JP2002180413A - Support structure of lining plate and lining method - Google Patents

Support structure of lining plate and lining method

Info

Publication number
JP2002180413A
JP2002180413A JP2000378579A JP2000378579A JP2002180413A JP 2002180413 A JP2002180413 A JP 2002180413A JP 2000378579 A JP2000378579 A JP 2000378579A JP 2000378579 A JP2000378579 A JP 2000378579A JP 2002180413 A JP2002180413 A JP 2002180413A
Authority
JP
Japan
Prior art keywords
girder
lining
lining plate
plate
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000378579A
Other languages
Japanese (ja)
Other versions
JP3450294B2 (en
Inventor
Shigeru Kobayashi
盛 小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHIN NIPPON KOGYO KK
Original Assignee
SHIN NIPPON KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=18847121&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=JP2002180413(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by SHIN NIPPON KOGYO KK filed Critical SHIN NIPPON KOGYO KK
Priority to JP2000378579A priority Critical patent/JP3450294B2/en
Publication of JP2002180413A publication Critical patent/JP2002180413A/en
Application granted granted Critical
Publication of JP3450294B2 publication Critical patent/JP3450294B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a support structure of a lining plate and a lining method capable of reducing a previous excavating quantity. SOLUTION: This support structure improves a structure for placing the lining plate 8 on a receiving beam 7 by placing the receiving beam 7 at a prescribed interval in the lateral direction on a beam seat 6 by arranging the beam seat 6 in the direction of an excavated groove 1 on the upper left and right both sides of an excavation work position under a road surface. That is, in this method, the beam seat 6 has an angle-shaped cross-sectional part so as to place an end part of the receiving beam 7 along an end surface and an end part under surface of the receiving beam 7, and is placed and arranged on the ground 2 under the vicinity of the excavated road surface. A vertical piece part 6a of the angle-shaped cross-sectional part of the beam seat 6 constitutes an earth retaining wall to the receiving beam 7 side under the vicinity of the road surface, and the vertical piece part 6a of the angle-shaped cross- sectional part of the beam seat 6 also serves as a regulating plate for regulating a lateral movement of the lining plate 8 placed on the receiving beam 7. In this lining method, lining work is performed before construction and excavating work of the earth retaining wall 4 caused by excavating work.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は地中に上下水道や
配線等のために配管を行い、又はその他の構造物を埋設
設置する場合等に行われる開削工事の覆工板の支持構造
及びその覆工方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a support structure for a lining plate for an open-cutting work to be performed when piping for water supply and sewerage, wiring and the like is buried underground, or when other structures are buried and installed. Related to lining method.

【0002】[0002]

【従来の技術】従来上記のような覆工は、図4に示すよ
うに掘削溝1の開削を行う地盤2上に舗装路面5に対し
て所定幅の舗装切断及び撤去、布掘り作業の後、その幅
内において、矢板3を順次並べて打込又は圧入して土留
壁4を構築し、次いで掘削溝1の上部を少なくとも桁受
取り付けに必要な深さまで仮掘削し、該仮掘削後に土留
壁4の左右内面上部に溝方向に沿った桁受6′を取り付
けていた。
2. Description of the Related Art Conventionally, as shown in FIG. 4, after a pavement is cut and removed from a pavement road surface 5 by a predetermined width on a ground 2 where an excavation groove 1 is cut, as shown in FIG. In the width, the sheet piles 3 are sequentially arranged and driven or press-fitted to construct the retaining wall 4, and then the upper part of the excavation groove 1 is temporarily excavated at least to a depth necessary for attaching the girder support. A girder support 6 'along the groove direction was attached to the upper part of the left and right inner surfaces of 4.

