JP2002207893A - Cost management device and cost management method for civil engineering work and computer readable storage medium storing program for executing the method - Google Patents

Cost management device and cost management method for civil engineering work and computer readable storage medium storing program for executing the method

Info

Publication number
JP2002207893A
JP2002207893A JP2001001297A JP2001001297A JP2002207893A JP 2002207893 A JP2002207893 A JP 2002207893A JP 2001001297 A JP2001001297 A JP 2001001297A JP 2001001297 A JP2001001297 A JP 2001001297A JP 2002207893 A JP2002207893 A JP 2002207893A
Authority
JP
Japan
Prior art keywords
construction
data
cost
input
costs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001001297A
Other languages
Japanese (ja)
Inventor
Chuzo Nashimoto
忠三 梨本
Takahiro Asamoto
隆広 淺本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ricoh Co Ltd
Original Assignee
Ricoh Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ricoh Co Ltd filed Critical Ricoh Co Ltd
Priority to JP2001001297A priority Critical patent/JP2002207893A/en
Publication of JP2002207893A publication Critical patent/JP2002207893A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a cost management device and cost management method of civil engineering works with which the input of cost data and the output of an estimate or the like can easily be performed by guidance display even without requiring an experienced execution management engineer. SOLUTION: This device is provided with a term dictionary selection means for selecting a desired engineering work term from a term dictionary file stored in a storage means by an instruction by an input means, an engineering work cost data input processing means for inputting data regarding an engineering work cost on the basis of the master data of engineering work cost calculation data from a master file stored in the storage means, an arithmetic means for computing an execution budget or the like by the inputted data regarding the engineering work cost and an engineering work cost slip output processing means for preparing a prescribed slip on the basis of the engineering work cost of an arithmetic result computed by the arithmetic means and performing a processing so as to print and output it by an output means.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は土木工事の原価管理
装置、原価管理方法及び該方法を実行するためのプログ
ラムを格納したコンピュータ読み取り可能な記憶媒体に
関し、詳細には土木建設等における工事原価管理に必要
なデータの入力手順を簡素化し、かつ工事原価を明確に
すると共に工事損益を把握することで適切な施工管理を
サポートする原価管理方法を提供することを目的とす
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a cost control device for civil engineering, a cost controlling method, and a computer-readable storage medium storing a program for executing the cost controlling method. It is an object of the present invention to provide a cost management method that supports appropriate construction management by simplifying the data input procedure necessary for construction, clarifying the construction cost, and grasping the construction profit and loss.

【0002】[0002]

【従来の技術】現在、橋や道路などの構造物の建設事業
においては、より安く、より早く、より良い構造物を安
全に施工するという目的をもって、ムリ、ムダ、ムラを
排除するための出発点として、工事の計画と管理を総称
した施工管理が非常に重要となっている。つまり、この
施工管理は、適切な品質、適切な工期、適切な価格で安
全に構造物を施工することである。その中で、工事に必
要な予算を立てた実行予算を計算し、管理していく原価
管理が重要となる。この実行予算というのは、もともと
細かな計算の積み重ねであり、工事の積算から契約、原
価管理に至るまでの業務によって算出される数値であ
る。また、この実行予算が決まらなければ工事を始める
こともできず、価格を抑えなければ利益も得られない。
更に、良い品質のものをいかに安く作るかという観点か
ら、コストコントロールという考え方で材料の質や設備
等の施工手段を一定にとしてできるだけ経済的に施工す
ることに重点を置く必要がある。また、別の観点では、
コストマネジメントという考え方で、材料や設備、そし
て施工方法等の施工手段の変更によって標準となる原価
そのものを引き下げて管理する点も重要である。
2. Description of the Related Art At present, in the construction business of structures such as bridges and roads, departures for eliminating waste, waste, and unevenness with the purpose of constructing cheaper, faster, and better structures safely. As a point, construction management, which collectively refers to construction planning and management, is very important. In other words, the construction management is to construct the structure safely with appropriate quality, appropriate construction period, and appropriate price. Among them, cost management that calculates and manages an execution budget for budgeting for construction is important. The execution budget is originally a accumulation of detailed calculations, and is a numerical value calculated by operations ranging from cost estimation to contracts and cost management. If the budget is not fixed, construction cannot be started, and profits cannot be obtained unless the price is reduced.
Furthermore, from the viewpoint of how to make good quality products at low cost, it is necessary to focus on cost-consideration as much as possible, while keeping the quality of materials and the construction means such as equipment constant as much as possible. Also, from another perspective,
It is also important from the viewpoint of cost management that the standard cost itself is reduced and managed by changing the construction methods such as materials, equipment, and construction methods.

【0003】[0003]

【発明が解決しようとする課題】このような原価管理を
行う際には、原価管理の目的を理解した上で、工事内容
の知識と工事費用の課目から細目に至るあらゆる積算項
目に精通した施工管理技士が処理しなければならず、ま
たその施工管理技士においても経験と勘に頼った手作業
による計算を繰り返すため、多くの労力と時間を費やす
ことになる。更に、迅速な工事計画の策定が行えないだ
けでなく、各種の変更があった場合その変更に柔軟にか
つ迅速に対応することが困難であった。
When performing such cost management, it is necessary to understand the purpose of cost management, and to understand the contents of the construction and to be familiar with all accumulated items from the items of the construction cost to the detailed items. The management technician has to handle the process, and the construction technician also has to spend a lot of effort and time because the manual calculation based on experience and intuition is repeated. Furthermore, not only is it not possible to quickly formulate a construction plan, but also it is difficult to flexibly and quickly respond to various changes when they occur.

【0004】本発明はこれらの問題点を解決するための
ものであり、熟練した施工管理技士でなくても原価デー
タの入力や見積書等の出力を案内表示によって簡単にで
き、かつ原価管理本来の目的である施工管理に反映でき
る、土木工事の原価管理装置、原価管理方法及び該方法
を実行するためのプログラムを格納したコンピュータ読
み取り可能な記憶媒体を提供することを目的とする。
The present invention has been made to solve these problems. Even if a skilled construction management engineer is not employed, the input of cost data and the output of a quotation etc. can be easily performed by the guidance display, and the cost management is not required. It is an object of the present invention to provide a cost management device for civil engineering, a cost management method, and a computer-readable storage medium storing a program for executing the method, which can be reflected in the construction management which is the object of the invention.

【0005】[0005]

【課題を解決するための手段】前記問題点を解決するた
めに、材料費、労務費や直接経費等の直接工事費及び共
通仮設費や現場管理費等の間接工事費を含む工事原価に
関して、工事着手前に予定し又は工事中で見直す実行予
算、業者に発注する発注、業者に発注する発注金額、発
注に対する実際の工事施工に要した実際原価に対しての
出来高、出来高に対する査定金額、業者に支払った支払
金額及び工事終了までに予想される支払金額である予想
未払金額等の工事原価算出データに基づいて算出した工
事原価を管理する、本発明の土木工事の原価管理装置
は、工事原価算出データを入力する際に工事用語を格納
する用語辞書ファイル、工事原価算出データのマスター
データを格納するマスターファイルや工事原価算出デー
タを格納するデータファイルを記憶する記憶手段と、デ
ータ入力及び指示入力を行う入力手段と、処理手順を示
すデータ処理案内表示や工事原価算出データに基づく帳
票を表示する表示手段と、帳票を印刷出力する出力手段
と、入力手段による指示により記憶手段に記憶された用
語辞書ファイルから所望の工事用語を選択する用語辞書
選択手段と、記憶手段に記憶されたマスターファイルか
らの工事原価算出データのマスターデータに基づいて工
事原価に関するデータを入力する工事原価データ入力処
理手段と、入力された工事原価に関するデータにより実
行予算等を演算する演算手段と、演算手段によって演算
された演算結果の工事原価に基づいて所定の帳票を作成
し、出力手段により印刷出力するように処理する工事原
価帳票出力処理手段とを有することに特徴がある。よっ
て、工事原価算出データを簡単に、かつ正確に入力で
き、簡単に所望の帳票を出力できる。
In order to solve the above-mentioned problems, the construction costs including direct construction costs such as material costs, labor costs and direct costs, and indirect construction costs such as common temporary construction costs and site management costs are described below. Execution budget scheduled to be reviewed before or during construction, orders placed by contractors, order amounts placed by contractors, orders for actual costs for actual construction work for orders, appraised amount for work volume, contractors The civil engineering work cost management device of the present invention, which manages construction costs calculated on the basis of construction cost calculation data such as the amount of payment paid to Term dictionary file that stores construction terms when entering calculation data, master file that stores master data of construction cost calculation data, and data that stores construction cost calculation data Storage means for storing files, input means for inputting data and instructions, display means for displaying a data processing guide display showing a processing procedure and a form based on construction cost calculation data, and output means for printing out a form. A term dictionary selecting means for selecting a desired construction term from a term dictionary file stored in the storage means in accordance with an instruction from the input means, and a work based on the master data of the construction cost calculation data from the master file stored in the storage means. Construction cost data input processing means for inputting data relating to costs, computing means for computing an execution budget and the like based on the inputted construction cost data, and a predetermined form based on the construction cost of the computation result computed by the computing means. Having a construction cost form output processing means for creating and processing to print out by the output means There is a butterfly. Therefore, construction cost calculation data can be easily and accurately input, and a desired form can be easily output.

【0006】また、工事原価データ入力手段によって入
力された工事原価に基づいて工事の進歩状況を示す工事
進捗率特性を作成処理する工事進捗率処理手段を有する
ことにより、原価実績の評価を逐次行うことができ、か
つ原価管理を確実に把握できる。
In addition, the construction progress rate processing means for creating and processing the construction progress rate characteristic indicating the progress of the construction based on the construction cost inputted by the construction cost data input means is provided, so that the cost performance is evaluated sequentially. And the cost control can be reliably grasped.

【0007】更に、データ処理案内表示における処理手
順の表示色を変えることにより、熟練した施工管理技士
でない工事現場担当者でも簡単に、かつ正確に入力及び
出力処理を行うことができる。
Further, by changing the display color of the processing procedure in the data processing guide display, input and output processing can be easily and accurately performed by a construction site technician who is not a skilled construction management engineer.

【0008】また、用語辞書選択手段は階層毎に用意さ
れた工事用語を選択する構成であることにより、簡単に
入力できる。
Further, the term dictionary selecting means is configured to select construction terms prepared for each hierarchy, so that the term dictionary can be easily input.

【0009】更に、査定金額の承認、工事原価に関する
データ、演算結果及び所定の帳票を作成するデータ等を
外部へ又は外部から送受信する通信部を有することによ
り、例えば査定金額を発注業者に通信部を介して送り、
送った査定金額を承認するか否かなどの承認処理を行
い、業者間の承認処理を簡素化できるなど、各種のデー
タの送受信をインターネット等の通信手段によって行
い、業者間の情報の伝送が可能となり、各種の処理が簡
素化できる。
Further, by providing a communication unit for transmitting / receiving externally or externally the data on the approval of the assessed value, the data related to the construction cost, the calculation result and the data for preparing a predetermined form, the communicating unit for communicating the assessed value to the ordering company, for example. Sent through
Approval processing such as whether or not to approve the sent appraisal value can be performed, and approval processing between traders can be simplified, and various types of data can be transmitted and received by communication means such as the Internet, and information can be transmitted between traders. Thus, various processes can be simplified.

【0010】また、別の発明として、土木工事の原価管
理方法によれば、処理手順を示すデータ処理案内表示や
工事原価算出データに基づく帳票を表示し、操作者の指
示により予め記憶されている用語辞書ファイルから所望
の工事用語を選択して工事原価算出データのマスターデ
ータに基づいて工事原価に関するデータを入力する。そ
して、入力された工事原価に関するデータにより実行予
算等を演算し、演算された演算結果の工事原価に基づい
て所定の帳票を作成して必要に応じて印刷出力する。よ
って、熟練した施工管理技士でなくても工事原価算出デ
ータを簡単に、かつ正確に入力でき、簡単に所望の帳票
を出力できる。
According to another aspect of the invention, according to a cost management method for civil engineering work, a data processing guide display showing a processing procedure and a form based on construction cost calculation data are displayed, and are stored in advance by an instruction of an operator. A desired construction term is selected from the term dictionary file, and data relating to the construction cost is input based on the master data of the construction cost calculation data. Then, an execution budget or the like is calculated based on the input data relating to the construction cost, a predetermined form is created based on the calculated construction cost as a result of the calculation, and printed out as necessary. Therefore, even if it is not a skilled construction management engineer, construction cost calculation data can be input easily and accurately, and a desired form can be easily output.

【0011】更に、入力された工事原価に基づいて工事
の進歩状況を示す工事進捗率特性を作成処理することに
より、原価管理本来の目的である施工管理に反映でき
る。
Further, by creating and processing a construction progress rate characteristic indicating the progress of the construction based on the inputted construction cost, it can be reflected on construction management which is the original purpose of cost management.

【0012】また、データ処理案内表示における処理手
順の表示色を変えることにより、より一層簡単にかつ正
確に入力及び出力の処理を行うことができる。
Further, by changing the display color of the processing procedure in the data processing guide display, the input and output processing can be more easily and accurately performed.

【0013】更に、階層毎に用意された工事用語を選択
することにより、簡単に入力できる。
Further, by selecting a construction term prepared for each hierarchy, it is possible to easily input the term.

【0014】また、査定金額の承認、工事原価に関する
データ、演算結果及び所定の帳票を作成するデータ等を
外部へ又は外部から送受信することにより、各種のデー
タの送受信をインターネット等によって行い、業者間の
情報の伝送が可能となり、各種の処理が簡素化できる。
Further, by transmitting / receiving externally or externally data such as approval of the assessed amount, data on construction costs, calculation results, and data for preparing a predetermined form, transmission / reception of various data is carried out through the Internet or the like. Can be transmitted, and various processes can be simplified.

【0015】更に、上記の土木工事の原価管理方法を実
行するためのプログラムを格納したコンピュータ読み取
り可能な記憶媒体に特徴がある。よって、既存のシステ
ムを変えることなく、原価管理システムを構築する装置
を汎用的に使用することができる。
Further, the present invention is characterized by a computer-readable storage medium storing a program for executing the above-mentioned cost management method for civil engineering work. Therefore, the apparatus for constructing the cost management system can be used for general purposes without changing the existing system.

【0016】[0016]

【発明の実施の形態】本発明の土木工事の原価管理装置
は、工事原価算出データを入力する際に工事用語を格納
する用語辞書ファイル、工事原価算出データのマスター
データを格納するマスターファイルや工事原価算出デー
タを格納するデータファイルを記憶する記憶手段と、デ
ータ入力及び指示入力を行う入力手段と、処理手順を示
すデータ処理案内表示や工事原価算出データに基づく帳
票を表示する表示手段と、帳票を印刷出力する出力手段
と、入力手段による指示により記憶手段に記憶された用
語辞書ファイルから所望の工事用語を選択する用語辞書
選択手段と、記憶手段に記憶されたマスターファイルか
らの工事原価算出データのマスターデータに基づいて工
事原価に関するデータを入力する工事原価データ入力処
理手段と、入力された工事原価に関するデータにより実
行予算等を演算する演算手段と、演算手段によって演算
された演算結果の工事原価に基づいて所定の帳票を作成
し、出力手段により印刷出力するように処理する工事原
価出力処理手段とを有する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The cost control device for civil engineering work according to the present invention includes a term dictionary file for storing construction terms when inputting construction cost calculation data, a master file for storing master data of the construction cost calculation data, and a construction file. Storage means for storing a data file for storing cost calculation data; input means for inputting data and instructions; display means for displaying a data processing guide display showing a processing procedure and a form based on construction cost calculation data; Output means for printing out, term dictionary selecting means for selecting a desired construction term from a term dictionary file stored in the storage means in accordance with an instruction from the input means, and construction cost calculation data from the master file stored in the storage means Construction cost data input processing means for inputting data related to construction costs based on master data of Calculating means for calculating an execution budget and the like based on the data relating to the construction cost, and a construction cost output for creating a predetermined form based on the construction cost of the calculation result calculated by the calculation means and printing it out by the output means Processing means.

