JP2002332713A - Mounting structure for ceiling membrane - Google Patents

Mounting structure for ceiling membrane

Info

Publication number
JP2002332713A
JP2002332713A JP2001137166A JP2001137166A JP2002332713A JP 2002332713 A JP2002332713 A JP 2002332713A JP 2001137166 A JP2001137166 A JP 2001137166A JP 2001137166 A JP2001137166 A JP 2001137166A JP 2002332713 A JP2002332713 A JP 2002332713A
Authority
JP
Japan
Prior art keywords
ceiling
frame
film material
membrane material
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001137166A
Other languages
Japanese (ja)
Other versions
JP4698060B2 (en
Inventor
Toshiaki Shimada
敏秋 島田
Koichi Miyasato
光一 宮里
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyo Kogyo Co Ltd
Original Assignee
Taiyo Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyo Kogyo Co Ltd filed Critical Taiyo Kogyo Co Ltd
Priority to JP2001137166A priority Critical patent/JP4698060B2/en
Publication of JP2002332713A publication Critical patent/JP2002332713A/en
Application granted granted Critical
Publication of JP4698060B2 publication Critical patent/JP4698060B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To attractively and efficiently install ceiling membrane materials. SOLUTION: A plurality sheets of ceiling membrane material units 10 in which internal membrane materials 5 are extensively installed in a frame body frame 11 formed by fixing the end parts of the membrane materials 5 into membrane material fixing grooves 13 formed in the peripheral edges of the frame body frame 11 are fixed to frame fixing pieces 15 fixed to ceiling structural materials 3 at positions corresponding to suspension pieces 16 through the suspension pieces 16 installed on the ceiling membrane material units 10. The ceiling corner bead portions covered with the ceiling membrane material units 10 are covered with the corner bead decorative materials 20.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は天井膜材の取付構造
に係り、特に室内天井の内装材として不燃性の膜材を用
いて効率よく見栄えの良い天井の内装を行えるようにし
た天井膜材の取付構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a ceiling film mounting structure, and more particularly to a ceiling film material capable of efficiently providing a good-looking ceiling interior by using a nonflammable film material as an interior ceiling interior material. Mounting structure.

【0002】[0002]

【従来の技術及び発明が解決しようとする課題】従来、
天井は上部の構造材を覆い、かつ室内の美観を高めるた
めにクロス張り、ボード張り等の仕上げ材によって仕上
げられている。また天井は一般に水平面で構成され、仕
上げ材の自重を考慮した取り付けを行うため、使用する
内装材料に応じたしっかりとした下地材の施工が必要と
なってくる。また、クロス内装張り等の場合には下地の
良否により仕上げの出来映えが大きく左右するため、下
地工事を含め、手間のかかる作業となっていた。
2. Description of the Related Art
The ceiling is finished with a cloth covering, board covering or the like to cover the upper structural material and enhance the aesthetics of the room. In addition, the ceiling is generally formed of a horizontal surface, and the mounting is performed in consideration of the own weight of the finishing material. Therefore, it is necessary to construct a solid base material according to the interior material to be used. Further, in the case of a cloth interior covering or the like, the quality of the finish greatly depends on the quality of the groundwork, so that the work including the groundwork is time-consuming.

【0003】これに対して出願人は不燃性膜材を用いた
所定寸法の天井膜材ユニットを開発し、これらの天井膜
材ユニットを構造材の一部に取り付けていくことによ
り、見栄えの良い天井仕上げを実現することを目指し
た。そこで、本発明の目的は上述した従来の技術が有す
る問題点を解消し、迅速な施工が行え、取り付け後も見
栄えの良い天井膜材の取付構造を提供することにある。
On the other hand, the applicant has developed a ceiling film material unit having a predetermined size using a non-combustible film material, and by attaching these ceiling film material units to a part of the structural material, the appearance is improved. The goal was to achieve a ceiling finish. SUMMARY OF THE INVENTION An object of the present invention is to solve the above-mentioned problems of the prior art, to provide a mounting structure of a ceiling membrane material which can be quickly constructed and has a good appearance even after the mounting.

【0004】[0004]

【課題を解決するための手段】上記目的を達成するため
に、本発明は枠体フレームの周縁に形成された膜材定着
溝内に膜材の端部を定着して前記枠体フレームに内装膜
材が張設された複数枚の天井膜材ユニットを、該天井膜
材ユニットに取着された吊りピースを介して、天井構造
材の前記吊りピースに対応する位置に固定されたフレー
ム固定手段に係止させるとともに、見切り縁化粧材で前
記天井膜材ユニットで覆われた天井見切り部分を覆って
取り付けたことを特徴とする。
SUMMARY OF THE INVENTION In order to achieve the above object, the present invention fixes an end portion of a film material in a film material fixing groove formed on a peripheral edge of the frame frame and installs the film material inside the frame frame. Frame fixing means for fixing a plurality of ceiling membrane material units on which the membrane material is stretched, via suspension pieces attached to the ceiling membrane material unit, at positions corresponding to the suspension pieces of the ceiling structural material. And a ceiling parting part covered with the ceiling film material unit and covered with a parting edge decorative material.

【0005】また、別発明として、枠体フレームの周縁
に形成された膜材定着溝内に膜材の端部を定着して前記
枠体フレームに内装膜材が張設された複数枚の天井膜材
ユニットを、該天井膜材ユニットに取着された吊りピー
スを介して、天井構造材の回り縁の前記吊りピースに対
応する位置に固定されたフレーム固定手段に係止させる
とともに、見切り縁化粧材で前記天井膜材ユニットで覆
われた天井見切り部分を覆って取り付けたことを特徴と
する。
Further, as another invention, a plurality of ceilings having an interior film material stretched on the frame frame by fixing an end portion of the film material in a film material fixing groove formed on a peripheral edge of the frame frame. The film material unit is locked to frame fixing means fixed at a position corresponding to the hanging piece on the peripheral edge of the ceiling structural material via a hanging piece attached to the ceiling film material unit, and The ceiling parting part covered with the ceiling membrane material unit is covered with a material and attached.

【0006】このとき、前記回り縁の対向する位置にワ
イヤを掛け渡し、該ワイヤに前記天井膜材ユニットの吊
りピースの一部を係止させて天井膜材ユニットの落下防
止手段とすることが好ましい。
At this time, it is preferable that a wire is wrapped around a position facing the peripheral edge, and a part of the suspension piece of the ceiling film material unit is locked to the wire to provide a means for preventing the ceiling film material unit from falling. .

【0007】以上の場合、前記天井膜材ユニットは、蝶
番を介して半割形状で施工場所に搬入され、前記蝶番部
分で広げて全寸法として前記構造材のフレーム固定ピー
ス部分に取り付けるようにすることが好ましい。
In the above case, the ceiling membrane material unit is carried into the construction site in a half-split shape via a hinge, spread at the hinge portion, and attached to the frame fixing piece portion of the structural material as a whole. Is preferred.

【0008】前記蝶番は、合成ゴム製プレートを前記枠
体フレーム内に配置した構造とすることが好ましい。
It is preferable that the hinge has a structure in which a synthetic rubber plate is disposed in the frame.

【0009】[0009]

【発明の実施の形態】以下、本発明の天井膜材の取付構
造の実施の形態について、新設時、改修時を例にそれぞ
れにおいて使用される部材の構成について、添付図面を
参照して説明する。 [新設天井膜材の施工]図1は、天井内装の新設時に、
本発明の天井膜材をユニット化し、所定枚数の天井膜材
ユニットを天井部分に取り付けた施工例を示した平面図
である。同図中、A部分は天井部分を上部構造材側から
下方に向けて見た平面図で、B部分は室内側から天井を
見上げた見上げ平面図である。B部分では、天井面を覆
う天井膜材ユニット10の天井1と壁2との見切り部分
に沿って見切り縁化粧材20が取り付けられている。一
方、A部分では、各天井膜材ユニット10の枠体フレー
ム11を上部構造材(図示せず)に固定するためのフレ
ーム固定ピース15が所定間隔をあけて配設されてい
る。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an exploded perspective view showing an embodiment of a ceiling membrane mounting structure according to the present invention, with reference to the attached drawings. . [Construction of new ceiling film material]
It is the top view which showed the construction example which unitized the ceiling film material of this invention and attached the predetermined number of ceiling film material units to the ceiling part. In the figure, part A is a plan view of the ceiling viewed downward from the upper structural material side, and part B is a plan view of the ceiling looking up from the indoor side. In the part B, the parting edge decorative material 20 is attached along the parting part between the ceiling 1 and the wall 2 of the ceiling membrane material unit 10 covering the ceiling surface. On the other hand, in part A, frame fixing pieces 15 for fixing the frame 11 of the ceiling membrane material unit 10 to the upper structural material (not shown) are arranged at predetermined intervals.

【0010】天井膜材ユニット10は、本実施の形態で
は900mm×2600mmの長方形状の枠体フレーム11
に所定の規格を満たした合成繊維織布等の膜材を張設し
たもので、図1に示したように、4枚の天井膜材ユニッ
ト10を並べて天井1全体を覆うことができるようにな
っている。枠体フレーム11は、図2,図3に示したよ
うな扁平中空長方形断面からなるアルミニウム製型材を
組み立てたもので、図1に示したように、剛性保持のた
めに3本の中間継材12が取り付けられている。また、
枠体フレーム11の外周を一周するように膜材定着溝1
3が形成されている。この膜材定着溝13の縁には係止
爪13aが形成されており、図4各図に示したように、
膜材5の端部5aを膜材定着溝13内に収容させた状態
で膜材押えバー14を膜材定着溝13内にはめ込むこと
により、それぞれの係止爪13a、14a同士が係合し
て膜材端部5aをフレームに定着させることができる。
なお、膜材としては不燃性能等の要求仕様を満たす素材
で、張設可能な材料であれば各種のものを選択すること
ができる。
In this embodiment, the ceiling film material unit 10 is a rectangular frame 11 mm of 900 mm × 2600 mm.
In FIG. 1, four ceiling membrane units 10 are arranged so that the entire ceiling 1 can be covered, as shown in FIG. Has become. The frame body frame 11 is formed by assembling aluminum mold members having a flat hollow rectangular cross section as shown in FIGS. 2 and 3, and as shown in FIG. 12 are attached. Also,
The film material fixing groove 1 extends around the outer periphery of the frame 11.
3 are formed. A locking claw 13a is formed at the edge of the film material fixing groove 13, and as shown in each of FIGS.
When the end portion 5a of the film material 5 is accommodated in the film material fixing groove 13 and the film material holding bar 14 is fitted into the film material fixing groove 13, the respective locking claws 13a and 14a engage with each other. Thus, the film material end 5a can be fixed to the frame.
As the film material, various materials can be selected as long as they can meet the required specifications such as noncombustibility and can be stretched.

【0011】図2,図3は、図4(a)に示した天井膜
材ユニット10をコンクリート躯体等の構造材3に取り
付けるための取付構造の詳細と各部材の取り合いを示し
た部分斜視図である。図2,図3に示したように、天井
膜材ユニット10は構造材3側の複数箇所にネジ止めに
より取り付けられたフレーム固定ピース15と、天井膜
材ユニット10の上面に取り付けられ、フレーム固定ピ
ース15の係止部に係止する吊りピース16により、天
井空間の所定位置に固定して吊り下げられるようになっ
ている。さらに、図4(a)に示したように、フレーム
固定ピース15の壁際には見切り縁化粧材20の固定ピ
ース17がフレーム固定ピース15と一体的にネジ18
により取り付けられている。
FIGS. 2 and 3 are partial perspective views showing details of a mounting structure for mounting the ceiling membrane material unit 10 shown in FIG. It is. As shown in FIGS. 2 and 3, the ceiling film unit 10 is fixed to a frame fixing piece 15 attached to a plurality of positions on the structural material 3 side by screws, and is attached to the upper surface of the ceiling film unit 10 to fix the frame. The hanging pieces 16 that are locked to the locking portions of the pieces 15 are fixed at predetermined positions in the ceiling space and can be hung. Further, as shown in FIG. 4A, the fixing piece 17 of the parting edge decorative material 20 is integrally screwed with the frame fixing piece 15 on the wall of the frame fixing piece 15.
It is attached by.

【0012】一方、天井膜材ユニット10の上面には部
材長手方向に断面が略L字形の係止レール11aが2本
平行して型材として一体的に形成されており、この係止
レール11aの任意の位置に吊りピース16をネジ止め
することができる。
On the other hand, on the upper surface of the ceiling film material unit 10, two locking rails 11a each having a substantially L-shaped cross section in the longitudinal direction of the member are integrally formed in parallel and integrally as a shape member. The hanging piece 16 can be screwed at any position.

【0013】ここで、フレーム固定ピース15と吊りピ
ース16に設けられた係止爪15a,16aの係止によ
る部材の固定について、図4(a)を参照して説明す
る。同図に示したように、フレーム固定ピース15は構
造材3にネジ18で固定された状態で、下方に向けて延
在する2本の平行な吊りフランジ15Aと、ネジ固定の
ための取付フランジ15Bとを一体的に成形してなる型
材で、特に吊りフランジ15Aの下端には、係止爪15
aが形成され、係止爪15aの肩部分に吊りピース16
の係止爪16aの顎部分を係止して天井膜材ユニット1
0全体を吊持させるようになっている。このとき隣接す
る天井膜材ユニット10,10間の接合部では、両方の
天井膜材ユニット10に取り付けられた吊りピース16
がそれぞれフレーム固定ピース15の係止爪15aに係
止するので、両者の隙間のない接合が可能となる。
Here, the fixing of the members by locking the locking claws 15a, 16a provided on the frame fixing piece 15 and the hanging piece 16 will be described with reference to FIG. As shown in the figure, the frame fixing piece 15 is fixed to the structural member 3 with the screw 18 and has two parallel hanging flanges 15A extending downward and a mounting flange for fixing the screw. 15B and a molding material formed integrally therewith.
a is formed on the shoulder of the locking claw 15a.
Of the ceiling film material unit 1 by locking the jaws of the locking claws 16a
0 is suspended. At this time, at the joint between the adjacent ceiling membrane material units 10, 10, the suspension pieces 16 attached to both the ceiling membrane material units 10 are attached.
Are locked to the locking claws 15a of the frame fixing piece 15, respectively, so that there is no gap between them.

【0014】一方、壁2の際の見切り部分では天井膜材
ユニット10の端部の仕舞いを調整するための縁部材1
9を用いて天井膜材ユニット10をフレーム固定ピース
15に対して遊びが生じないようにしている。さらに、
この縁部材19及び天井膜材ユニット10の端部を隠す
とともに、壁2と天井1との見切りのために見切り縁化
粧材20が取り付けられる。この一定幅の見切り縁化粧
材20を取り付けることにより壁2と天井膜材ユニット
10の端部との間に生じた隙間を覆い、見切り部分の見
栄えを向上させることができる。
On the other hand, in the parting-off portion at the wall 2, an edge member 1 for adjusting the end of the ceiling membrane material unit 10 is adjusted.
9 is used to prevent the ceiling film material unit 10 from causing play with respect to the frame fixing piece 15. further,
The edge member 19 and the end of the ceiling film material unit 10 are hidden, and a parting edge decorative material 20 is attached for parting the wall 2 and the ceiling 1. By attaching the parting edge decorative material 20 having this constant width, the gap generated between the wall 2 and the end of the ceiling membrane material unit 10 can be covered, and the appearance of the parting part can be improved.

【0015】(変形例1)以上に述べた天井膜材ユニッ
ト10では、一旦天井の構造材3に取り付けられた天井
膜材ユニット10は、係止部分で堅固に連結されるの
で、改装等を予定した場合、天井膜材ユニット10の構
造材3からの取り外しが難しい。そこで、必要に応じて
天井膜材ユニット10を構造材3から容易に取り外しで
きるようにした変形例について、図4(b),図5各図
を参照して説明する。図4(b)(図5(a))に示し
たように、フレーム固定ピース15と見切り縁材20の
固定ピース17の取付フランジ長が大きく設定されてお
り、このうち、フレーム固定ピース15の取付フランジ
15Aの中間位置に板バネからなる開脚バネ25が装着
されている。この開脚バネ25は図5(a)に示したよ
うに、通常は略へ字形に屈曲している。この状態では天
井膜材ユニット10側の吊りピース16の係止爪が図4
(a)の場合と同様に係止している。この状態から天井
膜材ユニット10を構造材3から取り外すには、図5
(b)に示したように天井膜材ユニット10同士を接続
するとともに構造材3に取り付ける吊りピース16の下
方の隙間から開脚バネ25の押し上げ用の治具(図示せ
ず)を挿入し、開脚バネ25を下方から押し上げ、フレ
ーム固定ピース15の取付フランジ15Aの間隔を開
く。これにより、取付フランジ15Aの係止爪15aか
ら吊りピース16の係止爪16aが離脱するので、天井
膜材ユニット10をフレーム固定ピース15から取り外
すことができる(図5(c)参照)。
(Modification 1) In the ceiling film material unit 10 described above, the ceiling film material unit 10 once attached to the structural member 3 of the ceiling is firmly connected at the locking portion, so that remodeling or the like is required. If scheduled, it is difficult to remove the ceiling membrane material unit 10 from the structural material 3. Therefore, a modification in which the ceiling membrane material unit 10 can be easily removed from the structural material 3 as needed will be described with reference to FIGS. 4B and 5. As shown in FIG. 4B (FIG. 5A), the mounting flange length of the frame fixing piece 15 and the fixing piece 17 of the parting edge material 20 is set to be large. An open leg spring 25 made of a leaf spring is mounted at an intermediate position of the mounting flange 15A. As shown in FIG. 5A, the open leg spring 25 is normally bent in a substantially rectangular shape. In this state, the locking claw of the hanging piece 16 on the ceiling membrane material unit 10 side is shown in FIG.
It is locked as in the case of (a). To remove the ceiling membrane material unit 10 from the structural material 3 in this state, FIG.
As shown in (b), the ceiling membrane material units 10 are connected to each other, and a jig (not shown) for pushing up the open leg spring 25 is inserted through a gap below the hanging piece 16 attached to the structural material 3. The open leg spring 25 is pushed up from below to open the space between the mounting flanges 15A of the frame fixing piece 15. Thereby, the locking claw 16a of the hanging piece 16 is detached from the locking claw 15a of the mounting flange 15A, so that the ceiling membrane material unit 10 can be removed from the frame fixing piece 15 (see FIG. 5C).

【0016】(変形例2)次に、天井膜材ユニット10
の枠体フレーム11の変形例について図4(c),
(d)を参照して説明する。図4(c)に示した枠体フ
レーム11は、吊りピース16が枠体に一体的に形成さ
れており、これにより部品点数を減らすとともに、枠体
にレールを形成しないので、枠体の重量軽減にもつなが
る。断面図から明らかなように、フレーム固定ピース1
5の係止爪15aの先端が枠体フレーム11に直接接触
するので、フレーム固定ピース15、見切り縁材20の
固定ピース17のフランジを短くして構造体3と膜材5
との間のクリアランスを小さくすることができ、縁部材
19の高さも枠体フレーム11の高さに合わせて小さく
することができる。図4(d)は膜材5の端部5aを膜
材定着溝13内に収容させた状態で膜材定着溝13内に
はめ込む膜材押えバーとして、弾性変形自在な紐状の合
成ゴム製の膜材押さえ部材9を用いた変形例を示してい
る。この膜材押さえ部材9は同図に示したように、膜材
定着溝13内にはめ込まれた際に溝形状に膜材5を溝周
面に押圧するように倣って変形させ、密着させることが
できる。
(Modification 2) Next, the ceiling membrane unit 10
FIG. 4C shows a modified example of the frame body frame 11 of FIG.
This will be described with reference to FIG. In the frame body frame 11 shown in FIG. 4C, the hanging pieces 16 are formed integrally with the frame body, thereby reducing the number of parts and not forming rails on the frame body. It also leads to reduction. As is clear from the sectional view, the frame fixing piece 1
5 is directly in contact with the frame 11, the flanges of the frame fixing piece 15 and the fixing piece 17 of the parting edge material 20 are shortened, and the structure 3 and the film material 5 are formed.
Can be reduced, and the height of the edge member 19 can also be reduced in accordance with the height of the frame body frame 11. FIG. 4 (d) shows an elastically deformable string-shaped synthetic rubber as a film material holding bar that is fitted into the film material fixing groove 13 with the end 5 a of the film material 5 being housed in the film material fixing groove 13. A modification using the film material holding member 9 of FIG. As shown in the figure, when the film material holding member 9 is fitted into the film material fixing groove 13, the film material pressing member 9 is deformed and adhered so as to press the film material 5 into a groove shape to the groove peripheral surface. Can be.

【0017】[改修天井膜材の施工]以上に述べた新設
天井膜材の施工に対して、既存建物の内装の改修を想定
した場合の天井膜材の施工について図6〜図11を参照
して説明する。既存建物の場合、上階や隣接区画にすで
に住民が入居している場合が一般的であり、そのような
場合、天井構造材へのドリル等による孔開け作業は、騒
音振動の発生が予想されるので行えない。そこで、あら
かじめ見切り部分に配置された回り縁31にフレーム固
定ピース32を固定する構造とした。このとき見切り位
置の回り縁31の側面にフレーム固定ピース32をネジ
(図示せず)等により固定するが、回り縁31が躯体側
に精度良く建て付けられていない場合の調整しろを吊り
ピース33と枠体フレーム11との間に設けることにし
た。
[Construction of Renovated Ceiling Membrane] In contrast to the construction of the new ceiling membrane described above, the construction of the ceiling membrane when the interior of an existing building is supposed to be modified will be described with reference to FIGS. Will be explained. In the case of existing buildings, it is common for residents to already be occupying the upper floors or adjacent sections, and in such cases, drilling holes in ceiling structural materials is expected to generate noise and vibration. I can't do that. Therefore, the frame fixing piece 32 is fixed to the peripheral edge 31 arranged in advance in the parting-off portion. At this time, the frame fixing piece 32 is fixed to the side surface of the peripheral edge 31 at the parting position by a screw (not shown) or the like. It is provided between the body frame 11.

【0018】図7は、回り縁31の隅角部付近における
天井膜材ユニット10及び見切り縁化粧材20の取付状
態を部分的に示した斜視図である。さらに、その取付状
態を図8各図に示した。図8(a)に示したように、枠
体フレーム11の上面には吊りピース33と係止する係
止レール11cが一体的に形成されており、このレール
11c部分と吊りピース33との間に鋸歯状の重なり代
調節面34が形成されている。フレーム固定ピース32
に取り付けた状態で吊りピース33のフランジ33aと
係止レール11cとの離れをこの重なり代調整面34で
調整することで、回り縁31との間のクリアランスのば
らつきを解消することができる。その状態で見切り縁化
粧材20の係止爪20aをフレーム固定ピース32の係
止爪32aに係止するようにして天井膜材ユニット10
の端部の見切り縁とする。図8(b)は、他の変形例と
して枠体フレーム11を支持する吊りピース33のフラ
ンジ部分に長孔33bを設け、この長孔33bを介して
ネジ34止めにより天井膜材ユニット10の位置決めを
するようになっている。なお、いずれの場合にも見切り
縁化粧材20のフランジ20a部分で枠体フレーム11
の端部を覆うことができる程度の調整しろを有してい
る。また、見切り縁化粧材20は天井膜材ユニット10
の端部を覆うばかりでなく、天井膜材ユニット10の一
部を支持できるようになっている。
FIG. 7 is a perspective view partially showing the state of attachment of the ceiling membrane material unit 10 and the parting edge decorative material 20 near the corner of the peripheral edge 31. Further, the attached state is shown in each figure of FIG. As shown in FIG. 8A, a locking rail 11 c for locking with the hanging piece 33 is integrally formed on the upper surface of the frame body frame 11, and between the rail 11 c and the hanging piece 33. Is formed with a serrated overlapping adjusting surface 34. Frame fixing piece 32
By adjusting the distance between the flange 33a of the suspending piece 33 and the locking rail 11c with the overlapping margin adjusting surface 34 in the state where the suspension piece 33 is attached, the variation in the clearance between the hanging edge 31 and the peripheral edge 31 can be eliminated. In this state, the locking claw 20a of the parting edge decorative material 20 is locked to the locking claw 32a of the frame fixing piece 32 so that the ceiling membrane material unit 10
Shall be the parting edge at the end of FIG. 8B shows another modification in which a long hole 33b is provided in a flange portion of a hanging piece 33 supporting a frame body frame 11, and the ceiling film material unit 10 is positioned by a screw 34 through the long hole 33b. It is supposed to. In any case, the frame body frame 11 is formed by the flange 20a of the parting edge decorative material 20.
Has an adjustment margin enough to cover the end of the rim. In addition, the parting edge decorative material 20 is the ceiling film material unit 10.
Of the ceiling film material unit 10 as well as covering the ends of the ceiling film material unit 10.

【0019】次に、図9,図10を参照して改修天井膜
材の施工手順について説明する。図6に示した平面図に
あるように、既存建物において天井回り縁31が施工さ
れている天井に4枚の天井膜材ユニット10を取り付け
る場合について説明する。図9両図は1枚の天井膜材ユ
ニット10の長手方向の断面線IX-IXに沿った断面図で
あり、この場合には図9(a)に示したように、あらか
じめ天井回り縁31の所定位置に取り付けられているフ
レーム固定ピース32の係止爪32aに枠体フレーム1
1の端部に取り付けられた吊りピース33の係止爪33
aが係合できるように、吊りピース33の位置を重なり
調整しろ部分で前後させるようにして調整し、フレーム
固定ピース32と吊りピース33との位置関係を確認し
ながら、天井膜材ユニット10全体を下方から取り付け
る。さらに見切り縁化粧材20の固定フランジをフレー
ム固定ピース32の係止溝に差し込むようにして見切り
縁化粧材20を全周にわたって取り付ける(図9(b)
参照)。一方、隣接する天井膜材ユニット10を取り付
ける場合は、図10(a)に示したように、各天井膜材
ユニット10の連結位置に配置された中間固定ピース3
5に吊りピース33の係止爪33aを係止して天井膜材
ユニット10全体を吊持させる。さらに最終的に見切り
縁化粧材20をフレーム固定ピース32に取り付けるこ
とで、容易に天井内装を膜材仕様に改修することができ
る。
Next, with reference to FIGS. 9 and 10, a description will be given of a procedure for applying the repaired ceiling film material. As shown in the plan view of FIG. 6, a case where four ceiling membrane material units 10 are attached to a ceiling where a ceiling peripheral edge 31 is constructed in an existing building will be described. 9A and 9B are cross-sectional views taken along a cross-sectional line IX-IX of one ceiling membrane material unit 10 in the longitudinal direction. In this case, as shown in FIG. The frame 1 is attached to the locking claw 32a of the frame fixing piece 32 attached at a predetermined position.
Locking claw 33 of hanging piece 33 attached to one end
a, the position of the suspension piece 33 is adjusted back and forth at the overlap adjustment margin so as to be able to engage, and while confirming the positional relationship between the frame fixing piece 32 and the suspension piece 33, the entire ceiling membrane material unit 10 is Is attached from below. Further, the parting edge decorative material 20 is attached over the entire circumference by inserting the fixing flange of the parting edge decorative material 20 into the locking groove of the frame fixing piece 32 (FIG. 9B).
reference). On the other hand, when the adjacent ceiling film material units 10 are attached, as shown in FIG. 10A, the intermediate fixing pieces 3 arranged at the connection positions of the respective ceiling film material units 10 are used.
5, the locking claw 33a of the hanging piece 33 is locked, and the entire ceiling membrane material unit 10 is hung. Further, by finally attaching the parting edge decorative material 20 to the frame fixing piece 32, the interior of the ceiling can be easily modified to a film material specification.

【0020】[天井膜材ユニット落下防止対策]既存建
物の天井膜材の取り付け工事では、騒音発生防止の観点
から、中間固定ピース35のベースプレート36を接着
剤で天井構造材3に直付けしている。この場合、中間固
定ピース35の接着が十分でない場合、天井膜材ユニッ
ト10の荷重を支えた状態にある中間固定ピース35が
構造材3から剥がれることも予想される。この場合、天
井膜材ユニット10が落下することを確実に回避する必
要がある。そこで、本実施の形態では、その落下防止対
策として図11(a)に示したような落下防止ワイヤ3
7を設けた。この落下防止ワイヤ37を対向する回り縁
31間に所定本数張設し、この落下防止ワイヤ37に同
図(b)に示したように、吊り下げフック38を引っ掛
けることで中間固定ピース35による支持が外れた場合
にも天井膜材ユニット10を保持させることができる。
なお、吊り下げフック38は枠体フレーム11に支持さ
れた中間継材12上にネジ止めされているが、枠体フレ
ーム11あるいは吊りピース33の一部に一体的に形成
するようにしても良い。
[Measures to Prevent Falling of Ceiling Membrane Unit] In the installation work of the ceiling membrane material of the existing building, from the viewpoint of noise generation, the base plate 36 of the intermediate fixing piece 35 is directly attached to the ceiling structural member 3 with an adhesive. I have. In this case, when the adhesion of the intermediate fixing piece 35 is not sufficient, the intermediate fixing piece 35 supporting the load of the ceiling membrane material unit 10 may be peeled off from the structural material 3. In this case, it is necessary to reliably prevent the ceiling film material unit 10 from falling. Therefore, in the present embodiment, the fall prevention wire 3 shown in FIG.
7 was provided. A predetermined number of the fall prevention wires 37 are stretched between the opposing peripheral edges 31, and as shown in FIG. The ceiling film material unit 10 can be held even when it comes off.
The hanging hook 38 is screwed onto the intermediate joining material 12 supported by the frame 11, but may be formed integrally with the frame 11 or a part of the hanging piece 33. .

【0021】[分割天井膜材ユニットの構造]上述した
天井膜材ユニット10は、その部屋の面積にもよるが、
1枚の全体寸法が900mm×2600mm程度のものを想
定している。したがって、この天井膜材ユニット10を
取り付ける部屋への搬入が困難な状況も想定できる。そ
のような状況を勘案して、所定寸法の天井膜材ユニット
10を半割した分割天井膜材ユニット10を考案した。
この分割天井膜材ユニット10は図12に示したよう
に、施工予定の大きさの半分の大きさに折り畳まれた状
態で施工場所に搬入され、天井膜材ユニット10の中央
位置の蝶番40を広げるようにして全体の大きさとする
ようになっている。この蝶番40の構造は枠体フレーム
11内の中空部11d内に挿入され、所定位置にネジ4
1止めにより平鋼製の押さえバー42を介して押圧固定
され屈曲自在な帯状の合成ゴムプレート43からなり、
搬入時には図13に2点鎖線で示したように、約180
°に折り曲げられる。そして図13,図14各図に示し
たように、全長分を広げて枠体フレーム11を直線状に
した状態で押さえバー42をネジを緩めた状態で長孔1
1eに沿って矢印A方向(図14(b))にスライドさ
せて枠体フレーム11の接合部Jを跨ぐように位置させ
て添接プレート44を取り付けた状態でネジ41,45
を締め付けることで接合部Jの剛性を確保して一体化さ
せることができる。これにより、膜材取付工事の迅速化
を図ることができる。
[Structure of Divided Ceiling Membrane Unit] The ceiling membrane material unit 10 described above depends on the area of the room.
It is assumed that the overall size of one sheet is about 900 mm × 2600 mm. Therefore, it can be assumed that it is difficult to carry the ceiling membrane material unit 10 into the room where the ceiling membrane material unit 10 is installed. In consideration of such a situation, a divided ceiling film material unit 10 in which the ceiling film material unit 10 having a predetermined size is divided in half is designed.
As shown in FIG. 12, the divided ceiling membrane material unit 10 is carried into a construction place in a state where it is folded to half the size to be constructed, and the hinge 40 at the center position of the ceiling membrane material unit 10 is removed. It is designed to be spread out to make the whole size. The structure of the hinge 40 is inserted into the hollow portion 11d in the frame 11 and the screw 4
It consists of a flexible band-like synthetic rubber plate 43 which is pressed and fixed via a flat steel holding bar 42 by one stop and is flexible.
At the time of loading, as shown by the two-dot chain line in FIG.
Bend to °. Then, as shown in FIGS. 13 and 14, the holding bar 42 is loosened with the holding bar 42 loosened while the frame frame 11 is straightened by extending the entire length.
1e, slide in the direction of arrow A (FIG. 14 (b)) so as to straddle the joint J of the frame 11, and attach the attachment plate 44 to the screws 41, 45.
By tightening, the rigidity of the joint J can be secured and integrated. Thus, the film material mounting work can be speeded up.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による天井膜材の取付構造の一実施の形
態を示した平面図。
FIG. 1 is a plan view showing one embodiment of a ceiling film material mounting structure according to the present invention.

【図2】本発明の天井膜材の取付構造の一部を拡大して
示した部分斜視図。
FIG. 2 is a partial perspective view showing an enlarged part of the ceiling membrane material mounting structure of the present invention.

【図3】本発明の天井膜材の取付構造の一部を拡大して
示した部分斜視図。
FIG. 3 is an enlarged partial perspective view showing a part of the ceiling membrane material mounting structure of the present invention.

【図4】天井膜材の取付構造の取り合い詳細を拡大して
示した部分断面図。
FIG. 4 is an enlarged partial cross-sectional view showing details of the connection of a ceiling membrane material mounting structure.

【図5】天井膜材の取付構造の一変形例を示した部分断
面図。
FIG. 5 is a partial cross-sectional view showing a modified example of the mounting structure of the ceiling film material.

【図6】既存建物における天井膜材の取付構造の一実施
の形態を示した平面図。
FIG. 6 is a plan view showing one embodiment of a structure for mounting a ceiling film material in an existing building.

【図7】本発明の天井膜材の取付構造の一部を拡大して
示した部分斜視図。
FIG. 7 is a partial perspective view showing an enlarged part of the ceiling membrane material mounting structure of the present invention.

【図8】天井膜材の取付構造の取り合い詳細を拡大して
示した部分断面図。
FIG. 8 is a partial cross-sectional view showing, in an enlarged manner, details of how a ceiling membrane material is attached.

【図9】天井膜材の取付構造の取付手順を模式的に示し
た断面図(長辺方向)。
FIG. 9 is a cross-sectional view (long side direction) schematically showing the mounting procedure of the mounting structure of the ceiling membrane material.

【図10】天井膜材の取付構造の取付手順を模式的に示
した断面図(短辺方向)。
FIG. 10 is a cross-sectional view (short side direction) schematically showing an attachment procedure of the ceiling membrane attachment structure.

【図11】落下防止構造の一例を部分的に示した部分断
面図。
FIG. 11 is a partial sectional view partially showing an example of a fall prevention structure.

【図12】分割天井膜材ユニットの施工例を模式的に示
した略斜視図。
FIG. 12 is a schematic perspective view schematically showing a construction example of a divided ceiling membrane material unit.

【図13】分割天井膜材ユニットの蝶番の折曲状態を拡
大して示した部分断面図。
FIG. 13 is an enlarged partial cross-sectional view showing a bent state of a hinge of the divided ceiling membrane material unit.

【図14】分割天井膜材ユニットの蝶番構造を拡大して
示した平面図、断面図。
FIG. 14 is an enlarged plan view and a sectional view showing a hinge structure of the divided ceiling membrane material unit.

【符号の説明】[Explanation of symbols]

1 天井 2 壁 3 構造材 5 膜材 10 天井膜材ユニット 11 枠体フレーム 12 中間継材 13 膜材定着溝 14 膜材押さえバー 15,32 フレーム固定ピース 16,33 吊りピース 19 縁部材 20 見切り縁化粧材 25 開脚バネ 31 回り縁 35 中間固定ピース 37 落下防止ワイヤ 40 蝶番 DESCRIPTION OF SYMBOLS 1 Ceiling 2 Wall 3 Structural material 5 Membrane material 10 Ceiling membrane material unit 11 Frame frame 12 Intermediate joining material 13 Membrane fixing groove 14 Membrane holding bar 15, 32 Frame fixing piece 16, 33 Hanging piece 19 Edge member 20 Edge edge 20 Cosmetic material 25 Open leg spring 31 Peripheral edge 35 Intermediate fixing piece 37 Fall prevention wire 40 Hinge

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】枠体フレームの周縁に形成された膜材定着
溝内に膜材の端部を定着して前記枠体フレームに内装膜
材が張設された複数枚の天井膜材ユニットを、該天井膜
材ユニットに取着された吊りピースを介して、天井構造
材の前記吊りピースに対応する位置に固定されたフレー
ム固定手段に係止させるとともに、見切り縁化粧材で前
記天井膜材ユニットで覆われた天井見切り部分を覆って
取り付けたことを特徴とする天井膜材の取付構造。
1. A plurality of ceiling film material units having an interior film material stretched on said frame material frame by fixing an end of the film material in a film material fixing groove formed on a peripheral edge of the frame material frame. A ceiling fixing member fixed to a position corresponding to the hanging piece of the ceiling structural material via a hanging piece attached to the ceiling film material unit, and the ceiling film material with a parting edge decorative material. An installation structure for a ceiling membrane material, wherein the installation is performed so as to cover a ceiling parting part covered by a unit.
【請求項2】枠体フレームの周縁に形成された膜材定着
溝内に膜材の端部を定着して前記枠体フレームに内装膜
材が張設された複数枚の天井膜材ユニットを、該天井膜
材ユニットに取着された吊りピースを介して、天井構造
材の回り縁の前記吊りピースに対応する位置に固定され
たフレーム固定手段に係止させるとともに、見切り縁化
粧材で前記天井膜材ユニットで覆われた天井見切り部分
を覆って取り付けたことを特徴とする天井膜材の取付構
造。
2. A plurality of ceiling membrane material units having an interior membrane material stretched on the frame frame by fixing an end of the membrane material in a film material fixing groove formed on a peripheral edge of the frame frame. A ceiling fixing member fixed to a position corresponding to the hanging piece on a peripheral edge of the ceiling structural material via a hanging piece attached to the ceiling membrane material unit, and the ceiling with a parting edge decorative material. An installation structure for a ceiling membrane material, wherein the ceiling is covered by a ceiling part covered by a membrane material unit.
【請求項3】前記回り縁の対向する位置にワイヤを掛け
渡し、該ワイヤに前記天井膜材ユニットの吊りピースの
一部を係止させて天井膜材ユニットの落下防止手段とし
たことを特徴とする請求項2記載の天井膜材の取付構
造。
3. A ceiling film material unit is provided with a wire suspended over a position opposite to the peripheral edge, and a part of a suspending piece of the ceiling film material unit is engaged with the wire so as to prevent the ceiling film material unit from falling. 3. The mounting structure for a ceiling film material according to claim 2, wherein:
【請求項4】前記天井膜材ユニットは、蝶番を介して半
割形状で施工場所に搬入され、前記蝶番部分で広げて全
寸法として前記構造材のフレーム固定ピース部分に取り
付けるようにしたことを特徴とする請求項1または請求
項2に記載の天井膜材の取付構造。
4. The method according to claim 1, wherein the ceiling membrane material unit is carried into a construction place in a half-split shape via a hinge, and is expanded at the hinge portion to be attached to a frame fixing piece portion of the structural material as a whole. The mounting structure for a ceiling membrane material according to claim 1 or 2, wherein:
【請求項5】前記蝶番は、合成ゴム製プレートを前記枠
体フレーム内に配置してなることを特徴とする請求項4
記載の天井膜材の取付構造。
5. The hinge according to claim 4, wherein a synthetic rubber plate is disposed in the frame.
Installation structure of the ceiling membrane material described.
JP2001137166A 2001-05-08 2001-05-08 Ceiling membrane material mounting structure Expired - Lifetime JP4698060B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001137166A JP4698060B2 (en) 2001-05-08 2001-05-08 Ceiling membrane material mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001137166A JP4698060B2 (en) 2001-05-08 2001-05-08 Ceiling membrane material mounting structure

Publications (2)

Publication Number Publication Date
JP2002332713A true JP2002332713A (en) 2002-11-22
JP4698060B2 JP4698060B2 (en) 2011-06-08

Family

ID=18984312

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001137166A Expired - Lifetime JP4698060B2 (en) 2001-05-08 2001-05-08 Ceiling membrane material mounting structure

Country Status (1)

Country Link
JP (1) JP4698060B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009263939A (en) * 2008-04-23 2009-11-12 Nihon Glassfiber Industrial Co Ltd Luminous ceiling, panel for luminous ceiling, and light transmission and smoke-air flow method through ceiling
JP2016089484A (en) * 2014-11-05 2016-05-23 フクビ化学工業株式会社 Membrane ceiling structure and construction method for the same
CN108505669A (en) * 2017-02-27 2018-09-07 北新集团建材股份有限公司 A kind of annular ceiling system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505664B (en) * 2017-02-27 2020-05-29 北新集团建材股份有限公司 Corner suspended ceiling module

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09184231A (en) * 1995-12-28 1997-07-15 Daiwa House Ind Co Ltd Stretched-film ceiling panel and ceiling air conditioner

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09184231A (en) * 1995-12-28 1997-07-15 Daiwa House Ind Co Ltd Stretched-film ceiling panel and ceiling air conditioner

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009263939A (en) * 2008-04-23 2009-11-12 Nihon Glassfiber Industrial Co Ltd Luminous ceiling, panel for luminous ceiling, and light transmission and smoke-air flow method through ceiling
JP2016089484A (en) * 2014-11-05 2016-05-23 フクビ化学工業株式会社 Membrane ceiling structure and construction method for the same
CN108505669A (en) * 2017-02-27 2018-09-07 北新集团建材股份有限公司 A kind of annular ceiling system
CN108505669B (en) * 2017-02-27 2020-03-27 北新集团建材股份有限公司 Annular ceiling system

Also Published As

Publication number Publication date
JP4698060B2 (en) 2011-06-08

Similar Documents

Publication Publication Date Title
US8522498B2 (en) System and method for removably connecting trim to a wall or ceiling or both
US6745536B2 (en) Ceiling tile support system and method
JP6141854B2 (en) Re-covering equipment for removable wall panels
JP2002332713A (en) Mounting structure for ceiling membrane
US20030182894A1 (en) Method of installing a set of ceiling panels
JPH1046785A (en) Mounting structure for decorative wall panel
KR101797048B1 (en) A barcket for mounting a screen louver to the ceiling surface or wall of a building
KR200404719Y1 (en) Structure that fitting panel in the ceiling
JPH1193321A (en) Ceiling structure
US20030213200A1 (en) Method for installing a faux wood ceiling and apparatus for use therein
JP3103652U (en) Honeycomb panel for hanging eaves
KR200345761Y1 (en) A frame connector of wall panel
JPH08232391A (en) Execution method for ceiling
JPH0732698Y2 (en) System ceiling
KR200298240Y1 (en) A Molding for a Building
JP2625063B2 (en) Ceiling panel mounting structure
KR100597001B1 (en) Stretch sheet establish construction for the ceiling panel
KR20050056844A (en) A frame connector of wall panel
JPH11190094A (en) Joint fitting for ceiling material
JPH0849339A (en) Hanger of ceiling material
JPH06288032A (en) Ceiling
JP3188482U (en) Building interior structure
JP2006274698A (en) Partition wall structure
JP2021042609A (en) Building ceiling and method of constructing the same
JP2004232245A (en) Partition wall panel structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080430

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110210

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110222

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110301

R150 Certificate of patent or registration of utility model

Ref document number: 4698060

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term