JP2002276293A - Confirming method of tunnel back-filing grouting material - Google Patents

Confirming method of tunnel back-filing grouting material

Info

Publication number
JP2002276293A
JP2002276293A JP2001077447A JP2001077447A JP2002276293A JP 2002276293 A JP2002276293 A JP 2002276293A JP 2001077447 A JP2001077447 A JP 2001077447A JP 2001077447 A JP2001077447 A JP 2001077447A JP 2002276293 A JP2002276293 A JP 2002276293A
Authority
JP
Japan
Prior art keywords
filling
transparent
backfilling
lining layer
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001077447A
Other languages
Japanese (ja)
Other versions
JP3849440B2 (en
Inventor
Toshio Yasuda
敏夫 安田
Yoshiaki Kamigaki
義明 上垣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2001077447A priority Critical patent/JP3849440B2/en
Publication of JP2002276293A publication Critical patent/JP2002276293A/en
Application granted granted Critical
Publication of JP3849440B2 publication Critical patent/JP3849440B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily and surely confirm a backfill condition at a low cost. SOLUTION: When a tunnel lining layer 10 is formed, an inspection hole 20 is bored through the lining layer 10, and it is examined whether there is a hollow part 12 on the back face side of the tunnel lining layer 10 or not. If existence of the harmful hollow part 12 is detected on the back side of the lining layer 10, a back-filling grouting material 14 is injected and charged into the hollow part 12. Before the grouting material 14 is injected and charged, a transparent cylinder 22 is installed. After installation of the transparent cylinder 22 is finished, the back-filing grouting material 14 is injected and charged into the hollow part 12. When the back-filling grouting material 14 is cured with the elapse of time, the charging condition can be checked visually through the transparent cylindrical body 22.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、トンネル裏込め
注入材の充填確認方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for confirming the filling of a tunnel backfill material.

【0002】[0002]

【従来の技術】トンネル工事においては、覆工層の背面
側に空洞部が発生することがあり、そのまま放置してお
くと、崩落などの原因となる。そこで、一般的には、ト
ンネル覆工層を形成した後に、覆工層に調査孔を穿設し
て、覆工層の背面側に存在する空洞部の調査を行ってい
る。
2. Description of the Related Art In tunnel construction, a cavity may be formed on the back side of a lining layer, and if left as it is, it may cause collapse or the like. Therefore, in general, after forming a tunnel lining layer, an inspection hole is formed in the lining layer to investigate a cavity existing on the back side of the lining layer.

【0003】このような調査で、空洞部が確認される
と、空洞部内にモルタルなどの硬化性の裏込め注入材を
充填して、空洞部を埋めている。
[0003] When a cavity is confirmed by such a survey, the cavity is filled with a curable backfill material such as mortar to fill the cavity.

【0004】このような空洞部への裏込め注入材の充填
では、施工中において、隣接する注入孔から注入材の
流出を確認する方法、注入する注入材の注入圧の上昇
(一般に、0.15〜0.2MPaと言われている)の
いずれかにより、注入材の充填状態を確認し、これらの
確認が行われると、注入を停止し、充填完了の基準とし
ていた。
[0004] In filling the backfilling filling material into such a cavity, a method of confirming the outflow of the filling material from an adjacent filling hole during the construction, an increase in the filling pressure of the filling material to be poured (generally, a pressure of 0. (Referred to as 15 to 0.2 MPa), the filling state of the injection material was confirmed, and when these were confirmed, the injection was stopped and used as a reference for the completion of the filling.

【0005】また、これ以外にも充填センサや熱電対な
どの計測により、充填を確認する方法もある。さらに、
裏込め注入材の注入硬化後に直接的な最終確認方法とし
て、任意断面において、チェックボーリングを行い、注
入材と地山との一体性を確認している。
[0005] In addition, there is a method of confirming the filling by measuring a filling sensor or a thermocouple. further,
As a direct final confirmation method after the injection hardening of the backfill injection material, check boring is performed on an arbitrary cross section to confirm the integrity between the injection material and the ground.

【0006】しかしながら、このような従来の裏込め注
入材の充填確認方法には、以下に説明する技術的な課題
があった。
[0006] However, such a conventional method of confirming the filling of the backfilling injection material has the following technical problems.

【0007】[0007]

【発明が解決しようとする課題】すなわち、前述した
,の施工中の充填確認方法では、注入材が地山に到
達しているかを直接確認しないので、確実性ないしは信
頼性に欠ける。また、計測による確認方法は、測定機器
の設置個所の確保が困難で、計測費用も高価になるとい
う問題がある。
That is, in the above-described method of confirming filling during construction, since it is not directly confirmed whether or not the injected material has reached the ground, the method is lacking in reliability or reliability. In addition, the confirmation method by measurement has a problem that it is difficult to secure a place where the measurement device is installed, and the measurement cost is high.

【0008】さらに、チェックボーリングによる確認方
法は、確実性はあるものの、施工性および経済性から、
採取個所の数が限られ、注入材の充填確認の範囲が狭い
という問題があった。
[0008] Further, although the check method by check boring has certainty, it is not easy to use because of its workability and economy.
There is a problem that the number of sampling points is limited, and the range of filling confirmation of the injection material is narrow.

【0009】本発明は、このような従来の問題点に鑑み
てなされたものであって、その目的とするところは、簡
単かつ安価で、しかも、確実に充填状態の確認が可能な
トンネル裏込め注入材の充填確認方法を提供することに
ある。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned conventional problems, and an object of the present invention is to provide a tunnel backfill that is simple and inexpensive and that can surely check the filling state. An object of the present invention is to provide a method for confirming filling of an injection material.

【0010】[0010]

【課題を解決するための手段】上記目的を達成するため
に、本発明は、トンネル覆工層の背面側に空洞部が確認
された際に、前記空洞部に硬化性の裏込め注入材を充填
した時に、前記裏込め注入材の充填状態の確認方法にお
いて、前記空洞部の存在が確認された際に、前記トンネ
ル覆工層に貫通形成される調査孔などの貫通孔から前記
空洞部側に延設され、先端が地山に到達する透視可能な
透明筒体を設置し、この後に、前記空洞部内に前記裏込
め注入材を充填し、充填した前記裏込め注入材の充填状
態を、前記透明筒体を介する目視観察により行うように
した。
In order to achieve the above-mentioned object, the present invention provides a method for manufacturing a semiconductor device, comprising the steps of: when a hollow portion is found on the back side of a tunnel lining layer; At the time of filling, in the method of checking the filling state of the backfilling injection material, when the presence of the cavity is confirmed, the cavity portion side from a through hole such as an investigation hole formed through the tunnel lining layer. Is installed, a transparent cylindrical body whose tip reaches the ground is installed, and thereafter, the backfilling filling material is filled in the hollow portion, and the filling state of the filled backfilling filling material is The observation was performed by visual observation through the transparent cylinder.

【0011】このように構成したトンネル裏込め注入材
の充填確認方法によれば、空洞部の調査に用いられる調
査孔などの貫通孔を利用して、貫通孔から空洞部側に延
設され、先端が地山に到達する透視可能な透明筒体を設
置し、この後に、空洞部内に裏込め注入材を充填し、充
填した裏込め注入材の充填状態を、透明筒体を介する目
視観察により行うので、比較的簡単な手段により、経済
的に、地山に注入材が到達しているか否かを確実に確認
することができる。
According to the method for confirming the filling of the tunnel backfill filling material configured as described above, a through hole such as an inspection hole used for investigating the cavity is used to extend from the through hole to the cavity side. A transparent tubular body whose tip reaches the ground is installed, and then the backfill filler is filled in the cavity, and the filling state of the filled backfill filler is visually observed through the transparent tubular body. Therefore, it is possible to reliably check whether or not the injected material has reached the ground by relatively simple means.

【0012】前記透明筒体の先端に破断可能な透明テー
プないしは透明フィルムを装着して閉塞し、前記充填状
態の確認後に、前記裏込め注入材の未充填が確認された
場合、前記透明テープないしは透明フィルムを破断し
て、前記裏込め注入材の最終充填を行うことができる。
When a transparent tape or a transparent film which can be broken is attached to the tip of the transparent cylinder and closed, and after the filling state is confirmed, it is confirmed that the back filling material is not filled, the transparent tape or the transparent tape or The transparent film can be broken to perform the final filling of the backfill filler.

【0013】前記目視観察は、前記透明筒体内に設置す
るファイバスコープないしはccdカメラを介して行う
ことができる。
The visual observation can be performed via a fiber scope or a ccd camera installed in the transparent cylinder.

【0014】[0014]

【発明の実施の形態】以下、本発明の好適な実施の形態
について、添付図面に基づいて詳細に説明する。図1か
ら図3は、本発明にかかるトンネル裏込め注入材の充填
確認方法の一実施例を示している。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the present invention will be described below in detail with reference to the accompanying drawings. FIG. 1 to FIG. 3 show one embodiment of a method for confirming the filling of a tunnel backfill filling material according to the present invention.

【0015】同図に示したトンネル裏込め注入材の充填
確認方法は、トンネルの構築現場で、トンネル覆工層1
0の背面側に空洞部12が確認された際に、空洞部12
に硬化性の裏込め注入材14を充填した時に、この裏込
め注入材14の充填状態を確認するために実施される。
The method of confirming the filling of the tunnel backfilling filling material shown in FIG.
When the hollow portion 12 is confirmed on the back side of the
This is performed in order to confirm the filling state of the backfilling injecting material 14 when the backfilling injecting material 14 is filled.

【0016】山岳トンネルを構築する際には、図1に示
すように、地山16が掘削され、掘削された地山掘削面
18の内側にトンネル覆工層10が形成される。なお、
空洞部12は、通常は、殆ど発生しないが図1には、理
解を容易にするために誇張して示している。
When constructing a mountain tunnel, as shown in FIG. 1, a ground 16 is excavated, and a tunnel lining layer 10 is formed inside the excavated ground excavation surface 18. In addition,
The cavities 12 usually rarely occur, but are exaggerated in FIG. 1 for easy understanding.

【0017】このトンネル覆工層10は、例えば、吹き
付けコンクリート工法や、型枠を用いるコンクリートの
現場打設、さらには、プレキャストコンクリートを用い
る方法などにより所定厚みに形成される。
The tunnel lining layer 10 is formed to a predetermined thickness by, for example, a spraying concrete method, a concrete casting method using a formwork, or a method using precast concrete.

【0018】トンネル覆工層10の背面地山16の空洞
部12を調査する場合、図1に示すように、トンネル覆
工層10に調査孔20が貫通形成され、トンネル覆工層
10の背面側に空洞部12が、存在するか否かが調査さ
れる。
When investigating the hollow portion 12 of the ground 16 behind the tunnel lining layer 10, as shown in FIG. 1, an inspection hole 20 is formed through the tunnel lining layer 10, and the rear surface of the tunnel lining layer 10 is formed. It is investigated whether a cavity 12 is present on the side.

【0019】この調査孔20は、例えば、トンネル軸方
向に沿って10mピッチで設けられる。なお、空洞部1
2の調査は、このような調査孔20を設ける場合だけで
なく、例えば、ハンマーなどにより覆工層10に打撃を
加えて、その際の発生音を聞くことなどにより行われ、
調査孔20を設けないで空洞部12が確認される場合に
は、調査孔20に相当する貫通孔を設ければ、本発明の
実施に支障は、来たさない。
The inspection holes 20 are provided, for example, at a pitch of 10 m along the tunnel axis direction. The cavity 1
The survey 2 is performed not only when the survey hole 20 is provided, but also by, for example, hitting the lining layer 10 with a hammer or the like and listening to the sound generated at that time.
In the case where the cavity 12 is confirmed without providing the inspection hole 20, providing a through hole corresponding to the inspection hole 20 does not hinder the implementation of the present invention.

【0020】調査孔20を介する調査により、トンネル
覆工層10の背面側に有害な空洞部12の存在が確認さ
れると、この空洞部12に裏込め注入材14を注入充填
することになるが、本実施例の場合には、この裏込め注
入材14を注入充填する前に、図2に示すように、透明
筒体22が設置される。
When the presence of the harmful cavity 12 on the back side of the tunnel lining layer 10 is confirmed by the investigation through the investigation hole 20, the cavity 12 is filled with the backfill filling material 14. However, in the case of the present embodiment, as shown in FIG. 2, a transparent cylindrical body 22 is installed before the backfill injection material 14 is injected and filled.

【0021】透明筒体22は、調査孔20の直径とほぼ
同じ外径を有し、両端が開口した中空円筒形状のもので
あって、例えば、透明なプラスチック製であって、内方
から外方への透視が可能な状態になっている。
The transparent cylinder 22 has an outer diameter substantially equal to the diameter of the inspection hole 20 and has a hollow cylindrical shape with both ends opened. For example, the transparent cylinder 22 is made of transparent plastic, It is in a state where it is possible to see through.

【0022】この透明筒体22の先端には、透明テープ
24が装着されていて、先端開口を破断可能に閉塞して
いる。なお、透明筒体22の先端開口を破断可能に閉塞
する手段は、この透明テープ24を装着すること以外
に、例えば、薄い透明フィルムを装着しても良いし、さ
らに、透明でかつ薄いプラスチックスを筒体22の先端
に一体に形成しても良い。
A transparent tape 24 is attached to the front end of the transparent cylindrical body 22, and the front end opening is closed so that it can be broken. The means for closing the opening at the tip of the transparent cylindrical body 22 so as to be rupturable may be, for example, a thin transparent film, or a transparent and thin plastic film. May be formed integrally with the tip of the cylindrical body 22.

【0023】透明筒体22は、調査孔20内に挿入され
て、空洞部12側に延設され、その先端の一部が地山掘
削面18に当接するようにして、地山16に到達するよ
うに設置される。
The transparent cylindrical body 22 is inserted into the inspection hole 20 and extends toward the hollow portion 12, and reaches the ground 16 so that a part of its tip comes into contact with the ground excavation surface 18. It is set up to do.

【0024】なお、このような状態に透明筒体22を設
置するためには、筒体22の設置前に調査孔20からそ
の上方の地山掘削面18までの距離を予め測定し、筒体
22の全長を、その距離を考慮した長さに設定する。
In order to install the transparent cylindrical body 22 in such a state, before installing the cylindrical body 22, the distance from the survey hole 20 to the ground excavation surface 18 above it is measured in advance. 22 is set to a length considering the distance.

【0025】透明筒体22の設置が終了すると、図3に
示すように、空洞部12内に裏込め注入材14の注入充
填が行われる。
When the installation of the transparent cylindrical body 22 is completed, as shown in FIG. 3, the backfilling filling material 14 is injected and filled into the hollow portion 12.

【0026】裏込め注入材14は、例えば、モルタルな
どの硬化性材料であって、このような裏込め注入材14
の注入充填は、調査孔20に隣接する他の調査孔や、調
査孔と同様にトンネル覆工層10を貫通する注入孔を穿
設して、これらの孔を介して行われる。
The backfill implant 14 is, for example, a curable material such as mortar.
Injection filling is performed through other holes adjacent to the inspection hole 20 and injection holes penetrating the tunnel lining layer 10 like the inspection holes.

【0027】空洞部12内に裏込め注入材14を注入す
ると、注入材14は、流動しながら空洞部12内を埋め
る。この時、透明筒体22の先端に装着されている透明
テープ24の上部側にも、裏込め注入材14が流動して
介在することになる。
When the backfill implant 14 is injected into the cavity 12, the implant 14 fills the cavity 12 while flowing. At this time, the back filling material 14 flows and intervenes also on the upper side of the transparent tape 24 attached to the tip of the transparent cylindrical body 22.

【0028】ところが、透明筒体22の先端側は、裏込
め注入材14の注入個所からかなり離間していて、先端
と地山掘削面18との間の間隔lも小さいので、透明テ
ープ24の上部側に裏込め注入材14が介在したとして
も、圧力が殆ど作用しないので、透明テープ24がこれ
により破断することはない。
However, the front end side of the transparent cylindrical body 22 is considerably separated from the injection point of the backfill injection material 14 and the interval l between the front end and the ground excavation surface 18 is small. Even if the backfill injection material 14 is interposed on the upper side, the pressure hardly acts, so that the transparent tape 24 is not broken by this.

【0029】従って、空洞部12内に充填された裏込め
注入材14が、透明筒体22内を通って、外部に漏出す
ることが防止される。
Therefore, the backfill filling material 14 filled in the hollow portion 12 is prevented from leaking outside through the transparent cylindrical body 22.

【0030】以上のようにして、空洞部12内に裏込め
注入材14が注入充填され、時間の経過によりこれが硬
化すると、その充填状態が透明筒体22を介する目視観
察により確認される。なお、このような充填状態の確認
は、注入材14が硬化した後に行えるだけでなく、例え
ば、裏込め注入材14の注入中にも目視観察することが
できる。
As described above, the backfill injection material 14 is injected and filled into the hollow portion 12, and when it is cured over time, the filled state is confirmed by visual observation through the transparent cylinder 22. In addition, such confirmation of the filling state can be performed not only after the injection material 14 is cured, but also, for example, can be visually observed during the injection of the backfill injection material 14.

【0031】この場合の目視観察は、例えば、照明用の
ライトを透明筒体22内に挿入して、直接的に目視観察
することもできるが、照明とともにファイバースコープ
やccdカメラを挿入設置して、これらで撮像した画像
情報をモニターに表示して目し観察を行うと、より明確
な情報が得られて、充填状態をより正確に把握すること
ができる。
For visual observation in this case, for example, a light for illumination can be inserted into the transparent cylindrical body 22 and directly observed visually. However, a fiberscope or a ccd camera is inserted and installed together with the illumination. When the image information captured by the above is displayed on the monitor and observed and observed, clearer information can be obtained, and the filling state can be grasped more accurately.

【0032】以上のように構成したトンネル裏込め注入
材14の充填確認方法によれば、空洞部12の調査に用
いられる調査孔20を利用して、調査孔20から空洞部
12側に延設され、先端が地山に到達する透視可能な透
明筒体22を設置し、この後に、空洞部12内に裏込め
注入材14を充填し、充填した裏込め注入材14の充填
状態を、透明筒体22を介する目視観察により行うの
で、比較的簡単な手段により、経済的に、地山16に注
入材14が到達しているか否かを確実に確認することが
できる。
According to the method of confirming the filling of the tunnel backfill filling material 14 configured as described above, the inspection hole 20 used for the inspection of the cavity 12 is used to extend from the investigation hole 20 to the cavity 12 side. Then, a transparent tubular body 22 whose tip reaches the ground is provided, and thereafter, the backfilling filling material 14 is filled in the hollow portion 12, and the filling state of the filled backfilling filling material 14 is set to be transparent. Since the visual observation is performed through the cylindrical body 22, it is possible to reliably confirm whether the injected material 14 has reached the ground 16 economically by relatively simple means.

【0033】そして、このような充填状態の確認で、注
入材14の硬化収縮やブリーデイング,地山16からの
湧水などによる注入材14の沈下,流出により、地山掘
削面18と裏込め注入材14との間に空洞が生じている
ことが判ると、透明テープ24を破断した後に、透明筒
体22の後端側から注入材14を注入して、最終充填を
行うことができる。
When the filling state is confirmed, the injected material 14 is settled and spilled due to hardening shrinkage and bleeding of the injected material 14 and spring water from the ground 16, so that the injected material 14 is backfilled with the ground excavated surface 18. If it is found that a cavity is formed between the transparent material 24 and the filling material 14, the filling material 14 can be injected from the rear end side of the transparent cylindrical body 22 after the transparent tape 24 is broken, and the final filling can be performed.

【0034】このような確実な施工管理方法を採用する
と、裏込め注入材14を注入するために覆工層10に穿
設する注入孔の設置間隔を大きくすることも可能にな
り、品質の向上だけでなく、施工の合理化も可能にな
る。
By adopting such a reliable construction management method, it is possible to increase the interval between the injection holes formed in the lining layer 10 for injecting the backfill injection material 14, thereby improving the quality. Not only that, it can also streamline construction.

【0035】なお、裏込め注入材14の充填状態が確認
された透明筒体22には、図3に示すように、調査孔2
0の開口端にキャップ26を装着して、キャップ26に
螺子栓28を取付けて閉塞する。
In addition, as shown in FIG. 3, the transparent hole 22 in which the filling state of the backfill injection material 14 has been confirmed
The cap 26 is attached to the opening end of the “0”, and a screw plug 28 is attached to the cap 26 to close the cap.

【0036】[0036]

【発明の効果】以上、詳細に説明したように、本発明に
かかるトンネル裏込め注入材の充填確認方法によれば、
調査孔を利用することなどにより、簡単かつ安価で、し
かも、確実に充填状態の確認が可能になる。
As described above in detail, according to the method for confirming the filling of the tunnel backfill filling material according to the present invention,
By using the inspection hole, it is possible to easily and inexpensively and surely check the filling state.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明にかかるトンネル裏込め注入材の充填確
認方法の初期工程の断面説明図である。
FIG. 1 is an explanatory sectional view of an initial step of a method for confirming the filling of a tunnel backfill material according to the present invention.

【図2】図1に引き続いて行われる工程の断面説明図で
ある。
FIG. 2 is an explanatory sectional view of a step performed subsequent to FIG. 1;

【図3】図2に引き続いて行われる工程の断面説明図で
ある。
FIG. 3 is an explanatory cross-sectional view of a step performed subsequent to FIG. 2;

【符号の説明】[Explanation of symbols]

10 トンネル覆工層 12 空洞部 14 裏込め注入材 16 地山 18 地山掘削面 20 調査孔 22 透明筒体 24 透明テープ DESCRIPTION OF SYMBOLS 10 Tunnel lining layer 12 Cavity part 14 Backfilling injection material 16 Ground mountain 18 Ground excavation surface 20 Inspection hole 22 Transparent cylinder 24 Transparent tape

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 トンネル覆工層の背面側に空洞部が確認
された際に、 前記空洞部に硬化性の裏込め注入材を充填した時の、前
記裏込め注入材の充填状態の確認方法において、 前記空洞部の存在が確認された際に、前記トンネル覆工
層に貫通形成される調査孔などの貫通孔から前記空洞部
側に延設され、先端が地山に到達する透視可能な透明筒
体を設置し、 この後に、前記空洞部内に前記裏込め注入材を充填し、 充填した前記裏込め注入材の充填状態を、前記透明筒体
を介する目視観察により行うこと特徴とするトンネル裏
込め注入材の充填確認方法。
1. A method of confirming the filling state of the backfilling filling material when the cavity portion is filled with a curable backfilling filling material when a cavity portion is confirmed on the back side of the tunnel lining layer. In the above, when the presence of the hollow portion is confirmed, it is extended to the hollow portion side from a through hole such as an inspection hole formed through the tunnel lining layer, and a tip reaches a ground level and is transparent. A tunnel is provided, in which a transparent cylinder is installed, and thereafter, the cavity is filled with the backfilling filler, and the filled state of the backfilling filler is visually observed through the transparent cylinder. How to check the filling of backfill injection material.
【請求項2】 前記透明筒体の先端に破断可能な透明テ
ープないしは透明フィルムを装着して閉塞し、 前記充填状態の確認後に、前記裏込め注入材の未充填が
確認された場合、前記透明テープないしは透明フィルム
を破断して、前記裏込め注入材の最終充填を行うことを
特徴とする請求項1記載のトンネル裏込め注入材の充填
確認方法。
2. A transparent tape or a transparent film, which can be broken, is attached to the tip of the transparent cylindrical body, and the transparent cylinder is closed. The method for confirming the filling of the tunnel backfilling material according to claim 1, wherein a final filling of the backfilling material is performed by breaking a tape or a transparent film.
【請求項3】 前記目視観察は、前記透明筒体内に設置
するファイバスコープないしはccdカメラを介して行
うことを特徴とする請求項1または2記載の裏込め注入
材の充填確認方法。
3. The method according to claim 1, wherein the visual observation is performed via a fiberscope or a ccd camera installed in the transparent cylinder.
JP2001077447A 2001-03-19 2001-03-19 Confirmation of filling of tunnel backfill injection material Expired - Fee Related JP3849440B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001077447A JP3849440B2 (en) 2001-03-19 2001-03-19 Confirmation of filling of tunnel backfill injection material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001077447A JP3849440B2 (en) 2001-03-19 2001-03-19 Confirmation of filling of tunnel backfill injection material

Publications (2)

Publication Number Publication Date
JP2002276293A true JP2002276293A (en) 2002-09-25
JP3849440B2 JP3849440B2 (en) 2006-11-22

Family

ID=18934203

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001077447A Expired - Fee Related JP3849440B2 (en) 2001-03-19 2001-03-19 Confirmation of filling of tunnel backfill injection material

Country Status (1)

Country Link
JP (1) JP3849440B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006070453A (en) * 2004-08-31 2006-03-16 Hokuriku Eesukon Kogyo Kk Filling confirmation implement for tunnel back-filling filler
JP2009091751A (en) * 2007-10-04 2009-04-30 Nishimatsu Constr Co Ltd Form for tunnel
JP2014111898A (en) * 2014-03-28 2014-06-19 Penta Ocean Construction Co Ltd Device and method for injecting filler
JP2015121054A (en) * 2013-12-25 2015-07-02 岐阜工業株式会社 Illumination device for concrete form
CN108316949A (en) * 2018-02-08 2018-07-24 中铁五局集团有限公司 Umbrella arch is without empty lining process

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006070453A (en) * 2004-08-31 2006-03-16 Hokuriku Eesukon Kogyo Kk Filling confirmation implement for tunnel back-filling filler
JP2009091751A (en) * 2007-10-04 2009-04-30 Nishimatsu Constr Co Ltd Form for tunnel
JP2015121054A (en) * 2013-12-25 2015-07-02 岐阜工業株式会社 Illumination device for concrete form
JP2014111898A (en) * 2014-03-28 2014-06-19 Penta Ocean Construction Co Ltd Device and method for injecting filler
CN108316949A (en) * 2018-02-08 2018-07-24 中铁五局集团有限公司 Umbrella arch is without empty lining process

Also Published As

Publication number Publication date
JP3849440B2 (en) 2006-11-22

Similar Documents

Publication Publication Date Title
KR100877580B1 (en) Eexperiment of grout stability for shield method
CN107060814B (en) A kind of prefabricated shield duct piece earth pressure gauge method for embedding
CN208502788U (en) The protection device for installing and measuring system of earth pressure gauge on the outside of shield duct piece
CN111271122B (en) Method for monitoring external water pressure of lining
CN108761049A (en) Device and method for detecting grouting fullness of steel bar connecting sleeve through preformed hole
CN102926413A (en) Embedded pipe for sampling pile tip of filling pile
JP3849440B2 (en) Confirmation of filling of tunnel backfill injection material
CN103573269B (en) Shield tunnel grouting layer performance detection method
JP2009138489A (en) Tunnel periphery natural ground investigating method, investigating apparatus and bar for investigation
JP2018003277A (en) Method and system for detecting natural ground improvement
JP2001193064A (en) Anchoring method for ground anchor
JP2011252370A (en) Installation method of strain-measuring pipe in face front natural ground
JP2015113572A (en) Method to install precedent underground displacement gage
JP3235927B2 (en) Super high pressure injection type ground improvement method
JPS6283685A (en) Method for measuring ae in ground
CN105926568A (en) Matched strengthening device and method for inclinometer pipe embedded through drilling
JP3188424B2 (en) Filling device and filling method for backfilling tunnel
CN205839724U (en) The supporting bracing means of inclinometer pipe is buried in a kind of boring underground
CN111927503A (en) Subway tunnel wall back grouting method
CN104061844B (en) Drill hole buried-in type method for observing grouting lifting deformation in any spherical radial directions
JP3744396B2 (en) Construction method of steel sheet pile impervious wall and its joint structure
JPS5846965B2 (en) Investigation test method for underground continuous walls
CN104061845B (en) Drill hole buried-in type device for observing grouting lifting deformation in any spherical radial directions
CN108060935A (en) A kind of method for embedding of tunnel optical fiber grating force-measuring locking foot anchor tube
JP2000129674A (en) Foundation pile, inspection method therefor and manufacture thereof

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060426

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060509

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060704

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060808

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060821

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100908

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100908

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110908

Year of fee payment: 5

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110908

Year of fee payment: 5

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110908

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120908

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120908

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130908

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130908

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140908

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees