JP3077715U - Pillar hardware - Google Patents

Pillar hardware

Info

Publication number
JP3077715U
JP3077715U JP2000008086U JP2000008086U JP3077715U JP 3077715 U JP3077715 U JP 3077715U JP 2000008086 U JP2000008086 U JP 2000008086U JP 2000008086 U JP2000008086 U JP 2000008086U JP 3077715 U JP3077715 U JP 3077715U
Authority
JP
Japan
Prior art keywords
bolt
column
mounting
screwed
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2000008086U
Other languages
Japanese (ja)
Inventor
修一郎 石森
Original Assignee
株式会社石森屋材木店
鈴木 博
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社石森屋材木店, 鈴木 博 filed Critical 株式会社石森屋材木店
Priority to JP2000008086U priority Critical patent/JP3077715U/en
Application granted granted Critical
Publication of JP3077715U publication Critical patent/JP3077715U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

(57)【要約】 【課題】 土台上に柱を建てる際に用いる柱脚金物にお
いて、筋交いや壁等の取り付けの邪魔にならずに土台上
に柱を強固に固定できるようにすることである。また、
桁または梁と柱とを強固に結合できる継手金物を提供す
る。 【解決手段】 土台2の上面と柱3の下端面との間に角
パイプ11を横置きにして、この角パイプ11の上面部
11aと柱3にねじ込まれる大径ボルト15とを取付ボ
ルト16で固定させ、その下面部11cと土台2をアン
カーボルト12及びナット13で固定させることによ
り、筋交い等の取付の邪魔にならずに土台2と柱3を強
固に固定できる。一方、下階側の柱5と桁6と上階側の
柱7にそれぞれねじ込まれる第1及び第2の大径ボルト
42、42、43、43に金属板41、41、41、4
1を結合させることにより、下階側の柱5と桁6と上階
側の柱7を強固に固定できる。
(57) [Summary] [PROBLEMS] To provide a pillar base metal used when erecting a pillar on a base so that the pillar can be firmly fixed on the base without obstructing mounting of a brace, a wall, or the like. . Also,
A joint hardware capable of firmly connecting a girder or a beam to a column is provided. SOLUTION: A square pipe 11 is placed horizontally between an upper surface of a base 2 and a lower end surface of a column 3, and an upper surface portion 11a of the square pipe 11 and a large-diameter bolt 15 screwed into the column 3 are attached to a mounting bolt 16. By fixing the lower surface 11c and the base 2 with the anchor bolts 12 and the nuts 13, the base 2 and the column 3 can be firmly fixed without disturbing the attachment such as bracing. On the other hand, the first and second large-diameter bolts 42, 42, 43, 43 screwed into the lower-floor column 5, the spar 6, and the upper-floor column 7 respectively are provided with metal plates 41, 41, 41, 4.
By combining 1, the lower-floor column 5, the spar 6, and the upper-floor column 7 can be firmly fixed.

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【考案の属する技術分野】[Technical field to which the invention belongs]

本考案は、柱脚金物及び継手金物に関する。 The present invention relates to column base hardware and joint hardware.

【0002】[0002]

【従来の技術】[Prior art]

従来の建設現場において、地震の縦揺れ等の縦方向の外力に対して柱と土台が ずれないように、引き抜き力が発生する個所には構造計算に基づいてホールダウ ン金物を設置している。一方、地震の横揺れや台風等の横方向の外力に対しては 、壁や筋交いによって対応しているが、壁や筋交いがもっている力を最大限に引 き出すために、力が集中しやすい柱脚にもホールダウン金物で補強をしている。 At conventional construction sites, hold-down hardware is installed based on structural calculations at locations where pull-out forces are generated so that columns and bases do not deviate due to vertical external forces such as earthquake pitching. On the other hand, external forces in the horizontal direction, such as an earthquake roll or a typhoon, are dealt with by walls and braces.However, in order to maximize the forces of the walls and braces, the forces are concentrated. The column bases are also reinforced with hole-down hardware.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the invention]

しかし、上記のようなホールダウン金物は、柱脚の側面と土台の上面に露出し ているため、筋交いや壁等を取り付けるときに、ホールダウン金物が邪魔になっ てしまうことがあった。 However, since the hole-down hardware as described above is exposed on the side surfaces of the column pedestal and the upper surface of the base, the hole-down hardware may interfere when attaching braces or walls.

【0004】 本考案の課題は、土台上に柱を建てる際に用いる柱脚金物において、筋交いや 壁等の取り付けの邪魔にならずに土台上に柱を強固に固定できるようにすること である。 また、本考案は、桁または梁と柱とを強固に結合できる継手金物を提供するこ とも課題としている。[0004] An object of the present invention is to make it possible to firmly fix a pillar on a base without disturbing attachment of a brace, a wall, or the like, in a column base metal fitting used when erecting a pillar on the base. . Another object of the present invention is to provide a joint fitting capable of firmly connecting a girder or a beam to a column.

【0005】[0005]

【課題を解決するための手段】[Means for Solving the Problems]

以上の課題を解決するため、請求項1記載の考案は、例えば、図1に示すよう に、土台2上に柱3を建てる際に用いる柱脚金物1であって、土台2の上面と柱 3の下端面との間に横置きに介設されて上下面11a、11cに取付穴11b、 11dを有する角パイプ11と、土台2上に突出するアンカーボルト12と、柱 3の下端面からねじ込まれて下端面に開口するねじ穴15bを有する大径ボルト 15と、前記角パイプ11の下面11cの前記取付穴11dから当該角パイプ1 1内に突出する前記アンカーボルト12に取り付けられるナット13と、前記角 パイプ11の上面11aの前記取付穴11bから前記大径ボルト15の前記ねじ 穴15bにねじ込まれる取付ボルト16と、からなることを特徴とする。 In order to solve the above-mentioned problems, the invention according to claim 1 is, for example, as shown in FIG. 1, a column base metal fitting 1 used when a column 3 is built on a base 2, wherein the upper surface of the base 2 and the column A square pipe 11 having mounting holes 11b and 11d in upper and lower surfaces 11a and 11c, an anchor bolt 12 protruding above the base 2, and a lower end surface of the column 3. A large-diameter bolt 15 having a screw hole 15b which is screwed into the lower end face and has an opening at a lower end face; And a mounting bolt 16 screwed into the screw hole 15b of the large-diameter bolt 15 from the mounting hole 11b on the upper surface 11a of the square pipe 11.

【0006】 請求項1記載の考案によれば、下面の取付穴から角パイプ内に突出するアンカ ーボルトにナットを取り付けて土台に角パイプを固定し、その角パイプ内におい て、上面の取付穴から大径ボルトのねじ穴に取付ボルトをねじ込んで角パイプに 柱を固定するので、従来のホールダウン金物のように、筋交いや壁等を取り付け るときの邪魔にならずに、柱と土台を強固に固定できる。According to the first aspect of the present invention, a nut is attached to an anchor bolt protruding into the square pipe from the mounting hole on the lower surface, and the square pipe is fixed to the base. Since the mounting bolt is screwed into the screw hole of the large-diameter bolt to fix the pillar to the square pipe, the pillar and the base can be fixed without obstructing when attaching braces or walls, as with conventional hole-down hardware. Can be fixed firmly.

【0007】 請求項2記載の考案は、例えば、図8に示すように、桁6または梁と柱5、7 を結合する際に用いる継手金物4であって、柱5、7の側面に当接されて取付穴 41eを有する正面部41a、桁6または梁の上面あるいは下面に当接されて取 付穴41dを有する端面部41b、これら端面部41b及び正面部41aに連続 する両側面部41cを備える金属板41と、桁6または梁の下面あるいは上面か らねじ込まれて少なくとも一面に開口するねじ穴42aを有する第1の大径ボル ト42と、柱5、7の側面からねじ込まれて側面に開口するねじ穴43a、43 aを有する第2の大径ボルト43と、前記金属板41の前記端面部41bの前記 取付穴41dから前記第1の大径ボルト42の前記ねじ穴42aにねじ込まれる 第1の取付ボルト44と、前記金属板41の前記正面部41aの前記取付穴41 eから前記第2の大径ボルト43の前記ねじ穴43aにねじ込まれる第2の取付 ボルト45と、からなることを特徴とする。The invention according to claim 2 is, for example, as shown in FIG. 8, a joint fitting 4 used for connecting a beam 6 or a beam to columns 5, 7. A front part 41a having an attachment hole 41e in contact therewith, an end part 41b having an attachment hole 41d in contact with the upper or lower surface of the beam 6 or the beam, and both side parts 41c continuous with the end part 41b and the front part 41a. A metal plate 41, a first large-diameter bolt 42 having a screw hole 42a which is screwed from the lower surface or upper surface of the beam 6 or the beam and opened at least on one side, and a side surface which is screwed from the side surface of the columns 5, 7 A second large-diameter bolt 43 having screw holes 43a, 43a that are open to the inside, and screwed into the screw holes 42a of the first large-diameter bolt 42 from the mounting holes 41d of the end face portion 41b of the metal plate 41. First And a second mounting bolt 45 screwed into the screw hole 43a of the second large-diameter bolt 43 from the mounting hole 41e of the front portion 41a of the metal plate 41. It is characterized by.

【0008】 請求項2記載の考案によれば、金属板の端面部を桁または梁の上面あるいは下 面に当接し、その金属板端面部の取付穴から第1の取付ボルトを桁または梁にね じ込まれた第1の大径ボルトのねじ穴にねじ込んで、金属板を桁または梁に結合 し、金属板の正面部を柱の側面に当接し、その金属板正面部の取付穴から第2の 取付ボルトを柱にねじ込まれた第2の大径ボルトのねじ穴にねじ込んで、金属板 を柱に結合することによって、桁または梁と柱とを強固に結合できる。According to the invention of claim 2, the end face of the metal plate is in contact with the upper or lower surface of the beam or beam, and the first mounting bolt is attached to the beam or beam through the mounting hole in the end face of the metal plate. Screw the metal plate into the girder or beam by screwing it into the screw hole of the screwed first large-diameter bolt, and abut the front of the metal plate against the side of the pillar. By screwing the second mounting bolt into the screw hole of the second large-diameter bolt screwed into the column and connecting the metal plate to the column, the girder or beam can be firmly connected to the column.

【0009】 請求項3記載の考案は、例えば、図8に示すように、前記金属板41を4個、 両端面に開口する前記ねじ穴42a、42a、43a、43aを有する前記第1 及び第2の大径ボルト42、43を2本ずつ、前記第1及び第2の取付ボルト4 4、45を4個ずつ用い、下階側の柱5の上端に桁6を挟んで上階側の柱7の下 端を載せた状態で、桁6に2本の前記第1の大径ボルト42、42をねじ込む一 方、上下階の柱5、7に前記第2の大径ボルト43、43をそれぞれねじ込んで 、桁6の上下面で上下階の柱5、7の両側面の4個所に前記金属板41、41、 41、41をそれぞれ設け、桁6を挟んで上下の前記金属板41、41、41、 41を、前記端面部41b、41b、41b、41bの前記取付穴41d、41 d、41d、41dから前記第1の大径ボルト42、42の前記ねじ穴42a、 42a、42a、42aに前記第1の取付ボルト44、44、44、44をそれ ぞれねじ込んで互いに結合するとともに、上下階の柱5、7を挟んで両側の前記 金属板41、41、41、41を、前記正面部41a、41a、41a、41a の前記取付穴41e、41e、41e、41eから前記第2の大径ボルト43、 43の前記ねじ穴43a、43a、43a、43aに前記第2の取付ボルト45 、45、45、45をそれぞれねじ込んで互いに結合したことを特徴とする。According to the invention of claim 3, for example, as shown in FIG. 8, the first and second metal plates 41 have four screw holes 42a, 42a, 43a, 43a opened at both end surfaces. 2 large-diameter bolts 42 and 43 each, and the first and second mounting bolts 44 and 45 each using four bolts. With the lower ends of the columns 7 mounted, the two first large-diameter bolts 42, 42 are screwed into the spar 6, while the second large-diameter bolts 43, 43 are mounted on the upper and lower columns 5, 7, respectively. The metal plates 41, 41, 41, 41 are respectively provided at four places on both sides of the columns 5, 7 on the upper and lower floors on the upper and lower surfaces of the spar 6, and the upper and lower metal plates 41, , 41, 41, 41 are connected to the mounting holes 41d, 41d of the end face portions 41b, 41b, 41b, 41b. , 41d, 41d, screw the first mounting bolts 44, 44, 44, 44 into the screw holes 42a, 42a, 42a, 42a of the first large-diameter bolts 42, 42, respectively. The metal plates 41, 41, 41, 41 on both sides of the pillars 5, 7 on the upper and lower floors are separated from the mounting holes 41e, 41e, 41e, 41e of the front portions 41a, 41a, 41a, 41a by the second method. The second mounting bolts 45, 45, 45, 45 are screwed into the screw holes 43a, 43a, 43a, 43a of the large diameter bolts 43, 43, respectively, and are connected to each other.

【0010】 請求項3記載の考案によれば、上下の金属板端面部の取付穴からその間に挟ま れた桁内の第1の大径ボルトのねじ穴に第1の取付ボルトをそれぞれねじ込んで 桁に上下の金属板を結合し、両側の金属板正面部の取付穴からその間に挟まれた 上下階の各柱内の第2の大径ボルトのねじ穴に第2の取付ボルトをそれぞれねじ 込んで上下階の柱に両側の金属板を結合することによって、下階の柱と桁と上階 の柱とを強固に結合できる。According to the present invention, the first mounting bolts are screwed into the screw holes of the first large-diameter bolts in the girders sandwiched between the mounting holes in the upper and lower metal plate end faces. The upper and lower metal plates are joined to the girder, and the second mounting bolts are respectively screwed into the screw holes of the second large-diameter bolts in the columns on the upper and lower floors sandwiched between the mounting holes on the front portions of the metal plates on both sides. By connecting the metal plates on both sides to the columns on the upper and lower floors, the columns on the lower floor and the girders can be firmly connected to the columns on the upper floor.

【0011】[0011]

【考案の実施の形態】[Embodiment of the invention]

以下、図を参照して本考案の実施の形態を詳細に説明する。 Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

【0012】 〔第1の実施の形態〕 本実施形態である柱脚金物1は、図1及び図2に示すように、土台2と柱3を 結合するものである。柱脚金物1は、土台2の上面と柱3の下端面との間に横置 きに介設される角パイプ11と、角パイプ11の内部に突出するアンカーボルト 12と、アンカーボルト12と角パイプ11を結合させるためのナット13及び 座金14(図7(a)及び(b)参照)と、柱3の下端面からねじ込まれる大径 ボルト15と、大径ボルト15と角パイプ11を結合させるための取付ボルト1 6とを備えている。First Embodiment A column base 1 according to the present embodiment connects a base 2 and a column 3 as shown in FIG. 1 and FIG. The pillar base 1 includes a square pipe 11 interposed between the upper surface of the base 2 and the lower end surface of the pillar 3, an anchor bolt 12 protruding into the square pipe 11, and an anchor bolt 12. The nut 13 and the washer 14 (see FIGS. 7A and 7B) for coupling the square pipe 11, the large-diameter bolt 15 screwed from the lower end surface of the column 3, the large-diameter bolt 15 and the square pipe 11 And mounting bolts 16 for coupling.

【0013】 図3から図6に示すように、角パイプ11の上面部11aには、取付ボルト1 6が挿通する取付穴11bが設けられている。下面部11cには、アンカーボル ト12が余裕をもって挿通する取付穴11dが設けられている。As shown in FIGS. 3 to 6, the upper surface 11 a of the square pipe 11 is provided with a mounting hole 11 b through which the mounting bolt 16 is inserted. The lower surface 11c is provided with a mounting hole 11d through which the anchor bolt 12 is inserted with a margin.

【0014】 大径ボルト15は、その外周が柱3と結合するために雄ねじ部15aになって いる。そして、柱3の下端面からねじ込まれる大径ボルト15には、その下端面 に開口するねじ穴15bが設けられている。The large-diameter bolt 15 has an external thread portion 15 a for connecting the outer periphery to the column 3. The large-diameter bolt 15 screwed from the lower end surface of the column 3 is provided with a screw hole 15b opened on the lower end surface.

【0015】 次に、上記柱脚金物1を用いた土台2と柱3の施工方法について説明する。 まず、柱3の下端面中央に穴を開け、その穴に大径ボルト15をあらかじめね じ込ませておく。そして、角パイプ11の上面部11aの取付穴11bから大径 ボルト15のねじ穴15bに取付ボルト16をねじ込むことによって柱3を角パ イプ11に固定させる。そして、柱3の下端面に結合された角パイプ11の下面 部11cに設けられる取付穴11dに、土台2の上面から突出しているアンカー ボルト12を挿通させて、柱3を角パイプ11を介して土台2上に載置する。そ して、角パイプ11の下面部11cの取付穴11dから角パイプ11内に突出す るアンカーボルト12にナット13及び座金14を取り付けることによって、角 パイプ11を土台2に固定させる。Next, a method of constructing the base 2 and the columns 3 using the column base hardware 1 will be described. First, a hole is made in the center of the lower end surface of the pillar 3, and a large-diameter bolt 15 is screwed into the hole in advance. Then, the column 3 is fixed to the square pipe 11 by screwing the mounting bolt 16 from the mounting hole 11b of the upper surface 11a of the square pipe 11 into the screw hole 15b of the large diameter bolt 15. Then, an anchor bolt 12 protruding from the upper surface of the base 2 is inserted into a mounting hole 11d provided in a lower surface portion 11c of the square pipe 11 coupled to the lower end surface of the column 3, and the column 3 is inserted through the square pipe 11. And place it on the base 2. Then, the square pipe 11 is fixed to the base 2 by attaching a nut 13 and a washer 14 to an anchor bolt 12 protruding into the square pipe 11 from the mounting hole 11d of the lower surface portion 11c of the square pipe 11.

【0016】 以上の実施形態によれば、以下の作用効果が得られる。 (1)角パイプ11の上面部11aの取付穴11bから大径ボルト15のねじ穴 15bに取付ボルト16をねじ込んで、柱3を角パイプ11に固定し、角パイプ 11の下面部11cの取付穴11dから角パイプ11内に突出するアンカーボル ト12にナット13及び座金14を取り付けて、角パイプ11を土台2に固定す るので、柱3の側面と土台2の上面に露出するホールダウン金物と比べ、筋交い や壁等の取り付けの邪魔にならずに、柱3と土台2を強固に固定できる。 (2)角パイプ11の下面部11cには、アンカーボルト12が余裕をもって挿 通する取付穴11dが設けられているので、柱3を土台2に載置するときの位置 決めを容易にし、かつ、載置後の柱3の位置の微調整も可能にする。According to the above embodiment, the following effects can be obtained. (1) The mounting bolt 16 is screwed into the screw hole 15b of the large-diameter bolt 15 from the mounting hole 11b of the upper surface 11a of the square pipe 11 to fix the column 3 to the square pipe 11, and the lower surface 11c of the square pipe 11 is mounted. A nut 13 and a washer 14 are attached to an anchor bolt 12 protruding into the square pipe 11 from the hole 11d, and the square pipe 11 is fixed to the base 2, so that the hole down exposed on the side surface of the pillar 3 and the upper surface of the base 2 is provided. Compared with hardware, the pillars 3 and the base 2 can be firmly fixed without obstructing the installation of braces and walls. (2) The lower surface 11c of the square pipe 11 is provided with a mounting hole 11d through which the anchor bolt 12 can be inserted with a margin, thereby facilitating the positioning when the column 3 is mounted on the base 2. Also, fine adjustment of the position of the pillar 3 after the placement is possible.

【0017】 〔第2の実施の形態〕 本実施形態は、図8から図10に示すように、下階側の柱5と桁6と上階側の 柱7とを結合させる場合に適用した継手金物4である。継手金物4は、下階側の 柱5と桁6あるいは上階側の柱7と桁6に当接する金属板41、41、41、4 1と、桁6の上面からねじ込まれる第1の大径ボルト42、42と、下階側の柱 5あるいは上階側の柱7の側面からねじ込まれる第2の大径ボルト43、43と 、金属板41、41、41、41と第1の大径ボルト42、42とを結合させる 第1の取付ボルト44、44、44、44と、金属板41、41、41、41と 第2の大径ボルト43、43とを結合させる第2の取付ボルト45、45、45 、45とを備えている。[Second Embodiment] As shown in FIGS. 8 to 10, this embodiment is applied to a case where a lower floor column 5, a spar 6, and an upper floor column 7 are connected. It is a joint hardware 4. The metal fittings 4 are made of metal plates 41, 41, 41, 41 abutting on the pillar 5 and the spar 6 on the lower floor or the pillar 7 and the spar 6 on the upper floor, and the first large screw screwed from the upper surface of the spar 6. Diameter bolts 42, 42, second large-diameter bolts 43, 43 screwed from the side of the lower floor pillar 5 or the upper floor pillar 7, metal plates 41, 41, 41, 41 and the first large bolt. The first mounting bolts 44, 44, 44, 44 for connecting the diameter bolts 42, 42, and the second mounting for connecting the metal plates 41, 41, 41, 41 and the second large diameter bolts 43, 43 Bolts 45, 45, 45, 45.

【0018】 金属板41は、下階側の柱5あるいは上階側の柱7の側面に当接される正面部 41aと、桁6の上面あるいは下面と当接される端面部41bと、これら端面部 41b及び正面部41aの両側に連続する側面部41cを備える。そして、この 端面部41bには、取付ボルト44が挿通する取付穴41dが設けられ、この正 面部41aには、取付ボルト45が挿通する取付穴41eが設けられる。The metal plate 41 includes a front portion 41 a that is in contact with the side surface of the lower floor column 5 or the upper floor column 7, an end surface portion 41 b that is in contact with the upper surface or lower surface of the spar 6, A side surface portion 41c is provided on both sides of the end surface portion 41b and the front surface portion 41a. The end face portion 41b is provided with a mounting hole 41d through which the mounting bolt 44 is inserted, and the front face portion 41a is provided with a mounting hole 41e through which the mounting bolt 45 is inserted.

【0019】 第1の大径ボルト42及び第2の大径ボルト43は、図11に示すように、ね じ穴42a、43aが両面に開口する点を除いて、第1の実施形態の大径ボルト 15と同じような雄ねじ部42b、43bを有する部品である。As shown in FIG. 11, the first large-diameter bolt 42 and the second large-diameter bolt 43 are the same as those of the first embodiment except that screw holes 42a and 43a are opened on both sides. This is a component having male screw portions 42b and 43b similar to the diameter bolt 15.

【0020】 次に、上記継手金物4を用いた下階側の柱5と桁6と上階側の柱7の施工方法 について説明する。 まず、桁6の所定の位置に第1の大径ボルト42、42をあらかじめねじ込ま せ、下階側の柱5及び上階側の柱7の所定の位置にも第2の大径ボルト43をそ れぞれねじ込ませてから、下階側の柱5と桁6と上階側の柱7を組み付ける。そ して、桁6の下側については、下階側の柱5の両側面と桁6の下面に2個の金属 板41、41を配置する。この金属板41、41の正面部41a、41aは下階 側の柱5の側面に当接し、その端面部41b、41bは桁6の下面に当接する。 そして、端面部41b、41bの取付穴41d、41dからその間に挟まれた桁 6内の第1の大径ボルト42のねじ穴42a、42aに第1の取付ボルト44、 44をそれぞれねじ込んで桁6に金属板41、41を結合し、正面部41a、4 1aの取付穴41e、41eからその間に挟まれた下階側の柱5内の第2の大径 ボルト43のねじ穴43a、43aに第2の取付ボルト45、45をそれぞれね じ込んで下階側の柱5に金属板41、41を結合する。一方、桁6の上側につい ては、桁6を挟んで下側の構造と対称となるので、その施工方法も下側と同様で ある。Next, a method of constructing the lower-floor column 5, the girder 6, and the upper-floor column 7 using the joint fitting 4 will be described. First, the first large-diameter bolts 42, 42 are screwed into predetermined positions of the spar 6 in advance, and the second large-diameter bolts 43 are also mounted at predetermined positions of the lower-floor pillar 5 and the upper-floor pillar 7. After being screwed in, respectively, the pillar 5 on the lower floor, the spar 6, and the pillar 7 on the upper floor are assembled. Then, on the lower side of the spar 6, two metal plates 41, 41 are arranged on both side surfaces of the lower pillar 5 and the lower surface of the spar 6. The front portions 41a, 41a of the metal plates 41, 41 are in contact with the side surfaces of the pillar 5 on the lower floor, and the end surfaces 41b, 41b are in contact with the lower surface of the spar 6. Then, the first mounting bolts 44, 44 are screwed into the screw holes 42a, 42a of the first large-diameter bolt 42 in the spar 6 sandwiched between the mounting holes 41d, 41d of the end face portions 41b, 41b, respectively. 6, the metal plates 41, 41 are connected to the mounting holes 41e, 41e of the front portions 41a, 41a, and the screw holes 43a, 43a of the second large-diameter bolt 43 in the lower floor pillar 5 sandwiched therebetween. Then, the second mounting bolts 45, 45 are respectively screwed, and the metal plates 41, 41 are connected to the pillar 5 on the lower floor side. On the other hand, the upper part of the girder 6 is symmetrical to the lower structure with the girder 6 interposed therebetween, and the construction method is the same as that of the lower side.

【0021】 以上の実施形態によれば、以下の作用効果が得られる。 (1)金属板41、41、41、41の端面部41b、41b、41b、41b の取付穴41d、41d、41d、41dからその間に挟まれた桁6内の第1の 大径ボルト42、42のねじ穴42a、42a、42a、42aに第1の取付ボ ルト44、44、44、44をそれぞれねじ込んで桁6に金属板41、41、4 1、41を結合し、正面部41a、41a、41a、41aの取付穴41e、4 1e、41e、41eからその間に挟まれた下階側の柱5及び上階側の柱7内の 第2の大径ボルト43、43のねじ穴43a、43a、43a、43aに第2の 取付ボルト45、45、45、45をそれぞれねじ込んで下階側の柱5及び上階 側の柱7に金属板41、41、41、41を結合することによって、下階の柱5 と桁6と上階の柱7とを強固に結合できる。According to the above embodiment, the following effects can be obtained. (1) The first large-diameter bolt 42 in the spar 6 sandwiched between the mounting holes 41d, 41d, 41d, 41d of the end faces 41b, 41b, 41b, 41b of the metal plates 41, 41, 41, 41, The first mounting bolts 44, 44, 44, 44 are screwed into the 42 screw holes 42a, 42a, 42a, 42a, respectively, and the metal plates 41, 41, 41, 41 are joined to the beam 6, and the front part 41a, Screw holes 43a of the second large-diameter bolts 43, 43 in the lower pillar 5 and the upper pillar 7 sandwiched between the mounting holes 41e, 41e, 41e, 41e of 41a, 41a, 41a. , 43a, 43a, 43a are screwed with second mounting bolts 45, 45, 45, 45, respectively, and the metal plates 41, 41, 41, 41 are connected to the lower pillar 5 and the upper pillar 7, respectively. According to the lower floor pillar 5 and girder 6 and upper floor And the pillar 7 can be firmly bonded.

【0022】 なお、以上の実施の形態においては、上下階の柱と桁とを結合させたが、本考 案はこれに限定されるものではなく、例えば、柱と梁のみを結合させても良い。 また、柱脚金物及び継手金物の材料や具体的形状等も任意であり、その他、具 体的な細部構造等についても適宜に変更可能であることは勿論である。In the above embodiment, the columns and the beams on the upper and lower floors are connected, but the present invention is not limited to this. For example, only the columns and the beams may be connected. good. In addition, the materials and specific shapes of the column base metal fittings and the joint metal fittings are arbitrary, and it goes without saying that the concrete detailed structure and the like can be appropriately changed.

【0023】[0023]

【考案の効果】[Effect of the invention]

請求項1記載の考案によれば、従来のホールダウン金物のように、筋交いや壁 等を取り付けるときの邪魔になることはなく、柱と土台を強固に固定できる。 According to the first aspect of the present invention, unlike the conventional hole-down hardware, the pillar and the base can be firmly fixed without being obstructed when attaching a brace, a wall, or the like.

【0024】 請求項2記載の考案によれば、桁または梁と柱とを強固に結合できる。According to the second aspect of the present invention, the girder or the beam and the column can be firmly connected.

【0025】 請求項3記載の考案によれば、下階の柱と桁と上階の柱とを強固に結合できる 。According to the third aspect of the present invention, the lower-floor pillar, the girder, and the upper-floor pillar can be firmly connected.

【提出日】平成13年1月12日(2001.1.12)[Submission date] January 12, 2001 (2001.1.12)

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】全文[Correction target item name] Full text

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents] 【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【考案の属する技術分野】[Technical field to which the invention belongs]

本考案は、柱脚金物に関する。 The present invention relates to column base hardware.

【0002】[0002]

【従来の技術】[Prior art]

従来の建設現場において、地震の縦揺れ等の縦方向の外力に対して柱と土台が ずれないように、引き抜き力が発生する個所には構造計算に基づいてホールダウ ン金物を設置している。一方、地震の横揺れや台風等の横方向の外力に対しては 、壁や筋交いによって対応しているが、壁や筋交いがもっている力を最大限に引 き出すために、力が集中しやすい柱脚にもホールダウン金物で補強をしている。 At conventional construction sites, hold-down hardware is installed based on structural calculations at locations where pull-out forces are generated so that columns and bases do not deviate due to vertical external forces such as earthquake pitching. On the other hand, external forces in the horizontal direction, such as an earthquake roll or a typhoon, are dealt with by walls and braces.However, in order to maximize the forces of the walls and braces, the forces are concentrated. The column bases are also reinforced with hole-down hardware.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the invention]

しかし、上記のようなホールダウン金物は、柱脚の側面と土台の上面に露出し ているため、筋交いや壁等を取り付けるときに、ホールダウン金物が邪魔になっ てしまうことがあった。 However, since the hole-down hardware as described above is exposed on the side surfaces of the column pedestal and the upper surface of the base, the hole-down hardware may interfere when attaching braces or walls.

【0004】 本考案の課題は、土台上に柱を建てる際に用いる柱脚金物において、筋交いや 壁等の取り付けの邪魔にならずに土台上に柱を強固に固定できるようにすること である。[0004] An object of the present invention is to make it possible to firmly fix a pillar on a base without disturbing attachment of a brace, a wall, or the like, in a column base metal fitting used when erecting a pillar on the base. .

【0005】[0005]

【課題を解決するための手段】[Means for Solving the Problems]

以上の課題を解決するため、本考案は、例えば、図1に示すように、土台2上 に柱3を建てる際に用いる柱脚金物1であって、土台2の上面と柱3の下端面と の間に横置きに介設されて上下面11a、11cに取付穴11b、11dを有す る角パイプ11と、土台2上に突出するアンカーボルト12と、柱3の下端面か らねじ込まれて下端面に開口するねじ穴15bを有する大径ボルト15と、前記 角パイプ11の下面11cの前記取付穴11dから当該角パイプ11内に突出す る前記アンカーボルト12に取り付けられるナット13と、前記角パイプ11の 上面11aの前記取付穴11bから前記大径ボルト15の前記ねじ穴15bにね じ込まれる取付ボルト16と、からなることを特徴とする。 In order to solve the above-mentioned problems, the present invention relates to a column base metal fitting 1 used when erecting a pillar 3 on a base 2, as shown in FIG. 1, for example, the upper surface of the base 2 and the lower end surface of the column 3. A square pipe 11 having mounting holes 11b and 11d in the upper and lower surfaces 11a and 11c, an anchor bolt 12 protruding above the base 2, and screwed in from the lower end surface of the column 3. A large-diameter bolt 15 having a screw hole 15b which is opened at the lower end face thereof, and a nut 13 attached to the anchor bolt 12 which projects into the square pipe 11 from the attachment hole 11d of the lower surface 11c of the square pipe 11. And a mounting bolt 16 which is screwed from the mounting hole 11b on the upper surface 11a of the square pipe 11 into the screw hole 15b of the large diameter bolt 15.

【0006】 本考案によれば、下面の取付穴から角パイプ内に突出するアンカーボルトにナ ットを取り付けて土台に角パイプを固定し、その角パイプ内において、上面の取 付穴から大径ボルトのねじ穴に取付ボルトをねじ込んで角パイプに柱を固定する ので、従来のホールダウン金物のように、筋交いや壁等を取り付けるときの邪魔 にならずに、柱と土台を強固に固定できる。According to the present invention, a nut is attached to an anchor bolt projecting into the square pipe from the mounting hole on the lower surface, and the square pipe is fixed to the base. The mounting bolt is screwed into the screw hole of the diameter bolt to fix the pillar to the square pipe, so that the pillar and the base are firmly fixed without obstructing when attaching braces or walls, as with conventional hole-down hardware it can.

【0007】[0007]

【考案の実施の形態】[Embodiment of the invention]

以下、図を参照して本考案の実施の形態を詳細に説明する。 Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

【0008】 実施形態の柱脚金物1は、図1及び図2に示すように、土台2と柱3を結合す るものである。柱脚金物1は、土台2の上面と柱3の下端面との間に横置きに介 設される角パイプ11と、角パイプ11の内部に突出するアンカーボルト12と 、アンカーボルト12と角パイプ11を結合させるためのナット13及び座金1 4(図7(a)及び(b)参照)と、柱3の下端面からねじ込まれる大径ボルト 15と、大径ボルト15と角パイプ11を結合させるための取付ボルト16とを 備えている。As shown in FIGS. 1 and 2, a column base metal fitting 1 according to an embodiment connects a base 2 and a column 3. The pillar base 1 includes a square pipe 11 interposed between the upper surface of the base 2 and the lower end face of the pillar 3, an anchor bolt 12 projecting into the inside of the square pipe 11, The nut 13 and the washer 14 (see FIGS. 7A and 7B) for connecting the pipe 11, the large-diameter bolt 15 screwed from the lower end surface of the column 3, the large-diameter bolt 15 and the square pipe 11 And mounting bolts 16 for coupling.

【0009】 図3から図6に示すように、角パイプ11の上面部11aには、取付ボルト1 6が挿通する取付穴11bが設けられている。下面部11cには、アンカーボル ト12が余裕をもって挿通する取付穴11dが設けられている。As shown in FIGS. 3 to 6, the upper surface 11 a of the square pipe 11 is provided with a mounting hole 11 b through which the mounting bolt 16 is inserted. The lower surface 11c is provided with a mounting hole 11d through which the anchor bolt 12 is inserted with a margin.

【0010】 大径ボルト15は、その外周が柱3と結合するために雄ねじ部15aになって いる。そして、柱3の下端面からねじ込まれる大径ボルト15には、その下端面 に開口するねじ穴15bが設けられている。The large-diameter bolt 15 has a male screw portion 15 a so that its outer periphery is connected to the column 3. The large-diameter bolt 15 screwed from the lower end surface of the column 3 is provided with a screw hole 15b opened on the lower end surface.

【0011】 次に、上記柱脚金物1を用いた土台2と柱3の施工方法について説明する。 まず、柱3の下端面中央に穴を開け、その穴に大径ボルト15をあらかじめね じ込ませておく。そして、角パイプ11の上面部11aの取付穴11bから大径 ボルト15のねじ穴15bに取付ボルト16をねじ込むことによって柱3を角パ イプ11に固定させる。そして、柱3の下端面に結合された角パイプ11の下面 部11cに設けられる取付穴11dに、土台2の上面から突出しているアンカー ボルト12を挿通させて、柱3を角パイプ11を介して土台2上に載置する。そ して、角パイプ11の下面部11cの取付穴11dから角パイプ11内に突出す るアンカーボルト12にナット13及び座金14を取り付けることによって、角 パイプ11を土台2に固定させる。Next, a method of constructing the base 2 and the columns 3 using the column base hardware 1 will be described. First, a hole is made in the center of the lower end surface of the pillar 3, and a large-diameter bolt 15 is screwed into the hole in advance. Then, the column 3 is fixed to the square pipe 11 by screwing the mounting bolt 16 from the mounting hole 11b of the upper surface 11a of the square pipe 11 into the screw hole 15b of the large diameter bolt 15. Then, an anchor bolt 12 protruding from the upper surface of the base 2 is inserted into a mounting hole 11d provided in a lower surface portion 11c of the square pipe 11 coupled to the lower end surface of the column 3, and the column 3 is inserted through the square pipe 11. And place it on the base 2. Then, the square pipe 11 is fixed to the base 2 by attaching a nut 13 and a washer 14 to an anchor bolt 12 protruding into the square pipe 11 from the mounting hole 11d of the lower surface portion 11c of the square pipe 11.

【0012】 以上の実施形態によれば、以下の作用効果が得られる。 (1)角パイプ11の上面部11aの取付穴11bから大径ボルト15のねじ穴 15bに取付ボルト16をねじ込んで、柱3を角パイプ11に固定し、角パイプ 11の下面部11cの取付穴11dから角パイプ11内に突出するアンカーボル ト12にナット13及び座金14を取り付けて、角パイプ11を土台2に固定す るので、柱3の側面と土台2の上面に露出するホールダウン金物と比べ、筋交い や壁等の取り付けの邪魔にならずに、柱3と土台2を強固に固定できる。 (2)角パイプ11の下面部11cには、アンカーボルト12が余裕をもって挿 通する取付穴11dが設けられているので、柱3を土台2に載置するときの位置 決めを容易にし、かつ、載置後の柱3の位置の微調整も可能にする。According to the above embodiment, the following effects can be obtained. (1) The mounting bolt 16 is screwed into the screw hole 15b of the large-diameter bolt 15 from the mounting hole 11b of the upper surface 11a of the square pipe 11 to fix the column 3 to the square pipe 11, and the lower surface 11c of the square pipe 11 is mounted. A nut 13 and a washer 14 are attached to an anchor bolt 12 protruding into the square pipe 11 from the hole 11d, and the square pipe 11 is fixed to the base 2, so that the hole down exposed on the side surface of the pillar 3 and the upper surface of the base 2 is provided. Compared with hardware, the pillars 3 and the base 2 can be firmly fixed without obstructing the installation of braces and walls. (2) The lower surface 11c of the square pipe 11 is provided with a mounting hole 11d through which the anchor bolt 12 can be inserted with a margin, thereby facilitating the positioning when the column 3 is mounted on the base 2. Also, fine adjustment of the position of the pillar 3 after the placement is possible.

【0013】 なお、柱脚金物の材料や具体的形状等も任意であり、その他、具体的な細部構 造等についても適宜に変更可能であることは勿論である。The material and the specific shape of the column base metal are also arbitrary, and it goes without saying that the specific detailed structure and the like can be appropriately changed.

【0014】[0014]

【考案の効果】[Effect of the invention]

本考案によれば、従来のホールダウン金物のように、筋交いや壁等を取り付け るときの邪魔になることはなく、柱と土台を強固に固定できる。 According to the present invention, unlike the conventional hole-down hardware, the pillar and the base can be firmly fixed without being obstructed when attaching a brace or a wall.

【手続補正2】[Procedure amendment 2]

【補正対象書類名】図面[Document name to be amended] Drawing

【補正対象項目名】図8[Correction target item name] Fig. 8

【補正方法】削除[Correction method] Deleted

【手続補正3】[Procedure amendment 3]

【補正対象書類名】図面[Document name to be amended] Drawing

【補正対象項目名】図9[Correction target item name] Fig. 9

【補正方法】削除[Correction method] Deleted

【手続補正4】[Procedure amendment 4]

【補正対象書類名】図面[Document name to be amended] Drawing

【補正対象項目名】図10[Correction target item name] FIG.

【補正方法】削除[Correction method] Deleted

【手続補正5】[Procedure amendment 5]

【補正対象書類名】図面[Document name to be amended] Drawing

【補正対象項目名】図11[Correction target item name] FIG.

【補正方法】削除[Correction method] Deleted

【図面の簡単な説明】[Brief description of the drawings]

【図1】本考案の柱脚金物を適用した第1の実施の形態
を示すもので、柱脚金物と柱と土台との組付状態を示す
正面図である。
FIG. 1 is a front view showing a first embodiment to which a column base metal according to the present invention is applied, showing an assembled state of a column base metal, a column, and a base.

【図2】図1の矢印A−A線に沿った断面図である。FIG. 2 is a sectional view taken along the line AA of FIG. 1;

【図3】第1の実施の形態における柱脚金物の構成部品
である角パイプを示す平面図である。
FIG. 3 is a plan view showing a square pipe which is a component of the column base metal according to the first embodiment.

【図4】図3の矢印B−B線に沿った断面部である。FIG. 4 is a sectional view taken along line BB of FIG. 3;

【図5】図4の矢印C−C線に沿った断面図である。FIG. 5 is a sectional view taken along the line CC of FIG. 4;

【図6】図5の矢印D−D線に沿った断面図である。FIG. 6 is a cross-sectional view taken along a line DD of FIG. 5;

【図7】第1の実施の形態における柱脚金物の構成部品
である座金を示す平面図(a)及び正面図(b)であ
る。
FIGS. 7A and 7B are a plan view (a) and a front view (b) showing a washer which is a component part of the column base metal according to the first embodiment.

【図8】本考案の継手金物を適用した第2の実施の形態
を示すもので、継手金物と上下階の柱と桁との組付状態
を示す側面図である。
FIG. 8 is a side view showing a second embodiment to which the joint hardware of the present invention is applied, and showing an assembled state of the joint hardware, the upper and lower floor columns and the girder.

【図9】本考案の継手金物を適用した第2の実施の形態
を示すもので、継手金物と上下階の柱と桁との組付状態
を示す正面図である。
FIG. 9 is a front view showing a second embodiment to which the joint hardware of the present invention is applied, showing an assembled state of the joint hardware, the columns and the beams of the upper and lower floors.

【図10】本考案の継手金物を適用した第2の実施の形
態を示すもので、継手金物と上下階の柱と桁との組付状
態を示す平面図である。
FIG. 10 is a plan view showing a second embodiment to which the joint hardware of the present invention is applied, showing an assembled state of the joint hardware, columns and spar of upper and lower floors.

【図11】第2の実施の形態における継手金物の構成部
品である第1及び第2の大径ボルトを示す正面図であ
る。
FIG. 11 is a front view showing first and second large-diameter bolts that are components of a fitting in the second embodiment.

【符号の説明】[Explanation of symbols]

1 柱脚金物 11 角パイプ 11a 上面部 11b 取付穴 11c 下面部 11d 取付穴 12 アンカーボルト 13 ナット 14 座金 15 大径ボルト 15a 雄ねじ部 15b ねじ穴 16 取付ボルト 2 土台 3 柱 4 継手金物 41 金属板 41a 正面部 41b 端面部 41c 側面部 41d、41e 取付穴 42 第1の大径ボルト 42a ねじ穴 42b 雄ねじ部 43 第2の大径ボルト 43a ねじ穴 43b 雄ねじ部 44 第1の取付ボルト 45 第2の取付ボルト 5 下階側の柱 6 桁 7 上階側の柱 DESCRIPTION OF SYMBOLS 1 Column base metal 11 Square pipe 11a Upper surface part 11b Mounting hole 11c Lower surface 11d Mounting hole 12 Anchor bolt 13 Nut 14 Washer 15 Large diameter bolt 15a Male screw part 15b Screw hole 16 Mounting bolt 2 Base 3 Column 4 Joint metal 41 Metal plate 41a Front part 41b End face part 41c Side part 41d, 41e Mounting hole 42 First large diameter bolt 42a Screw hole 42b Male screw part 43 Second large diameter bolt 43a Screw hole 43b Male screw part 44 First mounting bolt 45 Second mounting Bolts 5 Pillars on the lower floor 6 Digits 7 Pillars on the upper floor

─────────────────────────────────────────────────────
────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成13年1月12日(2001.1.1
2)
[Submission Date] January 12, 2001 (2001.1.1)
2)

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】全文[Correction target item name] Full text

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【書類名】 明細書[Document Name] Statement

【考案の名称】 柱脚金物[Name of device] Pillar hardware

【実用新案登録請求の範囲】[Utility model registration claims]

【図面の簡単な説明】[Brief description of the drawings]

【図1】本考案の柱脚金物を適用した実施形態を示すも
ので、柱脚金物と柱と土台との組付状態を示す正面図で
ある。
FIG. 1 is a front view showing an embodiment to which a column base metal according to the present invention is applied, showing an assembled state of a column base metal, a column, and a base.

【図2】図1の矢印A−A線に沿った断面図である。FIG. 2 is a sectional view taken along the line AA of FIG. 1;

【図3】実施形態における柱脚金物の構成部品である角
パイプを示す平面図である。
FIG. 3 is a plan view showing a square pipe which is a component of the column base hardware in the embodiment.

【図4】図3の矢印B−B線に沿った断面部である。FIG. 4 is a sectional view taken along line BB of FIG. 3;

【図5】図4の矢印C−C線に沿った断面図である。FIG. 5 is a sectional view taken along the line CC of FIG. 4;

【図6】図5の矢印D−D線に沿った断面図である。FIG. 6 is a cross-sectional view taken along a line DD of FIG. 5;

【図7】実施形態における柱脚金物の構成部品である座
金を示す平面図(a)及び正面図(b)である。
FIGS. 7A and 7B are a plan view and a front view, respectively, showing a washer which is a component of the column base metal according to the embodiment.

【符号の説明】 1 柱脚金物 11 角パイプ 11a 上面部 11b 取付穴 11c 下面部 11d 取付穴 12 アンカーボルト 13 ナット 14 座金 15 大径ボルト 15a 雄ねじ部 15b ねじ穴 16 取付ボルト 2 土台 3 柱[Description of Signs] 1 Pillar base 11 Square pipe 11a Upper surface 11b Mounting hole 11c Lower surface 11d Mounting hole 12 Anchor bolt 13 Nut 14 Washer 15 Large diameter bolt 15a Male thread 15b Screw hole 16 Mounting bolt 2 Base 3 Column

Claims (3)

【実用新案登録請求の範囲】[Utility model registration claims] 【請求項1】 土台上に柱を建てる際に用いる柱脚金物
であって、 土台の上面と柱の下端面との間に横置きに介設されて上
下面に取付穴を有する角パイプと、 土台上に突出するアンカーボルトと、 柱の下端面からねじ込まれて下端面に開口するねじ穴を
有する大径ボルトと、 前記角パイプの下面の前記取付穴から当該角パイプ内に
突出する前記アンカーボルトに取り付けられるナット
と、 前記角パイプの上面の前記取付穴から前記大径ボルトの
前記ねじ穴にねじ込まれる取付ボルトと、 からなることを特徴とする柱脚金物。
Claims 1. A pillar base metal used for erecting a pillar on a base, comprising a square pipe interposed between a top surface of the base and a lower end surface of the pillar and having mounting holes on upper and lower surfaces. An anchor bolt protruding on a base; a large-diameter bolt having a screw hole which is screwed from a lower end surface of a column and opened to a lower end surface; and wherein the protrusion protrudes into the square pipe from the mounting hole on a lower surface of the square pipe. A column base fitting, comprising: a nut mounted on an anchor bolt; and a mounting bolt screwed into the screw hole of the large diameter bolt from the mounting hole on the upper surface of the square pipe.
【請求項2】 桁または梁と柱を結合する際に用いる継
手金物であって、 柱の側面に当接されて取付穴を有する正面部、桁または
梁の上面あるいは下面に当接されて取付穴を有する端面
部、これら端面部及び正面部に連続する両側面部を備え
る金属板と、 桁または梁の下面あるいは上面からねじ込まれて少なく
とも一面に開口するねじ穴を有する第1の大径ボルト
と、 柱の側面からねじ込まれて側面に開口するねじ穴を有す
る第2の大径ボルトと、 前記金属板の前記端面部の前記取付穴から前記第1の大
径ボルトの前記ねじ穴にねじ込まれる第1の取付ボルト
と、 前記金属板の前記正面部の前記取付穴から前記第2の大
径ボルトの前記ねじ穴にねじ込まれる第2の取付ボルト
と、 からなることを特徴とする継手金物。
2. A joint fitting used for connecting a girder or a beam to a column, the fitting being in contact with a side surface of the column and having a mounting hole and an upper surface or a lower surface of a girder or a beam. An end face having a hole, a metal plate having both side faces continuous with the end face and the front face, and a first large-diameter bolt having a screw hole which is screwed from a lower surface or an upper surface of a girder or a beam and opened at least on one surface; A second large-diameter bolt having a screw hole that is screwed in from the side surface of the pillar and opens to the side surface; and a screw hole that is screwed into the screw hole of the first large-diameter bolt from the mounting hole in the end surface portion of the metal plate. A fitting metal comprising: a first mounting bolt; and a second mounting bolt screwed into the screw hole of the second large-diameter bolt from the mounting hole in the front portion of the metal plate.
【請求項3】 前記金属板を4個、両端面に開口する前
記ねじ穴を有する前記第1及び第2の大径ボルトを2本
ずつ、前記第1及び第2の取付ボルトを4個ずつ用い、 下階側の柱の上端に桁を挟んで上階側の柱の下端を載せ
た状態で、桁に2本の前記第1の大径ボルトをねじ込む
一方、上下階の柱に前記第2の大径ボルトをそれぞれね
じ込んで、桁の上下面で上下階の柱の両側面の4個所に
前記金属板をそれぞれ設け、 桁を挟んで上下の前記金属板を、前記端面部の前記取付
穴から前記第1の大径ボルトの前記ねじ穴に前記第1の
取付ボルトをそれぞれねじ込んで互いに結合するととも
に、 上下階の柱を挟んで両側の前記金属板を、前記正面部の
前記取付穴から前記第2の大径ボルトの前記ねじ穴に前
記第2の取付ボルトをそれぞれねじ込んで互いに結合し
たことを特徴とする請求項2記載の継手金物。
3. The four metal plates, two first and second large-diameter bolts having the screw holes opened at both end surfaces, and four first and second mounting bolts. Using the first large-diameter bolts screwed into the girder while the lower end of the upper-floor column is placed with the girder sandwiched between the upper ends of the lower-floor columns, 2 large-diameter bolts are screwed in, and the metal plates are respectively provided at four positions on both sides of the upper and lower columns on the upper and lower surfaces of the girder. The first mounting bolts are screwed into the screw holes of the first large-diameter bolts from the holes to be coupled to each other, and the metal plates on both sides of the upper and lower floor columns are connected to the mounting holes in the front part. The second mounting bolt is screwed into the screw hole of the second large-diameter bolt, respectively. 3. The fitting according to claim 2, wherein the fittings are joined together.
JP2000008086U 2000-11-13 2000-11-13 Pillar hardware Expired - Lifetime JP3077715U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000008086U JP3077715U (en) 2000-11-13 2000-11-13 Pillar hardware

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000008086U JP3077715U (en) 2000-11-13 2000-11-13 Pillar hardware

Publications (1)

Publication Number Publication Date
JP3077715U true JP3077715U (en) 2001-05-29

Family

ID=43210708

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000008086U Expired - Lifetime JP3077715U (en) 2000-11-13 2000-11-13 Pillar hardware

Country Status (1)

Country Link
JP (1) JP3077715U (en)

Similar Documents

Publication Publication Date Title
JP3077715U (en) Pillar hardware
JP2504555B2 (en) Pillar structure
JP4676610B2 (en) Unit building
JP2000273952A (en) Connecting device of structural material for building
JP3055431U (en) Composite pillars for steel structures
JPH0694689B2 (en) House pillar structure
JPH0636082Y2 (en) House wall structure
JPH09158322A (en) Connecting fitting and connecting structure of column and foundation by using connecting fitting thereof
JP2004156214A (en) Assembling structure of bracing frame for use in steel-framed framework structure
JPH0743288Y2 (en) Residential unit for industrialized housing
JP3276299B2 (en) Reinforcement hardware for wooden buildings
JP3924357B2 (en) Building unit connection structure
JPH0223710Y2 (en)
JPH0426570Y2 (en)
JP2567573Y2 (en) Corner panel mounting structure
JPH0337282Y2 (en)
JPH0427932Y2 (en)
JPH0755215Y2 (en) Roof panel mounting structure to outer wall panel
JPH019844Y2 (en)
JPH0333846Y2 (en)
JP2544914Y2 (en) Precast concrete beam-to-column joint structure
JPH0619681Y2 (en) Pillars and pillar joint hardware
JP2002364066A (en) Structure of frame of building
JPS6235769Y2 (en)
JP2001193148A (en) Deck with pergola

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term