【0017】[0017]

【実施例】図1は本発明の一実施例に係る土木工事の原
価管理装置のハードウェア構成を示すブロック図であ
る。同図において、本実施例の原価管理装置は、主に、
システム全体を制御するCPU1と、原価を管理する上
で必要となる後述する各種データを記憶する記憶ファイ
ルを有する記憶手段2と、キーボード、マウス等の入力
部3と、ディスプレイ等の表示部4と、プリンタ等の出
力部5と、FAXやインターネット等の通信部6と、後
述する原価管理プログラムがFDやCD−ROM等に記
憶されている外部記憶媒体7と、入力部3、表示部4、
出力部5、通信部6及び外部記憶媒体7の各々に対する
入出力を制御する入出力制御部8と、記憶手段2に格納
されている工種辞書ファイル、種別辞書ファイル及び細
別辞書ファイルのいずれかを選択する用語辞書選択処理
部9と、工種、種別、細別、名称/摘要の分類におい
て、数量、割増率、材料単価、労務単価、外注単価や経
費単価等の入力により実行予算を入力する実行予算入力
処理部10と、実行予算の内訳が総括された実行予算総
括表を出力する実行予算総括表出力処理部11と、実行
予算の内訳が工種、種別、細別、名称/摘要のレベルで
4要素別の実行予算内訳表を出力する実行予算内訳表出
力処理部12と、実行予算の内訳が工種、種別に総括さ
れた実行予算内訳一覧表を出力する実行予算内訳一覧表
出力処理部13と、予算データの名称/摘要及び代価デ
ータの名称上/下より指定した材料を抽出した材料抽出
表を出力する材料抽出表出力処理部14と、代価データ
より上記4要素別の代価をまとめた代価表を出力する代
価表出力処理部15と、発注を入力する発注入力処理部
16と、外注先への外注注文書を出力する外注注文書出
力処理部17と、外注注文書を変更して出力する外注注
文書変更出力処理部18と、出来高を入力する出来高入
力処理部19と、外注先の毎月の出来高金額が掲載され
た工事出来高調書を出力する工事出来高調書出力処理部
20と、支払いを入力する支払入力処理部21と、予想
未払いを入力する予想未払入力処理部22と、支払先毎
に任意の期間例えば月々の支払金額と未払金額が示され
た支払内訳書を出力する支払内訳書出力処理部23と、
外注先毎の契約に対する任意の期間例えば月々の支払金
額を示す契約台帳を出力する契約台帳出力処理部24
と、任意の期間毎例えば毎月の支払いにより工種別の実
行予算に対する原価と未払いを示す工事原価月報を出力
する工事原価月報出力処理部25と、工事進捗率を算出
処理する工事進捗率処理部26とを含んで構成されてい
る。また、記憶手段2は、工種辞書ファイル、種別辞書
ファイル、細別辞書ファイル、工事マスターファイル、
発注先マスターファイル、実行予算ファイル、代価デー
タファイル、契約データファイル、契約マスターファイ
ル、出来高データファイル、査定データファイル、支払
データファイル及び未払データファイルを有している。
更に、本発明の土木の原価管理プログラムが記憶されて
いる外部記憶媒体7を用いることにより、既存のシステ
ム構成を変えることなく、かつ原価管理システムを構築
する装置を汎用的に使用することができる。
FIG. 1 is a block diagram showing a hardware configuration of a cost management device for civil engineering work according to one embodiment of the present invention. In the figure, the cost control device of this embodiment mainly
A CPU 1 for controlling the entire system, a storage means 2 having a storage file for storing various data, which will be described later, required for managing costs, an input unit 3 such as a keyboard and a mouse, and a display unit 4 such as a display. An output unit 5 such as a printer, a communication unit 6 such as a facsimile or the Internet, an external storage medium 7 in which a cost management program described later is stored in an FD or a CD-ROM, an input unit 3, a display unit 4,
An input / output control unit 8 for controlling input / output to / from each of the output unit 5, the communication unit 6 and the external storage medium 7, and any one of a work type dictionary file, a type dictionary file and a subdivision dictionary file stored in the storage unit 2. An execution budget for inputting an execution budget by inputting a quantity, a premium rate, a material unit price, a labor unit price, a subcontract unit price, an expenditure unit price, etc. in the term dictionary selection processing unit 9 to be selected and in the classification of the type of work, type, subdivision, name / summary. An input processing unit 10, an execution budget summary table output processing unit 11 that outputs an execution budget summary table in which the breakdown of the execution budget is summarized, and a breakdown of the execution budget, which are four elements at the level of work type, type, subdivision, and name / summary. An execution budget breakdown table output processing unit 12 that outputs another execution budget breakdown table, an execution budget breakdown list output processing unit 13 that outputs an execution budget breakdown list in which the breakdown of the execution budget is summarized by type of work and type, Name / summary of calculation data and name of price data Material extraction table output processing unit 14 that outputs a material extraction table that extracts the material specified from above / below, and price table summarizing the price of each of the above four elements from the price data , An order input processing unit 16 for inputting an order, a subcontract order output processing unit 17 for outputting a subcontract order to a subcontractor, and changing and outputting a subcontract order. Outsourced order form change output processing part 18, work volume input processing part 19 for inputting work volume, work work harmonic output processing part 20 for outputting work work harmonic book in which monthly work amount of subcontractor is posted, and payment input A payment input processing unit 21 for inputting, a predicted unpaid input processing unit 22 for inputting expected unpaid, and a payment inscription for outputting a payment description indicating a payment amount and an unpaid amount for an arbitrary period, for example, a month for each payee. Out A processing unit 23,
Contract ledger output processing unit 24 that outputs a contract ledger indicating an arbitrary period, for example, a monthly payment amount for a contract for each subcontractor
And a construction cost monthly report output processing unit 25 that outputs a construction cost monthly report indicating the cost and unpaid cost for the execution budget of the work type at an arbitrary period, for example, monthly payment, and a construction progress rate processing unit 26 that calculates and processes the construction progress rate It is comprised including. Further, the storage means 2 stores a work type dictionary file, a type dictionary file, a subdivision dictionary file, a construction master file,
It has an ordering master file, an execution budget file, a price data file, a contract data file, a contract master file, a volume data file, an assessment data file, a payment data file, and an unpaid data file.
Further, by using the external storage medium 7 in which the civil engineering cost management program of the present invention is stored, an apparatus for constructing a cost management system can be generally used without changing the existing system configuration. .

【0018】そして、記憶手段2内の工種辞書ファイル
には、例えば直接工事関係、共通仮設関係及び作業経費
関係別の多くの工種用語が格納されている。種別辞書フ
ァイルには、例えば共通仮設、道路土木等の多くの種別
用語が格納されている。また細別辞書ファイルには、例
えば仮設費、運搬費、安全費等の多くの細別用語が格納
されている。工事マスターファイルには、主な工事内容
別のデータが格納されている。発注先マスターファイル
には、発注先のリストが格納されている。実行予算ファ
イルには、作成された実行予算が格納されている。代価
データファイルには、代価データが格納されている。契
約データファイルには、作成された契約書が格納されて
いる。契約マスターファイルには、発注先別の取り決め
られた契約要件等が格納されている。出来高データファ
イルには、作成された工事出来高調書に関するデータが
格納されている。査定データファイルには、発注先別に
査定された査定データが格納されている。支払データフ
ァイルには、入力された支払データが格納されている。
未払データファイルには、入力された未払データが格納
されている。
The work type dictionary file in the storage means 2 stores many work type terms for, for example, direct construction relations, common temporary relations, and work cost relations. The type dictionary file stores many type terms, such as common temporary construction and road civil engineering. The subdivision dictionary file stores many subdivision terms such as temporary costs, transportation costs, and safety costs. The construction master file stores data for each major construction content. The supplier master file stores a list of suppliers. The execution budget file stores the created execution budget. The price data file stores price data. The contract data file stores the created contract. The contract master file stores contract requirements and the like determined for each supplier. The work volume data file stores data relating to the created work completion harmonics. The assessment data file stores assessment data assessed for each supplier. The payment data file stores the input payment data.
The unpaid data file stores the inputted unpaid data.

【0019】次に、本実施例の原価管理装置のデータ入
力動作について説明する。はじめに、実行予算入力の動
作について当該動作フローを示す図2及び入力画面表示
例を示す図3〜図11に従って説明する。
Next, the data input operation of the cost control device of the present embodiment will be described. First, the operation of the execution budget input will be described with reference to FIG. 2 showing the operation flow and FIGS. 3 to 11 showing input screen display examples.

【0020】先ず、図3に示すメニュー画面から実行予
算入力のアイコンを指定し、図4に示す実行予算入力画
面に移行させ、この実行予算入力画面における工事名や
工期を直接入力又は図1の記憶手段2内の工事マスター
ファイルに格納されている工事名等のデータを実行予算
入力処理部10によって読み出して入力する。そして実
行予算入力画面における複数のタブから工種タブを選択
し(ステップS101,S102)、所定の工種の欄に
おいて図1の記憶手段2内の工種辞書ファイルに格納さ
れて図5に示す工種辞書画面を参照して選択入力し所望
の工種用語を入力する(ステップS103)。なお、こ
の工種辞書画面では新たな工種用語の登録や不要となっ
た工種用語の削除が可能である。次に、図6の実行予算
入力画面における複数のタブから種別タブを選択し(ス
テップS104)、所定の種別の欄において種別を直接
入力するか(ステップS105;NO、ステップS10
6)、又は図1の記憶手段2内の種別辞書ファイルに格
納されて図7に示す種別辞書画面を参照して選択入力す
るかによって所望の種別用語を入力する(ステップS1
05;YES、ステップS107,S108)。なお、
この種別辞書画面では新たな種別用語の登録や不要とな
った種別用語の削除が可能である。そして、図8の実行
予算入力画面における複数のタブから細別タブを選択し
(ステップS109)、所定の細別の欄において細別を
直接入力するか(ステップS110;NO、ステップS
111)、又は図1の記憶手段2内の細別辞書ファイル
に格納されて図9に示す細別辞書画面を参照して選択入
力するかによって所望の細別用語を入力する(ステップ
S110;YES、ステップS112,S113)。な
お、この細別辞書画面では新たな細別用語の登録や不要
となった細別用語の削除が可能である。次に、図10に
示す実行予算入力画面における複数のタブから名称/摘
要選択タブを選択し(ステップS114)、所定の代価
入力欄において数量、割増率、要素別単価等の代価入力
を直接行うか(ステップS115;NO、ステップS1
16)、又は直接入力しない場合は代価番号を入力して
図1の記憶手段2内の代価データファイルに格納されて
いる代価データを代価表出力処理15によって読み出し
て更に代価表タブを選択して図11に示す代価表画面上
で単位別の数量を入力し、更に数量、割増率、要素別単
価等の代価入力を行う(ステップS115;YES、ス
テップS117〜S120)。そして、ステップS12
1で次の名称/摘要の入力を行うか否かを判断し、入力
を行う場合はステップS114に戻り、入力を行わない
場合はステップS122で次の細別入力を行うか否かを
判断し、入力を行う場合はステップS109に戻り、入
力を行わない場合はステップS123で次の種別入力を
行うか否かを判断する。そして、入力を行う場合はステ
ップS104に戻り、入力を行わない場合はステップS
124で次の工種入力を行うか否かを判断し、入力を行
う場合はステップS101に戻り、入力を行わない場合
は実行予算入力の動作を終了する。
First, an icon for inputting the execution budget is designated from the menu screen shown in FIG. 3, and the screen is shifted to the execution budget input screen shown in FIG. 4, and the construction name and the construction period on this execution budget input screen are directly input or FIG. Data such as the construction name stored in the construction master file in the storage means 2 is read and input by the execution budget input processing unit 10. Then, a work type tab is selected from a plurality of tabs on the execution budget input screen (steps S101 and S102), and a work type dictionary screen shown in FIG. 5 is stored in a work type dictionary file in the storage unit 2 of FIG. , And input a desired engineering term (step S103). It is possible to register a new engineering term and delete an unnecessary engineering term on this engineering dictionary screen. Next, a type tab is selected from a plurality of tabs on the execution budget input screen of FIG. 6 (step S104), and a type is directly input in a predetermined type column (step S105; NO, step S10).
6) or inputting a desired type term by selecting and inputting with reference to the type dictionary screen shown in FIG. 7 stored in the type dictionary file in the storage means 2 of FIG. 1 (step S1).
05; YES, steps S107, S108). In addition,
On this type dictionary screen, it is possible to register a new type term or delete an unnecessary type term. Then, a subdivision tab is selected from a plurality of tabs on the execution budget input screen in FIG. 8 (step S109), and subdivision is directly input in a predetermined subdivision column (step S110; NO, step S110).
111) or inputting a desired subdivision term by selecting and inputting with reference to the subdivision dictionary screen shown in FIG. 9 stored in the subdivision dictionary file in the storage means 2 of FIG. 1 (step S110; YES, step S112) , S113). In this subdivision dictionary screen, it is possible to register a new subdivision term or delete an unnecessary subdivision term. Next, a name / summary selection tab is selected from a plurality of tabs on the execution budget input screen shown in FIG. 10 (step S114), and price, such as quantity, premium rate, and unit price per element, are directly input in a predetermined price input field. (Step S115; NO, Step S1
16) Or, if the price is not directly input, the price number is input, the price data stored in the price data file in the storage means 2 in FIG. 1 is read out by the price table output processing 15, and the price table tab is further selected. On the price list screen shown in FIG. 11, the user inputs the quantity for each unit, and further inputs the price such as quantity, premium rate, and unit price for each element (step S115; YES, steps S117 to S120). Then, step S12
It is determined at 1 whether or not to input the next name / abstract. If the input is performed, the process returns to step S114. If the input is not performed, it is determined at step S122 whether or not the next subdivision input is to be performed. If an input is made, the process returns to step S109. If no input is made, it is determined in step S123 whether the next type input is to be made. Then, when input is performed, the process returns to step S104, and when input is not performed, step S104 is performed.
At 124, it is determined whether or not to input the next work type. If the input is to be made, the process returns to step S101. If the input is not made, the operation for inputting the execution budget is ended.

【0021】次に、発注入力の動作について当該動作フ
ローを示す図12及び入力画面表示例を示す図13〜図
15に従って説明する。
Next, the order input operation will be described with reference to FIG. 12 showing the operation flow and FIGS. 13 to 15 showing input screen display examples.

【0022】先ず、図3に示すメニュー画面から発注入
力のアイコンを指定し、図13に示す発注入力メイン画
面に移行させ、発注入力メイン画面の上部に表示する処
理手順ガイダンスの「契約No.」部分の背景色又はフ
ォント字自体の色を変えて現在の処理内容を表示させ
る。そして、操作者からの指示によって契約番号を参照
するのか否かを判断して、参照しない場合は直接契約番
号を入力する(ステップS201;NO、ステップS2
02)。一方、参照する場合は操作者が参照ボタンを指
定すると図14に示す契約番号照会画面を表示させてこ
の発注入力画面において図1の記憶手段2内の契約マス
ターファイルに格納されている契約番号を発注入力処理
部16によって参照して選択入力する(ステップS20
1;YES、ステップS203、S204)。そして、
契約番号を新規に登録するか否かを判断し、新規登録を
行う場合は契約番号を登録する(ステップS205;Y
ES、ステップS206;YES、ステップS20
8)。一方、ステップS205で新規に登録しない場合
は図14に示す契約番号照会画面から契約番号を選択す
る(ステップS207)。また、ステップS202で契
約番号を入力した番号が新規契約番号のときはステップ
S208に移行して契約番号を登録する。そして、操作
者からの指示によって発注を選択するか否かを判断す
る。選択する場合とは、つまり操作者が図15に示す実
行予算照会画面上で発注選択ボタンを指示し、発注する
名称/摘要の発注ボタンをチェックすることである(ス
テップS210;NO、ステップS211,S21
2)。ステップS210で発注を選択しない場合は、元
数量や単価を入力し、契約を改めるか否かを判断する
(ステップS210;YES、ステップS213,S2
14)。契約を改める場合は、つまり操作者が契約改め
ボタンを指示すると、処理手順ガイダンスは「契約改
め」表示に移行し、改め金額を入力する(ステップS2
14;YES、ステップS215,S216)。そし
て、次の契約番号入力を行うか否かを判断し、次の契約
番号入力を行う場合はステップS201に戻り(ステッ
プS217;YES)、入力を行わない場合は発注入力
の動作を終了する(ステップS217;NO)。
First, an order input icon is designated from the menu screen shown in FIG. 3, the screen is shifted to the order input main screen shown in FIG. 13, and the "contract No." of the processing procedure guidance displayed at the top of the order input main screen is displayed. The current processing content is displayed by changing the background color of the portion or the color of the font character itself. Then, it is determined whether or not to refer to the contract number according to an instruction from the operator. If not, the contract number is directly input (step S201; NO, step S2).
02). On the other hand, in the case of reference, when the operator designates the reference button, the contract number inquiry screen shown in FIG. 14 is displayed, and the contract number stored in the contract master file in the storage means 2 in FIG. Select and input by referring to the order input processing unit 16 (step S20)
1; YES, steps S203, S204). And
It is determined whether or not to newly register a contract number, and if new registration is performed, the contract number is registered (step S205; Y
ES, step S206; YES, step S20
8). On the other hand, if no new registration is made in step S205, a contract number is selected from the contract number inquiry screen shown in FIG. 14 (step S207). If the number for which the contract number has been input in step S202 is the new contract number, the process proceeds to step S208 to register the contract number. Then, it is determined whether or not an order is selected according to an instruction from the operator. That is, the operator selects the order selection button on the execution budget inquiry screen shown in FIG. 15 and checks the name / summary order button for ordering (step S210; NO, step S211, step S211). S21
2). If no order is selected in step S210, the original quantity and unit price are entered, and it is determined whether or not the contract should be revised (step S210; YES, steps S213, S2).
14). When the contract is changed, that is, when the operator designates the contract change button, the processing procedure guidance shifts to “contract change” display and the changed amount is input (step S2).
14; YES, steps S215 and S216). Then, it is determined whether or not the next contract number is to be input. If the next contract number is to be input, the process returns to step S201 (step S217; YES); otherwise, the order input operation ends (step S217). Step S217; NO).

【0023】次に、出来高入力の動作について当該動作
フローを示す図16及び入力画面表示例を示す図17〜
図19に従って説明する。
Next, FIG. 16 showing the operation flow of the operation of the volume input and FIGS.
This will be described with reference to FIG.

【0024】先ず、図3に示すメニュー画面から出来高
入力のアイコンを指定し、図17に示す出来高入力メイ
ン画面に移行させる。そして、年月を入力する(ステッ
プS301)。契約番号入力を行う際に操作者からの指
示によって契約番号を参照するのか否かを判断して、参
照しない場合は直接契約番号を入力する(ステップS3
02;NO、ステップS303)。一方、参照する場合
は操作者が参照ボタンを指定すると図18に示す契約番
号照会画面を表示させてこの出来高入力画面において図
1の記憶手段2内の出来高データファイルに格納されて
いる契約番号を出来高入力処理部19によって参照して
選択入力する(ステップS302;YES、ステップS
304〜S306、ステップS307)。更に、今回ま
での累計数量を入力し、査定入力を行うか否かを判断す
る(ステップS307,S308)。査定入力を行う場
合は、つまり操作者が査定入力ボタンを指示すると、処
理手順ガイダンスは「査定入力」表示に移行し、今回ま
での査定数量を入力する(ステップS208;YES、
ステップS309,S310)。そして、査定数量入力
終了後又は査定入力を行わない場合は、次の契約番号に
対して出来高入力を行うか否かを判断し、次の契約番号
に対する出来高入力を行う場合はステップS301に戻
り(ステップS311;YES)、入力を行わない場合
は出来高入力の動作を終了する(ステップS311;N
O)。
First, the icon of the work volume input is designated from the menu screen shown in FIG. 3, and the screen is shifted to the work volume input main screen shown in FIG. Then, the date is input (step S301). When inputting the contract number, it is determined whether or not to refer to the contract number according to an instruction from the operator. If not, the contract number is directly input (step S3).
02; NO, step S303). On the other hand, in the case of reference, when the operator designates the reference button, the contract number inquiry screen shown in FIG. 18 is displayed, and the contract number stored in the volume data file in the storage means 2 in FIG. Select input by referring to the volume input processing unit 19 (step S302; YES, step S
304 to S306, step S307). Further, the cumulative count up to this time is input, and it is determined whether or not an assessment input is performed (steps S307 and S308). When the assessment input is performed, that is, when the operator designates the assessment input button, the processing procedure guidance shifts to “assessment input” display, and the assessment parameter amount up to this time is input (step S208; YES,
Steps S309 and S310). Then, after the input of the evaluation constant amount or when the evaluation input is not performed, it is determined whether or not to input the volume for the next contract number. When the input of the volume for the next contract number is performed, the process returns to step S301 ( If no input is made, the operation of the volume input is ended (step S311; N).
O).

【0025】このように出来高入力の査定入力を行うこ
とによって、発注業者に査定金額のメールを発信して査
定金額に対する承認伺い動作について、動作フローを示
す図20、査定金額承認願い画面アクセス画面を示す図
21及び査定金額承認願い画面を示す図22に従って説
明する。
As described above, by inputting the evaluation of the volume input, an e-mail of the evaluation amount is transmitted to the ordering company, and the operation of asking for approval of the evaluation amount is shown in FIG. 21 will be described with reference to FIG. 21 showing the evaluation amount approval request screen.

【0026】先ず、図16に示す出来高入力が行われた
後、査定入力で査定金額を決定する(ステップS40
1,S402)。そして、発注業者に査定金額通知を図
1の通信部6を介してメールにて送信する(ステップS
403)。発注先である発注業者は査定金額通知をメー
ルにて受信し、元請け会社のホームページにアクセスす
る(ステップS404,S405)。元請け会社のホー
ムページ上では、図21に示す査定金額承認願い画面へ
のアクセス画面において元請け会社の会社コードである
ID及びパスワードを入力する(ステップS406)。
そして、図22に示す査定金額承認願いの画面に移行
し、当該画面において工種と査定金額、そして承認可否
選択ボタンを表示する(ステップS407)。発注業者
は図22の画面に表示された査定金額に対して承認する
か否かを判断し、承認しない場合は承認否ボタンを選択
し、コメントを入力して送信ボタンをクリックする(ス
テップS408;NO、ステップS409)。元請け会
社は承認否通知をメールにて図1の通信部6を介して受
信し、送られてきたコメントを参考にして再度査定金額
を入力してステップS403からステップS408まで
繰り返す(ステップS410,S402)。一方、ステ
ップS408で図22の画面に表示された査定金額に対
して承認する場合は承認可ボタンを選択し、送信ボタン
をクリックする(ステップS408;YES、ステップ
S411)。元請け会社は承認可通知をメールにて図1
の通信部6を介して受信し、支払処理を行う(ステップ
S412,S413)。
First, after the volume input shown in FIG. 16 is performed, the assessment amount is determined by the assessment input (step S40).
1, S402). Then, an e-mail is sent to the ordering company via the communication unit 6 in FIG. 1 (step S).
403). The ordering company, which is the ordering party, receives the notification of the assessed amount by e-mail and accesses the homepage of the original contractor (steps S404 and S405). On the homepage of the prime contractor, an ID and a password, which are the company code of the prime contractor, are entered on an access screen to the assessment amount approval request screen shown in FIG. 21 (step S406).
Then, the screen shifts to a screen for requesting the appraisal of the assessment shown in FIG. The ordering company determines whether or not to approve the assessed amount displayed on the screen of FIG. 22, and if not approves, selects the approval / disapproval button, enters a comment, and clicks the send button (step S408; NO, step S409). The main contractor receives the approval / disapproval notice by e-mail via the communication unit 6 in FIG. 1, inputs the assessment amount again with reference to the sent comment, and repeats steps S403 to S408 (steps S410 and S402). ). On the other hand, when approving the appraisal amount displayed on the screen of FIG. 22 in step S408, the user selects the approve button and clicks the send button (step S408; YES, step S411). The main contractor sends an approval approval notice by e-mail
Received through the communication unit 6 and performs a payment process (steps S412 and S413).

【0027】次に、支払入力の動作について当該動作フ
ローを示す図23及び入力画面表示例を示す図24〜図
26に従って説明する。
Next, the payment input operation will be described with reference to FIG. 23 showing the operation flow and FIGS. 24 to 26 showing input screen display examples.

【0028】先ず、図3に示すメニュー画面から支払入
力のアイコンを指定し、図24に示す支払入力画面に移
行させる。そして、年月を入力する(ステップS50
1)。前月データを参照する際に操作者からの指示によ
って前月データを参照するのか否かを判断して、参照し
ない場合は直接明細入力ボタンを指示して明細データを
入力する(ステップS502;NO、ステップS50
5,S506)。一方、参照する場合は操作者が参照ボ
タンを指定すると図25に示す前月データの画面を表示
させてこの支払入力画面において図1の記憶手段2内の
支払データファイルに格納されている前月データを支払
入力処理部21によって参照して明細入力ボタンを指示
して明細データを入力する(ステップS502;YE
S、ステップS503〜S506)。そして、工種計表
示ボタンを指示して図26に示す工種計表示画面を表示
させて支払入力の動作を終了する(ステップS507,
S508)。
First, a payment input icon is designated from the menu screen shown in FIG. 3, and the screen is shifted to the payment input screen shown in FIG. Then, the date is input (step S50).
1). When referring to the previous month data, it is determined whether or not to refer to the previous month data according to an instruction from the operator. If not, the user directly instructs the detail input button to input the detail data (step S502; NO, step S50
5, S506). On the other hand, in the case of reference, when the operator designates the reference button, the screen of the previous month data shown in FIG. 25 is displayed, and the previous month data stored in the payment data file in the storage means 2 of FIG. The payment input processing unit 21 refers to the specification input button to input the specification data (step S502; YE).
S, steps S503 to S506). Then, the operator designates the work type meter display button to display the work type meter display screen shown in FIG. 26, and ends the operation of the payment input (step S507,
S508).

【0029】次に、予想支払入力の動作について当該動
作フローを示す図27及び入力画面表示例を示す図28
に従って説明する。
Next, FIG. 27 showing the operation flow of the expected payment input operation, and FIG. 28 showing an input screen display example.
It will be described according to.

【0030】先ず、図3に示すメニュー画面から予想支
払入力のアイコンを指定し、図28に示す予想支払入力
画面に移行させる。そして、年月を入力する(ステップ
S601)。前月データを参照する際に操作者からの指
示によって前月データを参照するのか否かを判断して、
参照しない場合は直接明細入力ボタンを指示して明細デ
ータを入力する(ステップS602;NO、ステップS
605,S606)。一方、参照する場合は操作者が参
照ボタンを指定すると図25に示す前月データの画面を
表示させてこの予想支払入力画面において図1の記憶手
段2内の支払データファイルに格納されている前月デー
タを予想支払入力処理部22によって参照して明細入力
ボタンを指示して明細データを入力する(ステップS6
02;YES、ステップS603〜S606)。そし
て、工種計表示ボタンを指示して図26に示す工種計表
示画面を表示させて予想支払入力の動作を終了する(ス
テップS607,S608)。
First, the icon of the expected payment input is designated from the menu screen shown in FIG. 3, and the screen is shifted to the expected payment input screen shown in FIG. Then, the date is input (step S601). When referring to the previous month data, determine whether to refer to the previous month data according to the instruction from the operator,
If not referred, the user directly designates the detail input button to input the detail data (step S602; NO, step S602).
605, S606). On the other hand, in the case of reference, when the operator designates the reference button, the screen of the previous month data shown in FIG. 25 is displayed, and the previous month data stored in the payment data file in the storage means 2 of FIG. Is referred to by the expected payment input processing unit 22, and the detail input button is designated to input the detail data (step S6).
02; YES, steps S603 to S606). Then, the operator designates the work type meter display button to display the work type meter display screen shown in FIG. 26, and terminates the operation of the expected payment input (steps S607 and S608).

【0031】次に、工事進捗率参照処理の動作について
当該動作フローを示す図29及び工事進捗率グラフ表示
画面を示す図30に従って説明する。
Next, the operation of the construction progress rate reference processing will be described with reference to FIG. 29 showing the operation flow and FIG. 30 showing the construction progress rate graph display screen.

【0032】先ず、図3に示すメニュー画面の例えばメ
ニューバーから工事進捗率参照メニューを指定すると、
図1の工事進捗率処理部26によって図1の記憶手段2
内の実行予算ファイルから実行予算金額及び支払データ
ファイルから当月までの支払累計金額を読出し、読み出
した実行予算金額及び当月までの支払累計金額を以下の
算出式に代入して工事進捗率を算出する(ステップS7
01,S702)。算出した工事進捗率を図30に示す
ような進捗グラフを表示する(ステップS703、ステ
ップS704;NO)。グラフ表示を終了するときは図
30の終了ボタンを指示し、処理を終了する(ステップ
S704;YES、ステップS705)。よって、工事
進捗率が許容安全区域の上下限界を示した工程管理曲線
(一般にバナナチャートと呼ぶ)を図30のグラフ上に
同時に表示することにより、現在の工事進捗状況の安全
性を把握できる。ここで、例えば工事進捗率が許容安全
区域を越えたときは予想未払を入力した上で実行予算の
変更又は発注の変更を行い、工事進捗率が許容安全区域
内に収まるようにするか、あるいは工程の変更等による
工程管理の見直しを行う。
First, when a construction progress rate reference menu is designated from, for example, a menu bar on the menu screen shown in FIG.
The storage means 2 of FIG. 1 is operated by the construction progress rate processing unit 26 of FIG.
Read the execution budget amount from the execution budget file and the accumulated payment amount up to the current month from the payment data file, and substitute the read execution budget amount and the accumulated payment amount up to the current month into the following formula to calculate the construction progress rate (Step S7
01, S702). A progress graph as shown in FIG. 30 is displayed on the calculated construction progress rate (step S703, step S704; NO). When ending the graph display, an end button in FIG. 30 is instructed, and the processing is ended (step S704; YES, step S705). Therefore, by simultaneously displaying a process control curve (generally called a banana chart) showing the upper and lower limits of the allowable safety zone in the construction progress rate on the graph of FIG. 30, it is possible to grasp the safety of the current construction progress status. Here, for example, when the construction progress rate exceeds the permissible safety zone, enter the expected unpaid and change the execution budget or change the order so that the construction progress rate falls within the permissible safety zone, Or, review the process management by changing the process.

【0033】工事進捗率(%)=(当月までの支払累計
金額/実行予算金額)×100
Construction progress rate (%) = (cumulative payment amount up to this month / effective budget amount) × 100

【0034】次に、本実施例の原価管理装置における各
帳票出力動作について説明する。はじめに、実行予算に
おける実行予算総括表の帳票出力動作について実行予算
総括表出力処理画面の表示例を示す図31及び動作フロ
ーを示す図32並びに実行予算総括表の帳票出力例を示
す図33に従って説明する。
Next, a description will be given of each form output operation in the cost management apparatus of this embodiment. First, the form output operation of the execution budget summary table in the execution budget will be described with reference to FIG. 31 showing a display example of an execution budget summary table output processing screen, FIG. 32 showing an operation flow, and FIG. 33 showing a form output example of an execution budget summary table. I do.

【0035】先ず、図3に示すメニュー画面から実行予
算総括表出力のアイコンを指定し、図1の実行予算総括
表出力処理部11によって図31に示す実行予算総括表
出力処理画面に移行させる。そして、年月を入力する
(ステップS801,S802)。次に、帳票を編集す
るか否かを判断し、編集する場合は図31の実行予算総
括表出力処理画面における表計算アプリ起動ボタンをも
って指示して表計算アプリを起動させる(ステップ80
3;YES、ステップS804)。起動した表計算アプ
リによって図1の記憶手段2に格納された各種データに
基づいて直接工事費、純工事費、工事出来高、工事益及
び総合計を所定の計算式によって算出し、起動された表
計算アプリによって帳票を出力してシートに帳票を表示
する(ステップS805〜S807)。そして、表示さ
れた帳票に対して編集を行い、編集後の実行予算総括表
に対する編集が終了した後は帳票を保存し、かつ表計算
アプリを閉じる(ステップS808〜S810)。一
方、ステップS803で帳票を編集しない場合、帳票を
印刷するか否かを判断し、帳票を印刷するときは図31
の実行予算総括表出力処理画面における作表ボタンをも
って指示して表計算アプリによる、直接工事費計算、純
工事費、工事出来高、工事益及び総合計を所定の計算式
によって計算し、起動した表計算アプリによって帳票を
出力して、例えば図33に示すような実行予算総括表を
印刷する(ステップS811〜S815)。そして、実
行予算総括表出力が終了して引き続いて処理を継続する
場合はステップS602に戻る(ステップS616;N
O)。また、実行予算総括表出力処理が終了して処理を
繰り返さない場合は、図31の実行予算総括表出力処理
画面におけるキャンセルボタンをもって指示して図3の
メニュー画面を表示させて実行予算総括表出力動作を終
了する(ステップS816;YES、ステップS81
7,S818)。
First, the icon of the execution budget summary table output is designated from the menu screen shown in FIG. 3, and the execution budget summary table output processing section 11 of FIG. 1 shifts to the execution budget summary table output processing screen shown in FIG. Then, the date is input (steps S801 and S802). Next, it is determined whether or not the form is to be edited. If the form is to be edited, the spreadsheet application is activated by instructing with the spreadsheet application start button on the execution budget summary table output processing screen in FIG. 31 (step 80).
3; YES, step S804). Based on the various data stored in the storage means 2 of FIG. 1 by the started spreadsheet application, the construction cost, the net construction cost, the construction work amount, the construction profit and the total sum are directly calculated by a predetermined formula, and the activated table is used. The form is output by the calculation application and the form is displayed on the sheet (steps S805 to S807). Then, the displayed form is edited, and after the edited execution budget summary table is edited, the form is saved and the spreadsheet application is closed (steps S808 to S810). On the other hand, if the form is not edited in step S803, it is determined whether or not to print the form.
Executed by using the spreadsheet application on the output screen of the budget summary table output screen, and instructed by the spreadsheet application to calculate the direct construction cost, net construction cost, construction work volume, construction profit, and the total amount according to the prescribed formula, and start the table. The form is output by the calculation application, and an execution budget summary table as shown in FIG. 33 is printed (steps S811 to S815). Then, when the execution budget summary table output is completed and the process is to be continued, the process returns to step S602 (step S616; N
O). If the execution budget summary table output process is completed and the process is not to be repeated, an instruction is given with the cancel button on the execution budget summary table output processing screen of FIG. 31 to display the menu screen of FIG. The operation ends (step S816; YES, step S81)
7, S818).

【0036】次に、実行予算における実行予算内訳表の
帳票出力動作について実行予算内訳表出力処理画面の表
示例を示す図34及び動作フローを示す図35に従って
説明する。
Next, the form output operation of the execution budget breakdown table in the execution budget will be described with reference to FIG. 34 showing a display example of the execution budget breakdown table output processing screen and FIG. 35 showing the operation flow.

【0037】先ず、図3に示すメニュー画面から実行予
算内訳表出力のアイコンを指定し、図1の実行予算内訳
表出力処理部12によって図34に示す実行予算内訳表
出力処理画面に移行させる(ステップS901)。そし
て、帳票を編集するか否かを判断し、編集する場合は図
34の実行予算内訳表出力処理画面における表計算アプ
リ起動ボタンをもって指示して表計算アプリを起動させ
る(ステップ902;YES、ステップS903)。起
動した表計算アプリによって図1の記憶手段2に格納さ
れた各種データに基づいて細別計及び種別計を所定の計
算式によって算出し、起動された表計算アプリによって
帳票を出力してシートに帳票を表示する(ステップS9
04〜S906)。そして、表示された帳票に対して編
集を行い、編集後の実行予算内訳表に対する編集が終了
した後は帳票を保存し、かつ表計算アプリを閉じる(ス
テップS907〜S909)。一方、ステップS902
で帳票を編集しない場合、帳票を印刷するか否かを判断
し、帳票を印刷するときは図34の実行予算内訳表出力
処理画面における作表ボタンをもって指示して表計算ア
プリによる、細別計及び種別計を所定の計算式によって
計算し、起動した表計算アプリによって帳票を出力し
て、図示していない実行予算内訳表を印刷する(ステッ
プS910〜S914)。そして、実行予算内訳表出力
が終了して引き続いて処理を継続する場合はステップS
902に戻る(ステップS915;NO)。また、実行
予算内訳表出力処理が終了して処理を繰り返さない場合
は、図34の実行予算内訳表出力処理画面におけるキャ
ンセルボタンをもって指示して図3のメニュー画面を表
示させて実行予算内訳表出力動作を終了する(ステップ
S915;YES、ステップS916,S917)。
First, the icon of the execution budget breakdown table output is designated from the menu screen shown in FIG. 3, and the execution budget breakdown table output processing section 12 of FIG. 1 shifts to the execution budget breakdown table output processing screen shown in FIG. 34 ( Step S901). Then, it is determined whether or not the form is to be edited. If the form is to be edited, the spreadsheet application is started by instructing with the spreadsheet application start button on the execution budget breakdown table output processing screen in FIG. 34 (step 902; YES, step S903). The started spreadsheet application calculates a subdivision total and a type meter based on various data stored in the storage unit 2 of FIG. 1 by a predetermined calculation formula, outputs a form by the started spreadsheet application, and writes the form on a sheet. Is displayed (Step S9)
04-S906). Then, the displayed form is edited, and after editing of the edited execution budget breakdown table is completed, the form is stored and the spreadsheet application is closed (steps S907 to S909). On the other hand, step S902
When the form is not edited, it is determined whether or not to print the form. When the form is to be printed, the user designates with the tabulation button on the execution budget breakdown table output processing screen of FIG. The type meter is calculated according to a predetermined calculation formula, a report is output by the started spreadsheet application, and an execution budget breakdown table (not shown) is printed (steps S910 to S914). If the output of the execution budget breakdown table is completed and the processing is to be continued, the process proceeds to step S
The process returns to 902 (step S915; NO). When the execution budget breakdown table output process is completed and the process is not to be repeated, an instruction is given with the cancel button on the execution budget breakdown table output process screen of FIG. 34 to display the menu screen of FIG. 3 and output the execution budget breakdown table. The operation ends (step S915; YES, steps S916, S917).

【0038】また、実行予算における実行予算内訳一覧
表の帳票出力動作について実行予算内訳一覧表出力処理
画面の表示例を示す図36及び動作フローを示す図37
に従って説明する。
Further, regarding the form output operation of the execution budget breakdown list in the execution budget, FIG. 36 showing a display example of the execution budget breakdown list output processing screen and FIG. 37 showing the operation flow
It will be described according to.

【0039】先ず、図3に示すメニュー画面から実行予
算内訳一覧表出力のアイコンを指定し、図1の実行予算
内訳一覧表出力処理部13によって図36に示す実行予
算内訳一覧表出力処理画面に移行させる(ステップS1
001)。そして、帳票を編集するか否かを判断し、編
集する場合は図36の実行予算内訳一覧表出力処理画面
における表計算アプリ起動ボタンをもって指示して表計
算アプリを起動させる(ステップ1002;YES、ス
テップS1003)。起動した表計算アプリによって図
1の記憶手段2に格納された各種データに基づいて直接
工事費、純工事費及び工事原価を所定の計算式によって
算出し、起動された表計算アプリによって帳票を出力し
てシートに帳票を表示する(ステップS1004〜S1
006)。そして、表示された帳票に対して編集を行
い、編集後の実行予算内訳一覧表に対する編集が終了し
た後は帳票を保存し、かつ表計算アプリを閉じる(ステ
ップS1007〜S1009)。一方、ステップS10
02で帳票を編集しない場合、帳票を印刷するか否かを
判断し、帳票を印刷するときは図36の実行予算内訳一
覧表出力処理画面における作表ボタンをもって指示して
表計算アプリによる、直接工事費、純工事費及び工事原
価を所定の計算式によって計算し、起動した表計算アプ
リによって帳票を出力して、図示していない実行予算内
訳一覧表を印刷する(ステップS1010〜S101
4)。そして、実行予算内訳一覧表出力が終了して引き
続いて処理を継続する場合はステップS1002に戻る
(ステップS1015;NO)。また、実行予算内訳一
覧表出力処理が終了して処理を繰り返さない場合は、図
36の実行予算内訳一覧表出力処理画面におけるキャン
セルボタンをもって指示して図3のメニュー画面を表示
させて実行予算内訳一覧表出力動作を終了する(ステッ
プS1015;YES、ステップS1016,S101
7)。
First, an icon for outputting the execution budget breakdown list is designated from the menu screen shown in FIG. 3, and the execution budget breakdown list output processing unit 13 shown in FIG. 1 displays the execution budget breakdown list output processing screen shown in FIG. Transfer (Step S1
001). Then, it is determined whether or not the form is to be edited. If the form is to be edited, the spreadsheet application is started by instructing the spreadsheet application start button on the execution budget breakdown list output processing screen shown in FIG. 36 (step 1002; YES, Step S1003). The started spreadsheet application directly calculates the construction cost, net construction cost and construction cost based on various data stored in the storage means 2 of FIG. 1 by a predetermined formula, and outputs the form by the started spreadsheet application. To display the form on the sheet (steps S1004 to S1).
006). Then, the displayed form is edited, and after the editing of the edited execution budget breakdown list is completed, the form is saved and the spreadsheet application is closed (steps S1007 to S1009). On the other hand, step S10
02, if the form is not edited, it is determined whether or not to print the form. When the form is to be printed, an instruction is given with the tabulation button on the execution budget breakdown list output processing screen shown in FIG. The construction cost, the net construction cost, and the construction cost are calculated according to a predetermined formula, and a report is output by the started spreadsheet application, and an execution budget breakdown list (not shown) is printed (steps S1010 to S101).
4). If the execution budget breakdown list has been output and processing is to be continued, the process returns to step S1002 (step S1015; NO). If the execution budget breakdown list output processing is completed and the processing is not to be repeated, an instruction is given with the cancel button on the execution budget breakdown list output processing screen of FIG. 36 to display the menu screen of FIG. The list output operation ends (step S1015; YES, steps S1016, S101)
7).

【0040】更に、実行予算における代価表の帳票出力
動作について代価表出力処理画面の表示例を示す図38
及び動作フローを示す図39に従って説明する。
Further, FIG. 38 shows a display example of a price list output processing screen regarding a price list form output operation in the execution budget.
The operation will be described with reference to FIG.

【0041】先ず、図3に示すメニュー画面から代価表
出力のアイコンを指定し、図1の代価表出力処理部15
によって図38に示す代価表出力処理画面に移行させる
(ステップS1101)。そして、全ての件に対して出
力処理を施すか否かを判断し、全件に対して出力処理を
行う場合は全件出力対象に対してチェックする(ステッ
プS1102;YES、ステップS1103)。ステッ
プS1102で全ての件に対して出力処理を施さない場
合は、出力対象となる件の代価番号を図38の代価表出
力処理画面上の所定の欄に入力する(ステップS110
4)。そして、帳票を編集するか否かを判断し、編集す
る場合は図38の代価表出力処理画面における表計算ア
プリ起動ボタンをもって指示して表計算アプリを起動さ
せる(ステップ1105;YES、ステップS110
6)。起動した表計算アプリによって図1の記憶手段2
に格納された各種データに基づいて合計及び単位当たり
の単価を所定の計算式によって算出し、起動された表計
算アプリによって帳票を出力してシートに帳票を表示す
る(ステップS1107〜S1109)。そして、表示
された帳票に対して編集を行い、編集後の代価表に対す
る編集が終了した後は帳票を保存し、かつ表計算アプリ
を閉じる(ステップS1110〜S1112)。一方、
ステップS1105で帳票を編集しない場合、帳票を印
刷するか否かを判断し、帳票を印刷するときは図38の
代価表出力処理画面における作表ボタンをもって指示し
て表計算アプリによる、合計及び単位当たりの単価を所
定の計算式によって計算し、起動した表計算アプリによ
って帳票を出力して、図示していない代価表を印刷する
(ステップS1113〜S1117)。そして、代価表
出力が終了して引き続いて処理を継続する場合はステッ
プS902に戻る(ステップS918;NO)。また、
代価表出力処理が終了して処理を繰り返さない場合は、
図38の代価表出力処理画面におけるキャンセルボタン
をもって指示して図3のメニュー画面を表示させて代価
表出力動作を終了する(ステップS1118;YES、
ステップS1119,S1120)。
First, a price table output icon is designated from the menu screen shown in FIG. 3, and the price table output processing unit 15 shown in FIG.
The screen is shifted to a price list output processing screen shown in FIG. 38 (step S1101). Then, it is determined whether or not to perform the output process on all the cases. If the output process is to be performed on all the cases, a check is made for all the output targets (step S1102; YES, step S1103). If the output process is not performed on all the items in step S1102, the price number of the output target is input to a predetermined column on the price table output process screen in FIG. 38 (step S110).
4). Then, it is determined whether or not to edit the form. If the form is to be edited, the spreadsheet application is activated by instructing the spreadsheet application activation button on the price list output processing screen in FIG. 38 (step 1105; YES, step S110).
6). Storing means 2 of FIG. 1 by the activated spreadsheet application
Then, the total and the unit price per unit are calculated by a predetermined formula based on the various data stored in the table, and the activated spreadsheet application outputs the form and displays the form on the sheet (steps S1107 to S1109). Then, the displayed form is edited, and after the edited price list is completed, the form is saved and the spreadsheet application is closed (steps S1110 to S1112). on the other hand,
If the form is not edited in step S1105, it is determined whether or not the form is to be printed. When the form is to be printed, it is instructed with the tabulation button on the price list output processing screen in FIG. The unit price per hit is calculated by a predetermined calculation formula, a form is output by the activated spreadsheet application, and a price table (not shown) is printed (steps S1113 to S1117). Then, when the price list output is completed and the process is to be continued, the process returns to step S902 (step S918; NO). Also,
If the price list output process is completed and you do not want to repeat the process,
An instruction is given with the cancel button on the price list output processing screen of FIG. 38, the menu screen of FIG. 3 is displayed, and the price list output operation ends (step S1118; YES,
Steps S1119 and S1120).

【0042】また、実行予算における材料抽出表の帳票
出力動作について材料抽出表出力処理画面の表示例を示
す図40及び動作フローを示す図41に従って説明す
る。
The operation of outputting the material extraction table form in the execution budget will be described with reference to FIG. 40 showing a display example of the material extraction table output processing screen and FIG. 41 showing the operation flow.

【0043】先ず、図3に示すメニュー画面から材料抽
出表出力のアイコンを指定し、図1の材料抽出表出力処
理部14によって図40に示す材料抽出表出力処理画面
に移行させる(ステップS1201)。そして、出力対
象となる材料名を図40の材料抽出表出力処理画面上の
所定の欄に入力する(ステップS1202)。そして、
帳票を編集するか否かを判断し、編集する場合は図40
の材料抽出表出力処理画面における表計算アプリ起動ボ
タンをもって指示して表計算アプリを起動させる(ステ
ップ1203;YES、ステップS1204)。起動し
た表計算アプリによって入力された材料名をキーワード
に該当する名称/摘要データ及び代価データの名称上/
下を抽出し、名称/摘要毎の金額を所定の計算式によっ
て算出し、起動された表計算アプリによって帳票を出力
してシートに帳票を表示する(ステップS1205〜S
1207)。そして、表示された帳票に対して編集を行
い、編集後の材料抽出表に対する編集が終了した後は帳
票を保存し、かつ表計算アプリを閉じる(ステップS1
208〜S1210)。一方、ステップS1205で帳
票を編集しない場合、帳票を印刷するか否かを判断し、
帳票を印刷するときは図40の材料抽出表出力処理画面
における作表ボタンをもって指示して表計算アプリによ
る、入力された材料名をキーワードに該当する名称/摘
要データ及び代価データの名称上/下を抽出し、名称/
摘要毎の金額を所定の計算式によって計算し、起動した
表計算アプリによって帳票を出力して、図示していない
材料抽出表を印刷する(ステップS1211〜S121
5)。そして、材料抽出表出力が終了して引き続いて処
理を継続する場合はステップS1202に戻る(ステッ
プS1216;NO)。また、材料抽出表出力処理が終
了して処理を繰り返さない場合は、図40の材料抽出表
出力処理画面におけるキャンセルボタンをもって指示し
て図3のメニュー画面を表示させて材料抽出表出力動作
を終了する(ステップS1216;YES、ステップS
1217,S1218)。
First, an icon for material extraction table output is designated from the menu screen shown in FIG. 3, and the screen is shifted to the material extraction table output processing screen shown in FIG. 40 by the material extraction table output processing section 14 in FIG. 1 (step S1201). . Then, the name of the material to be output is entered in a predetermined column on the material extraction table output processing screen of FIG. 40 (step S1202). And
It is determined whether or not to edit the form.
The spreadsheet application is activated by instructing with the spreadsheet application start button on the material extraction table output processing screen (step 1203; YES, step S1204). The material name entered by the launched spreadsheet application is the name corresponding to the keyword / on the name of the summary data and the price data /
The lower part is extracted, the amount of each name / summary is calculated by a predetermined calculation formula, the form is output by the started spreadsheet application, and the form is displayed on the sheet (steps S1205 to S1205).
1207). Then, the displayed form is edited, and after the editing of the edited material extraction table is completed, the form is saved and the spreadsheet application is closed (step S1).
208 to S1210). On the other hand, if the form is not edited in step S1205, it is determined whether to print the form,
When printing the form, the user designates with the tabulation button on the material extraction table output processing screen shown in FIG. 40, and the input material name is input / outputted by the spreadsheet application. And extract the name /
The amount of money for each summary is calculated by a predetermined calculation formula, a report is output by the started spreadsheet application, and a material extraction table (not shown) is printed (steps S1211 to S121).
5). Then, in the case where the output of the material extraction table is completed and the processing is to be continued, the process returns to step S1202 (step S1216; NO). If the material extraction table output processing is completed and the processing is not to be repeated, an instruction is given with the cancel button on the material extraction table output processing screen of FIG. 40 to display the menu screen of FIG. 3 and the material extraction table output operation ends. (Step S1216; YES, Step S
1217, S1218).

【0044】更に、発注における外注注文書の帳票出力
動作について外注注文書出力処理画面の表示例を示す図
42及び動作フローを示す図43に従って説明する。
Further, the form output operation of the outsourced order form in the ordering will be described with reference to FIG. 42 showing a display example of the outsourced order form output processing screen and FIG. 43 showing the operation flow.

【0045】先ず、図3に示すメニュー画面から外注注
文書出力のアイコンを指定し、図1の外注注文書出力処
理部17によって図42に示す外注注文書出力処理画面
に移行させる(ステップS1301)。そして、契約番
号入力を行う際に操作者からの指示によって契約番号を
参照するのか否かを判断して、参照しない場合は直接契
約番号を入力する(ステップS1302;NO、ステッ
プS1303)。一方、参照する場合は操作者が図42
の外注注文書出力処理画面における参照ボタンをもって
指示すると図18に示す契約番号照会画面を表示させて
図1の記憶手段2内の契約データファイルに格納されて
いる契約番号を外注注文書出力処理部17によって参照
して選択入力する(ステップS1302;YES、ステ
ップS1304〜S1306)。そして、帳票を編集す
るか否かを判断し、編集する場合は図42の外注注文書
出力処理画面における表計算アプリ起動ボタンをもって
指示して表計算アプリを起動させる(ステップ130
7;YES、ステップS1308)。起動した表計算ア
プリによって細別計及び種別計を所定の計算式によって
算出し、起動された表計算アプリによって帳票を出力し
てシートに帳票を表示する(ステップS1309〜S1
311)。そして、表示された帳票に対して編集を行
い、編集後の外注注文書に対する編集が終了した後は帳
票を保存し、かつ表計算アプリを閉じる(ステップS1
312〜S1314)。一方、ステップS1307で帳
票を編集しない場合、帳票を印刷するか否かを判断し、
帳票を印刷するときは図42の外注注文書出力処理画面
における作表ボタンをもって指示して表計算アプリによ
る、細別計及び種別計を所定の計算式によって計算し、
起動した表計算アプリによって帳票を出力して、図示し
ていない外注注文書を印刷する(ステップS1315〜
S1319)。そして、外注注文書出力が終了して引き
続いて処理を継続する場合はステップS1302に戻る
(ステップS1320;NO)。また、外注注文書出力
処理が終了して処理を繰り返さない場合は、図42の外
注注文書出力処理画面におけるキャンセルボタンをもっ
て指示して図3のメニュー画面を表示させて外注注文書
出力動作を終了する(ステップS1320;YES、ス
テップS1321,S1322)。
First, an icon for outputting the outsourced order form is designated from the menu screen shown in FIG. 3, and the outsourced order form output processing section 17 shown in FIG. 1 shifts to the outsourced order form output processing screen shown in FIG. 42 (step S1301). . Then, when inputting the contract number, it is determined whether or not to refer to the contract number according to an instruction from the operator. If not, the contract number is directly input (step S1302; NO, step S1303). On the other hand, when referring to FIG.
When the user designates with the reference button on the outsourced order form output processing screen, a contract number inquiry screen shown in FIG. 18 is displayed, and the contract number stored in the contract data file in the storage means 2 in FIG. 17 to select and input (step S1302; YES, steps S1304 to S1306). Then, it is determined whether or not the form is to be edited. If the form is to be edited, the spreadsheet application is started by instructing with the spreadsheet application start button on the outsourced order form output processing screen of FIG.
7; YES, step S1308). The subdivided total and the type total are calculated by the activated spreadsheet application according to a predetermined formula, and the activated spreadsheet application outputs a form and displays the form on a sheet (steps S1309 to S1).
311). Then, the displayed form is edited, and after the edited subcontract order is edited, the form is saved and the spreadsheet application is closed (step S1).
312 to S1314). On the other hand, if the form is not edited in step S1307, it is determined whether to print the form,
When printing the form, instruct with the tabulation button on the outsourced order form output processing screen of FIG. 42, calculate the subdivision total and type total by the spreadsheet application using a predetermined calculation formula,
The form is output by the started spreadsheet application, and an outsourcing order (not shown) is printed (step S1315)
S1319). Then, in the case where the output of the outsourced order form has been completed and the processing is to be continued, the process returns to step S1302 (step S1320; NO). If the processing of the outsourced order form is not completed and the processing is not to be repeated, an instruction is given with the cancel button in the outsourced order form output processing screen of FIG. 42 to display the menu screen of FIG. (Step S1320; YES, steps S1321, S1322).

【0046】また、発注における外注注文書変更の帳票
出力動作について外注注文書変更出力処理画面の表示例
を示す図44及び動作フローを示す図45に従って説明
する。
The operation of outputting a form for changing the outsourced order form in ordering will be described with reference to FIG. 44 showing a display example of the outsourced order form change output processing screen and FIG. 45 showing the operation flow.

【0047】先ず、図3に示すメニュー画面から外注注
文書変更出力のアイコンを指定し、図1の外注注文書変
更出力処理部18によって図44に示す外注注文書変更
出力処理画面に移行させる(ステップS1401)。そ
して、契約番号入力を行う際に操作者からの指示によっ
て契約番号を参照するのか否かを判断して、参照しない
場合は直接契約番号を入力する(ステップS1402;
NO、ステップS1403)。一方、参照する場合は操
作者が図44の外注注文書変更出力処理画面における参
照ボタンをもって指示すると図18に示す契約番号照会
画面を表示させて図1の記憶手段2内の契約データファ
イルに格納されている契約番号を外注注文書変更出力処
理部18によって参照して選択入力する(ステップS1
402;YES、ステップS1404〜S1406)。
そして、帳票を編集するか否かを判断し、編集する場合
は図44の外注注文書変更出力処理画面における表計算
アプリ起動ボタンをもって指示して表計算アプリを起動
させる(ステップ1407;YES、ステップS140
8)。起動した表計算アプリによって細別計、種別計、
増減数量及び増減金額を所定の計算式によって算出し、
起動された表計算アプリによって帳票を出力してシート
に帳票を表示する(ステップS1409〜S141
1)。そして、表示された帳票に対して編集を行い、編
集後の外注注文書変更に対する編集が終了した後は帳票
を保存し、かつ表計算アプリを閉じる(ステップS14
12〜S1414)。一方、ステップS1407で帳票
を編集しない場合、帳票を印刷するか否かを判断し、帳
票を印刷するときは図44の外注注文書変更出力処理画
面における作表ボタンをもって指示して表計算アプリに
よる、細別計、種別計、増減数量及び増減金額を所定の
計算式によって計算し、起動した表計算アプリによって
帳票を出力して、図示していない外注注文書変更を印刷
する(ステップS1415〜S1419)。そして、外
注注文書変更出力が終了して引き続いて処理を継続する
場合はステップS1402に戻る(ステップS142
0;NO)。また、外注注文書変更出力処理が終了して
処理を繰り返さない場合は、図44の外注注文書変更出
力処理画面におけるキャンセルボタンをもって指示して
図3のメニュー画面を表示させて外注注文書変更出力動
作を終了する(ステップS1420;YES、ステップ
S1421,S1422)。
First, an icon for changing the outsourced order form is designated from the menu screen shown in FIG. 3, and the screen is shifted to the outsourced order form change output processing screen shown in FIG. Step S1401). Then, when inputting the contract number, it is determined whether or not to refer to the contract number according to an instruction from the operator, and if not, the contract number is directly input (step S1402;
NO, step S1403). On the other hand, in the case of reference, when the operator designates with the reference button on the outsourced order form change output processing screen of FIG. 44, the contract number inquiry screen shown in FIG. 18 is displayed and stored in the contract data file in the storage means 2 of FIG. The contracted number is referred to by the outsourced order form change output processing section 18 and is selectively input (Step S1)
402; YES, steps S1404 to S1406).
Then, it is determined whether or not the form is to be edited. If the form is to be edited, the spreadsheet application is started by instructing the spreadsheet application start button on the outsourced order form change output processing screen in FIG. 44 (step 1407; YES, step S140
8). Depending on the launched spreadsheet application, subdivision total, type total,
Calculate the increase / decrease quantity and increase / decrease amount by a predetermined formula,
The form is output by the started spreadsheet application and the form is displayed on the sheet (steps S1409 to S141).
1). Then, the displayed form is edited, and after editing of the edited outsourced order change is completed, the form is saved and the spreadsheet application is closed (step S14).
12 to S1414). On the other hand, if the form is not edited in step S1407, it is determined whether or not the form is to be printed. If the form is to be printed, an instruction is given using the tabulation button on the outsourced order form change output processing screen shown in FIG. , The subtotal total, the type total, the increase / decrease amount and the increase / decrease amount are calculated by a predetermined calculation formula, the form is output by the activated spreadsheet application, and the outsourced order change not shown is printed (steps S1415 to S1419). . Then, when the process of changing the outsourced order form is completed and the process is to be continued, the process returns to step S1402 (step S142).
0; NO). In the case where the outsourced order change output process is completed and the process is not repeated, an instruction is given with the cancel button on the outsourced order change output process screen of FIG. 44 to display the menu screen of FIG. The operation ends (step S1420; YES, steps S1421, S1422).

【0048】更に、出来高における工事出来高調書の帳
票出力動作について工事出来高調書出力処理画面の表示
例を示す図46及び動作フローを示す図47に従って説
明する。
Further, the form output operation of the work completion harmonic report at the work volume will be described with reference to FIG. 46 showing a display example of the work completion harmonic output processing screen and FIG. 47 showing the operation flow.

【0049】先ず、図3に示すメニュー画面から工事出
来高調書出力のアイコンを指定し、図1の工事出来高調
書出力処理部20によって図46に示す工事出来高調書
出力処理画面に移行させる(ステップS1501)。そ
して、処理年月日を入力し(ステップS1502)、契
約番号入力を行う際に操作者からの指示によって契約番
号を参照するのか否かを判断して、参照しない場合は直
接契約番号を入力する(ステップS1503;NO、ス
テップS1504)。一方、参照する場合は操作者が図
46の工事出来高調書出力処理画面における参照ボタン
をもって指示すると図18に示す契約番号照会画面を表
示させて図1の記憶手段2内の契約データファイルに格
納されている契約番号を工事出来高調書出力処理部20
によって参照して選択入力する(ステップS1503;
YES、ステップS1505〜S1507)。そして、
帳票を編集するか否かを判断し、編集する場合は図46
の工事出来高調書出力処理画面における表計算アプリ起
動ボタンをもって指示して表計算アプリを起動させる
(ステップ1508;YES、ステップS1509)。
起動した表計算アプリによって細別計、種別計、工種
計、総合計及び査定計を所定の計算式によって算出し、
起動された表計算アプリによって帳票を出力してシート
に帳票を表示する(ステップS1510〜S151
2)。そして、表示された帳票に対して編集を行い、編
集後の工事出来高調書に対する編集が終了した後は帳票
を保存し、かつ表計算アプリを閉じる(ステップS15
13〜S1515)。一方、ステップS1508で帳票
を編集しない場合、帳票を印刷するか否かを判断し、帳
票を印刷するときは図46の工事出来高調書出力処理画
面における作表ボタンをもって指示して表計算アプリに
よる、細別計、種別計、工種計、総合計及び査定計を所
定の計算式によって計算し、起動した表計算アプリによ
って帳票を出力して、図示していない工事出来高調書を
印刷する(ステップS1516〜S1520)。そし
て、工事出来高調書出力が終了して引き続いて処理を継
続する場合はステップS1502に戻る(ステップS1
521;NO)。また、工事出来高調書出力処理が終了
して処理を繰り返さない場合は、図46の工事出来高調
書出力処理画面におけるキャンセルボタンをもって指示
して図3のメニュー画面を表示させて工事出来高調書出
力動作を終了する(ステップS1521;YES、ステ
ップS1522,S1523)。
First, the icon of work completion harmonic output is designated from the menu screen shown in FIG. 3, and the work completion harmonic output processing section 20 shown in FIG. 1 shifts to the work completion harmonic output processing screen shown in FIG. 46 (step S1501). . Then, the processing date is input (step S1502), and it is determined whether or not to refer to the contract number according to an instruction from the operator when inputting the contract number. If not, the contract number is directly input. (Step S1503; NO, Step S1504). On the other hand, in the case of reference, when the operator gives an instruction with the reference button on the work completion record output processing screen of FIG. 46, the contract number inquiry screen shown in FIG. 18 is displayed and stored in the contract data file in the storage means 2 of FIG. The contract number that has been constructed is output to the harmonic output processing unit 20
And select and input (step S1503;
YES, steps S1505 to S1507). And
It is determined whether or not to edit the form.
The spreadsheet application is started by instructing with the spreadsheet application start button on the work completion harmonic output processing screen (step 1508; YES, step S1509).
Calculate the subdivision total, type total, work type total, total total, and evaluator by the specified calculation formula by the launched spreadsheet application,
The form is output by the activated spreadsheet application and the form is displayed on the sheet (steps S1510 to S151).
2). Then, the displayed form is edited, and after the editing of the edited work record is completed, the form is saved and the spreadsheet application is closed (step S15).
13 to S1515). On the other hand, if the form is not edited in step S1508, it is determined whether or not the form is to be printed. When the form is to be printed, an instruction is given using the tabulation button on the work completion harmonic output processing screen shown in FIG. The subtotal meter, the type meter, the work type meter, the total meter, and the evaluator are calculated by a predetermined calculation formula, a report is output by the started spreadsheet application, and a work record (not shown) is printed (steps S1516 to S1520). ). Then, in the case where the output of the work completion harmonic is completed and the processing is to be continued, the process returns to step S1502 (step S1).
521; NO). When the work completion harmonic output process is completed and the process is not repeated, an instruction is given with the cancel button on the construction completion harmonic output process screen of FIG. 46 to display the menu screen of FIG. 3 and the construction completion harmonic output operation ends. (Step S1521: YES, steps S1522, S1523).

【0050】また、支払における契約台帳の帳票出力動
作について契約台帳出力処理画面の表示例を示す図48
及び動作フローを示す図49に従って説明する。
FIG. 48 shows a display example of a contract ledger output processing screen regarding a contract ledger form output operation upon payment.
The operation will be described with reference to FIG.

【0051】先ず、図3に示すメニュー画面から契約台
帳出力のアイコンを指定し、図1の契約台帳出力処理部
24によって図48に示す契約台帳出力処理画面に移行
させる(ステップS1601)。そして、処理年月日を
入力し(ステップS1602)、帳票を編集するか否か
を判断し、編集する場合は図48の契約台帳出力処理画
面における表計算アプリ起動ボタンをもって指示して表
計算アプリを起動させる(ステップ1603;YES、
ステップS1604)。起動した表計算アプリによって
当月支払金額及び累計支払金額を所定の計算式によって
算出し、起動された表計算アプリによって帳票を出力し
てシートに帳票を表示する(ステップS1605〜S1
607)。そして、表示された帳票に対して編集を行
い、編集後の契約台帳に対する編集が終了した後は帳票
を保存し、かつ表計算アプリを閉じる(ステップS16
08〜S1610)。一方、ステップS1603で帳票
を編集しない場合、帳票を印刷するか否かを判断し、帳
票を印刷するときは図48の契約台帳出力処理画面にお
ける作表ボタンをもって指示して表計算アプリによる、
当月支払金額及び累計支払金額を所定の計算式によって
計算し、起動した表計算アプリによって帳票を出力し
て、図示していない契約台帳を印刷する(ステップS1
611〜S1615)。そして、契約台帳出力が終了し
て引き続いて処理を継続する場合はステップS1602
に戻る(ステップS1616;NO)。また、契約台帳
出力処理が終了して処理を繰り返さない場合は、図48
の契約台帳出力処理画面におけるキャンセルボタンをも
って指示して図3のメニュー画面を表示させて契約台帳
出力動作を終了する(ステップS1616;YES、ス
テップS1617,S1618)。
First, an icon for contract ledger output is designated from the menu screen shown in FIG. 3, and the contract ledger output processing unit 24 shown in FIG. 1 shifts to the contract ledger output processing screen shown in FIG. 48 (step S1601). Then, the processing date is input (step S1602), and it is determined whether or not to edit the form. When the form is to be edited, an instruction is given by using a spreadsheet application start button on the contract ledger output processing screen of FIG. (Step 1603; YES,
Step S1604). The activated spreadsheet application calculates the current month's payment amount and the accumulated payment amount by a predetermined calculation formula, and the activated spreadsheet application outputs a form and displays the form on a sheet (steps S1605 to S1).
607). Then, the displayed form is edited, and after the edited contract ledger is edited, the form is saved and the spreadsheet application is closed (step S16).
08 to S1610). On the other hand, if the form is not edited in step S1603, it is determined whether or not the form is to be printed. If the form is to be printed, the spreadsheet application is instructed by instructing with the tabulation button on the contract ledger output processing screen in FIG.
The payment amount for the current month and the total payment amount are calculated by a predetermined calculation formula, a form is output by the started spreadsheet application, and a contract ledger (not shown) is printed (step S1).
611 to S1615). If the processing is to be continued after the output of the contract ledger is completed, step S1602
(Step S1616; NO). In the case where the contract ledger output processing is completed and the processing is not repeated, FIG.
Instructing the user with the cancel button on the contract ledger output processing screen of FIG. 3 displays the menu screen of FIG. 3 and ends the contract ledger output operation (step S1616; YES, steps S1617, S1618).

【0052】更に、支払における工事原価月報の帳票出
力動作について工事原価月報出力処理画面の表示例を示
す図50及び動作フローを示す図51に従って説明す
る。
Further, the operation of outputting the monthly report of the construction cost in the form of payment will be described with reference to FIG. 50 showing a display example of the construction cost monthly report output processing screen and FIG. 51 showing the operation flow.

【0053】先ず、図3に示すメニュー画面から工事原
価月報出力のアイコンを指定し、図1の工事原価月報出
力処理部25によって図50に示す工事原価月報出力処
理画面に移行させる(ステップS1701)。そして、
処理年月日を入力し(ステップS1702)、帳票を編
集するか否かを判断し、編集する場合は図50の工事原
価月報出力処理画面における表計算アプリ起動ボタンを
もって指示して表計算アプリを起動させる(ステップ1
703;YES、ステップS1704)。起動した表計
算アプリによって直接工事費計、純工事費計、工事原価
計、変更、出来高、総支出金、予算残高及び工事益を所
定の計算式によって算出し、起動された表計算アプリに
よって帳票を出力してシートに帳票を表示する(ステッ
プS1705〜S1707)。そして、表示された帳票
に対して編集を行い、編集後の工事原価月報に対する編
集が終了した後は帳票を保存し、かつ表計算アプリを閉
じる(ステップS1708〜S1710)。一方、ステ
ップS1703で帳票を編集しない場合、帳票を印刷す
るか否かを判断し、帳票を印刷するときは図50の工事
原価月報出力処理画面における作表ボタンをもって指示
して表計算アプリによる、直接工事費計、純工事費計、
工事原価計、変更、出来高、総支出金、予算残高及び工
事益を所定の計算式によって計算し、起動した表計算ア
プリによって帳票を出力して、図示していない工事原価
月報を印刷する(ステップS1711〜S1715)。
そして、工事原価月報出力が終了して引き続いて処理を
継続する場合はステップS1702に戻る(ステップS
1716;NO)。また、工事原価月報出力処理が終了
して処理を繰り返さない場合は、図50の工事原価月報
出力処理画面におけるキャンセルボタンをもって指示し
て図3のメニュー画面を表示させて工事原価月報出力動
作を終了する(ステップS1716;YES、ステップ
S1717,S1718)。
First, an icon for outputting a construction cost monthly report is designated from the menu screen shown in FIG. 3, and the construction cost monthly report output processing unit 25 shown in FIG. 1 shifts to a construction cost monthly report output processing screen shown in FIG. 50 (step S1701). . And
The processing date is input (step S1702), and it is determined whether or not to edit the form. When the form is to be edited, the spreadsheet application is activated by instructing the spreadsheet application start button on the construction cost monthly report output processing screen in FIG. Start (Step 1
703; YES, step S1704). Calculate the construction cost total, net construction cost total, construction cost total, change, volume, total expenditure, budget balance and construction profit directly by the launched spreadsheet application by a predetermined formula, and report by the launched spreadsheet application Is output and the form is displayed on the sheet (steps S1705 to S1707). Then, the displayed form is edited, and after the edited construction cost monthly report is completed, the form is saved and the spreadsheet application is closed (steps S1708 to S1710). On the other hand, if the form is not edited in step S1703, it is determined whether or not the form is to be printed. When the form is to be printed, an instruction is given using the spreadsheet button on the construction cost monthly report output processing screen in FIG. Direct construction cost total, net construction cost total,
The construction cost meter, change, work volume, total expenditure, budget balance and construction profit are calculated according to predetermined formulas, a report is output by the started spreadsheet application, and a construction cost monthly report (not shown) is printed (step). S1711 to S1715).
Then, when the construction cost monthly report is output and the process is to be continued, the process returns to step S1702 (step S1702).
1716; NO). When the construction cost monthly report output processing is completed and the processing is not to be repeated, an instruction is given with the cancel button on the construction cost monthly report output processing screen in FIG. 50 to display the menu screen in FIG. 3 and the construction cost monthly report output operation is ended. (Step S1716; YES, Steps S1717, S1718).

【0054】また、支払における支払内訳書の帳票出力
動作について支払内訳書出力処理画面の表示例を示す図
52及び動作フローを示す図53に従って説明する。
The operation for outputting the form of the payment details in the payment will be described with reference to FIG. 52 showing a display example of the payment details output processing screen and FIG. 53 showing the operation flow.

【0055】先ず、図3に示すメニュー画面から支払内
訳書出力のアイコンを指定し、図1の支払内訳書出力処
理部23によって図52に示す支払内訳書出力処理画面
に移行させる(ステップS1801)。そして、処理年
月日を入力し(ステップS1802)、帳票を編集する
か否かを判断し、編集する場合は図52の支払内訳書出
力処理画面における表計算アプリ起動ボタンをもって指
示して表計算アプリを起動させる(ステップ1803;
YES、ステップS1804)。起動した表計算アプリ
によって月別支払金額、工事計及び当月迄の累計を所定
の計算式によって算出し、起動された表計算アプリによ
って帳票を出力してシートに帳票を表示する(ステップ
S1805〜S1807)。そして、表示された帳票に
対して編集を行い、編集後の支払内訳書に対する編集が
終了した後は帳票を保存し、かつ表計算アプリを閉じる
(ステップS1808〜S1810)。一方、ステップ
S1803で帳票を編集しない場合、帳票を印刷するか
否かを判断し、帳票を印刷するときは図52の支払内訳
書出力処理画面における作表ボタンをもって指示して表
計算アプリによる、月別支払金額、工事計及び当月迄の
累計を所定の計算式によって計算し、起動した表計算ア
プリによって帳票を出力して、図示していない支払内訳
書を印刷する(ステップS1811〜S1815)。そ
して、支払内訳書出力が終了して引き続いて処理を継続
する場合はステップS1802に戻る(ステップS18
16;NO)。また、支払内訳書出力処理が終了して処
理を繰り返さない場合は、図52の支払内訳書出力処理
画面におけるキャンセルボタンをもって指示して図3の
メニュー画面を表示させて支払内訳書出力動作を終了す
る(ステップS1816;YES、ステップS181
7,S1818)。
First, the icon of payment invoice output is designated from the menu screen shown in FIG. 3, and the payment invoice output processing unit 23 of FIG. 1 shifts to the payment invoice output processing screen of FIG. 52 (step S1801). . Then, the processing date is input (step S1802), and it is determined whether or not to edit the form. When the form is to be edited, a spreadsheet application is activated by instructing with a spreadsheet application start button on the payment invoice output processing screen shown in FIG. Activate the application (Step 1803;
YES, step S1804). The activated spreadsheet application calculates the monthly payment amount, the construction total, and the cumulative total up to the current month according to a predetermined formula, outputs the form by the activated spreadsheet application, and displays the form on a sheet (steps S1805 to S1807). . Then, the displayed form is edited, and after the edited payment details are completed, the form is stored and the spreadsheet application is closed (steps S1808 to S1810). On the other hand, if the form is not edited in step S1803, it is determined whether or not the form is to be printed. If the form is to be printed, the form is designated by the spreadsheet application on the payment invoice output processing screen shown in FIG. The monthly payment amount, the construction total, and the total up to the current month are calculated by a predetermined calculation formula, the form is output by the started spreadsheet application, and the payment breakdown (not shown) is printed (steps S1811 to S1815). Then, in the case where the output of the payment breakdown has been completed and the processing is to be continued, the process returns to step S1802 (step S18).
16; NO). If the payment invoice output processing is completed and the processing is not to be repeated, an instruction is given with the cancel button in the payment invoice output processing screen of FIG. 52 to display the menu screen of FIG. 3 and the payment invoice output operation ends. (Step S1816; YES, Step S181)
7, S1818).

【0056】以上説明した実施例によれば、メニュー画
面において土木工事原価管理に必要なデータの入力手順
をメニュー配置により把握できると共にデータの入力に
より出力可能な帳票等の処理案内表示の表示色を変える
ことにより処理手順内容をより一層把握できる。また、
工種、種別、細別、名称/摘要の各階層に対応して入力
に必要な項目をタブ表示してこのタブ表示をもって順次
参照表示することにより簡単に入力できる。更に、実行
予算入力における名称/摘要入力に於いて代価番号を入
力することにより、代価表タブが表示され、代価入力を
簡単にできる。更に、発注入力において、実行予算で入
力したデータを表示し、外注に発注する名称/摘要をチ
ェックし、数量、単価を入力することにより、外注注文
書を簡単に作成できる。また、実行予算入力、発注入
力、出来高入力及び支払入力によって入力された各デー
タに基づいて、または逐次変更された各データに基づい
て工事進捗率を算出して工程管理曲線を表示することに
より、現在の工事進捗状況の安全性を把握でき、更に工
程管理アプリにリンクさせて工程管理を含む土木施工管
理に反映できる。
According to the embodiment described above, the input procedure of data required for civil engineering cost management can be grasped by the menu layout on the menu screen, and the display color of the processing guide display such as a form that can be output by inputting the data is displayed. By changing it, the contents of the processing procedure can be further grasped. Also,
Items necessary for input are displayed in tabs corresponding to the respective layers of the construction type, type, subdivision, and name / summary, and these tab displays are used to sequentially reference and display, thereby easily inputting. Further, by inputting the price number in the name / summary input in the execution budget input, a price table tab is displayed, and the price input can be simplified. Further, in order entry, the data entered in the execution budget is displayed, the name / description to be ordered for outsourcing is checked, and the quantity and unit price are entered, so that an outsourcing order can be easily created. In addition, by calculating the construction progress rate based on each data input by the execution budget input, order input, volume input and payment input, or based on each sequentially changed data, and displaying the process control curve, The safety of the current construction progress status can be grasped and further linked to the process management application and reflected in civil engineering work management including process management.

【0057】なお、本発明は上記実施例に限定されるも
のではなく、特許請求の範囲内の記載であれば多種の変
形や置換可能であることは言うまでもない。
It should be noted that the present invention is not limited to the above-described embodiment, and it goes without saying that various modifications and substitutions can be made within the scope of the claims.

【0058】[0058]

【発明の効果】以上説明したように、材料費、労務費や
直接経費等の直接工事費及び共通仮設費や現場管理費等
の間接工事費を含む工事原価に関して、工事着手前に予
定し又は工事中で見直す実行予算、業者に発注する発
注、業者に発注する発注金額、発注に対する実際の工事
施工に要した実際原価に対しての出来高、出来高に対す
る査定金額、業者に支払った支払金額及び工事終了まで
に予想される支払金額である予想未払金額等の工事原価
算出データに基づいて算出した工事原価を管理する、本
発明の土木工事の原価管理装置は、工事原価算出データ
を入力する際に工事用語を格納する用語辞書ファイル、
工事原価算出データのマスターデータを格納するマスタ
ーファイルや工事原価算出データを格納するデータファ
イルを記憶する記憶手段と、データ入力及び指示入力を
行う入力手段と、処理手順を示すデータ処理案内表示や
工事原価算出データに基づく帳票を表示する表示手段
と、帳票を印刷出力する出力手段と、入力手段による指
示により記憶手段に記憶された用語辞書ファイルから所
望の工事用語を選択する用語辞書選択手段と、記憶手段
に記憶されたマスターファイルからの工事原価算出デー
タのマスターデータに基づいて工事原価に関するデータ
を入力する工事原価データ入力処理手段と、入力された
工事原価に関するデータにより実行予算等を演算する演
算手段と、演算手段によって演算された演算結果の工事
原価に基づいて所定の帳票を作成し、出力手段により印
刷出力するように処理する工事原価帳票出力処理手段と
を有することに特徴がある。よって、工事原価算出デー
タを簡単に、かつ正確に入力でき、簡単に所望の帳票を
出力できる。
As described above, the construction costs including direct construction costs such as material costs, labor costs and direct costs, and indirect construction costs such as common temporary construction costs and site management costs are scheduled to be scheduled before construction starts or Execution budget to be reviewed during construction, order to place order with contractor, order amount to place order with contractor, work volume for actual cost required for actual construction work for order, appraised amount for work volume, payment amount paid to contractor, construction work The civil engineering work cost management device of the present invention, which manages construction costs calculated based on construction cost calculation data such as expected unpaid amounts that are expected to be paid up to the end, when inputting construction cost calculation data Term dictionary file that stores construction terms,
Storage means for storing a master file for storing master data of construction cost calculation data and a data file for storing construction cost calculation data; input means for inputting data and inputting instructions; Display means for displaying a form based on cost calculation data, output means for printing and outputting the form, term dictionary selecting means for selecting a desired construction term from a term dictionary file stored in a storage means by an instruction from the input means, Construction cost data input processing means for inputting construction cost data based on the master data of the construction cost calculation data from the master file stored in the storage means, and calculation for calculating an execution budget and the like based on the inputted construction cost data Means and a predetermined value based on the construction cost of the calculation result calculated by the calculation means. Create a form, it is characterized by having a construction costs form output processing means for processing to print output by the output means. Therefore, construction cost calculation data can be easily and accurately input, and a desired form can be easily output.

【0059】また、工事原価データ入力手段によって入
力された工事原価に基づいて工事の進歩状況を示す工事
進捗率特性を作成処理する工事進捗率処理手段を有する
ことにより、原価実績の評価を逐次行うことができ、か
つ原価管理を確実に把握できる。
Further, the construction progress rate processing means for creating and processing the construction progress rate characteristic indicating the progress of the construction based on the construction cost inputted by the construction cost data input means is provided, so that the cost performance is evaluated successively. And the cost control can be reliably grasped.

【0060】更に、データ処理案内表示における処理手
順の表示色を変えることにより、熟練した施工管理技士
でない工事現場担当者でも簡単に、かつ正確に入力及び
出力処理を行うことができる。
Further, by changing the display color of the processing procedure in the data processing guide display, input and output processing can be easily and accurately performed by a construction site technician who is not a skilled construction management engineer.

【0061】また、用語辞書選択手段は階層毎に用意さ
れた工事用語を選択する構成であることにより、簡単に
入力できる。
Further, the term dictionary selecting means is configured to select construction terms prepared for each hierarchy, so that the term dictionary can be easily input.

【0062】更に、査定金額の承認、工事原価に関する
データ、演算結果及び所定の帳票を作成するデータ等を
外部へ又は外部から送受信する通信部を有することによ
り、例えば査定金額を発注業者に通信部を介して送り、
送った査定金額を承認するか否かなどの承認処理を行
い、業者間の承認処理を簡素化できるなど、各種のデー
タの送受信をインターネット等の通信手段によって行
い、業者間の情報の伝送が可能となり、各種の処理が簡
素化できる。
Further, by providing a communication unit for transmitting / receiving externally or externally data such as approval of the assessed amount, data on construction costs, calculation results, and data for preparing a predetermined form, for example, the communicating unit transmits the assessed amount to the ordering company. Sent through
Approval processing such as whether or not to approve the sent appraisal value can be performed, and approval processing between traders can be simplified, and various types of data can be transmitted and received by communication means such as the Internet, and information can be transmitted between traders. Thus, various processes can be simplified.

【0063】また、別の発明として、土木工事の原価管
理方法によれば、処理手順を示すデータ処理案内表示や
工事原価算出データに基づく帳票を表示し、操作者の指
示により予め記憶されている用語辞書ファイルから所望
の工事用語を選択して工事原価算出データのマスターデ
ータに基づいて工事原価に関するデータを入力する。そ
して、入力された工事原価に関するデータにより実行予
算等を演算し、演算された演算結果の工事原価に基づい
て所定の帳票を作成して必要に応じて印刷出力する。よ
って、熟練した施工管理技士でなくても工事原価算出デ
ータを簡単に、かつ正確に入力でき、簡単に所望の帳票
を出力できる。
As another invention, according to the cost control method for civil engineering work, a data processing guide display showing a processing procedure and a form based on construction cost calculation data are displayed and stored in advance by an instruction of an operator. A desired construction term is selected from the term dictionary file, and data relating to the construction cost is input based on the master data of the construction cost calculation data. Then, an execution budget or the like is calculated based on the input data relating to the construction cost, a predetermined form is created based on the calculated construction cost as a result of the calculation, and printed out as necessary. Therefore, even if it is not a skilled construction management engineer, construction cost calculation data can be input easily and accurately, and a desired form can be easily output.

【0064】更に、入力された工事原価に基づいて工事
の進歩状況を示す工事進捗率特性を作成処理することに
より、原価管理本来の目的である施工管理に反映でき
る。
Further, by creating and processing a construction progress rate characteristic indicating the progress of the construction based on the inputted construction cost, it can be reflected on the construction management which is the original purpose of cost management.

【0065】また、データ処理案内表示における処理手
順の表示色を変えることにより、より一層簡単にかつ正
確に入力及び出力の処理を行うことができる。
By changing the display color of the processing procedure in the data processing guide display, input and output processing can be performed more easily and accurately.

【0066】更に、階層毎に用意された工事用語を選択
することにより、簡単に入力できる。
Further, by selecting a construction term prepared for each level, it is possible to easily input the term.

【0067】また、査定金額の承認、工事原価に関する
データ、演算結果及び所定の帳票を作成するデータ等を
外部へ又は外部から送受信することにより、各種のデー
タの送受信をインターネット等によって行い、業者間の
情報の伝送が可能となり、各種の処理が簡素化できる。
Further, by transmitting / receiving externally or externally data such as approval of the assessed amount, data on construction costs, calculation results, and data for preparing a predetermined form, transmission / reception of various data is performed via the Internet or the like. Can be transmitted, and various processes can be simplified.

【0068】更に、上記の土木工事の原価管理方法を実
行するためのプログラムを格納したコンピュータ読み取
り可能な記憶媒体に特徴がある。よって、既存のシステ
ムを変えることなく、原価管理システムを構築する装置
を汎用的に使用することができる。
Further, the present invention is characterized by a computer-readable storage medium storing a program for executing the above-mentioned cost management method for civil engineering work. Therefore, the apparatus for constructing the cost management system can be used for general purposes without changing the existing system.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例に係る土木工事の原価管理装
置のハードウェア構成を示すブロック図である。
FIG. 1 is a block diagram illustrating a hardware configuration of a cost management device for civil engineering work according to an embodiment of the present invention.

【図2】本実施例における実行予算入力の動作を示すフ
ローチャートである。
FIG. 2 is a flowchart showing an operation of inputting an execution budget in the embodiment.

【図3】メニュー画面の表示例を示す図である。FIG. 3 is a diagram showing a display example of a menu screen.

【図4】実行予算入力の入力画面表示例を示す図であ
る。
FIG. 4 is a diagram showing an example of an input screen display for inputting an execution budget.

【図5】実行予算入力の入力画面表示例を示す図であ
る。
FIG. 5 is a diagram showing an example of an input screen display for inputting an execution budget.

【図6】実行予算入力の入力画面表示例を示す図であ
る。
FIG. 6 is a diagram showing an example of an input screen for inputting an execution budget;

【図7】実行予算入力の入力画面表示例を示す図であ
る。
FIG. 7 is a diagram showing an example of an input screen display for inputting an execution budget.

【図8】実行予算入力の入力画面表示例を示す図であ
る。
FIG. 8 is a diagram illustrating an example of an input screen display for inputting an execution budget.

【図9】実行予算入力の入力画面表示例を示す図であ
る。
FIG. 9 is a diagram showing a display example of an input screen for inputting an execution budget.

【図10】実行予算入力の入力画面表示例を示す図であ
る。
FIG. 10 is a diagram illustrating an example of an input screen display for inputting an execution budget.

【図11】実行予算入力の入力画面表示例を示す図であ
る。
FIG. 11 is a diagram showing a display example of an input screen for inputting an execution budget.

【図12】本実施例の発注入力の動作を示すフローチャ
ートである。
FIG. 12 is a flowchart illustrating an order input operation according to the present embodiment.

【図13】発注入力の入力画面表示例を示す図である。FIG. 13 is a diagram illustrating an example of an input screen display for inputting an order.

【図14】発注入力の入力画面表示例を示す図である。FIG. 14 is a diagram showing an example of an input screen display for inputting an order.

【図15】発注入力の入力画面表示例を示す図である。FIG. 15 is a diagram illustrating an example of an input screen display for inputting an order.

【図16】本実施例の出来高入力の動作を示すフローチ
ャートである。
FIG. 16 is a flowchart showing the operation of the volume input of the embodiment.

【図17】出来高入力の入力画面表示例を示す図であ
る。
FIG. 17 is a diagram showing an example of an input screen display for a volume input.

【図18】出来高入力の契約番号照会表示例を示す図で
ある。
FIG. 18 is a diagram showing an example of a contract number inquiry display of a volume input;

【図19】出来高入力の査定入力画面表示例を示す図で
ある。
FIG. 19 is a diagram showing a display example of an assessment input screen for volume input.

【図20】メールによる査定金額に対する承認伺い動作
を示すフローチャートである。
FIG. 20 is a flowchart showing an operation of asking for approval of an assessment amount by e-mail.

【図21】査定金額承認願い画面アクセス画面を示す図
である。
FIG. 21 is a diagram showing an assessment amount approval request screen access screen.

【図22】査定金額承認願い画面を示す図である。FIG. 22 is a diagram showing an assessment amount approval request screen.

【図23】本実施例の支払入力の動作を示すフローチャ
ートである。
FIG. 23 is a flowchart illustrating a payment input operation according to the present embodiment.

【図24】支払入力の入力画面表示例を示す図である。FIG. 24 is a diagram showing an example of an input screen display for payment input.

【図25】支払入力の前月参照画面表示例を示す図であ
る。
FIG. 25 is a diagram showing a display example of a previous month reference screen for payment input.

【図26】支払入力の工種計画面表示例を示す図であ
る。
FIG. 26 is a diagram showing a display example of a work plan screen for inputting payment.

【図27】本実施玲の予想未払入力の動作を示すフロー
チャートである。
FIG. 27 is a flowchart showing an operation of a predicted unpaid input in the present embodiment;

【図28】予想未払入力の入力画面表示例を示す図であ
る。
FIG. 28 is a diagram showing an example of an input screen display of expected unpaid input.

【図29】本実施例の工事進捗率参照処理の動作を示す
フローチャートである。
FIG. 29 is a flowchart illustrating an operation of a construction progress rate reference process according to the present embodiment.

【図30】工事進捗率グラフ表示画面を示す図である。FIG. 30 is a diagram showing a construction progress rate graph display screen.

【図31】実行予算における実行予算総括表の表示例を
示す図である。
FIG. 31 is a diagram showing a display example of an execution budget summary table in an execution budget.

【図32】実行予算における実行予算総括表の帳票出力
動作を示すフローチャートである。
FIG. 32 is a flowchart showing a form output operation of the execution budget summary table in the execution budget.

【図33】実行予算総括表の帳票出力例を示す図であ
る。
FIG. 33 is a diagram showing a form output example of an execution budget summary table.

【図34】本実施例における実行予算内訳表出力処理画
面の表示例を示す図である。
FIG. 34 is a diagram showing a display example of an execution budget breakdown table output processing screen in the present embodiment.

【図35】実行予算内訳表の帳票出力動作を示すフロー
チャートである。
FIG. 35 is a flowchart showing a form output operation of an execution budget breakdown table.

【図36】実行予算内訳一覧表出力処理画面の表示例を
示す図である。
FIG. 36 is a diagram showing a display example of an execution budget breakdown list output processing screen.

【図37】本実施例における実行予算内訳一覧表出力処
理画面の表示例を示す図である。
FIG. 37 is a diagram showing a display example of an execution budget breakdown list output processing screen in the present embodiment.

【図38】本実施例の代価表出力処理画面の表示例を示
す図である。
FIG. 38 is a diagram illustrating a display example of a price list output processing screen according to the present embodiment.

【図39】代価表出力動作を示すフローチャートであ
る。
FIG. 39 is a flowchart showing a price list output operation.

【図40】本実施例の材料抽出表出力処理画面の表示例
を示す図35である。
FIG. 40 is a diagram illustrating a display example of a material extraction table output processing screen according to the embodiment;

【図41】材料抽出表出力動作を示すフローチャートで
ある。
FIG. 41 is a flowchart showing a material extraction table output operation.

【図42】発注における外注注文書出力処理画面の表示
例を示す図である。
FIG. 42 is a diagram showing a display example of an outsourced order form output processing screen in ordering.

【図43】外注注文書出力動作を示すフローチャートで
ある。
FIG. 43 is a flowchart showing an outsourced order form output operation.

【図44】発注における外注注文書変更出力処理画面の
表示例を示す図である。
FIG. 44 is a diagram showing a display example of a subcontract order change output processing screen in ordering.

【図45】外注注文書変更出力動作を示すフローチャー
トである。
FIG. 45 is a flowchart showing an outsourced order form change output operation.

【図46】出来高における工事出来高調書出力処理画面
の表示例を示す図である。
FIG. 46 is a diagram showing a display example of a construction work harmonic book output processing screen for work volume.

【図47】工事出来高調書出力の動作を示すフローチャ
ートである。
FIG. 47 is a flowchart showing the operation of work completion harmonic output.

【図48】支払における契約台帳出力処理画面の表示例
を示す図である。
FIG. 48 is a diagram showing a display example of a contract ledger output processing screen in payment.

【図49】契約台帳出力の動作を示すフローチャートで
ある。
FIG. 49 is a flowchart showing an operation of contract ledger output.

【図50】支払における工事原価月報出力処理画面の表
示例を示す図である。
FIG. 50 is a diagram showing a display example of a construction cost monthly report output processing screen for payment.

【図51】工事原価月報の帳票出力の動作を示すフロー
チャートである。
FIG. 51 is a flowchart showing an operation of outputting a monthly report of a construction cost.

【図52】支払における支払内訳書出力処理画面の表示
例を示す図である。
FIG. 52 is a diagram showing a display example of a payment breakdown statement output processing screen in payment.

【図53】支払内訳書の帳票出力の動作を示すフローチ
ャートである。
FIG. 53 is a flowchart showing an operation of outputting a payment breakdown form.

【符号の説明】[Explanation of symbols]

1;CPU、2;記憶手段、3;入力部、4;表示部、
5;出力部、6;通信部、7;記憶部、8;入出力制御
部、9;用語辞書選択処理部、10;実行予算入力処理
部、11;実行予算総括表出力処理部、12;実行予算
内訳表出力処理部、13;実行予算内訳一覧表出力処理
部、14;材料抽出表出力処理部、15;代価表出力処
理部、16;発注入力処理部、17;外注注文書出力処
理部、18;外注注文書変更出力処理部、19;出来高
入力処理部、20;工事出来高調書出力処理部、21;
支払入力処理部、22;予想未払入力処理部、23;支
払内訳書出力処理部、24;契約台帳出力処理部、2
5;工事原価月報出力処理部、26;工事進捗率処理
部。
1; CPU 2; storage means 3; input unit 4; display unit;
5; output unit, 6; communication unit, 7; storage unit, 8; input / output control unit, 9; term dictionary selection processing unit, 10; execution budget input processing unit, 11; execution budget summary table output processing unit, 12; Execution budget breakdown table output processing section, 13; Execution budget breakdown list output processing section, 14; Material extraction table output processing section, 15; Price list output processing section, 16; Order input processing section, 17; Outsourced order form output processing Part, 18; outsourced order change output processing part, 19; work input processing part, 20; work completion harmonic output processing part, 21;
Payment input processing section, 22; expected unpaid input processing section, 23; payment breakdown output processing section, 24; contract ledger output processing section, 2
5: Construction cost monthly report output processing unit, 26: Construction progress rate processing unit.

Claims (11)

【特許請求の範囲】[Claims] 【請求項1】 材料費、労務費や直接経費等の直接工事
費及び共通仮設費や現場管理費等の間接工事費を含む工
事原価に関して、工事着手前に予定し又は工事中で見直
す実行予算、業者に発注する発注、業者に発注する発注
金額、発注に対する実際の工事施工に要した実際原価に
対しての出来高、出来高に対する査定金額、業者に支払
った支払金額及び工事終了までに予想される支払金額で
ある予想未払金額等の工事原価算出データに基づいて算
出した前記工事原価を管理する土木工事の原価管理装置
において、 前記工事原価算出データを入力する際に工事用語を格納
する用語辞書ファイル、前記工事原価算出データのマス
ターデータを格納するマスターファイルや前記工事原価
算出データを格納するデータファイルを記憶する記憶手
段と、 データ入力及び指示入力を行う入力手段と、 処理手順を示すデータ処理案内表示や前記工事原価算出
データに基づく帳票を表示する表示手段と、 前記帳票を印刷出力する出力手段と、 前記入力手段による指示により前記記憶手段に記憶され
た用語辞書ファイルから所望の工事用語を選択する用語
辞書選択手段と、 前記記憶手段に記憶された前記マスターファイルからの
前記工事原価算出データのマスターデータに基づいて前
記工事原価に関するデータを入力する工事原価データ入
力処理手段と、 入力された前記工事原価に関するデータにより実行予算
等を演算する演算手段と、 該演算手段によって演算された演算結果の前記工事原価
に基づいて所定の前記帳票を作成し、前記出力手段によ
り印刷出力するように処理する工事原価帳票出力処理手
段とを有することを特徴とする土木工事の原価管理装
置。
(1) The execution budget for direct construction costs such as material costs, labor costs and direct costs, and construction costs including indirect construction costs such as common temporary construction costs and site management costs, which are planned before commencement of construction or reviewed during construction , Orders placed by contractors, orders placed by contractors, orders for the actual costs required for actual construction work for orders, assessments for work volume, payments paid to contractors, and expected by the end of work In a cost management device for civil engineering work that manages the construction cost calculated based on construction cost calculation data such as an estimated unpaid amount that is a payment amount, a term dictionary file that stores construction terms when the construction cost calculation data is input Storage means for storing a master file for storing master data of the construction cost calculation data and a data file for storing the construction cost calculation data, Input means for inputting data and instructions, display means for displaying a data processing guide display showing a processing procedure and a form based on the construction cost calculation data, output means for printing out the form, and input means A term dictionary selecting unit for selecting a desired construction term from a term dictionary file stored in the storage unit according to an instruction; and the master data of the construction cost calculation data from the master file stored in the storage unit. Construction cost data input processing means for inputting data relating to the construction cost, computing means for computing an execution budget and the like based on the inputted data relating to the construction cost, based on the construction cost of the computation result computed by the computing means Work cost form output for creating the prescribed form and processing it so that it is printed out by the output means Cost control device for civil construction work and having a physical means.
【請求項2】 前記工事原価データ入力手段によって入
力された工事原価に基づいて工事の進歩状況を示す工事
進捗率特性を作成処理する工事進捗率処理手段を有する
請求項1記載の土木工事の原価管理装置。
2. The cost of civil engineering work according to claim 1, further comprising construction progress rate processing means for creating construction progress rate characteristics indicating the progress of the construction based on the construction cost input by said construction cost data input means. Management device.
【請求項3】 前記データ処理案内表示における処理手
順の表示色を変える請求項1記載の土木工事の原価管理
装置。
3. The cost management device for civil engineering work according to claim 1, wherein a display color of a processing procedure in the data processing guide display is changed.
【請求項4】 前記用語辞書選択手段は階層毎に用意し
た工事用語を選択する請求項1記載の土木工事の原価管
理装置。
4. The civil engineering construction cost management device according to claim 1, wherein said term dictionary selecting means selects construction terms prepared for each hierarchy.
【請求項5】 前記査定金額の承認、前記工事原価に関
するデータ、前記演算結果及び前記所定の帳票を作成す
るデータ等を外部へ又は外部から送受信する通信部を有
する請求項1〜4のいずれかに記載の土木工事の原価管
理装置。
5. The communication unit according to claim 1, further comprising a communication unit for transmitting / receiving externally or externally the approval of the assessed amount, the data related to the construction cost, the calculation result, and the data for creating the predetermined form. The cost control device for civil engineering works described in 1.
【請求項6】 材料費、労務費や直接経費等の直接工事
費及び共通仮設費や現場管理費等の間接工事費を含む工
事原価に関して、工事着手前に予定し又は工事中で見直
す実行予算、業者に発注する発注、業者に発注する発注
金額、発注に対する実際の工事施工に要した実際原価に
対しての出来高、出来高に対する査定金額、業者に支払
った支払金額及び工事終了までに予想される支払金額で
ある予想未払金額等の工事原価算出データに基づいて算
出した前記工事原価を管理する土木工事の原価管理方法
において、 処理手順を示すデータ処理案内表示や前記工事原価算出
データに基づく帳票を表示し、操作者による指示により
予め記憶されている用語辞書ファイルから所望の工事用
語を選択して前記工事原価算出データのマスターデータ
に基づいて前記工事原価に関するデータを入力し、入力
された前記工事原価に関するデータにより実行予算等を
演算し、演算された演算結果の前記工事原価に基づいて
所定の前記帳票を作成し、印刷出力することを特徴とす
る土木工事の原価管理方法。
6. Execution budget for direct construction costs such as material costs, labor costs, direct costs, etc. and construction costs including indirect construction costs such as common temporary construction costs and site management costs before commencement of construction or review during construction. , Orders placed by contractors, orders placed by contractors, orders for the actual costs required for actual construction work for orders, assessments for work volume, payments paid to contractors, and expected by the end of work In a cost management method for civil engineering work that manages the construction cost calculated based on construction cost calculation data such as an estimated unpaid amount that is a payment amount, a data processing guide display indicating a processing procedure and a form based on the construction cost calculation data are generated. Display, select a desired construction term from a term dictionary file stored in advance by an instruction from the operator, and select a desired construction term based on the master data of the construction cost calculation data. Inputting data related to the construction cost, calculating an execution budget or the like based on the input data related to the construction cost, creating the predetermined form based on the calculated calculation result, and printing out the form. Civil engineering cost control method characterized by the following.
【請求項7】 入力された前記工事原価に基づいて工事
の進歩状況を示す工事進捗率特性を作成処理する請求項
6記載の土木工事の原価管理方法。
7. The cost management method for civil engineering work according to claim 6, wherein a construction progress rate characteristic indicating the progress of the construction is created and processed based on the input construction cost.
【請求項8】 前記データ処理案内表示における処理手
順の表示色を変える請求項6記載の土木工事の原価管理
方法。
8. The cost management method for civil engineering work according to claim 6, wherein a display color of a processing procedure in the data processing guide display is changed.
【請求項9】 階層毎に用意された工事用語を選択する
請求項6記載の土木工事の原価管理方法。
9. The method according to claim 6, wherein a construction term prepared for each hierarchy is selected.
【請求項10】 前記査定金額の承認、前記工事原価に
関するデータ、前記演算結果及び前記所定の帳票を作成
するデータ等を外部へ又は外部から送受信する請求項6
〜9のいずれかに記載の土木工事の原価管理方法。
10. Approval of the assessed amount, data on the construction cost, the calculation result, data for creating the predetermined form, and the like are transmitted / received externally or externally.
13. The cost control method for civil engineering work according to any one of claims 9 to 9.
【請求項11】 請求項6〜10のいずれかに記載の土
木工事の原価管理方法を実行するためのプログラムを格
納したコンピュータ読み取り可能な記憶媒体。
11. A computer-readable storage medium storing a program for executing the cost management method for civil engineering work according to claim 6.
JP2001001297A 2001-01-09 2001-01-09 Cost management device and cost management method for civil engineering work and computer readable storage medium storing program for executing the method Pending JP2002207893A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001001297A JP2002207893A (en) 2001-01-09 2001-01-09 Cost management device and cost management method for civil engineering work and computer readable storage medium storing program for executing the method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001001297A JP2002207893A (en) 2001-01-09 2001-01-09 Cost management device and cost management method for civil engineering work and computer readable storage medium storing program for executing the method

Publications (1)

Publication Number Publication Date
JP2002207893A true JP2002207893A (en) 2002-07-26

Family

ID=18869953

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001001297A Pending JP2002207893A (en) 2001-01-09 2001-01-09 Cost management device and cost management method for civil engineering work and computer readable storage medium storing program for executing the method

Country Status (1)

Country Link
JP (1) JP2002207893A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011039671A (en) * 2009-08-07 2011-02-24 Masuda Kensetsu:Kk Device for calculating payment at piece rates for construction work
JP2019168980A (en) * 2018-03-23 2019-10-03 株式会社オービック Progress rate calculation device, progress rate calculation method and progress rate calculation program

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011039671A (en) * 2009-08-07 2011-02-24 Masuda Kensetsu:Kk Device for calculating payment at piece rates for construction work
JP2019168980A (en) * 2018-03-23 2019-10-03 株式会社オービック Progress rate calculation device, progress rate calculation method and progress rate calculation program
JP7197989B2 (en) 2018-03-23 2022-12-28 株式会社オービック Progress rate calculation device, progress rate calculation method, and progress rate calculation program

Similar Documents

Publication Publication Date Title
US20040186763A1 (en) System for real-time monitoring and cost management of construction projects
US20140075342A1 (en) Collaborative on-line design landscape design tool
US20120072299A1 (en) Request-for-proposal (rfp) system with selective disclosure of information from competing bidders
KR20180017099A (en) Computer-implemented multi-currency invoice capture, transaction, access and payment system
JP4940787B2 (en) Print order receiving device, print order receiving program
Papajohn et al. Comparing contract administration functions for alternative and traditional delivery of highway projects
US20020152108A1 (en) Apparatus and method for displaying information concerning business schedule
GB2364140A (en) Cost manager user interface in transaction processing system for online trade mark registration
JP2012203607A (en) Accounting processing program, accounting processing device, and accounting processing method
JP2002207893A (en) Cost management device and cost management method for civil engineering work and computer readable storage medium storing program for executing the method
JP2023001317A (en) Information processing apparatus, information processing method, information processing program, and information processing system
JP2016162361A (en) Asset management simulation system
JP2004054662A (en) Work ledger creation device, and program for executing work ledger creation on computer
JP2022022345A (en) Transaction management device, transaction management method and transaction management program
JP2006285622A (en) Foreign exchange transaction support apparatus and program
JP5686147B2 (en) Information processing system, control method, and program
JP2002358413A (en) Financial futures dealing supporting method, program making computer implement financial futures dealing supporting method, and financial futures dealing supporting device
JP4156005B2 (en) Real estate lease brokerage apparatus and method
JP6163629B1 (en) Work order available information communication system
KR100452521B1 (en) Merchandising management system for intermediate and buying wholesale based on the pda and method thereof
Coleman et al. A comparison of contracting methods for bored pile (drilled shaft) construction between Europe and North America
JP6748182B2 (en) Data processing device, method and program
JP3320997B2 (en) Issuance method of documents about land readjustment project
JP7082359B1 (en) Inventory management device and inventory management system
JP2004110823A (en) Evaluation transition display system and method for financial commodity

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050303

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071017

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071030

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071226

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20080318