JP2002098567A - Abnormality detection method for gas meter and gas supply - Google Patents

Abnormality detection method for gas meter and gas supply

Info

Publication number
JP2002098567A
JP2002098567A JP2000287287A JP2000287287A JP2002098567A JP 2002098567 A JP2002098567 A JP 2002098567A JP 2000287287 A JP2000287287 A JP 2000287287A JP 2000287287 A JP2000287287 A JP 2000287287A JP 2002098567 A JP2002098567 A JP 2002098567A
Authority
JP
Japan
Prior art keywords
flow rate
gas
difference
determination
fuel gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000287287A
Other languages
Japanese (ja)
Other versions
JP2002098567A5 (en
JP4129114B2 (en
Inventor
Kazumitsu Nukui
一光 温井
Michinori Komaki
充典 小牧
Takeshi Tashiro
健 田代
Kazuo Kon
一生 今
Hiroto Uyama
浩人 宇山
Hitoaki Ishino
仁朗 石野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Tokyo Gas Co Ltd
Original Assignee
Toshiba Corp
Tokyo Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Tokyo Gas Co Ltd filed Critical Toshiba Corp
Priority to JP2000287287A priority Critical patent/JP4129114B2/en
Publication of JP2002098567A publication Critical patent/JP2002098567A/en
Publication of JP2002098567A5 publication Critical patent/JP2002098567A5/ja
Application granted granted Critical
Publication of JP4129114B2 publication Critical patent/JP4129114B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide an abnormality detection method for a gas meter and gas supply enabling enhancement of reliability in decisions related to warning operation. SOLUTION: CPU 12 checks that the absolute value of a difference in a flow rate ΔQS is equivalent to or more than that of reference flow rate QSK (|ΔQS|>=QSK) and then sequentially detects 'first decision shift state' where decision for gas G consumption state shifts from 'no flow rate change' to 'flow rate changed', and next 'second decision shift state' where it shifts from 'flow rate changed' to 'no flow rate change'. At this time, CPU 12 determines that a gas utensil 1 has operated when the difference in flow rate ΔQS varied within forward area during 'first decision shift state'-'flow rate changes'. Thus any operation of gas utensils can precisely be recognized at any time, so reliability in decision regarding warning action performance will be enhanced.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、燃料ガスの流量を
測定すると共にガス燃焼機器の稼働状態に基づいて燃料
ガスを利用する消費者の安全を監視するためのガスメー
タおよびガス供給に係る異常判定方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a gas meter for measuring the flow rate of a fuel gas and monitoring the safety of a consumer who uses the fuel gas based on the operation state of a gas combustion device, and an abnormality determination for the gas supply. About the method.

【0002】[0002]

【従来の技術】近年、消費者による家庭用燃料ガス(以
下、単に「ガス」ともいう。)の消費量(ガス流量)を
測定するために、膜式流量計などを搭載したガスメータ
が各消費者宅ごとに設置されている。最近では、ガス流
量を測定する他、ガスを利用する消費者の安全を確保す
るために、ガスの消費状態を監視する機能(保安機能)
を有するものも知られている。この保安機能は、例え
ば、ガスメータに搭載されたマイクロコンピュータによ
り実行される。
2. Description of the Related Art In recent years, a gas meter equipped with a membrane type flow meter or the like has been used to measure the consumption (gas flow rate) of household fuel gas (hereinafter simply referred to as "gas") by consumers. It is installed in each home. Recently, in addition to measuring gas flow, the function of monitoring the gas consumption status to ensure the safety of consumers using the gas (security function)
Are also known. This security function is executed by, for example, a microcomputer mounted on the gas meter.

【0003】保安機能を有するガスメータは、例えば、
ガス流量の変化(増加,減少)を検出することによりガ
ス器具(ガス燃焼機器)の稼働状態(稼働,停止)を認
識するようになっている。そして、ガスメータは、ガス
流量の増加量が所定の増加量(基準流量)以上であるか
どうかを判定し、ガス流量の増加量が基準流量以上とな
ったときに、通常のガスの利用状態では生じないような
過大なガスの消費状態を検知したものと判断し、ガス供
給の遮断や警告音の発令などの警告動作を行うようにな
っている。この種のガスメータによれば、消費者に対し
て危険をともなう不慮の事態における過大なガスの供給
状態が検知される。
A gas meter having a security function is, for example,
By detecting a change (increase, decrease) in the gas flow rate, the operating state (operating, stop) of the gas appliance (gas burning appliance) is recognized. Then, the gas meter determines whether or not the increase amount of the gas flow rate is equal to or more than a predetermined increase amount (reference flow rate). When the increase amount of the gas flow rate becomes equal to or more than the reference flow rate, in a normal gas use state, It is determined that an excessive gas consumption state that does not occur is detected, and a warning operation such as shutting off gas supply or issuing a warning sound is performed. According to this type of gas meter, an excessive gas supply state in an unforeseen situation with danger to the consumer is detected.

【0004】ここで、図5を参照して、従来の膜式流量
計を搭載したガスメータにおける警告動作の実行に係る
判定手順について説明する。図5は、ガスメータによっ
て検出されるガス流量変化の一例を表すものであり、図
中における「横軸」は時間T(秒)を表し、「縦軸」は
ガス流量Q(瞬時流量;L(リットル)/h(時間))
を表している。図5では、例えば、時間T1よりも以前
からガス器具Uが稼働している状態において時間T2の
経過後からガス器具Vが稼働し、時間T4において双方
のガス器具が停止した場合を示している。膜式流量計を
搭載したガスメータは、例えば、瞬間的なガス流量(瞬
時流量)を把握することができないため、ガスの消費に
応じて入力される流量パルスを所定の時間間隔(約30
秒間)ごとにカウントし、この流量パルスに対して所定
のパルスレートを乗ずることによりガス流量の演算を行
っている。すなわち、例えば、時間T2に到達した時点
において、時間T1〜T2間に消費されたガス流量Q1
が演算され、同様にガス流量Q2,Q3が演算される。
ここで、流量パルスのカウント間隔を「約30秒間」と
したのは、流量パルスのカウントは、必ずしも30秒間
ごとに行われるものとは限らず、30秒を経過したのち
に次の流量パルスを検出する時点まで行われるためであ
る。
[0004] Here, with reference to Fig. 5, a description will be given of a determination procedure related to execution of a warning operation in a gas meter equipped with a conventional membrane flow meter. FIG. 5 shows an example of a change in the gas flow rate detected by the gas meter. In FIG. 5, the “horizontal axis” represents time T (second), and the “vertical axis” represents the gas flow rate Q (instantaneous flow rate; L ( Liter) / h (hour))
Is represented. FIG. 5 shows, for example, a case where the gas appliance V operates after the time T2 has elapsed while the gas appliance U has been operating before the time T1, and both gas appliances have stopped at the time T4. . A gas meter equipped with a membrane type flow meter cannot, for example, grasp an instantaneous gas flow rate (instantaneous flow rate). Therefore, a flow rate pulse input according to gas consumption is set at a predetermined time interval (about 30 seconds).
Every second) and the flow rate pulse is multiplied by a predetermined pulse rate to calculate the gas flow rate. That is, for example, when the time T2 is reached, the gas flow rate Q1 consumed during the time T1 to T2.
Is calculated, and similarly, the gas flow rates Q2 and Q3 are calculated.
Here, the reason why the counting interval of the flow pulse is set to “about 30 seconds” is that the counting of the flow pulse is not always performed every 30 seconds. This is because the detection is performed until the time of detection.

【0005】まず、ガスメータは、時間T3において、
最も新しく測定したガス流量Q2とその直前に測定した
ガス流量Q1との流量差(すなわちガス流量の増加量;
Q2−Q1)を演算し、この流量差の絶対値(|Q2−
Q1|)がガス流量Q1の所定倍(例えば0.03倍;
0.03Q1)よりも大きいかどうかを判定する。この
とき、ガスメータは、流量差の絶対値がガス流量Q1の
0.03倍よりも大きい場合(|Q2−Q1|>0.0
3Q1)にはガスの消費状態に変化が生じた(1のガス
器具Vが新たに稼働した)ものと判断し、一方、流量差
の絶対値がガス流量Q1の0.03倍以下であった場合
(|Q2−Q1|≦0.03Q1)にはガスの消費状態
に変化が生じなかった(新たに稼働したガス器具は存在
しない)ものと判断する。ガスの消費状態に変化が生じ
たものと判断した場合には、ガスメータは、時間T4に
おいて、最も新しく測定したガス流量Q3とその2つ前
(約60秒前)に測定したガス流量Q1との流量差(Q
3−Q1)を演算し、この流量差を新たに稼働したガス
器具Vの個別流量として登録する。続いて、ガスメータ
は、登録した個別流量が所定の流量(安全流量)以上で
あるかどうかを判定する。個別流量が安全流量である場
合には、ガスメータは、通常のガスの利用状態では生じ
ないような過大なガスの消費状態を検知したものと判断
し、一連の警告動作を実行する。なお、ガスメータは、
所定の流量以下のガスの消費状態を検出した時点(時間
T5)において、全てのガス器具が停止したものと判断
する。
First, at time T3, the gas meter reads
The flow rate difference between the most recently measured gas flow rate Q2 and the gas flow rate Q1 measured immediately before (ie, the increase in the gas flow rate;
Q2-Q1) and calculate the absolute value of this flow rate difference (| Q2-
Q1 |) is a predetermined multiple (eg, 0.03 times) of the gas flow rate Q1.
0.03Q1) is determined. At this time, the gas meter determines that the absolute value of the flow rate difference is larger than 0.03 times the gas flow rate Q1 (| Q2-Q1 |> 0.0
In 3Q1), it was determined that a change occurred in the gas consumption state (1 gas appliance V was newly operated), and the absolute value of the flow rate difference was 0.03 times or less of the gas flow rate Q1. In this case (| Q2−Q1 | ≦ 0.03Q1), it is determined that the gas consumption state has not changed (there is no newly operated gas appliance). If it is determined that a change has occurred in the gas consumption state, the gas meter compares the gas flow rate Q3 measured most recently and the gas flow rate Q1 measured two times before (about 60 seconds before) at time T4. Flow difference (Q
3-Q1) is calculated, and this flow rate difference is registered as the individual flow rate of the newly operated gas appliance V. Subsequently, the gas meter determines whether the registered individual flow rate is equal to or higher than a predetermined flow rate (safe flow rate). If the individual flow rate is a safe flow rate, the gas meter determines that an excessive gas consumption state that does not occur in a normal gas use state is detected, and performs a series of warning operations. The gas meter is
At the time when the consumption state of the gas having a flow rate equal to or less than the predetermined flow rate is detected (time T5), it is determined that all the gas appliances have stopped.

【0006】[0006]

【発明が解決しようとする課題】ところで、ガスを利用
する消費者の利便性を考慮するならば、警告動作の実行
に係る判定の信頼性を高め、警告動作の誤動作を回避す
る必要がある。しかしながら、従来のガスメータでは、
以下のような理由により、警告動作の実行に係る判定の
信頼性が十分なものではないという問題があった。すな
わち、図6に示したように、例えば、時間T2〜T3間
において、ガス器具Vの稼働後、さらに他のガス器具W
が稼働した場合には、ガスメータは、2台のガス器具
(ガス器具V,ガス器具W)が稼働しているにもかかわ
らず、時間T4において、あたかも流量差Q5−Q1に
相当する個別流量を有する1台のガス器具が稼働してい
るものと判断してしまう。このときの個別流量は、2台
のガス器具の個別流量の総和となるため、比較的大きな
流量となる。このような場合には、個別流量が安全流量
以上となり、2台のガス器具が正常に稼働しているにも
かからわず警告動作が誤って実行される可能性が高くな
る。
By the way, if the convenience of consumers using gas is taken into consideration, it is necessary to increase the reliability of the judgment regarding the execution of the warning operation and to avoid the malfunction of the warning operation. However, with conventional gas meters,
For the following reasons, there is a problem that the reliability of the determination regarding the execution of the warning operation is not sufficient. That is, as shown in FIG. 6, for example, after the operation of the gas appliance V during the time T2 to T3, another gas appliance W
Operates, the gas meter reads the individual flow rate corresponding to the flow rate difference Q5-Q1 at the time T4 even though the two gas appliances (the gas appliance V and the gas appliance W) are operating. It is determined that one gas appliance is operating. Since the individual flow rate at this time is the sum of the individual flow rates of the two gas appliances, it is a relatively large flow rate. In such a case, the individual flow rate becomes equal to or higher than the safe flow rate, and there is a high possibility that the warning operation is erroneously executed even though the two gas appliances are operating normally.

【0007】本発明はかかる問題点に鑑みてなされたも
ので、その目的は、警告動作の実行に係る判定の信頼性
を向上させることが可能なガスメータおよびガス供給に
係る異常判定方法を提供することにある。
SUMMARY OF THE INVENTION The present invention has been made in view of the above problems, and has as its object to provide a gas meter and a method for determining an abnormality related to gas supply, which can improve the reliability of determination regarding execution of a warning operation. It is in.

【0008】[0008]

【課題を解決するための手段】本発明のガスメータは、
1または2以上のガス燃焼機器によって消費される燃料
ガスの流量を所定の時間間隔ごとに測定する流量測定手
段と、この流量測定手段により測定された燃料ガスの流
量のうちの最も新しく測定された対象流量とこれよりも
以前に測定された比較流量との流量差を演算する流量差
演算手段と、この流量差演算手段によって演算された流
量差の絶対値を基準流量と比較することにより燃料ガス
の消費状態に変化が生じたかどうかを判定する流量差判
定手段と、この流量差判定手段による判断結果を監視
し、燃料ガスの消費状態に変化が生じなかったものとす
る判断から変化が生じたものとする判断へ移行する第1
の判断移行状態を検出したのち、燃料ガスの消費状態に
変化が生じたものとする判断から変化が生じなかったも
のとする判断へ移行する第2の判断移行状態を検出した
ときに、1または2以上のガス燃焼機器のうちの1のガ
ス燃焼機器の稼働状態が変化したものと判断する第1の
稼動判断手段と、この第1の稼働判定手段により1のガ
ス燃焼機器の稼働状態が変化したものと判断されたとき
に、この判断に至る流量差の変化過程において流量差が
正の領域内において変化している場合には1のガス燃焼
機器が稼働したものと判断し、一方、流量差が負の領域
内において変化している場合には1のガス燃焼機器が停
止したものと判断する第2の稼働判断手段と、この第2
の稼働判断手段段によって1のガス燃焼機器の稼働が判
断されたときに、最も新しく検出された判断移行状態に
対応する燃料ガスの流量とこれよりも以前に検出された
判断移行状態に対応する燃料ガスの流量との差として稼
働している1のガス燃焼機器の個別流量を演算する個別
流量演算手段と、この個別流量演算手段によって演算さ
れた個別流量が安全流量以上であるかどうかを判定する
安全判定手段と、この安全判定手段によって個別流量が
安全流量以上であると判定されたときに1または2以上
のガス燃焼機器に対する燃料ガスの供給を遮断する遮断
手段とを備えるようにしたものである。
The gas meter according to the present invention comprises:
Flow rate measuring means for measuring the flow rate of the fuel gas consumed by one or more gas combustion devices at predetermined time intervals; and the most recently measured flow rate of the fuel gas measured by the flow rate measuring means. A flow rate difference calculating means for calculating a flow rate difference between the target flow rate and a comparative flow rate measured earlier, and a fuel gas by comparing an absolute value of the flow rate difference calculated by the flow rate difference calculating means with a reference flow rate; The flow rate difference determining means for determining whether or not the consumption state of the fuel gas has changed, and the result of determination by the flow rate difference determining means has been monitored, and a change has occurred from the determination that the fuel gas consumption state has not changed. The first to move to the judgment
After detecting the judgment transition state of the above, when detecting a second judgment transition state that shifts from the judgment that the fuel gas consumption state has changed to the judgment that no change has occurred, 1 or First operation determining means for determining that the operation state of one of the two or more gas-fired appliances has changed, and operating state of one gas-fired apparatus having changed by the first operation determination means When it is determined that the gas combustion device has operated in the process of changing the flow difference leading to this determination and the flow difference has changed in the positive region, it is determined that one gas combustion device has been operated. A second operation judging means for judging that one gas combustion device has stopped when the difference has changed in the negative region;
When the operation of one gas combustion device is determined by the operation determination means, the flow rate of the fuel gas corresponding to the most recently detected determination transition state and the fuel gas flow rate corresponding to the previously detected determination transition state are determined. Individual flow rate calculating means for calculating an individual flow rate of one gas combustion device operating as a difference from the flow rate of the fuel gas; and determining whether or not the individual flow rate calculated by the individual flow rate calculating means is greater than or equal to a safe flow rate. And a shutoff means for shutting off the supply of fuel gas to one or more gas combustion devices when the individual flow rate is judged to be equal to or higher than the safe flowrate by the safety judgment means. It is.

【0009】本発明のガスメータでは、流量測定手段に
より、1または2以上のガス燃焼機器によって消費され
る燃料ガスの瞬時流量が所定の時間間隔ごとに測定さ
れ、流量差演算手段により、燃料ガスの流量のうちの最
も新しく測定された対象流量とこれよりも以前に測定さ
れた比較流量との流量差が演算され、流量差判定手段に
より、流量差の絶対値が基準流量と比較されることによ
り燃料ガスの消費状態に変化が生じたかどうか判定され
る。この流量差判定手段による判断結果は第1の稼動判
断手段により監視され、燃料ガスの消費状態に変化が生
じなかったものとする判断から変化が生じたものとする
判断へ移行する第1の判断移行状態が検出されたのち、
燃料ガスの消費状態に変化が生じたものとする判断から
変化が生じなかったものとする判断へ移行する第2の判
断移行状態が検出されたときに、1または2以上のガス
燃焼機器のうちの1のガス燃焼機器の稼働状態が変化し
たものと判断される。1のガス燃焼機器の稼働状態が変
化したものと判断されたときには、第2の稼働判断手段
により、この判断に至る流量差の変化過程において流量
差が正の領域内において変化している場合には1のガス
燃焼機器が稼働したものと判断され、一方、流量差が負
の領域内において変化している場合には1のガス燃焼機
器が停止したものと判断される。1のガス燃焼機器の稼
働が判断されたときには、個別流量演算手段により、最
も新しく検出された第2の判断移行状態に対応する燃料
ガスの流量とこれよりも以前に検出された他の第2の判
断移行状態に対応する燃料ガスの流量との差として稼働
している1のガス燃焼機器の個別流量が演算され、安全
判定手段により、個別流量が安全流量以上であるかどう
かが判定される。個別流量が安全流量以上であると判定
されたときには、遮断手段により、1または2以上のガ
ス燃焼機器に対する燃料ガスの供給が遮断される。
In the gas meter according to the present invention, the flow rate measuring means measures the instantaneous flow rate of the fuel gas consumed by one or two or more gas combustion devices at predetermined time intervals, and the flow rate difference calculating means measures the fuel gas. By calculating the flow difference between the most recently measured target flow and the comparison flow measured earlier than this, the flow difference determining means compares the absolute value of the flow difference with the reference flow. It is determined whether or not the fuel gas consumption state has changed. The result of the judgment by the flow rate difference judging means is monitored by the first operation judging means, and the first judgment is made to shift from the judgment that the fuel gas consumption state has not changed to the judgment that the change has occurred. After the transition state is detected,
When a second determination transition state is detected, in which the determination is made that a change has occurred in the fuel gas consumption state and a determination has been made that no change has occurred, one or more gas combustion devices It is determined that the operating state of the first gas combustion device has changed. When it is determined that the operating state of the first gas-fired device has changed, the second operation determining means determines that the flow rate difference has changed within a positive region in the process of changing the flow rate difference leading to this determination. Is determined to have operated one gas-fired device, while if the flow rate difference has changed in the negative region, it is determined that one gas-fired device has stopped. When the operation of the first gas combustion device is determined, the flow rate of the fuel gas corresponding to the most recently detected second determination transition state and the other second detected previously are determined by the individual flow rate calculating means. The individual flow rate of one gas combustion device operating as a difference from the flow rate of the fuel gas corresponding to the transition state is calculated, and the safety determination means determines whether the individual flow rate is equal to or greater than the safe flow rate. . When it is determined that the individual flow rate is equal to or higher than the safe flow rate, the supply of the fuel gas to one or more gas combustion devices is shut off by the shutoff means.

【0010】本発明のガスメータでは、流量差判定手段
が、流量差演算手段によって演算された流量差の絶対値
が基準流量以上であったときに燃料ガスの消費状態に変
化が生じたものと判定し、一方、流量差の絶対値が基準
流量より小さいときに燃料ガスの消費状態に変化が生じ
なかったものと判定するようにしてもよい。
In the gas meter according to the present invention, the flow difference determining means determines that the fuel gas consumption state has changed when the absolute value of the flow difference calculated by the flow difference calculating means is equal to or greater than the reference flow rate. On the other hand, when the absolute value of the flow rate difference is smaller than the reference flow rate, it may be determined that the fuel gas consumption state has not changed.

【0011】また、本発明のガスメータでは、基準流量
が比較流量の所定倍に相当するものであるようにしても
よい。
In the gas meter according to the present invention, the reference flow rate may correspond to a predetermined multiple of the comparison flow rate.

【0012】また、本発明のガスメータでは、流量差演
算手段が、対象流量を用いて所定の演算処理を行ったの
ち、演算処理後の対象流量と比較流量との流量差を演算
するものであるようにしてもよい。
In the gas meter according to the present invention, the flow rate difference calculating means performs a predetermined calculation process using the target flow rate, and then calculates a flow difference between the target flow rate after the calculation process and the comparison flow rate. You may do so.

【0013】また、本発明のガスメータでは、流量差演
算手段が、演算した流量差を用いて所定の演算処理を行
うものであるようにしてもよい。
In the gas meter according to the present invention, the flow difference calculating means may perform a predetermined calculation process using the calculated flow difference.

【0014】また、本発明のガスメータでは、第1の稼
動判断手段が、第2の判断移行状態を検出したのち、燃
料ガスの消費状態に変化が生じなかったものとする判断
を所定の回数に渡って連続して検出したときに1のガス
燃焼機器の稼働状態が変化したものと判断するものであ
るようにし、個別流量演算手段が、流量差判定手段によ
る燃料ガスの消費状態に変化が生じなかったものとする
判断タイミングごとに測定された燃料ガスの流量の平均
値を用いて個別流量を演算するものであるようにしても
よい。
Further, in the gas meter according to the present invention, after the first operation judging means detects the second judgment shift state, the first operation judging means judges a predetermined number of times that the fuel gas consumption state has not changed. When the detection is continuously performed, it is determined that the operating state of one gas combustion device has changed, and the individual flow rate calculating means causes a change in the fuel gas consumption state by the flow rate difference determining means. The individual flow rate may be calculated using the average value of the flow rate of the fuel gas measured at each determination timing when it is determined that there is no flow rate.

【0015】また、本発明のガスメータでは、第1の稼
動判断手段が、最も新しく検出された第2の判断移行状
態の検出タイミングが、これよりも以前に検出された他
の第2の判断移行状態の検出タイミングから所定の時間
以内であった場合には、最も新しく検出された第2の判
断移行状態に関する認識を消去するものであるようにし
てもよい。
Further, in the gas meter according to the present invention, the first operation determining means determines that the detection timing of the most recently detected second determination transition state is the other second determination transition state detected earlier than this. If it is within a predetermined time from the detection timing of the state, the recognition regarding the most recently detected second determination transition state may be deleted.

【0016】本発明のガス供給に係る異常判定方法は、
1または2以上のガス燃焼機器によって消費される燃料
ガスの流量を所定の時間間隔ごとに測定する第1のステ
ップと、燃料ガスの流量のうちの最も新しく測定した対
象流量とこれよりも以前に測定した比較流量との流量差
を演算する第2のステップと、流量差の絶対値を基準流
量と比較することにより燃料ガスの諸費状態に変化が生
じたかどうかを判定する第3のステップと、燃料ガスの
消費状態に変化が生じなかったものとする判断から変化
が生じたものとする判断へ移行する第1の判断移行状態
を検出したのち、燃料ガスの消費状態に変化が生じたも
のとする判断から変化が生じなかったものとする判断へ
移行する第2の判断移行状態を検出したときに、1また
は2以上のガス燃焼機器のうちの1のガス燃焼機器の稼
働状態が変化したものと判断する第4のステップと、1
のガス燃焼機器の稼働状態が変化したものと判断したと
きに、この判断に至る流量差の変化過程において、流量
差が正の領域内において変化している場合には1のガス
燃焼機器が稼働したものと判断し、一方、流量差が負の
領域内において変化している場合には1のガス燃焼機器
が停止したものと判断する第5のステップと、1のガス
燃焼機器の稼働を判断したときに、最も新しく検出した
第2の判断移行状態に対応する燃料ガスの流量とこれよ
りも以前に検出した他の第2の判断移行状態に対応する
燃料ガスの流量との差として稼働している1のガス燃焼
機器の個別流量を演算する第6のステップと、この個別
流量が安全流量以上であるかどうかを判定する第7のス
テップと、個別流量が安全流量以上であると判定したと
きに1または2以上のガス燃焼機器に対する燃料ガスの
供給を遮断する第8のステップとを含むようにしたもの
である。
The abnormality determination method according to the present invention for gas supply comprises:
A first step of measuring the flow rate of the fuel gas consumed by the one or more gas-fired devices at predetermined time intervals, and the most recently measured target flow rate of the flow rate of the fuel gas and A second step of calculating a flow rate difference from the measured comparison flow rate, and a third step of comparing the absolute value of the flow rate difference with the reference flow rate to determine whether or not a change has occurred in the fuel gas various cost states; After detecting a first determination transition state in which a transition is made from a determination that a change has not occurred in the fuel gas consumption state to a determination that a change has occurred, it is assumed that a change has occurred in the fuel gas consumption state. When detecting the second determination transition state in which the determination is made that the change has not occurred, the operation state of one of the one or more gas combustion apparatuses has changed. A fourth step of determining as, 1
When it is determined that the operation state of the gas-fired device has changed, when the flow-rate difference changes within a positive range in the process of changing the flow-rate difference leading to this determination, one gas-fired device operates. A fifth step of determining that one gas-fired device has stopped if the flow rate difference has changed in the negative region, and determining the operation of one gas-fired device. When this is done, it operates as the difference between the flow rate of the fuel gas corresponding to the most recently detected second determination transition state and the flow rate of the fuel gas corresponding to the other second determination transition state detected earlier than this. A sixth step of calculating the individual flow rate of the one gas-fired device, a seventh step of determining whether the individual flow rate is equal to or higher than the safe flow rate, and determining that the individual flow rate is equal to or higher than the safe flow rate. Sometimes 1 or 2 or less In which the it was to include an eighth step of cutting off the supply of fuel gas to the gas burning appliance.

【0017】本発明のガス供給に係る異常判定方法で
は、第1のステップにおいて、1または2以上のガス燃
焼機器よって消費される燃料ガスの流量が所定の時間間
隔ごとに測定され、第2のステップにおいて、燃料ガス
の流量のうちの最も新しく測定された対象流量とこれよ
りも以前に測定された比較流量との流量差が演算され、
第3のステップにおいて、流量差の絶対値が基準流量と
比較されることにより燃料ガスの消費状態に変化が生じ
たかどうかが判定される。続いて、第4のステップにお
いて、燃料ガスの消費状態に変化が生じなかったものと
する判断から変化が生じたものとする判断へ移行する第
1の判断移行状態が検出されたのち、燃料ガスの消費状
態に変化が生じたものとする判断から変化が生じなかっ
たものとする判断へ移行する第2の判断移行状態が検出
されたときに、1または2以上のガス燃焼機器のうちの
1のガス燃焼機器の稼働状態が変化したものと判断され
る。続いて、第5のステップにおいて、1のガス燃焼機
器の稼働状態が変化したものと判断されたときに、この
判断に至る流量差の変化過程において、流量差が正の領
域内において変化している場合には1のガス燃焼機器が
稼働したものと判断され、一方、流量差が負の領域内に
おいて変化している場合には1のガス燃焼機器が停止し
たものと判断される。続いて、第6のステップにおい
て、1のガス燃焼機器の稼働が判断されたときに、最も
新しく検出された第2の判断移行状態に対応する燃料ガ
スの流量とこれよりも以前に検出された他の第2の判断
移行状態に対応する燃料ガスの流量との差として稼働し
ている1のガス燃焼機器の個別流量が演算され、第7の
ステップにおいて、この個別流量が安全流量以上である
かどうかが判定される。最後に、第8のステップにおい
て、個別流量が安全流量以上であると判定されたときに
1または2以上のガス燃焼機器に対する燃料ガスの供給
が遮断される。
In the method for judging abnormality of gas supply according to the present invention, in the first step, the flow rate of fuel gas consumed by one or more gas combustion devices is measured at predetermined time intervals, and the second step is performed. In the step, a flow difference between the most recently measured target flow of the fuel gas flow and the comparative flow measured earlier than this is calculated,
In the third step, it is determined whether or not the fuel gas consumption state has changed by comparing the absolute value of the flow rate difference with the reference flow rate. Subsequently, in a fourth step, after detecting a first determination transition state in which the determination is made that a change has not occurred in the fuel gas consumption state, the first determination transition state is detected. When a second determination transition state is detected, in which a transition is made from a determination that a change has occurred in the consumption state of the gas combustion apparatus to a determination that no change has occurred, one or more of the one or more gas-fired appliances is detected. It is determined that the operating state of the gas combustion device has changed. Subsequently, in the fifth step, when it is determined that the operating state of one gas-fired device has changed, in the process of changing the flow difference leading to this determination, the flow difference changes within a positive region. If there is, it is determined that one gas combustion device has been operated, while if the flow rate difference has changed in the negative region, it is determined that one gas combustion device has stopped. Subsequently, in the sixth step, when the operation of one gas combustion device is determined, the flow rate of the fuel gas corresponding to the most recently detected second determination transition state and the flow rate of the fuel gas detected earlier than this are determined. The individual flow rate of one gas combustion device operating as a difference from the flow rate of the fuel gas corresponding to the other second determination transition state is calculated, and in the seventh step, the individual flow rate is equal to or greater than the safe flow rate. Is determined. Finally, in the eighth step, when it is determined that the individual flow rate is equal to or higher than the safe flow rate, the supply of the fuel gas to one or more gas combustion devices is cut off.

【0018】本発明によるガス供給に係る異常判定方法
では、第3のステップにおいて、流量差の絶対値が基準
流量以上であったときに燃料ガスの消費状態に変化が生
じたものと判定し、一方、流量差の絶対値が基準流量よ
り小さいときに燃料ガスの消費状態に変化が生じなかっ
たものと判定するようにしてもよい。
In the method for determining an abnormality related to gas supply according to the present invention, in the third step, when the absolute value of the flow rate difference is equal to or more than the reference flow rate, it is determined that the fuel gas consumption state has changed, On the other hand, when the absolute value of the flow rate difference is smaller than the reference flow rate, it may be determined that the fuel gas consumption state has not changed.

【0019】また、本発明のガス供給に係る異常判定方
法では、比較流量の所定倍に相当するように基準流量を
設定するようにしてもよい。
Further, in the abnormality determination method according to the present invention, the reference flow rate may be set so as to correspond to a predetermined multiple of the comparison flow rate.

【0020】また、本発明のガス供給に係る異常判定方
法では、第2のステップにおいて、対象流量を用いて所
定の演算処理を行ったのち、演算処理後の対象流量と比
較流量との流量差を演算するようにしてもよい。
Further, in the method for determining an abnormality related to gas supply according to the present invention, in the second step, after performing a predetermined calculation process using the target flow rate, a flow rate difference between the target flow rate after the calculation process and the comparison flow rate is obtained. May be calculated.

【0021】また、本発明のガス供給に係る異常判定方
法では、さらに、第2のステップと第3のステップとの
間に、演算した流量差を用いて所定の演算処理を行う第
10のステップを含むようにしてもよい。
In the method for determining an abnormality related to gas supply according to the present invention, a tenth step of performing a predetermined calculation process using the calculated flow rate difference between the second step and the third step. May be included.

【0022】また、本発明のガス供給に係る異常判定方
法では、第4のステップにおいて、第2の判断移行状態
を検出したのち、燃料ガスの消費状態に変化が生じなか
ったものとする判断を所定の回数に渡って連続して検出
したときに1のガス燃焼機器の稼働状態が変化したもの
と判断し、第6のステップにおいて、第3のステップに
おける燃料ガスの消費状態に変化が生じなかったものと
する判断タイミングごとに取得された燃料ガスの流量の
平均値を用いて個別流量を演算するようにしてもよい。
Further, in the abnormality determination method according to the present invention, in the fourth step, after detecting the second determination transition state, it is determined that no change has occurred in the fuel gas consumption state. It is determined that the operating state of one gas combustion device has changed when the detection is continuously performed for a predetermined number of times. In the sixth step, no change occurs in the fuel gas consumption state in the third step. The individual flow rate may be calculated using an average value of the flow rate of the fuel gas obtained at each determination timing.

【0023】また、本発明のガス供給に係る異常判定方
法では、第4のステップにおいて、最も新しく検出した
第2の判断移行状態の検出タイミングが、これよりも以
前に検出した他の第2の判断移行状態の検出タイミング
から所定の時間以内であった場合には、最も新しく検出
した第2の判断移行状態に関する認識を消去するように
してもよい。
In the method for judging abnormality of gas supply according to the present invention, in the fourth step, the detection timing of the most recently detected second judgment transition state is determined by the other second detection state detected earlier than this. If it is within a predetermined time from the detection timing of the judgment transition state, the recognition regarding the most recently detected second judgment transition state may be deleted.

【0024】[0024]

【発明の実施の形態】以下、本発明の実施の形態につい
て、図面を参照して詳細に説明する。
Embodiments of the present invention will be described below in detail with reference to the drawings.

【0025】図1は、本発明の一実施の形態に係るガス
メータ10の要部の概略構成を表すものである。なお、
本実施の形態に係る「ガス供給に係る異常判定方法」
は、このガスメータ10によって具現化されるので、以
下、併せて説明する。
FIG. 1 shows a schematic configuration of a main part of a gas meter 10 according to an embodiment of the present invention. In addition,
“Abnormality determination method related to gas supply” according to the present embodiment
Is embodied by the gas meter 10, and will be described together below.

【0026】ガスメータ10は、筐体の内部に、配管中
を流れるガスGの流量を測定するための計量部11と、
ガスメータ10全体の動作を制御するためのCPU(Ce
ntral Proccessing Unit;中央演算処理装置)12と、
各種情報を格納するためのRAM(Random Access Memo
ry)13と、時間計測を行うためのクロック14と、C
PU12等に電力供給を行うためのリチウムバッテリ1
5と、ガスメータ10よりも下流側へのガスGの供給状
態を切り替えるための遮断弁16とを備えている。ま
た、筐体の外側の表面には、ガスメータ10に関する各
種情報を表示するための表示部17が設けられている。
なお、図示しないが、このガスメータには、配管を介し
て1または2以上のガス器具(例えば、ガスレンジ,ガ
ス湯沸し器,ガス暖房器等)が設置されているものとす
る。ここで、計量部11が本発明における「流量測定手
段」の一具体例に対応し、遮断弁16が本発明における
「遮断手段」の一具体例に対応する。
The gas meter 10 has a measuring section 11 for measuring the flow rate of the gas G flowing in the pipe inside the housing,
CPU (Ce) for controlling the operation of the entire gas meter 10
ntral Proccessing Unit; 12,
RAM (Random Access Memo) for storing various information
ry) 13, a clock 14 for measuring time, and C
Lithium battery 1 for supplying power to PU 12 and the like
5 and a shutoff valve 16 for switching the supply state of the gas G to the downstream side of the gas meter 10. In addition, a display unit 17 for displaying various information related to the gas meter 10 is provided on the outer surface of the housing.
Although not shown, it is assumed that one or more gas appliances (for example, a gas range, a gas water heater, a gas heater, etc.) are installed in the gas meter via a pipe. Here, the measuring unit 11 corresponds to a specific example of “flow rate measuring unit” in the present invention, and the shutoff valve 16 corresponds to a specific example of “cutoff unit” in the present invention.

【0027】計量部11は、例えば、フルイディック素
子や熱式のフローセンサよりなるものであり、配管中を
流れるガスGの流量に応じて、CPU12に対して流量
信号を出力するようになっている。このような構成を有
する計量部11を用いることにより、膜式流量計などの
場合とは異なり、ガスGの瞬時流量QSを測定すること
が可能となる。
The measuring section 11 is composed of, for example, a fluidic element or a thermal type flow sensor, and outputs a flow signal to the CPU 12 in accordance with the flow rate of the gas G flowing in the pipe. I have. By using the measuring unit 11 having such a configuration, it is possible to measure the instantaneous flow rate QS of the gas G, unlike the case of a membrane type flow meter or the like.

【0028】CPU12は、主に、例えば、クロック1
4から出力されるクロック信号に基づいて、所定の時間
間隔(例えば1秒)ごとに、計量部11から出力される
流量信号を取り込み、この流量信号に基づいてガスGの
瞬時流量QSを演算するようになっている。また、CP
U12は、例えば、所定の時間間隔(例えば1時間)ご
とに瞬時流量QSを積算してガスGの積算流量QKを演
算するようになっている。CPU12は、取得した一連
の流量データ(QS,QK)を表示部17に対して出力
すると共にRAM13に随時格納する。
The CPU 12 mainly executes the clock 1
The flow signal output from the metering unit 11 is fetched at predetermined time intervals (for example, one second) based on the clock signal output from the counter 4, and the instantaneous flow QS of the gas G is calculated based on the flow signal. It has become. Also, CP
The U12 calculates the integrated flow rate QK of the gas G by integrating the instantaneous flow rate QS at predetermined time intervals (for example, one hour). The CPU 12 outputs the acquired series of flow rate data (QS, QK) to the display unit 17 and stores it in the RAM 13 as needed.

【0029】このCPU12は、特に、ガスGの使用に
ともなう消費者の安全を確保することを目的とした以下
のような保安機能を有している。すなわち、CPU12
は、例えば、まず、ガスGの瞬時流量QSを演算したの
ち、最も新しく演算した瞬時流量QSを含めた過去10
回分の瞬時流量の平均値として平均流量QSRを演算す
る(移動平均演算処理)。この移動平均演算処理は、例
えば、CPU12による瞬時流量QSの演算開始後、1
0個の流量データ(10個の瞬時流量QS)を取得した
時点から開始される。もちろん、この移動平均演算処理
は、瞬時流量QSの演算タイミングごとに繰り返し行わ
れる。
The CPU 12 has the following security function for the purpose of ensuring the safety of the consumer accompanying the use of the gas G. That is, the CPU 12
For example, first, after calculating the instantaneous flow rate QS of the gas G, the past 10 including the most recently calculated instantaneous flow rate QS
The average flow rate QSR is calculated as the average value of the instantaneous flow rates of the batches (moving average calculation processing). This moving average calculation process is performed, for example, after the CPU 12 starts calculating the instantaneous flow rate QS.
The process is started from the time when zero flow data (ten instantaneous flow QS) is obtained. Of course, this moving average calculation processing is repeatedly performed at each calculation timing of the instantaneous flow rate QS.

【0030】続いて、CPU12は、最も新しく演算し
た平均流量QSR(対象流量)と、これよりも以前(例
えば10秒前)に演算した平均流量QSR(比較流量)
との流量差ΔQSを演算する。ここで、図2は、ガスG
の平均流量QSRの変化(A)および流量差ΔQSの変
化(B)の一例を表すものであり、両者の相関を説明す
るためのものである。図2において、「横軸」は時間T
(秒)を表し、「縦軸」は平均流量QSRまたは流量差
ΔQS(L/h)を表している。いずれのガス器具も稼
働していない状態において1のガス器具Xが稼働・停止
する場合には、平均流量QSRは、ガス器具Xの稼働に
応じて増加してほぼ一定となったのち、ガス器具Xの停
止に応じて減少する。このとき、流量差ΔQSは、平均
流量QSRの増加に応じて増加したのち、平均流量QS
Rが一定になると減少する。また、稼働していたガス器
具Xが停止する場合には、流量差ΔQSは、平均流量Q
SRの減少に応じて減少したのち増加する。ここで、C
PU12が、本発明における「流量差演算手段」の一具
体例に対応する。
Subsequently, the CPU 12 calculates the average flow rate QSR (target flow rate) calculated most recently and the average flow rate QSR (comparison flow rate) calculated earlier (for example, 10 seconds before).
Is calculated. Here, FIG.
3 shows an example of the change (A) of the average flow rate QSR and the change (B) of the flow rate difference ΔQS, and explains the correlation between the two. In FIG. 2, the “horizontal axis” represents time T
(Seconds), and the “ordinate” indicates the average flow rate QSR or the flow rate difference ΔQS (L / h). When one gas appliance X operates / stops in a state where none of the gas appliances is operating, the average flow rate QSR increases in accordance with the operation of the gas appliance X and becomes substantially constant. Decreases as X stops. At this time, the flow rate difference ΔQS increases in accordance with the increase of the average flow rate QSR, and then increases.
It decreases when R becomes constant. When the operating gas appliance X stops, the flow rate difference ΔQS becomes the average flow rate Q
It decreases and then increases according to the decrease in SR. Where C
The PU 12 corresponds to a specific example of “flow rate difference calculating unit” in the present invention.

【0031】続いて、CPU12は、例えば、演算した
流量差ΔQSを用いて所定の平均化演算処理を行う。こ
の平均化演算処理は、例えば、以下のような演算式を用
いて行われる。
Subsequently, the CPU 12 performs a predetermined averaging operation using, for example, the calculated flow rate difference ΔQS. This averaging operation is performed using, for example, the following operation expression.

【0032】ΔQS=1/4ΔQS1+3/4ΔQS2ΔQS = 1 / ΔQS1 + 3 / 4ΔQS2

【0033】上記の式中において、「ΔQS」は平均化
演算処理後の流量差、「ΔQS1」は最も新しく演算し
た流量差、「ΔQS2」は「ΔQS」よりも1つ前(例
えば1秒前)に平均化演算処理を行った流量差をそれぞ
れ表している。
In the above equation, “ΔQS” is the flow rate difference after the averaging operation, “ΔQS1” is the most recently calculated flow rate difference, and “ΔQS2” is one time before (for example, one second before) “ΔQS”. The parentheses indicate the flow rate differences after the averaging operation.

【0034】続いて、CPU12は、例えば、平均化演
算処理後の流量差ΔQSを用いて所定の切り捨て演算処
理を行う。この切り捨て演算処理としては、例えば、流
量差ΔQSの「1の桁」を切り捨てるようにする。具体
的には、例えば、平均化演算処理前の流量差ΔQSが
「96L/h」である場合には、これを「90L/h」
とする。ただし、切り捨て演算処理を適用する「桁」は
必ずしも「1の桁」に限らず、例えば、「1の桁」以外
の桁(例えば、「10の桁」)に適用してもよいし、ま
たは複数の桁(例えば、「1の桁」および「10の
桁」)に適用するようにしてもよい。もちろん、上記の
平均化演算処理および切り捨て演算処理は、流量差ΔQ
Sの演算タイミングごとに繰り返し行われる。
Subsequently, the CPU 12 performs a predetermined truncation calculation process using the flow rate difference ΔQS after the averaging calculation process, for example. In this truncation calculation process, for example, “1 digit” of the flow rate difference ΔQS is truncated. Specifically, for example, when the flow rate difference ΔQS before the averaging calculation processing is “96 L / h”, this is set to “90 L / h”.
And However, the “digit” to which the truncation operation processing is applied is not necessarily limited to “1 digit”, and may be applied to a digit other than “1 digit” (eg, “10 digit”), or You may make it apply to several digits (for example, "1 digit" and "10 digit"). Of course, the above-described averaging operation and truncation operation are performed by the flow rate difference ΔQ
It is repeatedly performed at each calculation timing of S.

【0035】続いて、CPU12は、切り捨て演算処理
後の流量差ΔQSの絶対値(|ΔQS|)を基準流量Q
SKと比較することによりガスGの消費状態に変化が生
じたかどうかを判定する。具体的には、CPU12は、
例えば、切り捨て演算処理後の流量差ΔQSの絶対値
(|ΔQS|)が基準流量QSK以上であるかどうかを
判定する。この基準流量ΔQSKは、ガスGの消費状態
の変化を検出するための検出基準となるものであり、例
えば、予めガス事業者等により設定され、RAM13に
格納されている。基準流量ΔQSKとしては、例えば、
所定の流量(例えば100L/h)を固定して登録する
ようにしてもよいし、または流量差ΔQSの演算タイミ
ングごとに平均流量QSR(比較流量)の所定倍(例え
ば0.03倍)の流量が演算されるようにしてもよい。
このとき、CPU12は、流量差ΔQSの絶対値が基準
流量QSK以上である場合(|ΔQS|≧QSK)に
は、ガスGの消費状態に変化が生じたもの(流量変化
有)と判断し、一方、流量差ΔQSの絶対値が基準流量
より小さい場合(|ΔQS|<QSK)にはガスGの消
費状態に変化が生じなかったもの(流量変化無)と判断
する。ここで、CPU12が、本発明における「流量差
判定手段」,「消費状態判断」の一具体例に対応する。
Subsequently, the CPU 12 calculates the absolute value (| ΔQS |) of the flow rate difference ΔQS after the truncation calculation processing as the reference flow rate Q
By comparing with SK, it is determined whether or not the gas G consumption state has changed. Specifically, the CPU 12
For example, it is determined whether or not the absolute value (| ΔQS |) of the flow rate difference ΔQS after the truncation calculation processing is equal to or larger than the reference flow rate QSK. The reference flow rate ΔQSK serves as a detection reference for detecting a change in the consumption state of the gas G, and is set in advance by, for example, a gas company and stored in the RAM 13. As the reference flow rate ΔQSK, for example,
A predetermined flow rate (for example, 100 L / h) may be fixed and registered, or a flow rate that is a predetermined multiple (for example, 0.03 times) of the average flow rate QSR (comparison flow rate) at each calculation timing of the flow rate difference ΔQS. May be calculated.
At this time, when the absolute value of the flow rate difference ΔQS is equal to or larger than the reference flow rate QSK (| ΔQS | ≧ QSK), the CPU 12 determines that the gas G consumption state has changed (the flow rate has changed), On the other hand, when the absolute value of the flow rate difference ΔQS is smaller than the reference flow rate (| ΔQS | <QSK), it is determined that the gas G consumption state has not changed (the flow rate does not change). Here, the CPU 12 corresponds to a specific example of “flow rate difference determination means” and “consumption state determination” in the present invention.

【0036】ここで、再び図2を参照して、流量差ΔQ
Sの変化とガスGの消費状態の変化(ガス器具の稼働状
態の変化)との相関について説明する。図2に示したよ
うに、上記した「流量差ΔQSの絶対値(|ΔQS|)
が基準流量QSK以上であるかどうか」の判定結果とし
て、流量差ΔQSの変化パターン中の各領域について、
以下のように、CPU12によりガスGの消費状態の変
化(「流量変化有」または「流量変化無」)が判断され
ることとなる。すなわち、流量差ΔQSの変化パターン
のうち、流量差ΔQSが+QSR以上(ΔQS≧+QS
R)の領域R1および流量差ΔQSが−QSR以下(Δ
QS≦−QSR)の領域R2では、流量差ΔQSの絶対
値が基準流量QSK以上(|ΔQS|≧QSK)となる
ため、これらの領域R1および領域R2は「流量変化
有」と判断される。一方、流量差ΔQSが−QSRより
大きく+QSRよりも小さい範囲内(−QSR<ΔQS
<+QSR)である領域R3では、流量差ΔQSの絶対
値が基準流量QSKよりも小さく(|ΔQS|<QS
K)なるため、この領域R3は「流量変化無」と判断さ
れる。図中の点M1は、「流量変化無」から「流量変化
有」へ判断内容が移行した状態に相当し、点M2は、点
M1以降における最後の「流量変化有」の判断状態に対
応し、点M3は、「流量変化有」から「流量変化無」へ
判断内容が移行した状態に相当する。流量差ΔQSは点
M1〜点M2間において正の領域内で変化することとな
り、このときの流量差ΔQSの変化はガス器具の「稼
働」に対応するものである。また、図中の点M4,M
5,M6は、上記の点M1,M2,M3にそれぞれ対応
するものである。流量差ΔQSは点M4〜点M5間にお
いて負の領域内で変化することとなり、このときの流量
差ΔQSの変化はガス器具の「停止」に対応するもので
ある。ガスGの消費状態の変化に関する判断(「流量変
化有」または「流量変化無」)を監視することにより、
ガス器具の稼働状態(稼働,停止)を判断することが可
能となる。
Here, referring again to FIG. 2, the flow rate difference ΔQ
The correlation between the change in S and the change in the consumption state of the gas G (change in the operation state of the gas appliance) will be described. As shown in FIG. 2, the “absolute value of flow rate difference ΔQS (| ΔQS |)
Is greater than or equal to the reference flow rate QSK? ”For each region in the change pattern of the flow rate difference ΔQS,
As described below, the CPU 12 determines a change in the gas G consumption state (“change in flow rate” or “no change in flow rate”). That is, in the change pattern of the flow rate difference ΔQS, the flow rate difference ΔQS is equal to or more than + QSR (ΔQS ≧ + QS
R) and the flow rate difference ΔQS is −QSR or less (Δ
In the region R2 of (QS ≦ −QSR), the absolute value of the flow rate difference ΔQS is equal to or larger than the reference flow rate QSK (| ΔQS | ≧ QSK), so that these regions R1 and R2 are determined to have “flow rate change”. On the other hand, the flow rate difference ΔQS is larger than −QSR and smaller than + QSR (−QSR <ΔQS
<+ QSR), the absolute value of the flow rate difference ΔQS is smaller than the reference flow rate QSK (| ΔQS | <QS
K), the region R3 is determined to be “no change in flow rate”. A point M1 in the figure corresponds to a state where the determination has shifted from “no flow rate change” to “flow rate change”, and a point M2 corresponds to the last “flow rate change” determination state after the point M1. , Point M3 corresponds to a state in which the determination content has shifted from “with flow rate change” to “without flow rate change”. The flow rate difference ΔQS changes within a positive region between the points M1 and M2, and the change in the flow rate difference ΔQS at this time corresponds to “operation” of the gas appliance. In addition, points M4 and M
5, M6 respectively correspond to the above points M1, M2, M3. The flow rate difference ΔQS changes in a negative region between the points M4 and M5, and the change in the flow rate difference ΔQS at this time corresponds to “stop” of the gas appliance. By monitoring the determination regarding the change in the consumption state of the gas G (“change in flow rate” or “no change in flow rate”),
It is possible to determine the operation state (operation, stop) of the gas appliance.

【0037】続いて、CPU12は、ガスGの消費状態
の変化に関する判断結果(「流量変化有」または「流量
変化無」)を監視し、「流量変化無」から「流量変化
有」へ判断内容が移行する「第1の判断移行状態」を検
出する。そして、CPU12は、「第1の判断移行状
態」を検出したのち、ガスGの消費状態の変化に関する
判断結果を継続して監視し、「流量変化有」から「流量
変化無」へ判断内容が移行する「第2の判断移行状態」
を検出する。「第1の判断移行状態」〜「第2の判断移
行状態」間では、例えば、「流量変化有」の判断が連続
して検出される。「第1の判断移行状態」を検出したの
ち「第2の判断移行状態」を検出した場合には、CPU
12は、1のガス器具の稼働状態に変化が生じたものと
判断する。ここで、CPU12が、本発明における「第
1の稼動判断手段」の一具体例に対応する。
Subsequently, the CPU 12 monitors the determination result ("flow rate change" or "no flow rate change") regarding the change in the gas G consumption state, and changes the content from "no flow rate change" to "flow rate change". Is detected, the “first judgment transition state” to which the transition is made. Then, after detecting the “first determination transition state”, the CPU 12 continuously monitors the determination result regarding the change in the gas G consumption state, and changes the determination content from “with flow rate change” to “without flow rate change”. Transition "second judgment transition state"
Is detected. For example, between the “first determination transition state” and the “second determination transition state”, for example, the determination of “flow rate change” is continuously detected. When detecting the “second judgment transition state” after detecting the “first judgment transition state”, the CPU
12 judges that the operating state of one gas appliance has changed. Here, the CPU 12 corresponds to a specific example of “first operation determination unit” in the present invention.

【0038】続いて、CPU12は、例えば、最も新し
く検出した「第2の判断移行状態」よりも以前に他の
「第2の判断移行状態」を検出していなかったかどうか
を確認する。このとき、他の「第2の判断移行状態」を
検出していた場合において、例えば、他の「第2の判断
移行状態」の検出タイミングから最も新しく検出した
「第2の判断移行状態」の検出タイミングまでの時間
(検出間隔TH)が所定の時間(検出許容時間TY;例
えば5秒)以下であった場合(TH≦TY)には、CP
U12は、最も新しく検出した「第2の判断移行状態」
がガスGの利用以外の要因(例えばガスGの脈動等)に
よるものであると判断し、このときの「第2の判断移行
状態」に関する認識を消去する。なお、検出間隔THが
検出許容時間TYより大きい場合(TH>TY)ときに
は、CPU12は、最も新しく検出した「第2の判断移
行状態」がガス器具の稼働または停止に応じて発生した
ものであると判断する。このような「第2の判断移行状
態」の検出間隔THに関する判定は、「第2の判断移行
状態」の検出タイミングごとに行われる。
Subsequently, for example, the CPU 12 checks whether or not another "second judgment transition state" has been detected before the most recently detected "second judgment transition state". At this time, when another “second judgment transition state” is detected, for example, the “second judgment transition state” most recently detected from the detection timing of the other “second judgment transition state” If the time until the detection timing (detection interval TH) is shorter than a predetermined time (detection allowable time TY; for example, 5 seconds) (TH ≦ TY), the CP
U12 is the most recently detected “second judgment transition state”
Is determined to be due to a factor other than the use of the gas G (for example, pulsation of the gas G), and the recognition regarding the “second determination transition state” at this time is deleted. When the detection interval TH is longer than the permissible detection time TY (TH> TY), the CPU 12 determines that the most recently detected “second determination transition state” has occurred in response to the operation or stoppage of the gas appliance. Judge. Such a determination regarding the detection interval TH in the “second determination transition state” is performed at each detection timing of the “second determination transition state”.

【0039】続いて、消去対象外の「第2の判断移行状
態」を検出した場合には、CPU12は、「第1の判断
移行状態」〜「第2の判断移行状態」間における流量差
ΔQSの変化過程において、流量差ΔQSが正の領域内
で変化していたか、あるいは負の領域内で変化していた
かを判定する。このとき、CPU12は、流量差ΔQS
が正の領域内で変化していた場合には1のガス器具Xが
新たに稼働したものと判断し、一方、流量差ΔQSが負
の領域内で変化していた場合には1のガス器具Xが停止
したものと判断する。ここで、CPU12が、本発明に
おける「第2の稼働判断手段」の一具体例に対応する。
Subsequently, when detecting the "second judgment transition state" which is not to be deleted, the CPU 12 determines the flow rate difference ΔQS between the "first judgment transition state" and the "second judgment transition state". In the changing process, it is determined whether the flow rate difference ΔQS has changed in the positive region or has changed in the negative region. At this time, the CPU 12 determines the flow rate difference ΔQS
Is changed in the positive region, it is determined that one gas appliance X is newly operated. On the other hand, when the flow rate difference ΔQS is changed in the negative region, one gas appliance X is changed. It is determined that X has stopped. Here, the CPU 12 corresponds to a specific example of “second operation determining means” in the present invention.

【0040】続いて、CPU12は、「第2の判断移行
状態」に対応するガスGの平均流量QSRを流量増加
量、すなわちガス器具Xの個別流量QBXとして登録
し、RAM13に格納する。
Subsequently, the CPU 12 registers the average flow rate QSR of the gas G corresponding to the “second determination transition state” as the flow rate increase amount, that is, the individual flow rate QBX of the gas appliance X, and stores it in the RAM 13.

【0041】続いて、CPU12は、個別流量QBXが
安全流量QZ以上であるかどうかを判定する。この「安
全流量QZ」は、例えば、消費者宅内に設置されている
複数のガス器具のうち、ガス消費量の大きい任意の2つ
のガス器具が同時に稼働した場合におけるガスGの瞬時
流量QSの増加量よりも大きい範囲の流量となるように
ガス事業者等により設定され、予めRAM13に格納さ
れている。個別流量QBXが安全流量QZ以上である場
合(QBX≧QZ)には、CPU12は、通常のガスG
の利用状態では生じないような過大なガスGの消費状態
を検知したものと判断して警告動作を実行する。このと
き、CPU12は、警告動作として、例えば、遮断弁1
6に対して弁駆動信号Sを出力し、遮断弁16を駆動さ
せることによりガス器具に対するガスGの供給を遮断す
る(個別流量オーバー遮断)。なお、個別流量QBXが
安全流量QZより小さい場合(QBX<QZ)には、C
PU12は、正常なガスGの利用状態を検知したものと
判断する。ここで、CPU12が、本発明における「安
全判定手段」の一具体例に対応する。
Subsequently, the CPU 12 determines whether or not the individual flow rate QBX is equal to or greater than the safe flow rate QZ. This “safe flow rate QZ” is, for example, an increase in the instantaneous flow rate QS of the gas G when two arbitrary gas appliances having a large gas consumption amount are simultaneously operated among a plurality of gas appliances installed in the consumer's house. The flow rate is set by a gas company or the like so as to be in a range larger than the amount, and is stored in the RAM 13 in advance. When the individual flow rate QBX is equal to or greater than the safe flow rate QZ (QBX ≧ QZ), the CPU 12
Then, it is determined that an excessive gas G consumption state that does not occur in the use state is detected, and a warning operation is performed. At this time, the CPU 12 performs, for example, the shutoff valve 1 as a warning operation.
The supply of the gas G to the gas appliance is interrupted by outputting the valve drive signal S to the valve 6 and driving the shutoff valve 16 (individual flow rate over interrupt). If the individual flow rate QBX is smaller than the safe flow rate QZ (QBX <QZ), C
The PU 12 determines that the normal gas G usage state has been detected. Here, the CPU 12 corresponds to a specific example of “safety determination means” in the present invention.

【0042】なお、上記ではいずれのガス器具も稼働し
ていない状態において1のガス器具Xが稼働する場合に
ついて説明したが、1のガス器具Xが先行して稼働して
いる状態において他のガス器具Yが稼働するような場合
には、CPU12は、ガス器具Yの稼働に応じて検出し
た「第2の判断移行状態」に対応するガスGの平均流量
QSRと、ガス器具Xの稼働に応じて検出した「第2の
判断移行状態」に対応するガスGの平均流量QSR(す
なわち、ガス器具Xの稼働時において登録済みの個別流
量QBX)との差としてガス器具Yの個別流量QBY
(=QSR−QBY)を演算し、登録する。もちろん、
3以上のガス器具が順次稼働する場合においても同様に
各ガス器具の稼働が随時認識され、それらの個別流量が
順次演算される。ここで、CPU12が、本発明におけ
る「個別流量演算手段」の一具体例に対応する。
Although the case where one gas appliance X is operated in a state where none of the gas appliances is operating has been described above, other gas appliances are operated in a state where one gas appliance X is operated in advance. In a case where the appliance Y operates, the CPU 12 determines the average flow rate QSR of the gas G corresponding to the “second determination transition state” detected according to the operation of the gas appliance Y and the operation of the gas appliance X. The individual flow rate QBY of the gas appliance Y as a difference from the average flow rate QSR of the gas G corresponding to the “second determination transition state” detected at the time (ie, the individual flow rate QBX registered when the gas appliance X is operating).
(= QSR-QBY) is calculated and registered. of course,
Similarly, when three or more gas appliances operate sequentially, the operation of each gas appliance is recognized at any time, and their individual flow rates are sequentially calculated. Here, the CPU 12 corresponds to a specific example of “individual flow rate calculation means” in the present invention.

【0043】上記した「瞬時流量QSの測定タイミング
(例えば1秒)」、「平均流量QSRを演算する際に用
いる瞬時流量QSの個数(移動平均幅;例えば10
個)」、「流量差ΔQSを演算する際に用いる瞬時流量
QS(比較流量)の選択タイミング(例えば10秒前の
瞬時流量QS)」、「切り捨て演算処理における切り捨
て対象桁(例えば1の桁)」および「検出許容時間TY
(例えば5秒)」等の各パラメータ値は自由に変更可能
になっている。
The above-mentioned "measurement timing of instantaneous flow rate QS (for example, one second)" and "the number of instantaneous flow rates QS used for calculating average flow rate QSR (moving average width; for example, 10
), "Selection timing of instantaneous flow rate QS (comparison flow rate) used when calculating flow rate difference ΔQS (for example, instantaneous flow rate QS 10 seconds before)", and "digit to be truncated in truncation calculation processing (for example, 1 digit)""And" Permissible detection time TY "
(For example, 5 seconds) "can be freely changed.

【0044】なお、CPU12は、上記した個別流量オ
ーバー遮断機構以外の各種の遮断機構も備えている。具
体的には、例えば、ガスGの消費量(例えば、個別流量
または合計流量)ごとにガスGを継続して消費可能な時
間(継続時間)が予め登録されており、ガスGの消費時
間が継続時間に到達したときにガスGの供給を遮断する
もの(継続時間オーバー遮断)や、ガスGの合計流量が
予め設定された流量(安全最大流量)に到達したときに
ガスGの供給を遮断するもの(合計流量オーバー遮断)
などである。
The CPU 12 also has various shut-off mechanisms other than the individual flow rate over shut-off mechanism. Specifically, for example, for each gas G consumption (for example, individual flow rate or total flow rate), the time (continuous time) in which the gas G can be continuously consumed is registered in advance, and the gas G consumption time is registered in advance. One that shuts off the supply of gas G when the continuous time is reached (duration over cut off), and shuts off the supply of gas G when the total flow rate of gas G reaches a preset flow rate (safe maximum flow rate) What to do (total flow rate over cutoff)
And so on.

【0045】引き続き、図1を参照して、ガスメータ1
0の構成例について説明する。遮断弁16は、CPU1
2から出力される弁駆動信号Sに応じて駆動し、ガス器
具に対するガスGの供給を遮断するようになっている。
Subsequently, referring to FIG.
A configuration example of 0 will be described. The shut-off valve 16 is connected to the CPU 1
It is driven in accordance with the valve drive signal S output from 2 to shut off the supply of gas G to the gas appliance.

【0046】表示部17は、例えば表示パネル等よりな
るものであり、ガスGの流量データ(QS,QK)や遮
断弁16の駆動状況等の情報を表示するようになってい
る。消費者またはガス事業者等は、表示部17を目視に
て確認することにより、ガスGの利用状況を把握するこ
とができる。
The display section 17 is composed of, for example, a display panel or the like, and is configured to display information such as flow rate data (QS, QK) of the gas G and the driving status of the shut-off valve 16. A consumer or a gas company can grasp the usage status of the gas G by visually checking the display unit 17.

【0047】次に、図1〜図4を参照して、本実施の形
態に係るガスメータ10の動作について説明する。ここ
で、図3および図4は、ガスメータ10の動作を説明す
るための流れ図である。以下では、主に、例えば、1の
ガス器具Xが先行して稼働している状態(ガス器具Xの
個別流量QBXが登録済み)において、他のガス器具Y
が稼働する場合における保安機能(個別流量オーバー遮
断機構)に係るCPU12の動作について説明する。
Next, the operation of the gas meter 10 according to the present embodiment will be described with reference to FIGS. Here, FIG. 3 and FIG. 4 are flowcharts for explaining the operation of the gas meter 10. In the following, for example, in a state where one gas appliance X is operating in advance (the individual flow rate QBX of the gas appliance X has been registered), the other gas appliances Y are mainly described.
The operation of the CPU 12 relating to the security function (individual flow rate over shutoff mechanism) when the system operates will be described.

【0048】このガスメータ10では、まず、計量部1
1を作動させ、所定の時間間隔(例えば1秒)ごとにガ
スGの瞬時流量QSを演算する(図3;ステップS10
1)。続いて、例えば、最も新しく演算した瞬時流量Q
Sを含めた過去10回分の瞬時流量の平均値として平均
流量QSRを演算する(移動平均演算処理,図3;ステ
ップS102)。続いて、最も新しく演算した平均流量
QSR(対象流量)と、これよりも以前(例えば10秒
前)に演算した平均流量QSR(比較流量)との流量差
ΔQSを演算する(図3;ステップS103)。
In the gas meter 10, first, the measuring section 1
1 is operated, and the instantaneous flow rate QS of the gas G is calculated at predetermined time intervals (for example, one second) (FIG. 3: step S10).
1). Subsequently, for example, the most recently calculated instantaneous flow rate Q
The average flow rate QSR is calculated as an average value of the instantaneous flow rates of the past 10 times including S (moving average calculation processing, FIG. 3; step S102). Subsequently, a flow difference ΔQS between the most recently calculated average flow rate QSR (target flow rate) and the average flow rate QSR (comparative flow rate) calculated earlier (for example, 10 seconds before) is calculated (FIG. 3; step S103). ).

【0049】続いて、演算した流量差ΔQSを用いて所
定の平均化演算処理を施す(図3;ステップS10
4)。この平均化演算処理としては、例えば、平均化演
算処理後の流量差を「ΔQS」,最も新しく演算した流
量差を「ΔQS1」,「ΔQS」よりも1つ前(例えば
1秒前)に平均化演算処理を行った流量差を「ΔQS
2」とした場合、「ΔQS=1/4ΔQS1+3/4Δ
QS2」よりなる演算を行う。続いて、平均化演算後の
流量差ΔQSを用いて所定の切り捨て演算処理を行う
(図3;ステップS105)。この切り捨て演算処理と
しては、例えば、流量差ΔQSの「1の桁」を切り捨て
るようにする。
Subsequently, a predetermined averaging calculation process is performed using the calculated flow rate difference ΔQS (FIG. 3, step S10).
4). As this averaging calculation processing, for example, the flow rate difference after the averaging calculation processing is “ΔQS”, and the flow rate difference calculated most recently is “ΔQS1”, which is averaged one time before (eg, one second before) “ΔQS”. The flow rate difference that has been subjected to the
When “2” is set, “ΔQS = 1 / 4ΔQS1 + 3 / 4Δ”
QS2 ”. Subsequently, a predetermined truncation calculation process is performed using the flow rate difference ΔQS after the averaging calculation (FIG. 3; step S105). In this truncation calculation process, for example, “1 digit” of the flow rate difference ΔQS is truncated.

【0050】続いて、切り捨て演算処理後の流量差ΔQ
Sの絶対値(|ΔQS|)が基準流量QSK以上である
かどうかを判定する(図3;ステップS106)。この
とき、流量差ΔQSの絶対値が基準流量QSK以上であ
る場合(|ΔQSR|≧QSK,図3;ステップS10
6Y)には、ガスGの消費状態に変化が生じたもの(流
量変化有)と判断し、「流量変化無」から「流量変化
有」へ判断内容が変化する「第1の判断以降状態」を検
出する(図3;ステップS107)。続いて、CPU1
2は、「流量変化有」から「流量変化無」へ判断内容が
変化する「第2の判断以降状態」を検出する(図3;ス
テップS108)。なお、流量差ΔQSの絶対値が基準
流量QSKより小さい場合(|ΔQS|<QSK,図
3;ステップS106N)には、ガスGの消費状態に変
化が生じなかったものと判断し、瞬時流量QSの測定
(ステップS101)に回帰する。
Subsequently, the flow rate difference ΔQ after the truncation calculation processing is performed.
It is determined whether the absolute value of S (| ΔQS |) is equal to or greater than the reference flow rate QSK (FIG. 3; step S106). At this time, when the absolute value of the flow rate difference ΔQS is equal to or larger than the reference flow rate QSK (| ΔQSR | ≧ QSK, FIG. 3; step S10).
6Y), it is determined that a change has occurred in the gas G consumption state (flow rate change has occurred), and the determination content changes from “no flow rate change” to “flow rate change has occurred” “state after first determination” Is detected (FIG. 3; step S107). Then, CPU1
No. 2 detects a “state after the second judgment” in which the judgment content changes from “with flow rate change” to “without flow rate change” (FIG. 3; step S108). If the absolute value of the flow rate difference ΔQS is smaller than the reference flow rate QSK (| ΔQS | <QSK, FIG. 3; step S106N), it is determined that the gas G consumption state has not changed, and the instantaneous flow rate QS (Step S101).

【0051】続いて、最も新しく検出した「第2の判断
以降状態」よりも以前に他の「第2の判断以降状態」を
検出していなかったかどうかを確認する(図4;ステッ
プS109)。このとき、他の「第2の判断以降状態」
を検出していた場合(図4;ステップS109Y)に
は、他の「第2の判断以降状態」の検出タイミングから
最も新しく検出した「第2の判断以降状態」の検出タイ
ミングまでの時間(検出間隔TH)が所定の時間(検出
許容時間TY;例えば5秒)以下であるかどうかを判定
する(図4;ステップS110)。検出間隔THが検出
許容時間TH以下であった場合(TH≦TY,図4;ス
テップS110Y)には、最も新しく検出した「第2の
判断以降状態」がガスGの利用以外の要因(例えばガス
Gの脈動等)によるものであると判断し、このときの
「第2の判断以降状態」に関する認識を消去する。な
お、検出間隔THが検出許容時間TYより大きい場合
(TH>TY,図4;ステップS110N)には、検出
した「第2の判断以降状態」がガス器具の稼働または停
止に応じて発生したものであると判断する。
Subsequently, it is confirmed whether another "state after the second judgment" has not been detected before the most recently detected "state after the second judgment" (FIG. 4, step S109). At this time, another "state after the second determination"
(FIG. 4; step S109Y), the time (detection time) from the detection timing of the other “state after the second determination” to the detection timing of the most recently detected “state after the second determination” It is determined whether or not the interval TH) is equal to or shorter than a predetermined time (detection allowable time TY; for example, 5 seconds) (FIG. 4; step S110). If the detection interval TH is shorter than the allowable detection time TH (TH ≦ TY, FIG. 4; step S110Y), the most recently detected “state after the second determination” is a factor other than the use of the gas G (for example, gas G pulsation, etc.), and the recognition regarding the “state after the second determination” at this time is deleted. If the detection interval TH is longer than the permissible detection time TY (TH> TY, FIG. 4; step S110N), the detected “state after the second judgment” occurs in response to the operation or stoppage of the gas appliance. Is determined to be.

【0052】続いて、「第1の判断移行状態」〜「第2
の判断移行状態」における流量差ΔQSの変化過程にお
いて、流量差ΔQSが正の領域内で変化していたかどう
かを判定する(図4;ステップS111)。なお、上記
した他の「第2の判断移行状態」の検出確認(ステップ
S109)」時において、最も新しく検出した「第2の
判断移行状態」よりも以前に他の「第2の判断移行状
態」を検出していなかった場合(図4;ステップS10
9N)には、上記した「検出間隔THに関する判定(ス
テップS110)」を省略して「流量差ΔQSの変化領
域の確認に関する判定(ステップS111)」に移行す
る。このとき、流量差ΔQSが正の領域内で変化してい
た場合(図4;ステップS111Y)には、1のガス器
具Yが新たに稼働したものと判断し、ガス器具Yの稼働
に応じて検出された「第2の判断移行状態」に対応する
平均流量QSRと、ガス器具Xの稼働に応じて検出され
た「第2の判断移行状態」に対応する平均流量QSR
(すなわち、ガス器具Xの稼働時において登録済みの個
別流量QBX)との差としてガス器具Yの個別流量QB
Y(=QSR−QBX)を演算する(図4;ステップS
112)。この個別流量QBYは、新たなガスGの消費
量の増加量として登録され、RAM13に格納される。
なお、流量差ΔQSが正の領域内で変化していなかった
場合(流量差ΔQSが負の領域内で変化していた場合,
図4;ステップS111N)には、先行して稼働してい
たガス器具Xが停止したものと判断し、登録されていた
ガス器具Xの個別流量QBXを消去する。
Subsequently, the "first judgment shift state" to the "second judgment shift state"
It is determined whether or not the flow rate difference ΔQS has changed within a positive region in the process of changing the flow rate difference ΔQS in the “determination transition state” (FIG. 4; step S111). Note that, at the time of the above-described detection confirmation of the other “second determination transition state” (step S109), the other “second determination transition state” is performed before the most recently detected “second determination transition state”. Is not detected (FIG. 4; step S10).
9N), the above-described “determination regarding the detection interval TH (step S110)” is omitted, and the process proceeds to “determination regarding confirmation of a change region of the flow rate difference ΔQS (step S111)”. At this time, if the flow rate difference ΔQS has changed within the positive region (FIG. 4; step S111Y), it is determined that one gas appliance Y has newly operated, and The average flow rate QSR corresponding to the detected “second determination transition state” and the average flow rate QSR corresponding to the “second determination transition state” detected according to the operation of the gas appliance X
(That is, the individual flow rate QB of the gas appliance Y as a difference from the registered individual flow rate QBX when the gas appliance X is in operation).
Y (= QSR-QBX) is calculated (FIG. 4: step S
112). This individual flow rate QBY is registered as an increase in the consumption amount of the new gas G, and is stored in the RAM 13.
When the flow rate difference ΔQS has not changed in the positive region (when the flow difference ΔQS has changed in the negative region,
In FIG. 4; step S111N), it is determined that the gas appliance X that has been operating in advance has stopped, and the registered individual flow rate QBX of the gas appliance X is deleted.

【0053】続いて、演算した個別流量QBYが安全流
量QZ以上であるかどうかを判定する(図4;ステップ
S113)。このとき、個別流量QBYが安全流量QZ
以上である場合(QBY≧QZ,図4;ステップS11
3Y)には、通常のガスGの利用状態では生じないよう
な過大なガスGの消費状態を検知したものと判断し、遮
断弁16に対して弁駆動信号Sを出力する(図4;ステ
ップS114)。これにより、遮断弁16が駆動し、ガ
ス器具に対するガスGの供給が遮断される。なお、個別
流量QBYが安全流量QZより小さい場合(QBY<Q
Z,図4;ステップS113N)には、正常なガスGの
利用状態を検知したものと判断し、瞬時流量QSの測定
(図3;ステップS101)に回帰する。
Subsequently, it is determined whether or not the calculated individual flow rate QBY is equal to or greater than the safe flow rate QZ (FIG. 4; step S113). At this time, the individual flow rate QBY is changed to the safe flow rate QZ.
If the above is the case (QBY ≧ QZ, FIG. 4; step S11)
3Y), it is determined that an excessive gas G consumption state that does not occur in a normal gas G use state is detected, and a valve drive signal S is output to the shutoff valve 16 (FIG. 4; step). S114). Thereby, the shutoff valve 16 is driven, and the supply of the gas G to the gas appliance is shut off. When the individual flow rate QBY is smaller than the safe flow rate QZ (QBY <Q
Z, FIG. 4; step S113N), it is determined that the normal use state of the gas G has been detected, and the process returns to the measurement of the instantaneous flow rate QS (FIG. 3; step S101).

【0054】以上説明したように、本実施の形態のガス
メータ10およびガス供給に係る異常判定方法では、ガ
スGの消費状態の変化(「流量変化有」または「流量変
化無」)を監視することにより「第1の判断移行状態」
および「第2の判断移行状態」を順次検出したときに1
のガス器具の稼働状態が変化したものと判断すると共
に、特に、「第1の判断移行状態」〜「第2の判断移行
状態」間において流量差ΔQSが正の領域内で変化した
ときに1のガス器具が新たに稼働したものと判断するよ
うにしている。このような場合には、連続して稼働した
複数のガス器具によるガスGの消費状態を1台のガス器
具によるガスGの消費状態と誤判断してしまう従来の場
合とは異なり、各ガス器具の稼働が随時的確に認識され
るため、各ガス器具の個別流量が正確に演算され、警告
動作が適正に実行される。したがって、警告動作の実行
に係る判定の信頼性を向上させることができる。これに
より、ガスGを利用する消費者の利便性が向上すること
となる。
As described above, in the gas meter 10 and the abnormality determination method according to the gas supply according to the present embodiment, the change in the consumption state of the gas G (“with flow rate change” or “without flow rate change”) is monitored. "First judgment transition state"
And when the “second judgment transition state” is sequentially detected,
It is determined that the operating state of the gas appliance has changed, and in particular, when the flow rate difference ΔQS changes within the positive region between the “first determination transition state” and the “second determination transition state”, 1 Is determined to be newly operated. In such a case, unlike the conventional case where the gas G consumption state by a plurality of gas appliances operated continuously is erroneously determined as the gas G consumption state by one gas appliance, Since the operation of the gas appliance is accurately recognized at any time, the individual flow rate of each gas appliance is accurately calculated, and the warning operation is properly executed. Therefore, it is possible to improve the reliability of the determination regarding the execution of the warning operation. Thereby, the convenience of the consumer using the gas G is improved.

【0055】また、本実施の形態では、以下のような理
由により、稼働したガス器具の個別流量を演算するまで
に要する時間を短縮することができる。すなわち、従来
のガスメータ(図5参照)では、膜式流量計の構造的な
制約により約30秒ごとにガスGの流量測定が行われる
ため、ガス器具Vの稼働にともないガス流量が増加して
から時間T4においてガス器具Vの個別流量が演算され
るまでに約60秒程度かかる。これに対して、本実施の
形態(図2参照)では、ガス器具Xの稼働にともないガ
ス流量(平均流量QSR)が増加してからガス器具Xの
個別流量QBXが演算されるまで(点M3まで)に要す
る時間は、30秒以下である。
Further, in the present embodiment, the time required for calculating the individual flow rate of the operated gas appliance can be reduced for the following reasons. That is, in the conventional gas meter (see FIG. 5), since the flow rate of the gas G is measured about every 30 seconds due to the structural limitation of the membrane flow meter, the gas flow rate increases with the operation of the gas appliance V. It takes about 60 seconds from time to time T4 to calculate the individual flow rate of the gas appliance V. On the other hand, in the present embodiment (see FIG. 2), the gas flow rate (average flow rate QSR) increases with the operation of the gas appliance X and then the individual flow rate QBX of the gas appliance X is calculated (point M3). ) Is 30 seconds or less.

【0056】また、本実施の形態では、ガスGの瞬時流
量QS(対象流量)を用いて移動平均演算処理を行うこ
とにより平均流量QSRを演算したのち、この平均流量
QSRを用いて流量差ΔQSを演算するようにしたの
で、ガスGの脈動等に起因する平均流量QSRの変動が
抑制される。このため、流量差ΔQSの変動が抑制さ
れ、ガス器具の稼働状態を正確に判断することができ
る。なお、上記の効果は、流量差ΔQSを用いて平均化
演算処理および切り捨て演算処理を行うことによっても
同様に得られる。
In this embodiment, the average flow rate QSR is calculated by performing a moving average calculation process using the instantaneous flow rate QS (target flow rate) of the gas G, and then the flow rate difference ΔQS is calculated using the average flow rate QSR. Is calculated, the fluctuation of the average flow rate QSR due to the pulsation of the gas G or the like is suppressed. Therefore, the fluctuation of the flow rate difference ΔQS is suppressed, and the operating state of the gas appliance can be accurately determined. The above effects can be obtained similarly by performing the averaging calculation processing and the truncation calculation processing using the flow rate difference ΔQS.

【0057】また、本実施の形態では、「第2の判断移
行状態」の検出タイミングごとに検出間隔THが検出許
容時間TY以下であるかどうかの判定を行い、検出間隔
THが検出許容時間TY以下であった場合に「第2の判
断移行状態」に関する認識をを消去するようにしたの
で、ガスGの脈動等に起因して流量差ΔQSが変動した
としても、このときの流量差ΔQSの変動を警告動作の
実行判定対象から除外することができる。
Further, in the present embodiment, it is determined whether or not the detection interval TH is equal to or less than the allowable detection time TY at each detection timing of the “second judgment shift state”, and the detection interval TH is set to the allowable detection time TY. In the following case, the recognition regarding the “second judgment transition state” is deleted, so that even if the flow difference ΔQS fluctuates due to the pulsation of the gas G or the like, the flow difference ΔQS Fluctuations can be excluded from the target of execution determination of the warning operation.

【0058】なお、本実施の形態では、ガスGの瞬時流
量QSを測定したのち、移動平均演算処理を行うように
したが、必ずしもこれに限られるものではなく、例え
ば、移動平均演算処理を行わずに、瞬時流量QSをその
まま用いて流量差ΔQSの演算を行うようにしてもよ
い。ただし、ガスGの脈動等に起因する流量差ΔQSの
変動を抑制したいならば、移動平均演算処理を行うよう
にするのが好ましい。
In this embodiment, the moving average calculation processing is performed after measuring the instantaneous flow rate QS of the gas G. However, the present invention is not limited to this. For example, the moving average calculation processing is performed. Instead, the flow rate difference ΔQS may be calculated using the instantaneous flow rate QS as it is. However, if it is desired to suppress the fluctuation of the flow rate difference ΔQS caused by the pulsation of the gas G, it is preferable to perform the moving average calculation processing.

【0059】また、本実施の形態では、流量差ΔQSを
演算したのち、この流量差ΔQSを用いて平均化演算処
理および切り捨て演算処理の双方を行うようにしたが、
必ずしもこれに限られるものではない。例えば、平均化
演算処理または切り捨て演算処理のいずれか一方のみを
行うようにしてよいし、またはいずれの演算処理も行わ
ないようにしてもよい。ただし、ガスGの脈動等に起因
する流量差ΔQSの変動を抑制したいならば、平均化演
算処理および切り捨て演算処理の双方を行うようにする
のが好ましい。なお、演算処理の実行順は自由であり、
切り捨て演算処理を行ったのちに平均化演算処理を行う
ようにしてもよい。さらに、流量差ΔQSを演算したの
ち、この流量差ΔQSを用いて移動平均演算処理を行う
ようにしてもよい。
In this embodiment, after calculating the flow rate difference ΔQS, both the averaging calculation processing and the truncation calculation processing are performed using the flow rate difference ΔQS.
It is not necessarily limited to this. For example, only one of the averaging operation processing and the truncation operation processing may be performed, or none of the operation processing may be performed. However, if it is desired to suppress the fluctuation of the flow rate difference ΔQS caused by the pulsation of the gas G, it is preferable to perform both the averaging calculation processing and the truncation calculation processing. The execution order of the arithmetic processing is arbitrary,
The averaging operation may be performed after the truncation operation. Further, after calculating the flow rate difference ΔQS, the moving average calculation processing may be performed using the flow rate difference ΔQS.

【0060】また、本実施の形態では、「第1の判断移
行状態」を検出したのち「第2の判断移行状態」を検出
したときに、1のガス器具の稼働状態に変化が生じたも
のと判断するようにしたが、必ずしもこれに限られるも
のではない。例えば、「第2の判断移行状態」を検出し
たのち、ガスGの消費状態に変化が生じなかったものと
する判断(流量変化無)を所定の回数(例えば2回)に
渡って連続して検出したときに、1のガス器具の稼働状
態に変化が生じたものと判断するようにしてもよい。こ
れにより、ガスGの脈動等に起因して流量差ΔQSが変
動したとしても、このときの流量差ΔQSの変動を警告
動作の実行判定対象から除外することができると共に、
ガス器具の稼働状態をより正確に判断することができ
る。なお、上記のような場合には、ガスGの消費状態に
変化が生じなかったものとする判断タイミング(「流量
変化無」とする判断タイミング)ごとに測定されたガス
流量(平均流量QSR)の平均値を用いて個別流量QB
Yを演算するようにしてもよい。あるいは、ガス流量
(平均流量QSR)を用いて複数の個別流量QBYを演
算したのち、これらの複数の個別流量QBYの平均値を
演算するようにしてもよい。
Further, in the present embodiment, when the "second judgment transition state" is detected after the "first judgment transition state" is detected, the operating state of one gas appliance changes. However, the present invention is not necessarily limited to this. For example, after detecting the “second determination transition state”, the determination that there is no change in the consumption state of the gas G (no change in flow rate) is continuously performed a predetermined number of times (for example, two times). When it is detected, it may be determined that a change has occurred in the operating state of one gas appliance. Thereby, even if the flow rate difference ΔQS fluctuates due to the pulsation of the gas G or the like, the fluctuation of the flow rate difference ΔQS at this time can be excluded from the execution determination target of the warning operation, and
The operating state of the gas appliance can be determined more accurately. In the above case, the gas flow rate (average flow rate QSR) measured at each determination timing (determination timing of “no change in flow rate”) assuming that the gas G consumption state has not changed has been determined. Individual flow QB using average value
Y may be calculated. Alternatively, after calculating a plurality of individual flow rates QBY using the gas flow rate (average flow rate QSR), an average value of the plurality of individual flow rates QBY may be calculated.

【0061】また、本実施の形態では、切り捨て演算処
理の替わりに切り上げ演算処理または四捨五入演算処理
などを行うようにしてもよい。いずれの演算処理を行う
場合においても、例えば、流量差ΔQSの「1の桁」を
切り上げまたは四捨五入するようにする。具体的に、切
り上げ演算処理としては、例えば、平均化演算処理前の
流量差ΔQSが「92L/h」である場合には、これを
「100L/h」とする。
In this embodiment, a round-up operation or a round-off operation may be performed instead of the round-down operation. In either case, for example, the “one digit” of the flow rate difference ΔQS is rounded up or rounded off. Specifically, in the round-up calculation processing, for example, when the flow rate difference ΔQS before the averaging calculation processing is “92 L / h”, this is set to “100 L / h”.

【0062】以上、実施の形態を挙げて本発明を説明し
てきたが、本発明は上記実施の形態において説明したも
のに限定されるものではなく、種々の変形が可能であ
る。例えば、上記実施の形態では、ガスGの脈動等に起
因する流量差ΔQSの変動を抑制することを目的とし
て、警告動作の実行に係る一連の判定過程において、移
動平均演算処理、平均化演算処理および切り捨て演算処
理等を行うようにしているが、演算処理の種類は必ずし
もこれらのものに限られるものではなく、上記以外の各
種の演算処理を行うようにしてもよい。
Although the present invention has been described with reference to the embodiment, the present invention is not limited to the above-described embodiment, and various modifications are possible. For example, in the above-described embodiment, in order to suppress the fluctuation of the flow rate difference ΔQS caused by the pulsation of the gas G or the like, the moving average calculation processing and the averaging calculation processing are performed in a series of determination processes related to the execution of the warning operation. And the truncation operation processing is performed, but the type of operation processing is not necessarily limited to these, and various operation processing other than the above may be performed.

【0063】[0063]

【発明の効果】以上説明したように、請求項1ないし請
求項7のいずれか1項に記載のガスメータまたは請求項
8ないし請求項14のいずれか1項に記載のガス供給に
係る異常判定方法によれば、流量差の絶対値と基準流量
との比較判定により得られる燃料ガスの消費状態の変化
に関する判断に基づき、燃料ガスの消費状態に変化が生
じなかったものとする判断から変化が生じたものとする
判断へ移行する第1の判断移行状態を検出したのち、燃
料ガスの消費状態に変化が生じたものとする判断から変
化が生じなかったものとする判断へ移行する第2の判断
移行状態を検出したときに1のガス燃焼機器の稼働状態
が変化したものと判断するようにしている。このような
場合には、複数のガス燃焼機器が稼働する場合において
各ガス燃焼機器の稼働が随時的確に認識されるため、各
ガス燃焼機器の個別流量が正確に演算され、警告動作が
適正に実行される。したがって、警告動作の実行に係る
判定の信頼性を向上させることができる。
As described above, the gas meter according to any one of claims 1 to 7 or the abnormality determination method according to any one of claims 8 to 14 according to the gas supply. According to the above, based on the determination regarding the change in the fuel gas consumption state obtained by comparing and determining the absolute value of the flow rate difference and the reference flow rate, a change occurs from the determination that no change has occurred in the fuel gas consumption state. After detecting a transition state, a second decision is made to shift from a determination that a change has occurred in the fuel gas consumption state to a determination that no change has occurred. When the transition state is detected, it is determined that the operating state of the one gas combustion device has changed. In such a case, when a plurality of gas-fired devices operate, the operation of each gas-fired device is accurately recognized at any time, so the individual flow rate of each gas-fired device is accurately calculated, and the warning operation is properly performed. Be executed. Therefore, it is possible to improve the reliability of the determination regarding the execution of the warning operation.

【0064】特に、請求項4記載のガスメータまたは請
求項11記載のガス供給に係る異常判定方法によれば、
対象流量を用いて所定の演算処理を行ったのち、演算後
の対象流量と比較流量との流量差を演算するようにした
ので、燃料ガスの脈動等に起因する流量差のばらつきが
抑制され、ガス燃焼機器の稼働状態の判断を正確に行う
ことができる。
In particular, according to the gas meter described in claim 4 or the abnormality determination method according to the gas supply described in claim 11,
After performing a predetermined calculation process using the target flow rate, the flow rate difference between the target flow rate after the calculation and the comparison flow rate is calculated, so that variation in the flow rate difference due to pulsation of the fuel gas or the like is suppressed, It is possible to accurately determine the operation state of the gas combustion device.

【0065】また、請求項5記載のガスメータまたは請
求項12記載のガス供給に係る異常判定方法によれば、
演算した流量差を用いて所定の演算処理を行うようにし
たので、燃料ガスの脈動等に起因する流量差のばらつき
が抑制され、ガス燃焼機器の稼働状態を正確に判断する
ことができる。
Further, according to the gas meter described in claim 5 or the abnormality determination method relating to gas supply described in claim 12,
Since the predetermined calculation process is performed using the calculated flow difference, variation in the flow difference due to pulsation of the fuel gas or the like is suppressed, and the operating state of the gas combustion device can be accurately determined.

【0066】また、請求項6記載のガスメータまたは請
求項13記載のガス供給に係る異常判定方法によれば、
第2の判断移行状態を検出したのち、燃料ガスの消費状
態に変化が生じなかったものとする判断を所定の回数に
渡って連続して検出したときに1のガス燃焼機器の稼働
状態が変化したものと判断するようにしたので、燃料ガ
スの脈動等に起因して流量差が変動したとしても、この
ときの流量差の変動を警告動作の実行判定対象から除外
することができると共に、ガス燃焼機器の稼働状態をよ
り正確に判断することができる。
According to the gas meter described in claim 6 or the abnormality determination method according to the gas supply described in claim 13,
After detecting the second determination transition state, when the determination that no change has occurred in the fuel gas consumption state is continuously detected for a predetermined number of times, the operating state of one gas combustion device changes. Therefore, even if the flow rate difference fluctuates due to the pulsation of the fuel gas or the like, the change in the flow rate difference at this time can be excluded from the execution determination target of the warning operation. The operating state of the combustion equipment can be more accurately determined.

【0067】また、請求項7記載のガスメータまたは請
求項14記載のガス供給に係る異常判定方法によれば、
最も新しく検出した第2の判断移行状態の検出タイミン
グが、これよりも以前に検出した他の第2の判断移行状
態の検出タイミングから所定の時間以内であった場合に
は、最も新しく検出した第2の判断移行状態に関する認
識を消去するようにしたので、燃料ガスの脈動等に起因
して発生する流量差の変動を警告動作の実行判定対象か
ら除外することができる。
Further, according to the gas meter described in claim 7 or the abnormality determination method according to gas supply described in claim 14,
If the detection timing of the most recently detected second determination transition state is within a predetermined time from the detection timing of another previously detected second determination transition state, the most recently detected second determination transition state is detected. Since the recognition relating to the determination transition state of No. 2 is deleted, the fluctuation of the flow rate difference caused by the pulsation of the fuel gas or the like can be excluded from the execution determination target of the warning operation.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施の形態に係るガスメータの概略
構成を表すブロック図である。
FIG. 1 is a block diagram illustrating a schematic configuration of a gas meter according to an embodiment of the present invention.

【図2】平均流量と流量差との相関を説明するための図
である。
FIG. 2 is a diagram for explaining a correlation between an average flow rate and a flow rate difference.

【図3】ガスメータの動作を説明するための流れ図であ
る。
FIG. 3 is a flowchart for explaining the operation of the gas meter.

【図4】図3に続く動作を説明するための流れ図であ
る。
FIG. 4 is a flowchart illustrating the operation subsequent to FIG. 3;

【図5】従来のガスメータにおける警告動作の実行に係
る判定手順を説明するための図である。
FIG. 5 is a diagram for explaining a determination procedure related to execution of a warning operation in a conventional gas meter.

【図6】従来のガスメータの警告動作の実行に係る判定
手順における問題点を説明するための図である。
FIG. 6 is a diagram for explaining a problem in a determination procedure related to execution of a warning operation of a conventional gas meter.

【符号の説明】[Explanation of symbols]

10…ガスメータ、11…計量部、12…CPU、13
…RAM、14…クロック、15…リチウムバッテリ、
16…遮断弁、17…表示部、検出間隔…TH、TY…
検出許容時間、QBX,QBY…個別流量、QK…積算
流量、QS…瞬時流量、QSK…基準流量、QSR…平
均流量、QZ…安全流量、ΔQS…流量差。
10 gas meter, 11 measuring unit, 12 CPU, 13
... RAM, 14 ... clock, 15 ... lithium battery,
16 ... shut-off valve, 17 ... display, detection interval ... TH, TY ...
Allowable detection time, QBX, QBY: individual flow rate, QK: integrated flow rate, QS: instantaneous flow rate, QSK: reference flow rate, QSR: average flow rate, QZ: safe flow rate, ΔQS: flow rate difference.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 小牧 充典 東京都港区海岸1丁目5番20号 東京瓦斯 株式会社内 (72)発明者 田代 健 東京都港区海岸1丁目5番20号 東京瓦斯 株式会社内 (72)発明者 今 一生 神奈川県川崎市幸区柳町70番地 株式会社 東芝柳町事業所内 (72)発明者 宇山 浩人 神奈川県川崎市幸区柳町70番地 株式会社 東芝柳町事業所内 (72)発明者 石野 仁朗 神奈川県川崎市幸区柳町70番地 株式会社 東芝柳町事業所内 Fターム(参考) 2F030 CB01 CC13 CE02 CE04 CE21 CF05 CF11  ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Mitsunori Komaki Tokyo Gas Co., Ltd. 1-5-20 Kaigan, Minato-ku, Tokyo (72) Inventor Takeshi Ken Tashiro 1-5-20 Kaigan, Minato-ku, Tokyo Tokyo Gas (72) Inventor: Issei Imao 70, Yanagicho, Yuki-ku, Kawasaki, Kanagawa Prefecture, Japan Inside the Toshiba Yanagicho Office (72) Inventor: Hiroto Uyama, 70, Yanagicho, Yukicho, Kawasaki, Kanagawa Prefecture, Japan ) Inventor Jiro Ishino 70 Yanagicho, Yuki-ku, Kawasaki-shi, Kanagawa Prefecture F-term in Toshiba Yanagicho Plant (reference) 2F030 CB01 CC13 CE02 CE04 CE21 CF05 CF11

Claims (14)

【特許請求の範囲】[Claims] 【請求項1】 1または2以上のガス燃焼機器によって
消費される燃料ガスの流量を所定の時間間隔ごとに測定
する流量測定手段と、 この流量測定手段によって測定された燃料ガスの流量の
うちの最も新しく測定された対象流量とこれよりも以前
に測定された比較流量との流量差を演算する流量差演算
手段と、 この流量差演算手段によって演算された流量差の絶対値
を基準流量と比較することにより、燃料ガスの消費状態
に変化が生じたかどうかを判定する流量差判定手段と、 この流量差判定手段による判定結果を監視し、燃料ガス
の消費状態に変化が生じなかったものとする判断から変
化が生じたものとする判断へ移行する第1の判断移行状
態を検出したのち、燃料ガスの消費状態に変化が生じた
ものとする判断から変化が生じなかったものとする判断
へ移行する第2の判断移行状態を検出したときに、前記
1または2以上のガス燃焼機器のうちの1のガス燃焼機
器の稼働状態が変化したものと判断する第1の稼動判断
手段と、 この第1の稼働判定手段によって1のガス燃焼機器の稼
働状態が変化したものと判断されたときに、この判断に
至る流量差の変化過程において、流量差が正の領域内に
おいて変化している場合には1のガス燃焼機器が稼働し
たものと判断し、一方、流量差が負の領域内において変
化している場合には1のガス燃焼機器が停止したものと
判断する第2の稼働判断手段と、 この第2の稼働判断手段段によって1のガス燃焼機器の
稼働が判断されたときに、最も新しく検出された第2の
判断移行状態に対応する燃料ガスの流量とこれよりも以
前に検出された他の第2の判断移行状態に対応する燃料
ガスの流量との差として稼働している1のガス燃焼機器
の個別流量を演算する個別流量演算手段と、 この個別流量演算手段によって演算された個別流量が安
全流量以上であるかどうかを判定する安全判定手段と、 この安全判定手段によって個別流量が安全流量以上であ
ると判定されたときに、前記1または2以上のガス燃焼
機器に対する燃料ガスの供給を遮断する遮断手段とを備
えたことを特徴とするガスメータ。
1. A flow rate measuring means for measuring a flow rate of a fuel gas consumed by one or more gas combustion devices at predetermined time intervals, and a flow rate of the fuel gas measured by the flow rate measuring means. A flow difference calculating means for calculating a flow difference between the most recently measured target flow rate and a comparative flow rate measured earlier than this, and an absolute value of the flow difference calculated by the flow difference calculating means is compared with a reference flow rate. The flow rate difference determining means for determining whether a change has occurred in the fuel gas consumption state, and monitoring the determination results by the flow rate difference determining means to determine that the fuel gas consumption state has not changed. After detecting the first determination transition state in which the determination is shifted to the determination that a change has occurred, no change has occurred from the determination that the change in the fuel gas consumption state has occurred. A first operation that determines that the operating state of one of the one or more gas-fired devices has changed when detecting a second determination-transition state that shifts to the determination of Determining means, when the first operation determining means determines that the operating state of the one gas-fired device has changed, in the process of changing the flow rate difference leading to this determination, the flow rate difference is within a positive region. If it has changed, it is determined that one gas-fired device has operated, while if the flow rate difference has changed in the negative region, it is determined that one gas-fired device has stopped. And a flow rate of the fuel gas corresponding to the most recently detected second determination transition state when the operation of the first gas combustion device is determined by the second operation determination means. Detected earlier than Individual flow rate calculating means for calculating the individual flow rate of one gas combustion device operating as a difference from the flow rate of the fuel gas corresponding to the second judgment transition state, and the individual flow rate calculated by the individual flow rate calculating means Determining whether or not the fuel flow rate is equal to or greater than a safe flow rate; and supplying the fuel gas to the one or more gas combustion devices when the safety determining means determines that the individual flow rate is equal to or greater than the safe flow rate. And a shutoff means for shutting off the gas.
【請求項2】 前記流量差判定手段は、前記流量差演算
手段によって演算された流量差の絶対値が基準流量以上
であったときに燃料ガスの消費状態に変化が生じたもの
と判定し、一方、流量差の絶対値が基準流量より小さい
ときに燃料ガスの消費状態に変化が生じなかったものと
判定することを特徴とする請求項1記載のガスメータ。
2. The flow rate difference determining means determines that a change has occurred in the fuel gas consumption state when the absolute value of the flow rate difference calculated by the flow rate difference calculation means is equal to or greater than a reference flow rate. 2. The gas meter according to claim 1, wherein when the absolute value of the flow rate difference is smaller than the reference flow rate, it is determined that the fuel gas consumption state has not changed.
【請求項3】 前記基準流量は前記比較流量の所定倍に
相当するものであることを特徴とする請求項1または請
求項2に記載のガスメータ。
3. The gas meter according to claim 1, wherein the reference flow rate corresponds to a predetermined multiple of the comparison flow rate.
【請求項4】 前記流量差演算手段は、前記対象流量を
用いて所定の演算処理を行ったのち、演算処理後の前記
対象流量と前記比較流量との流量差を演算するものであ
ることを特徴とする請求項1ないし請求項3のいずれか
1項に記載のガスメータ。
4. The method according to claim 1, wherein the flow rate difference calculating means calculates a flow rate difference between the target flow rate after the calculation processing and the comparison flow rate after performing a predetermined calculation process using the target flow rate. The gas meter according to any one of claims 1 to 3, characterized in that:
【請求項5】 前記流量差演算手段は、演算した流量差
を用いて所定の演算処理を行うものであることを特徴と
する請求項1ないし請求項4のいずれか1項に記載のガ
スメータ。
5. The gas meter according to claim 1, wherein the flow difference calculating means performs a predetermined calculation process using the calculated flow difference.
【請求項6】 前記第1の稼動判断手段は、第2の判断
移行状態を検出したのち、燃料ガスの消費状態に変化が
生じなかったものとする判断を所定の回数に渡って連続
して検出したときに1のガス燃焼機器の稼働状態が変化
したものと判断するものであり、 前記個別流量演算手段は、前記流量差判定手段による燃
料ガスの消費状態に変化が生じなかったものとする判断
タイミングごとに測定された燃料ガスの流量の平均値を
用いて個別流量を演算するものであることを特徴とする
請求項1ないし請求項4のいずれか1項に記載のガスメ
ータ。
6. The first operation judging means, after detecting the second judgment transition state, continuously judges, for a predetermined number of times, that the fuel gas consumption state has not changed. When it is detected, it is determined that the operating state of one gas combustion device has changed, and the individual flow rate calculating means assumes that the fuel gas consumption state by the flow rate difference determining means has not changed. The gas meter according to any one of claims 1 to 4, wherein the individual flow rate is calculated using an average value of the flow rate of the fuel gas measured at each determination timing.
【請求項7】 前記第1の稼動判断手段は、最も新しく
検出された第2の判断移行状態の検出タイミングが、こ
れよりも以前に検出された他の第2の判断移行状態の検
出タイミングから所定の時間以内であった場合には、最
も新しく検出された第2の判断移行状態に関する認識を
消去するものであることを特徴とする請求項1ないし請
求項6のいずれか1項に記載のガスメータ。
7. The first operation judging means sets the detection timing of the most recently detected second judgment transition state from the detection timing of another second judgment transition state detected earlier than this. The method according to any one of claims 1 to 6, wherein when the predetermined time has elapsed, the recognition of the most recently detected second determination transition state is deleted. Gas meter.
【請求項8】 1または2以上のガス燃焼機器によって
消費される燃料ガスの流量を所定の時間間隔ごとに測定
する第1のステップと、 燃料ガスの流量のうちの最も新しく測定した対象流量と
これよりも以前に測定した比較流量との流量差を演算す
る第2のステップと、 流量差の絶対値を基準流量と比較することにより燃料ガ
スの消費状態に変化が生じたかどうかを判定する第3の
ステップと、 燃料ガスの消費状態に変化が生じなかったものとする判
断から変化が生じたものとする判断へ移行する第1の判
断移行状態を検出したのち、燃料ガスの消費状態に変化
が生じたものとする判断から変化が生じなかったものと
する判断へ移行する第2の判断移行状態を検出したとき
に、前記1または2以上のガス燃焼機器のうちの1のガ
ス燃焼機器の稼働状態が変化したものと判断する第4の
ステップと、 1のガス燃焼機器の稼働状態が変化したものと判断した
ときに、この判断に至る流量差の変化過程において、流
量差が正の領域内において変化している場合には1のガ
ス燃焼機器が稼働したものと判断し、一方、流量差が負
の領域内において変化している場合には1のガス燃焼機
器が停止したものと判断する第5のステップと、 1のガス燃焼機器の稼働を判断したときに、最も新しく
検出した第2の判断移行状態に対応する燃料ガスの流量
とこれよりも以前に検出した他の第2の判断移行状態に
対応する燃料ガスの流量との差として稼働している1の
ガス燃焼機器の個別流量を演算する第6のステップと、 この個別流量が安全流量以上であるかどうかを判定する
第7のステップと、 前記個別流量が安全流量以上であると判定したときに、
前記1または2以上のガス燃焼機器に対する燃料ガスの
供給を遮断する第8のステップとを含むことを特徴とす
るガス供給に係る異常判定方法。
8. A first step of measuring the flow rate of fuel gas consumed by one or more gas-fired devices at predetermined time intervals; and determining the most recently measured target flow rate of the flow rate of fuel gas. A second step of calculating a flow rate difference from a comparative flow rate measured earlier than this, and a step of comparing the absolute value of the flow rate difference with a reference flow rate to determine whether a change has occurred in the fuel gas consumption state. Step 3, and a first judgment transition state where a transition is made from a judgment that the fuel gas consumption state has not changed to a judgment that a change has occurred to the fuel gas consumption state is detected, and then the fuel gas consumption state changes. When detecting a second judgment transition state in which the judgment is made that the change has occurred and the judgment that no change has occurred, when one of the one or more gas combustion appliances is detected, A fourth step of determining that the operating state has changed; and, when determining that the operating state of the gas-fired device has changed, in the process of changing the flow rate difference leading to this determination, the area where the flow rate difference is positive It is determined that one gas-fired device has been operated when it has changed within the range, while it has been determined that one gas-fired device has stopped when the flow rate difference has changed within the negative region. A fifth step of determining when the operation of the gas-fired device is determined, and determining the flow rate of the fuel gas corresponding to the most recently detected second determination transition state and the other second detection level detected earlier. A sixth step of calculating an individual flow rate of one gas-fired device operating as a difference from the flow rate of the fuel gas corresponding to the determination transition state; and a step of determining whether the individual flow rate is equal to or greater than the safe flow rate. 7 steps and before When it is determined that the individual flow rate is equal to or higher than the safe flow rate,
An eighth step of shutting off the supply of the fuel gas to the one or more gas-fired appliances.
【請求項9】 前記第3のステップにおいて、 流量差の絶対値が基準流量以上であったときに燃料ガス
の消費状態に変化が生じたものと判定し、一方、流量差
の絶対値が基準流量より小さいときに燃料ガスの消費状
態に変化が生じなかったものと判定することを特徴とす
る請求項8記載のガス供給に係る異常判定方法。
9. In the third step, when the absolute value of the flow rate difference is equal to or greater than the reference flow rate, it is determined that a change has occurred in the fuel gas consumption state. 9. The method according to claim 8, wherein when the flow rate is smaller than the flow rate, it is determined that the fuel gas consumption state has not changed.
【請求項10】 前記比較流量の所定倍に相当するよう
に前記基準流量を設定することを特徴とする請求項8ま
たは請求項9に記載のガス供給に係る異常判定方法。
10. The abnormality determination method according to claim 8, wherein the reference flow rate is set so as to correspond to a predetermined multiple of the comparison flow rate.
【請求項11】 前記第2のステップにおいて、 前記対象流量を用いて所定の演算処理を行ったのち、演
算処理後の前記対象流量と前記比較流量との流量差を演
算することを特徴とする請求項8ないし請求項10のい
ずれか1項に記載のガス供給に係る異常判定方法。
11. In the second step, after performing a predetermined calculation process using the target flow rate, a flow difference between the target flow rate after the calculation process and the comparison flow rate is calculated. An abnormality determination method according to any one of claims 8 to 10.
【請求項12】 さらに、 前記第2のステップと前記第3のステップとの間に、演
算した流量差を用いて所定の演算処理を行う第10のス
テップを含むことを特徴とする請求項8ないし請求項1
1のいずれか1項に記載のガス供給に係る異常判定方
法。
12. The method according to claim 8, further comprising, between the second step and the third step, a tenth step of performing a predetermined calculation process using the calculated flow rate difference. Or claim 1
2. The abnormality determination method according to claim 1, wherein the abnormality is determined.
【請求項13】 前記第4のステップにおいて、第2の
判断移行状態を検出したのち、燃料ガスの消費状態に変
化が生じなかったものとする判断を所定の回数に渡って
連続して検出したときに1のガス燃焼機器の稼働状態が
変化したものと判断し、 前記第6のステップにおいて、前記第3のステップにお
ける燃料ガスの消費状態に変化が生じなかったものとす
る判断タイミングごとに測定された燃料ガスの流量を用
いて複数の個別流量を演算したのち、これらの複数の個
別流量の平均値を演算することを特徴とする請求項8な
いし請求項12のいずれか1項に記載のガス供給に係る
異常判定方法。
13. In the fourth step, after detecting the second judgment transition state, the judgment that the fuel gas consumption state has not changed is detected continuously for a predetermined number of times. Sometimes, it is determined that the operating state of the gas-fired device has changed, and in the sixth step, the measurement is performed at each determination timing in which it is determined that the fuel gas consumption state in the third step has not changed. The method according to any one of claims 8 to 12, wherein after calculating a plurality of individual flow rates using the obtained flow rate of the fuel gas, an average value of the plurality of individual flow rates is calculated. An abnormality determination method related to gas supply.
【請求項14】 前記第4のステップにおいて、最も新
しく検出した第2の判断移行状態の検出タイミングが、
これよりも以前に検出した他の第2の判断移行状態の検
出タイミングから所定の時間以内であった場合には、最
も新しく検出した第2の判断移行状態に関する認識を消
去することを特徴とする請求項8ないし請求項13のい
ずれか1項に記載のガス供給に係る異常判定方法。
14. In the fourth step, the detection timing of the most recently detected second judgment transition state is:
If the detection timing of another second judgment transition state detected earlier than this is within a predetermined time, the recognition regarding the most recently detected second judgment transition state is deleted. An abnormality determination method according to any one of claims 8 to 13.
JP2000287287A 2000-09-21 2000-09-21 Abnormality judgment method for gas meter and gas supply Expired - Fee Related JP4129114B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000287287A JP4129114B2 (en) 2000-09-21 2000-09-21 Abnormality judgment method for gas meter and gas supply

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000287287A JP4129114B2 (en) 2000-09-21 2000-09-21 Abnormality judgment method for gas meter and gas supply

Publications (3)

Publication Number Publication Date
JP2002098567A true JP2002098567A (en) 2002-04-05
JP2002098567A5 JP2002098567A5 (en) 2005-12-08
JP4129114B2 JP4129114B2 (en) 2008-08-06

Family

ID=18771061

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000287287A Expired - Fee Related JP4129114B2 (en) 2000-09-21 2000-09-21 Abnormality judgment method for gas meter and gas supply

Country Status (1)

Country Link
JP (1) JP4129114B2 (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006133017A (en) * 2004-11-04 2006-05-25 Aichi Tokei Denki Co Ltd Gas counter and gas meter
JP2007024752A (en) * 2005-07-20 2007-02-01 Matsushita Electric Ind Co Ltd Gas meter unit
JP2008107190A (en) * 2006-10-25 2008-05-08 Matsushita Electric Ind Co Ltd Flow measurement instrument
US8515692B2 (en) 2006-10-25 2013-08-20 Panasonic Corporation Flow rate measuring apparatus and program thereof
JP2018025437A (en) * 2016-08-09 2018-02-15 パナソニック株式会社 Flow rate measuring device
JP2018025436A (en) * 2016-08-09 2018-02-15 パナソニック株式会社 Flow rate measuring device
JP2018025438A (en) * 2016-08-09 2018-02-15 パナソニック株式会社 Flow rate measuring device
JP2020079733A (en) * 2018-11-12 2020-05-28 大阪瓦斯株式会社 Gas meter
CN111461456A (en) * 2020-04-16 2020-07-28 中煤科工集团重庆研究院有限公司 Method for early warning outburst danger based on gas monitoring data instantaneous change characteristics

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006133017A (en) * 2004-11-04 2006-05-25 Aichi Tokei Denki Co Ltd Gas counter and gas meter
JP4625307B2 (en) * 2004-11-04 2011-02-02 愛知時計電機株式会社 Gas counter and gas meter
JP2007024752A (en) * 2005-07-20 2007-02-01 Matsushita Electric Ind Co Ltd Gas meter unit
JP4665642B2 (en) * 2005-07-20 2011-04-06 パナソニック株式会社 Gas meter device
JP2008107190A (en) * 2006-10-25 2008-05-08 Matsushita Electric Ind Co Ltd Flow measurement instrument
US8515692B2 (en) 2006-10-25 2013-08-20 Panasonic Corporation Flow rate measuring apparatus and program thereof
JP2018025437A (en) * 2016-08-09 2018-02-15 パナソニック株式会社 Flow rate measuring device
JP2018025436A (en) * 2016-08-09 2018-02-15 パナソニック株式会社 Flow rate measuring device
JP2018025438A (en) * 2016-08-09 2018-02-15 パナソニック株式会社 Flow rate measuring device
JP2020079733A (en) * 2018-11-12 2020-05-28 大阪瓦斯株式会社 Gas meter
JP7249760B2 (en) 2018-11-12 2023-03-31 大阪瓦斯株式会社 gas meter
CN111461456A (en) * 2020-04-16 2020-07-28 中煤科工集团重庆研究院有限公司 Method for early warning outburst danger based on gas monitoring data instantaneous change characteristics
CN111461456B (en) * 2020-04-16 2022-08-12 中煤科工集团重庆研究院有限公司 Method for early warning outburst danger based on gas monitoring data instantaneous change characteristics

Also Published As

Publication number Publication date
JP4129114B2 (en) 2008-08-06

Similar Documents

Publication Publication Date Title
US8515692B2 (en) Flow rate measuring apparatus and program thereof
JP4492648B2 (en) Gas shut-off device
JP3802399B2 (en) GAS LEAK DETECTION DEVICE FOR DETECTING GAS LEAKAGE WITH GAS EQUIPMENT JUDGMENT AND GAS METER HAVING THE SAME
WO2010087185A1 (en) Gas shutoff device
JP2002098567A (en) Abnormality detection method for gas meter and gas supply
EP2177828A1 (en) Gas shutoff device
JP5428518B2 (en) Gas shut-off device
JP4956342B2 (en) Gas shut-off device
JP2008134125A (en) Gas shut-off device
JP2002062176A (en) Gas meter and method for deciding abnormality regarding gas supply
JP4626606B2 (en) Gas shut-off device
JP5125077B2 (en) Gas shut-off device
JP3179950B2 (en) Flow rate change determination device
JP5074791B2 (en) Gas leak detection device
JP4439195B2 (en) Utility consumer equipment operation recognition device
JP5186759B2 (en) Gas shut-off device
JP5046057B2 (en) Gas shut-off device
JP2008134064A (en) Gas shut-off device
JP5341403B2 (en) Gas shut-off device, flow rate change determination method therefor, and controller for gas shut-off device
JP5617185B2 (en) Gas shut-off device
JP5299039B2 (en) Gas shut-off device
JP5402022B2 (en) Gas shut-off device
JP4893523B2 (en) Gas shut-off device and gas supply system
JP2512116B2 (en) Gas shutoff device
JP2008210339A (en) Gas security device

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051025

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051025

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080402

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080502

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080516

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110523

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4129114

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110523

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110523

Year of fee payment: 3

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110523

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110523

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120523

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130523

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140523

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees