Prior art keywords
buried pipe
pipe
cord
fitting
wedge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000400347A
Other languages
Japanese (ja)
Other versions
JP4412848B2 (en
Inventor
Katsutoshi Nishiura
克敏 西浦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
Original Assignee
Osaka Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd filed Critical Osaka Gas Co Ltd
Priority to JP2000400347A priority Critical patent/JP4412848B2/en
Publication of JP2002195454A publication Critical patent/JP2002195454A/en
Application granted granted Critical
Publication of JP4412848B2 publication Critical patent/JP4412848B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Clamps And Clips (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

PROBLEM TO BE SOLVED: To efficiently pull out a buried pipe in the case of pulling out the buried pipe to be removed throughout its overall length, by repeating such an operation that the end of the buried pipe is held to pull out a part thereof inside a pit, and the part which has pulled out is cut so as to have a cylindrical shape, thereafter the end of the buried pipe is held again to pull out the other one part thereof. SOLUTION: A cable member fixing jig fixes a cable member 1 inserted to an overall buried pipe to the end of the buried pipe in a tensile state in order to tighten a buried pipe A to be removed in the longitudinal direction of a pipe. This jig comprises: a reaction force receiving member 2 capable of locking to the end of the buried pipe in a state in which the cable member is inserted into the buried pipe; and a wedge member 3 capable of fitting in the longitudinal direction of the pipe to a fitting part 4 formed at the reaction force receiving member. To a fitting surface 8 of the fitting part, the cable member is provided so as to bed capable of mounting/ dismounting from the radial direction, and the reaction receiving member is locked to the end of the buried pipe. The cable member is held between the fitting surface of the fitting part and a wedge surface 12 of the wedge member, thereby being locked and fixed to the end of the buried pipe in the tensile state.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、撤去対象の埋設管
を管長手方向に締め込むために、その埋設管の全長に亘
って挿通した索条体を緊張状態で埋設管端部に固定する
索条体固定治具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for fastening a buried pipe to be removed in the longitudinal direction of the buried pipe in a tensioned state at an end of the buried pipe. The present invention relates to a cord fixing jig.

【0002】[0002]

【従来の技術】撤去対象の埋設管の一端部を把持して地
中から引き抜く埋設管引き抜き工法において、埋設管の
途中箇所に印ロウ管継手(ソケット管接合) などを使用
してある抜け止め阻止力が小さい継手部分がある場合
は、埋設管の一端部を把持して引き抜こうとすると、そ
の継手部分が外れて埋設管が地中で分断されてしまい、
埋設管を全長に亘って引き抜けないおそれがある。上記
索条体固定治具は、このような埋設管引き抜き工法にお
いて、埋設管の一端部を把持して引き抜いても、抜け止
め阻止力が少ない継手部分が外れないよう、撤去対象の
埋設管の全長に亘って挿通した索条体を緊張状態で埋設
管端部に固定して、その埋設管を管長手方向に締め込む
ために使用されている。従来の索条体固定治具として
は、図8(イ) に示すように、筒体32に複数のワイヤ
ー固定用ビス33を螺着した筒状の固定治具Bを使用し
ており、図8(ロ) に示すように、ワイヤー(索条体の
一例) 1を撤去対象の埋設管Aの全長に亘って挿通し
て、その一端側を埋設管Aの一端部に固定するととも
に、他端側を固定治具Bに挿通し、他端側を引っ張るこ
とにより緊張させたワイヤー1に固定治具Bをビス33
で締め付け固定して、その固定治具Bを埋設管Aの引き
抜き方向下手側の他端部に係止するように構成してあ
る。
2. Description of the Related Art In a buried pipe drawing method in which one end of a buried pipe to be removed is gripped and pulled out from the ground, a retaining pipe is used at a halfway point of the buried pipe using a brazing pipe joint (socket pipe joint). If there is a joint part with a small blocking force, if you try to pull out by grasping one end of the buried pipe, the joint part will come off and the buried pipe will be cut off in the ground,
The buried pipe may not be pulled out over the entire length. In the above-mentioned buried pipe pulling method, the above-described cord fixing jig is used to remove the buried pipe to be removed so that even if one end of the buried pipe is gripped and pulled out, a joint part having a small retaining force is not removed. It is used for fixing a cord inserted through the entire length to an end of a buried pipe in a tension state, and tightening the buried pipe in a pipe longitudinal direction. As a conventional cord fixing jig, a cylindrical fixing jig B in which a plurality of wire fixing screws 33 are screwed to a cylindrical body 32 is used as shown in FIG. As shown in FIG. 8 (b), a wire (an example of a cord) 1 is inserted through the entire length of the buried pipe A to be removed, and one end thereof is fixed to one end of the buried pipe A. The end of the fixing jig B is inserted into the fixing jig B, and the other end of the fixing jig B is screwed onto the wire 1 tensioned by pulling the other end.
The fixing jig B is locked to the other end of the buried pipe A on the lower side in the drawing direction.

【0003】[0003]

【発明が解決しようとする課題】このため、図9(イ)
に示すように、埋設管Aの引き抜き方向下手側に設けた
ピット34内に、埋設管Aの端部を把持して牽引する牽
引装置Cを設置して、その牽引装置Cで埋設管Aの一端
部を把持し、埋設管Aの一部をピット34内に引き抜い
て、その引き抜き部分31を筒状に切断してから、再
度、ワイヤー1を緊張させて、固定治具Bで埋設管端部
に固定し直し、図9(ロ) に示すように、埋設管Aの端
部を把持し直して、牽引装置Cでその一部を引き抜くと
いう作業を繰り返すことにより、撤去対象の埋設管Aを
全長に亘って引き抜く場合は、ワイヤー1の固定治具B
への抜き差しに手間が掛かり、埋設管Aを能率良く引き
抜けない欠点がある。つまり、埋設管Aの一端部を把持
してその一部を引き抜く作業を繰り返すには、その都
度、引き抜き部分31を切断したあとの埋設管端部に固
定治具Bを係止し直す必要があるが、筒状の固定治具B
を使用しているために、固定治具Bと筒状に切断した引
き抜き部分31とからワイヤー1を抜き出して、切断し
た引き抜き部分31をワイヤー1から外してから、固定
治具Bにワイヤー1を挿通し直して、埋設管端部に係止
する必要があり、固定治具Bや筒状に切断した引き抜き
部分31へのワイヤー1の抜き差しに手間が掛かるから
である。本発明は上記実情に鑑みてなされたものであっ
て、埋設管の一端部を把持してその一部をピット内に引
き抜き、その引き抜き部分を筒状に切断してから、再
度、埋設管の端部を把持してその一部を引き抜くという
作業を繰り返すことによって、撤去対象の埋設管を全長
に亘って引き抜く場合に、埋設管を能率良く引き抜ける
ようにすることを目的とする。
Therefore, FIG. 9 (a)
As shown in the figure, a traction device C for gripping and towing the end of the buried pipe A is installed in a pit 34 provided on the lower side in the drawing direction of the buried pipe A, and One end is gripped, a part of the buried pipe A is pulled out into the pit 34, the drawn part 31 is cut into a cylindrical shape, and then the wire 1 is tightened again, and the end of the buried pipe is fixed by the fixing jig B. 9 (b), the end of the buried pipe A is gripped again, and a part of the buried pipe C is pulled out by the towing device C. As a result, the buried pipe A to be removed is repeated. When the wire is pulled out over the entire length, the fixing jig B of the wire 1 is used.
There is a disadvantage that it takes time and trouble to insert and remove the pipe, and the buried pipe A cannot be efficiently pulled out. In other words, in order to repeat the work of grasping one end of the buried pipe A and extracting a part thereof, it is necessary to re-lock the fixing jig B to the end of the buried pipe after cutting the withdrawn portion 31 each time. There is a cylindrical fixing jig B
Is used, the wire 1 is extracted from the fixing jig B and the drawn-out portion 31 cut into a cylindrical shape, the cut-off drawn portion 31 is detached from the wire 1, and then the wire 1 is inserted into the fixing jig B. This is because it is necessary to reinsert and lock the end of the buried pipe, and it takes time to insert and remove the wire 1 to and from the fixing jig B and the drawn-out portion 31 cut into a cylindrical shape. The present invention has been made in view of the above circumstances, and grasps one end of a buried pipe, pulls out a part of the buried pipe into a pit, cuts the drawn portion into a cylindrical shape, and then re-embeds the buried pipe. An object of the present invention is to efficiently pull out a buried pipe when the buried pipe to be removed is pulled out over the entire length by repeating an operation of gripping an end portion and pulling out a part thereof.

【0004】[0004]

【課題を解決するための手段】請求項1記載の発明の特
徴構成は、撤去対象の埋設管を管長手方向に締め込むた
めに、その埋設管の全長に亘って挿通した索条体を緊張
状態で埋設管端部に固定する索条体固定治具であって、
前記索条体を前記埋設管の全長に亘って挿通した状態
で、前記埋設管端部に管長手方向から係止可能な反力受
け部材と、その反力受け部材に形成した嵌合部に埋設管
の外側から管長手方向に嵌合自在な楔部材とを備え、前
記嵌合部を、その嵌合面に前記索条体を索条体径方向か
ら装脱自在に設け、前記反力受け部材を前記埋設管端部
に係止するとともに、前記索条体を前記嵌合部の嵌合面
と前記楔部材の楔面との間に挟み込んで、その索条体を
緊張状態で埋設管端部に係止固定するように構成してあ
る点にある。 〔作用〕索条体を緊張状態で埋設管端部に係止固定する
ときは、索条体を撤去対象の埋設管の全長に亘って挿通
した状態で、反力受け部材を埋設管端部に管長手方向か
ら係止して、緊張させた索条体をその反力受け部材に形
成した嵌合部の嵌合面に索条体径方向から装着し、楔部
材を嵌合部に埋設管の外側から管長手方向に嵌合するこ
とにより、索条体を嵌合部の嵌合面と楔部材の楔面との
間に挟み込んで、その索条体を緊張状態で埋設管端部に
係止固定する。そして、埋設管の一端部を把持して牽引
するに伴って、抜け止め阻止力が小さい継手部分が緩ん
で埋設管が伸びようとすると、埋設管端部に係止してあ
る反力受け部材と楔部材とが、楔部材を嵌合部に押し込
むように相対移動して、嵌合部と楔部材とによる索条体
の挟み込み力が増大する。また、索条体を係止固定して
いる反力受け部材と楔部材とを埋設管端部から外すとき
は、楔部材の嵌合部への嵌合を解除して、索条体が嵌合
部から索条体径方向に抜け出るように、反力受け部材と
楔部材とを埋設管端部から撤去する。 〔効果〕索条体を緊張状態で埋設管端部に係止固定する
ときも、索条体の係止固定を解除するときも、索条体に
対して索条体径方向から装脱することができるので、埋
設管の引き抜き方向下手側に設けたピット内に、埋設管
の端部を把持して牽引する牽引装置を設置し、その牽引
装置で埋設管の一端部を把持して埋設管の一部をピット
内に引き抜いて、その引き抜き部分を筒状に切断してか
ら、再度、埋設管の端部を把持してその一部を引き抜く
という作業を繰り返すことによって、撤去対象の埋設管
を全長に亘って引き抜く場合に、固定治具や筒状に切断
した引き抜き部分にワイヤーを抜き差しすることなく、
引き抜き部分を切断したあとの埋設管端部に固定治具を
係止し直すことができ、埋設管を能率良く引き抜くこと
ができる。また、埋設管の端部を把持して牽引するに伴
って、抜け止め阻止力が小さい継手部分が緩んで埋設管
が伸びようとすると、嵌合部の嵌合面と楔部材の楔面と
による索条体の挟み込み力が増大するので、索条体を緊
張状態で埋設管端部に係止固定するときに、索条体の挟
み込み力が小さい軽い操作力で索条体を嵌合面と楔面と
の間に簡便に挟み込みながら、索条体が緩まないように
固定し易い。
According to a first feature of the present invention, in order to tighten a buried pipe to be removed in the longitudinal direction of the pipe, a cord inserted through the entire length of the buried pipe is tensioned. A cord fixing jig for fixing to a buried pipe end in a state,
A reaction force receiving member that can be engaged with the end of the buried pipe from the longitudinal direction of the pipe while the cord is inserted over the entire length of the buried pipe, and a fitting portion formed on the reaction force receiving member. A wedge member that can be fitted in the pipe longitudinal direction from the outside of the buried pipe, and the fitting portion is provided on the fitting surface so that the cable body can be attached and detached from the cable body radial direction, and the reaction force A receiving member is locked to the end of the buried pipe, and the cord is sandwiched between a fitting surface of the fitting portion and a wedge surface of the wedge member, and the cord is embedded in a tensioned state. The point is that it is configured to be locked and fixed to the pipe end. [Operation] When the cord is locked and fixed to the end of the buried pipe in a tensioned state, the reaction force receiving member is attached to the end of the buried pipe while the cord is inserted through the entire length of the buried pipe to be removed. The tensioned cord is attached from the pipe longitudinal direction to the fitting surface of the fitting part formed on the reaction force receiving member, and the wedge member is embedded in the fitting part. By fitting in the longitudinal direction of the pipe from the outside of the pipe, the cord is sandwiched between the fitting surface of the fitting portion and the wedge surface of the wedge member, and the cord is tightened to embed the pipe end. Lock and fix to. Then, as the one end of the buried pipe is gripped and pulled, the joint part having a small retaining force is loosened and the buried pipe tries to expand, and the reaction force receiving member locked to the end of the buried pipe. The wedge member and the wedge member relatively move so as to push the wedge member into the fitting portion, and the pinching force of the cord by the fitting portion and the wedge member increases. Further, when the reaction force receiving member and the wedge member that lock and fix the cord are removed from the end of the buried pipe, the fitting of the wedge member to the fitting portion is released, and the cord is fitted. The reaction force receiving member and the wedge member are removed from the buried pipe end so as to escape from the joint portion in the cable body radial direction. [Effect] Even when the cord is locked and fixed to the end of the buried pipe in a tensioned state or when the cord is unlocked, the cord is attached to and detached from the cord in the radial direction of the cord. A traction device that grips and pulls the end of the buried pipe is installed in a pit provided on the lower side in the drawing direction of the buried pipe, and the traction device grips one end of the buried pipe and buries it. By pulling out a part of the pipe into the pit, cutting the drawn out part into a tube, and then again grasping the end of the buried pipe and pulling out part of it, the burial to be removed When pulling out the pipe over the entire length, without pulling the wire into and out of the fixing jig or the drawn part cut into a tube,
The fixing jig can be re-locked to the end of the buried pipe after cutting the drawn part, and the buried pipe can be efficiently pulled out. In addition, as the end of the buried pipe is gripped and pulled, the joint portion having a small retaining force is loosened and the buried pipe tries to expand, and the fitting surface of the fitting portion and the wedge surface of the wedge member are removed. Since the pinching force of the cable body by the cable body increases, when the cable body is locked and fixed to the buried pipe end in a tensioned state, the cable body is fitted with a small operating force with a small pinching force of the cable body. It is easy to fix so that the cord is not loosened while easily sandwiching it between the wire and the wedge surface.

【0005】請求項2記載の発明の特徴構成は、前記楔
部材に、前記索条体を索条体径方向から装脱自在で、か
つ、その索条体を前記嵌合面と前記楔面との間に挟み込
んだ索条体部分対して屈曲するように挟み付けて固定す
る固定具を設けてある点にある。 〔作用〕索条体を緊張状態で埋設管端部に係止固定する
ときも、索条体から外すときも、楔部材を索条体に対し
て索条体径方向から装脱できるようにしながら、索条体
を嵌合面と楔面との間に挟み込んだ索条体部分対して屈
曲するように挟み付けて、索条体と楔部材との管長手方
向に沿う相対移動に対して大きな抵抗が作用するように
固定できる。 〔効果〕索条体を嵌合部の嵌合面と楔部材の楔面との間
に挟み込んで、その索条体を緊張状態で埋設管端部に係
止固定したときに、索条体と楔部材とが管長手方向に相
対移動しにくく、索条体が緩みにくい。
According to a second aspect of the present invention, the wedge member is configured such that the cord can be detachably attached to the wedge member in a radial direction of the cord, and the cord is attached to the fitting surface and the wedge surface. And a fixing tool for pinching and fixing the cord portion sandwiched between them. [Action] The wedge member can be attached to and detached from the cord body in the radial direction of the cord even when the cord body is locked and fixed to the end of the buried pipe in a tensioned state or when the cord body is removed from the cord body. While the rope is sandwiched between the fitting surface and the wedge surface so as to be bent with respect to the rope portion, the relative movement of the rope and the wedge member along the pipe longitudinal direction is prevented. It can be fixed so that a large resistance acts. [Effect] When the cord is sandwiched between the fitting surface of the fitting portion and the wedge surface of the wedge member, and the cord is locked and fixed to the end of the buried pipe in a tensioned state, It is difficult for the wedge member and the wedge member to relatively move in the longitudinal direction of the pipe, and the cord is not easily loosened.

【0006】[0006]

【発明の実施の形態】以下に本発明の実施の形態を図面
に基づいて説明する。尚、図面において従来例と同一の
符号で表示した部分は、同一又は相当の部分を示してい
る。図1〜図3は、撤去対象の都市ガス供給用鋼製埋設
管Aを管長手方向に締め込むために、その埋設管Aの全
長に亘って挿通した鋼製ワイヤー(索条体の一例)1を
緊張状態で埋設管端部に固定する本発明に係るステンレ
ス鋼製の索条体固定治具(以下、単に固定治具という)
Bを示し、図4〜図7は、その固定治具Bを使用して、
撤去対象の埋設管Aの一端部を把持して地中から引き抜
く埋設管引き抜き工法を示している。
Embodiments of the present invention will be described below with reference to the drawings. In the drawings, portions denoted by the same reference numerals as those of the conventional example indicate the same or corresponding portions. 1 to 3 show a steel wire (an example of a cord) inserted through the entire length of the buried pipe A in order to tighten the steel buried pipe A for city gas supply to be removed in the pipe longitudinal direction. 1 is a stainless steel cord fixing jig (hereinafter simply referred to as a fixing jig) according to the present invention for fixing 1 to the buried pipe end in a tensioned state.
B. FIGS. 4 to 7 show the fixing jig B using FIGS.
This figure shows a buried pipe drawing method in which one end of a buried pipe A to be removed is gripped and pulled out from the ground.

【0007】前記固定治具Bは、図1,図2に示すよう
に、ワイヤー1を埋設管Aの全長に亘って挿通した状態
で、埋設管端部に管長手方向から係止可能な反力受け部
材2と、その反力受け部材2に形成した嵌合部4に埋設
管Aの外側から管長手方向に嵌合自在な楔部材3とを備
えている。
As shown in FIGS. 1 and 2, the fixing jig B has a wire 1 inserted through the entire length of the buried pipe A, and can be locked at the end of the buried pipe in the longitudinal direction of the pipe. It has a force receiving member 2 and a wedge member 3 which can be fitted in a fitting portion 4 formed on the reaction force receiving member 2 from the outside of the buried pipe A in the pipe longitudinal direction.

【0008】前記反力受け部材2は、埋設管Aの端部に
外嵌するキャップ部材5と、嵌合部4を形成してある嵌
合部材6とを溶接で一体に固定して構成してあり、ワイ
ヤー1を埋設管Aの全長に亘って挿通した状態でキャッ
プ部材5を埋設管Aの端部に外嵌できるように、ワイヤ
ー1をワイヤー径方向から挿通自在な切欠き部7をキャ
ップ部材5に設けてある。
The reaction force receiving member 2 is formed by integrally fixing a cap member 5 fitted externally to the end of the buried pipe A and a fitting member 6 forming a fitting portion 4 by welding. A notch 7 through which the wire 1 can be inserted from the wire diameter direction is provided so that the cap member 5 can be fitted to the end of the embedded tube A in a state where the wire 1 is inserted through the entire length of the embedded tube A. It is provided on the cap member 5.

