Info

Publication number
JP2003015733A
JP2003015733A JP2001204147A JP2001204147A JP2003015733A JP 2003015733 A JP2003015733 A JP 2003015733A JP 2001204147 A JP2001204147 A JP 2001204147A JP 2001204147 A JP2001204147 A JP 2001204147A JP 2003015733 A JP2003015733 A JP 2003015733A
Authority
JP
Japan
Prior art keywords
display
signal
completion
switch
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001204147A
Other languages
Japanese (ja)
Inventor
Tetsuo Kosuda
徹夫 小須田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Meidensha Corp
Meidensha Electric Manufacturing Co Ltd
Original Assignee
Meidensha Corp
Meidensha Electric Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meidensha Corp, Meidensha Electric Manufacturing Co Ltd filed Critical Meidensha Corp
Priority to JP2001204147A priority Critical patent/JP2003015733A/en
Publication of JP2003015733A publication Critical patent/JP2003015733A/en
Pending legal-status Critical Current

Links

Landscapes

  • Testing And Monitoring For Control Systems (AREA)
  • Selective Calling Equipment (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a remote monitor control system capable of improving operability by reducing the labor of an operator due to the delay of a response since the switch operation of the operator until the corresponding operation of a display unit. SOLUTION: A master station transmits a switch operation signal to a slave station according to the acceptance of a switch operation SW by an operator, and the salve station controls equipment 4 according to the switch operation signal, and the salve station transmits the action completion signal of the equipment to the master station, and the master station performs the action completion display of the equipment at a lamp L according to the action completion signal. In this case, this system is provided with an operation supporting agent 6 for displaying the operation completion signal at the lamp L according to the acceptance of the switch operation signal, and for stopping the display according to the reception of the action completion signal. The operation supporting agent performs the operation completion corresponding to the opening and closing operation of the equipment by the display switching processing of the display unit, and performs the operation completion corresponding to the inching operation of the equipment by the additional display processing of the target manipulated variables of the display unit, and performs the operation completion display and the action completion display at the same display unit or different display units, and performs warning generation processing to the switch operation when any action completion signal is not received within a fixed time since the operation completion display.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、遠方監視制御シス
テムに係り、特に操作員による機器の遠隔操作を支援す
るヒューマンインタフェースに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a remote monitoring and control system, and more particularly to a human interface for assisting an operator to remotely operate a device.

【0002】[0002]

【従来の技術】遠方監視制御システムは、制御所(親
局)と被制御所(子局)間を専用線や公衆回線などの通
信ネットワークで結合し、子局側の機器の状態や計測情
報を監視情報として親局側に伝送し、親局側では監視情
報を基にして得る制御情報を子局側に伝送し、この制御
情報に従って子局側で機器等を制御することができる。
2. Description of the Related Art In a remote monitoring control system, a control station (master station) and a controlled station (slave station) are connected by a communication network such as a leased line or a public line, and the status and measurement information of equipment on the slave station side are connected. Can be transmitted to the master station side as monitoring information, the master station side can transmit control information obtained based on the monitoring information to the slave station side, and the slave station side can control the device and the like according to the control information.

【0003】機器等の制御には、親局側の監視制御用コ
ンピュータやホストコンピュータのソフトウェア処理に
よる他、操作員がディスプレイ装置やスクリーンパネル
を監視しながら制御卓上のスイッチ等を操作する遠隔操
作方式がある。
In order to control equipment and the like, software processing of a supervisory control computer and a host computer on the master station side is performed, and an operator operates a switch on a control desk while monitoring a display device or a screen panel. There is.

【0004】図4は、操作員による遠隔操作の処理系統
例を示す。制御卓1は親局の監視制御用コンピュータの
遠隔操作用情報処理部2の入出力手段として設けられ、
スイッチSW(スイッチ機構やディスプレイ装置画面上
のスイッチボタン)の操作信号が情報処理部2で符号化
処理されて子局側に伝送される。
FIG. 4 shows an example of a processing system for remote operation by an operator. The control console 1 is provided as an input / output means of the remote control information processing unit 2 of the monitor control computer of the master station,
The operation signal of the switch SW (switch mechanism or switch button on the screen of the display device) is encoded by the information processing unit 2 and transmitted to the slave station side.

【0005】子局側では、PLC(プログラマブルロジ
ックコントローラ)などの制御装置の遠隔操作用情報処
理部3で操作信号が復号処理され、機器4の操作出力と
される。この操作出力による機器4の動作完了信号は、
情報処理部3で符号化処理されて親局側に伝送される。
On the slave station side, the remote control information processing unit 3 of a control device such as a PLC (Programmable Logic Controller) decodes the operation signal and outputs it as an operation output of the device 4. The operation completion signal of the device 4 by this operation output is
The information processing unit 3 performs an encoding process and transmits it to the master station side.

【0006】親局側では、情報処理部2により動作信号
が復号され、表示器(動作表示用ランプLや動作量表示
用メータM)の表示切り替え制御またはそれらのディス
プレイ装置画面上の表示切り替え制御がなされる。
On the master station side, the operation signal is decoded by the information processing unit 2, and the display switching control of the display (operation display lamp L or operation amount display meter M) or the display switching control on those display device screens is performed. Is done.

【0007】機器等の遠隔操作態様としては、遮断器等
の機器に適用される開閉(入り/切りやオン/オフの切
り替え)操作と、電動弁や油圧機器等に適用されるイン
チング(開度調節やストローク調節)操作がある。
The remote operation mode of equipment and the like includes opening / closing (switching on / off and switching on / off) applied to equipment such as circuit breakers, and inching (opening degree) applied to electric valves and hydraulic equipment. Adjustment and stroke adjustment) operation.

【0008】[0008]

【発明が解決しようとする課題】操作員による遠隔操作
において、スイッチSWの操作に対するランプLやメー
タMの表示までの時間(応答時間)が長くかかり、操作
員の操作性を著しく低下させる問題がある。
In the remote operation by the operator, it takes a long time (response time) until the lamp L or the meter M is displayed in response to the operation of the switch SW, which causes a problem that the operability of the operator is significantly deteriorated. is there.

【0009】この応答時間は、例えば図4の処理系統例
では、(a)情報処理部2での操作入力受付と符号化処
理時間、(b)下り系伝送時間、(c)情報処理部3で
の復号処理と操作出力時間、(d)情報処理部3での機
器の動作入力受付と符号化処理時間,(e)上り系伝送
時間,(f)情報処理部2での復号処理と動作表示出力
時間の合計値になる。
This response time is, for example, in the processing system example of FIG. 4, (a) operation input acceptance and encoding processing time in the information processing unit 2, (b) downlink transmission time, and (c) information processing unit 3 Decoding process and operation output time, (d) Device operation input acceptance and encoding process time in the information processing unit 3, (e) Upstream transmission time, (f) Decoding process and operation in the information processing unit 2 It is the total value of the display output time.

【0010】この応答時間は、遠方監視制御システムの
構成の違い(専用線サービス、高速大容量のATMメガ
リンクサービス、ISDN等の各種通信サービスの違
い、通信方式の違い、情報処理部の動作速度や情報処理
量の違い、監視制御機器数の違い等)によって異なる
が、図5に示すように、機器設置現場でコントローラ5
を使用して直接に機器を操作する場合と比べて非常に長
くなる。
This response time depends on the difference in the configuration of the distant monitoring and control system (the leased line service, the high speed and large capacity ATM megalink service, the difference in various communication services such as ISDN, the difference in the communication method, the operating speed of the information processing section. , The amount of information processing, the number of monitoring control devices, etc.), but as shown in FIG.
This is much longer than when using the to operate the equipment directly.

【0011】一般的に、上記の応答時間は、システム仕
様書に「機器操作応答時間○○秒とする」などと記述さ
れるが、これが3秒以上になると、操作員にはスイッチ
操作に対する表示器の表示動作がいつまでもなされない
ことになって、精神的なストレスを与えてしまう。
Generally, the above response time is described in the system specifications as "device operation response time is XX seconds", but when it exceeds 3 seconds, the operator is informed of switch operation. The display operation of the vessel is not done for a long time, which causes mental stress.

【0012】また、応答時間が3秒未満であっても、イ
ンチング操作では計器類を視認しながらスイッチを繰り
返し操作することになり、親局側で動作完了信号を受信
しない限り計器類の表示が変化しないため、この変化を
待たされる操作員の操作負担が非常に大きくなる。
Further, even if the response time is less than 3 seconds, the switches are repeatedly operated while visually observing the instruments in the inching operation, and the instruments are displayed unless the master station receives the operation completion signal. Since there is no change, the operation burden on the operator who waits for this change becomes very large.

【0013】本発明の目的は、操作員のスイッチ操作か
ら表示器の応動までの応答遅れによる操作員の負担を軽
減し、操作性を高めた遠方監視制御システムを提供する
ことにある。
An object of the present invention is to provide a distant monitoring control system in which the burden on the operator due to the response delay from the switch operation by the operator to the response of the display is reduced and the operability is improved.

【0014】[0014]

【課題を解決するための手段】図6の(a)に示すよう
に、従来の遠隔操作方式では、操作員の操作情報は親局
から子局に伝送され、子局側で機器を制御し、機器の動
作完了信号が子局から親局まで伝送され、表示器に操作
の完了表示がなされるため、操作開始から操作完了まで
の長い待ち時間が操作性を低下させる。
As shown in FIG. 6A, in the conventional remote control system, the operation information of the operator is transmitted from the master station to the slave station, and the slave station controls the equipment. Since the operation completion signal of the device is transmitted from the slave station to the master station and the completion of the operation is displayed on the display unit, the long waiting time from the start of the operation to the completion of the operation deteriorates the operability.

【0015】本発明は、上記の課題を解決するため、図
6の(b)に示すように、操作員の操作入力に対して機
器の実動作(動作完了)を待つことなく操作の完了表示
処理を行い、機器の動作完了信号で操作完了表示を停止
処理、さらには一定時間内に動作完了しないときは警報
発生処理を行うようにしたもので、以下の構成を特徴と
する。
In order to solve the above problems, the present invention, as shown in FIG. 6 (b), displays the completion of the operation without waiting for the actual operation (completion of operation) of the equipment in response to the operation input of the operator. The processing is performed, the operation completion display is stopped by the operation completion signal of the device, and the alarm generation processing is performed when the operation is not completed within a certain time. The following features are provided.

【0016】(1)親局は操作員によるスイッチ操作の
受付けで子局にスイッチ操作信号を伝送し、子局は該ス
イッチ操作信号に従って機器を制御し、子局は機器の動
作完了信号を親局に伝送し、親局は該動作完了信号で表
示器に機器の動作完了表示を行うヒューマンインタフェ
ースを有する遠方監視制御システムにおいて、親局は、
前記スイッチ操作信号の受付けで操作完了信号を表示出
力し、この表示を前記動作完了信号の受信で停止する操
作支援エージェントを備えたことを特徴とする。
(1) The master station transmits a switch operation signal to the slave station upon receipt of a switch operation by an operator, the slave station controls the equipment in accordance with the switch operation signal, and the slave station sends the operation completion signal of the equipment to the master station. In the remote monitoring and control system having a human interface for transmitting to the station, and the master station displaying the operation completion of the device on the display with the operation completion signal, the master station
It is characterized by further comprising an operation support agent for displaying and outputting an operation completion signal when the switch operation signal is received, and for stopping the display when the operation completion signal is received.

【0017】(2)前記操作支援エージェントは、機器
の開閉操作には操作完了を表示器の表示切替え処理で行
い、機器のインチング操作には操作完了を表示器に目標
動作量を追加表示処理で行うことを特徴とする。
(2) The operation support agent performs the operation completion by the display switching process of the display unit for the opening / closing operation of the device, and the operation completion is the additional display process of the target motion amount on the display unit for the inching operation of the device. It is characterized by performing.

【0018】(3)前記操作支援エージェントは、前記
操作完了表示と動作完了表示を同じ表示器または別の表
示器で表示処理することを特徴とする。
(3) The operation support agent displays the operation completion display and the operation completion display on the same display or on another display.

【0019】(4)前記操作支援エージェントは、前記
操作完了表示から一定時間内に前記動作完了信号の受信
がないときはスイッチ操作に対する警報発生処理を行う
ことを特徴とする。
(4) The operation support agent performs an alarm generation process for a switch operation when the operation completion signal is not received within a fixed time from the operation completion display.

【0020】[0020]

【発明の実施の形態】図1は、本発明の実施形態を示す
遠隔操作の処理系統図である。同図が図4と異なる部分
は、親局側に操作支援エージェントを設けた点にある。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is a processing diagram of a remote operation showing an embodiment of the present invention. The difference between this figure and FIG. 4 is that an operation support agent is provided on the master station side.

【0021】操作支援エージェント6は、情報処理部2
にソフトウェア構成で追加され、図2に示す処理手順を
有して以下の処理を実行する。
The operation support agent 6 includes an information processing unit 2
Is added with a software configuration, and has the processing procedure shown in FIG.

【0022】(1)制御卓1のスイッチSWの操作入力
を受付ける(S1)。この受付で、操作入力を記憶保持
し、ランプLを操作完了表示させるための操作完了出力
を発生する(S2)。例えば、ランプLが機器の「切
り」状態を緑色表示し、「入り」状態を赤色表示する場
合、機器の「入り」操作入力の受付でランプLを緑色表
示から赤色フリッカ表示にする。
(1) The operation input of the switch SW of the control console 1 is accepted (S1). At this reception, the operation input is stored and held, and the operation completion output for displaying the operation completion of the lamp L is generated (S2). For example, when the lamp L displays the "OFF" state of the device in green and the "ON" state in red, the lamp L is changed from the green display to the red flicker display when the "ON" operation input of the device is received.

【0023】これにより、操作員は、スイッチSWの操
作とほぼ同時に操作入力が受け付けられたことを確認す
ることができ、応答時間の遅れを意識することなく操作
でき、また操作に不安を与えることもない。
As a result, the operator can confirm that the operation input has been accepted almost at the same time as the operation of the switch SW, can perform the operation without being aware of the delay of the response time, and give the operation anxiety. Nor.

【0024】(2)同時に、子局側に操作エージェント
信号を伝送する(S3)。この信号を受信した子局の情
報処理部3では従来と同様に機器4の操作出力を発生
し、機器4を制御する。
(2) At the same time, an operation agent signal is transmitted to the slave station side (S3). The information processing unit 3 of the slave station that receives this signal generates an operation output of the device 4 and controls the device 4 as in the conventional case.

【0025】(3)子局から機器4の動作完了信号が伝
送されてきたとき(S4)、記憶保持している操作完了
出力をリセットする(S5)。この処理により、ランプ
Lへの操作完了信号を遮断し、ランプLのフリッカ表示
を停止させる。
(3) When the operation completion signal of the device 4 is transmitted from the slave station (S4), the stored operation completion output is reset (S5). By this processing, the operation completion signal to the lamp L is cut off and the flicker display of the lamp L is stopped.

【0026】(4)同時に、動作完了信号を出力し(S
6)、ランプLの表示状態を切り替える。上記の(1)
の例では、ランプLを赤色表示に切り替える。
(4) At the same time, an operation completion signal is output (S
6) Switch the display state of the lamp L. (1) above
In the example, the lamp L is switched to red display.

【0027】これにより、操作員は、ランプLの表示状
態が切り替えられることで、操作が確実に行われたこと
を確認することができる。
As a result, the operator can confirm that the operation has been performed reliably by switching the display state of the lamp L.

【0028】(5)操作入力の受付時点から機器の動作
完了信号受付までの時間が予めタイマ設定する時間(例
えば、操作員に不安を起こさせない3秒)を超えたとき
(S7)、操作失敗の警報信号を発生し(S8)、制御
卓1に設けるブザーBZ等を動作させ、操作員に操作失
敗を知らせる。
(5) When the time from the reception of the operation input to the reception of the operation completion signal of the device exceeds the time set in advance by the timer (for example, 3 seconds that does not cause the operator to feel uneasy) (S7), the operation fails (S8), the buzzer BZ or the like provided in the control console 1 is operated to notify the operator of the operation failure.

【0029】これにより、操作員は、操作失敗を確認で
き、スイッチSWの再操作や情報伝送系のチェックなど
の対応で確実な操作を行うことができる。
As a result, the operator can confirm the operation failure and can perform a reliable operation by re-operating the switch SW or checking the information transmission system.

【0030】図3は、本発明の他の実施形態を示す遠隔
操作の処理系統図であり、機器のインチング操作を行う
操作支援エージェントの場合である。
FIG. 3 is a processing system diagram of a remote operation showing another embodiment of the present invention, and is a case of an operation support agent for performing an inching operation of a device.

【0031】この場合、操作支援エージェント6による
処理手順は図2と同様に、スイッチ操作の受付けと同時
に表示器に操作完了の表示を行うが、この表示には表示
器が動作量(開度やストローク量)表示用メータMにな
るため、以下の手順をもつ動作量表示処理になる。
In this case, the processing procedure by the operation support agent 6 displays the completion of the operation on the display at the same time when the switch operation is received, as in FIG. Since the stroke amount) display meter M is used, the operation amount display processing has the following procedure.

【0032】(1)制御卓1のスイッチSWの操作入力
を受付けたとき、操作目標動作量SPVを現在の動作量
PVとは識別可能になるよう表示色の違いやフリッカ等
を持たせて表示する。この動作量の二重表示により、操
作員は、目標動作量SPVの視認で操作を確認し、操作
を終了する。
(1) When the operation input of the switch SW of the control console 1 is accepted, the operation target operation amount SPV is displayed with a display color difference or flicker so that it can be distinguished from the current operation amount PV. To do. With this double display of the movement amount, the operator visually confirms the target movement amount SPV, confirms the operation, and ends the operation.

【0033】(2)同時に、子局側にSPVエージェン
ト信号を伝送する。この信号を受信した子局の情報処理
部3では従来と同様に機器4の動作量PVを目標動作量
SPVと一致させる操作出力MVを出力し、機器4を制
御する。
(2) At the same time, the SPV agent signal is transmitted to the slave station side. The information processing unit 3 of the slave station that receives this signal outputs the operation output MV that matches the operation amount PV of the device 4 with the target operation amount SPV as in the conventional case, and controls the device 4.

【0034】(3)子局から機器4の現在の動作量PV
が伝送されてきたとき、この動作量PVと目標動作量S
PVの偏差絶対値が誤差設定値αよりも小さいか否かを
チェックし、誤差設定値αよりも小さいときに操作完了
処理を行う。この処理は、表示器には目標動作量SPV
の表示を停止し、動作量PVのみ表示する。
(3) Current operation amount PV of the device 4 from the slave station
Is transmitted, this operation amount PV and target operation amount S
It is checked whether the deviation absolute value of PV is smaller than the error setting value α, and when it is smaller than the error setting value α, the operation completion process is performed. In this process, the target operation amount SPV is displayed on the display.
Is stopped and only the movement amount PV is displayed.

【0035】(4)操作入力の受付時点から予めタイマ
設定する時間までに上記のチェックで操作完了が得られ
ないとき、操作失敗の警報信号を発生し、制御卓1に設
けるブザーBZ等を動作させ、操作員に操作失敗を知ら
せる。
(4) When the operation is not completed by the above check from the time when the operation input is received until the time set in advance by the timer, an operation failure alarm signal is generated and the buzzer BZ or the like provided in the control console 1 is operated. And notify the operator of the operation failure.

【0036】本実施形態においても、操作員はスイッチ
SWの操作とほぼ同時に操作入力が受け付けられたこと
を確認することができ、応答時間の遅れを意識すること
なく操作でき、また不安を与えることもない。また、操
作員は、メータMに目標動作量SPVも表示されること
で、操作が確実に行われたことを確認することができ
る。また、操作員は、操作失敗を確認でき、スイッチS
Wの再操作や情報伝送系のチェックなどの対応で確実な
操作を行うことができる。
Also in the present embodiment, the operator can confirm that the operation input is accepted almost at the same time as the operation of the switch SW, and the operation can be performed without being aware of the delay of the response time, and the anxiety may be given. Nor. Further, the operator can confirm that the operation has been performed reliably by displaying the target movement amount SPV on the meter M as well. Also, the operator can confirm the operation failure and switch S
Reliable operation can be performed by handling W again and checking the information transmission system.

【0037】なお、実施形態においては、同じ表示器で
操作完了の表示と動作完了の表示を行う場合を示すが、
これらを別の表示器で表示する構成にして同等の作用効
果を得ることができる。また、警報発生は、ブザーで警
報音として出力する場合を示すが、ランプの点灯等によ
る光表示など、他の警報発生手段に置換できる。
In the embodiment, the case of displaying the operation completion and the operation completion on the same display is shown.
The same operation and effect can be obtained by displaying these on another display. Further, although the alarm generation shows the case where the alarm sound is output by the buzzer, it can be replaced with another alarm generation means such as an optical display by lighting a lamp.

【0038】[0038]

【発明の効果】以上のとおり、本発明によれば、操作員
の操作入力に対して機器の実動作(動作完了)を待つこ
となく操作の完了表示処理を行い、機器の動作完了信号
で操作完了表示を停止処理、さらには一定時間内に動作
完了しないときは警報発生処理を行うようにしたため、
操作員のスイッチ操作から表示器の応動までの応答遅れ
による操作員の負担を軽減し、操作性を高めることがで
きる。
As described above, according to the present invention, the operation completion display processing is performed without waiting for the actual operation (operation completion) of the equipment in response to the operation input of the operator, and the operation completion signal of the equipment is used for the operation. Since the completion display is stopped, and if the operation is not completed within a certain period of time, alarm generation processing is performed.
It is possible to reduce the burden on the operator due to the response delay from the switch operation of the operator to the response of the display, and to improve the operability.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施形態を示す遠隔操作の処理系統
図。
FIG. 1 is a processing system diagram of remote control showing an embodiment of the present invention.

【図2】実施形態における操作支援エージェントの処理
手順図。
FIG. 2 is a processing procedure diagram of an operation support agent according to the embodiment.

【図3】本発明の他の実施形態を示す遠隔操作の処理系
統図。
FIG. 3 is a processing system diagram of remote operation according to another embodiment of the present invention.

【図4】従来の遠隔操作の処理系統例。FIG. 4 shows an example of a conventional remote control processing system.

【図5】直接操作の処理系統例。FIG. 5 shows an example of a processing system of direct operation.

【図6】従来方式と本発明方式との機能構成図。FIG. 6 is a functional configuration diagram of a conventional system and a system of the present invention.

【符号の説明】[Explanation of symbols]

1…制御卓 2…親局の情報処理部 3…子局の情報処理部 4…機器 6…操作支援エージェント SW…操作スイッチ L…表示ランプ BZ…警報ブザー M…メータ 1 ... Control console 2 ... Information processing unit of the master station 3 ... Information processing unit of child station 4 ... Equipment 6 ... Operation support agent SW ... Operation switch L: Indicator lamp BZ ... Alarm buzzer M ... meter

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 親局は操作員によるスイッチ操作の受付
けで子局にスイッチ操作信号を伝送し、子局は該スイッ
チ操作信号に従って機器を制御し、子局は機器の動作完
了信号を親局に伝送し、親局は該動作完了信号で表示器
に機器の動作完了表示を行うヒューマンインタフェース
を有する遠方監視制御システムにおいて、 親局は、前記スイッチ操作信号の受付けで操作完了信号
を表示出力し、この表示を前記動作完了信号の受信で停
止する操作支援エージェントを備えたことを特徴とする
遠方監視制御システム。
1. A master station transmits a switch operation signal to a slave station in response to a switch operation by an operator, the slave station controls equipment according to the switch operation signal, and the slave station sends an operation completion signal of the equipment to the master station. In the remote monitoring and control system having a human interface for displaying the operation completion signal of the device on the display by the operation completion signal, the master station displays and outputs the operation completion signal upon receipt of the switch operation signal. A remote monitoring control system comprising an operation support agent that stops this display upon receipt of the operation completion signal.
【請求項2】 前記操作支援エージェントは、機器の開
閉操作には操作完了を表示器の表示切替え処理で行い、
機器のインチング操作には操作完了を表示器に目標動作
量を追加表示処理で行うことを特徴とする請求項1に記
載の遠方監視制御システム。
2. The operation support agent, when opening and closing a device, performs operation completion by a display switching process of a display device,
2. The remote monitoring control system according to claim 1, wherein the inching operation of the device is performed by additionally displaying the target operation amount on the display to complete the operation.
【請求項3】 前記操作支援エージェントは、前記操作
完了表示と動作完了表示を同じ表示器または別の表示器
で表示処理することを特徴とする請求項1または2に記
載の遠方監視制御システム。
3. The remote monitoring control system according to claim 1, wherein the operation support agent displays the operation completion display and the operation completion display on the same display device or another display device.
【請求項4】 前記操作支援エージェントは、前記操作
完了表示から一定時間内に前記動作完了信号の受信がな
いときはスイッチ操作に対する警報発生処理を行うこと
を特徴とする請求項1〜3のいずれか1項に記載の遠方
監視制御システム。
4. The operation support agent performs an alarm generation process for a switch operation when the operation completion signal is not received within a fixed time from the operation completion display, The remote monitoring and control system according to item 1.
JP2001204147A 2001-07-05 2001-07-05 Remote monitor control system Pending JP2003015733A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001204147A JP2003015733A (en) 2001-07-05 2001-07-05 Remote monitor control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001204147A JP2003015733A (en) 2001-07-05 2001-07-05 Remote monitor control system

Publications (1)

Publication Number Publication Date
JP2003015733A true JP2003015733A (en) 2003-01-17

Family

ID=19040654

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001204147A Pending JP2003015733A (en) 2001-07-05 2001-07-05 Remote monitor control system

Country Status (1)

Country Link
JP (1) JP2003015733A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012079011A (en) * 2010-09-30 2012-04-19 Mitsubishi Heavy Ind Ltd Nuclear power plant control system and nuclear power plant inspection method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012079011A (en) * 2010-09-30 2012-04-19 Mitsubishi Heavy Ind Ltd Nuclear power plant control system and nuclear power plant inspection method
US9666316B2 (en) 2010-09-30 2017-05-30 Mitsubishi Heavy Industries, Ltd. Nuclear power plant control system and method of testing nuclear power plant

Similar Documents

Publication Publication Date Title
US5064026A (en) Elevator monitor apparatus
JP2003015733A (en) Remote monitor control system
JPH05204444A (en) State display method of control system
JP2001091033A (en) Air conditioner
JP3193782B2 (en) Display operation device
JP3305760B2 (en) Control device for automatic water supply
JPH09161181A (en) Automatic display device
JPH07154879A (en) Supervisory and controlling device
JP3482684B2 (en) Air conditioner
JP4041963B2 (en) Inching control method and inching control system
JPH04174245A (en) Operating device for terminal equipment
JP2845511B2 (en) Control device for air conditioner
JPH0217793A (en) Controller used for terminal supervisory and controlling equipment
JPH11192947A (en) Switching support device for railway signal maintenance system
JPH0274130A (en) Controller/monitor for distribution machinery and apparatus
JPH0217791A (en) Controller and supervisory equipment used for terminal supervisory and controlling equipment
JPH07288879A (en) Remote supervisory and controlling device
JP2000075920A (en) Plant monitor and control unit
JPH02278422A (en) Monitoring device
JPH0644481A (en) Aggregate alarm display device with exchange function
JPH0287946A (en) Signal transmission terminal equipment for molded-case circuit-breaker
JPH027799A (en) Central control supervisory equipment