【0003】この桁受6′の取り付けは、覆工板表面か
ら逆算して決められる高さで、土留壁4内面に対して桁
受6を固定するものであるが、該取り付け作業は先ず土
留壁4を構成する矢板3にボルト孔(図示しない)をガ
ス溶断等によって所定位置に穿設し、チャンネル鋼等
(あるいは外側にアングル鋼等を沿えて)かななる桁受
6′を矢板3内面に前後方向に順次ボルト締めによって
取り付けして行われる。
The attachment of the girder 6 'is to fix the girder 6 to the inner surface of the retaining wall 4 at a height determined by calculating backward from the surface of the lining plate. A bolt hole (not shown) is drilled at a predetermined position in the sheet pile 3 constituting the wall 4 by gas fusing or the like, and a channel steel 6 (or an outer side along an angle steel or the like) girder support 6 ′ is attached to the inner surface of the sheet pile 3. The bolts are sequentially attached in the front-rear direction by bolts.

【0004】そして上記桁受6上に左右方向の受桁7′
が覆工板8の前後方向の長さ又は幅に応じた所定間隔毎
に載置された後、該受桁7上に順次覆工板8の前後端を
載置して溝方向に沿って敷き詰められる。この時受桁載
置のために妨げとなる部分の矢板3の上部は切除され、
又は予め打ち込み時に上端が低くなるように設置され
る。
[0004] Then, on the girder support 6, a girder 7 ′ in the left-right direction.
Are placed at predetermined intervals in accordance with the length or width of the lining plate 8 in the front-rear direction, and then the front and rear ends of the lining plate 8 are sequentially placed on the receiving girder 7 along the groove direction. Paved. At this time, the upper part of the sheet pile 3 which is obstructed for placing the girder is cut off,
Alternatively, it is set in advance so that the upper end is lowered during driving.

【0005】また覆工板8の敷設に先端って、受桁7の
左右端には、掘削溝1に対する路面両側からの土留めと
なり、覆工板8の左右動を規制するチャンネル鋼等から
なる規制部材9′が仮付溶接等によって取り付けられ
る。
[0005] Further, at the left and right ends of the receiving girder 7 at the end of the laying of the lining plate 8, there are earth retaining from the both sides of the road surface with respect to the excavation groove 1, and a channel steel or the like for regulating the left and right movement of the lining plate 8. Is attached by temporary welding or the like.

【0006】上記覆工板設置後は、覆工板8を順次除去
しながら且つ掘削済部分上部には順次覆工を行いなが
ら、覆工板上からバックホー等の重機により、所定深さ
の本掘削を行う。本掘削完了後は、土留壁4の両内面に
ブラケット11を取り付けて復起し12を載置し、切梁
13を張設することにより山留めの安定を図る。
[0006] After the above-mentioned lining plate is installed, the lining plate 8 is sequentially removed and the upper part of the excavated portion is sequentially wrapped. Excavate. After completion of the main excavation, brackets 11 are attached to both inner surfaces of the retaining wall 4 to be restored, and the bracket 12 is mounted thereon.

【0007】その後埋設物の設置、掘削溝1の埋戻し、
覆工板の除去、矢板の引き抜き除去、仮舗装等の手順で
工事が終了する。なお上記作業中の仮掘削状態で作業を
中断するときは、仮掘り状態を埋戻す仮覆旧を行って次
の作業に待機する。
After that, installation of buried objects, backfilling of the excavation trench 1,
The construction is completed by removing the lining board, pulling out the sheet pile, and temporarily paving. When the operation is interrupted in the temporary excavation state during the operation, the temporary excavation state is buried in the temporary excavation state, and the next operation is awaited.

【0008】[0008]

【発明が解決しようとする課題】しかし、上記従来技術
の方法による場合、特に市街地に於いての路面覆工は、
交通止めあるいは車線規制を行い、その中で施工するた
め、短時間にしかも規制時間内に終了させ、速やかに交
通開放し、バタツキのない安定した路面覆工をしなけれ
ばならない。
However, in the case of the above-mentioned prior art method, road lining, particularly in an urban area, requires
Traffic blocking or lane regulation is performed, and construction must be completed within that time. Therefore, it must be completed in a short time and within the regulation time, traffic must be released quickly, and stable road lining without flapping must be performed.

【0009】また現場での施工は、予想せぬアクシデン
トが発生することがままあり、そのような場合でも、速
やかに中止し、交通の開放をしなければならない。
[0009] In addition, the construction on site may cause unexpected accidents, and even in such a case, it is necessary to immediately stop the operation and open the traffic.