【0009】前記嵌合部4は、ワイヤー1を楔部材3と
の間に挟み込む横断面が円弧状の第1嵌合面8と、楔部
材3が直に接当する第2嵌合面9とを備えた略V字形の
溝状に形成するとともに、切欠き部7に連通するワイヤ
ー挿通溝10を形成して、切欠き部7に挿通したワイヤ
ー1を第1嵌合面8にワイヤー径方向から装脱自在に設
けてあり、第1嵌合面8には、ワイヤー1に食い込み可
能な多数の突条を円弧状に形成したワイヤー係止部11
を設けてある。
The fitting portion 4 has a first fitting surface 8 having an arc-shaped cross section that sandwiches the wire 1 between the wire 1 and the wedge member 3, and a second fitting surface 9 with which the wedge member 3 directly contacts. And a wire insertion groove 10 communicating with the notch 7 so that the wire 1 inserted through the notch 7 has a wire diameter on the first fitting surface 8. The first fitting surface 8 is provided with a plurality of ridges which can bite into the wire 1 in a circular arc shape.
Is provided.

【0010】前記楔部材3は、ワイヤー1を第1嵌合面
8との間に挟み込む横断面が円弧状の第1楔面12と、
第2嵌合面9に接当する第2楔面13とを備えた略V字
形に形成してあり、第1楔面12にも、ワイヤー1に食
い込み可能な多数の突条を円弧状に形成したワイヤー係
止部14を設けてある。
The wedge member 3 includes a first wedge surface 12 having a circular cross section and sandwiching the wire 1 between the first wedge surface 12 and the first fitting surface 8.
It is formed in a substantially V-shape having a second wedge surface 13 that contacts the second fitting surface 9, and a large number of ridges that can bite into the wire 1 are also formed on the first wedge surface 12 in an arc shape. The formed wire locking portion 14 is provided.

【0011】また、第1楔面12の嵌合方向後端側に、
その第1楔面12対して傾斜する横断面が円弧状の傾斜
面15を形成して、傾斜面15との間にワイヤー1をワ
イヤー径方向から装脱自在で、かつ、そのワイヤー1を
第1嵌合面8と第1楔面12との間に挟み込んだワイヤ
ー部分16に対して屈曲するように傾斜面15との間に
挟み付けて固定する固定具17を設けてある。
Also, at the rear end side of the first wedge surface 12 in the fitting direction,
The cross section inclined with respect to the first wedge surface 12 forms an inclined surface 15 having an arc shape, and the wire 1 is detachable from the inclined surface 15 in a wire radial direction, and the wire 1 is connected to the first wedge surface 12. A fixture 17 is provided to be clamped and fixed to the inclined surface 15 so as to bend with respect to the wire portion 16 sandwiched between the first fitting surface 8 and the first wedge surface 12.

【0012】前記固定具17は、傾斜面15との間にワ
イヤー1を挟み込む横断面が円弧状の挟持面18を形成
してある挟持部材19を、図3に示すように、ワイヤー
1を挟み付ける挟持位置とその挟み付けを解除する挟持
解除位置とに亘ってスライド移動自在に、楔部材3に支
持するとともに、挟持部材19にアーム20を延設し
て、楔部材3を挟んで挟持面18に対してスライド移動
方向で対抗する方向に螺進操作自在なボルト21を、そ
のアーム20に螺合し、ボルト21の螺進操作で、挟持
部材19を挟持位置と挟持解除位置とにスライド移動自
在に設けてある。
As shown in FIG. 3, the fixing member 17 holds the wire 1 between the inclined surface 15 and the holding member 19 having a circular arc-shaped holding surface 18 for holding the wire 1 therebetween. The wedge member 3 is slidably supported between a holding position to be attached and a holding release position for releasing the holding, and the arm 20 is extended to the holding member 19 to hold the wedge member 3 therebetween. A bolt 21 operable to be screwed in a direction opposite to the slide movement direction with respect to 18 is screwed to the arm 20, and the screwing operation of the bolt 21 slides the holding member 19 between a holding position and a holding release position. It is provided movably.

【0013】前記固定治具Bを使用して、撤去対象の埋
設管Aの一端部を把持して地中から引き抜く埋設管引き
抜き工法を、図4〜図7を参照しながら説明する。図4
(イ) に示すように、印ロウ管継手(ソケット管接合)
などを使用した抜け止め阻止力が小さい継手部分22を
途中箇所に設けてある撤去対象の埋設管Aの両端部をピ
ット23a,23b内に露出させて、埋設管Aの全長に
亘ってワイヤー1を通線具等で挿通し、その一端側を埋
設管Aの一端部に外嵌したキャップ24等に固定すると
ともに、埋設管Aの他端部を把持して牽引する牽引装置
Cを一方のピット23a内に設置する。
A method of drawing a buried pipe by using the fixing jig B to hold one end of the buried pipe A to be removed and pull it out of the ground will be described with reference to FIGS. FIG.
As shown in (a), brazing pipe joint (socket pipe joint)
The two ends of the buried pipe A to be removed, in which the joint portion 22 having a small retaining force is used, are exposed in the pits 23a and 23b. One end of the buried pipe A is fixed to a cap 24 or the like externally fitted to one end of the buried pipe A, and the other end of the buried pipe A is pulled by a towing device C. It is installed in the pit 23a.

【0014】前記牽引装置Cは、図6に示すように、互
いに平行に並べて装備してある左右一対の油圧シリンダ
25と、それらの油圧シリンダ25のロッドどうしを連
結する連結部26に、油圧シリンダ25の伸縮方向に沿
って、上下揺動自在に支持してある牽引ロッド27と、
牽引ロッド27の先端部に、油圧シリンダ25の伸縮方
向に沿って、上下揺動自在に支持してある管把持具28
とを備えている。
As shown in FIG. 6, the traction device C includes a pair of left and right hydraulic cylinders 25 arranged in parallel with each other and a connecting portion 26 connecting the rods of the hydraulic cylinders 25 to each other. A pulling rod 27 supported so as to be able to swing up and down along the direction of expansion and contraction of 25;
A tube gripper 28 supported at the tip of the tow rod 27 so as to be vertically swingable along the direction of expansion and contraction of the hydraulic cylinder 25.
And

【0015】前記管把持具28は、図7に示すように、
埋設管Aの上面側に係止する上部係止片29と、埋設管
Aの下面側に係止する下部係止片30とを、埋設管Aの
外径よりも広い間隔を隔てて上下に設けて、正面視で略
コの字状に形成してあり、上部係止片29と下部係止片
30との間に埋設管Aを入り込ませた状態で、牽引方向
上手側に倒して、上部係止片29と下部係止片30とを
埋設管Aの外周面に上下から係止させることで、埋設管
Aを把持できるようにしてある。
[0015] As shown in FIG.
The upper locking piece 29 that locks on the upper surface side of the buried pipe A and the lower locking piece 30 that locks on the lower surface side of the buried pipe A are vertically moved at a wider interval than the outer diameter of the buried pipe A. It is formed in a substantially U-shape in a front view, and in a state where the buried pipe A is inserted between the upper locking piece 29 and the lower locking piece 30, it is tilted to the upper side in the towing direction, The buried pipe A can be gripped by locking the upper locking piece 29 and the lower locking piece 30 from above and below on the outer peripheral surface of the buried pipe A.

【0016】そして、油圧シリンダ25を収縮させた状
態で、管把持具28で埋設管Aの一端部を把持してか
ら、油圧シリンダ25の伸長作動で牽引ロッド27を移
動させることにより、埋設管Aを油圧シリンダ25の伸
長ストローク分だけ地中から引き出し、管把持具28を
持ち上げて埋設管Aの把持を解除してから、油圧シリン
ダ25を収縮作動させて、再度、管把持具28で埋設管
Aを把持する作業を繰り返して、埋設管Aをピット23
a内に少しずつ引き出せるようにしてある。
Then, in a state where the hydraulic cylinder 25 is contracted, one end of the buried pipe A is gripped by the pipe gripper 28, and then the traction rod 27 is moved by the extension operation of the hydraulic cylinder 25, whereby the buried pipe is moved. A is pulled out of the ground by the extension stroke of the hydraulic cylinder 25, the pipe gripper 28 is lifted to release the gripping of the buried pipe A, and then the hydraulic cylinder 25 is contracted and embedded again with the pipe gripper 28. The operation of grasping the pipe A is repeated, and the buried pipe A is
It can be pulled out little by little into a.

【0017】次に、図4(ロ) に示すように、ワイヤー
1を切欠き部7に入り込ませて、キャップ部材5を埋設
管Aの他端部に外嵌し、反力受け部材2を埋設管端部に
係止するとともに、ワイヤー1をワイヤー挿通溝10と
嵌合部4とに通して牽引装置Cの管把持具28に連結
し、牽引装置Cを利用して、油圧シリンダ25の伸長作
動でワイヤー1を引っ張って緊張させる。
Next, as shown in FIG. 4B, the wire 1 is inserted into the notch 7, the cap member 5 is fitted over the other end of the buried pipe A, and the reaction force receiving member 2 is connected. The wire 1 is connected to the tube gripper 28 of the traction device C through the wire insertion groove 10 and the fitting portion 4 while being locked at the end of the buried pipe. The wire 1 is pulled and tensioned by the extension operation.

【0018】次に、挟持解除位置に保持してある挟持部
材19の挟持面18と楔部材3の傾斜面15との間にワ
イヤー1を入り込ませながら、楔部材3を嵌合部4に押
し込んで、第1嵌合面8と第1楔面12との間にワイヤ
ー1を挟み込み、固定具17のボルト21を楔部材3側
に螺進操作して、図2,図3に示したように、ワイヤー
1を楔部材3に挟持固定し、牽引装置Cによるワイヤー
1の引っ張りを解除して、ワイヤー1を管把持具28か
ら外す。
Next, the wedge member 3 is pushed into the fitting portion 4 while the wire 1 is inserted between the holding surface 18 of the holding member 19 held at the holding release position and the inclined surface 15 of the wedge member 3. Then, the wire 1 is sandwiched between the first fitting surface 8 and the first wedge surface 12, and the bolt 21 of the fixing tool 17 is screwed toward the wedge member 3 side, as shown in FIGS. Then, the wire 1 is clamped and fixed to the wedge member 3, the pulling of the wire 1 by the traction device C is released, and the wire 1 is removed from the tube gripper 28.

【0019】次に、図5(ハ) に示すように、管把持具
28で埋設管Aの一端部を把持して、図5(ニ) に示す
ように、埋設管Aのピット23a内への引き抜き部分3
1の長さが所定長さになるように牽引し、引き抜き部分
31を切断した後、固定具17による楔部材3へのワイ
ヤー1の挟持固定を解除するとともに、楔部材3を嵌合
部4から抜き出してワイヤー1を緩めて、固定治具Bを
引き抜き部分31から外し、その固定治具Bを使用し
て、図5(ホ) に示すように、引き抜き部分31を切断
した後の埋設管Aの端部にワイヤー1を緊張状態で再度
固定し、埋設管Aを全長に亘ってピット23a内に引き
抜くまで、上記作業を繰り返す。
Next, as shown in FIG. 5 (c), one end of the buried pipe A is gripped by the pipe gripper 28, and is inserted into the pit 23a of the buried pipe A as shown in FIG. 5 (d). Extraction part 3 of
1 is pulled so that the length of the wire 1 becomes a predetermined length, and the cut-out portion 31 is cut. Then, the fixing of the wire 1 to the wedge member 3 by the fixture 17 is released, and the wedge member 3 is connected to the fitting portion 4. 5, the wire 1 is loosened, the fixing jig B is detached from the withdrawn portion 31, and the embedded jig is cut using the fixing jig B as shown in FIG. The wire 1 is fixed again to the end of A under tension, and the above operation is repeated until the buried pipe A is pulled out into the pit 23a over the entire length.

【0020】〔その他の実施形態〕 1.本発明による索条体固定治具は、埋設管の途中箇所
に腐食箇所や破損箇所などがあって、その埋設管の一端
部を把持して引き抜こうとすると、埋設管がその箇所で
ちぎれて分断されてしまうおそれがある場合に、その埋
設管を管長手方向に締め込むために使用しても良い。 2.本発明による索条体固定治具は、ポリエチレン樹脂
などの樹脂製や鋳鉄製の埋設管を管長手方向に締め込む
ために使用しても良い。 3.本発明による索条体固定治具は、上水道用や下水道
用の埋設管を管長手方向に締め込むために使用しても良
い。
[Other Embodiments] In the cord fixing jig according to the present invention, when a buried pipe has a corroded portion or a broken portion in the middle thereof, and when one end of the buried pipe is gripped and pulled out, the buried pipe is torn off at that location and cut off. When there is a risk of being buried, the buried pipe may be used to tighten the pipe in the pipe longitudinal direction. 2. The cord fixing jig according to the present invention may be used for fastening a buried pipe made of resin such as polyethylene resin or cast iron in the pipe longitudinal direction. 3. The cord fixing jig according to the present invention may be used to tighten a buried pipe for water supply or sewerage in the pipe longitudinal direction.

【図面の簡単な説明】[Brief description of the drawings]

【図1】索条体固定治具の斜視図FIG. 1 is a perspective view of a cord fixing jig.

【図2】要部の断面側面図FIG. 2 is a sectional side view of a main part.

【図3】要部の一部切欠き正面図FIG. 3 is a partially cutaway front view of a main part.

【図4】埋設管引き抜き工法の説明図FIG. 4 is an explanatory view of a buried pipe drawing method.

【図5】埋設管引き抜き工法の説明図FIG. 5 is an explanatory view of a buried pipe drawing method.

【図6】牽引装置の斜視図FIG. 6 is a perspective view of a traction device.

【図7】要部の側面図FIG. 7 is a side view of a main part.

【図8】従来技術の説明図FIG. 8 is an explanatory diagram of a conventional technique.

【図9】従来技術の説明図FIG. 9 is an explanatory diagram of a conventional technique.

【符号の説明】[Explanation of symbols]

A 埋設管 1 索条体 2 反力受け部材 3 楔部材 4 嵌合部 8 嵌合面 12 楔面 16 索条体部分 17 固定具 A buried pipe 1 cord body 2 reaction force receiving member 3 wedge member 4 fitting part 8 fitting surface 12 wedge face 16 cord body part 17 fixture

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 撤去対象の埋設管を管長手方向に締め込
むために、その埋設管の全長に亘って挿通した索条体を
緊張状態で埋設管端部に固定する索条体固定治具であっ
て、 前記索条体を前記埋設管の全長に亘って挿通した状態
で、前記埋設管端部に管長手方向から係止可能な反力受
け部材と、その反力受け部材に形成した嵌合部に埋設管
の外側から管長手方向に嵌合自在な楔部材とを備え、 前記嵌合部を、その嵌合面に前記索条体を索条体径方向
から装脱自在に設け、 前記反力受け部材を前記埋設管端部に係止するととも
に、前記索条体を前記嵌合部の嵌合面と前記楔部材の楔
面との間に挟み込んで、その索条体を緊張状態で埋設管
端部に係止固定するように構成してある索条体固定治
具。
1. A cord fixing jig for fixing a cord inserted through the entire length of a buried pipe to an end of the buried pipe in a tensioned state in order to tighten the buried pipe to be removed in the pipe longitudinal direction. A reaction force receiving member that can be locked to the end of the buried pipe from the longitudinal direction of the pipe, and the reaction force receiving member is formed in a state where the cord is inserted through the entire length of the buried pipe. A wedge member that can be fitted in the longitudinal direction of the pipe from the outside of the buried pipe at the fitting portion, and the fitting portion is provided on the fitting surface so as to be detachable from the wire body radial direction. While the reaction force receiving member is locked to the end of the buried pipe, the cable body is sandwiched between the fitting surface of the fitting portion and the wedge surface of the wedge member, and the cable body is A cord fixing jig configured to be locked and fixed to an end of a buried pipe in a tensioned state.
【請求項2】 前記楔部材に、前記索条体を索条体径方
向から装脱自在で、かつ、その索条体を前記嵌合面と前
記楔面との間に挟み込んだ索条体部分対して屈曲するよ
うに挟み付けて固定する固定具を設けてある請求項1記
載の索条体固定治具。
2. A rope body in which the rope body is detachably mounted on the wedge member in a radial direction of the rope body, and the rope body is sandwiched between the fitting surface and the wedge surface. 2. The cord fixing jig according to claim 1, further comprising: a fixing member which is sandwiched and fixed so as to bend with respect to the portion.
JP2000400347A 2000-12-28 2000-12-28 Thread body fixing jig Expired - Fee Related JP4412848B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000400347A JP4412848B2 (en) 2000-12-28 2000-12-28 Thread body fixing jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000400347A JP4412848B2 (en) 2000-12-28 2000-12-28 Thread body fixing jig

Publications (2)

Publication Number Publication Date
JP2002195454A true JP2002195454A (en) 2002-07-10
JP4412848B2 JP4412848B2 (en) 2010-02-10

Family

ID=18864956

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000400347A Expired - Fee Related JP4412848B2 (en) 2000-12-28 2000-12-28 Thread body fixing jig

Country Status (1)

Country Link
JP (1) JP4412848B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008274617A (en) * 2007-04-27 2008-11-13 Osaka Gas Co Ltd Non-open-cut excavation burying device
JP6009611B1 (en) * 2015-04-22 2016-10-19 東京製綱株式会社 Wedge clamp
CN117949380A (en) * 2024-03-22 2024-04-30 山东华武电工有限公司 Wire rod is with check out test set

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102954323B (en) * 2012-11-12 2015-06-03 华南理工大学 Controllable wedge pre-tightening mechanism for micro platform of compliant mechanism
CN103576271B (en) * 2013-09-02 2016-06-15 国网河南省电力公司周口供电公司 A kind of press from both sides the wire clamp of fiber unit in intelligent wire

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008274617A (en) * 2007-04-27 2008-11-13 Osaka Gas Co Ltd Non-open-cut excavation burying device
JP6009611B1 (en) * 2015-04-22 2016-10-19 東京製綱株式会社 Wedge clamp
CN117949380A (en) * 2024-03-22 2024-04-30 山东华武电工有限公司 Wire rod is with check out test set
CN117949380B (en) * 2024-03-22 2024-06-07 山东华武电工有限公司 Wire rod is with check out test set

Also Published As

Publication number Publication date
JP4412848B2 (en) 2010-02-10

Similar Documents

Publication Publication Date Title
US3912406A (en) Gripper with center pull feed through release member
JP2002195454A (en) Cable member fixing jig
JP3751222B2 (en) Bucking prevention device and propulsion pipe for backing prevention
US6799923B2 (en) Trenchless water pipe replacement device and method
EP0374156A1 (en) Connector.
KR200235095Y1 (en) anchorage device for ground anchor with removing tension member
KR200242474Y1 (en) anchorage device for ground anchor with removing tension member
JP4847264B2 (en) Backing prevention device
US20100329793A1 (en) Small diameter splitter and method
JP2001311480A (en) Pull up jig for plastic pipe
JP4603729B2 (en) Jig for extracting buried pipe
JP6433938B2 (en) Anchor unloading jig and forced unloading method
KR100494011B1 (en) anchor for elimination equipment of tension member
KR100447996B1 (en) dismantling method of tension member for anchor method
KR100997202B1 (en) Post tension cylinder for tensioning a cable of prestressed fabric
US20060214146A1 (en) Systems for extracting construction forms and other embedded elements
KR20100063243A (en) Fixing agent for ground anchor of steel wire cutter
JPH0511978Y2 (en)
JPH1141736A (en) Chuck-type multitube pulling device for cable protective tube
KR200291860Y1 (en) separator equipment of tension member for anchor method
JP7023473B1 (en) Construction method of profile holder with reinforcement and rehabilitation pipe
CN217204057U (en) Lock capable of preventing clamping piece from breaking off
JP4089795B2 (en) PC steel wire fixing bracket and removable anchor using the fixing bracket
JPH05172189A (en) Rope connecting tool
JPS5918857A (en) Removal of pc steel material

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061222

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091013

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091105

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091117

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121127

Year of fee payment: 3

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121127

Year of fee payment: 3

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151127

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees