JP2003034932A - Method of drawing out existing piles and excavation casing used for it - Google Patents

Method of drawing out existing piles and excavation casing used for it

Info

Publication number
JP2003034932A
JP2003034932A JP2001222681A JP2001222681A JP2003034932A JP 2003034932 A JP2003034932 A JP 2003034932A JP 2001222681 A JP2001222681 A JP 2001222681A JP 2001222681 A JP2001222681 A JP 2001222681A JP 2003034932 A JP2003034932 A JP 2003034932A
Authority
JP
Japan
Prior art keywords
casing
existing pile
cut
pile
existing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001222681A
Other languages
Japanese (ja)
Other versions
JP3581336B2 (en
Inventor
Hidetaka Onodera
秀隆 小野寺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MARUTOKU KIGYO KK
Marutoku Kigyo Co Ltd
Original Assignee
MARUTOKU KIGYO KK
Marutoku Kigyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MARUTOKU KIGYO KK, Marutoku Kigyo Co Ltd filed Critical MARUTOKU KIGYO KK
Priority to JP2001222681A priority Critical patent/JP3581336B2/en
Publication of JP2003034932A publication Critical patent/JP2003034932A/en
Application granted granted Critical
Publication of JP3581336B2 publication Critical patent/JP3581336B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To obtain a method for easily and reliably drawing out existing piles, without giving damages to the housing environment of neighboring inhabitants, etc., and also preventing subsequent existing pile cutting operations from becoming difficult due to the slime arising from cutting operations, and to obtain an excavation casing used for this method. SOLUTION: A casing 3 provided with a narrow strip of cutter 8 in a spiral form along its inner bottom circumferential surface in the way that the spiral may reduce its inner diameter as it goes up is inserted into ground while being rotated so as to cover an existing pile 1 to be drawn out. The outer circumference of the existing pile 1 is cut with the spiral cutter 8 located within the casing 3 to reduce the diameter of the existing pile 1, which is then cut off at the point where its diameter has been reduced, and the cut-off pile portion is drawn out. The operations are repeated to finally draw out the entire existing pile 1.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、地中に埋設された
既存杭の引き抜き方法およびそれに使用する掘削ケーシ
ングに関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for extracting an existing pile buried in the ground and a drill casing used for the method.

【0002】[0002]

【従来の技術】従来、図7に示すような主筋15が配筋さ
れたコンクリート製の既存杭1の引き抜き方法として、
例えば、クレーンで吊支したバイブロハンマーを既存杭
の頭部にチャック装置で接続し、バイブロハンマーによ
って発生する上下運動を利用して、既存杭をバイブロハ
ンマーとともにクレーンで吊り上げて引き抜く方法や、
図8〜図10に示すように先端にケーシングビット11を取
り付け、下方部の内側に杭破壊用のビット12の複数個を
スパイラル状に取り付けたオーガーケーシング13を利用
する方法がある。
2. Description of the Related Art Conventionally, as a method for pulling out an existing concrete pile 1 having a main bar 15 arranged as shown in FIG.
For example, connecting a vibro hammer suspended by a crane to the head of an existing pile with a chuck device, and using the vertical movement generated by the vibro hammer, a method of lifting the existing pile with a vibro hammer and pulling it out with a crane,
As shown in FIGS. 8 to 10, there is a method of using an auger casing 13 in which a casing bit 11 is attached to the tip and a plurality of pile breaking bits 12 are attached spirally inside the lower portion.

【0003】このオーガーケーシング13による方法は、
オーガーケーシング13を回転しながら既存杭1の周囲に
これを取り囲むように挿入し、杭破壊用のビット12で既
存杭1の外周面を切削して主筋15を切断しながら既存杭
1を縮径し、この縮径部分をハンマーグラブ16などでつ
かんで折って引き上げるもので、かかる動作を繰り返し
て既存杭1を上部から順次切削し径を小さくしてから折
って引き抜いていくものである。
The method using the auger casing 13 is as follows.
Insert the auger casing 13 around the existing pile 1 so as to surround it while rotating, cut the outer peripheral surface of the existing pile 1 with the bit 12 for pile destruction, and cut the main bar 15 to reduce the diameter of the existing pile 1. Then, this reduced diameter portion is grasped with a hammer grab 16 or the like and folded and pulled up. By repeating such an operation, the existing pile 1 is sequentially cut from the upper portion to reduce the diameter, and then folded and pulled out.

【0004】[0004]

【発明が解決しようとする課題】前者のバイブロハンマ
ーを用いる方法では、稼働時の振動と騒音が大きく、近
隣の住民などへの影響を配慮すると都市部などでの施工
が困難であり、また、後者のオーガーケーシング13を利
用する方法は、複数個の杭破壊用のビット12が適宜間隔
でオーガーケーシング13の内周面に突出しているため、
既存杭1とオーガーケーシング13の内周面との間に隙間
が生じ、この隙間や切断後の未だ地中に残っている既存
杭1の上部に、杭破壊用のビット12での切削により生じ
るスライム14が落下して残留し、オーガーケーシング13
の内部がこのスライム14で詰まり、下方部分にいくにし
たがい切削しにくくなるおそれがある。
With the former method of using a vibro hammer, vibration and noise during operation are large, and it is difficult to carry out construction in urban areas, etc., considering the influence on neighboring residents and the like. The method of utilizing the latter auger casing 13, since a plurality of bits 12 for pile breakage are projected on the inner peripheral surface of the auger casing 13 at appropriate intervals,
A gap is created between the existing pile 1 and the inner peripheral surface of the auger casing 13, and this gap and the upper part of the existing pile 1 still remaining in the ground after cutting are formed by cutting with the bit 12 for pile destruction. Slime 14 drops and remains, auger casing 13
There is a risk that the inside of this will be clogged with this slime 14 and it will become difficult to cut as it goes to the lower part.

【0005】本発明の目的は前記従来例の不都合を解消
し、近隣住民などの住宅環境を害するおそれがなく、し
かも、既存杭を切削する場合に、切削により発生するス
ライムによって以後の切削が困難になることを防止し
て、容易かつ確実に引き抜くことができる既存杭の引き
抜き方法およびそれに使用する掘削ケーシングを提供す
ることにある。
The object of the present invention is to eliminate the inconveniences of the above-mentioned conventional examples, there is no fear of damaging the housing environment of neighboring residents, and when cutting existing piles, the subsequent cutting is difficult due to the slime generated by cutting. It is intended to provide a method for extracting an existing pile that can be easily and surely extracted while preventing the occurrence of the occurrence of the problem, and an excavation casing used for the method.

【0006】[0006]

【課題を解決するための手段】本発明は前記目的を達成
するため、既存杭の引き抜き方法として、第1に、下方
部の内周面に、帯状のカッターを上方にいくにしたがい
内径が小さくなるようにしてスパイラル状に設けた掘削
ケーシングを回転させながら既存杭を囲むようにして地
盤に挿入し、前記掘削ケーシングの内側のスパイラル状
のカッターで既存杭の外周部を切削して縮径させ、該縮
径箇所で既存杭を切断し切断箇所よりも上方部分を引き
抜き、これを順次繰り返し、既存杭の全体を引き抜くこ
と、第2に、掘削ケーシングの挿入は、オールケーシン
グ工法で使用する建て込み装置によることを要旨とする
ものである。
In order to achieve the above object, the present invention relates to a method of extracting an existing pile. Firstly, the inner diameter of the inner peripheral surface of the lower part is reduced as the band-shaped cutter is moved upward. Inserting into the ground so as to surround the existing pile while rotating the excavating casing provided in a spiral manner, and cutting the outer peripheral portion of the existing pile with a spiral cutter inside the excavating casing to reduce the diameter, The existing pile is cut at the reduced diameter part, the part above the cut part is pulled out, and this is repeated sequentially to pull out the entire existing pile. Secondly, the excavation casing is inserted by the erection device used in the all casing method. This is the summary.

【0007】既存杭の引き抜き方法に使用する掘削ケー
シングとして、第3に、外周をチャックされながら回転
推進されて地盤に挿入させる掘削ケーシングにおいて、
下方部の内周面に帯状のカッターを上方にいくにしたが
い内径が小さくなるようにしてスパイラル状に設けたこ
とを要旨とするものである。
Thirdly, as an excavation casing used in the method of extracting existing piles, thirdly, in an excavation casing which is rotated and propelled while being chucked at the outer periphery to be inserted into the ground,
The gist is that a strip-shaped cutter is provided in a spiral shape on the inner peripheral surface of the lower portion so that the inner diameter becomes smaller as it goes upward.

【0008】請求項1記載の本発明によれば、既存杭を
囲むようにして掘削ケーシングを回転させながら地盤に
挿入することにより、挿入と同時に掘削ケーシングの内
側のスパイラル状のカッターが既存杭の外周部を切削す
る。これにより、既存杭の切削部分が縮径し、該縮径箇
所で既存杭が折れる。よって、既存杭が切断され切断箇
所よりも上方部分の既存杭を引き抜き、かかる作業を順
次繰り返せば、既存杭の下方部分も引き抜かれる。この
場合、バイブロハンマーによる場合のような振動や騒音
は発生せず、また、大規模なクレーンも使用しないで引
き抜きが行える。
According to the first aspect of the present invention, by inserting the excavation casing into the ground while rotating the excavation casing so as to surround the existing pile, the spiral cutter inside the excavation casing is simultaneously inserted into the outer peripheral portion of the existing pile. To cut. As a result, the cut portion of the existing pile is reduced in diameter, and the existing pile is broken at the reduced diameter portion. Therefore, if the existing pile is cut and the existing pile above the cutting point is pulled out and such work is repeated sequentially, the lower portion of the existing pile is also pulled out. In this case, the vibration and noise unlike the vibro hammer do not occur, and the pulling out can be performed without using a large-scale crane.

【0009】請求項2記載の本発明によれば、前記作用
に加えて、掘削ケーシングの挿入は、オールケーシング
工法で使用する建て込み装置を使用するから、装置が大
規模にならず、施工場所の制約も少なくなり、掘削ケー
シングを使用して既存杭を確実に引き抜くことができ
る。
According to the second aspect of the present invention, in addition to the above-mentioned action, since the digging casing is inserted by using the erection device used in the all-casing construction method, the device does not become large-scale and the construction site is There are less restrictions and the excavation casing can be used to reliably pull out existing piles.

【0010】請求項3記載の本発明によれば、掘削ケー
シングとして、掘削ケーシングの下方部には内周面に帯
状のカッターを上方にいくにしたがい内径が小さくなる
ようにしてスパイラル状に設けたから、このカッターで
既存杭を切削したときに発生するスライムは、スパイラ
ル状のカッターにそって引き上げられる。よって、スラ
イムが掘削ケーシングの内部で落下して既存杭との間の
隙間に詰まることもなく、既存杭の下方部分の切断が困
難になることがない。
According to the third aspect of the present invention, as the excavation casing, a strip-shaped cutter is provided in the lower part of the excavation casing in a spiral shape so that the inner diameter becomes smaller as it goes upward. The slime generated when cutting an existing pile with this cutter is pulled up along the spiral cutter. Therefore, the slime does not fall inside the excavating casing and does not clog the gap between the existing pile and the existing pile, and it is not difficult to cut the lower part of the existing pile.

【0011】[0011]

【発明の実施の形態】以下、図面について本発明の実施
の形態を詳細に説明する。図1は本発明の既存杭の引き
抜き方法で使用する建て込み装置と掘削ケーシングの斜
視図、図2は同上要部である掘削ケーシングの下方部分
の縦断正面図で、建て込み装置2の構造から説明する
と、該建て込み装置2は周知のように例えばオールケー
シング工法で使用する圧入機であり、ケーシング3の外
周をたが状に締め付けるチャック装置4とこのチャック
装置4を回転駆動するモーターや減速機などの駆動装置
5と、これらチャック装置4および駆動装置5を上下動
する油圧シリダーによる昇降シリンダー6とからなる。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described in detail below with reference to the drawings. FIG. 1 is a perspective view of an erection device and an excavation casing used in the method for extracting an existing pile of the present invention, and FIG. 2 is a vertical cross-sectional front view of a lower portion of the excavation casing, which is a main part of the same. To explain, the built-in device 2 is, as is well known, a press-fitting machine used in, for example, an all-casing construction method, and a chuck device 4 for tightening the outer periphery of the casing 3 in a rattle shape, and a motor and a speed reducer for rotating the chuck device 4 And the like, and an elevating cylinder 6 by a hydraulic cylinder that vertically moves the chuck device 4 and the driving device 5.

【0012】図中7は建て込み装置2を水平に設置する
水平ジャッキによるアウトリガーを示す。
Reference numeral 7 in the drawing denotes an outrigger which is a horizontal jack for horizontally installing the building device 2.

【0013】ケーシング3は前記建て込み装置2により
外周をチャックされながら回転推進されて地盤に挿入さ
れるもので、適宜途中で継ぎ足して必要な長さとする本
体管と、この本体管の先端に着脱自在に嵌着するケーシ
ングヘッドとの組合せからなり、嵌着部はボルトで締結
する。そして、先端のケーシングヘッドの先端には掘削
刃であるケーシングビット11を設けた。このケーシング
ビット11は切削土を外側に押し出すように刃の角度を設
定する。
The casing 3 is inserted into the ground by being rotatably propelled while being chucked on the outer periphery by the erection device 2, and is inserted into and removed from the main body tube which is replenished at an appropriate length to a required length and the tip of the main body tube. It is a combination with a casing head that is freely fitted, and the fitting portion is fastened with bolts. Then, a casing bit 11 as an excavating blade was provided at the tip of the casing head at the tip. This casing bit 11 sets the angle of the blade so that the cutting soil is pushed outward.

【0014】本発明ではかかる構成に加えて図2、図3
にも示すようにケーシング3の先端のケーシングヘッド
の先端の内周面に帯状のカッター8を上方にいくにした
がい内径が小さくなるようにしてスパイラル状に設け
た。このカッター8はケーシング3を構成する金属より
も焼き入れの多い超硬金属をもって帯の長さ方向に連続
する山部と谷部とで形成し、溶接などにより堅牢にケー
シング3の内周に突出させて固着することが望ましい。
In the present invention, in addition to this configuration, FIG. 2 and FIG.
As shown in FIG. 5, the strip-shaped cutter 8 is spirally provided on the inner peripheral surface of the tip of the casing head at the tip of the casing 3 such that the inner diameter becomes smaller as the cutter 8 goes upward. The cutter 8 is made of a cemented carbide that is harder than the metal of which the casing 3 is made, and is formed by continuous peaks and valleys in the lengthwise direction of the strip. It is desirable to let it adhere.

【0015】次にかかるケーシング3を使用して既存杭
1を引き抜く方法を図4〜図6について説明する。埋設
されている既存杭1の上方に建て込み装置2を据え付
け、ケーシング3をその外周をチャック装置4で締め付
け固定し、駆動装置5でこのチャック装置4を回転させ
ると同時に昇降シリンダー6をフリーとしてケーシング
3を既存杭1の周囲を囲むようにしてその外周部分の地
盤に挿入する。なお、既存杭1は図7について既に説明
したものと同様の主筋15が配筋されたコンクリート製の
ものである。
Next, a method for pulling out the existing pile 1 using the casing 3 will be described with reference to FIGS. The building device 2 is installed above the existing buried pile 1, the casing 3 is clamped and fixed at its outer periphery by the chuck device 4, and the chuck device 4 is rotated by the drive device 5 while the lifting cylinder 6 is free. The casing 3 is inserted into the ground of the outer peripheral portion so as to surround the existing pile 1. The existing pile 1 is made of concrete in which the same main bars 15 as those described with reference to FIG. 7 are arranged.

【0016】この場合、ケーシング3には先端にケーシ
ングビット11が突設してあるから、硬質地盤でも容易に
挿入できる。
In this case, since the casing bit 11 is projectingly provided at the tip of the casing 3, even the hard ground can be easily inserted.

【0017】図4に示すように所定の深度、すなわち杭
頭までケーシング3を回転させながら挿入し、さらにそ
のまま図5に示すようにケーシング3を回転させながら
既存杭1の周囲に挿入すれば、ケーシング3の内周面に
スパイラル状に突設してある帯状のカッター8が既存杭
1の外周面に食い込み、回転にともない上方から下方に
向けて順次切削する。
As shown in FIG. 4, if the casing 3 is inserted while rotating to a predetermined depth, that is, the pile head, and further, as shown in FIG. 5, the casing 3 is rotated and inserted around the existing pile 1, A strip-shaped cutter 8 protruding in a spiral shape on the inner peripheral surface of the casing 3 bites into the outer peripheral surface of the existing pile 1 and sequentially cuts from the upper side to the lower side with rotation.

【0018】これにより、既存杭1の切削部分が縮径
し、該縮径部分を図6に示すようにハンマーグラブ16な
どでつかんで折り曲げれば、縮径部分の下部位置で既存
杭1が切断される。よって、切断箇所よりも上方部分の
縮径された既存杭1を引き抜き、かかる作業を順次繰り
返せば、既存杭1の下方部分も引き抜かれ、既存杭1が
全長にわたって引き抜かれる。
As a result, the diameter of the cut portion of the existing pile 1 is reduced, and if the reduced diameter portion is grasped and bent by a hammer grab 16 or the like as shown in FIG. Be disconnected. Therefore, if the existing pile 1 having a reduced diameter in the upper part of the cut portion is pulled out and such work is repeated in sequence, the lower part of the existing pile 1 is also pulled out, and the existing pile 1 is pulled out over the entire length.

【0019】前記カッター8による既存杭1の外周部の
切削の際、切削により多量のスライム14が発生するが、
スライム14は、スパイラル状のカッター8の回転によっ
てこれにそって引き上げられる。よって、スライム14が
ケーシング3の内部で落下して既存杭1との間の隙間に
詰まることもなく、既存杭1の下方部分の切断が困難に
なることがない。この場合、バイブロハンマーによる場
合のような振動や騒音は発生せず、また、大規模なクレ
ーンも使用しないで引き抜きが行える。
When the outer peripheral portion of the existing pile 1 is cut by the cutter 8, a large amount of slime 14 is generated by the cutting,
The slime 14 is pulled up along with the rotation of the spiral cutter 8. Therefore, the slime 14 does not fall inside the casing 3 and clog the gap between the slime 14 and the existing pile 1, and it is not difficult to cut the lower part of the existing pile 1. In this case, the vibration and noise unlike the vibro hammer do not occur, and the pulling out can be performed without using a large-scale crane.

【0020】[0020]

【発明の効果】以上述べたように本発明の既存杭の引き
抜き方法およびそれに使用する掘削ケーシングは、バイ
ブロハンマーによる場合のような振動や騒音が発生しな
いから、近隣住民などの住宅環境を害するおそれがな
く、しかも、既存杭を切削する場合に、切削により発生
するスライムがケーシング内を落下することを防止でき
るから、落下したスライムがケーシング内で詰まって以
後の切削が困難になることを阻止して、容易かつ確実に
引き抜くことができる。また、大規模なクレーンも使用
しないで引き抜きが行えるから、施工場所の制約も少な
くなるものである。
As described above, the existing pile extracting method of the present invention and the excavating casing used for the same do not generate vibration and noise as in the case of a vibro hammer, and thus may harm the residential environment of neighboring residents and the like. Moreover, when cutting an existing pile, it is possible to prevent the slime generated by cutting from falling inside the casing, and prevent the falling slime from clogging inside the casing and making subsequent cutting difficult. Can be pulled out easily and surely. In addition, since it can be pulled out without using a large-scale crane, there are less restrictions on the construction site.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の既存杭の引き抜き方法で使用する建て
込み装置と掘削ケーシングの斜視図である。
FIG. 1 is a perspective view of an erection device and an excavation casing used in a method for extracting an existing pile according to the present invention.

【図2】本発明の既存杭の引き抜き方法で使用する掘削
ケーシングの下方部分の縦断正面図である。
FIG. 2 is a vertical sectional front view of a lower portion of the excavation casing used in the existing pile extracting method of the present invention.

【図3】本発明の既存杭の引き抜き方法で使用する掘削
ケーシングの下方部分の横断平面図である。
FIG. 3 is a cross-sectional plan view of the lower portion of the excavation casing used in the existing pile extraction method of the present invention.

【図4】本発明の既存杭の引き抜き方法を示す掘削ケー
シングによる切削開始状態の縦断正面図である。
FIG. 4 is a vertical cross-sectional front view of a cutting start state by an excavation casing showing a method of extracting an existing pile of the present invention.

【図5】本発明の既存杭の引き抜き方法を示す掘削ケー
シングによる切削中の状態の縦断正面図である。
FIG. 5 is a vertical sectional front view showing a method of extracting an existing pile of the present invention during cutting by an excavating casing.

【図6】本発明の既存杭の引き抜き方法を示す切断時の
状態を示す縦断正面図である。
FIG. 6 is a vertical cross-sectional front view showing a state at the time of cutting showing a method for extracting an existing pile of the present invention.

【図7】引き抜こうとする既存杭の縦断正面図である。FIG. 7 is a vertical sectional front view of an existing pile to be pulled out.

【図8】従来の掘削ケーシングによる既存杭の引き抜き
方法の切削開始時の縦断正面図である。
FIG. 8 is a vertical cross-sectional front view at the start of cutting in a conventional method of extracting an existing pile with an excavating casing.

【図9】従来の掘削ケーシングによる既存杭の引き抜き
方法の切削途中の縦断正面図である。
FIG. 9 is a vertical cross-sectional front view of a conventional method of extracting an existing pile using an excavating casing during cutting.

【図10】従来の掘削ケーシングによる既存杭の引き抜
き方法の切断時の状態を示す縦断正面図である。
FIG. 10 is a vertical cross-sectional front view showing a state at the time of cutting according to a conventional method of extracting an existing pile with an excavating casing.

【符号の説明】[Explanation of symbols]

1…既存杭 2…建て込み装置 3…ケーシング 4…チャック装置 5…駆動装置 6…昇降シリンダー 7…アウトリガー 8…カッター 11…ケーシングビット 12…杭破壊用のビッ
ト 13…オーガーケーシング 14…スライム 15…主筋 16…ハンマーグラブ
1 ... Existing pile 2 ... Building device 3 ... Casing 4 ... Chuck device 5 ... Drive device 6 ... Elevating cylinder 7 ... Outrigger 8 ... Cutter 11 ... Casing bit 12 ... Pile breaking bit 13 ... Auger casing 14 ... Slime 15 ... Main bar 16 ... Hammer grab

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 下方部の内周面に、帯状のカッターを上
方にいくにしたがい内径が小さくなるようにしてスパイ
ラル状に設けた掘削ケーシングを回転させながら既存杭
を囲むようにして地盤に挿入し、前記掘削ケーシングの
内側のスパイラル状のカッターで既存杭の外周部を切削
して縮径させ、該縮径箇所で既存杭を切断し切断箇所よ
りも上方部分を引き抜き、これを順次繰り返し既存杭の
全体を引き抜くことを特徴とする既存杭の引き抜き方
法。
1. An inner peripheral surface of a lower part is inserted into the ground so as to surround an existing pile while rotating an excavating casing provided in a spiral shape so that the inner diameter thereof becomes smaller as the cutter goes upward. The outer peripheral portion of the existing pile is cut by the spiral cutter inside the excavation casing to reduce the diameter, the existing pile is cut at the reduced diameter portion, and the upper portion is pulled out from the cut portion, which is sequentially repeated to remove the existing pile. A method for extracting existing piles, which is characterized by pulling out the whole.
【請求項2】 掘削ケーシングの挿入は、オールケーシ
ング工法で使用する建て込み装置による請求項1に記載
の既存杭の引き抜き方法。
2. The method for extracting an existing pile according to claim 1, wherein the excavation casing is inserted by a building device used in the all-casing construction method.
【請求項3】 外周をチャックされながら回転推進され
て地盤に挿入させる掘削ケーシングにおいて、下方部の
内周面に帯状のカッターを上方にいくにしたがい内径が
小さくなるようにしてスパイラル状に設けたことを特徴
とする掘削ケーシング。
3. An excavating casing which is rotatably propelled while being chucked at its outer periphery and is inserted into the ground, is provided with a strip-shaped cutter on the inner peripheral surface of the lower portion in a spiral shape so that the inner diameter becomes smaller as it goes upward. A drilling casing characterized in that
JP2001222681A 2001-07-24 2001-07-24 Extraction method of existing pile and drilling casing used for it Expired - Fee Related JP3581336B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001222681A JP3581336B2 (en) 2001-07-24 2001-07-24 Extraction method of existing pile and drilling casing used for it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001222681A JP3581336B2 (en) 2001-07-24 2001-07-24 Extraction method of existing pile and drilling casing used for it

Publications (2)

Publication Number Publication Date
JP2003034932A true JP2003034932A (en) 2003-02-07
JP3581336B2 JP3581336B2 (en) 2004-10-27

Family

ID=19056124

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001222681A Expired - Fee Related JP3581336B2 (en) 2001-07-24 2001-07-24 Extraction method of existing pile and drilling casing used for it

Country Status (1)

Country Link
JP (1) JP3581336B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007211533A (en) * 2006-02-10 2007-08-23 Land Creative:Kk Method for removing underground structure
JP2013224565A (en) * 2012-04-23 2013-10-31 Copros Ltd Steel casing, existent manhole removal method using the same and novel manhole construction method
JP2021038559A (en) * 2019-09-03 2021-03-11 株式会社タケミ企画 First tube and method for removing underground obstacles used thereof
JP2021080646A (en) * 2019-11-14 2021-05-27 株式会社神島組 Device and method for pulling out existing structure
CN115613577A (en) * 2022-12-21 2023-01-17 中铁二十二局集团轨道工程有限公司 Full-rotation full-casing drilling machine and construction method for removing old pile thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007211533A (en) * 2006-02-10 2007-08-23 Land Creative:Kk Method for removing underground structure
JP4602919B2 (en) * 2006-02-10 2010-12-22 株式会社ランド・クリエイティブ Removal method of underground structure
JP2013224565A (en) * 2012-04-23 2013-10-31 Copros Ltd Steel casing, existent manhole removal method using the same and novel manhole construction method
JP2021038559A (en) * 2019-09-03 2021-03-11 株式会社タケミ企画 First tube and method for removing underground obstacles used thereof
JP2021080646A (en) * 2019-11-14 2021-05-27 株式会社神島組 Device and method for pulling out existing structure
CN115613577A (en) * 2022-12-21 2023-01-17 中铁二十二局集团轨道工程有限公司 Full-rotation full-casing drilling machine and construction method for removing old pile thereof

Also Published As

Publication number Publication date
JP3581336B2 (en) 2004-10-27

Similar Documents

Publication Publication Date Title
JP2013253455A (en) First tube and underground obstacle removal method
JP2009256999A (en) Pile extracting construction method for existing hollow pile
JP2003034932A (en) Method of drawing out existing piles and excavation casing used for it
JP2007332559A (en) Removal method for existing underground pile
JP3683229B2 (en) Existing pile removal method and equipment
JP2005273293A (en) Excavating method
JP2012241329A (en) Method of removing existing pile
JP4366597B2 (en) Cutting and removing existing piles
JP2010189952A (en) Existing pile removing device
JP4106374B2 (en) Destruction method for existing piles
JP6758629B2 (en) Existing pile gripping device
JP2001146746A (en) Pull-out method for existing pile, and drilling casing to be used therefor
JP2004084164A (en) Removal method for existing pile and its device
JP2001303570A (en) Method for drawing out pile
JP5303352B2 (en) Removal method of existing concrete piles
JP4400700B2 (en) Cutting and drawing method and equipment for existing piles
JP4091716B2 (en) Soil sampling apparatus and sampling method
JP2007138544A (en) Method of pulling out existing pile
JP2006057258A (en) Removal method for foundation pile
JP2002349171A (en) Vertical hole excavator and vertical hole excavation method
JP2005200841A (en) Drilling method by auger with casing and mud removing bucket
JP2534544B2 (en) Existing pipe laying replacement method
JP2003321988A (en) Excavation method and excavator for shaft by earth auger
JPH0641959A (en) Withdrawing device for existing concrete pile
JP5183510B2 (en) Crusher

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040629

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040720

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040722

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070730

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080730

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100730

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120730

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120730

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130730

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees