JP2002342098A - Management device, data processing system, management method and program for making computer perform management method - Google Patents

Management device, data processing system, management method and program for making computer perform management method

Info

Publication number
JP2002342098A
JP2002342098A JP2001145764A JP2001145764A JP2002342098A JP 2002342098 A JP2002342098 A JP 2002342098A JP 2001145764 A JP2001145764 A JP 2001145764A JP 2001145764 A JP2001145764 A JP 2001145764A JP 2002342098 A JP2002342098 A JP 2002342098A
Authority
JP
Japan
Prior art keywords
data processing
completion
request
processing device
candidate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2001145764A
Other languages
Japanese (ja)
Inventor
Takehiko Hosokawa
武彦 細川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2001145764A priority Critical patent/JP2002342098A/en
Publication of JP2002342098A publication Critical patent/JP2002342098A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Multi Processors (AREA)

Abstract

PROBLEM TO BE SOLVED: To perform the deadline management of distributed batch processings in a distributed batch system. SOLUTION: Clients 3A-3N transmit a batch processing request to a management server 1 and the manager 11 of the management server 1 inquires of processing servers 2A-2N whether or not the batch processing can be completed by a deadline. The batch job scheduling demons 22A-22N of the respective processing servers judge whether or not the processing can be performed by the deadline and reply the manager 11. The manager 11 selects one of the processing servers capable of performing the processing by the deadline and the clients 3A-3N feed the batch processing to the batch service 23 of the selected processing server.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、複数のバッチサ
ービスを提供する複数のサーバとバッチジョブの要求を
行う複数のクライアントにより構成される分散システム
において、デッドライン管理を可能とするための分散バ
ッチジョブスケジュール技術に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a distributed batch system for enabling deadline management in a distributed system comprising a plurality of servers for providing a plurality of batch services and a plurality of clients for requesting batch jobs. It relates to job scheduling technology.

【0002】[0002]

【従来の技術】従来のバッチシステムでは設計する段階
において、実行するCPU資源、メモリ資源、ディスク
資源などを割り当てる静的な負荷分散を行っていた。ま
た、特願平9−146660「分散システム環境におけ
るバッチジョブの動的負荷分散処理方法およびそのシス
テム」などのような分散バッチシステムでは分散システ
ム上での動的負荷分散を可能としているが、分散システ
ム上ではバッチ処理のデッドライン管理が行えなくなる
という問題点があった。
2. Description of the Related Art In a conventional batch system, at the stage of designing, a static load distribution for allocating a CPU resource, a memory resource, a disk resource, and the like to be executed is performed. In a distributed batch system such as Japanese Patent Application No. 9-146660 “Dynamic load distribution processing method and system for batch jobs in a distributed system environment”, dynamic load distribution on a distributed system is possible. There is a problem that the deadline management of batch processing cannot be performed on the system.

【0003】[0003]

【発明が解決しようとする課題】本発明は分散バッチシ
ステムにおいて、上記課題を解決しデッドライン管理を
可能とするものである。
SUMMARY OF THE INVENTION The present invention solves the above-mentioned problems and enables deadline management in a distributed batch system.

【0004】[0004]

【課題を解決するための手段】本発明に係る管理装置
は、データ処理要求に基づき所定のデータ処理を行う複
数のデータ処理装置を管理し、データ処理要求ごとにデ
ータ処理を行うデータ処理装置を指定データ処理装置と
して指定する管理装置であって、データ処理要求ごとに
データ処理の予測完了時期を示す予測完了時期情報を少
なくとも一つ以上のデータ処理装置より受信する通信部
と、前記予測完了時期情報に基づき、データ処理要求ご
とに指定データ処理装置を指定し、指定データ処理装置
にデータ処理要求に基づくデータ処理を行わせる指定部
とを有することを特徴とする。
A management apparatus according to the present invention manages a plurality of data processing apparatuses that perform predetermined data processing based on a data processing request, and performs a data processing for each data processing request. A communication unit that receives, from at least one or more data processing devices, prediction completion time information indicating a prediction completion time of data processing for each data processing request; A designation unit that designates a designated data processing device for each data processing request based on the information, and causes the designated data processing device to perform data processing based on the data processing request.

【0005】前記通信部は、少なくとも一つ以上のデー
タ処理装置より、データ処理の完了期限が定められた期
限付きデータ処理要求に基づく期限付きデータ処理を前
記完了期限前に完了させることができる旨を通知する完
了可能情報を受信し、前記指定部は、前記完了可能情報
を送信したデータ処理装置のうちいずれかのデータ処理
装置を前記期限付きデータ処理を行う指定データ処理装
置として指定することを特徴とする。
The communication unit is capable of completing term-limited data processing based on a term-limited data processing request in which at least one data processing unit has a term of completion by at least one data processing device before the completion term. Receiving the completion possible information that notifies the completion of the deadline processing, the designation unit designates any one of the data processing devices that have transmitted the completion complete information as a designated data processing device that performs the time-limited data processing. Features.

【0006】前記通信部は、少なくとも一つ以上のデー
タ処理装置より、それぞれのデータ処理装置が実行を予
定している少なくとも一つ以上のデータ処理の実行を中
止すれば前記期限付きデータ処理を前記完了期限前に完
了させることができる旨を通知する条件付き完了可能情
報を受信し、前記指定部は、前記条件付き完了可否情報
を送信したデータ処理装置のうちいずれかのデータ処理
装置を前記期限付きデータ処理を行う指定データ処理装
置として指定することを特徴とする。
[0006] The communication unit executes the time-limited data processing when at least one or more data processing apparatuses stop executing at least one or more data processing scheduled to be executed by each data processing apparatus. Receiving the conditional completion possible information notifying that the completion can be completed before the completion deadline, and the designation unit sets any one of the data processing devices that transmitted the conditional completion feasibility information to the data processing device according to the deadline. It is designated as a designated data processing device for performing attached data processing.

【0007】前記通信部は、少なくとも一つ以上のデー
タ処理装置より、それぞれのデータ処理装置において実
行中止の対象となる少なくとも一つ以上の中止対象デー
タ処理に関する情報を含む条件付き完了可能情報を受信
し、前記指定部は、前記条件付き完了可能情報を送信し
たデータ処理装置のうちいずれかのデータ処理装置を候
補データ処理装置として選択し、前記候補データ処理装
置の中止対象データ処理を他のいずれかのデータ処理装
置へ移行できるか否かを判断し、前記候補データ処理装
置の中止対象データ処理を他のいずれかのデータ処理装
置へ移行できる場合に前記候補データ処理装置を前記指
定データ処理装置として指定することを特徴とする。
The communication unit receives, from at least one or more data processing devices, conditional completion possible information including information on at least one or more data to be canceled to be suspended in each data processing device. The specifying unit selects any one of the data processing devices that transmitted the conditional completion possible information as a candidate data processing device, and sets the candidate data processing device to cancel any other target data process. It is determined whether or not the candidate data processing apparatus can be transferred to any of the other data processing apparatuses. It is specified as

【0008】前記通信部は、少なくとも一つ以上のデー
タ処理装置より、中止対象データ処理のデータ処理量が
示された条件付き完了可能情報を受信し、前記指定部
は、前記条件付き完了可能情報に示された前記中止対象
データ処理のデータ処理量に基づき、前記候補データ処
理装置を選択することを特徴とする。
The communication unit receives, from at least one or more data processing devices, conditional completion possible information indicating a data processing amount of the data processing to be canceled, and the designation unit receives the conditional completion possible information. And selecting the candidate data processing device based on the data processing amount of the stop target data processing shown in (1).

【0009】前記通信部は、少なくとも一つ以上のデー
タ処理装置より、中止対象データ処理の個数が示された
条件付き完了可能情報を受信し、前記指定部は、前記条
件付き完了可能情報に示された前記中止対象データ処理
の個数に基づき、前記候補データ処理装置を選択するこ
とを特徴とする。
[0009] The communication unit receives, from at least one or more data processing devices, conditional completion enable information indicating the number of data processing to be canceled, and the designation unit indicates the conditional completion enable information indicated in the conditional completion enable information. The candidate data processing apparatus is selected based on the number of the data processing to be aborted.

【0010】前記通信部は、前記候補データ処理装置以
外のいずれかのデータ処理装置より、前記候補データ処
理装置の中止対象データ処理の予測完了時期を通知する
候補予測完了時期情報を受信し、前記指定部は、前記候
補予測完了時期情報に基づき、前記候補予測完了時期情
報を送信したデータ処理装置のうちいずれかのデータ処
理装置を前記候補データ処理装置の中止対象データ処理
の移行先に指定することを特徴とする。
[0010] The communication unit receives, from any one of the data processing devices other than the candidate data processing device, candidate prediction completion time information for notifying the prediction completion time of the data processing to be stopped by the candidate data processing device, The designating unit designates, based on the candidate prediction completion time information, one of the data processing devices that has transmitted the candidate prediction completion time information, as a migration destination of the cancellation target data processing of the candidate data processing device. It is characterized by the following.

【0011】前記通信部は、少なくとも一つ以上のデー
タ処理装置より、少なくとも一つ以上の中止対象データ
処理と各中止対象データ処理の完了期限とが示された条
件付き完了可能情報を受信し、前記指定部は、少なくと
も一つ以上の中止対象データ処理と各中止対象データ処
理の完了期限とが示された条件付き完了可能情報を送信
したデータ処理装置のうちいずれかのデータ処理装置を
前記候補データ処理装置として選択し、前記通信部は、
前記候補データ処理装置以外のいずれかのデータ処理装
置より、前記候補データ処理装置の各中止対象データ処
理を各中止対象データの完了期限前に完了させることが
できる旨を通知する候補完了可能情報を受信し、前記指
定部は、前記候補完了可能情報を送信したデータ処理装
置のうちいずれかのデータ処理装置を前記候補データ処
理装置の中止対象データ処理の移行先に指定することを
特徴とする。
[0011] The communication unit receives, from at least one or more data processing devices, conditional completion possible information indicating at least one or more stop target data processes and a completion deadline of each stop target data process. The designation unit is a candidate for any one of the data processing devices that transmitted the conditional completion possible information indicating at least one or more stop target data processes and the completion deadline of each stop target data process, as the candidate. Selected as a data processing device, the communication unit,
From any one of the data processing devices other than the candidate data processing device, candidate completion possible information for notifying that each stop target data process of the candidate data processing device can be completed before the completion deadline of each stop target data Upon receiving, the specification unit specifies any of the data processing devices that have transmitted the candidate completion possibility information as a migration destination of the data processing to be canceled by the candidate data processing device.

【0012】前記通信部は、少なくとも一つ以上のデー
タ処理装置より、複数の中止対象データ処理と前記複数
の中止対象データ処理に対して共通に定められた共通完
了期限が示された条件付き完了可能情報を受信し、前記
指定部は、複数の中止対象データ処理と複数の中止対象
データ処理に対する共通完了期限が示された条件付き完
了可能情報を送信したいずれかのデータ処理装置を前記
候補データ処理装置として選択し、前記通信部は、前記
候補データ処理装置以外のいずれかのデータ処理装置よ
り、前記候補データ処理装置の複数の中止対象データ処
理を共通完了期限前に完了させることができる旨を通知
する候補完了可能情報を受信し、前記指定部は、前記候
補完了可能情報を送信したデータ処理装置のうちいずれ
かのデータ処理装置を前記候補データ処理装置の複数の
中止対象データ処理の移行先に指定することを特徴とす
る。
[0012] The communication unit may be configured to execute a conditional completion from a plurality of data processing devices, wherein a plurality of data processing units to be canceled and a common completion time period commonly defined for the plurality of data units to be canceled are indicated. Receiving the possible information, and the specifying unit transmits any one of the data processing apparatuses that transmitted the conditional completion possible information indicating a plurality of data to be suspended and a common completion date for the plurality of data to be suspended to the candidate data. Selected as a processing device, the communication unit can complete a plurality of stop target data processes of the candidate data processing device by a data processing device other than the candidate data processing device before a common completion deadline. Receiving the candidate completion possible information, and specifying the one of the data processing devices among the data processing apparatuses that transmitted the candidate completion possible information. The characterized in that it specifies the destination of the plurality of stop target data processing of the candidate data processing apparatus.

【0013】前記管理装置は、データ処理要求を送信す
る少なくとも一つ以上のデータ処理要求装置に接続さ
れ、前記通信部は、いずれかのデータ処理要求装置より
データ処理要求を受信するとともに、各データ処理装置
に対して受信したデータ処理要求に基づくデータ処理の
予測完了時期の算出要求を送信することを特徴とする。
[0013] The management device is connected to at least one or more data processing request devices for transmitting a data processing request, and the communication unit receives a data processing request from one of the data processing request devices, A request for calculating a prediction completion time of data processing based on the received data processing request is transmitted to the processing device.

【0014】前記通信部は、いずれかのデータ処理装置
よりデータ処理要求を受信するとともに、前記データ処
理要求を送信したデータ処理装置以外のデータ処理装置
に対して受信したデータ処理要求に基づくデータ処理の
予測完了時期の算出要求を送信することを特徴とする。
The communication unit receives a data processing request from one of the data processing devices and performs a data processing based on a data processing request received from a data processing device other than the data processing device that transmitted the data processing request. And transmitting a calculation request for the prediction completion time.

【0015】前記管理装置は、更に、データ処理要求に
基づき所定のデータ処理を行うデータ処理部と、前記デ
ータ処理部によるデータ処理の予測完了時期を算出し、
算出した予測完了時期を自装置予測完了時期情報として
前記指定部に出力する完了時期予測部とを有し、前記指
定部は、前記完了時期予測部より前記自装置予測完了時
期情報を取得し、取得した自装置予測完了時期情報と前
記通信部により受信された予測完了時期情報とに基づ
き、前記複数のデータ処理装置及び前記管理装置の中か
ら前記指定データ処理装置を指定することを特徴とす
る。
[0015] The management device further calculates a data processing unit for performing predetermined data processing based on the data processing request, and a prediction completion time of the data processing by the data processing unit.
A completion time prediction unit that outputs the calculated prediction completion time to the designation unit as own device prediction completion time information, wherein the designation unit acquires the own device prediction completion time information from the completion time prediction unit, The designated data processing device is specified from the plurality of data processing devices and the management device based on the acquired own device prediction completion time information and the prediction completion time information received by the communication unit. .

【0016】前記管理装置は、更に、データ処理要求に
基づき所定のデータ処理を行うデータ処理部と、前記デ
ータ処理部が前記期限付きデータ処理を前記完了期限前
に完了させることができるか否か判断し、判断結果に応
じて前記データ処理部が前記期限付きデータ処理を前記
完了期限前に完了させることができるを旨を通知する自
装置完了可能情報を前記指定部に出力する完了可否判断
部とを有し、前記指定部は、前記完了可否判断部より前
記自装置完了可能情報を取得し、取得した自装置完了可
能情報と前記通信部により受信された完了可能情報とに
基づき、前記複数のデータ処理装置及び前記管理装置の
中から前記指定データ処理装置を指定することを特徴と
する。
The management device may further include a data processing unit for performing predetermined data processing based on the data processing request, and whether the data processing unit can complete the time-limited data processing before the completion time limit. And determining whether the data processing unit can complete the data processing with time limit before the completion time limit in accordance with the determination result. The designation unit acquires the own device completion possible information from the completion possibility determination unit, and based on the acquired own device completion possibility information and the completion possibility information received by the communication unit, The designated data processing device is designated from among the data processing device and the management device.

【0017】本発明に係るデータ処理システムは、デー
タ処理要求に基づき所定のデータ処理を行う複数のデー
タ処理装置と、前記複数のデータ処理装置を管理し、デ
ータ処理要求ごとにデータ処理を行うデータ処理装置を
指定データ処理装置として指定する管理装置とを有する
データ処理システムであって、前記管理装置は、前記複
数のデータ処理装置に対して、データ処理の完了期限が
定められた期限付きデータ処理要求に基づく期限付きデ
ータ処理を前記完了期限前に完了させることができるか
否かを問い合わせる完了可否問い合わせを送信し、各デ
ータ処理装置は、前記完了可否問い合わせに基づき前記
期限付きデータ処理の予測完了時期を計測し、計測した
予測完了時期に基づき、前記完了期限前に前記期限付き
データ処理を完了させることができるか否かを判断し、
前記完了期限前に前記期限付きデータ処理を完了させる
ことができる場合に、前記予測完了時期を含み、前記完
了期限前に前記期限付きデータ処理を完了させることが
できる旨を通知する完了可能情報を前記管理装置に対し
て送信し、前記管理装置は、完了可能情報に含まれた予
測完了時期に基づき、完了可能情報を送信したデータ処
理装置のうちいずれかのデータ処理装置を前記期限付き
データ処理を行う指定データ処理装置として指定するこ
とを特徴とする。
A data processing system according to the present invention includes a plurality of data processing devices for performing predetermined data processing based on a data processing request, and a data for managing the plurality of data processing devices and performing data processing for each data processing request. A data processing system comprising: a management device that designates a processing device as a designated data processing device, wherein the management device performs, with respect to the plurality of data processing devices, data processing with a time limit for completing data processing. A completion permission inquiry is sent to inquire whether the time-limited data processing based on the request can be completed before the completion time limit.Each data processing device transmits a completion completion prediction of the time-limited data processing based on the completion permission inquiry. Measure the time and complete the time-limited data processing before the completion time limit based on the measured predicted completion time It determines whether it is possible to,
When the time-limited data processing can be completed before the completion time limit, including the predicted completion time, the completion possible information for notifying that the time-limited data processing can be completed before the completion time limit is included. The management device transmits to the management device, and based on the predicted completion time included in the completion possibility information, the management device sends one of the data processing devices that transmitted the completion possibility information to the time-limited data processing device. Is specified as a specified data processing device that performs

【0018】各データ処理装置は、前記完了期限前に前
記期限付きデータ処理を完了させることができない場合
に、各データ処理装置が実行を予定している少なくとも
一つ以上のデータ処理の実行を中止すれば前記期限付き
データ処理を前記完了期限前に完了させることができる
か否かを判断し、実行を予定している少なくとも一つ以
上のデータ処理の実行を中止すれば前記期限付きデータ
処理を前記完了期限前に完了させることができる場合
に、実行中止の対象となる少なくとも一つ以上の中止対
象データ処理に関する情報を含み、前記中止対象データ
処理の実行を中止すれば前記期限付きデータ処理を前記
完了期限前に完了させることができる旨を通知する条件
付き完了可能情報を前記管理装置に送信し、前記管理装
置は、条件付き完了可能情報を送信したデータ処理装置
のうちいずれかのデータ処理装置を候補データ処理装置
として選択し、前記候補データ処理装置の中止対象デー
タ処理を他のいずれかのデータ処理装置へ移行できるか
否かを判断し、前記候補データ処理装置の中止対象デー
タ処理を他のいずれかのデータ処理装置へ移行できる場
合に前記候補データ処理装置を前記指定データ処理装置
として指定することを特徴とする。
Each of the data processing devices stops executing at least one or more data processes scheduled to be executed by each of the data processing devices when the data processing with a time limit cannot be completed before the completion time limit. Then, it is determined whether the time-limited data processing can be completed before the completion time limit, and if the execution of at least one or more data processing scheduled to be executed is stopped, the time-limited data processing is performed. If it is possible to complete before the completion deadline, including information on at least one or more stop target data processing to be canceled, if the stop of the execution of the stop target data processing, the time-limited data processing The management device transmits conditional completion possible information notifying that the completion can be completed before the completion deadline to the management device, and the management device Whether any of the data processing devices that have transmitted the function information is selected as a candidate data processing device, and whether or not the cancellation target data processing of the candidate data processing device can be transferred to any of the other data processing devices And when the data processing to be stopped of the candidate data processing apparatus can be transferred to any other data processing apparatus, the candidate data processing apparatus is designated as the designated data processing apparatus.

【0019】各データ処理装置は、データ処理要求を送
信する少なくとも一つ以上のデータ処理要求装置に接続
され、各データ処理装置は、いずれかのデータ処理要求
装置よりデータ処理の完了期限が定められた期限付きデ
ータ処理要求を受信し、受信した期限付きデータ処理要
求に基づく期限付きデータ処理を前記完了期限前に完了
させることができるか否かを判断し、前記完了期限前に
前記期限付きデータ処理を完了させることができない場
合に、前記期限付きデータ処理要求を前記管理装置に対
して転送し、前記管理装置は、前記期限付きデータ処理
要求を転送したデータ処理装置以外のデータ処理装置に
対して、前記期限付きデータ処理を前記完了期限前に完
了させることができるか否かを問い合わせる完了可否問
い合わせを送信することを特徴とする。
Each data processing device is connected to at least one or more data processing request devices for transmitting a data processing request, and each data processing device has a data processing completion time limit determined by one of the data processing request devices. Received the time-limited data processing request, and determines whether the time-limited data processing based on the received time-limited data processing request can be completed before the completion time limit. When the processing cannot be completed, the time-limited data processing request is transferred to the management device, and the management device sends the time-limited data processing request to a data processing device other than the data processing device that transferred the time-limited data processing request. Sends a completion permission inquiry asking whether the data processing with time limit can be completed before the completion time limit. It is characterized in.

【0020】各データ処理装置は、データ処理要求を送
信する少なくとも一つ以上のデータ処理要求装置に接続
され、各データ処理装置は、いずれかのデータ処理要求
装置よりデータ処理の完了期限が定められた期限付きデ
ータ処理要求を受信し、受信した期限付きデータ処理要
求に基づく期限付きデータ処理を前記完了期限前に完了
させることができるか否かを判断し、前記完了期限前に
前記期限付きデータ処理を完了させることができない場
合に、各データ処理装置が実行を予定している少なくと
も一つ以上のデータ処理の実行を中止すれば前記期限付
きデータ処理を前記完了期限前に完了させることができ
るか否かを判断し、実行を予定している少なくとも一つ
以上のデータ処理の実行を中止すれば前記期限付きデー
タ処理を前記完了期限前に完了させることができる場合
に、実行中止の対象となる少なくとも一つ以上の中止対
象データ処理を所定の完了期限前に完了させることを要
求するデータ処理要求を前記管理装置に対して送信し、
前記管理装置は、各データ処理装置より前記中止対象デ
ータ処理のデータ処理要求を受信し、前記中止対象デー
タ処理のデータ処理要求を送信したデータ処理装置以外
のデータ処理装置に対して、前記中止対象データ処理を
前記完了期限前に完了させることができるか否かを問い
合わせる完了可否問い合わせを送信することを特徴とす
る。
Each data processing device is connected to at least one or more data processing request devices for transmitting a data processing request, and each data processing device has a data processing completion time limit determined by one of the data processing request devices. Received the time-limited data processing request, and determines whether the time-limited data processing based on the received time-limited data processing request can be completed before the completion time limit. When the processing cannot be completed, if the execution of at least one or more data processing scheduled to be executed by each data processing apparatus is stopped, the time-limited data processing can be completed before the completion time limit. Judge whether or not the execution of at least one or more data processing scheduled to be executed is completed and the time-limited data processing is completed. If it can be completed before the deadline, a data processing request is sent to the management device requesting that at least one or more data to be aborted to be aborted is completed before a predetermined completion deadline. And
The management device receives a data processing request of the data processing to be stopped from each data processing device, and transmits the data processing request of the data processing to be stopped to a data processing device other than the data processing device that transmits the data processing request of the data to be stopped. It is characterized by transmitting a completion possibility inquiry for inquiring whether data processing can be completed before the completion deadline.

【0021】本発明に係る管理方法は、データ処理要求
に基づき所定のデータ処理を行う複数のデータ処理装置
を管理し、データ処理要求ごとにデータ処理を行うデー
タ処理装置を指定データ処理装置として指定する管理方
法であって、データ処理要求ごとにデータ処理の予測完
了時期を示す予測完了時期情報を少なくとも一つ以上の
データ処理装置より受信する通信ステップと、前記予測
完了時期情報に基づき、データ処理要求ごとに指定デー
タ処理装置を指定し、指定データ処理装置にデータ処理
要求に基づくデータ処理を行わせる指定ステップとを有
することを特徴とする。
A management method according to the present invention manages a plurality of data processing devices that perform predetermined data processing based on a data processing request, and designates a data processing device that performs data processing for each data processing request as a designated data processing device. A communication step of receiving, from at least one or more data processing devices, prediction completion time information indicating a prediction completion time of data processing for each data processing request, and performing data processing based on the prediction completion time information. Specifying a designated data processing device for each request, and causing the designated data processing device to perform data processing based on the data processing request.

【0022】前記通信ステップは、少なくとも一つ以上
のデータ処理装置より、データ処理の完了期限が定めら
れた期限付きデータ処理要求に基づく期限付きデータ処
理を前記完了期限前に完了させることができる旨を通知
する完了可能情報を受信し、前記指定ステップは、前記
完了可能情報を送信したデータ処理装置のうちいずれか
のデータ処理装置を前記期限付きデータ処理を行う指定
データ処理装置として指定することを特徴とする。
In the communication step, the term-limited data processing based on the term-limited data processing request in which the term of completion of the data processing is determined can be completed before the term of completion by at least one data processing device. Receiving the completion possible information, and specifying the one of the data processing devices that transmitted the completion possible information as a specified data processing device that performs the time-limited data processing. Features.

【0023】前記通信ステップは、少なくとも一つ以上
のデータ処理装置より、それぞれのデータ処理装置が実
行を予定している少なくとも一つ以上のデータ処理の実
行を中止すれば前記期限付きデータ処理を前記完了期限
前に完了させることができる旨を通知する条件付き完了
可能情報を受信し、前記指定ステップは、前記条件付き
完了可否情報を送信したデータ処理装置のうちいずれか
のデータ処理装置を前記期限付きデータ処理を行う指定
データ処理装置として指定することを特徴とする。
In the communication step, the execution of the time-limited data processing is stopped when at least one or more data processing apparatuses stop executing at least one or more data processing scheduled to be executed by each data processing apparatus. Receiving the conditional completion possible information notifying that the completion can be completed before the completion deadline, and the specifying step causes the one of the data processing devices that transmitted the conditional completion feasibility information to the data processing device to perform the deadline. It is designated as a designated data processing device for performing attached data processing.

【0024】前記通信ステップは、少なくとも一つ以上
のデータ処理装置より、それぞれのデータ処理装置にお
いて実行中止の対象となる少なくとも一つ以上の中止対
象データ処理に関する情報を含む条件付き完了可能情報
を受信し、前記指定ステップは、前記条件付き完了可能
情報を送信したデータ処理装置のうちいずれかのデータ
処理装置を候補データ処理装置として選択し、前記候補
データ処理装置の中止対象データ処理を他のいずれかの
データ処理装置へ移行できるか否かを判断し、前記候補
データ処理装置の中止対象データ処理を他のいずれかの
データ処理装置へ移行できる場合に前記候補データ処理
装置を前記指定データ処理装置として指定することを特
徴とする。
[0024] The communication step includes receiving, from at least one or more data processing apparatuses, conditional completion possible information including information on at least one or more data processing units to be aborted in each data processing apparatus. The specifying step selects any one of the data processing devices that transmitted the conditional completion possible information as a candidate data processing device, and sets the candidate data processing device to cancel any other target data process. It is determined whether or not the candidate data processing apparatus can be transferred to any of the other data processing apparatuses. It is specified as

【0025】本発明に係る管理方法をコンピュータに実
行させるためのプログラムは、データ処理要求に基づき
所定のデータ処理を行う複数のデータ処理装置を管理
し、データ処理要求ごとにデータ処理を行うデータ処理
装置を指定データ処理装置として指定する管理方法をコ
ンピュータに実行させるためのプログラムであって、デ
ータ処理要求ごとにデータ処理の予測完了時期を示す予
測完了時期情報を少なくとも一つ以上のデータ処理装置
より受信する通信ステップと、前記予測完了時期情報に
基づき、データ処理要求ごとに指定データ処理装置を指
定し、指定データ処理装置にデータ処理要求に基づくデ
ータ処理を行わせる指定ステップとを有する管理方法を
コンピュータに実行させるためのプログラムであること
を特徴とする。
A program for causing a computer to execute the management method according to the present invention manages a plurality of data processing devices that perform predetermined data processing based on a data processing request, and executes a data processing that performs data processing for each data processing request. A program for causing a computer to execute a management method of designating a device as a designated data processing device, wherein at least one or more data processing devices provide predicted completion time information indicating a predicted completion time of data processing for each data processing request. A management method comprising: a communication step of receiving; and a designation step of, based on the prediction completion time information, designating a designated data processing device for each data processing request and causing the designated data processing device to perform data processing based on the data processing request. It is a program to be executed by a computer.

【0026】[0026]

【発明の実施の形態】実施の形態1.本実施の形態に係
る分散バッチシステムの構成を、図1を用いて説明す
る。図において、1は、管理装置たる管理サーバ、2は
データ処理装置たる処理サーバ、3はデータ処理要求装
置たるクライアントである。図1においては、サーバ2
は2A〜2Nが存在するものとし、またクライアント3
も3A〜3Nが存在するものとする。なお、管理サーバ
1及び処理サーバ2A〜2Nを単にサーバと呼ぶ場合も
ある。管理サーバ1は、クライアント3A〜3Nより送
信されたバッチ処理要求ごとにバッチ処理を行うべき処
理サーバを処理サーバ2A〜2Nの中から指定する。な
お、管理サーバ1と処理サーバ2の構成は、ほぼ同様で
あり、管理サーバ1にマネージャ11が配置されている
点のみが異なる。従って、管理サーバ1は、処理サーバ
としてバッチ処理を行うこともできる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiment 1 The configuration of the distributed batch system according to the present embodiment will be described with reference to FIG. In the figure, 1 is a management server as a management device, 2 is a processing server as a data processing device, and 3 is a client as a data processing request device. In FIG. 1, the server 2
Means that 2A to 2N exist, and the client 3
3A to 3N exist. Note that the management server 1 and the processing servers 2A to 2N may be simply referred to as servers. The management server 1 specifies a processing server to perform batch processing for each batch processing request transmitted from the clients 3A to 3N from among the processing servers 2A to 2N. Note that the configuration of the management server 1 and the processing server 2 are almost the same, except that the manager 11 is arranged in the management server 1. Therefore, the management server 1 can also perform batch processing as a processing server.

【0027】次に、管理サーバ1の内部構成について説
明する。図中の10は、クライアント3A〜3N及び処
理サーバ2A〜2Nとの間で通信を行う通信部である。
通信部10は、例えば、クライアント3A〜3Nとの間
でバッチ処理要求及びその回答の送受信を行い、また、
処理サーバ2A〜2Nとの間で、後述する見積もり要求
及びその回答の送受信を行う。11は、指定部たるマネ
ージャであり、クライアント3A〜3Nより送信された
バッチ処理要求ごとにバッチ処理を行うべき処理サーバ
を処理サーバ2A〜2Nの中から指定する。マネージャ
11は、通信部10を通じて処理サーバ2A〜2Nに対
して見積もり要求を送信し、また通信部10を通じて見
積もり回答を受信し、受信した見積もり回答に基づき処
理サーバを指定する。12は、完了時期予測部又は完了
可否判断部として機能するバッチジョブスケジューリン
グデーモンである。バッチジョブスケジューリングデー
モン12は、マネージャ11からの見積もり要求に対し
てバッチ処理の完了時間(自装置予測完了時期)を算出
し、算出したバッチ処理の完了時間を見積もり回答とし
て返答する。13は、データ処理部たるバッチサービス
であり、バッチ処理要求に基づき所定のバッチ処理を行
う。
Next, the internal configuration of the management server 1 will be described. A communication unit 10 communicates with the clients 3A to 3N and the processing servers 2A to 2N.
The communication unit 10 transmits and receives a batch processing request and its response to and from the clients 3A to 3N, for example.
It sends and receives an estimate request and a response to the estimate request, which will be described later, between the processing servers 2A to 2N. Reference numeral 11 denotes a manager as a designating unit, which designates, from among the processing servers 2A to 2N, a processing server to perform batch processing for each batch processing request transmitted from the clients 3A to 3N. The manager 11 transmits an estimation request to the processing servers 2A to 2N through the communication unit 10, receives an estimation response through the communication unit 10, and specifies a processing server based on the received estimation response. Reference numeral 12 denotes a batch job scheduling daemon that functions as a completion time prediction unit or a completion availability determination unit. The batch job scheduling daemon 12 calculates the completion time of the batch processing (the own apparatus predicted completion time) in response to the estimation request from the manager 11, and returns the calculated completion time of the batch processing as an estimation response. Reference numeral 13 denotes a batch service as a data processing unit, which performs a predetermined batch process based on a batch process request.

【0028】なお、管理サーバ1は、例えばマイクロプ
ロセッサ等のCPUと、磁気ディスクや半導体メモリ等
の記録手段を有するコンピュータであり、記録手段は、
マネージャ11、バッチジョブスケジューリングデーモ
ン12、バッチサービス13の各機能を記述したコンピ
ュータプログラムを記録し、CPUがこれらコンピュー
タプログラムを読み出して、プログラムの内容を実行す
ることにより管理サーバ1の各機能が実現されている。
The management server 1 is a computer having a CPU such as a microprocessor and recording means such as a magnetic disk and a semiconductor memory.
A computer program describing the functions of the manager 11, the batch job scheduling daemon 12, and the batch service 13 is recorded, and the CPU reads out the computer programs and executes the contents of the programs to realize the functions of the management server 1. ing.

【0029】次に、処理サーバ2A〜2Nの内部構成に
ついて説明する。20A〜20Nは、通信部であり、管
理サーバ1の通信部10より見積もり要求を受信し、ま
た管理サーバ1の通信部10に対して見積もり回答を送
信する。22A〜22Nは、バッチジョブスケジューリ
ングデーモンであり、管理サーバ1のバッチジョブスケ
ジューリングデーモン12と同じ動作を行う。すなわ
ち、管理サーバ1より要求された見積もり要求に対して
バッチ処理の完了時間(予測完了時期)を算出し、算出
したバッチ処理の完了時間を見積もり回答として返答す
る。また、バッチジョブスケジューリングデーモン22
A〜22Nは、完了時期予測部又は完了可否判断部とし
て機能する。23A〜23Nは、バッチサービスであ
り、管理サーバ1のバッチサービス13と同様に、バッ
チ処理要求に基づき所定のバッチ処理を行う。また、バ
ッチサービス23A〜23Nは、データ処理部として機
能する。なお、図1では、管理サーバ1及び処理サーバ
2A〜2Nにバッチサービスが一つづつ配置されている
が、各サーバに複数のバッチサービスとしてもよい。
Next, the internal configuration of the processing servers 2A to 2N will be described. Reference numerals 20A to 20N denote communication units, which receive an estimation request from the communication unit 10 of the management server 1 and transmit an estimation reply to the communication unit 10 of the management server 1. Reference numerals 22A to 22N denote batch job scheduling daemons, which perform the same operations as the batch job scheduling daemon 12 of the management server 1. That is, in response to the estimation request requested by the management server 1, the completion time of the batch processing (estimated completion time) is calculated, and the calculated completion time of the batch processing is returned as an estimation response. Also, the batch job scheduling daemon 22
A to 22N function as a completion time prediction unit or a completion possibility determination unit. 23A to 23N are batch services, and perform predetermined batch processing based on a batch processing request, similarly to the batch service 13 of the management server 1. Further, the batch services 23A to 23N function as data processing units. In FIG. 1, one batch service is arranged in each of the management server 1 and the processing servers 2A to 2N, but a plurality of batch services may be provided in each server.

【0030】次に、クライアント3A〜3N、マネージ
ャ11、バッチジョブスケジューリングデーモン12,
22A〜22N、バッチサービス13,23A〜23N
の動作を図2を用いて説明する。バッチ処理を要求する
クライアントは、マネージャ11に対してバッチ処理要
求をバッチ処理のデッドラインと作業量を付加して送信
する(S21)。ここでは、クライアント3Kがバッチ
処理要求を送信するものとする。なお、デッドラインが
示されたバッチ処理要求を期限付きデータ処理要求とい
う。マネージャ11は各処理サーバ2A〜2N及び管理
サーバ1上のバッチジョブスケジューリングデーモン1
2,22A〜22Nに見積もり要求を送信する(S2
2)。バッチジョブスケジューリングデーモン12,2
2A〜22Nは自サーバ上の各バッチサービスのスケジ
ュール状況、および要求に付加されたデッドライン、作
業量から要求されたバッチ処理の完了時間(予測完了時
期)を算出し、デッドライン内に完了可能ならばその完
了時間を、不可能ならば処理不可能の見積もり回答をマ
ネージャ11に送信する(S23)。マネージャ11は
各バッチジョブスケジューリングデーモンからの回答を
受け、その中から完了時間の最も早いものを選択する。
ここでは、バッチジョブスケジューリングデーモン22
Lが選択されたとする。そして、マネージャ11は、選
択したバッチジョブスケジューリングデーモン22Lに
対してスケジューリング要求を送信する(S24)。も
し、処理可能なサーバがない場合は、処理不可能を回答
としてクライアント3Kに送信する。バッチジョブスケ
ジューリングデーモン22Lは該当するバッチサービス
23Lに対してスケジューリングを行い(S25)、ス
ケジューリング完了をマネージャ11に送信する(S2
6)。マネージャ11はクライアントに対して選択した
サーバを回答として送信する(S27)。クライアント
は回答されたサーバに対してバッチの投入を行う(S2
8)。バッチサービス23Lはバッチジョブスケジュー
リングデーモンからのスケジューリングに合わせて、投
入されたバッチ処理を実行し、クライアント3Kにバッ
チ実行結果を送信する(S29)。
Next, clients 3A to 3N, manager 11, batch job scheduling daemon 12,
22A-22N, batch service 13, 23A-23N
Will be described with reference to FIG. The client requesting the batch processing transmits the batch processing request to the manager 11 with the deadline and the work amount of the batch processing added (S21). Here, it is assumed that the client 3K transmits a batch processing request. Note that a batch processing request indicating a deadline is called a data processing request with a term. The manager 11 is a batch job scheduling daemon 1 on each of the processing servers 2A to 2N and the management server 1.
2, 22A to 22N to send an estimate request (S2
2). Batch job scheduling daemon 12,2
2A to 22N calculate the completion time of the requested batch process (predicted completion time) from the schedule status of each batch service on the own server, the deadline added to the request, and the workload, and can complete the deadline within the deadline If so, the completion time is sent to the manager 11, and if not possible, an estimate response indicating that processing is impossible is sent to the manager 11 (S23). The manager 11 receives a response from each batch job scheduling daemon and selects the one with the earliest completion time from among the responses.
Here, the batch job scheduling daemon 22
It is assumed that L is selected. Then, the manager 11 transmits a scheduling request to the selected batch job scheduling daemon 22L (S24). If there is no server that can process, the server sends a response indicating that processing is impossible to the client 3K. The batch job scheduling daemon 22L performs scheduling for the corresponding batch service 23L (S25), and transmits the completion of the scheduling to the manager 11 (S2).
6). The manager 11 transmits the selected server as an answer to the client (S27). The client submits the batch to the answered server (S2
8). The batch service 23L executes the input batch process in accordance with the scheduling from the batch job scheduling daemon, and transmits a batch execution result to the client 3K (S29).

【0031】図3を用いて、本実施の形態のマネージャ
11のフローチャートについて説明する。S101にお
いて、マネージャ11は通信部10を通じてクライアン
ト3A〜3Nのいずれかよりバッチ処理要求を受信す
る。S102において、各バッチジョブスケジューリン
グデーモン12,22A〜22Nに見積もり要求を送信
する。S103において回答の受信待ちを行い、タイム
アウト時間が経過しても回答がなければS106に進
み、回答があればS104に進む。S104において見
積もり回答を受信し、S105において、全ての回答を
受信していればS106に進み、受信していなければS
103に戻る。S106において、デッドラインまでに
処理可能な処理サーバがある場合にS107に進み、な
ければS111に進む。S107において、デッドライ
ンまでに処理可能な処理サーバの中から完了時間の最も
早い処理サーバをクライアント3A〜3Nからのバッチ
処理要求に対してバッチ処理を行う処理サーバとして決
定し、S108において、S107で決定した処理サー
バ上のバッチジョブスケジューリングデーモンにスケジ
ューリング要求を送信する。S109において、バッチ
ジョブスケジューリングデーモンからのスケジューリン
グ完了を受信し、S107で決定したサーバ名を回答と
してクライアントに送信する。S106において、デッ
ドラインまでに処理可能な処理サーバがなければ、S1
11において、処理不可を回答としてクライアントに送
信する。
A flowchart of the manager 11 according to the present embodiment will be described with reference to FIG. In S101, the manager 11 receives a batch processing request from any of the clients 3A to 3N via the communication unit 10. In S102, an estimate request is transmitted to each batch job scheduling daemon 12, 22A to 22N. In step S103, reception of a response is waited. If there is no response even after the timeout period has elapsed, the process proceeds to step S106, and if there is a response, the process proceeds to step S104. In step S104, the estimation response is received. In step S105, if all the responses have been received, the process proceeds to step S106.
Return to 103. In S106, if there is a processing server that can process by the deadline, the process proceeds to S107; otherwise, the process proceeds to S111. In S107, the processing server with the earliest completion time is determined as the processing server that performs the batch processing in response to the batch processing request from the clients 3A to 3N from among the processing servers that can be processed before the deadline, and in S108, in S107 The scheduling request is transmitted to the batch job scheduling daemon on the determined processing server. In S109, the completion of scheduling is received from the batch job scheduling daemon, and the server name determined in S107 is transmitted as an answer to the client. In S106, if there is no processing server capable of processing before the deadline, S1
In step 11, the processing failure is transmitted to the client as a response.

【0032】以上のような構成により、本実施の形態で
は分散バッチシステム上においてのデッドライン管理を
可能とする。
With the above configuration, the present embodiment enables deadline management on a distributed batch system.

【0033】なお、以上の説明では、管理サーバ1はバ
ッチジョブスケジューリングデーモン12及びバッチサ
ービス13を有し、自らもバッチ処理要求に対してバッ
チ処理要求を行うこととしたが、管理サーバ1は、これ
らバッチジョブスケジューリングデーモン12及びバッ
チサービス13を有していなくてもよい。この場合に
は、管理サーバ1は、処理サーバ2A〜2Nの管理のみ
を行うことになる。
In the above description, the management server 1 has the batch job scheduling daemon 12 and the batch service 13, and the management server 1 itself requests the batch processing in response to the batch processing request. The batch job scheduling daemon 12 and the batch service 13 need not be provided. In this case, the management server 1 only manages the processing servers 2A to 2N.

【0034】実施の形態2.実施の形態2に係る分散バ
ッチシステムの構成は図1と同様である。本実施の形態
の動作は実施の形態1の図2に示した動作とほぼ同じで
あるが、S111の処理が異なる。異なる動作について
図4を用いて説明する。まずマネージャ11は各バッチ
ジョブスケジューリングデーモン12,22A〜22N
に対し条件付見積もり要求を送信する(S31)。ここ
で、条件付き見積もり要求とは、バッチ処理要求に基づ
くバッチ処理をデッドラインまでに完了できないと判断
される場合には、条件付き見積もり回答を返信するよ
う、各バッチジョブスケジューリングデーモン12,2
2A〜22Nに要求するものである。各バッチジョブス
ケジューリングデーモン12,22A〜22Nは既にス
ケジュールされているバッチ処理のうちの1つのバッチ
処理を実行しなければ(即ち、バッチ処理の実行を中止
すれば)要求を受けた処理をデッドラインまでに完了さ
せられる場合にその中止の対象となるバッチ処理(中止
対象データ処理)の作業量(データ処理量)、及び中止
対象のバッチ処理のデッドラインを条件付見積もり回答
としてマネージャ11に送信する(S32)。マネージ
ャ11は受信した条件付見積もり回答のうち、最も作業
量の少ないバッチジョブスケジューリングデーモンを選
択する。図4では、バッチジョブスケジューリングデー
モン22Lが選択されたこととする。なお、この選択さ
れたバッチジョブスケジューリングデーモンを候補デー
タ処理装置という。マネージャ11は選択した条件付見
積もり回答に示された中止対象のバッチ処理に関して、
見積もり依頼をバッチジョブスケジューリングデーモン
22L以外の各バッチジョブスケジューリングデーモン
に送信する(S33)。バッチジョブスケジューリング
デーモン22L以外の各バッチジョブスケジューリング
デーモンは見積もり回答をマネージャ11に送信する
(S34)。マネージャ11は見積もり回答から完了時
間の最も早いバッチジョブスケジューリングデーモンを
選択する。図4では、例えばバッチジョブスケジューリ
ングデーモン22Mを選択する。次に、選択したバッチ
ジョブスケジューリングデーモン22Mにバッチ移行要
求を送信する(S35)。バッチ移行要求を受信したバ
ッチジョブスケジューリングデーモン22Mは、中止対
象のバッチ処理を実行する予定だった処理サーバ2L上
のバッチジョブスケジューリングデーモン22Lから中
止対象のバッチ処理の移行を行い、移行が完了したらマ
ネージャ11に対してバッチ移行完了を送信する(S3
6)。各バッチ処理の移行が完了したら、マネージャ1
1はスケジューリング要求をバッチジョブスケジューリ
ングデーモン22Lに送信する(S24)。
Embodiment 2 The configuration of the distributed batch system according to the second embodiment is the same as that of FIG. The operation of the present embodiment is almost the same as the operation of the first embodiment shown in FIG. 2, but the processing of S111 is different. The different operation will be described with reference to FIG. First, the manager 11 executes the batch job scheduling daemons 12, 22A to 22N.
A conditional estimation request is transmitted to the client (S31). Here, the conditional estimation request means that each batch job scheduling daemon 12,2 returns a conditional estimation response when it is determined that the batch processing based on the batch processing request cannot be completed by the deadline.
2A to 22N. Each of the batch job scheduling daemons 12, 22A to 22N deadline the requested process unless one of the batch processes already scheduled is executed (that is, if the execution of the batch process is stopped). If the processing is completed by this time, the work amount (data processing amount) of the batch processing (data processing to be canceled) to be canceled and the deadline of the batch processing to be canceled are transmitted to the manager 11 as a conditional estimation response. (S32). The manager 11 selects the batch job scheduling daemon with the least amount of work from the received conditional estimate responses. In FIG. 4, it is assumed that the batch job scheduling daemon 22L has been selected. Note that the selected batch job scheduling daemon is called a candidate data processing device. The manager 11 will cancel the batch process indicated in the selected conditional estimate answer,
The estimation request is transmitted to each batch job scheduling daemon other than the batch job scheduling daemon 22L (S33). Each batch job scheduling daemon other than the batch job scheduling daemon 22L transmits an estimate reply to the manager 11 (S34). The manager 11 selects the batch job scheduling daemon with the earliest completion time from the estimated response. In FIG. 4, for example, the batch job scheduling daemon 22M is selected. Next, a batch transfer request is transmitted to the selected batch job scheduling daemon 22M (S35). Upon receiving the batch transfer request, the batch job scheduling daemon 22M transfers the stop target batch process from the batch job scheduling daemon 22L on the processing server 2L that was to execute the stop target batch process. 11 is transmitted to S11 (S3).
6). When the transfer of each batch process is completed, Manager 1
1 transmits a scheduling request to the batch job scheduling daemon 22L (S24).

【0035】本実施の形態に係るマネージャの動作を、
実施の形態1と異なる部分について図5を用いて説明す
る。図3のS106で処理可能なサーバがなかった場合
は、図5のS201に移行し、S201において、条件
付見積もり要求を各バッチジョブスケジューリングデー
モン12,22A〜22Nに送信する。S202におい
て回答の受信待ちを行い、タイムアウト時間が経過して
も回答がなければS205に進み、回答があればS20
3に進む。S203において、条件付見積もり回答を受
信し、S204において、全ての回答を受信していれば
S205に進み、受信していなければS202に戻る。
S205において、中止対象のバッチ処理を行わなけれ
ばデッドラインまでにバッチ処理が可能な処理サーバが
ある場合にS206に進み、なければS215に進む。
S206において、最も作業量の少ない中止対象バッチ
処理を移行バッチ処理として決定する。S207におい
て、S206で決定した移行バッチ処理を実行する予定
だった処理サーバ2のバッチジョブスケジューリングデ
ーモン以外の各バッチジョブスケジューリングデーモン
に見積もり要求を送信する。S208において回答の受
信待ちを行い、タイムアウト時間が経過しても回答がな
ければS211に進み、回答があればS209に進む。
S209において見積もり回答を受信し、S210にお
いて、全ての回答を受信していればS211に進み、受
信していなければS208に戻る。S211において、
デッドラインまでに移行バッチ処理の処理が可能な処理
サーバがある場合にS212に進み、なければS216
に進む。S212において、デッドラインまでに移行バ
ッチ処理の処理が可能な処理サーバから完了時間の最も
早いサーバを移行先に決定し、S213において、S2
12で決定したサーバ上のバッチジョブスケジューリン
グデーモンにバッチ処理移行要求を送信する。S214
において、バッチジョブスケジューリングデーモンから
のバッチ処理移行完了を受信し、図3のS108に進
む。なお、S205及びS211において処理可能なサ
ーバがなければ、S215、S216において、処理不
可の回答をクライアントに送信する。
The operation of the manager according to this embodiment is as follows.
Parts different from the first embodiment will be described with reference to FIG. If there is no server that can be processed in S106 in FIG. 3, the process proceeds to S201 in FIG. 5, and in S201, a conditional estimation request is transmitted to each batch job scheduling daemon 12, 22A to 22N. In step S202, reception of a response is waited. If there is no response even after the timeout period has elapsed, the process proceeds to step S205.
Proceed to 3. In S203, a conditional estimation response is received. In S204, if all the responses have been received, the process proceeds to S205, and if not, the process returns to S202.
In step S205, if the batch process to be canceled is not performed, the process proceeds to step S206 if there is a processing server that can perform the batch process before the deadline. Otherwise, the process proceeds to step S215.
In S206, the batch process to be canceled with the least amount of work is determined as the transfer batch process. In S207, an estimate request is transmitted to each batch job scheduling daemon other than the batch job scheduling daemon of the processing server 2 which was to execute the migration batch processing determined in S206. In step S208, reception of a response is waited. If there is no response after the timeout period has elapsed, the process proceeds to step S211. If there is a response, the process proceeds to step S209.
In step S209, the estimation response is received. In step S210, if all the responses have been received, the process proceeds to step S211. If not, the process returns to step S208. In S211,
If there is a processing server capable of performing the transfer batch processing by the deadline, the process proceeds to S212; otherwise, the process proceeds to S216.
Proceed to. In S212, a server having the earliest completion time is determined as a migration destination from a processing server capable of performing the migration batch processing by the deadline.
A batch processing shift request is transmitted to the batch job scheduling daemon on the server determined in step 12. S214
, The completion of batch processing transfer from the batch job scheduling daemon is received, and the process proceeds to S108 in FIG. If there is no server that can be processed in S205 and S211, a response indicating that processing is not possible is transmitted to the client in S215 and S216.

【0036】以上のような動作により、サーバを効率的
に使用することが可能となる。また、図5では、S21
6において、処理不可の回答をクライアントに送信して
いるが、S206に戻り、他のバッチ処理を選択して処
理を続行しても良い。上述のように、S206でデータ
量の最も少ない中止対象バッチ処理が選択されるが、選
択された中止対象バッチ処理のデッドラインがタイトで
あるため、デッドラインまでに処理可能なサーバが存在
しないような場合が考えられる。このため、S211に
おいてNoであった場合でも、S206へ戻り、データ
量は若干多くなるもののデッドラインに余裕のある他の
中止対象バッチ処理を新たに選択し、新たに選択した中
止対象バッチ処理に対してS207以降の処理を行うこ
とが考えられる。
With the above operation, the server can be used efficiently. In FIG. 5, S21
In step 6, a response indicating that processing is not possible is transmitted to the client, but the processing may return to step S206, select another batch processing, and continue processing. As described above, the stop target batch process with the smallest data amount is selected in S206, but since the deadline of the selected stop target batch process is tight, there is no server that can process before the deadline. Case is conceivable. Therefore, even in the case of No in S211, the process returns to S206, selects another batch process to be canceled which has a slightly larger data amount but still has a deadline, and selects a new batch process to be canceled. On the other hand, it is conceivable to perform the processing after S207.

【0037】実施の形態3.実施の形態3に係る分散バ
ッチシステムの構成は図1と同様である。本実施の形態
の動作は実施の形態2の図4に示した動作とほぼ同じで
あるが、条件付見積もり回答の内容が異なる。実施の形
態2での条件付見積もり回答には1つの移行が必要なバ
ッチ処理の作業量とデッドラインが示されていたが、本
実施の形態では、バッチジョブスケジューリングデーモ
ンは、複数のバッチ処理を実行しなければ要求を受けた
処理をデッドラインまでに完了することができる場合
に、その中止対象バッチ処理の数、中止対象バッチ処理
の各々の作業量、中止対象バッチ処理の各々のデッドラ
インを条件付見積もり回答としてマネージャ11に送信
する。
Embodiment 3 The configuration of the distributed batch system according to the third embodiment is the same as that of FIG. The operation of the present embodiment is almost the same as the operation of the second embodiment shown in FIG. 4, but the contents of the conditional estimation answer are different. Although the conditional estimation response in the second embodiment indicates the workload and deadline of the batch processing requiring one shift, in the present embodiment, the batch job scheduling daemon executes a plurality of batch processes. If the requested process can be completed by the deadline if not executed, the number of batch processes to be canceled, the amount of work for each batch process to be canceled, and the deadline for each batch process to be canceled It is transmitted to the manager 11 as a conditional estimate response.

【0038】本実施の形態に係るのマネージャ11の動
作を、実施の形態2と異なる部分について図6を用いて
説明する。図5のS205において処理可能な処理サー
バがある場合、S301に進む。S301において、条
件付見積もり回答に示された移行が必要な中止対象バッ
チ処理の数が最も少ないサーバを、バッチ処理の移行の
対象となるサーバとして決定する。S302において、
S301で決定したサーバの各中止対象バッチ処理に関
してS303〜S308の処理を行い、全ての中止対象
バッチ処理に関して処理が完了したらS309に進む。
S303において、S301で決定したサーバ上で動作
するバッチジョブスケジューリングデーモン以外の各バ
ッチジョブスケジューリングデーモンに見積もり要求を
送信する。S304において回答の受信待ちを行い、タ
イムアウト時間が経過しても回答がなければS307に
進み、回答があればS305に進む。S305において
見積もり回答を受信し、S306において、全ての回答
を受信していればS307に進み、受信していなければ
S304に戻る。S307において、S301で決定し
たサーバの中止対象サーバ処理をデッドラインまでに処
理可能なサーバがある場合にS308に進み、なければ
S312に進む。S308において、完了時間の最も早
いサーバを決定しS302に戻る。移行する全てのバッ
チ処理について移行先のサーバが決定すると、処理をS
302からS309へ移す。S309において、S30
1で選択した条件付見積もり回答内の各バッチ処理に関
してS310〜S311の処理を行い全てのバッチ処理
に関して処理が完了したら図3のS108に進む。S3
10において、S308で決定したサーバ上で動作する
バッチジョブスケジューリングデーモンにバッチ処理移
行要求を送信し、S311においてバッチジョブスケジ
ューリングデーモンからのバッチ処理移行完了を受信す
る。また、S307において処理可能なサーバがない場
合は、S312において、処理不可の回答をクライアン
トに送信する。
The operation of the manager 11 according to the present embodiment will be described with reference to FIG. If there is a processing server that can process in S205 of FIG. 5, the process proceeds to S301. In step S301, the server that has the least number of batch processes to be canceled and needs to be migrated, which is indicated in the conditional estimation response, is determined as a server to be migrated in batch processing. In S302,
The processes of S303 to S308 are performed for each of the batch processes to be canceled of the server determined in S301, and when the processes for all the batch processes to be canceled are completed, the process proceeds to S309.
In S303, an estimate request is transmitted to each batch job scheduling daemon other than the batch job scheduling daemon that runs on the server determined in S301. In step S304, the process waits for reception of a response. If there is no response even after the timeout period has elapsed, the process proceeds to step S307, and if there is a response, the process proceeds to step S305. In step S305, the estimation response is received. In step S306, if all the responses have been received, the process proceeds to step S307, and if not, the process returns to step S304. In step S307, if there is a server that can process the server process to be canceled of the server determined in step S301 before the deadline, the process proceeds to step S308. Otherwise, the process proceeds to step S312. In S308, the server with the earliest completion time is determined, and the process returns to S302. When the migration destination server is determined for all the batch processes to be migrated, the process proceeds to S
Move from S302 to S309. In S309, S30
The processes in S310 to S311 are performed for each batch process in the conditional estimation answer selected in 1 and when the processes for all batch processes are completed, the process proceeds to S108 in FIG. S3
In step 10, a batch processing shift request is transmitted to the batch job scheduling daemon operating on the server determined in step S308, and in step S311, batch processing shift completion from the batch job scheduling daemon is received. If there is no server that can be processed in S307, a response indicating that processing is not possible is transmitted to the client in S312.

【0039】以上のような動作により、サーバを効率的
に使用することが可能となる。また、本実施の形態では
S312において、処理不可の回答をクライアントに送
信しているが、S301に戻り、他のサーバを選択して
処理を続行しても良い。上述のように、S301におい
て、中止対象バッチ処理の個数が最も少ないサーバが決
定されるが、選択された中止対象バッチ処理のデッドラ
インがタイトであるため、デッドラインまでに処理可能
なサーバが存在しないような場合が考えられる。このた
め、S307においてNoであった場合でも、S301
へ戻り、中止対象バッチ処理の個数は多くなるもののデ
ッドラインに余裕のある他の中止対象バッチ処理を新た
に選択し、新たに選択した中止対象バッチ処理に対して
S303以降の処理を行うことが考えられる。
With the above operation, the server can be used efficiently. Further, in the present embodiment, a response indicating that processing is not possible is transmitted to the client in S312, but the processing may return to S301, select another server, and continue processing. As described above, in S301, the server having the smallest number of batch processes to be canceled is determined. However, since the deadline of the selected batch process to be canceled is tight, there is a server that can be processed before the deadline. There may be cases where they do not. For this reason, even if No in S307, S301
Returning to step S <b> 303, it is possible to newly select another stop target batch process that has a large deadline but has a margin of deadline, and perform the processing of step S <b> 303 and thereafter for the newly selected stop target batch process. Conceivable.

【0040】実施の形態4.実施の形態4に係る分散バ
ッチシステムの構成は図1と同様である。本実施の形態
の動作は実施の形態2の図4に示した動作とほぼ同じで
あるが条件付見積もり回答の内容が異なる。実施の形態
2での条件付見積もり回答には1つの移行が必要なバッ
チ処理の作業量とデッドラインが示されていたが、本実
施の形態では、バッチジョブスケジューリングデーモン
は、連続してスケジュールされている複数のバッチ処理
からなるバッチ処理グループを1つ実行しなければ要求
を受けた処理をデッドラインまでに完了させられる場合
に、バッチ処理グループ全体の作業量の合計、バッチ処
理グループで共通のデッドラインを条件付見積もり回答
としてマネージャ11に送信する。
Embodiment 4 FIG. The configuration of the distributed batch system according to the fourth embodiment is the same as that of FIG. The operation of the present embodiment is almost the same as the operation of the second embodiment shown in FIG. 4, but the contents of the conditional estimation answer are different. In the conditional estimation response according to the second embodiment, the workload and the deadline of the batch processing requiring one shift are indicated, but in the present embodiment, the batch job scheduling daemon is continuously scheduled. If the requested process can be completed by the deadline unless one batch process group consisting of multiple batch processes is executed, the total work volume of the entire batch process group The deadline is transmitted to the manager 11 as a conditional estimate response.

【0041】本実施の形態におけるマネージャのフロー
チャートは実施の形態2の図3と同様である。
The flow chart of the manager in this embodiment is the same as that in FIG. 3 of the second embodiment.

【0042】以上のような動作により、実施の形態2よ
りもサーバを効率的に使用することが可能となり、実施
の形態3よりも移行にかかる処理を少なくすることが可
能となる。
With the above operation, it is possible to use the server more efficiently than in the second embodiment, and it is possible to reduce the number of processes required for migration as compared with the third embodiment.

【0043】実施の形態5.実施の形態5に係る分散バ
ッチシステムの構成は図1と同様である。本実施の形態
の動作は実施の形態2の図4に示した動作とほぼ同じで
あるが条件付見積もり回答の内容が異なる。実施の形態
2での条件付見積もり回答は移行が必要な1つのバッチ
処理の作業量とデッドラインを示していたが、本実施の
形態では、バッチジョブスケジューリングデーモンは、
連続してスケジュールされている複数のバッチ処理から
なるバッチ処理グループを複数個実行しなければ要求を
受けた処理をデッドラインまでに完了させられる場合
に、複数個のバッチ処理グループ全体の作業量の合計、
複数個のバッチ処理グループで共通のデッドラインを条
件付見積もり回答としてマネージャ11に送信する。
Embodiment 5 FIG. The configuration of the distributed batch system according to the fifth embodiment is the same as that of FIG. The operation of the present embodiment is almost the same as the operation of the second embodiment shown in FIG. 4, but the contents of the conditional estimation answer are different. The conditional estimation answer in the second embodiment indicates the workload and deadline of one batch process that needs to be migrated, but in the present embodiment, the batch job scheduling daemon
If the requested process can be completed by the deadline unless multiple batch processing groups consisting of multiple batch processes that are scheduled in succession are executed, the amount of work of the entire batch processing group can be reduced. total,
A deadline common to a plurality of batch processing groups is transmitted to the manager 11 as a conditional estimate response.

【0044】本実施の形態におけるマネージャ11のフ
ローチャートは実施の形態3の図5と同様である。
The flowchart of the manager 11 in the present embodiment is the same as that in FIG. 5 of the third embodiment.

【0045】以上のような動作により、実施の形態2よ
りもサーバを効率的に使用することが可能となる。
With the above operation, the server can be used more efficiently than in the second embodiment.

【0046】実施の形態6.実施の形態6に係る分散バ
ッチシステムの構成を図7を用いて説明する。図7にお
いて、管理サーバ1、処理サーバ2A〜2N、クライア
ント3A〜3Nは図1と同様のものである。図1では、
クライアント3A〜3Nは管理サーバ1に対してバッチ
処理要求を送信していたが、図7では、クライアント3
A〜3Nは管理サーバ1及び処理サーバ2A〜2Nのい
ずれに対してもバッチ処理要求を送信できる点が異な
る。
Embodiment 6 FIG. The configuration of the distributed batch system according to the sixth embodiment will be described with reference to FIG. 7, a management server 1, processing servers 2A to 2N, and clients 3A to 3N are the same as those in FIG. In FIG.
Although the clients 3A to 3N have transmitted the batch processing request to the management server 1, in FIG.
A to 3N are different in that a batch processing request can be transmitted to any of the management server 1 and the processing servers 2A to 2N.

【0047】本実施の形態に係る分散バッチシステムの
動作を図8〜図10を用いて説明する。ここでは、クラ
イアント3K(図示せず)が処理サーバ2L(図示せ
ず)に対してバッチ処理要求を送信するものとする。バ
ッチ処理を要求するクライアント3Kは、処理サーバ2
Lのバッチジョブスケジューリングデーモン22Lに対
してバッチ処理要求をバッチ処理のデッドラインと作業
量を付加して送信する(S21)。バッチジョブスケジ
ューリングデーモン22Lは要求されたバッチ処理を自
サーバ上でデッドライン内に処理できる場合は図8のよ
うに動作し、バッチサービス23Lに対してスケジュー
リングを行い(S25)、自サーバ名を回答として送信
する(S27)。クライアントは回答されたサーバ2L
に対してバッチの投入を行う(S28)。バッチサービ
ス23Lはバッチジョブスケジューリングデーモン22
Lからのスケジューリング(S25)に合わせて、投入
されたバッチ処理を実行し、クライアント3Kにバッチ
実行結果を送信する(S29)。
The operation of the distributed batch system according to this embodiment will be described with reference to FIGS. Here, it is assumed that the client 3K (not shown) transmits a batch processing request to the processing server 2L (not shown). The client 3K that requests batch processing is the processing server 2
A batch processing request is sent to the L batch job scheduling daemon 22L with the deadline and the workload of the batch processing added (S21). When the requested batch process can be processed within the deadline on the own server, the batch job scheduling daemon 22L operates as shown in FIG. 8, performs scheduling for the batch service 23L (S25), and returns the own server name. (S27). The client is the answering server 2L
, And a batch is input (S28). The batch service 23L is a batch job scheduling daemon 22
In accordance with the scheduling from L (S25), the input batch processing is executed, and the batch execution result is transmitted to the client 3K (S29).

【0048】一方、バッチジョブスケジューリングデー
モン22Lは要求されたバッチ処理を自サーバ上でデッ
ドライン内に処理できない場合は図9のように動作す
る。バッチジョブスケジューリングデーモン22Lはマ
ネージャ11に対してバッチ処理要求を送信する(S4
1)。マネージャ11はバッチ処理要求を送信したサー
バ2L以外の各サーバ1,2A〜2K、2M〜2N上の
バッチジョブスケジューリングデーモン12,22A〜
22K、22M〜22Nに見積もり要求を送信する(S
22)。見積もり要求を受けたバッチジョブスケジュー
リングデーモンは自サーバ上の各バッチサービスのスケ
ジュール状況、および要求に付加されたデッドライン、
作業量から要求されたバッチ処理の完了時間を算出し、
デッドライン内に完了可能ならばその完了時間を、不可
能ならば処理不可能を示す見積もり回答をマネージャ1
1に送信する(S23)。マネージャ11は各バッチジ
ョブスケジューリングデーモンからの回答を受け、その
中から完了時間の最も早いものを選択する。ここでは、
バッチジョブスケジューリングデーモン22Mを選択す
ることとする。次に、マネージャ11は、選択したバッ
チジョブスケジューリングデーモン22Mに対してスケ
ジューリング要求を送信する(S24)。一方、処理可
能なサーバがない場合は、処理不可能を回答としてバッ
チジョブスケジューリングデーモン22Lに送信する
(S27)。バッチジョブスケジューリングデーモン2
2Mは該当するバッチサービス23Mに対してスケジュ
ーリングを行い(S25)、スケジューリング完了をマ
ネージャ11に送信する(S26)。マネージャ11は
バッチジョブスケジューリングデーモン22Lに対して
選択したサーバを回答として送信する。バッチジョブス
ケジューリングデーモン22Lはマネージャ11から受
信した回答をクライアント3Kに送信する(S27)。
クライアント3Kは回答されたサーバ2Mに対してバッ
チの投入を行う(S28)。バッチサービス23Mはバ
ッチジョブスケジューリングデーモン22Mからのスケ
ジューリング(S25)に合わせて、投入されたバッチ
処理を実行し、クライアントにバッチ実行結果を送信す
る(S29)。
On the other hand, the batch job scheduling daemon 22L operates as shown in FIG. 9 when the requested batch processing cannot be processed within the deadline on its own server. The batch job scheduling daemon 22L transmits a batch processing request to the manager 11 (S4).
1). The manager 11 is a batch job scheduling daemon 12, 22A- on each of the servers 1, 2A-2K, 2M-2N other than the server 2L that has sent the batch processing request.
22K, and sends an estimate request to 22M to 22N (S
22). The batch job scheduling daemon that receives the estimate request, schedule status of each batch service on its own server, deadline added to the request,
Calculate the completion time of the requested batch process from the amount of work,
If it can be completed within the deadline, the completion time is shown.
1 (S23). The manager 11 receives a response from each batch job scheduling daemon and selects the one with the earliest completion time from among the responses. here,
It is assumed that the batch job scheduling daemon 22M is selected. Next, the manager 11 transmits a scheduling request to the selected batch job scheduling daemon 22M (S24). On the other hand, if there is no server that can process, the server sends a response indicating that processing is impossible to the batch job scheduling daemon 22L (S27). Batch job scheduling daemon 2
The 2M performs scheduling on the corresponding batch service 23M (S25), and sends a notification of scheduling completion to the manager 11 (S26). The manager 11 sends the selected server as an answer to the batch job scheduling daemon 22L. The batch job scheduling daemon 22L sends the response received from the manager 11 to the client 3K (S27).
The client 3K submits a batch to the server 2M to which the response has been made (S28). The batch service 23M executes the input batch processing in accordance with the scheduling (S25) from the batch job scheduling daemon 22M, and transmits a batch execution result to the client (S29).

【0049】また、バッチジョブスケジューリングデー
モン22Lは要求されたバッチ処理を自サーバ上でデッ
ドライン内に処理できない場合は図10のように動作し
ても良い。バッチジョブスケジューリングデーモン22
Lは、スケジュールされているバッチ処理のうちの1つ
のバッチ処理を実行しなければ要求を受けた処理をデッ
ドラインまでに完了させられる場合に、そのバッチ処理
の作業量、デッドラインを示すバッチ移行要求をマネー
ジャ11に対して送信する(S35)。マネージャ11
はバッチ移行要求を送信したサーバ2L以外の各サーバ
1,2A〜2K、2M〜2N上のバッチジョブスケジュ
ーリングデーモン12,22A〜22K、22M〜22
Nに見積もり要求を送信する(S22)。各バッチジョ
ブスケジューリングデーモン12,22A〜22K、2
2M〜22Nは自サーバ上の各バッチサービスのスケジ
ュール状況、および要求に付加されたデッドライン、作
業量から要求されたバッチ処理の完了時間を算出し、デ
ッドライン内に完了可能ならばその完了時間を、不可能
ならば処理不可能を示す見積もり回答をマネージャ11
に送信する(S23)。マネージャ11は各バッチジョ
ブスケジューリングデーモン12,22A〜22K、2
2M〜22Nからの回答を受け、その中から完了時間の
最も早いものを選択する。ここでは、バッチジョブスケ
ジューリングデーモン22Mを選択することとする。次
に、マネージャ11は、選択したバッチジョブスケジュ
ーリングデーモン22Mに対してバッチ移行要求を送信
する(S24)。バッチ移行要求を受信したバッチジョ
ブスケジューリングデーモン22Mは、バッチジョブス
ケジューリングデーモン22Lからバッチ処理の移行を
行い、移行が完了したらマネージャ11に対してバッチ
移行完了を送信し(S36)、マネージャ11はバッチ
ジョブスケジューリングデーモン22Lにバッチ移行完
了を送信する(S46)。バッチジョブスケジューリン
グデーモン22Lは、該当するバッチサービス23Lに
対してスケジューリングを行い(S25)、回答をクラ
イアント3Kに送信する(S27)。クライアント3K
は回答されたサーバに対してバッチの投入を行う(S2
8)。バッチサービス23Lはバッチジョブスケジュー
リングデーモンからのスケジューリング(S25)に合
わせて、投入されたバッチ処理を実行し、クライアント
にバッチ実行結果を送信する(S29)。
The batch job scheduling daemon 22L may operate as shown in FIG. 10 when the requested batch processing cannot be processed within the deadline on its own server. Batch job scheduling daemon 22
L indicates a work load of the batch process and a batch transfer indicating the deadline when the requested process can be completed by the deadline unless one of the scheduled batch processes is executed. The request is transmitted to the manager 11 (S35). Manager 11
Are batch job scheduling daemons 12, 22A to 22K and 22M to 22 on the servers 1, 2A to 2K and 2M to 2N other than the server 2L that has transmitted the batch transfer request.
Then, an estimation request is transmitted to N (S22). Each batch job scheduling daemon 12, 22A to 22K, 2
2M to 22N calculate the completion status of the requested batch process from the schedule status of each batch service on the own server, the deadline added to the request, and the workload, and if the completion is possible within the deadline, the completion time If it is not possible, the manager 11
(S23). The manager 11 manages each batch job scheduling daemon 12, 22A to 22K, 2
Responses from 2M to 22N are received, and the one with the earliest completion time is selected from the responses. Here, the batch job scheduling daemon 22M is selected. Next, the manager 11 transmits a batch transfer request to the selected batch job scheduling daemon 22M (S24). Upon receiving the batch transfer request, the batch job scheduling daemon 22M transfers the batch processing from the batch job scheduling daemon 22L, and when the transfer is completed, sends a batch transfer completion to the manager 11 (S36). The completion of batch transfer is transmitted to the scheduling daemon 22L (S46). The batch job scheduling daemon 22L performs scheduling for the corresponding batch service 23L (S25), and sends a response to the client 3K (S27). Client 3K
Submits a batch to the answered server (S2
8). The batch service 23L executes the input batch process in accordance with the scheduling (S25) from the batch job scheduling daemon, and transmits the batch execution result to the client (S29).

【0050】なお、実施の形態1〜6では、本発明に係
る管理装置及びデータ処理システムの動作について説明
してきたが、実施の形態1〜6に示した動作手順により
本発明に係る管理方法も実現することができる。
Although the operations of the management device and the data processing system according to the present invention have been described in the first to sixth embodiments, the management method according to the present invention can be implemented by the operation procedure shown in the first to sixth embodiments. Can be realized.

【0051】ここで、以上にて説明した本発明の特徴を
まとめると、以下のようになる。本発明による分散バッ
チジョブスケジュール方式は、複数のバッチサービスを
提供する複数のサーバとバッチジョブの要求を行う複数
のクライアントにより構成される分散バッチシステムに
おいて、各サーバ上にバッチサービスのスケジューリン
グを行うバッチジョブスケジューリングデーモンとサー
バの内のいずれか1つにクライアントとバッチジョブス
ケジューリングデーモンとの調整を行うマネージャを備
え、バッチ処理のデッドライン管理を行うことを特徴と
する。
Here, the features of the present invention described above are summarized as follows. In a distributed batch job scheduling method according to the present invention, in a distributed batch system including a plurality of servers providing a plurality of batch services and a plurality of clients requesting a batch job, a batch for scheduling a batch service on each server is provided. One of the job scheduling daemon and the server is provided with a manager for coordinating between the client and the batch job scheduling daemon, and performs deadline management of batch processing.

【0052】前記分散バッチジョブスケジュール方式
は、バッチを処理できるサーバが無い場合に、1つのバ
ッチ処理を他のサーバに移行することによりスケジュー
リングを行うことを特徴とする。
The distributed batch job scheduling method is characterized in that when there is no server capable of processing a batch, scheduling is performed by transferring one batch process to another server.

【0053】前記分散バッチジョブスケジュール方式
は、バッチを処理できるサーバが無い場合に、複数のバ
ッチ処理を他のサーバに移行することによりスケジュー
リングを行うことを特徴とする。
The distributed batch job scheduling method is characterized in that when there is no server capable of processing a batch, scheduling is performed by transferring a plurality of batch processes to another server.

【0054】前記分散バッチジョブスケジュール方式
は、バッチを処理できるサーバが無い場合に、連続して
スケジュールされている複数のバッチ処理を1つのバッ
チ処理として他のサーバに移行することによりスケジュ
ーリングを行うことを特徴とする。
In the distributed batch job scheduling method, when there is no server capable of processing batches, scheduling is performed by transferring a plurality of batch processes that are continuously scheduled to another server as one batch process. It is characterized by.

【0055】前記分散バッチジョブスケジュール方式
は、バッチを処理できるサーバが無い場合に、連続して
スケジュールされている複数のバッチ処理を1つのバッ
チ処理として、複数のバッチ処理を他のサーバに移行す
ることによりスケジューリングを行うことを特徴とす
る。
In the distributed batch job scheduling method, when there is no server capable of processing batches, a plurality of batch processes scheduled continuously are treated as one batch process, and the plurality of batch processes are transferred to another server. Thus, scheduling is performed.

【0056】本発明による分散バッチジョブスケジュー
ル方式は、複数のバッチサービスを提供する複数のサー
バとバッチジョブの要求を行う複数のクライアントによ
り構成される分散バッチシステムにおいて、各サーバ上
にバッチサービスのスケジューリングを行うバッチジョ
ブスケジューリングデーモンとサーバの内のいずれか1
つにバッチジョブスケジューリングデーモンの調整を行
うマネージャを備え、クライアントは任意のサーバ上の
バッチジョブスケジューリングデーモンにバッチ処理要
求を送信することにより、バッチ処理のデッドライン管
理を行うことを特徴とする。
In the distributed batch job scheduling method according to the present invention, in a distributed batch system including a plurality of servers providing a plurality of batch services and a plurality of clients requesting a batch job, scheduling of the batch service is performed on each server. One of the batch job scheduling daemon and server that performs
Finally, a manager for adjusting the batch job scheduling daemon is provided, and the client performs a batch processing deadline management by transmitting a batch processing request to a batch job scheduling daemon on an arbitrary server.

【0057】前記分散バッチジョブスケジュール方式
は、バッチ処理要求を送信したサーバ上でバッチを処理
出来ない場合にバッチジョブスケジューリングデーモン
がマネージャに対して、バッチ処理要求を行うことによ
り、バッチ処理のデッドライン管理を行うことを特徴と
する。
In the distributed batch job scheduling method, the batch job scheduling daemon issues a batch processing request to the manager when a batch cannot be processed on the server that has transmitted the batch processing request, thereby achieving the deadline of batch processing. It is characterized by performing management.

【0058】前記分散バッチジョブスケジュール方式
は、バッチ処理要求を送信したサーバ上でバッチを処理
出来ない場合に、バッチジョブスケジューリングデーモ
ンがマネージャに対して、バッチ移行要求を行うことに
より、バッチ処理のデッドライン管理を行うことを特徴
とする。
In the distributed batch job scheduling method, when a batch cannot be processed on the server that has transmitted the batch processing request, the batch job scheduling daemon issues a batch transfer request to the manager, thereby causing the batch processing deadline. It is characterized by performing line management.

【0059】[0059]

【発明の効果】このように本発明によれば、管理サーバ
は、各処理サーバに対してデッドラインまでにバッチ処
理が完了可能かどうかを問い合わせ、デッドラインまで
に処理可能な処理サーバの中からバッチ処理を実行する
処理サーバを選択するため、分散バッチシステムにおけ
るデッドライン管理を有効に行うことができる。
As described above, according to the present invention, the management server inquires each processing server whether batch processing can be completed by the deadline, and from among the processing servers capable of processing by the deadline. Since a processing server that executes batch processing is selected, deadline management in a distributed batch system can be effectively performed.

【0060】また、本発明によれば、デッドラインまで
に処理可能な処理サーバが存在しない場合であっても、
管理サーバは条件付き見積もり回答に基づき処理サーバ
間でバッチ処理を移行させ、この結果、いずれかの処理
サーバはデッドラインまでに処理を完了させることがで
きる。このため、本発明は、各処理サーバの資源を効率
的に活用することができる。
According to the present invention, even if there is no processing server capable of processing before the deadline,
The management server shifts the batch processing between the processing servers based on the conditional estimation answer, and as a result, any one of the processing servers can complete the processing by the deadline. For this reason, the present invention can efficiently utilize the resources of each processing server.

【0061】また、本発明によれば、管理サーバは最も
少ない作業量のバッチ処理を選択して移行させるため、
バッチ処理の移行先を早期に決定することができる。
According to the present invention, the management server selects and shifts the batch processing with the least amount of work.
The destination of the batch processing can be determined early.

【0062】また、本発明によれば、管理サーバは最も
少ない個数のバッチ処理を選択して移行させるため、バ
ッチ処理の移行先を早期に決定することができる。
Further, according to the present invention, since the management server selects and transfers the least number of batch processes, the destination of the batch process can be determined early.

【0063】また、本発明によれば、管理サーバは複数
個のバッチ処理をグループとして扱うため、バッチ処理
の移行処理を効率化することができる。
Further, according to the present invention, the management server treats a plurality of batch processes as a group, so that the batch process transfer process can be made more efficient.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 分散バッチシステムの構成を示す図。FIG. 1 is a diagram showing a configuration of a distributed batch system.

【図2】 実施の形態1に係る分散バッチシステムの動
作を説明する図。
FIG. 2 is a diagram illustrating an operation of the distributed batch system according to the first embodiment.

【図3】 実施の形態1に係る管理サーバのマネージャ
の動作を説明するフローチャート図。
FIG. 3 is a flowchart illustrating an operation of a manager of the management server according to the first embodiment;

【図4】 実施の形態2に係る分散バッチシステムの動
作を説明する図。
FIG. 4 is a diagram illustrating an operation of the distributed batch system according to the second embodiment.

【図5】 実施の形態2に係る管理サーバのマネージャ
の動作を説明するフローチャート図。
FIG. 5 is a flowchart illustrating the operation of a manager of the management server according to the second embodiment.

【図6】 実施の形態3に係る管理サーバのマネージャ
の動作を説明するフローチャート図。
FIG. 6 is a flowchart illustrating an operation of a manager of the management server according to the third embodiment.

【図7】 分散バッチシステムの構成を示す図。FIG. 7 is a diagram showing a configuration of a distributed batch system.

【図8】 実施の形態6に係る分散バッチシステムの動
作を説明する図。
FIG. 8 illustrates an operation of the distributed batch system according to the sixth embodiment.

【図9】 実施の形態6に係る分散バッチシステムの動
作を説明する図。
FIG. 9 illustrates an operation of the distributed batch system according to the sixth embodiment.

【図10】 実施の形態6に係る分散バッチシステムの
動作を説明する図。
FIG. 10 is a diagram illustrating an operation of the distributed batch system according to the sixth embodiment.

【符号の説明】[Explanation of symbols]

1 管理サーバ、2 処理サーバ、3 クライアント、
10 通信部、11マネージャ、12 バッチジョブス
ケジューリングデーモン、13 バッチサービス、20
通信部、22 バッチジョブスケジューリングデーモ
ン、23 バッチサービス。
1 management server, 2 processing servers, 3 clients,
10 communication unit, 11 manager, 12 batch job scheduling daemon, 13 batch service, 20
Communication unit, 22 batch job scheduling daemon, 23 batch service.

Claims (22)

【特許請求の範囲】[Claims] 【請求項1】 データ処理要求に基づき所定のデータ処
理を行う複数のデータ処理装置を管理し、データ処理要
求ごとにデータ処理を行うデータ処理装置を指定データ
処理装置として指定する管理装置であって、 データ処理要求ごとにデータ処理の予測完了時期を示す
予測完了時期情報を少なくとも一つ以上のデータ処理装
置より受信する通信部と、 前記予測完了時期情報に基づき、データ処理要求ごとに
指定データ処理装置を指定し、指定データ処理装置にデ
ータ処理要求に基づくデータ処理を行わせる指定部とを
有することを特徴とする管理装置。
1. A management device that manages a plurality of data processing devices that perform predetermined data processing based on a data processing request, and specifies a data processing device that performs data processing for each data processing request as a designated data processing device. A communication unit that receives, from at least one data processing device, prediction completion time information indicating a prediction completion time of data processing for each data processing request; and a designated data processing for each data processing request based on the prediction completion time information. A designation unit for designating a device and causing a designated data processing device to perform data processing based on a data processing request.
【請求項2】 前記通信部は、少なくとも一つ以上のデ
ータ処理装置より、データ処理の完了期限が定められた
期限付きデータ処理要求に基づく期限付きデータ処理を
前記完了期限前に完了させることができる旨を通知する
完了可能情報を受信し、 前記指定部は、前記完了可能情報を送信したデータ処理
装置のうちいずれかのデータ処理装置を前記期限付きデ
ータ処理を行う指定データ処理装置として指定すること
を特徴とする請求項1に記載の管理装置。
2. The communication unit according to claim 2, wherein at least one or more data processing devices complete term-limited data processing based on a term-limited data processing request in which a term of completion of data processing is determined before the completion term. Receiving the completion possible information notifying that the completion is possible, the designation unit designates any one of the data processing devices that transmitted the completion complete information as the designated data processing device that performs the time-limited data processing The management device according to claim 1, wherein:
【請求項3】 前記通信部は、少なくとも一つ以上のデ
ータ処理装置より、それぞれのデータ処理装置が実行を
予定している少なくとも一つ以上のデータ処理の実行を
中止すれば前記期限付きデータ処理を前記完了期限前に
完了させることができる旨を通知する条件付き完了可能
情報を受信し、 前記指定部は、前記条件付き完了可否情報を送信したデ
ータ処理装置のうちいずれかのデータ処理装置を前記期
限付きデータ処理を行う指定データ処理装置として指定
することを特徴とする請求項2に記載の管理装置。
3. The time-limited data processing when the communication unit stops executing at least one or more data processes scheduled to be executed by each of the data processing devices from at least one or more data processing devices. Receiving the conditional completion possible information notifying that the completion can be completed before the completion deadline, and the specifying unit transmits any one of the data processing apparatuses among the data processing apparatuses that transmitted the conditional completion feasibility information. The management apparatus according to claim 2, wherein the management apparatus is designated as a designated data processing apparatus that performs the time-limited data processing.
【請求項4】 前記通信部は、少なくとも一つ以上のデ
ータ処理装置より、それぞれのデータ処理装置において
実行中止の対象となる少なくとも一つ以上の中止対象デ
ータ処理に関する情報を含む条件付き完了可能情報を受
信し、 前記指定部は、前記条件付き完了可能情報を送信したデ
ータ処理装置のうちいずれかのデータ処理装置を候補デ
ータ処理装置として選択し、前記候補データ処理装置の
中止対象データ処理を他のいずれかのデータ処理装置へ
移行できるか否かを判断し、前記候補データ処理装置の
中止対象データ処理を他のいずれかのデータ処理装置へ
移行できる場合に前記候補データ処理装置を前記指定デ
ータ処理装置として指定することを特徴とする請求項3
に記載の管理装置。
4. The conditional completion completion information including information on at least one or more data processing units to be aborted in each of the data processing devices from at least one or more data processing devices. The designation unit selects any one of the data processing devices that transmitted the conditional completion possible information as a candidate data processing device, and selects other data processing units to be canceled by the candidate data processing device. Judge whether it is possible to shift to any of the data processing devices, and if the data processing to be stopped of the candidate data processing device can be shifted to any other data processing device, the candidate data processing device 4. The apparatus according to claim 3, wherein the apparatus is designated as a processing apparatus.
Management apparatus according to.
【請求項5】 前記通信部は、少なくとも一つ以上のデ
ータ処理装置より、中止対象データ処理のデータ処理量
が示された条件付き完了可能情報を受信し、 前記指定部は、前記条件付き完了可能情報に示された前
記中止対象データ処理のデータ処理量に基づき、前記候
補データ処理装置を選択することを特徴とする請求項4
に記載の管理装置。
5. The communication unit receives, from at least one or more data processing devices, conditional completion enable information indicating a data processing amount of a data process to be canceled, and the designation unit receives the conditional completion. 5. The candidate data processing device is selected based on a data processing amount of the data to be canceled indicated in the possible information.
Management apparatus according to.
【請求項6】 前記通信部は、少なくとも一つ以上のデ
ータ処理装置より、中止対象データ処理の個数が示され
た条件付き完了可能情報を受信し、 前記指定部は、前記条件付き完了可能情報に示された前
記中止対象データ処理の個数に基づき、前記候補データ
処理装置を選択することを特徴とする請求項4に記載の
管理装置。
6. The communication unit receives, from at least one or more data processing devices, conditional completion enable information indicating the number of data processes to be aborted, and the designation unit receives the conditional completion enable information. 5. The management device according to claim 4, wherein the candidate data processing device is selected based on the number of the data processing to be stopped indicated in (b).
【請求項7】 前記通信部は、前記候補データ処理装置
以外のいずれかのデータ処理装置より、前記候補データ
処理装置の中止対象データ処理の予測完了時期を通知す
る候補予測完了時期情報を受信し、 前記指定部は、前記候補予測完了時期情報に基づき、前
記候補予測完了時期情報を送信したデータ処理装置のう
ちいずれかのデータ処理装置を前記候補データ処理装置
の中止対象データ処理の移行先に指定することを特徴と
する請求項4に記載の管理装置。
7. The communication unit receives, from one of the data processing devices other than the candidate data processing device, candidate prediction completion time information for notifying the prediction completion time of the stop target data processing of the candidate data processing device. The designation unit is configured to, based on the candidate prediction completion time information, set any one of the data processing devices that transmitted the candidate prediction completion time information to a migration destination of the candidate data processing device to be canceled. The management device according to claim 4, wherein the management device is designated.
【請求項8】 前記通信部は、少なくとも一つ以上のデ
ータ処理装置より、少なくとも一つ以上の中止対象デー
タ処理と各中止対象データ処理の完了期限とが示された
条件付き完了可能情報を受信し、 前記指定部は、少なくとも一つ以上の中止対象データ処
理と各中止対象データ処理の完了期限とが示された条件
付き完了可能情報を送信したデータ処理装置のうちいず
れかのデータ処理装置を前記候補データ処理装置として
選択し、 前記通信部は、前記候補データ処理装置以外のいずれか
のデータ処理装置より、前記候補データ処理装置の各中
止対象データ処理を各中止対象データの完了期限前に完
了させることができる旨を通知する候補完了可能情報を
受信し、 前記指定部は、前記候補完了可能情報を送信したデータ
処理装置のうちいずれかのデータ処理装置を前記候補デ
ータ処理装置の中止対象データ処理の移行先に指定する
ことを特徴とする請求項4に記載の管理装置。
8. The communication unit receives, from at least one or more data processing devices, conditional completion possible information indicating at least one or more stop target data processes and a completion deadline of each stop target data process. The designation unit may include any one of the data processing devices that transmitted the conditional completion enable information indicating at least one or more stop target data processes and the completion deadline of each stop target data process. Select as the candidate data processing device, the communication unit, from any one of the data processing device other than the candidate data processing device, each stop target data processing of the candidate data processing device before the completion deadline of each stop target data Receiving the candidate completion possible information for notifying that the candidate completion can be completed, the designation unit includes any one of the data processing apparatuses that transmitted the candidate completion possible information The management apparatus according to claim 4, wherein the data processing apparatus is designated as a migration destination of the data processing to be canceled of the candidate data processing apparatus.
【請求項9】 前記通信部は、少なくとも一つ以上のデ
ータ処理装置より、複数の中止対象データ処理と前記複
数の中止対象データ処理に対して共通に定められた共通
完了期限が示された条件付き完了可能情報を受信し、 前記指定部は、複数の中止対象データ処理と複数の中止
対象データ処理に対する共通完了期限が示された条件付
き完了可能情報を送信したいずれかのデータ処理装置を
前記候補データ処理装置として選択し、 前記通信部は、前記候補データ処理装置以外のいずれか
のデータ処理装置より、前記候補データ処理装置の複数
の中止対象データ処理を共通完了期限前に完了させるこ
とができる旨を通知する候補完了可能情報を受信し、 前記指定部は、前記候補完了可能情報を送信したデータ
処理装置のうちいずれかのデータ処理装置を前記候補デ
ータ処理装置の複数の中止対象データ処理の移行先に指
定することを特徴とする請求項4に記載の管理装置。
9. The communication unit according to claim 1, wherein at least one or more data processing devices indicate a plurality of stop target data processes and a common completion time limit commonly defined for the plurality of stop target data processes. The designation unit receives any of the data processing devices that transmitted conditional completion possible information indicating a plurality of stop target data processes and a common completion deadline for the plurality of stop target data processes. The communication unit may be selected as a candidate data processing device, and the communication unit may complete a plurality of stop target data processes of the candidate data processing device by a data processing device other than the candidate data processing device before a common completion deadline. Receiving the candidate completion possible information for notifying that the candidate completion possible information is transmitted, and 5. The management apparatus according to claim 4, wherein the apparatus is designated as a migration destination of a plurality of data to be canceled of the candidate data processing apparatus.
【請求項10】 前記管理装置は、データ処理要求を送
信する少なくとも一つ以上のデータ処理要求装置に接続
され、 前記通信部は、いずれかのデータ処理要求装置よりデー
タ処理要求を受信するとともに、各データ処理装置に対
して受信したデータ処理要求に基づくデータ処理の予測
完了時期の算出要求を送信することを特徴とする請求項
1に記載の管理装置。
10. The management device is connected to at least one or more data processing request devices that transmit a data processing request, and the communication unit receives a data processing request from one of the data processing request devices, 2. The management apparatus according to claim 1, wherein a request for calculating a prediction completion time of data processing based on the received data processing request is transmitted to each data processing apparatus.
【請求項11】 前記通信部は、いずれかのデータ処理
装置よりデータ処理要求を受信するとともに、前記デー
タ処理要求を送信したデータ処理装置以外のデータ処理
装置に対して受信したデータ処理要求に基づくデータ処
理の予測完了時期の算出要求を送信することを特徴とす
る請求項1に記載の管理装置。
11. The communication unit receives a data processing request from one of the data processing devices, and based on a data processing request received from a data processing device other than the data processing device that transmitted the data processing request. The management device according to claim 1, wherein the management device transmits a calculation request for a prediction completion time of the data processing.
【請求項12】 前記管理装置は、更に、 データ処理要求に基づき所定のデータ処理を行うデータ
処理部と、 前記データ処理部によるデータ処理の予測完了時期を算
出し、算出した予測完了時期を自装置予測完了時期情報
として前記指定部に出力する完了時期予測部とを有し、 前記指定部は、前記完了時期予測部より前記自装置予測
完了時期情報を取得し、取得した自装置予測完了時期情
報と前記通信部により受信された予測完了時期情報とに
基づき、前記複数のデータ処理装置及び前記管理装置の
中から前記指定データ処理装置を指定することを特徴と
する請求項1に記載の管理装置。
12. The management apparatus further calculates a data processing unit that performs predetermined data processing based on a data processing request, calculates a prediction completion time of data processing by the data processing unit, and automatically calculates the calculated prediction completion time. A completion time prediction unit that outputs to the designation unit as device prediction completion time information, wherein the designation unit acquires the own device prediction completion time information from the completion time prediction unit, and acquires the acquired own device prediction completion time. The management according to claim 1, wherein the designated data processing device is designated from among the plurality of data processing devices and the management device based on information and the prediction completion time information received by the communication unit. apparatus.
【請求項13】 前記管理装置は、更に、 データ処理要求に基づき所定のデータ処理を行うデータ
処理部と、 前記データ処理部が前記期限付きデータ処理を前記完了
期限前に完了させることができるか否か判断し、判断結
果に応じて前記データ処理部が前記期限付きデータ処理
を前記完了期限前に完了させることができるを旨を通知
する自装置完了可能情報を前記指定部に出力する完了可
否判断部とを有し、 前記指定部は、前記完了可否判断部より前記自装置完了
可能情報を取得し、取得した自装置完了可能情報と前記
通信部により受信された完了可能情報とに基づき、前記
複数のデータ処理装置及び前記管理装置の中から前記指
定データ処理装置を指定することを特徴とする請求項2
に記載の管理装置。
13. The management device, further comprising: a data processing unit that performs predetermined data processing based on a data processing request; and whether the data processing unit can complete the time-limited data processing before the completion time limit. Whether or not the data processing unit outputs self-apparatus completion enable information to the designation unit to notify that the time-limited data processing can be completed before the completion time limit according to the determination result. Having a determination unit, the designation unit acquires the own device completion possibility information from the completion possibility determination unit, based on the acquired own device completion possibility information and the completion possibility information received by the communication unit, 3. The designated data processing device is designated from among the plurality of data processing devices and the management device.
Management apparatus according to.
【請求項14】 データ処理要求に基づき所定のデータ
処理を行う複数のデータ処理装置と、前記複数のデータ
処理装置を管理し、データ処理要求ごとにデータ処理を
行うデータ処理装置を指定データ処理装置として指定す
る管理装置とを有するデータ処理システムであって、 前記管理装置は、 前記複数のデータ処理装置に対して、データ処理の完了
期限が定められた期限付きデータ処理要求に基づく期限
付きデータ処理を前記完了期限前に完了させることがで
きるか否かを問い合わせる完了可否問い合わせを送信
し、 各データ処理装置は、 前記完了可否問い合わせに基づき前記期限付きデータ処
理の予測完了時期を計測し、 計測した予測完了時期に基づき、前記完了期限前に前記
期限付きデータ処理を完了させることができるか否かを
判断し、 前記完了期限前に前記期限付きデータ処理を完了させる
ことができる場合に、前記予測完了時期を含み、前記完
了期限前に前記期限付きデータ処理を完了させることが
できる旨を通知する完了可能情報を前記管理装置に対し
て送信し、 前記管理装置は、 完了可能情報に含まれた予測完了時期に基づき、完了可
能情報を送信したデータ処理装置のうちいずれかのデー
タ処理装置を前記期限付きデータ処理を行う指定データ
処理装置として指定することを特徴とするデータ処理シ
ステム。
14. A designated data processing device comprising: a plurality of data processing devices for performing predetermined data processing based on a data processing request; and a data processing device for managing the plurality of data processing devices and performing data processing for each data processing request. A data processing system comprising: a management device that designates the data processing device as a data processing system, the management device comprising: Transmits a completion permission / inquiry inquiry as to whether or not the completion can be completed before the completion deadline.Each data processing device measures and estimates the predicted completion time of the time-limited data processing based on the completion permission / inhibition inquiry. Based on the predicted completion time, it is determined whether the time-limited data processing can be completed before the completion time limit. In the case where the time-limited data processing can be completed before the completion time limit, the completion including the predicted completion time and notifying that the time-limited data processing can be completed before the completion time limit can be completed. Transmitting the information to the management device, and the management device transmits one of the data processing devices that transmitted the completion possibility information to the management device based on the predicted completion time included in the completion possibility information with the time limit. A data processing system, which is designated as a designated data processing device for performing data processing.
【請求項15】 各データ処理装置は、 前記完了期限前に前記期限付きデータ処理を完了させる
ことができない場合に、各データ処理装置が実行を予定
している少なくとも一つ以上のデータ処理の実行を中止
すれば前記期限付きデータ処理を前記完了期限前に完了
させることができるか否かを判断し、 実行を予定している少なくとも一つ以上のデータ処理の
実行を中止すれば前記期限付きデータ処理を前記完了期
限前に完了させることができる場合に、実行中止の対象
となる少なくとも一つ以上の中止対象データ処理に関す
る情報を含み、前記中止対象データ処理の実行を中止す
れば前記期限付きデータ処理を前記完了期限前に完了さ
せることができる旨を通知する条件付き完了可能情報を
前記管理装置に送信し、 前記管理装置は、 条件付き完了可能情報を送信したデータ処理装置のうち
いずれかのデータ処理装置を候補データ処理装置として
選択し、前記候補データ処理装置の中止対象データ処理
を他のいずれかのデータ処理装置へ移行できるか否かを
判断し、前記候補データ処理装置の中止対象データ処理
を他のいずれかのデータ処理装置へ移行できる場合に前
記候補データ処理装置を前記指定データ処理装置として
指定することを特徴とする請求項14に記載のデータ処
理装置。
15. When each data processing device cannot complete the time-limited data processing before the completion time limit, each data processing device executes at least one or more data processes scheduled to be executed by each data processing device. If it is determined that the time-limited data processing can be completed before the completion time limit, the execution of at least one or more data processing scheduled to be performed is stopped. If the processing can be completed before the completion deadline, the information including at least one or more stop target data processing to be canceled and including the information on the stop target data processing, if the execution of the stop target data processing is stopped, the time-limited data The management device transmits conditional completion possible information notifying that the process can be completed before the completion deadline, and the management device Select one of the data processing devices that have transmitted the completion possibility information as a candidate data processing device, and determine whether or not the candidate data processing device's suspension target data processing can be transferred to any other data processing device Determining whether the candidate data processing device can be transferred to any of the other data processing devices by the candidate data processing device, and specifying the candidate data processing device as the designated data processing device. 15. The data processing device according to 14.
【請求項16】 各データ処理装置は、データ処理要求
を送信する少なくとも一つ以上のデータ処理要求装置に
接続され、 各データ処理装置は、 いずれかのデータ処理要求装置よりデータ処理の完了期
限が定められた期限付きデータ処理要求を受信し、受信
した期限付きデータ処理要求に基づく期限付きデータ処
理を前記完了期限前に完了させることができるか否かを
判断し、 前記完了期限前に前記期限付きデータ処理を完了させる
ことができない場合に、前記期限付きデータ処理要求を
前記管理装置に対して転送し、 前記管理装置は、 前記期限付きデータ処理要求を転送したデータ処理装置
以外のデータ処理装置に対して、前記期限付きデータ処
理を前記完了期限前に完了させることができるか否かを
問い合わせる完了可否問い合わせを送信することを特徴
とする請求項14に記載のデータ処理システム。
16. Each data processing device is connected to at least one or more data processing request devices for transmitting a data processing request, and each data processing device has a data processing completion deadline from one of the data processing request devices. Receiving a data processing request with a fixed time limit, determining whether it is possible to complete the data processing with a time limit based on the received data processing request with a time limit before the completion time limit, and When the time-limited data processing cannot be completed, the time-limited data processing request is transferred to the management device; and the management device is a data processing device other than the data processing device that has transferred the time-limited data processing request. In response to this, a completion availability inquiry asking whether or not the time-limited data processing can be completed before the completion time limit is issued. Data processing system according to claim 14, characterized in that the signal.
【請求項17】 各データ処理装置は、データ処理要求
を送信する少なくとも一つ以上のデータ処理要求装置に
接続され、 各データ処理装置は、 いずれかのデータ処理要求装置よりデータ処理の完了期
限が定められた期限付きデータ処理要求を受信し、受信
した期限付きデータ処理要求に基づく期限付きデータ処
理を前記完了期限前に完了させることができるか否かを
判断し、 前記完了期限前に前記期限付きデータ処理を完了させる
ことができない場合に、各データ処理装置が実行を予定
している少なくとも一つ以上のデータ処理の実行を中止
すれば前記期限付きデータ処理を前記完了期限前に完了
させることができるか否かを判断し、 実行を予定している少なくとも一つ以上のデータ処理の
実行を中止すれば前記期限付きデータ処理を前記完了期
限前に完了させることができる場合に、実行中止の対象
となる少なくとも一つ以上の中止対象データ処理を所定
の完了期限前に完了させることを要求するデータ処理要
求を前記管理装置に対して送信し、 前記管理装置は、 各データ処理装置より前記中止対象データ処理のデータ
処理要求を受信し、前記中止対象データ処理のデータ処
理要求を送信したデータ処理装置以外のデータ処理装置
に対して、前記中止対象データ処理を前記完了期限前に
完了させることができるか否かを問い合わせる完了可否
問い合わせを送信することを特徴とする請求項14に記
載のデータ処理システム。
17. Each data processing device is connected to at least one or more data processing request devices for transmitting a data processing request, and each data processing device has a data processing completion deadline from one of the data processing request devices. Receiving a data processing request with a fixed time limit, determining whether it is possible to complete the data processing with a time limit based on the received data processing request with a time limit before the completion time limit, and When the data processing with a term cannot be completed, if the execution of at least one or more data processing scheduled by each data processing device is stopped, the data processing with a term is completed before the completion time limit. Judge whether or not the processing of at least one or more scheduled data processing is stopped, and When the completion can be completed before the completion deadline, a data processing request requesting that the at least one or more stop target data processing to be canceled is completed before a predetermined completion deadline to the management device. Transmitting, the management device receives a data processing request of the stop target data processing from each data processing device, and for a data processing device other than the data processing device that has transmitted the data processing request of the stop target data processing, 15. The data processing system according to claim 14, wherein a completion permission inquiry is transmitted to inquire whether the suspension target data processing can be completed before the completion deadline.
【請求項18】 データ処理要求に基づき所定のデータ
処理を行う複数のデータ処理装置を管理し、データ処理
要求ごとにデータ処理を行うデータ処理装置を指定デー
タ処理装置として指定する管理方法であって、 データ処理要求ごとにデータ処理の予測完了時期を示す
予測完了時期情報を少なくとも一つ以上のデータ処理装
置より受信する通信ステップと、 前記予測完了時期情報に基づき、データ処理要求ごとに
指定データ処理装置を指定し、指定データ処理装置にデ
ータ処理要求に基づくデータ処理を行わせる指定ステッ
プとを有することを特徴とする管理方法。
18. A management method for managing a plurality of data processing devices that perform predetermined data processing based on a data processing request and designating a data processing device that performs data processing for each data processing request as a designated data processing device. A communication step of receiving, from at least one data processing device, prediction completion time information indicating a prediction completion time of data processing for each data processing request; and a designated data processing for each data processing request based on the prediction completion time information. And a designation step of designating a device and causing the designated data processing device to perform data processing based on the data processing request.
【請求項19】 前記通信ステップは、少なくとも一つ
以上のデータ処理装置より、データ処理の完了期限が定
められた期限付きデータ処理要求に基づく期限付きデー
タ処理を前記完了期限前に完了させることができる旨を
通知する完了可能情報を受信し、 前記指定ステップは、前記完了可能情報を送信したデー
タ処理装置のうちいずれかのデータ処理装置を前記期限
付きデータ処理を行う指定データ処理装置として指定す
ることを特徴とする請求項18に記載の管理方法。
19. The communication step, wherein at least one or more data processing devices complete term-limited data processing based on a term-limited data processing request in which a term of completion of data processing is determined before the completion term. Receiving the completion possible information notifying that the completion possible information is transmitted, and the specifying step specifies one of the data processing apparatuses transmitting the completion possible information as the specified data processing apparatus that performs the time-limited data processing The management method according to claim 18, wherein:
【請求項20】 前記通信ステップは、少なくとも一つ
以上のデータ処理装置より、それぞれのデータ処理装置
が実行を予定している少なくとも一つ以上のデータ処理
の実行を中止すれば前記期限付きデータ処理を前記完了
期限前に完了させることができる旨を通知する条件付き
完了可能情報を受信し、 前記指定ステップは、前記条件付き完了可否情報を送信
したデータ処理装置のうちいずれかのデータ処理装置を
前記期限付きデータ処理を行う指定データ処理装置とし
て指定することを特徴とする請求項19に記載の管理方
法。
20. The time-limited data processing when the execution of at least one or more data processing scheduled to be executed by each of the at least one data processing apparatus is stopped by the at least one or more data processing apparatuses. Receiving the conditional completion possible information notifying that the completion can be completed before the completion deadline, and the specifying step includes any one of the data processing apparatuses that transmitted the conditional completion feasibility information. 20. The management method according to claim 19, wherein the management method is designated as a designated data processing device that performs the time-limited data processing.
【請求項21】 前記通信ステップは、少なくとも一つ
以上のデータ処理装置より、それぞれのデータ処理装置
において実行中止の対象となる少なくとも一つ以上の中
止対象データ処理に関する情報を含む条件付き完了可能
情報を受信し、 前記指定ステップは、前記条件付き完了可能情報を送信
したデータ処理装置のうちいずれかのデータ処理装置を
候補データ処理装置として選択し、前記候補データ処理
装置の中止対象データ処理を他のいずれかのデータ処理
装置へ移行できるか否かを判断し、前記候補データ処理
装置の中止対象データ処理を他のいずれかのデータ処理
装置へ移行できる場合に前記候補データ処理装置を前記
指定データ処理装置として指定することを特徴とする請
求項20に記載の管理方法。
21. The communication step, wherein at least one or more data processing devices execute conditional completion possible information including information on at least one or more stop target data processes whose execution is to be stopped in each data processing device. And the specifying step selects any one of the data processing devices that have transmitted the conditional completion possible information as a candidate data processing device, and selects another candidate data processing of the candidate data processing device. Judge whether it is possible to shift to any one of the data processing devices, and when the data processing to be stopped of the candidate data processing device can be shifted to any other data processing device, the candidate data processing device 21. The management method according to claim 20, wherein the management method is designated as a processing device.
【請求項22】 データ処理要求に基づき所定のデータ
処理を行う複数のデータ処理装置を管理し、データ処理
要求ごとにデータ処理を行うデータ処理装置を指定デー
タ処理装置として指定する管理方法をコンピュータに実
行させるためのプログラムであって、 データ処理要求ごとにデータ処理の予測完了時期を示す
予測完了時期情報を少なくとも一つ以上のデータ処理装
置より受信する通信ステップと、 前記予測完了時期情報に基づき、データ処理要求ごとに
指定データ処理装置を指定し、指定データ処理装置にデ
ータ処理要求に基づくデータ処理を行わせる指定ステッ
プとを有する管理方法をコンピュータに実行させるため
のプログラム。
22. A computer which manages a plurality of data processing apparatuses which perform predetermined data processing based on a data processing request and designates a data processing apparatus which performs data processing for each data processing request as a designated data processing apparatus. A program for executing, based on the prediction completion time information, a communication step of receiving, from at least one or more data processing devices, prediction completion time information indicating a prediction completion time of data processing for each data processing request. A program for causing a computer to execute a management method having a designation step of designating a designated data processing device for each data processing request and causing the designated data processing device to perform data processing based on the data processing request.
JP2001145764A 2001-05-16 2001-05-16 Management device, data processing system, management method and program for making computer perform management method Withdrawn JP2002342098A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001145764A JP2002342098A (en) 2001-05-16 2001-05-16 Management device, data processing system, management method and program for making computer perform management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001145764A JP2002342098A (en) 2001-05-16 2001-05-16 Management device, data processing system, management method and program for making computer perform management method

Publications (1)

Publication Number Publication Date
JP2002342098A true JP2002342098A (en) 2002-11-29

Family

ID=18991520

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001145764A Withdrawn JP2002342098A (en) 2001-05-16 2001-05-16 Management device, data processing system, management method and program for making computer perform management method

Country Status (1)

Country Link
JP (1) JP2002342098A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005208834A (en) * 2004-01-21 2005-08-04 Sony Corp Distributed processing system and method, data processor and terminal equipment
JP2010262571A (en) * 2009-05-11 2010-11-18 Hitachi Ltd Service providing system and method
WO2012014312A1 (en) * 2010-07-30 2012-02-02 富士通株式会社 Multi-core processor system, allocation program, control program, allocation method and control method
JP2013114627A (en) * 2011-11-30 2013-06-10 Fujitsu Ltd Server device, movement control program and movement control method
JP2016506557A (en) * 2012-11-26 2016-03-03 サイクル コンピューティング,エルエルシー Transparent routing of job submissions between different environments
JP2016507121A (en) * 2013-02-11 2016-03-07 アマゾン・テクノロジーズ・インコーポレーテッド Cost minimizing task scheduler
CN105930289A (en) * 2010-07-30 2016-09-07 富士通株式会社 Multi-core processor system, allocation program, control program, allocation method, and control method
US9465646B2 (en) 2012-03-19 2016-10-11 Fujitsu Limited Detection apparatus, notification method, and computer product
WO2020148933A1 (en) * 2019-01-17 2020-07-23 三菱電機株式会社 Information processing system and information processing device

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4534495B2 (en) * 2004-01-21 2010-09-01 ソニー株式会社 Distributed processing system and method, data processing device, terminal device
JP2005208834A (en) * 2004-01-21 2005-08-04 Sony Corp Distributed processing system and method, data processor and terminal equipment
JP2010262571A (en) * 2009-05-11 2010-11-18 Hitachi Ltd Service providing system and method
CN105930289A (en) * 2010-07-30 2016-09-07 富士通株式会社 Multi-core processor system, allocation program, control program, allocation method, and control method
WO2012014312A1 (en) * 2010-07-30 2012-02-02 富士通株式会社 Multi-core processor system, allocation program, control program, allocation method and control method
CN103026340A (en) * 2010-07-30 2013-04-03 富士通株式会社 Multi-core processor system, allocation program, control program, allocation method and control method
JP5516737B2 (en) * 2010-07-30 2014-06-11 富士通株式会社 Processor system, control program, and control method
US9170965B2 (en) 2010-07-30 2015-10-27 Fujitsu Limited Interrupt assigning method, interrupt control method, and system therefor
US9772964B2 (en) 2010-07-30 2017-09-26 Fujitsu Limited Multicore processor system, computer product, assigning method, and control method
CN103026340B (en) * 2010-07-30 2016-05-04 富士通株式会社 Multi-core processor system, allocator, control program, distribution method and control method
JP2013114627A (en) * 2011-11-30 2013-06-10 Fujitsu Ltd Server device, movement control program and movement control method
US9465646B2 (en) 2012-03-19 2016-10-11 Fujitsu Limited Detection apparatus, notification method, and computer product
JP2016506557A (en) * 2012-11-26 2016-03-03 サイクル コンピューティング,エルエルシー Transparent routing of job submissions between different environments
JP2016507121A (en) * 2013-02-11 2016-03-07 アマゾン・テクノロジーズ・インコーポレーテッド Cost minimizing task scheduler
JP2018163697A (en) * 2013-02-11 2018-10-18 アマゾン・テクノロジーズ・インコーポレーテッド Cost-minimizing task scheduler
US10552774B2 (en) 2013-02-11 2020-02-04 Amazon Technologies, Inc. Cost-minimizing task scheduler
WO2020148933A1 (en) * 2019-01-17 2020-07-23 三菱電機株式会社 Information processing system and information processing device

Similar Documents

Publication Publication Date Title
US7185046B2 (en) Submitting jobs in a distributed computing environment
Cao et al. Gridflow: Workflow management for grid computing
US20050188087A1 (en) Parallel processing system
US7085831B2 (en) Intelligent system control agent for managing jobs on a network by managing a plurality of queues on a client
US11954535B2 (en) Systems, devices, and methods for execution of tasks in an internet-of-things (IOT) environment
Wang et al. Joint server assignment and resource management for edge-based MAR system
JP2002342098A (en) Management device, data processing system, management method and program for making computer perform management method
WO2018061825A1 (en) Distributed processing system, distributed processing method, and recording medium
JP4410608B2 (en) Web service providing method
JP2017168074A (en) Method and apparatus for controlling data transmission
Avasalcai et al. Latency-aware distributed resource provisioning for deploying IoT applications at the edge of the network
Awada et al. Resource-aware multi-task offloading and dependency-aware scheduling for integrated edge-enabled IoV
EP1607880A1 (en) Decentralized processing control device, decentralized processing control method, decentralized processing control program
Gezer et al. Real-time edge framework (RTEF): task scheduling and realisation
JPH09288648A (en) Distributed processing method in network and its system
JP2004102506A (en) Program, information processing method and device
CN112835707A (en) Load scheduling method and device for distributed system, computer storage medium and equipment
JP5045576B2 (en) Multiprocessor system and program execution method
JPH09138776A (en) Load distribution system for transaction processing
JP2009064310A (en) Data communication method and client/server system
JPH0855091A (en) Distributed processing system and load distributing method for this system
JPH0434640A (en) Calculation server host selecting system
JP3741818B2 (en) Information distribution response system with many computers participating
JPH11296349A (en) Parallel installation system of parallel computer
Vallabhajosyula et al. Reference Implementation of Smart Scheduler: A CI-Aware, AI-Driven Scheduling Framework for HPC Workloads

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20051019

A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20080805