG.
Other panel-shaped components are stacked in the front-rear direction.
Is placed. First, based on FIG.
Explanation of the arrangement state and the main components that accompany them
Then, the individual components will be described in detail. Gaming machine book
In the game board mounting space 9 formed in the upper body of the body 4
The game board 5 is fitted. Door frame in front of game board 5
7 are provided. A glass window G is located above the door frame 7.
Are fitted, and a snap is provided below the glass window G.
An upper tray 8 as a ball receiving tray is formed. Play
A mechanism is provided at the rear position of the board 5 so as to cover the game board 5 from the back.
A board 10 is provided. Immediately below the mechanism panel 10, a board
A mounting base 11 is provided. Downward direction of game board 5
A cover plate 13 is provided at the position. Cover
The rate 13 is fixed to the gaming machine body 4. Mosquito
A lower tray 14 is formed on the bar plate 13 so as to protrude forward.
Is formed. Cover plate 13 is compatible with conventional models
Corresponding to the lower cover plate. Simply cover pre
In the present embodiment, the door frame of the upper tray 8 is set as the port 13.
The upper part where the upper tray 8 is originally arranged with the movement to the side 7
This is because a cover plate is not required. Undercarriage
An operation handle 15 is mounted on the right side of the plate 14.
You. First, the gaming machine body 4 and the gaming board 5
explain in detail. As shown in FIG. 1, FIG. 7 and FIG.
The horizontal frame 18 and the right and left vertical
Game board mounting framed by frame 19
The storage space 9 is formed. Gaming board mounting space
As shown in FIG.
1 below the pachinko ball processing area 21.
A dick ball launching mechanism 23 and an acoustic mechanism 24 are provided.
You. The game board 5 is placed on the top plate 22 of the pachinko ball processing area 21.
It is placed and fitted in the game board mounting space 9.
As shown in FIG. 6, the game board 5 is a substantially square panel body.
Thus, the game surface 2 which is disposed almost vertically on the front of the game board 5
0 is surrounded by an inner rail 25 and an outer rail 26.
A substantially circular game area 27 is formed. Gaming area
The winning opening 28, the variable display device 29, etc.
It is arranged in the place. At the bottom of the inner rail 25
An outlet ball collection port 30 is formed. After the game ends
Pachinko balls (game balls) that did not win the prize mouth 28
The player exits backward from the out ball collection port 30 as a ball.
The nails are not shown. 7 and 8
As shown in FIG.
A curtain plate 31 framed in a shape corresponding to the game area 27 is formed.
Have been. The curtain plate 31 is a game board placed on the top plate 22
5 and a function to prevent falling off
I do. As shown in FIG. 3 and FIG.
Of conventional models (the upper tray is located on the gaming machine body side
) And a variable display device
The display screen 29a of the display 29 also becomes larger and
Occupies a fairly large area. This is an upper tray
To the upper tray by moving the
Mechanism can be dispersed, and as a result,
The main reason for being able to configure
It is. [0010] As shown in FIG.
There are three safe balls at the lower position of the variable display device 29
A collecting gutter 32 is provided. Under safe ball collecting gutter 32
The safe ball collecting plate 34 is disposed on the side. Safe sphere
Pachinko balls (safe balls) won in the collecting gutter 32
A passage on the back side that passes after exiting from area 27,
The safe ball guided to the sphere ball collecting gutter 32 is a safe ball collecting plate
34 through the inside (gap between the game board 5)
To fall. As shown in FIG. 9 to FIG.
A main board is provided on the back of the gutter 32 and the safe ball collecting plate 34.
33 are provided. Game content on the main board 33
The program that corresponds to it and the program to start it
And the like are sealed and disposed according to each model. Next, the pachinko ball processing area 21 of the game board 5
The peripheral structure will be described. Pachinko ball processing area 21
The pachinko machine supplied from the payout mechanism 40 described later
Introductory passage 45 and pachinko ball that lead the ball to the front (player side)
And a discharge passage unit 46 for guiding the outside to the outside.
You. First, the introduction passage 45 will be described. Introductory passage 45
Is a main passage 47 for guiding a pachinko ball to the upper tray 8 and an upper tray.
8 becomes full and overflows toward the lower tray 14
With a bypass passage 49 for guiding the lowered pachinko ball
I have. As shown in FIGS. 9 to 11, the main passage 47 is a game machine book.
An inlet 50 is provided on the back side of the body 4 and is shown in FIGS.
To the outlet 51 on the front side of the gaming machine body 4
I have. As shown in FIG. 13, FIG. 14, and FIG.
The pachinko ball introduced from the inlet 50 is inserted in the front 47.
The flow lower surface 47a to be made to flow down is formed. Flow surface 47
a is provided with a gentle inclination toward the front.
The flow lower surface 47a is interrupted on the way, and the outlet 51 is
It is arranged in front of the flow lower surface 47a across the space. FIGS. 9 to 11 and FIGS.
The bypass passage 49 is guided to the back side of the gaming machine
An over-equipment provided with an entrance 52 and arranged on the front of the gaming machine body 4
It is communicated with the inside of the lower tray passage 53 as a flow passage.
I have. Introduced from the inlet 52 into the bypass passage 49
The lower surface 49a where the pachinko ball flows down is formed
I have. A gentle inclination toward the front is formed on the lower surface 49a.
Is provided. The main passage 47 and the bypass passage 49 are shown in FIG.
The game board 5 is placed as shown in FIGS.
The position is lower than the position of the top plate 22 and is on the left (in FIG.
). 1, 5, 9 to 11 and
As shown in FIG. 16, the lower tray passage 53 is
The lower tray 14 flows in from the front left side to the right.
It communicates with the mouth 14a. The lower tray passage 53 is cracked
A bypass passage in the left front direction of the ball processing area 21
Pachinko balls flowing down from the lower surface 49a of the 49
The first passage 53a to be lowered and the falling pachinko ball are smooth
Formed into a curved surface that turns around 90 degrees to the right
A second guide for guiding the guide portion 53b and the pachinko ball diagonally downward and to the right.
Of the passage 53c. The second passage 53c is a game
The lower tray 14 is provided at a substantially central position in the left-right direction of the machine body 4.
Is connected to the inflow port 14a. As shown in FIG.
Above the starting position of the second passage 53c is an open space 54.
And the lower end of the lower surface 47a of the main passage 47 appears.
ing. As shown in FIGS. 1, 5, 13 and 14,
The outlet 51 is provided with a flap 55 standing upright. H
The wrap 55 is rotatably supported by a rotation shaft 55a.
And is urged by a spring (not shown). Figure
As shown in FIG. 14, closing the door frame 7 will be described later.
The insertion tray 57 is inserted from the outlet 51 to the open space 54.
It will be inserted. Lower surface 5 of insertion tray 57
7a is the main passage 47 inserted into the open space 54.
It is disposed at a position slightly lower than the lower surface 47a,
Pachinko balls flowing down the 47a more quickly downstream
A gentle slope is provided forward to allow the water to flow down.
Have been. With the insertion tray 57 inserted,
The top 55 is laid down on the open space 54 side,
Downstream position of the flow lower surface 49a interrupted by the open space 54
, A bridge in the direction of the outlet 51 is formed. this
The snap that has flowed down the lower surface 47a of the main passage 47 in the state
The ball flows into the insertion tray 57, and further flows out of the outlet 51.
From the upper tray 8. On the other hand, the door frame 7
When opened, the flap 55 is spring-loaded as shown in FIG.
To the upright position by the urging force of. In this state,
The dick ball is not guided to the outlet 51. That is, the door frame
Pachinko on upper tray 8 which has been opened integrally with 7
Pachinko that flows down from the upstream because it can not guide the ball
The ball needs to be guided to the lower tray 14. That is, insert
The pachinko ball is open space 54 because the receiving tray 57 is eliminated.
From the lower tray 14 in the direction of the second passage 53c below.
Will flow into At this time, the flow lower surface 49 vigorously
The pachinko ball flowing down a is guided by the flap 55
Jumping out from the outlet 51 to the outside is prevented. FIG.
, The first passage 53 adjacent to the open space 54
a is in a communicating state without a partition wall in the middle. So
Therefore, too many pachinko balls are led to the main passage 47
If you can not go down, the overflowing crack
Niko ball is on the way from main passage 47 to insertion tray 57
Move from the open space 54 in the direction of the first passage 53a.
It is led to the lower tray passage 53 (that is, the lower tray 14
Inflow). That is, the bypass passage 4
Pachinko balls led to the main passage 47 without passing through 9
It overflows when it reaches the front of the machine body 4
In this case, the detour is performed in the direction of the lower tray 14. [0014] Here, as shown in FIG.
In the direction of the upper tray from the mechanism panel through the communication passage
When supplying the pachinko balls, open the door frame and the upper tray
Pachinko balls are not spilled because the passage to is blocked
The path 160 that guides the pachinko ball to the lower tray is played
(Passage 160 is formed in the present embodiment)
A passage whose periphery is completely covered, such as a lower tray passage 53
It is merely a rail-shaped member that is open at the top.)
However, this passage 160 is an overflowing pachinko ball
There is no function to guide the lower tray to the lower tray.
Pachinko balls that should flow down in the direction of the receiving tray by opening
Has the function of leading to the lower tray as an escape route for
No. In this regard, the lower tray passage 53 of the present embodiment is
-Function and door frame to guide buffed pachinko balls to lower tray
The pachinko ball is lowered by blocking the passage to the upper tray with opening.
Having both functions of guiding to the saucer
Become. The insertion tray 57 is opened when the door frame 7 is closed.
Pachinko balls flow from the space 54 toward the lower tray 14
This mechanism is provided to prevent
The lower tray passage 53 has both functions.
It is possible. As shown in FIG. 1, FIG. 5 and FIG.
As described above, the lower receiving passage 53 is located below the second passage 53c.
Is provided with a sensor storage section 66. Sensor storage 6
6, a limit switch (not shown) is provided.
The lower tray 14 becomes full of pachinko balls and the second passage
When this overflows to the 53c side, it is detected and a payout described later is performed.
The release of the prize ball (pachinko) from the device 96 is stopped.
On the right side of the sensor housing 66, a detour passage 89 (described later)
1) is connected to the pachinko ball from the upper pan 8
A communication passage 104 is formed to allow the tray 14 to avoid it.
ing. Next, the discharge passage unit 46 will be described.
You. As shown in FIG. 9 to FIG.
Is the back side of the pachinko ball processing area 21 (that is, the main body of the gaming machine).
4 on the back side).
ing. As shown in FIG. 26, the discharge passage unit 46
Base plate 121 and discharge passage protruding from the front surface
122. Multiple discharge passages 122
And the collecting frame 12 in order from the top.
3, the first inclined passage 124, the second inclined passage 125, the vertical
A direct passage 126 and a discharge mass 127 are provided. FIG.
As shown in FIG.
24, combining the second inclined passage 125 and the vertical passage 126
The first reinforcing rib 128 corresponding to the formed outer shape is projected.
And the surrounding second to improve strength
Are formed to protrude. FIG. 10, FIG.
As shown in FIG. 6 and FIG. 28, the ball collecting frame 123
A ball receiving frame member that is extended and has a large opening at the top.
Thus, the mounting surface 120 and the front and left and right wall surfaces 123a
~ 123c. Ball collection frame 123
Out ball falling from out ball collection port 30 and safe
Collect safe balls falling from the ball collecting plate 34
The pachinko ball serves to guide the first slanted passage 124 into the
Than the first inclined passage 124 to make it easier to receive
It is configured wide in the front-rear direction. As shown in FIG.
In addition, a buffer member extending in the left-right direction is provided in the ball collection frame 123.
Guide plates 131 are formed. On the guide plate 131
The pachinko ball that has finished the above game falls and passes through the first slope
Before reaching the road 124, the momentum is reduced and the discharge passage 122
In order to prevent it from popping out
A facing slope is provided. The first inclined passage 124 has a mounting surface 120.
And formed in a gutter shape by the front wall 124a and the bottom plate 124b.
The bottom plate 124b is attached to the first reinforcing rib 128.
Have been matched. In FIG. 10, the bottom plate 124b
The slant is provided so that the pachinko ball flows down to the right
I have. As shown in FIG. 10 and FIG.
2b at the front corner to discharge dust inside
Is formed. First inclined passage 1
The downstream side of 24 communicates with the second inclined passage 125.
You. The second inclined passage 125 has a mounting surface 120 and a front wall.
125a and a bottom plate 125b are formed in a gutter shape.
Bottom plate 125b abuts on the first reinforcing rib 128
Have been. In FIG. 10, the bottom plate 125b has a pachinko
The slope is provided so that the ball flows down to the left. Figure
As shown in FIG. 10 and FIG. 26, the front corner of the bottom plate 124b
Has slits 13 for discharging dust inside at a plurality of locations.
3 are formed. The downstream side of the second inclined passage 125
It is gradually curved and communicates with the vertical passage 126.
The vertical passage 126 has a space surrounded by a tube.
Has formed. The discharge mass is located at the lower end of the vertical passage 126.
127 are connected, and the pachinko game is completed from here.
The ball is discharged to the outside. FIG. 25, FIG.
As shown in FIG. 27 and FIG.
On the upstream side, a ball extraction flow described later formed on the mechanism panel 10 side
Pachinko balls that come in contact with pachinko balls that flow down from Road 99
A ball contact surface 135 is formed. Downstream pachinko ball abutment
The configuration of the surface 135 and its surroundings will be described later. this
The discharge passage unit 46 configured as described above is mounted on the mounting surface 1.
37 is exchangeably mounted with screws. By the way, in the conventional pachinko game machine, the mechanism is
There was a large safe ball processing unit at the bottom of the panel.
And the safe ball passes through the guide passage formed in the mechanism panel.
All once sent to the safe ball processing unit and suspended,
The payout device is driven by the mechanical counting of the ball
Had to be done. Mainly this safe ball processing equipment
In the past, payment was difficult due to the lack of space
Payment of pachinko balls (prize balls) paid out from the dispensing device
The shift position (corresponding to a branching mechanism 61 described later) is located upward.
There is no choice but to cut out some game boards and provide a passage
The configuration was as follows. Therefore, the safe ball
Since it is necessary to send in the direction of the ball processing device,
The discharge passage unit 46 is not provided in the conventional model.
won. Also, there is no room to arrange it in terms of space
Was. On the other hand, in this embodiment, the safe ball
The processing apparatus is abolished, and a discharge passage unit 46 is provided.
You. This is not to drive the dispensing device mechanically.
Payout provided on the board mounting base 11
Dispensed by electrical control by substrate (not shown)
The device 96 is driven. More specific
Specifically, the dispensing device 96 is operated as follows.
First, a detecting means (sensor) not shown is installed in the winning opening.
The winning is detected by this detecting means. That
Therefore, safe spheres are no longer necessary and safe spheres
Drop it on the collecting plate 34 and discharge it in the same way as an out ball.
I don't care. The winning number is counted by the detection signal.
The control unit of the dispensing board based on this count number
The payout device 96 to be described later is driven. Subordinate
Therefore, since a safe ball processing device is not required,
The discharge passage unit 46 can be installed in the lower space.
Safe ball is ejected together with the out ball
It has become possible. As a result, the space by the safe ball processing device
Payout position will be eliminated
Will also be released. In other words,
A game board 5 in which a part of the game board 5 is cut out to provide a passage.
It is not necessary to have a structure that affects the design of
And disposing the branching mechanism 61 at a lower position of the game board 5
Is possible. In addition, with safe ball processing equipment
Since the guide path for guiding the safe ball is not required, the mechanical panel 1
The mechanical association with 0 will be completely eliminated. Change
In addition, since the safe ball processing device is not required, the branching mechanism 61
It has a mechanically simple structure. Dare for these reasons
Even if it is not provided on the mechanism panel side,
To be provided on the gaming machine body 4 side via the attachment base 11
Is possible. About the detailed structure of the branching mechanism 61
Will be described later. Next, the pachinko ball firing mechanism 23 will be described.
I will tell. As shown in FIGS. 1, 9 to 12, the main body of the gaming machine
4 near the lower right (lower left when viewed from the back)
A shell ball firing mechanism 23 is provided. Pachinko ball launch
The mechanism 23 includes the operation handle 15, the firing hammer 63,
Data device 64, firing cam not shown, coil not shown
It is composed of a spring or the like. The motor device 64 allows the player
Touching the handle ring 15a of the operation handle 15
At a predetermined timing (in this embodiment, one minute
100 times). Rotation of motor device 64
The firing cam is fixed to the shaft, and the firing cam rotates.
Rotate the launch hammer 63 against the urging force of the coil spring
Move. The firing hammer 63 is not engaged with the rotated firing cam.
Instantaneously by the urging force of the coil spring
It will return to the original position. Game by momentum at this time
A ball is fired. Handle ring 1 of operation handle 15
By controlling the biasing force of the coil spring by rotating 5a,
The contact speed of the launch hammer 63 to the pachinko ball (game ball)
It is designed to adjust. As shown in FIG. 1 and FIG.
A firing guide rail 65 is provided on the right side of the dish passage 53.
ing. The lower end (right end) of the launch guide rail 65 is the launch
It is arranged on the side of the hammer 63 and moves the firing hammer 63 forward and backward.
It extends obliquely upward and to the left overlapping with the direction. Departure
Pachinko ball fired from the upper end of firing guide rail 65
The jump area 67 where the (game ball) jumps and jumps over
Is formed. Below the jump area 67,
Top plate 6 forming second passage 53c of tray passage 53
8 are arranged. The upper surface of the top plate 68 is directed to the lower right
Because it is a slope that goes down, even if fired, the game surface 2
Pachinko balls without momentum that came back without reaching 0
It falls from the jump area 67 onto the top plate 68 and snaps
The ball moves down the top 68 to the right, and the launch guide rail 6
5 is introduced into the return passage 69 from below.
I have. In this embodiment, the return passage 69 is for the lower tray.
It communicates with an open space 54 above the passage 53. Launch plan
A firing guide rail is provided on the mounting rib 65a of the inner rail 65.
65 that supports the game balls set on
The pad 79 is fixed. Here, as shown in FIG.
When the inner rail 65 is viewed straight, the lower end of the launch guide rail 45
The shift is located below the upper end of the cover plate 13
Is done. In other words, hidden positions that cannot be seen from the front
It is to be arranged in. This is the top and bottom of the game board 5
The width is expanded as described above and the lower position compared to the conventional model
Launch guide rail 6
5 is shifted to a lower position as a whole.
Normally, when the launch guide rail 65 goes down, the operation handle
By lowering the 15 position as well, the firing guide rail 65
The lower part of the is never hidden. But snap
The position of the operation handle 15 in the game machine is controlled by the player.
Ergonomically decided to be placed in a position that is easy to work
I'm done. Therefore, lower the position of the operation handle 15
I can't do that. However, the approach distance after the launch of the game ball
Therefore, the launch guide rail 65 having a predetermined length is required. So
Here, the configuration is as described above. Here, the launch plan
One after another at the lowermost position of the inner rail 65 (launch preparation position)
The game ball to be launched is flowing in, so the game ball is sure
Need to be retained. Launch guide rail for conventional models
65 is adjacent to the upper cover plate arranged on the front side
Outlet for game balls from the upper cover plate
Can be designed to face the ready-to-launch position.
Was. However, a cover plate as in this embodiment
Launch preparation position hidden from the upper end of 13 below
Then, such a design is difficult. That is, preparation for launch
The game ball (standby ball for launch) set at the position is supported from the front.
There will be no means to carry. So the book
In the embodiment, as shown in FIG. 12 and FIG.
A game ball guide plate adjacent to the lowermost position of the rail 65
70 are provided. The game ball guide plate 70 is a door frame
It is supplied from the upper receiving tray 8 on the firing guide rail 65
Support the game ball from the front. That is, FIG.
As shown in FIG. 17, the position adjacent to the launch preparation position (forward
Position) of the same plate 70 at the position)
Located slightly higher than the launch guide rail 65
It is. As a result, the launch guide rail 65 is ready for firing.
The game ball placed at the bottom is one step below the plate 70.
Forward by the game ball guide plate 70
, And accurate firing becomes possible. Mosquito
An ashtray 72 is on the left of the lower tray 14 of the bar plate 13.
It is arranged. In the present embodiment, the back of this ashtray 72
A speaker (not shown) of the acoustic mechanism 24 is disposed
I have. As shown in FIG. 1, FIG. 5 and FIG.
A key hole 73 is formed on the right side of the rule 65. This key
The hole 73 controls opening and closing of the door frame 7 with respect to the gaming machine body 4.
Things. Next, the door frame 7 will be described in detail. Figure 1 to Figure
As shown in FIG. 4, a door frame 7 is provided on the front of the game board 5.
ing. The door frame 7 is turned around the rotation axis 6 a of the hinge 6.
Moving (that is, coaxial with the rotation axis of the gaming machine body 4)
It is attached to the body 4 so that it can be opened and closed and is detachable.
You. The door frame 7 has a substantially rectangular outer shape and a substantially circular shape in the center.
A large window hole 75 is formed. Make the window hole 75 circular
The game corresponds to the game area 27 on the game surface 9 of the game board 5.
It was made. The gaming surface 9 of the game board 5 is exposed in the window hole 75.
The glass G for taking out is inserted. Door frame 7
A reinforcement frame 74 is arranged on the rear side and around the window hole 75.
Is established. The front side of the door frame 7 and the periphery of the window hole 75
Is provided with a decorative panel 76 for decoration at a predetermined position.
You. A lamp (not shown) is provided in each decorative panel 76.
Is blinked based on the control by the main board 33.
You. An operation button 77 for lending a ball is provided below the window hole 75.
7-segment display panel 78 for displaying the remaining amount of cards
Are arranged. Below operation buttons 77 and display panel 78
Is provided with an upper tray 8. 18 and FIG.
As shown, the upper saucer 8 contains the introduced pachinko balls.
The lower surface 81 to be pooled and the surrounding wall surrounding the lower surface 81
82. Pachinko not shown on the lower surface 81
Pachinko balls released from the ball distribution nozzle of the ball rental device
Comes into contact with the fall. The flow surface 81 is formed with a downward slope.
And the downstream side (right side) gradually narrows
A constriction passage 84 is formed such that the dick balls are arranged in tandem.
Have been. The upper tray 8 has a door frame 7 wall on the upstream side (left side).
Introduced from the pachinko ball inlet 83 formed at the bottom
As the ball is pooled, it will gradually flow downstream
The stenosis passage 84 is reached, and further disposed at the most downstream of the stenosis passage 84.
The supply port 85 is guided to the rear side of the door frame 7. In FIG.
As shown, at the corresponding rear position of the door frame 7 of the supply port 85,
Is a game ball plan for guiding game balls to the game ball guide plate 70
An internal passage 87 is provided. The game ball guiding device 87 is above
The pachinko balls flowing down from the supply port 85 of the tray 8 are discharged as described above.
This is a device for dropping on the shooting guide rail 65. Game ball plan
Pachinko balls accumulated in the upper receiving tray 8 beside the inner device 87
Is caused by the lower tray 14 voluntarily by the operation of the player.
Is formed. As shown in FIG. 1 and FIG.
The corresponding back of the door frame 7 of the pachinko ball inlet 83
The insertion tray 57 protrudes rearward at the surface position.
It is formed. In the insertion tray 57, the door frame 7 is played
Opened from the outlet 51 while attached to the front of the machine body 4
It is inserted into the release space 54 and supplied from the pachinko ball processing area 21.
Received pachinko balls from pachinko ball inlet 83
Guide to dish 8. The operation button 77 and the display panel 78
On the back side, a ball rental board box with a built-in ball rental board
Box 88 is provided. As shown in FIG. 18 and FIG.
The surrounding wall 82 surrounding the flow lower surface 81 of 8 is a pachinko ball introduction
High wall portion 8 in which the periphery of mouth 83 is formed higher than other portions
2a. The upper end of the high wall portion 82a is a pachinko ball ball
The position is higher than the upper end position of the entrance 83, and
The pachinko ball inlet 83 is surrounded by
And the high wall portion 82a. High wall
82a (and the wall surface of the door frame 7)
The left position (in front of the pachinko ball inlet 83) is a pachinko ball
Pachinko balls fall from the ball placement nozzle of the rental device
Position. Therefore, the size of the game board 5 becomes large.
The upper tray 8 is located lower than the conventional model.
And the distance from the ball distribution nozzle to the lower surface 81 is longer.
Even if the
The issued pachinko ball does not jump out. Here,
In the next model, the upper tray is separated from the door frame by the upper cover plate.
Had been arranged at the site. Top cover plate under door frame
It is a member disposed at the first position. Therefore, open the door frame
Of the upper tray provided on the upper cover plate when
The height of the door frame so that it does not interfere with the opening of the door frame.
I had to set height restrictions. That
Pachinko ball lending device from the ball placement nozzle to the upper tray
If the distance is long, the pachinko balls that fall on the upper tray will
There was a possibility of getting over and jumping out. Follow
And set the ball placement nozzle so that it is as low as possible
It had been. Make sure that the walls are not too high.
Carefully design the top cover plate
There were design restrictions. However, this implementation
In this state, the upper tray 8 is on the door frame 7 side and is integrated with the door frame 7.
The height of the high wall portion 82a is not limited.
(To the extent that it does not actually touch the game surface 20 of the game board 5)
There is a need to). Next, the mechanism panel 10 will be described. Figure
As shown in FIG. 2, FIG. 4 and FIG.
The mechanism panel 10 is attached to the gaming machine body 4 so as to be openable and closable.
ing. The mechanism panel 10 is provided with hinge parts 90 disposed vertically.
(Only the lower side is displayed in this embodiment)
4 and the opening / closing pins arranged
To the gaming machine body 4 by pulling out and pushing
It is made detachable. Near the center of the mechanical panel 10
A mold opening 10a is formed. Of the large opening 10a
The upper half is covered by a cover 92 from the back. Figure
As shown in FIG. 9, the mechanical panel 10 is closed with respect to the gaming machine main body 4.
The back of the game board 5 from the large opening 10a in the closed state
The variable display device 29 and the main substrate 33 provided in the
Will be issued. The variable display device 29 is backed by a cover 92.
The main board 33 is covered for visual confirmation.
I can't. A tank T is provided above the mechanism panel 10.
I have. A tank rail 93 is provided below the tank T.
ing. The tank rail 93 is the path introduced from the tank T.
The cock ball is moved from left to right in FIG. Book
In the embodiment, the gaming board 5 is also located above the conventional model.
Due to expansion, the tank T is slightly
It is formed shallower. To the right of the tank rail 93 is
Payout unit 9 as a payout mechanism toward
5 are provided. Payout unit 95 pays out
The device 96 and a first device for guiding the pachinko ball to the dispensing device 96
Pachinko machine due to the passage 97 of the pachinko machine
In removing the ball from the island, the ball in the first flow path 97 is removed.
And a pachinko machine for removing balls.
The ball discharging channel 99 from which the balls are discharged and the dispensing device 96
Downstream second flow path 100, bell 101, bell 101
And a third flow path 103 downstream of. Real truth
In the embodiment, the two payout devices 96 generate a safe ball.
Pays out a predetermined amount of pachinko balls (prize balls) based on. Pa
The dick ball flows down the second flow path 100 to the bell 101 on the way.
Abut Pachinko balls in contact with bell 101
Guide the road 103 diagonally downward (diagonally downward in FIG. 9).
It is. The pachinko balls that have flowed down the third flow path 103 are collected on the substrate.
It reaches the inside of the attachment base 11. Down the back of the mechanical panel 10
The pachinko balls that came in
To change direction. As shown in FIG. 2, FIG. 4 and FIG.
Substrate mounting base 11 is arranged below 10.
You. The board mounting base 11 has hinges arranged vertically.
Supported by the gaming machine body 4 so as to be openable and closable by the unit 105.
And the opening / closing pin 107 arranged on the left side in FIG.
Attached to gaming machine body 4 by pulling and pushing
It is possible to remove. As shown in FIG. 9, FIG. 20 and FIG.
As described above, the firing board is stored in the board mounting base 11.
Launch board box 11a and the power supply board
The source substrate box 11b is fixed. Shown in FIG.
So that the payout board box where the payout board is stored
The switch 11c is detachable. This is fraud-proof
From the point, only the printed circuit board box 11c is separately provided to the user.
Because it is necessary to supply. As shown in FIG. 9, FIG. 20 to FIG.
Mounting the dispensing board box 11c of the mounting base 11
A branch unit 61 as a branch mechanism is provided on the front side of the landing position.
It is arranged detachably. Branch unit 61 is paid out
Pachinko balls flowing down from the device 96
Between the upper tray 8 and the lower tray 14
This is the first branching mechanism that branches off somewhere. As shown in FIG.
As shown, the branch unit 61 is hollow and substantially square
The first partitioning space inside
Are provided. The branch unit 61 is
It is fixed to the plate mounting base 11 via the fixing piece 106.
Are fixed by a thread 108. The branch unit 61
In the horizontal position, the game board 5 is placed as shown in FIG.
It is arranged below the position of the top plate 22 which is located. sand
That is, the branch unit 61 is lower than the lowermost position of the game board 5.
And the substrate mounting base 1
1 is attached to the gaming machine main body 4 side. Minute
The inside of the branch unit 61 is partitioned into three passages. FIG.
3, the main passage intermediate passage 109 and the by-pass
Intermediate passage 110 for pass passage and passage 111 for ball empty passage
It has been. Each passage 109, 110, 111 is horizontal
They are arranged side by side. Intermediate passage 109 for main passage
The intermediate passage 110 for the bypass passage is formed by the first shielding plate 66.
And the intermediate passage 110 for the bypass passage and the ball extraction flow
The road passage 111 is partitioned by the second shielding plate 71.
ing. As shown in FIGS. 22 and 24, the first shielding plate
66 is a substantially right-angled triangular appearance, and the first shielding plate 66 is
It is detachably fixed by a screw 112. First
The shielding plate 66 has a curved slope with the hypotenuse of the triangle slightly curved.
The curved inclined surface 66a is a main passage.
It is arranged so as to face the use intermediate passage 109 side. Branch
The rear wall 61a of the unit 61 is
It can be attached and detached with screws 113 for attachment and detachment. main
A first entrance port 114 is provided above the passage intermediate passage 109.
It has an opening, and a first outlet 115 is opened on the front surface.
Have been. Above the intermediate passage 110 for the bypass passage,
The second entrance 116 is opened, and the second exit is
The ball opening 117 is open. Ball passage 111
The third entrance 118 is opened above the
Has a third exit port 119 opened. As shown in FIG.
As described above, the first entrance port 114 is connected to the third flow path 103.
Diagonally below (i.e., below the flowing pachinko ball)
At the downstream position), and the first exit port 115
Is connected to the main passage 47. The second entrance 116
Open to the side position deviated from the main flow down position of the third flow path 103
The second exit hole 117 is connected to the bypass passage 49.
It is connected to the. The third entrance 118 is a ball-extraction channel 9
9 is connected to the lower exit, and the third outlet 119 is
The falling pachinko ball is directly opposed to the contact surface 135. FIG.
As shown in Fig. 9, the pachinko balls that have been drained and flowed down are
It falls down from the third exit hole 119 or falls down
It falls after contacting the ball contact surface 135. fell down
The pachinko ball is in the second inclined passage 1 of the discharge passage unit 46.
25 and finally discharged to the outside
You. That is, the main passage intermediate passage 109 and the bypass passage
Pachinko balls passing through the road intermediate passage 110
Pachinko balls to be used in the game, in front of the gaming machine body 4
Is guided to the upper tray 8 or the lower tray 14,
The pachinko balls that pass through the ball passage channel 111 are, so to speak,
Pachinko balls are no longer needed and need to be discharged.
You. Therefore, the third exit hole 119 is provided in the discharge passage unit 4
6 (discharge passage 122). Here, the substrate mounting base 11 is a mechanical panel.
It is configured separately from 10. For conventional models,
Board, power supply board and payout board are
And it is not always easy to check in this way
It is not necessarily located at a lower position. Form of this implementation
In this state, the board mounting base 11 is
The main reason for the separate configuration is 1)
Large and heavy mechanical panels 2) Separate
This will speed up the task of assembling pachinko machines.
And 3) Conversely, reasons such as ease of removal when reused
Because. Further, in the present embodiment, the pachinko game machine and
Board that has commonality regardless of the game content
Attach it to the mounting base 11 as a separate body
This makes maintenance and inspection easier. Also like this
The substrate mounting base 11 can be provided as described above.
The amusement machine main body was abolished because the safe ball processing device was abolished
A discharge passage unit 46 is provided in the pachinko ball processing area 21 of No. 4.
It can be moved and the position of the mechanism panel 10
This is also due to the extra space available. FIG.
As shown in FIG. 11, the vertical width of the mechanism board 10 is
Of the mechanism panel 10
The substrate mounting base 11 is opened by opening
Or maintenance / inspection / renewal of game board 5 without removing
Work such as replacement can be performed. Also, the launch board button
Box 11a, power supply board box 11b and payout base
Isolate the plate box 11c from the discharge passage unit 46
The static generated when pachinko balls come into contact with each other
Making it less susceptible to electrical noise (electrical signals)
This is because the board mounting base 11 is configured separately.
is there. Next, the present embodiment thus configured
The operation around the discharge passage unit 46 will be described.
Enter the pachinko balls that have finished playing on the game surface 9 of the game board 5
The safe ball which won the prize mouth 28 is from the safe ball collecting plate 34
Fall backward. At this time, the prize is not shown as described above.
Detection means (sensor). Also, do not win
Pachinko balls fall backward from the out ball collection port 30
I do. All pachinko balls that have completed these games will be implemented
Guide plate of ball collecting frame 123 of discharge passage unit 46 in the form of
1st tilt further downward while being received by 131
It reaches the inclined passage 124. Pachinko ball is on the right side of the bottom plate 124b
Down to the second inclined passage 125 on the downstream side.
The second inclined passage 125 is for the pachinko ball flowing down
Turn around and reverse the momentum of pachinko balls
It has the function of relaxing by making it inclined. pachinko
The ball is further discharged from the vertical passage 126 to the discharge mass 127.
Is done. In addition, a pachinko ball is inserted into the intermediate passage 109 for the main passage.
Traffic jams (for example, a large amount of pachinko balls paid out
Pachinko that overflows from the main passage 47
When the ball fills the main passage intermediate passage 109, the pachinko ball
Moves from the second entrance 116 over the first shielding plate 66.
It is guided into the intermediate passage 110 for the ipass passage.
Pachinko introduced into the intermediate passage 110 for the bypass passage
The ball turns 90 degrees forward and from the second exit hole 117
It is introduced in the direction of the bypass passage 49. This pachinko ball
Lower support as an overflow passage on the front of the gaming machine body 4
From the dish passage 53 to the lower tray 14. That is,
The overflow passage provided on the mechanical panel side is separated.
The discharge passage unit 46 and the gaming machine body 4
Will be arranged. Also, by replacing the model
Once all pachinko balls in tank T are discharged,
That is, in the ball removing operation, the ball removing mechanism 98 is operated.
Thus, the ball is removed from the ball removal channel 99. At this time
The pachinko ball flows down the ball extraction channel 99 and enters the third entrance 1
From 18 is introduced into the branch unit 61. Branch unit
In step 61, the pachinko ball is moved from the third entrance 118
It is introduced into the passage 111 for the extraction channel. Ball passage
Pachinko ball introduced into 111 turns 90 degrees forward
In other words, the pachinko ball contact surface 1 flowing down from the third outlet 119
35, falls into the lower second inclined passage 125, and
As with the other pachinko balls described above, the discharge
And is discharged to the outside. In this implementation of this
The discharge passage unit 46 in the form shown in FIGS.
As shown in FIG. So
Then, the substrate mounting base 11 is centered on the hinge 105.
Or remove it (see FIGS. 10 and 11).
State), the mechanism panel 10 can be exposed to the rear without opening it.
Will be issued. With this configuration, in the present embodiment,
Has the following effects. (1) In a conventional pachinko game machine, as shown in FIG.
Play all safe balls and out balls that have been moved to the
Processing can now be performed on the technical machine body side. This
This is because, as described above, in this embodiment, the safe ball processing device is used.
The safe ball is intentionally sent to the mechanical panel 10 because it is no longer required.
It is no longer necessary. In addition, safe ball processing equipment
Space at the lower part of the mechanical panel 10
To provide the exhaust passage unit 46
Has been synergistically improved
It is. By this, safe ball and out ball discharge machine
The structure is simplified, resulting in cost reduction. Ma
In addition, the structure has been simplified and the connection with the mechanism panel 10 has been eliminated.
As a result, problems such as clogging of the balls during the discharge of pachinko balls
It became harder to read. Also, distinguish between a safe ball and an out ball.
Without using the same discharge passage unit 46.
This also simplifies the structure and reduces costs.
Contribute to reduction. (2) All safe balls and out balls are on the gaming machine side
And the connection with the mechanical panel 10
The structure has been simplified because it has disappeared. In addition, conventional machines
The overflow passage installed on the construction panel side is as described above.
In this embodiment, a lower tray is provided on the front side of the gaming machine main body 4.
The passage 53 is provided. That is, the discharge passage unit
The knit 46 is simply a safe ball and an out ball (and
Of the pachinko ball at the time)
So that the overflow passage, the safe ball and the out ball
Since the exit passage is arranged on the mechanism panel overlapping, the structure is
Does not become complicated or thick. That
On the back of the discharge passage unit 46, a substrate mounting base
There is enough room to attach 11
You. (3) In the conventional model, the ball empty passage 159 is out.
Separate passage separate from the discharge passage for balls and safe balls
Thus, it is connected to the discharge mass 153 on the mechanism panel 155 side.
In order to connect the ball removing passage 159 to the discharge mass 153,
The pachinko machine is installed on the island where the pachinko machines are installed.
Problems of arrangement of collecting mechanism (bucket etc.) for collecting dick balls
Is big. A separate discharge port is provided directly below the ball passage 159.
It is necessary to install multiple collection mechanisms on the island side
In the past, the passage was complicated and
Discharges ball-free passage 159 despite total lengthening
The structure which connects to the mass 153 was adopted. Only
However, in the present embodiment, the gas has flowed down from the ball emptying channel 99.
Pachinko balls from which the balls were removed particularly reached the discharge mass 127
It is not necessary to provide a special passage for The above configuration
Ball of the branch unit 61 from the third entrance 118
It is led to the passage 111 for the flow path, and is lower than the third outlet 119.
Is configured to be guided to the second inclined passage 125.
I have. The second inclined passage 125 has a wide upper portion and opens in the left-right direction.
Snapping and falling from the third outlet 119
The ball is the second inclined passage 125 without providing a special passage.
And fall on the bottom plate 125b. Follow
In the present embodiment, the
Without providing a specially structured mechanism for the dick ball,
In addition, it is possible to lead the
Is possible. This results in a single discharge passage
The unit 46 (discharge passage 122) allows the safe ball,
Exclude all the balls and pachinko balls from which balls have been removed.
You can get out. (4) In the conventional model, the pachinko ball discharging mechanism is
Even if the mechanism panel is opened with the inside sealed,
Dispensing mechanism is difficult to see and adjust for defects
Met. In this embodiment, the board mounting base 11 is
Rotate or remove around hinge 105
(Painting ball flow)
Can be viewed from the front of
Inspection can be performed very easily. Also, the mechanical panel 10
Covered by a separate board mounting base 11
Without exposing the mechanism panel 10 to the rear side.
It will be. (5) The discharge passage unit 46 is mounted on the substrate mounting base 11.
Is turned around the hinge 105, or
It can be exposed by removing (state of FIG. 10 and FIG. 11) and discharge
Conventionally, the passage unit 46 can be easily replaced by itself.
This is advantageous as compared with a discharge mechanism integrated with a mechanical panel as described above. (6) Unlike the related art, the safe ball is the game area on the game surface 9.
The back of the game board 5 from the position behind the winning opening 28 scattered in 27
It is guided to the surface side and falls as it is. You
That is, the safe ball is on the left and right sides when viewed from the back side of the game board 5.
Will fall evenly into the passage in the direction
You. In the present embodiment, the discharge mass 127 is thus wide.
The most efficient discharge of pachinko balls flowing from the area
It is arranged at a substantially central position in the left-right direction. Incidentally, the present invention is specifically modified with the following changes.
It is also possible to convert. In the above embodiment, the discharge passage unit 46 is provided separately.
Is mounted in the pachinko ball processing area 21 of the gaming machine body 4
Was. However, it is integral with the gaming machine body 4 (that is,
). In the above embodiment, the discharge passage unit 46 is provided separately.
Is mounted in the pachinko ball processing area 21 of the gaming machine body 4
Was. This is arranged on the front side of the substrate mounting base 11.
You may make it so. In this case, the board mounting base 1
Even if it is constituted integrally with 1, it should be mounted so that it can be replaced
Is also good. The shape of the discharge passage unit 46 is an example, and
It is not limited. In the above embodiment, the first shielding plate 66 is replaced.
Is possible, but the branch unit 61 cannot be replaced.
It doesn't matter.・ The gaming machine body 4 is made of metal material and can be used for a long time
It may be applied to a functioning model. The shape of the branching unit 61 is an example, and the shape of the above embodiment is used.
It is not limited to the state. In the above embodiment, the second inclined passage 124 and the second inclined passage 124
An inclined passage 125 is provided, and finally the exhaust
27 was arranged, but depending on the design,
One or three or more inclined passages 124 and 125
It is also possible to set the discharge mass 127 in the center
You don't have to. -A part or all of the branch unit 61 is provided with an earth member.
May be provided. For example, some
Guide plates 131 and 124b that are most in contact with pachinko balls,
125b. When flowing down in such a configuration
Static electricity generated when surrounding pachinko balls come into contact with each other
Therefore, noise caused by static electricity can be prevented. A
Other shielding members themselves are made of conductive metal.
Or by depositing a thin film of conductive metal.
No. Further, a conductive resin may be used.・ In this embodiment, the pachinko ball whose game has been completed is discharged to the outside.
It was an example of a pachinko machine
May be used.・ This embodiment is also applied to CR machines other than cash machines
It is possible.・ The present invention is a pachinko ball called a so-called pachilot
It may be applied to slot machines using
No. In addition, the present invention is implemented in a mode that does not depart from the gist of the present invention.
You are free. In order to achieve the object of the present invention,
Other technical ideas that can be grasped from the form are as follows
This will be described as an additional note. (1) The passage is formed integrally with the gaming table.
The gaming machine according to claim 1, wherein: (2) The passage is unitized and can be exchanged for the game console
2. The device according to claim 1, wherein the device is configured separately.
The described gaming machine. With this configuration, the passage needs to be replaced
In the event of a failure, only the unitized passage
Can be exchanged. (3) Board pick-up for mounting various control boards on the gaming table
Mounting base, and the passage
The gaming machine according to claim 1, wherein: (4) The passage is replaceable with the substrate mounting base.
The game according to Supplementary Note 3, wherein the game is provided.
Machine. (5) The passage is a discharge passage for discharging pachinko balls outside the machine.
The road is characterized by the fact that it is a road.
The gaming machine according to any one of the above. (6) A falling slingshot extending in the left-right direction in the passage
It is characterized by a ball collecting frame for collecting balls
The method according to claim 1 or any one of supplementary notes 1 to 5,
Gaming machine. This collection frame makes it easier to catch pachinko balls
Compared with the passage that passes the pachinko ball on the downstream side
It is preferable that the opening is configured to be wide. (7) Receive the falling pachinko ball in the collecting frame
Note that a cushioning member is provided to reduce the momentum of falling.
The gaming machine according to attachment 6, wherein By this,
Pachinko ball that has finished the game that has fallen from the ball collection frame
Bouncing out is prevented, and the lower passage is quickly
The pachinko ball can be guided to. (8) The recovered pachinko balls flowing down the passage are
The outlet is formed almost at the center of the game console in the left-right direction.
8. The method according to claim 1, wherein
A gaming machine according to claim 1. Unlike before, the safe ball is in front of the playing surface 9
Play from the position behind the winning opening 28 scattered in the
Because it is guided to the back side of the technical board 5 and falls as it is,
When viewed from the back side of the board 5, the safe sphere is
It is supposed to fall into the passage evenly. Follow
And even pachinko balls that flow from such a wide range
The outlet is almost at the center in the left-right direction for the most efficient discharge.
It is preferable to arrange them at positions. (9) The path is used for pachinko balls when removing the ball from the tank.
Together with the pachinko balls that have flowed down from the
2. The method according to claim 1, wherein
A gaming machine according to any one of claims 1 to 8. In the above embodiment, the
The inclined passage 125 of the outlet passage 122 has the function. This
As a result of a single passage, safe sphere, out sphere and sphere
All processing of the extracted pachinko balls became possible. (10) Count the number of safe balls electrically with winning
Then, based on this count number, under the control of the dispensing board
Order the payout device to pay out the prize balls.
And that you can use the same passage as the ball out
The method according to claim 1 or any one of supplementary notes 1 to 9, wherein
Game machine. In other words, it requires a conventional safe ball processing device.
There is no need to go through a safe ball processing device
Safe ball can use the same path as the out ball
It became. (11) The pachinko ball tray is an upper tray,
Pachinko balls supplied to the upper tray are over the supply passage side
-A crack that overflows to the bottom tray when it overflows
An overflow passage that bypasses the ball is in front of the game console
3. The method according to claim 1, wherein
10. The gaming machine according to any one of 10. This will over
A flow path and a path to guide pachinko balls that have finished playing
Can be placed separately on the front and back of the game console,
The complication can be prevented. (12) The passage should be used for pachinko
The pachinko ball that flows down from the ball drain channel from which the ball is discharged is received.
2. An attachment according to claim 1, wherein
A gaming machine according to any one of the preceding claims. To be configured in this way
Induces pachinko balls to flow down from the ball drain channel
It is not necessary to separately provide a separate passage. (13) The ball emptying passage is provided with a path flowing down from the dispensing device.
Always guide the dick ball to the upper tray and to the same tray
The supplied pachinko balls overflow to the supply passage side
Contact with the branching mechanism that changes the direction
Pachinko balls flowing down the ball drain channel
It is guided in the direction of the passage via a structure
The game according to claim 1 or any one of supplementary notes 1 to 12.
Machine. [0033]

【図面の簡単な説明】 【図1】 本発明の実施の形態のパチンコ遊技機の開放
した状態を示す概略斜視図。 【図2】 同じパチンコ遊技機の分解側面図。 【図3】 同じパチンコ遊技機の正面図。 【図4】 同じパチンコ遊技機の側面図。 【図5】 同じパチンコ遊技機の扉枠を外した状態の正
面図。 【図6】 同じパチンコ遊技機の遊技盤の正面図。 【図7】 同じパチンコ遊技機の遊技機本体の上半身の
正面図。 【図8】 同じパチンコ遊技機の遊技機本体の上半身の
側断面図。 【図9】 同じパチンコ遊技機の背面図。 【図10】 同じパチンコ遊技機の機構盤を外した状態
の背面図。 【図11】 図10においてメイン基板周辺を取り外し
た状態の背面図。 【図12】 同じパチンコ遊技機のパチンコ球処理領域
付近の斜め上方からの斜視図。 【図13】 図5におけるA−A線での断面図。 【図14】 図5におけるA−A線での断面図。 【図15】 図5におけるB−B線での断面図。 【図16】 同じパチンコ遊技機の主通路、バイパス通
路及び導出口の断面図。 【図17】 図5におけるC−C線での断面図。 【図18】 同じパチンコ遊技機の上受け皿の平面図。 【図19】 同じパチンコ遊技機の上受け皿の断面図。 【図20】 同じパチンコ遊技機の基板取り付けベース
の平面図。 【図21】 同じパチンコ遊技機の基板取り付けベース
の斜視図。 【図22】 分岐ユニット周辺の切り欠き背面図。 【図23】 同じパチンコ遊技機の基板取り付けベース
の正面図。 【図24】 分岐ユニットの分解斜視図。 【図25】 基板取り付けベース及び排出通路ユニット
周辺の平面図。 【図26】 排出通路ユニットの斜視図。 【図27】 排出通路ユニットの取り付け面周辺の背面
図。 【図28】 図10におけるD−D線での断面図。 【図29】 分岐ユニットの球抜き流路用通路と流下パ
チンコ球当接面との接続状態を説明する断面図。 【図30】 従来のパチンコ遊技機の上受け皿、遊技機
本体及び機構盤の一部断面部分平面図。 【図31】 従来のパチンコ遊技機の機構盤の部分拡大
正面図。部断面部分平面図。 【符号の説明】 1…支持枠体としての外枠、4…遊技台としての遊技機
本体、5…遊技盤、7…扉枠、8…上受け皿、14…下
受け皿、20…遊技面、46…排出通路ユニット、12
2…通路としての排出通路、123…通路の一部である
集球枠、124…通路の一部である第1の傾斜通路、1
25…通路の一部である第2の傾斜通路、126…通路
の一部である垂直通路。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a schematic perspective view showing an open state of a pachinko gaming machine according to an embodiment of the present invention. FIG. 2 is an exploded side view of the same pachinko gaming machine. FIG. 3 is a front view of the same pachinko gaming machine. FIG. 4 is a side view of the same pachinko gaming machine. FIG. 5 is a front view of the same pachinko gaming machine with a door frame removed. FIG. 6 is a front view of the gaming board of the same pachinko gaming machine. FIG. 7 is a front view of the upper body of the gaming machine main body of the same pachinko gaming machine. FIG. 8 is a side sectional view of the upper body of the gaming machine main body of the same pachinko gaming machine. FIG. 9 is a rear view of the same pachinko gaming machine. FIG. 10 is a rear view of the same pachinko gaming machine with a mechanical board removed. FIG. 11 is a rear view of FIG. 10 in a state where a periphery of a main board is removed. FIG. 12 is a perspective view of the vicinity of a pachinko ball processing area of the same pachinko gaming machine viewed from obliquely above. FIG. 13 is a sectional view taken along line AA in FIG. 5; FIG. 14 is a sectional view taken along line AA in FIG. 5; FIG. 15 is a sectional view taken along line BB in FIG. 5; FIG. 16 is a sectional view of a main passage, a bypass passage, and an outlet of the same pachinko gaming machine. FIG. 17 is a sectional view taken along line CC in FIG. 5; FIG. 18 is a plan view of the upper tray of the same pachinko game machine. FIG. 19 is a cross-sectional view of the upper tray of the same pachinko game machine. FIG. 20 is a plan view of a board mounting base of the same pachinko game machine. FIG. 21 is a perspective view of a board mounting base of the same pachinko game machine. FIG. 22 is a cutaway rear view around the branch unit. FIG. 23 is a front view of a board mounting base of the same pachinko game machine. FIG. 24 is an exploded perspective view of a branch unit. FIG. 25 is a plan view of the periphery of a substrate mounting base and a discharge passage unit. FIG. 26 is a perspective view of a discharge passage unit. FIG. 27 is a rear view around the mounting surface of the discharge passage unit. FIG. 28 is a sectional view taken along line DD in FIG. 10; FIG. 29 is a cross-sectional view for explaining a connection state between a ball emptying passage of the branch unit and a down-flow pachinko ball contact surface. FIG. 30 is a partial cross-sectional partial plan view of an upper tray, a gaming machine main body, and a mechanism board of a conventional pachinko gaming machine. FIG. 31 is a partially enlarged front view of a mechanical panel of a conventional pachinko gaming machine. FIG. [Description of Signs] 1 ... Outer frame as a support frame, 4 ... Game machine body as a game table, 5 ... Game board, 7 ... Door frame, 8 ... Top tray, 14 ... Bottom tray, 20 ... Game plane, 46 ... discharge passage unit, 12
Reference numeral 2 denotes a discharge passage as a passage, 123 denotes a ball-collecting frame that is a part of the passage, and 124 denotes a first inclined passage that is a part of the passage.
25: a second inclined passage which is a part of the passage, 126 ... a vertical passage which is a part of the passage.

Claims (1)

【特許請求の範囲】 【請求項1】支持枠体に支持され遊技者が対面して遊技
を行う遊技面を備えた遊技台と、 同遊技台に対して開閉可能に支持され同遊技面の前方に
配置される扉枠と、 同扉枠の下方に配置され、同扉枠と一体化してあるいは
単独で前記遊技台に対して開閉可能に支持され払い出し
機構から供給されるパチンコ球を貯留するパチンコ球受
け皿と、 同パチンコ球受け皿から供給されるパチンコ球を遊技者
の操作によって前記遊技面上部に向かって発射させる発
射操作機構とを備えた遊技機において、 前記遊技面での遊技が終了して前記遊技台の裏面に誘導
されて落下するすべてのパチンコ球を受け止めて所定方
向に向かって流下させる通路を同遊技台裏面に配設した
ことを特徴とする遊技機。
Claims: 1. A game console having a game surface supported by a support frame and having a player face-to-face with a game, and a game surface supported and openable with respect to the game table. A door frame disposed in front thereof, and a pachinko ball provided below the door frame, integrated with the door frame or independently supported by the game console so as to be openable and closable and supplied from the payout mechanism. In a gaming machine having a pachinko ball tray and a firing operation mechanism for firing a pachinko ball supplied from the pachinko ball tray toward an upper portion of the gaming surface by a player's operation, the game on the gaming surface is terminated. A game machine, characterized in that a path for receiving all the pachinko balls guided to the back of the gaming table and falling down in a predetermined direction is provided on the back of the gaming table.
JP2001243130A 2001-08-10 2001-08-10 Game machine Pending JP2003052982A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001243130A JP2003052982A (en) 2001-08-10 2001-08-10 Game machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001243130A JP2003052982A (en) 2001-08-10 2001-08-10 Game machine

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2004292129A Division JP4214980B2 (en) 2004-10-05 2004-10-05 Game machine

Publications (2)

Publication Number Publication Date
JP2003052982A true JP2003052982A (en) 2003-02-25
JP2003052982A5 JP2003052982A5 (en) 2005-04-14

Family

ID=19073272

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001243130A Pending JP2003052982A (en) 2001-08-10 2001-08-10 Game machine

Country Status (1)

Country Link
JP (1) JP2003052982A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006218075A (en) * 2005-02-10 2006-08-24 Juki Corp Ball path structure for pinball game machine
JP2014087481A (en) * 2012-10-30 2014-05-15 Heiwa Corp Pinball game machine
JP2014161546A (en) * 2013-02-26 2014-09-08 Heiwa Corp Game machine
JP2017100006A (en) * 2017-03-07 2017-06-08 株式会社平和 Pinball game machine

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006218075A (en) * 2005-02-10 2006-08-24 Juki Corp Ball path structure for pinball game machine
JP2014087481A (en) * 2012-10-30 2014-05-15 Heiwa Corp Pinball game machine
JP2014161546A (en) * 2013-02-26 2014-09-08 Heiwa Corp Game machine
JP2017100006A (en) * 2017-03-07 2017-06-08 株式会社平和 Pinball game machine

Similar Documents

Publication Publication Date Title
JP2002301246A (en) Game machine
JP2003052982A (en) Game machine
JP4218227B2 (en) Game machine
JP2003052982A5 (en)
JP4214980B2 (en) Game machine
JP4247317B2 (en) Game machine
JP4155578B2 (en) Slot machine
JP2003079850A (en) Pachinko game machine
JP2003019313A (en) Pachinko machine
JP3236958B2 (en) Pachinko machine
JP2003103005A (en) Game machine
JP2003038803A (en) Game machine
JP5024743B2 (en) Game machine
JP3236959B2 (en) Pachinko machine
JP3991237B2 (en) Pachinko machine
JP3938076B2 (en) Pachinko machine
JP3019856B2 (en) Pachinko machine
JPH04218190A (en) Pachinko or pinball machine
JP3879683B2 (en) Pachinko machine
JP2004255219A (en) Game machine
JP2003024598A (en) Game machine
JP2002336505A (en) Game machine
JP2003024598A5 (en)
JP5077720B2 (en) Game machine
JP2000176124A (en) Game machine

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040604

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040608

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080310

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080401

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080528

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081021

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20090310