JP2002242338A - Wooden framework bearing wall constituted of diagonally crossed braces fixed to fixtures - Google Patents

Wooden framework bearing wall constituted of diagonally crossed braces fixed to fixtures

Info

Publication number
JP2002242338A
JP2002242338A JP2001088764A JP2001088764A JP2002242338A JP 2002242338 A JP2002242338 A JP 2002242338A JP 2001088764 A JP2001088764 A JP 2001088764A JP 2001088764 A JP2001088764 A JP 2001088764A JP 2002242338 A JP2002242338 A JP 2002242338A
Authority
JP
Japan
Prior art keywords
foundation
hardware
brace
column
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001088764A
Other languages
Japanese (ja)
Inventor
Yutaka Sakamoto
裕 坂本
Norihiko Kato
紀彦 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2001088764A priority Critical patent/JP2002242338A/en
Publication of JP2002242338A publication Critical patent/JP2002242338A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/26Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
    • E04B2001/2696Shear bracing

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

PROBLEM TO BE SOLVED: To impart large flexibility to the floor plan of a house, and to simplify structural design and construction work in the field, by simplifying braces, joint metals, and hold-down fasteners which are available in a wooden framework construction method, positively transmitting external forces to a foundation, and reducing the number of the hold-down fasteners to be set. SOLUTION: The brace is directly connected to an anchor bolt also functioning to fix the foundation, which simplifies the joint portion of the brace, whereby external forces are positively transmitted to the foundation. In this case, external drawing forces from an immediately upper story is not imposed on a column but is transmitted directly to the foundation. Therefore, column drawing force is reduced. When drawing forces are generated, the hold-down fastener for bearing the drawing forces is bolt-connected to the joint portion of the brace. Alternatively, there is provided a fixture integrating a brace fixture with the hold-down fastener. The single anchor bolt functions concurrently as a fixing bolt for the brace, a fixing bolt for the hole-down fastener, and a foundation fixing bolt.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、木造軸組工法の構
造耐力壁に関するものです。
TECHNICAL FIELD The present invention relates to a structural load-bearing wall of a wooden frame construction method.

【0002】[0002]

【従来の技術】「建築基準法」は鉄筋筋かいの使用が認
められております。また固定方法及び納まりに関する技
術規定等もあります。
[Prior Art] The Building Standards Law permits the use of reinforcing bars. There are also technical regulations for fixing method and fitting.

【0003】「建設省告示第1460号」には鉄筋筋か
いは鋼板添え板で柱及び土台に釘での固定または柱を貫
通して三角座金によってナットにて固定することになっ
ています。
According to "Ministry of Construction Notification No. 1460", reinforcing bars are fixed to pillars and bases with nails or fixed to nuts with triangular washers through pillars and bases with steel plate attached plates.

【0004】耐力壁の柱と梁および土台の接合に関して
も「建設省告示第1460号」にホールダウン金物等で
柱が引き抜かれないよう基礎または土台に固定すること
になっています。
[0004] Regarding the connection of columns, beams and foundations of load-bearing walls, the construction is to be fixed to the foundation or foundation so that the columns will not be pulled out with hole-down hardware etc. in "Ministry of Construction Notification No. 1460".

【0005】[0005]

【発明が解決しようとする課題】鋼板添え板付き鉄筋筋
かいの場合、地震力等の外力を基礎に伝える前に柱及び
土台に伝えその後基礎に伝える方法では接合カ所が増
え、また限られた範囲に8本の釘が集中するため土台お
よび柱が割れやすくなります。また釘の耐久性等の問題
もあります。なお告示では鋼板添え板の仕様形状は明記
がありません。
SUMMARY OF THE INVENTION In the case of a reinforcing rod bracing with a steel plate attached plate, the method of transmitting external force such as seismic force to a column and a base before transmitting it to the foundation and then transmitting it to the foundation increases the number of joints and is limited. Eight nails are concentrated in the area, so the base and pillars are easily broken. There are also problems such as the durability of nails. In the notice, the specification shape of the steel plate is not specified.

【0006】三角座金によるナット固定の場合、筋かい
の斜材の角度にあわせて柱を貫通し取り付たうえ柱と土
台や梁そして基礎との確実な接合が必要になります。な
お告示では三角座金の仕様形状は明記がありません。ま
た上記の接合の場合その金物が仕上げ材と干渉し仕上げ
の不陸を避けるには金物を座彫りするなどの工夫が必要
になってきます。
In the case of fixing a nut with a triangular washer, it is necessary to penetrate and attach the column in accordance with the angle of the brace diagonal, and to securely connect the column to the base, beam and foundation. In the notice, the specification shape of the triangle washer is not specified. In addition, in the case of the above-mentioned joint, it is necessary to devise a method such as carving the metal in order to avoid that the metal interferes with the finishing material and the finish is not uneven.

【0007】鉄筋の筋かいに関わらず壁倍率によっては
ホールダウン金物が必要になりますが筋かいとホールダ
ウン金物が重なり取り付けできない場合もあります。ま
た基礎とホールダウン金物の直結はその位置合わせに精
度の高い施工が求められます。
[0007] Hole down hardware is required depending on the wall magnification regardless of whether the reinforcement is braided or not. The direct connection between the foundation and the hole-down hardware requires high-precision construction for alignment.

【0008】[0008]

【課題を解決するための手段】筋かいを土台の固定を兼
ねた1本のアンカーボルトに金物を介して結合すること
で接合部を簡素化し、外力を確実に基礎まで伝達するこ
とが可能になります。この場合直上階による引き抜き力
は柱にかからず直接基礎に伝達されます。従って柱の引
き抜き力は少なくなります。引き抜き力が発生する場合
は筋かいの接合部に引き抜き力を負担させるホールダウ
ン金物をボルト接合します。また筋交い金物とホールダ
ウン金物を一体化した金物もあります。筋かい金物の固
定ボルトとホールダウン金物の固定ボルトおよび土台固
定のボルトは全てアンカーボルト1本で兼用していま
す。
Means for Solving the Problems By connecting the bracing to a single anchor bolt which also serves as a fixing of the base via a metal member, the joint can be simplified and the external force can be reliably transmitted to the foundation. Become. In this case, the pull-out force from the upper floor is transmitted directly to the foundation, not to the pillar. Therefore, the pull-out force of the pillar is reduced. When pull-out force is generated, bolt-down metal fittings that bear the pull-out force are joined to the joint of the bracing. There are also hardware that integrates bracing hardware and hole-down hardware. The anchor bolt for the bracing hardware, the bolt for fixing the hole-down hardware, and the bolt for fixing the base are all shared by one anchor bolt.

【0009】[0009]

【発明の実施の形態】コの字金物を上下に設け、上部は
柱に近接する部分の梁にボルト接合し、下部は柱に近接
する部分の基礎に土台を挟みアンカーボルトに接合しま
す。これらの上下のコの字金物の立ち上がり部に長ナッ
ト付きC型金物をボルト接合し鉄筋筋かいを取り付け耐
力壁を構成します。地震力等の外力を確実に基礎に伝え
るため鉄筋筋かいの接合ボルトの位置はできるだけ芯ず
れのない様に配置します。コの字金物のアンカーボルト
との接合部は長穴又は大きめの穴になっておりその範囲
で位置調整ができます。金物の形状はコ型形状の他T型
形状、L型形状等も考えられます。
BEST MODE FOR CARRYING OUT THE INVENTION U-shaped metal fittings are provided on the upper and lower sides, and the upper part is connected to the beam near the column by bolts, and the lower part is connected to the anchor bolt with the base sandwiched between the foundations near the column. C-shaped metal fittings with long nuts are bolted to the rising parts of these upper and lower U-shaped metal fittings, and reinforcing steel braces are attached to form a bearing wall. To ensure that external forces such as seismic force are transmitted to the foundation, the position of the joint bolts on the rebar braces should be as small as possible. The joint between the U-shaped hardware and the anchor bolt is a long hole or a large hole, and the position can be adjusted within that range. The shape of the metal can be T-shaped or L-shaped in addition to the U-shaped shape.

【0010】柱に引き抜き力が働く場合は上記のコの字
金物の柱側端部に位置調整用長穴付きホールダウン金物
を被せてボルト接合し柱の引き抜きを防ぎます。このホ
ールダウン金物はアンカーボルトと金物を介して結合さ
れることで引き抜き力は基礎に伝わります。なおホール
ダウン金物とコの字金物を一体化した金物が考えられま
す。
[0010] When a pull-out force acts on the column, cover the column-shaped end of the above-mentioned U-shaped metal with a hole-down metal with a long hole for position adjustment and join it with a bolt to prevent the column from being pulled out. This hole-down metal is connected to the anchor bolt and metal through the metal, so the pull-out force is transmitted to the foundation. It is also possible to consider hardware that integrates hole-down hardware and U-shaped hardware.

【0011】[0011]

【実施例】上下のコの字金物は全く同じ形状で接合用の
ボルト穴が3カ所あけられており底面のボルト穴は梁又
は土台にボルト又はアンカーボルトで接合し、もう2カ
所は鉄筋筋かいの長ナット付きC型金物をボルトで接合
します。コの字金物の土台側の穴は施工精度を考慮して
長穴又は大きめの穴にする場合もあります。また土台や
梁との接合を増強するため剪断力を負担できるラグスク
リュー等の穴を空ける場合もあります。この上下のコの
字金物は基礎又は梁に固定され回転することはありませ
ん。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The upper and lower U-shaped metal parts have exactly the same shape, and three bolt holes for connection are formed. The bolt holes on the bottom surface are connected to a beam or a base by bolts or anchor bolts, and two other reinforcing bars are used. Join the C-shaped hardware with long nuts with bolts. The hole on the base side of the U-shaped hardware may be a long hole or a large hole in consideration of construction accuracy. In some cases, holes such as lag screws that can bear the shearing force may be drilled to strengthen the connection with the base and beams. The upper and lower U-shaped hardware is fixed to the foundation or beam and does not rotate.

【0012】柱に引き抜き力が働く場合はコの字金物の
外側にホールダウン金物を被せるようにボルト接合しま
す。そして柱にラグスクリュー等で接合します。コの字
金物とホールダウン金物の機能を兼ね備えた一体の金物
もあります。
When a pull-out force is applied to the pillar, bolt the joint so that the hole-down metal fitting is placed over the outside of the U-shaped metal fitting. Then, it is joined to the pillar with a lag screw. There is also one piece of hardware that combines the functions of U-shaped hardware and hole-down hardware.

【0013】[0013]

【発明の効果】筋かいの接合部にホールダウン金物等の
設置による柱の引き抜き防止策が建築基準法で義務付け
された現在、確実で手間のかからない施工が望まれてま
す。本件の方法は耐力壁を自由に配置することができホ
ールダウン金物との取り合いも簡単で確実で簡素な施工
ができ且つ確実な強度が得られます。筋かい部分の奥行
き寸法が小さいため真壁工法でも使用できます。直上階
の外力による引き抜き力は当該柱に伝わらず直接基礎に
伝達され、柱の引き抜き力は従来の接合方法に比べ少な
くなり結果としてホールダウン金物の数を大幅に減らす
ことができます。
[Effect of the Invention] At present, measures to prevent column pull-out by installing hole-down hardware etc. at the joints of braces are required by the Building Standards Law, and reliable and hassle-free construction is desired. In this method, the load-bearing wall can be freely arranged, and the connection with the hole-down hardware can be easily performed. Since the depth dimension of the braced part is small, it can be used even with the makabe method. The pull-out force due to the external force on the upper floor is not transmitted to the column but directly to the foundation, and the pull-out force of the column is smaller than the conventional joining method, resulting in a significant reduction in the number of hole-down hardware.

【0014】大地震等が発生した場合でも接合金物部分
が強固のため鉄筋筋かいの軸部のじん性により急激な倒
壊は起こりません。また鉄筋筋かいが柱、梁、土台に与
える影響はほとんどありませんから地震後の復旧作業も
鉄筋筋かいを取り替えてボルトを締め直すことで傾いた
建築物をもとどおりにたて起こすことができます。筋か
いとホールダウン金物が筋かいのある柱間に納まること
で掃き出しサッシ等を自由に配置することができ自由な
間取りが可能となります。
Even when a large earthquake or the like occurs, the joint metal part is strong, so that the toughness of the shaft portion of the reinforcing bar does not cause sudden collapse. In addition, the rebar braces have almost no effect on columns, beams, and foundations, so restoration work after an earthquake can be re-established by replacing the rebar braces and retightening bolts to restore the tilted building to its original position. You. Bracing and hole-down hardware can be placed between pillars with bracing, allowing sweeping sashes to be placed freely and free layout.

【図面の簡単な説明】[Brief description of the drawings]

【図1】耐力壁の立面図である。FIG. 1 is an elevation view of a load-bearing wall.

【図2】コの字金物の部分透視図である。FIG. 2 is a partial perspective view of a U-shaped hardware.

【図3】コの字金物とホールダウン金物を取り付けた場
合の透視図である。
FIG. 3 is a perspective view when a U-shaped hardware and a hole-down hardware are attached.

【図4】コの字金物とホールダウン金物を一体化した場
合の透視図である。
FIG. 4 is a perspective view when a U-shaped metal part and a hole-down metal part are integrated.

【図5】L字金物とホールダウン金物を一体化した場合
の透視図である。
FIG. 5 is a perspective view when an L-shaped hardware and a hole-down hardware are integrated.

【符号の説明】[Explanation of symbols]

1 柱 2 梁 3 土台 4 鉄筋筋かい 5 長ナット付きC型金物 6 コの字金物 7 ホールダウン金物 8 コの字金物とホールダウン金物の一体の金物 9 アンカーボルト 10 基礎 11 ボルト 12 Lの字金物とホールダウン金物の一体の金物 13 ターンバックル付き鉄筋筋かい DESCRIPTION OF SYMBOLS 1 Column 2 Beam 3 Base 4 Reinforcement bracing 5 C-shaped hardware with long nut 6 U-shaped hardware 7 Hole-down hardware 8 U-shaped hardware and integrated hardware of hardware and hole-down hardware 9 Anchor bolt 10 Foundation 11 Bolt 12 L 12 L Integrated hardware of hardware and hole-down hardware 13 Reinforced bracing with turnbuckle

フロントページの続き Fターム(参考) 2E002 FA02 FA03 FB07 GA02 HA02 HB02 JA01 JA02 JB02 LA01 LB01 LC02 MA04 MA12 2E125 AA04 AA14 AA18 AA33 AB12 AB13 AC07 AC23 AG11 AG12 AG41 BB09 BB11 BB16 BB18 BB22 BC01 BC09 BD01 BE01 BF03 CA02 CA05 CA14 EA01Continued on front page F-term (reference) 2E002 FA02 FA03 FB07 GA02 HA02 HB02 JA01 JA02 JB02 LA01 LB01 LC02 MA04 MA12 2E125 AA04 AA14 AA18 AA33 AB12 AB13 AC07 AC23 AG11 AG12 AG41 BB09 BB11 BB16 BB18 BB22 CA01 BC03 CA01 BE01

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 上部を梁にボルト等で固定された金物、
下部を土台の場合はアンカーボルト、梁の場合はボルト
等で固定された金物にボルトで接合した鉄筋筋かいで、
建物に加わる外力が基礎まで確実に伝達されるようにし
た柱間且つ、梁と土台間又は梁と梁間に設ける耐力壁。
1. A metal part whose upper part is fixed to a beam with bolts or the like,
In the case of a base, the lower part is an anchor bolt, and in the case of a beam, it is a reinforcing steel bar that is bolted to hardware fixed with bolts, etc.
A load-bearing wall provided between columns and between beams and bases or between beams so that external forces applied to the building are reliably transmitted to the foundation.
【請求項2】 「請求項1」の金物にホールダウン金物
を取り付け、柱に側面からボルト等で固定し柱の引き抜
きに対抗できるようにした柱間且つ、梁と土台間又は梁
と梁間に設ける耐力壁。
2. A hole-down metal fitting is attached to the metal fitting of claim 1, and the column is fixed to the column with bolts or the like from the side so as to be able to resist pulling out of the column, and between the beam and the base or between the beam and the beam. A load-bearing wall to be provided.
【請求項3】 「請求項1」の金物と「請求項2」のホ
ールダウン金物を一体化した金物でブレースの取り付け
の立ち上がり部分が片側または両側にある金物で柱の引
き抜き防止をより確実にした柱間且つ、梁と土台間又は
梁と梁間に設ける耐力壁。
3. A hardware in which the hardware of claim 1 and the hole-down hardware of claim 2 are integrated with each other so that the rising portion of the brace is mounted on one or both sides to prevent the column from being pulled out more reliably. Bearing walls provided between the columns and between the beams and the base or between the beams.
JP2001088764A 2001-02-20 2001-02-20 Wooden framework bearing wall constituted of diagonally crossed braces fixed to fixtures Pending JP2002242338A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001088764A JP2002242338A (en) 2001-02-20 2001-02-20 Wooden framework bearing wall constituted of diagonally crossed braces fixed to fixtures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001088764A JP2002242338A (en) 2001-02-20 2001-02-20 Wooden framework bearing wall constituted of diagonally crossed braces fixed to fixtures

Publications (1)

Publication Number Publication Date
JP2002242338A true JP2002242338A (en) 2002-08-28

Family

ID=18943806

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001088764A Pending JP2002242338A (en) 2001-02-20 2001-02-20 Wooden framework bearing wall constituted of diagonally crossed braces fixed to fixtures

Country Status (1)

Country Link
JP (1) JP2002242338A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101354678B1 (en) 2013-10-24 2014-01-27 엘아이지넥스원 주식회사 Transmitter for eliminate error of bit signal
KR101386719B1 (en) 2013-10-24 2014-04-18 엘아이지넥스원 주식회사 Method for eliminate error of bit signal of transmitter

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101354678B1 (en) 2013-10-24 2014-01-27 엘아이지넥스원 주식회사 Transmitter for eliminate error of bit signal
KR101386719B1 (en) 2013-10-24 2014-04-18 엘아이지넥스원 주식회사 Method for eliminate error of bit signal of transmitter

Similar Documents

Publication Publication Date Title
JP2002242338A (en) Wooden framework bearing wall constituted of diagonally crossed braces fixed to fixtures
JP2006322278A (en) Aseismatic reinforcement device
JP5596338B2 (en) Reinforcing brackets for wooden buildings and methods for reinforcing wooden buildings
JP3611876B2 (en) Column base and foundation beam structure
JP4542996B2 (en) Seismic reinforcement method for brace connecting bolts and wooden houses
JP2010084477A (en) Seismic control structure
JP3088068B2 (en) Seismic reinforcement hardware for buildings
JPH0432182B2 (en)
JP3471787B2 (en) Reinforcement members for wooden buildings
JP3144465B2 (en) Wooden reinforced steel for earthquake resistance
JP3124752B2 (en) Reinforcement structure of wooden frame
JP2004124660A (en) Method of mounting holddown hardware and reinforcing brace accommodated in also double-sided core wall
JP2003155780A (en) Connecting structure using tenon bar hardware
JP3668347B2 (en) Foundation structure in steel frame ramen structure
JP3040645U (en) External type seismic reinforcement metal fittings at the joint of an existing wooden house
JPH1018425A (en) Framework device of wooden structure
JP2757138B2 (en) Elastic reinforced steel for wooden seismic resistance
JP2004027836A (en) Reinforcing member for wooden building and method of reinforcing wooden building using it
JP3122340B2 (en) Panel mounting device
JPH0296026A (en) Structuring building with underground structure
JP3077715U (en) Pillar hardware
JP2003306979A (en) Framed structure of building, joint device, and frame constructing method
JP2003278281A (en) Setting structure of column of building
JP2004238912A (en) Framework structure
JP2001288931A (en) Vibration control device installing structure, vibration control device installing method, and vibration control device installing jig