JP2002146922A - Anchorage structure of exposed column base - Google Patents

Anchorage structure of exposed column base

Info

Publication number
JP2002146922A
JP2002146922A JP2000347475A JP2000347475A JP2002146922A JP 2002146922 A JP2002146922 A JP 2002146922A JP 2000347475 A JP2000347475 A JP 2000347475A JP 2000347475 A JP2000347475 A JP 2000347475A JP 2002146922 A JP2002146922 A JP 2002146922A
Authority
JP
Japan
Prior art keywords
concrete
concrete foundation
column base
fixing
anchor bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000347475A
Other languages
Japanese (ja)
Inventor
Tomohide Someya
友英 染矢
Hirokazu Yasuda
博和 安田
Isamu Miyauchi
勇 宮内
Koji Yoda
香二 與田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Kawasaki Steel Metal Products and Engineering Inc
Original Assignee
Kawasaki Steel Metal Products and Engineering Inc
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Steel Metal Products and Engineering Inc, Kawasaki Steel Corp filed Critical Kawasaki Steel Metal Products and Engineering Inc
Priority to JP2000347475A priority Critical patent/JP2002146922A/en
Publication of JP2002146922A publication Critical patent/JP2002146922A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To solve problems for an anchorage structure of the conventional exposed column base so that a concrete foundation is thinned to lighten excavation work and concrete casting work and, at the same time, to efficiently carry out work by unitizing anchor metal fittings. SOLUTION: For the anchorage structure of the exposed column base connecting the column base section of a steel framed column to the concrete foundation with an anchor bolt, the anchor bolt is made to pass through up to the lower part of the concrete foundation, at the same time, the lower end thereof is connected to the anchor fittings arranged to the lower surface of the concrete foundation, and the head of the anchor bolt is inserted into a base plate of the column base section mounted on the upper surface of the concrete foundation to connect.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、鉄骨造や鉄骨鉄筋
コンクリート造の建築物等における鉄骨柱脚部のコンク
リート基礎への定着構造に関する。鉄骨柱にはその柱脚
部を露出させたままコンクリート基礎に定着する露出柱
脚、コンクリート内に鉄骨柱を埋め込む埋め込み柱脚、
および鉄骨柱にコンクリートを巻き立ててコンクリート
基礎に対して剛に定着する根巻き柱脚があるが、本発明
は露出柱脚の定着構造に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure for fixing a steel column base to a concrete foundation in a steel frame or a steel reinforced concrete building. For steel columns, exposed column bases that settle on the concrete foundation with their column bases exposed, embedded column bases that embed steel columns in concrete,
In addition, there is a base-winding column base that is fixed to a concrete foundation by rolling concrete around a steel frame column. The present invention relates to a fixing structure of an exposed column base.

【0002】[0002]

【従来の技術】一般に、鉄骨造や鉄骨鉄筋コンクリート
造の建築物等における露出柱脚のコンクリート基礎への
定着構造は、図5に示すように、捨てコンクリートSの
上に鉄骨フレーム1を介して定着金物3を載置し、この
定着金物3とコンクリート基礎4の上に載置されたベース
プレート52とをアンカーボルト2及びナット21によって
緊結して構成されている。なお、コンクリート基礎4に
は鉄筋41が縦横上下に配置されており、また鉄骨柱の柱
脚部51はベースプレート52に固定されている。また、必
要に応じ、コンクリート基礎4とベースプレート52の間
にモルタルMが充填されている。
2. Description of the Related Art In general, an anchoring structure of an exposed column base to a concrete foundation in a steel frame or a steel-framed reinforced concrete building is fixed on a discarded concrete S via a steel frame 1 as shown in FIG. The metal fitting 3 is placed, and the fixing metal 3 and the base plate 52 placed on the concrete foundation 4 are tightly connected by the anchor bolt 2 and the nut 21. Reinforcing bars 41 are arranged vertically and horizontally on the concrete foundation 4, and column bases 51 of the steel columns are fixed to a base plate 52. Further, a mortar M is filled between the concrete foundation 4 and the base plate 52 as required.

【0003】かかる定着構造の施工は以下の手順で行わ
れる。まず地盤を所定レベルまで根切りして砕石地業を
行い、あるいは捨てコンクリートSを打設し、その上面
の所定位置に鉄骨フレーム1を配置する。ついで、この
鉄骨フレーム1上に定着金物3を取り付け、この定着金物
3に対してねじ止め、あるいは溶接でアンカーボルト2を
取り付ける。つづいて、捨てコンクリートSの上方のコ
ンクリート基礎4となる空間内に鉄筋41を配置した後、
型枠を施工してコンクリートCを打設する。養生期間の
後、鉄骨柱5の建て方に入りコンクリート基礎4の上面に
モルタル塊や鋼板ライナなどのレベル出し具を置いて柱
脚部51のベースプレート52を載せ、ベースプレート52の
ボルト孔にアンカーボルト2の頭部を挿通してナット21
をかけ、レベル出しの後ナット21を締めつけて柱脚部51
をコンクリート基礎4に緊結する。基礎コンクリート4と
ベースプレート52下部の隙間にはモルタルMを充填して
グラウトする。
[0003] The construction of such a fixing structure is performed in the following procedure. First, the ground is cut to a predetermined level to perform crushed stone work, or abandoned concrete S is cast, and the steel frame 1 is placed at a predetermined position on the upper surface thereof. Next, the fixing hardware 3 is mounted on the steel frame 1 and the fixing hardware 3 is attached.
Attach anchor bolt 2 to 3 by screwing or welding. Then, after arranging the reinforcing bar 41 in the space which becomes the concrete foundation 4 above the waste concrete S,
The concrete form is cast and concrete C is cast. After the curing period, enter the construction method of the steel column 5, place a leveling tool such as a mortar block or a steel plate liner on the upper surface of the concrete foundation 4, put the base plate 52 of the column base 51, and anchor bolts in the bolt holes of the base plate 52. Insert the head of 2 and nut 21
After leveling, tighten the nut 21 to secure the column base 51
To the concrete foundation 4. The mortar M is filled in the gap between the base concrete 4 and the lower part of the base plate 52 and grouted.

【0004】[0004]

【発明が解決しようとする課題】このようなコンクリー
ト基礎への定着構造では、コンクリート基礎4の厚さ
は、まずアンカーボルト2から定着金物3へ伝達される引
張張力を誘因としてコンクリートが定着金物3の周辺か
ら円錐形に引き抜かれるコーン破壊に対する耐力を有す
るものとして定められ、これにより定着金物3からコン
クリート基礎4の上面までの厚さが決まる。また、コン
クリート基礎4内に埋設される定着金物3に対しては、法
定のかぶり厚を確保する必要があり、それにより定着金
物3からコンクリート基礎4の下面までの厚さが決まる。
すなわち、定着金物3から上方にはコーン破壊に対する
耐力を考慮した厚さ、下方にはコンクリートのかぶり厚
が最低限必要となるから、基礎の掘削深さは必然的に大
きいものとならざるを得ない。
In such a structure for anchoring to a concrete foundation, the thickness of the concrete foundation 4 is first determined by the tensile force transmitted from the anchor bolts 2 to the anchoring hardware 3 as a trigger. Is defined as having a resistance to the destruction of the cone that is pulled out from the periphery of the cone in a cone shape, thereby determining the thickness from the fixing hardware 3 to the upper surface of the concrete foundation 4. Further, it is necessary to secure a legal cover thickness for the fixing metal 3 buried in the concrete foundation 4, which determines the thickness from the fixing metal 3 to the lower surface of the concrete foundation 4.
In other words, since the minimum thickness is required considering the strength against cone breakage above the anchorage hardware 3 and the concrete cover thickness is required below the minimum, the excavation depth of the foundation is necessarily large. Absent.

【0005】また、かかる定着構造の現場施工に当たっ
ては、コンクリートCを打設する際、鉄骨フレーム1がコ
ンクリートの圧力によりゆがみ、あるいは位置ずれを起
こしやすく、そのため、アンカーボルト2の位置が変化
して鉄骨柱5を建てるに際して修正を行わなければなら
ない場合もある。さらに定着金物3の形状によってはそ
の下方にコンクリートが十分に流れ込まず、空隙が残っ
て後にこの中に水が溜まり、定着金物3が腐食を起こす
などの問題点もある。また鉄骨フレーム1、定着金物3の
配置や、定着金物3へのアンカーボルト2の取り付けなど
にも多大の人手を必要とする。
[0005] In the construction of the anchoring structure on site, when the concrete C is cast, the steel frame 1 is easily distorted or misaligned due to the pressure of the concrete, so that the position of the anchor bolt 2 changes. Modifications may need to be made when building the steel column 5. Further, depending on the shape of the fixing hardware 3, there is also a problem that the concrete does not sufficiently flow below the fixing hardware 3, leaving voids and water remaining therein, causing corrosion of the fixing hardware 3. In addition, arranging the steel frame 1 and the fixing hardware 3 and attaching the anchor bolts 2 to the fixing hardware 3 also require a great deal of manpower.

【0006】本発明は、従来の露出柱脚の定着構造にお
けるこのような問題点を解消し、コンクリート基礎を薄
くして掘削ならびにコンクリート打設作業の軽減を図る
とともに、定着金物をユニット化して施工を効率化する
ことを目的とする。
SUMMARY OF THE INVENTION The present invention solves such a problem in the conventional anchoring structure for exposed column bases, reduces the work of excavation and concrete placing by thinning the concrete foundation, and unitizes the anchoring hardware for construction. The purpose is to improve the efficiency.

【0007】[0007]

【課題を解決するための手段】本発明は、鉄骨柱の柱脚
部がアンカーボルトによってコンクリート基礎に接合さ
れてなる露出柱脚の定着構造において、前記アンカーボ
ルトがコンクリート基礎下部まで貫通するとともに、そ
の下端が前記コンクリート基礎の下面に配置した定着金
物に接合され、かつ、前記アンカーボルトの頭部が前記
コンクリート基礎の上面に載置された柱脚部のベースプ
レートに挿通して接合されてなるものである。
According to the present invention, there is provided an anchoring structure for an exposed column base in which a column base of a steel column is joined to a concrete foundation by an anchor bolt, wherein the anchor bolt penetrates to a lower portion of the concrete foundation, The lower end thereof is joined to a fixing hardware arranged on the lower surface of the concrete foundation, and the head of the anchor bolt is inserted and joined to a base plate of a column base placed on the upper surface of the concrete foundation. It is.

【0008】また、上記発明において定着金物は少なく
とも露出面が防錆処理されていること、あるいはハーフ
プレキャストコンクリートに上面を露出して埋設された
ものであることを好適とし、さらに、定着金物にはアン
カーボルトのねじ込み孔が設けられていることを好適と
する。
[0008] In the above invention, it is preferable that at least the exposed surface of the fixing metal is rust-proofing or that the fixing metal is buried with the upper surface exposed in half precast concrete. Preferably, a screw hole for the anchor bolt is provided.

【0009】[0009]

【発明の実施の形態】以下、本発明の実施形態を実施例
に基づき具体的に説明する。図1は、本発明に係る露出
柱脚の定着構造の1実施例を示す断面図、図2はその平
面図である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be specifically described below based on examples. FIG. 1 is a sectional view showing an embodiment of a fixing structure for an exposed column base according to the present invention, and FIG. 2 is a plan view thereof.

【0010】図1に示すように、本発明では、アンカー
ボルト2をコンクリート基礎4の下部まで貫通させるとと
もに、定着金物3をコンクリート基礎4の内部に埋め込む
のではなく下面に配置している。この場合において、コ
ンクリートCの厚さは、定着金物3によるコーン破壊に対
する耐力のみを考慮した厚さとすればよい。
As shown in FIG. 1, in the present invention, the anchor bolt 2 is penetrated to the lower part of the concrete foundation 4, and the fixing hardware 3 is not embedded in the concrete foundation 4, but is arranged on the lower surface. In this case, the thickness of the concrete C may be a thickness in consideration of only the proof strength against cone destruction by the fixing hardware 3.

【0011】図1に示す例では、定着金物3は、図3に示
すようなハーフプレキャストコンクリート32にその上面
のみを露出して埋設されたものとなっている。したがっ
て、定着金物の側面および下面は完全にハーフプレキャ
ストコンクリート32によって覆われており、それによっ
て定着金物の防錆が確保されている。したがって定着金
物3に対するコンクリートの法定かぶりの機能はハーフ
プレキャストコンクリート32によって確保されているの
で、この場合考慮する必要がない。なお、このハーフプ
レキャストコンクリートに埋設された定着金物3にはア
ンカーボルト2のねじ込み穴が設けられている。
In the example shown in FIG. 1, the fixing hardware 3 is buried in a half precast concrete 32 as shown in FIG. 3 with only its upper surface exposed. Therefore, the side and lower surfaces of the fixing hardware are completely covered with the half precast concrete 32, thereby ensuring the rust prevention of the fixing hardware. Therefore, the function of the legal covering of the concrete with respect to the fixing hardware 3 is secured by the half precast concrete 32, so that it is not necessary to consider in this case. The fixing hardware 3 embedded in the half precast concrete is provided with a screw hole for the anchor bolt 2.

【0012】図1に示す露出柱脚の施工に当たっては、
まず地盤を所定レベルまで根切りしてた後砕石地業を行
う。その際、図3に示すハーフプレキャストコンクリー
トに埋設した定着金物3を砕石地業S内にその上面が砕石
地業面と面一になるように埋め込んでおく。しかる後、
前記定着金物3のアンカーボルトねじ込み穴にアンカー
ボルト2をねじ込んで固定する。続いて、鉄筋41により
コンクリート基礎4の配筋を行うとともに型枠を施工す
る。その際、鉄筋41の下面側においてコンクリートCの
法定かぶり厚さが確保できるようにする。しかる後、型
枠内にコンクリートCを打設する。
In constructing the exposed column base shown in FIG.
First, the ground is cut down to a predetermined level, and then the crushed stone is carried out. At this time, the fixing hardware 3 embedded in the half precast concrete shown in FIG. 3 is embedded in the crushed stone ground S so that the upper surface thereof is flush with the crushed stone ground. After a while
The anchor bolt 2 is screwed into the anchor bolt screw hole of the fixing hardware 3 and fixed. Subsequently, the reinforcement of the concrete foundation 4 is provided by the reinforcing bars 41 and the formwork is constructed. At this time, the legal cover thickness of the concrete C is ensured on the lower surface side of the reinforcing bar 41. After that, concrete C is poured into the formwork.

【0013】コンクリート4の打設後、所定の養生期間
をおいて、コンクリート基礎を完成し、しかる後、鉄骨
柱の建て方を行う。その施工工程は、従来と変わること
なく、柱脚部51をコンクリート基礎4に緊結して行う。
なお、必要に応じて、モルタルMを充填してグラウトす
る。
After the concrete 4 is cast, a concrete foundation is completed after a predetermined curing period, and thereafter, a method of building a steel column is performed. In the construction process, the column base 51 is tied to the concrete foundation 4 without changing from the conventional one.
If necessary, mortar M is filled and grouted.

【0014】この例では、定着金物3は、コンクリート
基礎4の下面に配置されている。したがって、コンクリ
ート基礎4の定着金物上面側厚さは、アンカーボルト2か
ら定着金物3へ伝達される引張張力を誘因としてコンク
リートが定着金物3の周辺から円錐形に引き抜かれるコ
ーン破壊に対する耐力を有するものとして設計すればよ
い。一方定着金物3の下面側のコンクリートの法定かぶ
りは、その機能がプレキャストコンクリート32によって
確保されているので、特段の考慮をする必要がない。し
たがって、その分だけ、コンクリート基礎4の厚さを薄
くすることができる。
In this example, the fixing hardware 3 is arranged on the lower surface of the concrete foundation 4. Therefore, the thickness of the anchoring metal upper surface side of the concrete foundation 4 has a strength against cone destruction in which the concrete is pulled out from the periphery of the anchoring hardware 3 in a conical shape due to the tensile tension transmitted from the anchor bolt 2 to the anchoring hardware 3. It may be designed as On the other hand, the legal cover of the concrete on the lower surface side of the fixing hardware 3 does not need to be considered especially since its function is secured by the precast concrete 32. Therefore, the thickness of the concrete foundation 4 can be reduced by that much.

【0015】さらに、定着金物3はハーフプレキャスト
コンクリートに固定されて砕石地業S中に安定性良く埋
め込まれており、アンカーボルト2がその安定性の良い
定着金物3にねじ込みによって固定されているから、コ
ンクリートCの打設の際に、定着金物がずれることがな
く、アンカーボルト2を所定の位置に極めて正確に取り
付けられるという利点がある。
Further, the anchoring hardware 3 is fixed to the half precast concrete and is embedded in the crushed stone ground S with good stability, and the anchor bolt 2 is fixed to the anchoring hardware 3 with good stability by screwing. In addition, there is an advantage that the anchoring hardware can be mounted very accurately at a predetermined position without displacing the fixing hardware when the concrete C is poured.

【0016】図4は、本発明の露出柱脚の定着構造に係
る別の実施形態を示す断面図である。この例でも、定着
金物3はハーフプレキャストコンクリートに埋め込まれ
たものとしてコンクリート基礎4の下面側に置かれてい
る。ただし、この定着金物3はハーフプレキャストコン
クリートに埋め込まれた状態で砕石地業Sに上に置かれ
ている。したがって、このハーフプレキャストコンクリ
ートを定着金物3とともに包み込むようにしてコンクリ
ート基礎4が打設される。この場合において、鉄筋41の
一部411を定着金物3の上に直接配筋する場合には、該鉄
筋411に対するコンクリートの法定かぶり厚さは、ハー
フプレキャストコンクリートの厚さとして確保される。
FIG. 4 is a sectional view showing another embodiment of the fixing structure of the exposed column base of the present invention. Also in this example, the fixing hardware 3 is placed on the lower surface side of the concrete foundation 4 as embedded in half precast concrete. However, the anchor metal 3 is placed on the crushed stone ground S while being embedded in half precast concrete. Therefore, the concrete foundation 4 is placed so as to wrap the half precast concrete together with the fixing hardware 3. In this case, when the part 411 of the reinforcing bar 41 is arranged directly on the fixing metal 3, the legal cover thickness of the concrete with respect to the reinforcing bar 411 is secured as the thickness of the half precast concrete.

【0017】この場合、コンクリート基礎4の厚さは、
定着金物3の上面側では定着金物3の周辺からコンクリー
トが円錐形に引き抜かれるコーン破壊に対する耐力を有
するものとなり、下面側ではハーフプレキャストコンク
リートの厚さと同等のものとなる。この場合において
も、定着金物3はハーフプレキャストコンクリート付き
のものとして砕石地業S上に安定性良く据え込まれてお
り、アンカーボルト2がその安定性の良い定着金物3にね
じ込みによって固定されているから、コンクリートCの
打設の際に、定着金物がずれることがなく、アンカーボ
ルト2を所定の位置に極めて正確に取り付けられるとい
う利点がある。
In this case, the thickness of the concrete foundation 4 is
On the upper surface side of the fixing hardware 3, the concrete has a strength against cone destruction in which the concrete is pulled out from the periphery of the fixing hardware 3, and on the lower surface side, the thickness is equal to the thickness of the half precast concrete. Also in this case, the anchoring hardware 3 is stably installed on the crushed stone ground S as one with half precast concrete, and the anchor bolt 2 is fixed to the anchoring hardware 3 with good stability by screwing. Therefore, there is an advantage that the anchoring hardware can be mounted very accurately at a predetermined position without displacing the fixing hardware at the time of placing the concrete C.

【0018】以上本発明を2つの実施形態に基づいて説
明したが、本発明の実施形態はこれらに留まるものでは
なく、種々の形態をとりうる。例えば、定着金物3は、
図3に示したようなハーフプレキャストコンクリートと
一体化されたものでなくてもよく、露出面が防錆処理さ
れた1枚の厚鋼板でもよい。防錆手段は、特に問うとこ
ろではなく、公知の防食手段をすべて利用することがで
き、例えば、亜鉛めっき等で十分である。
Although the present invention has been described based on two embodiments, the embodiments of the present invention are not limited to these embodiments, and may take various forms. For example, fixing hardware 3
It does not have to be integrated with the half precast concrete as shown in FIG. 3, but may be a single thick steel plate whose exposed surface is rust-proofed. The rust preventive means is not particularly limited, and any known anticorrosive means can be used. For example, zinc plating is sufficient.

【0019】また、定着金物3へのアンカーボルトの取
り付けは、図1、図4に示したようなねじ込み式のもの
でなくてもよく、定着金物に溶接などの手段によって固
定するものでもよい。さらに、定着金物を載置する砕石
地業は、捨てコンクリート打ちに代えることもできる。
なお、複数のアンカーボルトの頭部にテンプレート等を
取り付けて互いに位置決めしておくこともできる。これ
により、アンカーボルト2の位置ずれを一層完全に防止
することができる。
The fixing of the anchor bolts to the fixing hardware 3 is not limited to the screw-in type shown in FIGS. 1 and 4, but may be a method of fixing to the fixing hardware by welding or the like. Further, the crushed stone ground business on which the fixing hardware is placed can be replaced with discarded concrete.
It should be noted that a template or the like can be attached to the heads of the plurality of anchor bolts and positioned relative to each other. Thereby, the displacement of the anchor bolt 2 can be more completely prevented.

【0020】[0020]

【発明の効果】本発明によれば、コンクリート基礎の厚
みが減少して掘削ならびにコンクリート打設作業の軽減
が図られるとともに、鉄骨フレームをなくしたこと、定
着金物の平面精度がよいこと等により施工が効率化され
るという、すぐれた効果を奏する。
According to the present invention, the thickness of the concrete foundation is reduced, so that the work of excavation and concrete casting is reduced, the steel frame is eliminated, and the flatness of the fixing hardware is improved, and the construction is performed. It has an excellent effect that the efficiency is improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の実施例の露出柱脚の定着構造の1実
施形態を示す断面図である。
FIG. 1 is a sectional view showing an embodiment of a fixing structure of an exposed column base according to an embodiment of the present invention.

【図2】 本発明の実施例の露出柱脚の定着構造を示す
平面図である。
FIG. 2 is a plan view showing a fixing structure of an exposed column base according to the embodiment of the present invention.

【図3】 ハーフプレキャストコンクリートに埋め込ん
だ定着金物の構造の一部切欠き斜視図である。
FIG. 3 is a partially cutaway perspective view of the structure of a fixing hardware embedded in half precast concrete.

【図4】 発明の実施例の露出柱脚の定着構造の他の実
施形態を示す断面図である。
FIG. 4 is a sectional view showing another embodiment of the fixing structure of the exposed column base according to the embodiment of the present invention.

【図5】 従来例の露出柱脚の定着構造を示す断面図で
ある。
FIG. 5 is a cross-sectional view illustrating a fixing structure of a conventional exposed column base.

【符号の説明】[Explanation of symbols]

1:鉄骨フレーム 2:アンカーボルト 3:定着金物 4:コンクリート基礎 5:鉄骨柱 21:ナット 32:ハーフプレキャストコンクリート 41:鉄筋 51:柱脚部 52:ベースプレート C:コンクリート M:モルタル S:捨てコンクリートまたは砕石地業 1: steel frame 2: anchor bolt 3: anchor metal 4: concrete foundation 5: steel column 21: nut 32: half precast concrete 41: steel bar 51: column base 52: base plate C: concrete M: mortar S: discarded concrete or Crushed stone industry

───────────────────────────────────────────────────── フロントページの続き (72)発明者 安田 博和 東京都千代田区内幸町2丁目2番3号 川 崎製鉄株式会社東京本社内 (72)発明者 宮内 勇 兵庫県神戸市中央区北本町通1丁目1番28 号 川鉄建材株式会社内 (72)発明者 與田 香二 兵庫県神戸市中央区北本町通1丁目1番28 号 川鉄建材株式会社内 Fターム(参考) 2E125 AA03 AA45 AB01 AC04 AC15 AG03 AG12 AG41 AG60 BA07 BA22 BB02 BB08 BB22 BB24 BB30 BD01 BF04 CA04 CA13 CA19 CA82 EA33  ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Hirokazu Yasuda 2-3-2 Uchisaiwai-cho, Chiyoda-ku, Tokyo Kawasaki Steel Corporation Tokyo Head Office (72) Inventor Isamu Miyauchi Kitahonmachidori, Chuo-ku, Kobe City, Hyogo Prefecture 1-1-28 Kawatetsu Building Materials Co., Ltd. (72) Inventor Koji Yoda 1-1-1-2 Kita-Honmachidori, Chuo-ku, Kobe-shi, Hyogo Kawatetsu Building Materials Co., Ltd. F-term (reference) 2E125 AA03 AA45 AB01 AC04 AC15 AG03 AG12 AG41 AG60 BA07 BA22 BB02 BB08 BB22 BB24 BB30 BD01 BF04 CA04 CA13 CA19 CA82 EA33

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 鉄骨柱の柱脚部がアンカーボルトによっ
てコンクリート基礎に接合されている露出柱脚の定着構
造において、 前記アンカーボルトがコンクリート基礎下部まで貫通す
るとともに、その下端が前記コンクリート基礎の下面に
配置した定着金物に接合され、かつ、 前記アンカーボルトの頭部が前記コンクリート基礎の上
面に載置された柱脚部のベースプレートに挿通して接合
されてなることを特徴とする露出柱脚の定着構造。
1. An anchoring structure for an exposed column base in which a column base of a steel column is joined to a concrete foundation by an anchor bolt, wherein the anchor bolt penetrates to a lower part of the concrete foundation, and a lower end of the lower part is a lower surface of the concrete foundation. The exposed column base, wherein the head of the anchor bolt is inserted into and joined to the base plate of the column base placed on the upper surface of the concrete foundation. Fixing structure.
【請求項2】 前記定着金物はハーフプレキャストコン
クリートに上面を露出して埋設されたものであることを
特徴とする請求項1に記載の露出柱脚の定着構造。
2. The fixing structure according to claim 1, wherein the fixing hardware is buried in half precast concrete with its upper surface exposed.
【請求項3】 前記定着金物は少なくとも露出面が防錆
処理されているものであることを特徴とする請求項1に
記載の露出柱脚の定着構造。
3. The fixing structure for an exposed column base according to claim 1, wherein at least the exposed surface of the fixing hardware has been subjected to a rust prevention treatment.
【請求項4】前記定着金物にはアンカーボルトのねじ込
み孔が設けられていることを特徴とする請求項1、2又
は3の何れかに記載の露出柱脚の定着構造。
4. The fixing structure for an exposed column base according to claim 1, wherein said fixing hardware is provided with a screw hole for an anchor bolt.
JP2000347475A 2000-11-15 2000-11-15 Anchorage structure of exposed column base Pending JP2002146922A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000347475A JP2002146922A (en) 2000-11-15 2000-11-15 Anchorage structure of exposed column base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000347475A JP2002146922A (en) 2000-11-15 2000-11-15 Anchorage structure of exposed column base

Publications (1)

Publication Number Publication Date
JP2002146922A true JP2002146922A (en) 2002-05-22

Family

ID=18821195

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000347475A Pending JP2002146922A (en) 2000-11-15 2000-11-15 Anchorage structure of exposed column base

Country Status (1)

Country Link
JP (1) JP2002146922A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10844590B2 (en) 2016-11-18 2020-11-24 Senqcia Corporation Column base structure for construction, and base plate
TWI712722B (en) * 2016-11-22 2020-12-11 日商森科嘉股份有限公司 Plinth structure and bottom plate of structure
CN114775856A (en) * 2022-03-10 2022-07-22 中海建筑有限公司 Connecting structure for unit curtain wall and curtain wall construction method
CN116290568A (en) * 2023-03-08 2023-06-23 湖北工建集团第三建筑工程有限公司 Exposed steel column base and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10844590B2 (en) 2016-11-18 2020-11-24 Senqcia Corporation Column base structure for construction, and base plate
TWI712722B (en) * 2016-11-22 2020-12-11 日商森科嘉股份有限公司 Plinth structure and bottom plate of structure
CN114775856A (en) * 2022-03-10 2022-07-22 中海建筑有限公司 Connecting structure for unit curtain wall and curtain wall construction method
CN116290568A (en) * 2023-03-08 2023-06-23 湖北工建集团第三建筑工程有限公司 Exposed steel column base and construction method thereof

Similar Documents

Publication Publication Date Title
US8069624B1 (en) Pocketformer assembly for a post-tension anchor system
US5609005A (en) Foundation connector for tilt-up concrete wall panel and method of use
JP2008180082A (en) Construction method of wall structure having permanent anchor and wall structure having permanent anchor
JP4675363B2 (en) PC steel bar fixing method in after-bond method, and instrument used for carrying out the method
JP2002146922A (en) Anchorage structure of exposed column base
KR200201561Y1 (en) Head reinforcement structure of steel pipe pile
JP2004293281A (en) Construction method for permanent anchor-applied wall structure and permanent anchor-applied wall structure
CN114045750B (en) Construction method of high pier column tie beam
JP3101163B2 (en) How to join columns and beams
US20200011059A1 (en) Pre-cast concrete sound barrier mechanical post connection and sound barrier usng the same
JP2009257006A (en) Ground anchor construction method
JP2000297480A (en) Reinforcing method for steel-pipe structure column base section
JP3482621B2 (en) Reinforcement method of existing reinforced concrete wall
JP3680209B2 (en) Sediment layer reinforcement method and tightening jig
US11927012B2 (en) One piece molded post-tension tendon pocket former with push in retention tabs and method of use thereof
JPH08109641A (en) Anchoring method of steel pedestal to foundation pile
JPS5851243Y2 (en) Steel pipe column end fixing device
JPH09296457A (en) Anchorage structure of anchoring material in steel frame column base
JP2891107B2 (en) SRC column base anchoring structure
JP7003363B2 (en) Spray thickness guide structure and reinforcement method with spray mortar
JPH1025808A (en) Steel column base anchoring structure
JP2003013502A (en) Strut joining hardware, joining structure of foundation and strut, manufacturing method for strut joining hardware, installation method for strut joining hardware, installation tool, and building steel product
JP2579944Y2 (en) Load-bearing wall assembly structure
JP2914205B2 (en) Installation method of handrail wall or lumbar wall
JP2005256424A (en) Steel frame exposed type column base structure