JP2002312445A - Management device and method for warehouse - Google Patents

Management device and method for warehouse

Info

Publication number
JP2002312445A
JP2002312445A JP2001119721A JP2001119721A JP2002312445A JP 2002312445 A JP2002312445 A JP 2002312445A JP 2001119721 A JP2001119721 A JP 2001119721A JP 2001119721 A JP2001119721 A JP 2001119721A JP 2002312445 A JP2002312445 A JP 2002312445A
Authority
JP
Japan
Prior art keywords
work
worker
assignment
unit
warehouse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001119721A
Other languages
Japanese (ja)
Inventor
Hiroto Oda
寛仁 尾田
Eiji Hirata
栄治 平田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kao Corp
Original Assignee
Kao Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kao Corp filed Critical Kao Corp
Priority to JP2001119721A priority Critical patent/JP2002312445A/en
Publication of JP2002312445A publication Critical patent/JP2002312445A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To enhance efficiency of cargo handling work of a workman in a physical distribution warehouse and to provide flexible correspondence to a change or the like of a shipping schedule or a cargo receiving schedule. SOLUTION: A work unit to be used as a work assignment unit is defined every work process, and work assignment is carried out in work units. In the assignment, accumulation of articles is prevented by assigning at least one workman to a work process not necessarily busy but with cargo work and not by assigning cargo work only to work units where cargo work concentrates.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、物流倉庫における
作業者の管理に関する。本発明は、特に荷作業に携わる
作業者に対して作業の割り当てを行うスケジューリング
装置および方法に関する。本発明は、物流倉庫において
行われる荷の格納、検品、ピッキング、仕分け、荷揃え
等の荷作業に携わる作業者のスケジューリングの技術に
関する。
[0001] The present invention relates to management of workers in a distribution warehouse. The present invention relates to a scheduling device and a method for allocating a task to a worker who is particularly involved in a loading operation. TECHNICAL FIELD The present invention relates to a technique for scheduling workers involved in loading operations such as storage, inspection, picking, sorting, and packing of loads performed in a distribution warehouse.

【0002】[0002]

【従来の技術】入庫した物品を配送先ごとにピッキン
グ、仕分け、荷揃えを行って出荷する物流倉庫の荷作業
として、荷の格納、ピッキング、仕分け、荷揃え等を自
動倉庫で行うものがある。この自動倉庫による管理は、
規格化された個別の物品や規格化された物品群をパレッ
ト単位で扱う場合には、省力化を図ることができる利点
がある。しかし、物流倉庫では、この規格化された大き
さの物品だけでなく、種々の大きさや種類の物品を同時
に扱うものであり、例えば物品の配送目的によって種々
の物品を取り扱わなければならない。このため、人によ
る物品のピッキング、移動、荷揃え、梱包などの荷作業
が自動倉庫の作業と併せて行われる。特に、物品によっ
ては梱包されずにいるばらの物品をピッキングして物品
群としてまとめて移動し荷揃えする作業を人手によって
すべて行わなければならない場合もある。また、危険物
など、法規制があり、人手による管理を必要とする物品
を他の物品と並行して取り扱わなければならない場合も
ある。
2. Description of the Related Art As a loading operation in a distribution warehouse that picks, sorts, and sorts incoming goods for each delivery destination and then ships the goods, there is a method in which storage, picking, sorting, and sorting of loads are performed in an automatic warehouse. . The management by this automatic warehouse,
When standardized individual articles or standardized article groups are handled in pallet units, there is an advantage that labor can be saved. However, a distribution warehouse handles not only articles of standardized size but also articles of various sizes and types at the same time. For example, various articles must be handled according to the purpose of delivering the articles. For this reason, loading operations such as picking, moving, packing, and packing of articles by a person are performed together with the operations of the automatic warehouse. In particular, in some cases, all the work of picking loose articles that are not packed, moving them as a group of articles, and arranging the goods must be performed manually. There are also cases where there are laws and regulations, such as dangerous goods, which need to be managed by hand, in parallel with other goods.

【0003】[0003]

【発明が解決しようとする課題】自動倉庫での物品管理
の技術については、種々のアルゴリズムや管理手法が提
案されている。しかし、人手による荷作業については、
経験的な管理手法が実行されているだけであり、多種の
物品を同時に並行的に取り扱う物流倉庫での合理的な作
業管理手法の提案が望まれている。
Various algorithms and management methods have been proposed for an article management technique in an automatic warehouse. However, for manual loading,
Only an empirical management method is being executed, and a proposal for a rational work management method in a distribution warehouse that handles various kinds of articles simultaneously in parallel is desired.

【0004】本発明は、作業者による荷作業の管理を合
理的に行い、また効率的に荷作業を管理することができ
る管理装置および方法を提供することを目的とする。本
発明は、物流倉庫における作業者のスケジューリングが
合理的に行える管理装置および方法を提供することを目
的とする。また、本発明は、倉庫内の物品の流れに沿っ
て、作業者を適正に配分し、その荷作業がスムーズに行
われ、物品の滞留を少なくすることができる管理装置お
よび方法を提供することを目的とする。
[0004] It is an object of the present invention to provide a management apparatus and method capable of rationally managing the work of a worker and efficiently managing the work of a load. SUMMARY OF THE INVENTION An object of the present invention is to provide a management apparatus and a management method that can reasonably schedule workers in a distribution warehouse. Further, the present invention provides a management device and a method capable of appropriately distributing workers along a flow of goods in a warehouse, performing a smooth loading operation, and reducing stagnation of goods. With the goal.

【0005】[0005]

【課題を解決するための手段】倉庫内の物品の流れに沿
って、作業工程をわけ、作業指示の対象として作業単位
を定義する。例えばバラの物品が収納されている収納手
段から指示された物品を指定個数取り出してカゴ車(カ
ート)に載せ、同じ階の荷を引き渡す場所まで移動させ
るという作業を1作業単位とする。倉庫内の荷作業は、
このような作業単位が連結された流れとして把握され、
この作業単位ごとに作業単位の識別番号を付与して作業
管理を行うようにする。作業管理を行う上位の管理装置
は、作業割り当て(スケジューリング)において、1作
業単位で作業者を割り当てる。そして、作業者の割り当
てにおいて、荷作業の工程で作業がある工程に人を割り
当て、作業がある部分には少し作業負荷が少ない(忙し
くない)工程があってもそこに作業者を割り当てるよう
にする。これによって、作業工程間で処理すべき物品が
滞留してボトルネックが生ずるようなことを防止でき
る。
According to the present invention, work steps are divided along a flow of goods in a warehouse, and a work unit is defined as a target of a work instruction. For example, the operation of taking out a specified number of designated articles from the storage means in which loose articles are stored, placing them on a cart (cart), and moving them to a place where a load on the same floor is delivered is defined as one work unit. Loading in the warehouse
Such a unit of work is understood as a linked flow,
The work management is performed by assigning a work unit identification number to each work unit. A higher-level management device that performs work management allocates workers in units of work in work assignment (scheduling). In the assignment of workers, a person is assigned to a process where work is performed in the loading process, and a worker is assigned to a portion where work is performed even if there is a process with a small workload (not busy). I do. Thus, it is possible to prevent the articles to be processed from staying between the work processes and causing a bottleneck.

【0006】また、作業者により得意な作業、また特定
の作業者しか扱うことができない物品や作業があるの
で、作業者ごとに行うことができる荷作業を作業単位ご
とに決めておき、作業割り当てにおいて優先順位を付け
ておく。作業割り当てを行うときはこの優先順位の情報
に基づいて作業割り当てを行うようにする。これによ
り、適切な作業者に適切な作業が割り当てられるので、
効率的な作業が行うことができるように作業者の配置が
できる。
[0006] Further, since there is a work or a work that the worker is better at, or a product or work that can be handled only by a specific worker, a load work that can be performed by each worker is determined for each work unit, and work assignment is performed. Priority is given in. When performing work assignment, work assignment is performed based on this priority information. This ensures that the right people are assigned the right job,
Workers can be arranged so that efficient work can be performed.

【0007】また、作業割り当ての計算は、所定時間間
隔、例えば5分とか15分間隔で計算するようにする。
あるいは、作業者が指示された一つの作業単位を完了し
た旨の入力があったことを契機として、作業割り当ての
計算を行うようにしてもよく、頻繁に割り当ての再計算
を行うようにする。これにより、物品の流れにしたがっ
てリアルタイムで作業者の割り当てを行うことができ
る。また割り込みがあっても作業の割り当てが随時可能
であり、出荷計画の変更などにも柔軟に対応することが
可能である。
The work assignment is calculated at predetermined time intervals, for example, at intervals of 5 minutes or 15 minutes.
Alternatively, the work assignment may be calculated in response to an input indicating that the worker has completed one designated work unit, and the assignment may be recalculated frequently. Thus, it is possible to allocate workers in real time in accordance with the flow of articles. Even if there is an interruption, work can be assigned at any time, and it is possible to flexibly cope with a change in the shipping plan.

【0008】すなわち、本発明は、倉庫での作業者の荷
作業の管理を行う管理装置であり、この管理装置は、作
業工程区分ごとに一人の作業者が行えるひとまとまりの
荷作業を割り当ての単位である作業単位として定義し、
この作業単位ごとに作業者を割り当てる割当手段を備
え、この割当手段は、作業工程ごとの作業負荷および作
業の制約条件に応じて作業者を割り当てるにあたり、荷
作業が存在する工程へは少なくとも一人の作業者を割り
当てる手段を含み、この作業割り当ての演算を所定時間
ごとに繰り返し行う手段を含むことを特徴とする。
[0008] That is, the present invention is a management device for managing the loading work of workers in a warehouse, and this management device allocates a group of loading operations that can be performed by one worker for each work process division. Defined as a unit of work,
Allocating means for allocating a worker for each work unit, wherein the allocating means allocates at least one worker to a process in which a load work exists in allocating a worker according to a work load and a work constraint for each work process. It includes means for assigning workers, and means for repeatedly performing the calculation of the work assignment at predetermined time intervals.

【0009】なお、前記割当手段は、割り当てる作業者
の行うことができる作業を作業者ごとに作業区分または
作業場所について作業割り当て順位が設けられた優先順
位データに基づいて、前記作業割り当てを行う手段を含
むことができる。
[0009] The assigning means assigns the work that can be performed by the worker to be assigned to the work based on the priority data in which the work assignment rank is provided for the work division or the work place for each worker. Can be included.

【0010】また、荷作業が発生するごとに作業割り当
ての再計算を行う手段を含むことができる。
[0010] Further, means for recalculating the work assignment each time a load work occurs can be included.

【0011】また、前記管理装置は、作業の開始および
完了の入力ごとに作業割り当ての再計算を行う手段を含
むことができる。
Further, the management device may include means for recalculating the work assignment every time the start and completion of the work are input.

【0012】また、作業者は作業指示が行われる端末を
携帯し、前記管理装置は、この携帯端末を介して作業者
に作業指示を行うとともに作業工程ごとの開始および完
了の入力を行う手段を含むことができる。
Further, the worker carries a terminal to which a work instruction is given, and the management device provides means for giving a work instruction to the worker through the portable terminal and inputting start and completion of each work process. Can be included.

【0013】また、本発明は、物流倉庫で行われる荷作
業を複数の工程にわけ、この各工程にそれぞれ作業者を
割り当てる物流倉庫の作業管理方法において、荷作業の
工程ごとに、一人の作業者が行えるひとまとまりの荷作
業を割り当ての単位である作業単位として定義し、この
作業単位ごとに作業者に作業指示を行い、この荷作業が
存在する工程には少なくとも一人の作業者を割り当て、
この作業者の割り当ての演算を所定時間ごとに行うこと
を特徴とする。
Further, according to the present invention, in a work management method for a distribution warehouse, in which a cargo operation performed in a distribution warehouse is divided into a plurality of processes and an operator is assigned to each of the processes, one operation is performed for each of the loading processes. A group of cargo work that can be performed by a worker is defined as a work unit, which is a unit of assignment, a work instruction is given to the worker for each work unit, and at least one worker is assigned to a process in which this work exists,
It is characterized in that the calculation of the assignment of the worker is performed every predetermined time.

【0014】[0014]

【発明の実施の形態】以下図面を参照して本発明の実施
の形態を説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0015】図1は、倉庫内の物品の大まかな流れとそ
の作業を説明する図である。図2は、その倉庫内での入
庫格納のフローを示す図である。図3は、配送先に物品
を梱包単位で出荷するフローを示す図、図4は、バラの
物品をピッキングして配送先に出荷する作業フローを示
す図、図5は、物品の移動を示す図である。図6は、こ
の倉庫での荷作業を制御する上位の管理システムの構成
を示す図である。図7は、作業割り当てを行う管理シス
テム(作業マネジメントCPUとそれに対するデータの
入出力について)の構成例を示すものである。図8は、
作業マネジメントCPUが行う作業割り当ての手順を示
すフローチャートである。
FIG. 1 is a diagram for explaining the general flow of goods in a warehouse and the operation thereof. FIG. 2 is a diagram showing a flow of storing and storing in the warehouse. FIG. 3 is a diagram illustrating a flow of shipping an article to a delivery destination in packing units, FIG. 4 is a diagram illustrating a work flow of picking loose articles and shipping the delivery destination, and FIG. 5 is a diagram illustrating movement of the article. FIG. FIG. 6 is a diagram showing the configuration of a higher-level management system that controls the loading operation in this warehouse. FIG. 7 shows an example of a configuration of a management system for assigning work (work management CPU and data input / output to / from the work management CPU). FIG.
It is a flowchart which shows the procedure of the work assignment performed by the work management CPU.

【0016】まず、本実施の形態での倉庫内の物品の流
れとその作業を説明する。
First, a description will be given of the flow of goods in a warehouse and the operation thereof according to the present embodiment.

【0017】図1に示されるように、工場その他から入
庫される物品は、まず入荷検品され、その検品に基づい
て所定の保管格納場所に格納される。保管場所として
は、自動倉庫、危険物倉庫、SA間口、各階間口などが
あり、入荷された物品によりそれぞれの保管場所に搬送
されて格納される。この保管格納された物品は、出荷計
画に基づいて必要な物品がピッキングされてそれぞれ配
送先ごとに仕分けされ、検品された後、荷揃えされる。
荷揃えの終わった物品はそれぞれの配送車に積み込ま
れ、配送先である店舗やターミナルへ配送される。な
お、出荷検品の作業は必ずしも仕分け後でなくともよ
く、荷揃えと同時あるいは後に行うこともできるし、ま
た、仕分け、出荷検品、荷揃えは同時の作業としても把
握できる。
As shown in FIG. 1, articles received from a factory or the like are first inspected for arrival and stored in a predetermined storage location based on the inspection. The storage places include an automatic warehouse, a dangerous goods warehouse, an SA frontage, each floor frontage, and the like, and are transported to and stored in the respective storage places by the received articles. In the stored articles, necessary articles are picked based on a shipping plan, sorted for each delivery destination, inspected, and then packed.
The finished goods are loaded on each delivery vehicle and delivered to the destination store or terminal. It should be noted that the work of shipping inspection does not necessarily have to be performed after sorting, and can be performed at the same time as or after loading, and sorting, shipping inspection, and packing can be grasped as simultaneous operations.

【0018】次に図2を参照して倉庫への入荷格納のフ
ローを説明する。この図2において、Nに番号を付与し
た部分が作業者に指示する作業単位の識別番号を示す。
Next, the flow of storing and receiving goods in the warehouse will be described with reference to FIG. In FIG. 2, the part where the number is given to N indicates the identification number of the work unit instructed to the worker.

【0019】まず、工場その他から物品搭載車が到着す
ると、入荷車到着登録を行う(N00)。そして入荷予
定に基づき検品を行い格納先を指示するラベルを貼る
(N10)。また、特別扱いをするような消費期限管理
品やロット管理品は入荷仮置きし、別途格納指示により
格納先ラベルを貼付する(N10)。さらに、過剰数量
など、予定外のものは返送の処理を行う(N10)。
First, when an article-laden vehicle arrives from a factory or the like, arrival arrival arrival registration is performed (N00). Inspection is performed based on the arrival schedule, and a label indicating the storage location is attached (N10). In addition, the expiration date-managed products and the lot-managed products that are specially handled are temporarily placed in stock, and a storage destination label is affixed according to a separate storage instruction (N10). Further, unscheduled items such as excess quantities are returned (N10).

【0020】倉庫内の保管格納箇所としては、自動倉
庫、SA間口、危険物倉庫、各階間口、それと別倉庫と
があり、貼付された格納先ラベルによりそれぞれの保管
格納箇所に送られる(N01,N50,N60,N7
0,N20)。カゴ車に格納される場合にはカゴ車ごと
に格納カゴ車ラベルが1台ごとに貼付される。また、自
動倉庫に格納される物品には格納先ラベルは発行されな
い。
The storage locations in the warehouse include an automatic warehouse, an SA frontage, a dangerous goods warehouse, each floor frontage, and a separate warehouse. N50, N60, N7
0, N20). When stored in a car, a car cart label is attached to each car. Also, no storage destination label is issued for articles stored in the automatic warehouse.

【0021】なお、間口とは、物品を平置きする場所を
いい、2〜4階間口ではカゴ車に格納された状態もしく
はパレット積みの状態で保管する。各階間口で保管する
物品は、パレット又はカゴ車に格納され垂直搬送設備に
より各階間口に搬送され、ここで各階間口で荷渡し仮置
きがされ各間口で保管される(N29,N39,N4
9)。またSA間口はパレット単位で物品が保管される
場所であり、このときの作業としてはフォークリフトを
用いる。
The frontage means a place where articles are laid flat, and at the second to fourth floor frontage, the articles are stored in a cart or in a palletized state. Articles to be stored at each floor entrance are stored in pallets or carts and transported to each floor entrance by vertical transport equipment, where they are temporarily placed at each floor entrance and stored at each frontage (N29, N39, N4).
9). The SA frontage is a place where articles are stored in units of pallets, and a forklift is used for the work at this time.

【0022】次に保管格納された物品をピッキングして
仕分け、荷揃えをして出荷する作業を図3に基づいて説
明する。この図3に示す作業は、配送先ごとに梱包単位
で出荷する場合の作業フローの例である。
Next, the operation of picking and sorting the stored articles, sorting the packages, and shipping them will be described with reference to FIG. The work shown in FIG. 3 is an example of a work flow in the case where shipment is performed in a packing unit for each delivery destination.

【0023】各間口に保管されている物品を作業指示に
したがってピッキングする。このピッキングとしては、
品種単位で仕分け総数を指示にしたがって物品をピッキ
ングする作業(K20,K30,K40)と、仕分け先
ごとに指示された物品を指示された量だけピッキングす
る作業(K21,K31,K41 ここではこれを摘取
と表現する)とがあり、垂直搬送設備のある荷渡し仮置
き場所まで搬送する。これとは別に出荷計画により、自
動倉庫、SA間口、危険物倉庫からそれぞれ指示された
物品がピッキングされる(K50,K10,K60,K
70)。
The articles stored in each frontage are picked according to a work instruction. As this picking,
The operation of picking articles according to the total number of sorts in units of varieties (K20, K30, K40), and the operation of picking articles specified for each sort destination by the indicated amount (K21, K31, K41). Transported to a temporary delivery place with a vertical transport facility. Separately from this, according to a shipping plan, articles designated respectively from the automatic warehouse, the SA frontage, and the dangerous goods warehouse are picked (K50, K10, K60, and K).
70).

【0024】仕分けは、図3では「種まき」と表現され
ており、ピッキングした物品を仕分けてまとめる。ま
た、この種まき時に同時に出荷検品される(ここでの作
業単位は、K90,K80,K60,K50,K10と
される)。ここで、荷揃えロケーションごとに荷揃えが
完了すれば物品には荷揃え完了ラベルが貼付される。荷
揃えされ各店舗へ直接配送される物品は、直送分車単位
擬似店別荷揃えされ、直送配送車に付紐けされ積み込ま
れる(E90)。また、ターミナルなどに配送されるも
のは、リレー分拠点単位荷揃えされ、リレー車に紐付け
され積み込まれる(E90)。
The sorting is expressed as "seed sowing" in FIG. 3, and the picked articles are sorted and put together. At the time of seeding, shipment inspection is performed at the same time (work units here are K90, K80, K60, K50, and K10). Here, if the packing is completed for each packing location, the packing completion label is attached to the article. The articles that are packed and delivered directly to each store are sorted by the direct delivery car unit by pseudo shop, attached to the direct delivery car and loaded (E90). In addition, items to be delivered to a terminal or the like are packed in units of bases for relays, tied to relay vehicles and loaded (E90).

【0025】図4は、カゴ車に品種単位でカゴ車が一杯
になるまで物品をピッキングして配送先単位に仕分けを
行うカート仕分け室へ搬送する作業フロー(ここではバ
ラ総量ピッキングという)を示している。カート仕分け
室では、B20、B30、B40のように2階、3階、
4階間口に格納された物品をピッキングし積込んだカゴ
車から物品を取り出し、カートで店舗単位に仕分けして
一時保管場所で一時保管し、保管場所から、配送車単位
で配送先順に出庫し、パレット積みする(オリコン段積
み)。そして荷揃えエリアの所定のロケーションに置か
れ、梱出荷分と合わせて配送車に積み込まれて配送され
る。この作業フローでの作業単位にはB20、B30の
ようにBに数字が付与された識別番号が付けられてい
る。
FIG. 4 shows a work flow (herein referred to as total picking of loose pieces) for picking up articles in a cart type until the carts are full and transporting the articles to a cart sorting room for sorting by delivery destination unit. ing. In the cart sorting room, the second floor, the third floor, like B20, B30, B40,
Pick up the goods stored in the 4th floor frontage, take out the goods from the loaded cart, sort them into stores by cart, temporarily store them in the temporary storage place, and deliver them from the storage place in the order of delivery destination by delivery car unit. Pallet stacking (oricon stacking). Then, it is placed at a predetermined location in the cargo assortment area, loaded into a delivery vehicle together with the package shipment, and delivered. The work unit in this work flow is provided with an identification number in which a number is added to B, such as B20 and B30.

【0026】図5は、物品の移動に着目して移動の指示
を行う場合の搬送形態を示している。例えば、別倉庫に
格納されていた物品は、垂直搬送設備を介して各階間口
や自動倉庫、SA間口、危険物倉庫に移動される。これ
らはM29,M39,M49,M51,M61,M71
という作業単位で示されている。また、返品エリアや間
口仮置き、自動倉庫からの移動についてもそれぞれの作
業単位が示されている。
FIG. 5 shows a transport mode in which a movement instruction is given while focusing on the movement of an article. For example, an article stored in another warehouse is moved to each floor entrance, an automatic warehouse, an SA entrance, and a dangerous goods warehouse via vertical transport equipment. These are M29, M39, M49, M51, M61, M71
It is shown in the work unit. In addition, the respective work units are also shown for the return area, the frontage temporary storage, and the transfer from the automatic warehouse.

【0027】以上が、倉庫内での作業フローの例を示す
ものである。
The above is an example of the work flow in the warehouse.

【0028】この倉庫で荷作業の管理を行う上位の管理
システムの構成例を図6に示す。物品のピッキング管理
を行うピッキングCPU61と、作業者への作業指示や
作業者のスケジューリング等を行って作業管理を実行す
る作業マネジメントCPU62と、各作業者に対する無
線で作業指示その他のデータの出力、作業者からのデー
タ入力の処理を行う無線CPU63とがバス64によっ
て接続されている。無線CPU63は倉庫内に設けられ
た無線通信網65に接続されており、この無線通信網6
5を介して作業者が保持する無線ハンディターミナル
(以下無線HTという)66に接続され、作業指令、デ
ータの入出力等が無線回線を使って行われる。無線HT
66は、表示部、印刷部、バーコード読み取り部とを備
えたものであり、表示部には、上位の管理装置からの作
業指示等が表示される。印刷部は、格納先ラベル、カゴ
車ラベル、荷揃え完了ラベル等をプリントする。またバ
ーコード読み取り部は、物品やカゴ車に貼付された各種
ラベル等の識別を示すバーコードを読み取る。この無線
HT66は作業者一人一人が携帯しており、その所持す
る作業者ごとに作業指示、データの入出力が行われる。
FIG. 6 shows an example of the configuration of a higher-level management system that manages cargo work in this warehouse. A picking CPU 61 for performing picking management of articles, a work management CPU 62 for performing work management by performing work instructions to workers and scheduling workers, and wirelessly outputting work instructions and other data to each worker; A wireless CPU 63 that performs data input processing from a user is connected by a bus 64. The wireless CPU 63 is connected to a wireless communication network 65 provided in the warehouse.
5 is connected to a wireless handy terminal (hereinafter referred to as a wireless HT) 66 held by the worker, and work instructions and data input / output are performed using a wireless line. Wireless HT
66 is provided with a display unit, a printing unit, and a barcode reading unit, and the display unit displays work instructions and the like from a higher-level management device. The printing unit prints a storage destination label, a cart label, a packing completion label, and the like. The bar code reading unit reads a bar code indicating the identification of various labels and the like attached to the article and the cart. This wireless HT 66 is carried by each worker, and work instructions and data are input / output for each worker.

【0029】なお、バスには、入出荷計画を管理する物
流CPUや物品の管理を行うCPUなどが別途システム
として接続される。
The bus is connected as a separate system to a distribution CPU for managing the receipt / shipment plan and a CPU for managing the articles.

【0030】次に作業マネジメントCPUでの作業者の
作業割り当て(スケジューリング)を図7ないし図9に
基づいて説明する。
Next, the work assignment (scheduling) of the worker in the work management CPU will be described with reference to FIGS.

【0031】図7は、作業割り当てを行う管理システム
でのデータの流れを示すものであり、図6の作業マネジ
メントCPU、ピッキングCPUに対応する構成であ
る。
FIG. 7 shows the flow of data in the management system for performing work assignment, and has a configuration corresponding to the work management CPU and picking CPU in FIG.

【0032】作業マネジメントCPUは、作業者の割り
当て計算を行うスケジューラ71を備えており、作業マ
ネジメントCPUおよびピッキングCPUが共有して使
用する記憶装置(共有ディスク)にある作業者投入制約
条件マスタ73、シフト別勤務予定者マスタ74、作業
者マスタ75、作業定義マスタ76を使用して作業者の
割り当てを行う。また、ピッキングCPUは、ピッキン
グデータを作成する作業単位データ作成手段72を備え
ており、別途バスで接続されている物流CPUからのデ
ータ、および作業定義マスタ76、在庫データ77を使
用して作業者に対する作業単位のピッキングデータを作
成する。
The work management CPU includes a scheduler 71 for calculating the assignment of workers. The work management CPU and the picking CPU share a worker input constraint master 73 in a storage device (shared disk). Workers are assigned using the shift-specific work schedule master 74, worker master 75, and work definition master 76. The picking CPU includes work unit data creating means 72 for creating picking data. The picking CPU uses the data from the physical distribution CPU separately connected by a bus, the work definition master 76, and the stock data 77 to perform the work. Create picking data for a unit of work for.

【0033】ここで、作業定義マスタ76は、上述の作
業単位ごとに作業工程を定義したファイルであり、作業
単位番号ごとに作業工程名称、標準人時生産性、作業工
程定義、作業単位、無線HT画面のデータをもつ。例え
ば、作業単位N20は、作業工程名称を「入荷格納各階
行き」、標準人時生産性を「388」、作業工程定義を
「検品場所のN10、N11の階毎カゴ車を昇降機へ運
ぶ→各階へ」、作業単位「号車毎」、無線HT画面を
「格納各階行き」とのデータが定義されている。各作業
単位ごとにこれらのデータが設定されている。
Here, the work definition master 76 is a file in which the work process is defined for each of the above work units, and for each work unit number, the work process name, the standard human productivity, the work process definition, the work unit, the wireless It has HT screen data. For example, the work unit N20 is such that the work process name is “each store floor on arrival”, the productivity at standard time is “388”, and the work process definition is “carry the carts for each floor of N10 and N11 at the inspection place to the elevator → each floor. , The work unit “each car”, and the wireless HT screen “stored each floor”. These data are set for each work unit.

【0034】作業者投入制約条件マスタ73は、作業場
所ごとに投入できる作業者数、作業者に必要な資格など
のデータをもつファイルであり、作業単位番号ごとにこ
れらのデータが設定されている。例えば倉庫1階の入荷
エリアでの作業単位N20「入荷格納各階行き」では、
ハンドリングは「フォークリフト」、最大人数「10
人」、最小人数「1人」、フォーク資格「全員必要」と
のデータが設定されている。また、荷揃えエリアでの作
業単位K90「梱出荷間口ピッキング分1F荷揃え」
は、ハンドリングは「人」、最大人数は「20人」、最
小人数「1人」、フォーク資格「必要なし」というデー
タが設定されている。
The worker input constraint master 73 is a file having data such as the number of workers that can be input for each work place and the qualifications required for the workers, and these data are set for each work unit number. . For example, in the unit of work N20 in the receiving area on the first floor of the warehouse, “for each storage of the storage”,
Handling is "forklift", maximum number of people "10
The data includes "person", a minimum number of "one", and a fork qualification "need all". In addition, the work unit K90 in the packing area is "1B packing for 1st picking of the bundling frontage picking".
, Data is set such that the handling is "person", the maximum number is "20", the minimum number is "1", and the fork qualification is "no need".

【0035】またシフト別勤務予定者マスタ74は、作
業者ごとに、作業者シフト勤務予定が登録されたもので
あり、開始時刻と終了時刻の組にシフト番号を付与し、
このシフト番号を各人の勤務日ごとに設定している。例
えば、作業者コードAが、X月Y日の勤務が開始時刻
6:00、終了時刻15:00であり、このシフトにシ
フト番号「1」が付与されている場合、AのX月Y日の
シフトのデータにはシフト番号「1」が設定される。こ
れらのシフト別勤務予定者マスタには、月間の勤務につ
いて各人ごとにこれらのシフトのデータが登録される。
The shift work schedule master 74 stores a shift work schedule for each worker, and assigns a shift number to a set of start time and end time.
The shift number is set for each working day of each person. For example, if the worker code A has a start time of 6:00 and an end time of 15:00 on X / Y and the shift number “1” is assigned to this shift, The shift number “1” is set to the data of the shift. These shift-by-shift masters are registered with the data of these shifts for each person for the monthly work.

【0036】作業者マスタ75は、作業者ごとにその資
格、作業者の区分、作業場所の優先順位、作業区分別優
先順位のデータが設定されたものである。この作業マス
タに登録された優先順位のデータは、作業者ごとにどの
場所、どの作業を優先して割り当てるかのデータであ
り、作業者の資格、作業能率によってあらかじめ設定さ
れているものである。例えば、作業者のコードAについ
て、作業者区分1F作業員6、フォークリフト資格有、
自動倉庫操作資格有で、作業場所別優先順として、順位
1「入荷」、順位2「自動倉庫」、順位3「危険物倉
庫」、順位4「SA間口」が設定され、作業区分別優先
順位として、順位1「入荷検品格納」、順位2「梱出
荷」、順位3「バラ総量」が設定される。作業者には、
原則的に作業場所別優先順位、作業区分優先順位を設定
しておくものとする。
In the worker master 75, data on the qualification, the category of the worker, the priority of the work place, and the priority of each work category are set for each worker. The priority data registered in the work master is data indicating which place and which work is to be preferentially assigned to each worker, and is set in advance according to the qualification and work efficiency of the worker. For example, regarding the code A of the worker, the worker category 1F worker 6, forklift qualified,
With the automatic warehouse operation qualification, priority 1 according to the work place, order 1 “arrival”, order 2 “automatic warehouse”, order 3 “dangerous goods warehouse”, order 4 “SA frontage” are set. As the order, "order storage 1", order 2 "batch shipping", and order 3 "total amount of roses" are set. For workers,
In principle, priority for each work place and priority for work division shall be set.

【0037】ここで作業者Aに対するK20(2階間口
で梱ピッキング(品種総量)を行う)の作業指示の例で
説明する。作業者Aが勤務開始により氏名コードを入力
して作業者登録あるいは作業完了通知を行って、作業者
別作業/作業工程データにすでに設定されている作業者
Aの作業単位番号(K20)を取得する。この作業単位
の作業指示として作業者Aの無線HTの表示部には、
「2階間口で梱ピッキング(品種総量)を行う」との作
業指示が表示される。この作業単位番号を取得すると、
今度は、ピッキングCPUの作業単位データに設定され
ている作業単位ごとの具体的作業内容を取得する。この
作業単位データは、作業単位データ作成手段72が、物
流CPUから受け取ったデータに基づいて作成してある
ので、作業者Aに対する具体的な作業単位K20の内容
が無線HTに表示される。
Here, a description will be given of an example of a work instruction to the worker A for K20 (package picking (total type) at the second floor entrance). Worker A enters his / her name code at the start of work, registers the worker or notifies the completion of the work, and obtains the work unit number (K20) of worker A already set in the work / work process data for each worker. I do. As a work instruction of this work unit, the display section of the wireless HT of the worker A includes:
A work instruction of "performing package picking (total type) at the second floor entrance" is displayed. Once you get this work unit number,
This time, the specific work content for each work unit set in the work unit data of the picking CPU is acquired. Since the work unit data is created by the work unit data creation means 72 based on the data received from the physical distribution CPU, the specific contents of the work unit K20 for the worker A are displayed on the wireless HT.

【0038】スケジューラ71は、作業者投入制約条件
マスタ73、シフト別勤務予定者マスタ74、作業者マ
スタ75、作業定義マスタ76のデータに基づいて、作
業者の割り当て(スケジューリング)を行う。それにつ
いて図8、図9を参照して説明する。図8はスケジュー
ラ71、および作業指示データを作成する作業単位デー
タ作成手段72の動作を説明するフローチャートであ
る。
The scheduler 71 allocates (schedules) workers based on the data of the worker input constraint master 73, shift-by-shift master 74, worker master 75, and work definition master 76. This will be described with reference to FIGS. FIG. 8 is a flowchart for explaining the operations of the scheduler 71 and the work unit data creating means 72 for creating work instruction data.

【0039】スケジューラ71でのスケジューリング
は、スケジューラが所定の契機で起動すると(S8
1)、まず、作業工数を算出し、その作業工数に基づい
て作業者割り当てを行う(S82、S83)。この作業
割り当ての演算結果に対してその作業時間が短いものに
ついては補正を行い(S84)、補正結果に基づいて作
業者に対する指示データを作成し、作業指示を行う(S
85、S86)。
The scheduling by the scheduler 71 starts when the scheduler is started at a predetermined timing (S8).
1) First, work man-hours are calculated, and workers are assigned based on the work man-hours (S82, S83). The calculation result of the work assignment is corrected if the work time is short (S84), instruction data for the worker is created based on the correction result, and a work instruction is given (S84).
85, S86).

【0040】さらに、各ステップについて説明する。Further, each step will be described.

【0041】まず、シフト別勤務予定者マスタのデータ
から出勤予定者を把握する。なお、出勤予定者でなくて
も、無線HTから作業者登録を行ったものも作業者対象
として扱う。また物流CPUから受け取った、入荷物品
量のデータ、出荷物品量のデータから、作業対象となる
物品量を把握し、作業工数を算出する。これにより投入
できる人と処理すべき物品量を把握できる。ここで、物
品量の把握として、作業バッチデータから作業単位ごと
(作業ナンバーごと)に扱う物品量を把握する。このと
き前工程と後工程との関係を考慮する。例えば、K90
には前工程として、K20、K21、K30、K31が
あり、この前工程の物品を後工程として扱うことにな
る。そして、作業単位ごとに、作業工数を算出する。作
業工数は、物品量、人時生産性により計算する。その計
算式は、(作業単位ごとの作業物品量)/(作業単位毎
の人時生産性)で表される。そして、フロアごとに作業
工数を計算し、フロア単位の括りでフローごとの作業工
数を算出する。
First, the person who is going to work is grasped from the data of the person who intends to work by shift. It should be noted that even those who are not going to work, those who have registered workers from the wireless HT are also treated as workers. Further, from the data on the amount of incoming and outgoing goods received from the physical distribution CPU and the data on the amount of shipped goods, the amount of goods to be worked on is grasped, and the number of work steps is calculated. Thereby, it is possible to know who can put in and the amount of articles to be processed. Here, as the grasp of the article quantity, the article quantity to be handled for each work unit (each work number) is grasped from the work batch data. At this time, the relationship between the pre-process and the post-process is considered. For example, K90
There are K20, K21, K30, and K31 as pre-processes, and articles in the pre-process will be handled as post-processes. Then, the number of work steps is calculated for each work unit. Work man-hours are calculated based on the quantity of goods and productivity at man hour. The calculation formula is represented by (work article quantity for each work unit) / (human productivity for each work unit). Then, the work man-hours are calculated for each floor, and the work man-hours for each flow are calculated by consolidating the floor units.

【0042】次にこのデータに基づいて作業者の割り当
てを行う。
Next, workers are assigned based on this data.

【0043】まず、作業割り当て対象者人数をもとにフ
ロア別作業人数を計算し、作業工程別に人数を割り振
る。このとき作業者投入制約条件マスタ73の最大人数
制限を考慮する。そして作業場所および作業区分での作
業者割り当てを行う。
First, the number of workers for each floor is calculated based on the number of persons to be assigned work, and the number of workers is assigned for each work process. At this time, the maximum number of persons in the worker input constraint condition master 73 is considered. Then, the worker is assigned at the work place and the work division.

【0044】この作業者の割り当ては次の条件が成立す
るように行う。 1)作業定義マスタの「標準人時生産性」のデータを基
に作業工程ごとの作業工数を計算する。このとき、作業
がある作業工程すべてに作業者を割り付ける。ただし、
作業者投入制約条件マスタにあるフロアごとの最大人数
枠の条件を満たすようにする。このことは、最も忙しい
工程以外の作業工程であっても作業がある限り作業者を
割り付けることを意味しており、作業量が多いところに
のみ作業者を割り付けるようにしない。 2)作業工程ごとの作業工数に応じて必要人数を割り付
ける。 3)作業工程ごとの作業者投入制約条件マスタの制約条
件と作業者ごとの作業者マスタの資格、優先順を考慮し
て作業者を決定する。 4)同一作業には同一作業者を継続割り当てするように
する。 5)優先バッチ部分には投入できる最大人数を割り当て
るようにする。 6)作業工数が少ない作業者に対しては、待機状態にな
らないように次の作業工程まで決めておく。ただし、こ
の場合、フロア間移動が極力少なくなるように割り付け
る。 7)バッチ収束時、作業工数が少なくなってきた場合に
は、過剰に人数を割り付けないようにし、作業が終了し
たものに対しては作業場所の後片付けを意味する整理、
整頓、清掃(3S)指示を出す。
The assignment of the workers is performed so that the following condition is satisfied. 1) Calculate the number of man-hours for each work process based on the data of "standard man-hour productivity" of the work definition master. At this time, workers are assigned to all work processes in which there is work. However,
The condition of the maximum number of persons for each floor in the worker input constraint condition master is satisfied. This means that workers are allocated as long as there is work even in work processes other than the busiest process, and workers are not allocated only to places where the amount of work is large. 2) Allocate the required number of people according to the number of work steps for each work process. 3) The worker is determined in consideration of the constraint of the worker input constraint master for each work process, the qualification of the worker master for each worker, and the priority order. 4) Assign the same worker continuously to the same work. 5) Assign the maximum number of people who can be input to the priority batch part. 6) For workers with a small number of work steps, the next work process is determined so as not to be in a standby state. However, in this case, the assignment is performed so that the movement between floors is minimized. 7) At the time of batch convergence, if the number of man-hours is reduced, do not assign an excessive number of people.
A tidy and cleaning (3S) instruction is issued.

【0045】また、短時間作業補正として、割り当て作
業が少数の場合には30分先の作業まで用意するように
その割り当てを補正する。これは30分以内で作業が終
了する作業を抽出して、作業を組み合わせるもので、作
業者の資格、移動順位(まず、同一作業場所、次に同一
フロア、次に他のフロアの順)にしたがって作業の組み
合わせを行って作業者割り当てを行うものである。
In addition, as a short-time work correction, when the assignment work is small, the assignment is corrected so that the work up to 30 minutes ahead is prepared. In this method, work that is completed within 30 minutes is extracted and combined, and the qualifications of workers and the order of movement (first in the same work place, then in the same floor, then in other floors) Therefore, the assignment of the workers is performed by combining the works.

【0046】このような条件を満たすように作業者割り
当てを行うが、作業者割り当ては、現実の物品の流れお
よびそれに対する処置に対応するように所定の事項を契
機として再計算を行うようにする。この再計算の実行タ
イミングとしては次のような契機とする。 新たな出荷データを受け取ったとき 入荷車到着登録を行ったとき 一定周期、例えば5分とか10分間隔 無線HTにて作業者が勤務終了を行ったとき シフト別勤務予定者の欠勤入力を行ったとき マネジャ判断による操作端末での任意起動
The worker assignment is performed so as to satisfy such conditions. In the worker assignment, recalculation is performed with a predetermined matter as an opportunity so as to correspond to the actual flow of the articles and the measures for them. . The timing for executing this recalculation is as follows. When new shipment data is received When the arrival of the arrival vehicle is registered A fixed period, for example, every 5 minutes or 10 minutes When the worker finishes his / her duties by wireless HT, he / she inputs the absence of the person who is going to work by shift. When arbitrarily started on the operation terminal according to the manager's judgment

【0047】図9は、作業開始前から作業者が勤務終了
を入力したときまでの作業者割り当て処理の動作を説明
するフローである。まず、シフト別勤務予定者マスタを
作成しておく(S91)。これは1月前からでも登録す
ることができる。
FIG. 9 is a flowchart for explaining the operation of the worker assignment process from before the start of the work to when the worker inputs the end of work. First, a work schedule master for each shift is created (S91). You can register this one month before.

【0048】毎日の作業者の勤務前に、シフト別勤務予
定者マスタ、作業定義マスタ、作業者マスタ、作業者投
入制約マスタのデータに基づいて勤務予定者で作業者割
り当て計算を行ってあらかじめ作業指示を作成しておく
(S92)。当日に作業者が勤務開始登録を無線HTで
行うと(S93)、予定していた作業を指示する。作業
中は、この登録された作業者に対して、作業定義マス
タ、作業者マスタ、作業者投入制約マスタのデータに基
づいて作業割り当てを行い作業指示を行う(S94)。
作業者が無線HTにて勤務終了登録を行うと、この作業
者を作業マメジネントの対象から除外する(S95)。
Prior to the daily work of the worker, the work scheduler calculates the worker assignment based on the data of the shift schedule master, the work definition master, the worker master, and the worker input constraint master, and performs the work in advance. An instruction is created (S92). When the worker performs the work start registration by wireless HT on the day (S93), the worker instructs the scheduled work. During the work, work is assigned to the registered worker based on the data of the work definition master, the worker master, and the worker input constraint master, and a work instruction is given (S94).
When the worker performs the work end registration by using the wireless HT, the worker is excluded from the targets of the work material (S95).

【0049】このように、事前にあらかじめ作業者の予
定に基づいて作業指示を作成しておくが、上述のよう
に、それぞれの契機により割り当ての再計算を行って作
業指示を行うようにする。
As described above, a work instruction is created in advance based on the schedule of the worker, and as described above, the work instruction is performed by recalculating the assignment at each opportunity.

【0050】シフト別勤務予定者マスタで作業を割り当
てた作業者が休んだ場合、欠勤入力を行うことにより、
無線HTで登録されている他の作業者に休んだ作業者に
予定していた作業を割り当てる。
When a worker who has been assigned work in the shift-by-shift work master is absent, he / she can enter absence and enter
The scheduled work is assigned to the rested worker to other workers registered by the wireless HT.

【0051】[0051]

【発明の効果】本発明は作業者の割り当てにおいて、作
業量が多く忙しいところだけに集中的に投入するのでは
なく、作業負荷がそれほどではなく、忙しいとまではい
えない作業工程であっても作業が存在するという工程に
も作業者を配置するように割り当てている。これによ
り、忙しいところの物品の流れはある部分遅いかもしれ
ないが、全体として物品が流れるように工程を管理する
ことができる。また、作業者の工程間の移動を少なくす
ることができ、人員の配置を合理的にすることができ
る。
According to the present invention, in the assignment of workers, the work load is not so concentrated that only busy places are busy. Workers are also assigned to processes where work exists. Thus, the flow of articles in a busy place may be slow in some parts, but the process can be controlled so that the articles flow as a whole. In addition, it is possible to reduce the movement of the worker between processes, and it is possible to rationalize the arrangement of personnel.

【0052】また、作業者割り当てを所定時間ごとにそ
の都度計算して行うため、入荷出荷の計画の変更や入荷
出荷の変動に応じて作業者の割り当てを行うことができ
るため、物品の流れに応じてリアルタイムで荷作業を対
応させることが可能である。
Further, since the worker assignment is calculated and performed at every predetermined time, the worker can be assigned according to the change of the plan of the incoming and outgoing shipment and the fluctuation of the incoming and outgoing shipment. Accordingly, it is possible to correspond the loading work in real time.

【0053】作業者ごとに割り付ける作業に優先順位を
設定し、また作業工程ごとに作業者に必要な資格や最大
配置可能な数等の情報に基づいて、作業効率が高くなる
ように作業者を割り当てるため、効率的に作業が行われ
るように作業割り当てを行うことが可能である。
Priorities are set for the work to be assigned to each worker, and based on information such as qualifications necessary for the worker and the maximum number of work pieces that can be arranged for each work process, the workers are assigned to increase the work efficiency. Since the work is allocated, the work can be allocated so that the work is performed efficiently.

【0054】さらに、作業者が携帯する無線HTを介し
て作業割り当てを作業者に直接行い、また作業者からの
勤務開始登録、勤務終了登録も無線HTを介して行うこ
とができるため、倉庫内での作業者割り当ておよび作業
指示を作業者に随時制約なしに行うことができる。
Further, work can be assigned directly to the worker via the wireless HT carried by the worker, and work start registration and work end registration from the worker can also be performed via the wireless HT. Can be given to the worker at any time without restriction.

【図面の簡単な説明】[Brief description of the drawings]

【図1】倉庫内で物品の流れと作業の概要を示す図。FIG. 1 is a diagram showing the flow of goods and the outline of work in a warehouse.

【図2】入荷格納の作業フローを説明する図。FIG. 2 is a diagram for explaining a work flow of storing goods;

【図3】梱出荷の作業フローを説明する図。FIG. 3 is a diagram for explaining a work flow of packing and shipping.

【図4】バラ出荷の作業フローを説明する図。FIG. 4 is a diagram illustrating a work flow of bulk shipment.

【図5】移動の作業フローを説明する図。FIG. 5 is a diagram illustrating a work flow of movement.

【図6】上位の作業管理システムの構成を示す図。FIG. 6 is a diagram showing a configuration of a higher-level work management system.

【図7】作業マネジメントにおけるデータの流れを説明
する図。
FIG. 7 is a view for explaining the flow of data in work management.

【図8】作業者割り当て処理のフローを示す図。FIG. 8 is a diagram showing a flow of a worker assignment process.

【図9】作業者の勤務前から勤務終了までの作業者割当
て処理のフローを示す図。
FIG. 9 is a diagram showing a flow of a worker assignment process from before the worker's work to the end of the work.

【符号の説明】[Explanation of symbols]

61 ピッキングCPU 62 マネジメントCPU 63 無線CPU 64 バス 65 無線通信網 66 無線HT 71 スケジューラ 72 作業単位データ作成手段 73 作業者投入制約条件マスタ 74 シフト別勤務予定者マスタ 75 作業者マスタ 76 作業定義マスタ 77 在庫データ Reference Signs List 61 picking CPU 62 management CPU 63 wireless CPU 64 bus 65 wireless communication network 66 wireless HT 71 scheduler 72 work unit data creation means 73 worker input restriction condition master 74 shift work schedule master 75 worker master 76 work definition master 77 stock data

───────────────────────────────────────────────────── フロントページの続き Fターム(参考) 3F022 MM03 MM05 MM07 MM11 MM21 ──────────────────────────────────────────────────続 き Continued on the front page F-term (reference) 3F022 MM03 MM05 MM07 MM11 MM21

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 倉庫での作業者の荷作業の管理を行う管
理装置であり、 この管理装置は、作業工程区分ごとに一人の作業者が行
えるひとまとまりの荷作業を割り当ての単位である作業
単位として定義し、この作業単位ごとに作業者を割り当
てる割当手段を備え、 この割当手段は、作業工程ごとの作業負荷および作業の
制約条件に応じて作業者を割り当てるにあたり、荷作業
が存在する工程へは少なくとも一人の作業者を割り当て
る手段を含み、 この作業割り当ての演算を所定時間ごとに繰り返し行う
手段を含むことを特徴とする倉庫の管理装置。
The present invention relates to a management device that manages a cargo operation of a worker in a warehouse, and the management device assigns a group of cargo operations that can be performed by one worker for each work process division. An assignment unit is defined as a unit and assigns a worker for each work unit. The assignment unit assigns a worker according to a work load and a work constraint for each work process. A means for allocating at least one worker, and means for repeatedly calculating the work assignment at predetermined time intervals.
【請求項2】 前記割当手段は、割り当てる作業者の行
うことができる作業を作業者ごとに作業区分または作業
場所について作業割り当て順位が設けられた優先順位デ
ータに基づいて、前記作業割り当てを行う手段を含む請
求項1記載の物流倉庫の管理装置。
2. The assigning means assigns the work that can be performed by the worker to be assigned to the worker based on the priority data in which the work assignment order is set for each worker for each work category or work place. The management apparatus for a distribution warehouse according to claim 1, further comprising:
【請求項3】 前記管理装置は、荷作業が発生するごと
に作業割り当ての再計算を行う手段を含む請求項1記載
の物流倉庫の管理装置。
3. The distribution warehouse management apparatus according to claim 1, wherein said management apparatus includes means for recalculating a work assignment each time a load operation occurs.
【請求項4】 前記管理装置は、作業の開始および完了
の入力ごとに作業割り当ての再計算を行う手段を含む請
求項1記載の物流倉庫の管理装置。
4. The distribution warehouse management apparatus according to claim 1, wherein said management apparatus includes means for recalculating the work assignment each time the start and completion of the work are input.
【請求項5】 作業者は作業指示が行われる端末を携帯
し、 前記管理装置は、この携帯端末を介して作業者に作業指
示を行うとともに作業工程ごとの開始および完了の入力
を行う手段を含む請求項1記載の物流倉庫の管理装置。
5. The worker carries a terminal to which a work instruction is given, and the management device provides means for giving a work instruction to the worker via the portable terminal and inputting start and completion of each work process. The management apparatus for a distribution warehouse according to claim 1, further comprising:
【請求項6】 物流倉庫で行われる荷作業を複数の工程
にわけ、この各工程にそれぞれ作業者を割り当てる物流
倉庫の作業管理方法において、 荷作業の工程ごとに、一人の作業者が行えるひとまとま
りの荷作業を割り当ての単位である作業単位として定義
し、 この作業単位ごとに作業者に作業指示を行い、 この荷作業が存在する工程には少なくとも一人の作業者
を割り当て、 この作業者の割り当ての演算を所定時間ごとに行うこと
を特徴とする物流倉庫の作業管理方法。
6. In a work management method of a distribution warehouse, in which a loading operation performed in a distribution warehouse is divided into a plurality of processes and an operator is assigned to each of the processes, one worker can perform one loading operation. A group of load work is defined as a work unit, which is the unit of assignment, and a work instruction is given to the worker for each work unit. At least one worker is assigned to the process in which this load work exists. A work management method for a distribution warehouse, wherein calculation of assignment is performed at predetermined time intervals.
JP2001119721A 2001-04-18 2001-04-18 Management device and method for warehouse Pending JP2002312445A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001119721A JP2002312445A (en) 2001-04-18 2001-04-18 Management device and method for warehouse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001119721A JP2002312445A (en) 2001-04-18 2001-04-18 Management device and method for warehouse

Publications (1)

Publication Number Publication Date
JP2002312445A true JP2002312445A (en) 2002-10-25

Family

ID=18969893

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001119721A Pending JP2002312445A (en) 2001-04-18 2001-04-18 Management device and method for warehouse

Country Status (1)

Country Link
JP (1) JP2002312445A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014191377A (en) * 2013-03-26 2014-10-06 Hitachi Systems Ltd Worker allocation method, and worker allocation system
JP2015229808A (en) * 2014-06-04 2015-12-21 株式会社豊田自動織機 Fiber bundle supply stop device of fine spinning frame
WO2022215780A1 (en) * 2021-04-07 2022-10-13 쿠팡 주식회사 Operation method of electronic apparatus for managing product warehousing information, and electronic apparatus supporting same
EP4024320A4 (en) * 2019-08-28 2023-08-23 LOGISTEED, Ltd. Work planning system and work planning method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014191377A (en) * 2013-03-26 2014-10-06 Hitachi Systems Ltd Worker allocation method, and worker allocation system
JP2015229808A (en) * 2014-06-04 2015-12-21 株式会社豊田自動織機 Fiber bundle supply stop device of fine spinning frame
EP4024320A4 (en) * 2019-08-28 2023-08-23 LOGISTEED, Ltd. Work planning system and work planning method
WO2022215780A1 (en) * 2021-04-07 2022-10-13 쿠팡 주식회사 Operation method of electronic apparatus for managing product warehousing information, and electronic apparatus supporting same

Similar Documents

Publication Publication Date Title
Alnahhal et al. In-plant milk run decision problems
JP2019112226A (en) Delivery method of article and delivery information processing system
De Koster Warehouse assessment in a single tour
WO2021039143A1 (en) Work planning system and work planning method
JP2002312445A (en) Management device and method for warehouse
JP2002203158A (en) Work planning method and work planning device
JP4586491B2 (en) Delivery system and delivery method
JP3699361B2 (en) Load management device
JP2002308407A (en) Managing method and device of cargo handling work
JP2007076831A (en) Conveyance system
JP4321847B2 (en) A method for assembling goods in each shipping destination
JP2005145578A (en) Article warehousing system
JP2002249209A (en) Carrying system utilizing hanger with bar code
JP2008156128A (en) Method of arranging articles
JPH07110684B2 (en) Delivery instruction device in distribution warehouse
JP2002312447A (en) Management method for warehouse and warehouse
JP3796288B2 (en) Receipt and shipment method and system for goods
JP3852005B2 (en) Article sorting method and apparatus
JP4125612B2 (en) Assortment method of goods
JPH08268514A (en) Picking device of physical distribution system
JP2002308409A (en) Stock control method of warehouse and warehouse
JP3161330B2 (en) Inbound and outbound processing instructions
JPH05113988A (en) Arrival/ship scheduling device
JPH0741115A (en) Processing/loading-on/controlling system
JP2538401B2 (en) Delivery instruction device in distribution warehouse

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041130

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050120

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050215