【0010】さらに施工順序としては、舗装切断・撤
去,仮復旧,布掘り,山留杭打,仮覆旧,路面覆工と何
工程にもわたり施工するので、日数及び資材のロスが非
常に多い。
[0010] Further, as the order of construction, cutting and removal of pavement, temporary restoration, cloth digging, pile pile driving, temporary covering, old road covering, and road surface lining are performed in many steps, so that the number of days and loss of materials are extremely low. Many.

【0011】例えば在来工法では覆工前に必ず矢板鋼等
による土留壁の構築を行って桁受を設置する必要があ
り、そのために桁受設置のための1m近い深さの仮掘削
及び土留壁外側の作業スペースの掘削、さらに作業手順
によっては仮掘削の埋め戻しを伴う等の問題がある。こ
の発明は上記問題点を解決するための覆工板の支持構造
と覆工方法を提供せんとするものである。
For example, in the conventional construction method, it is necessary to construct a retaining wall using sheet pile steel or the like and install a girder before the lining. There are problems such as excavation of the work space outside the wall and backfilling of temporary excavation depending on the work procedure. An object of the present invention is to provide a lining plate support structure and a lining method for solving the above problems.

【0012】[0012]

【課題を解決するための手段】上記課題を解決するため
の本発明は、第1に路面下の開削工事位置の上部の左右
両側に開削溝1の方向に沿って桁受6を設置し、該桁受
6上に左右方向に受桁7を所定間隔を介して載置し、上
記受桁7上に覆工板8を載置する構造において、前記桁
受6が受桁7の端面と端部下面に沿って受桁7の端部を
載置するようにアングル状断面部を備え、掘削された路
面近傍下の地盤2上に載置して配設されることを特徴と
している。
According to the present invention for solving the above-mentioned problems, firstly, a girder support 6 is installed along the direction of the cutting groove 1 on both the left and right sides of the upper part of the cutting work position under the road surface, In the structure in which the girder 7 is placed on the girder 6 in the left-right direction at a predetermined interval and the lining plate 8 is placed on the girder 7, the girder 6 is in contact with the end face of the girder 7. An angle-shaped cross-section is provided so that the end of the girder 7 is placed along the lower surface of the end, and is placed and arranged on the ground 2 below the excavated road surface.

【0013】第2に、桁受6のアングル状断面部の縦片
部6aが路面近傍下の受桁7側への土留壁を構成するこ
とを特徴としている。
Second, the vertical piece 6a of the angled cross section of the girder support 6 constitutes a retaining wall on the side of the girder 7 near the road surface.

【0014】第3に、桁受6のアングル状断面部の縦片
部6aが、受桁7上に載置された覆工板8の左右移動を
規制する規制板を兼ねたことを特徴としている。
Third, the vertical piece 6a of the angled cross section of the girder support 6 also serves as a restriction plate for restricting the left and right movement of the lining plate 8 placed on the support girder 7. I have.

【0015】第4に、受桁7の端部の桁受6上に載置さ
れる部分の下部に切欠部7aを設け、該切欠部7aの底
面側に桁受6の底片部6bに沿って載置される底板18
を設けてなることを特徴としている。
Fourth, a notch 7a is provided at a lower portion of the end of the girder 7 to be placed on the girder 6 and a bottom portion 6b of the girder 6 is provided on the bottom side of the notch 7a. To be placed on the bottom plate 18
Is provided.

【0016】第5に、開削工事に伴う土留壁4の構築及
び掘削工事前に請求項1乃至2の覆工工事を行うことを
特徴としている。
Fifth, before the construction and excavation of the earth retaining wall 4 accompanying the digging work, the lining work of claims 1 and 2 is performed.

【0017】[0017]

【発明の実施の形態】図1は本発明の実施形態を示し、
図4における桁受6′,受桁7′,規制部材9′以外の
部材は既に説明した同図のものと共通なので、詳細な説
明の繰り返しを割愛する。
FIG. 1 shows an embodiment of the present invention.
Members other than the girder 6 ', the girder 7' and the regulating member 9 'in FIG. 4 are the same as those already described in the same figure, and therefore, detailed description will not be repeated.

【0018】図1に示す例では、桁受6の断面形状と設
置位置及び設置順序等に特徴があり、これに対応して受
桁7の形状や桁受6への載置状態等に特徴がある。
The example shown in FIG. 1 is characterized by the cross-sectional shape of the girder 6, the installation position, the installation order, and the like. Correspondingly, the shape of the girder 7 and the mounting state on the girder support 6 are characterized. There is.

【0019】即ち、桁受6は縦片6aと底片6bとから
なるL字形(アングル状)断面をしたアングル鋼(例え
ばH300mm×L200mm)を所定長さ(例えば3m)
のものを順次突き合わせ接続して使用する。ジョイント
部は図2,図3に示すように各桁受6の端部の底片6b
上にプレート16を溶着等によって固着し、各隣端同士
を突き合わせた状態で各プレート16のボルト孔17に
ボルト(図示しない)を挿通することにより締着固定し
て所定長さ(例えば50〜100m)順次接続配置す
る。
That is, the girder support 6 is made of an angle steel (for example, H300 mm × L200 mm) having an L-shaped (angled) cross section composed of a vertical piece 6 a and a bottom piece 6 b and having a predetermined length (for example, 3 m).
Are used by sequentially connecting them. The joint part is a bottom piece 6b at the end of each girder support 6, as shown in FIGS.
The plate 16 is fixed thereon by welding or the like, and a bolt (not shown) is inserted into a bolt hole 17 of each plate 16 in a state where the adjacent ends are abutted with each other to be fixed and fixed to a predetermined length (for example, 50 to 50 mm). 100m) Connect and arrange sequentially.

【0020】また受桁7は図1〜図3に示すように、覆
工板8(寸法例H200×W1000×L2000)の
敷設幅(例L=2000)に応じた長さを備えたH型鋼
(H250×W300)を用いており、その両端下部は
所定深さ(端部より約200mm、底面より約195mm)
位置でアングル状の切欠部7aを設け、該切欠部7aの
上面(切り残し端の下面)には上面と平行な底板18が
溶着等により固着されている。このように上記切欠部7
aの上方部も、側面視でH型を形成して補強されてい
る。さらに切欠端面には、上記底板18とともにアング
ル状を形成するように垂直方向に端板19が一体固着さ
れている。端板19はそれ自体が土留板になる。
As shown in FIGS. 1 to 3, the receiving girder 7 is an H-shaped steel having a length corresponding to the laying width (example L = 2000) of the lining plate 8 (example size H200 × W1000 × L2000). (H250 × W300), the lower part of both ends is a predetermined depth (about 200 mm from the end, about 195 mm from the bottom)
An angle-shaped notch 7a is provided at the position, and a bottom plate 18 parallel to the upper surface is fixed to the upper surface (the lower surface of the uncut end) of the notch 7a by welding or the like. Thus, the notch 7
The upper part of a is also reinforced by forming an H shape in a side view. Further, an end plate 19 is integrally fixed to the notch end surface in the vertical direction so as to form an angle with the bottom plate 18. The end plate 19 itself becomes a retaining plate.

【0021】そして前記桁受6の敷設は路面5の舗装切
断後、舗装の剥離撤去を行い、舗装切断面10の内側を
桁受6の略縦片6aの高さに相当する深さ(約300m
m)だけ掘削する。次いで上記各舗装切断面10の内側
両端部地盤面の一定の地均し及び望ましくは地固めを行
った後、該地盤面コーナー部に沿ってL字形断面の桁受
6を配置し、必要長さだけ順次レール状に敷設する。
After the pavement of the road surface 5 is cut off, the pavement is peeled and removed, and the inside of the pavement cut surface 10 is laid at a depth corresponding to the height of the approximately vertical piece 6a of the girder support 6 (approximately). 300m
m) Excavate only. Next, after a certain leveling and preferably consolidation of the ground surface at both inner end portions of each of the pavement cut surfaces 10, the girder 6 having an L-shaped cross section is arranged along the ground surface corner, and the required length is set. Only lay in a rail shape.

【0022】上記桁受6の敷設の前又は後に、受桁7の
配置予定位置の地盤を少なくとも受桁7の幅に応じた広
さで受桁7の底面予定深さ(桁受底片6b上面より20
0〜250mm)迄掘削し、当該予定位置において受桁7
両端の底板18を桁受6の底片6b上に安定的に載置す
ることにより、受桁7を所定ピッチ(約3m)毎に配置
する。上記掘削は予め左右の桁受間の略全面を掘削して
おいてもよい。
Before or after the laying of the girder support 6, the ground at the position where the girder support 7 is to be arranged is to have a width corresponding to at least the width of the girder support 7 and an expected bottom surface depth of the girder 7 (the upper surface of the girder support bottom piece 6 b). More than 20
0-250mm) and the receiving girder 7
By stably mounting the bottom plates 18 at both ends on the bottom piece 6b of the beam receiver 6, the beam receivers 7 are arranged at a predetermined pitch (about 3 m). In the excavation, substantially the entire surface between the left and right girder supports may be excavated in advance.

【0023】上記作業によって覆工板8の敷設が可能と
なり、覆工板8は図2に示す例では200×3000×
1000(mm)のものを左右に2列順次載置し、覆工板
終了後は作業の都合により次の土留壁4の構築のための
矢板3の打込作業等を開始するか、後の打込作業のため
にそのままの覆工状態を保っておく。その後の本掘削や
土留壁4の構築作業は前述した従来の方法と同要領で行
われるが、矢板3の打込作業前に桁受6の設置及び覆工
ができる点が作業手順として相違する。
The above operation makes it possible to lay the lining plate 8, and the lining plate 8 is 200 × 3000 × in the example shown in FIG.
After the lining board is finished, the work of driving the sheet pile 3 for the construction of the next retaining wall 4 or the like is started after completion of the lining board, or Keep the lining state for the driving work. Subsequent main excavation and construction of the retaining wall 4 are performed in the same manner as in the above-described conventional method, except that the girder support 6 can be installed and lining before the sheet pile driving operation. .

【0024】特にこの発明の例によれば、桁受設置作業
のために必要な路面5からの掘削深さD2は約300mm
で足りるのに対し、従来の方法によれば受桁設置のため
の深さD1は少なくとも850mmもの開削部の仮掘削と
矢板3の外側の作業スペース部分の掘削が必要であり、
両方法の必要掘削量が著しく異なる。
In particular, according to the example of the present invention, the excavation depth D 2 from the road surface 5 required for the girder receiving work is about 300 mm.
On the other hand, according to the conventional method, the depth D 1 for installing the girder requires a temporary excavation of an open part of at least 850 mm and an excavation of the work space outside the sheet pile 3,
The required amount of excavation differs significantly between the two methods.

【0025】その他上記実施形態に示される特徴として
次の点が挙げられる。 (1)桁の支持部分を低くしたため、掘削土量及び掘削
量が少なくてすむので、残土の搬出及び仮置きが少な
く、重機及び車輌の台数を極力少なくでき作業も短時間
ですむ。 (2)掘削深さが少ないので、埋設物等の障害に当たる
率が少なく、舗装面に近い浅い部分が支持地盤となるた
め、地耐力のある路盤、または、地盤上に桁受が据え付
けられる。 (3)桁受の連続接続が可能なので、荷重の分散を計れ
る。 (4)30型以上の舗装であれば、路盤材の再利用がで
き、有効活用できる。 (5)受桁が巾止の役目をするので、受台の安定が計れ
る。 (6)埋戻しが路面下300mm位までできるので、転圧
が容易である。 (7)覆工撤去と同時に仮復旧ができ、資材の節約がで
きる。
Other features of the above embodiment include the following. (1) Since the supporting portion of the girder is lowered, the amount of excavated soil and excavation can be reduced, so that the removal and temporary placement of the remaining soil is reduced, and the number of heavy machinery and vehicles can be reduced as much as possible, thus shortening the work time. (2) Since the excavation depth is small, the probability of hitting obstacles such as buried objects is small, and the shallow portion near the pavement surface becomes the supporting ground, so that the girder can be installed on the ground bearing ground or on the ground. (3) Since the girder supports can be connected continuously, the load can be dispersed. (4) If the pavement has a size of 30 or more, the roadbed material can be reused and effectively used. (5) Since the girder serves as a width stop, the stability of the girder can be measured. (6) Since backfilling can be performed up to about 300 mm below the road surface, rolling compaction is easy. (7) Temporary restoration can be performed simultaneously with removal of the lining, and material can be saved.

【0026】[0026]

【発明の効果】以上のように構成される本発明によれ
ば、覆工作業の簡略化,省力化,省資源化,低コスト化
及び工期の短縮化と覆工部の安定性確保、低騒音化等、
特に市街地の開削工事の大きい改革が実現できる利点が
ある。
According to the present invention constructed as described above, the lining work is simplified, labor and resources are saved, the cost is reduced, the construction period is shortened, and the stability of the lining part is ensured. Noise reduction, etc.
In particular, there is an advantage that a major reform of the excavation work in the city area can be realized.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の覆工板支持構造を示す断面図である。FIG. 1 is a sectional view showing a lining plate support structure of the present invention.

【図2】同じく覆工板支持構造の平面図である。FIG. 2 is a plan view of the lining plate support structure.

【図3】覆工板支持構造の拡大斜視図である。FIG. 3 is an enlarged perspective view of a lining plate support structure.

【図4】従来の覆工板支持構造の断面図である。FIG. 4 is a sectional view of a conventional lining plate support structure.

【符号の説明】[Explanation of symbols]

1 開削溝 2 地盤 5 路面 6 桁受 6a 縦片 6b 底片 7 受桁 7a 切欠部 18 底板 DESCRIPTION OF SYMBOLS 1 Opening groove 2 Ground 5 Road surface 6 Girder 6a Vertical piece 6b Bottom piece 7 Receiving girder 7a Notch 18 Bottom plate

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 路面下の開削工事位置の上部の左右両
側に開削溝(1)の方向に沿って桁受(6)を設置し、
該桁受(6)上に左右方向に受桁(7)を所定間隔を介
して載置し、上記受桁(7)上に覆工板(8)を載置す
る構造において、前記桁受(6)が受桁(7)の端面と
端部下面に沿って受桁(7)の端部を載置するようにア
ングル状断面部を備え、掘削された路面近傍下の地盤
(2)上に載置して配設される覆工板の支持構造。
1. A girder support (6) is installed along the direction of a digging groove (1) on both left and right sides of an upper part of a digging work position under a road surface,
In a structure in which a receiving girder (7) is mounted on the girder support (6) in a left-right direction at a predetermined interval, and a lining plate (8) is mounted on the girder support (7). (6) a ground (2) having an angle-shaped cross-section so that the end of the girder (7) is placed along the end surface of the girder (7) and the lower surface of the end; A support structure for a lining plate placed and placed on top.
【請求項2】 桁受(6)のアングル状断面部の縦片
部(6a)が路面近傍下の受桁(7)側への土留壁を構
成する請求項1の覆工板の支持構造。
2. The supporting structure for a lining plate according to claim 1, wherein the vertical piece (6a) of the angled cross section of the girder (6) forms a retaining wall on the side of the girder (7) below the road surface. .
【請求項3】 桁受(6)のアングル状断面部の縦片
部(6a)が、受桁(7)上に載置された覆工板(8)
の左右移動を規制する規制板を兼ねた請求項1又は2の
覆工板の支持構造。
3. A lining plate (8) in which a vertical piece (6a) of an angled cross section of a girder support (6) is placed on a girder (7).
The support structure for a lining plate according to claim 1, wherein the lining plate also serves as a regulating plate for regulating lateral movement of the lining.
【請求項4】 受桁(7)の端部の桁受(6)上に載
置される部分の下部に切欠部(7a)を設け、該切欠部
(7a)の底面側に桁受(6)の底片部(6b)に沿っ
て載置される底板(18)を設けてなる請求項1乃至3
の覆工板の支持構造。
4. A notch (7a) is provided at a lower portion of a portion placed on the girder (6) at the end of the receiving girder (7), and a girder (7) is provided on the bottom side of the notch (7a). 4. A bottom plate (18) mounted along the bottom piece (6b) of (6).
Lining board support structure.
【請求項5】 開削工事に伴う土留壁(4)の構築及
び掘削工事前に請求項1乃至2の覆工工事を行う覆工方
法。
5. The lining method according to claim 1, wherein the lining work according to claim 1 or 2 is carried out before the construction and excavation work of the retaining wall (4) accompanying the digging work.
JP2000378579A 2000-12-13 2000-12-13 Supporting structure of lining plate and lining method Expired - Fee Related JP3450294B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000378579A JP3450294B2 (en) 2000-12-13 2000-12-13 Supporting structure of lining plate and lining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000378579A JP3450294B2 (en) 2000-12-13 2000-12-13 Supporting structure of lining plate and lining method

Publications (2)

Publication Number Publication Date
JP2002180413A true JP2002180413A (en) 2002-06-26
JP3450294B2 JP3450294B2 (en) 2003-09-22

Family

ID=18847121

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000378579A Expired - Fee Related JP3450294B2 (en) 2000-12-13 2000-12-13 Supporting structure of lining plate and lining method

Country Status (1)

Country Link
JP (1) JP3450294B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016011513A (en) * 2014-06-27 2016-01-21 株式会社大盛工業 Earth-retaining member and road surface lining method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104562887B (en) * 2015-01-07 2017-05-24 深圳市建筑设计研究总院有限公司 Building constructed in marine reclamation area, and construction method thereof
CN104929012A (en) * 2015-04-28 2015-09-23 广州市市政集团有限公司 Construction method for basalt brick road and tile road of skid pad

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3071772U (en) 2000-03-15 2000-09-22 株式会社大盛工業 Clamp for lining work

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016011513A (en) * 2014-06-27 2016-01-21 株式会社大盛工業 Earth-retaining member and road surface lining method

Also Published As

Publication number Publication date
JP3450294B2 (en) 2003-09-22

Similar Documents

Publication Publication Date Title
KR101834847B1 (en) Echo-environmental construction method of tunnel portal area using mini pipe-roof
JP3327191B2 (en) Underground structure and its construction method
KR101026836B1 (en) Structure for open cut excavation using light weight composite lining boards, and their construction methods
KR101206860B1 (en) Excavation tunnel constructing method using vertical side wall and arch ceiling
KR102196532B1 (en) Under ground structure construction method using composite steel pile underground column wall and top-down under ground structure therewith
KR20110026143A (en) Underground structure construction method without middle temporary pile
JPH06116942A (en) Construction method of critical sheathing wall
KR20120013182A (en) Structure for Open Cut Excavation Using Light Weight Composite Lining Boards, and Their Construction Methods
JP3893056B2 (en) Construction method of underground structure
JPH11303087A (en) Retaining wall using corrosion-resistant structure anchor
KR20210078779A (en) Underground roadway removed upper structure between upper slab and surface of road after constructing the steel continuous wall in the earth by top-down method and method for constructing the same
KR20210055980A (en) Underground roadway by top-down method using steel continuous wall in the earth without traffic control and temporary road and method for constructing the same
JP2002180413A (en) Support structure of lining plate and lining method
KR20070079675A (en) Method for construction of tunnel
KR101155155B1 (en) Underground structure construction method using teporary center pile
KR100837340B1 (en) Length Control Type Steel Pipe Strut
KR101879602B1 (en) Construction method for underground structure
JP3120150B1 (en) Road lining method
KR20210055981A (en) Underground roadway using steel continuous wall in the earth with minimum traffic control in constructing by top-down method and method for constructing the same
JP2004257184A (en) Structure of grade separated crossing of road, and its construction method
JP5167578B2 (en) Construction method for underground structures
JP4889993B2 (en) Construction method of widening shaft
JP2020066973A (en) Construction method of lifeline
JP4195215B2 (en) Mountain retaining method and foundation construction method
JP7110015B2 (en) Road lining unit for width change

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080711

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090711

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100711

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100711

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110711

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120711

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130711

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees