JP2002054161A - Method for construction and execution of concrete retaining wall by means of precast concrete member - Google Patents

Method for construction and execution of concrete retaining wall by means of precast concrete member

Info

Publication number
JP2002054161A
JP2002054161A JP2000238507A JP2000238507A JP2002054161A JP 2002054161 A JP2002054161 A JP 2002054161A JP 2000238507 A JP2000238507 A JP 2000238507A JP 2000238507 A JP2000238507 A JP 2000238507A JP 2002054161 A JP2002054161 A JP 2002054161A
Authority
JP
Japan
Prior art keywords
precast concrete
main body
retaining wall
added
factory
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000238507A
Other languages
Japanese (ja)
Inventor
Yasunori Higa
康紀 比嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MAKIMINATO HYUUMUKAN KOGYOSHO
MAKIMINATO HYUUMUKAN KOGYOSHO KK
Original Assignee
MAKIMINATO HYUUMUKAN KOGYOSHO
MAKIMINATO HYUUMUKAN KOGYOSHO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MAKIMINATO HYUUMUKAN KOGYOSHO, MAKIMINATO HYUUMUKAN KOGYOSHO KK filed Critical MAKIMINATO HYUUMUKAN KOGYOSHO
Priority to JP2000238507A priority Critical patent/JP2002054161A/en
Publication of JP2002054161A publication Critical patent/JP2002054161A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To enable the realization of a reduction in cost by allowing the standardized product of a precast concrete retaining wall to be mass-produced in a factory in advance and permit the term of work to be shortened by bringing efficiency to site construction in relation to a method for construction and execution of an earth retaining wall for a sloping ground. SOLUTION: The main body 3 of the precast concrete retaining wall having a base 1 and a vertical wall 2 is produced in the factory in advance. Not only a base extending panel 5 added to the end of the base 1 of the main body 3 but also a vertical-wall extending panel 7 added to the upper end of the vertical wall 2 is produced for preparation as a precast concrete member in the factory. Either of the extending panels 5 and 7 is selected according to the circumstance of each job site and added for use to each of the ends of the main body 3 by a coupling means.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、道路や宅地、公園など
を施工する際の傾斜地の土留擁壁の構築方法並びに施工
方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction method and a construction method of a retaining wall on a slope when constructing a road, a residential area, a park, or the like.

【0002】[0002]

【従来の技術】特開平2−80718号公報などに記載
されているような底版とたて壁とがL形に一体となった
コンクリート擁壁が多用されている。
2. Description of the Related Art A concrete retaining wall in which a bottom plate and a vertical wall are integrated into an L-shape as described in Japanese Patent Application Laid-Open No. 2-80718 is frequently used.

【0003】そして、コンクリート擁壁の構築方法とし
て、現場作業の省力化や工期の短縮、品質管理などの問
題から、L形の一体型のプレキャストコンクリート擁壁
が積極的に使用されるようになってきた。
[0003] As a method of constructing a concrete retaining wall, an L-type integrated precast concrete retaining wall has been actively used due to problems such as labor saving of on-site work, shortening of a construction period, and quality control. Have been.

【0004】[0004]

【発明が解決しようとする課題】ところで、従来工場で
成型される一体型のプレキャストコンクリート擁壁は、
現場測量に基づいて作図された施工図に合わせて製造す
る。つまり、各現場ごとに、各現場の状況に合った設計
に基づいて一体成型する受注生産である。
By the way, an integrated precast concrete retaining wall conventionally molded in a factory is:
It is manufactured according to the construction drawing drawn based on the on-site survey. In other words, it is a build-to-order production in which each site is integrally molded based on a design suitable for the situation of each site.

【0005】そのため、予め規格品として大量生産でき
ないのが現状であり、納期が間に合わないため、現場で
はプレキャストコンクリート擁壁の待ちが生じたりす
る。製品の待ち時間を短縮するために、プレキャストコ
ンクリート擁壁工場では、作業員を増やしたり、残業等
で対処しているのが現状である。その結果、製品コスト
が高くなる。
[0005] For this reason, it is currently impossible to mass-produce the product as a standard product in advance, and the delivery date is not in time. At present, precast concrete retaining wall factories are increasing the number of workers or working overtime to reduce the waiting time for products. As a result, product costs increase.

【0006】本発明の技術的課題は、このような問題に
着目し、プレキャストコンクリート擁壁の規格品を予め
工場において量産可能とすることによってコスト低減を
実現でき、しかも現場工事を効率化することで工期を短
縮可能とすることにある。
[0006] The technical problem of the present invention is to focus on such a problem and to realize a cost reduction by making it possible to mass-produce a standard precast concrete retaining wall in a factory in advance, and to improve the efficiency of site construction. To shorten the construction period.

【0007】[0007]

【課題を解決するための手段】本発明の技術的課題は次
のような手段によって解決される。請求項1は、底版と
たて壁を有するプレキャストコンクリート擁壁の本体を
予め工場生産しておくと共に、本体の底版先端に継ぎ足
す底版延長パネルも、たて壁上端に継ぎ足すたて壁延長
パネルも、プレキャストコンクリート部材として工場生
産して準備しておき、各現場の状況に応じて、前記本体
の各先端に前記の各延長パネルを連結手段で継ぎ足して
使用することを特徴とするプレキャストコンクリート擁
壁の構築方法である。
The technical problem of the present invention is solved by the following means. A precast concrete retaining wall body having a bottom slab and a vertical wall is preliminarily manufactured at a factory, and a bottom slab extension panel to be added to the tip of the bottom slab of the main body is also extended to the upper end of the vertical wall. Panels are also factory-produced and prepared as precast concrete members, and according to the situation at each site, each of the extension panels is added to each end of the main body by connecting means and used, and the precast concrete is used. How to build a retaining wall.

【0008】このように、底版とたて壁を有するプレキ
ャストコンクリート擁壁の本体と各種寸法の延長パネル
を予め工場生産しておき、各現場の状況に応じて、前記
各延長パネルを選択して、前記本体の各先端に継ぎ足し
て使用するため、工場で予め量産しておくことが可能と
なり、製品のコストを低減できる。しかも、連結作業だ
けであるから、コンクリートの養生期間なども不要とな
り、短時間に対応できる。
As described above, the main body of the precast concrete retaining wall having the bottom slab and the vertical wall and the extension panels of various dimensions are previously produced at the factory, and the extension panels are selected according to the situation at each site. Since it is used by being added to each end of the main body, it is possible to mass-produce it in a factory in advance, and the cost of the product can be reduced. In addition, since it is only the connection work, the curing time of the concrete is not required, and it is possible to respond in a short time.

【0009】請求項2は、請求項1に記載の底版とたて
壁を有するプレキャストコンクリート擁壁本体の各種規
格寸法の最小寸法を予め工場生産しておくと共に、本体
の底版先端に継ぎ足す底版延長パネルも、たて壁上端に
継ぎ足すたて壁延長パネルも、プレキャストコンクリー
ト部材として、各種規格寸法に応じて工場生産して準備
しておき、各現場の状況に応じて、前記各延長パネルを
選択して前記本体の各先端に連結手段で継ぎ足して使用
することを特徴とするプレキャストコンクリート擁壁の
構築方法である。
According to a second aspect of the present invention, a minimum slab of various standard dimensions of the precast concrete retaining wall main body having the bottom slab and the vertical wall according to the first aspect is manufactured in advance in a factory, and the bottom slab is added to the tip of the bottom slab of the main body. Both the extension panel and the vertical wall extension panel added to the upper end of the vertical wall are also prepared and prepared as a precast concrete member according to various standard dimensions at the factory. And connecting and using each of the ends of the main body with a connecting means to provide a precast concrete retaining wall.

【0010】このように、プレキャストコンクリート擁
壁の本体は、規格寸法の最小寸法のみを工場生産してお
き、また各延長パネルは各種規格寸法に応じて工場生産
しておくので、大量生産によるコスト低減がより効果的
に実現できる。
As described above, the main body of the precast concrete retaining wall is factory-manufactured only for the minimum standard size, and each extension panel is factory-manufactured according to various standard sizes. Reduction can be realized more effectively.

【0011】請求項3は、底版とたて壁を有するプレキ
ャストコンクリート擁壁の本体を予め工場生産しておく
と共に、本体の底版先端に継ぎ足す底版延長パネルも、
たて壁上端に継ぎ足すたて壁延長パネルも、プレキャス
トコンクリート部材として、各種寸法に応じて予め工場
生産して準備しておき、前記本体の底版の先端のみ、予
め延長パネルを継ぎ足した状態で現場に搬入して、埋戻
し工事を始め、埋戻し工事の途中で、たて壁の上端に延
長パネルを継ぎ足すことを特徴とするプレキャストコン
クリート擁壁の施工方法である。
A third aspect of the present invention is that a main body of a precast concrete retaining wall having a bottom slab and a vertical wall is factory-produced in advance, and a bottom slab extension panel to be added to a tip of the bottom slab of the main body is also provided.
The vertical wall extension panel added to the top of the vertical wall is also prepared as a precast concrete member by factory production according to various dimensions in advance, and only the tip of the bottom plate of the main body is added with the extension panel in advance. This is a method for constructing a precast concrete retaining wall, which is carried into a site, starts backfilling work, and adds an extension panel to an upper end of a vertical wall during the backfilling work.

【0012】このように、前記本体の底版の先端のみ、
予め延長パネルを継ぎ足した状態で現場に搬入して、埋
戻し工事を始め、埋戻し工事の最中に、たて壁の上端に
延長パネルを継ぎ足して完成するので、たて壁上端に延
長パネルを継ぎ足してない、半完成品をいち早く納品し
て、先に埋戻し工事を始められるので、工期短縮が可能
となる。
Thus, only the tip of the bottom plate of the main body is
The extension panel is added to the site beforehand, and then carried into the site, and backfilling work is started. During the backfilling work, the extension panel is added to the top of the vertical wall to complete it. Since semi-finished products that have not been added can be delivered quickly and backfilling work can be started first, the construction period can be shortened.

【0013】[0013]

【発明の実施の形態】次に本発明によるプレキャストコ
ンクリート部材によるコンクリート擁壁の構築方法並び
に施工方法が実際上どのように具体化されるか実施形態
を説明する。図1は本発明によるL字状のプレキャスト
コンクリート擁壁を用いて施工した後の断面図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, an embodiment will be described as to how a concrete retaining wall construction method and a construction method using a precast concrete member according to the present invention are actually embodied. FIG. 1 is a cross-sectional view after construction using an L-shaped precast concrete retaining wall according to the present invention.

【0014】水平な底版1とたて壁2とでL字状の本体
3が形成されている。内部には、縦横に鉄筋4を埋設し
て、プレキャスト製造されている。このL字状本体3
は、通常の用途における最小寸法が好ましい。しかも、
規格品であれば、大量生産でき、かつ汎用性があるの
で、各種の規格品の最小サイズを製造しておくのが望ま
しい。
An L-shaped main body 3 is formed by the horizontal bottom plate 1 and the vertical wall 2. Inside, the reinforcing bar 4 is buried vertically and horizontally, and is manufactured by precasting. This L-shaped main body 3
Is preferably the smallest dimension in normal use. Moreover,
Since standard products can be mass-produced and have versatility, it is desirable to manufacture the minimum size of various standard products.

【0015】底版1の先端には、予め工場で水平方向の
延長パネル5を連結手段6で継ぎ足してある。また、た
て壁2の上端には、壁高を高くするための上方向の延長
パネル7を連結手段6で継ぎ足してある。この延長パネ
ル5、7は、各種の規格品に対応して各種サイズを製造
しておき、その中から現場に応じて選んで使用する。
A horizontal extension panel 5 is previously added to the front end of the bottom plate 1 by a connecting means 6 at a factory. At the upper end of the vertical wall 2, an upward extension panel 7 for increasing the wall height is added by a connecting means 6. The extension panels 5 and 7 are manufactured in various sizes corresponding to various standard products, and are used by selecting from them according to the site.

【0016】埋戻し後の地表面9の高さが高く、延長パ
ネル7を要する場合のみ、上方向の延長パネル7を継ぎ
足せばよく、また強度保持のために底版1の延長パネル
5を継ぎ足せばよい。
Only when the height of the ground surface 9 after backfilling is high and the extension panel 7 is required, the extension panel 7 in the upward direction may be added, and the extension panel 5 of the bottom slab 1 is joined to maintain strength. Just add it.

【0017】埋戻し後の地表面9の高さが低く、延長パ
ネル7、5を必要としない場合は、L字状本体3のみで
足りることは言うまでもない。
If the height of the ground surface 9 after backfilling is low and the extension panels 7 and 5 are not required, it goes without saying that only the L-shaped main body 3 is sufficient.

【0018】現在の規格では、底版の寸法Lは、1750m
m、1900mm、2050mmの3種類が有るので、L字状本体3
の底版1は最小寸法の1750mmに設計すればよい。このと
き、延長パネル5としては、150mm の寸法に設計して、
最小寸法の1750mmの底版1に継ぎ足せば、1900mmの規格
品にできる。また、300mm の寸法に設計して、最小寸法
の1750mmの底版1に継ぎ足せば、最大寸法の2050mmの規
格品にできる。
According to the current standard, the dimension L of the bottom plate is 1750 m
m, 1900mm, 2050mm
Bottom plate 1 may be designed to have a minimum dimension of 1750 mm. At this time, the extension panel 5 is designed to have a size of 150 mm,
If it is added to the minimum size 1750mm bottom plate 1, it can be made 1900mm standard product. Also, if it is designed to be 300 mm in size and added to the bottom plate 1 of 1750 mm, which is the minimum size, it can be a standard product of 2050 mm, which is the maximum size.

【0019】たて壁の寸法Hは、2500mm、2750mm、3000
mmの3種類が有るので、L字状本体3のたて壁2は最小
寸法の2500mmに設計すればよい。このとき、延長パネル
7としては、250mm の寸法に設計して、最小寸法の2500
mmのたて壁2に継ぎ足せば、2750mmの規格品にできる。
また、500mm の寸法に設計して、最小寸法の2500mmのた
て壁2に継ぎ足せば、最大寸法の3000mmの規格品にでき
る。
The dimension H of the vertical wall is 2500 mm, 2750 mm, 3000
Since there are three types, mm, the vertical wall 2 of the L-shaped main body 3 may be designed to have a minimum dimension of 2500 mm. At this time, the extension panel 7 is designed to have a dimension of 250 mm and has a minimum dimension of 2500.
If it is added to the vertical wall 2 mm, it can be made a standard product of 2750 mm.
In addition, if it is designed to have a dimension of 500 mm and is added to a vertical wall 2 having a minimum dimension of 2500 mm, a standard product having a maximum dimension of 3000 mm can be obtained.

【0020】このように、延長パネル5、7は、各種の
規格に対応して予め各種サイズを用意しておく。3種類
の規格が有る場合は、最小サイズ以外の2種類を用意し
ておけばよい。
As described above, various sizes of the extension panels 5 and 7 are prepared in advance in accordance with various standards. If there are three types of standards, two types other than the minimum size may be prepared.

【0021】なお、施工に際しては、現場は従来通り擁
壁を構築する場所を掘り下げて、基礎栗石Cと基礎コン
クリートB及び敷モルタルAを行っておき、前記の延長
パネル5、7付きのL字状本体3を、敷モルタルAの上
に墨出し位置に合わせて設置する。そして、前記のよう
に延長パネル5を継ぎ足した底版1の上に裏込め土8を
埋戻していく。
At the time of construction, the site is dug down into a place where a retaining wall is to be constructed as usual, and the foundation stone C, the foundation concrete B and the mortar A are laid in advance, and the L-shape with the extension panels 5 and 7 is provided. The main body 3 is placed on the mortar A in accordance with the ink marking position. Then, the backfill soil 8 is buried on the bottom slab 1 on which the extension panel 5 is added as described above.

【0022】現場作業の都合で、プレキャストコンクリ
ート製品の待ち時間が無い場合は、現場の工期短縮のた
め、L字状本体3の底版1先端に延長パネル5のみを連
結した状態で、早めに現場に搬入して据え付工事を進め
る。
If there is no waiting time for the precast concrete product due to the work at the site, in order to shorten the construction period at the site, the extension panel 5 is connected to the tip of the bottom plate 1 of the L-shaped main body 3 and the site is early. And carry on the installation work.

【0023】そして、工事が進み、埋戻し工事の最終の
工程で、上端の延長パネル7を搬入して連結し、延長パ
ネル7の上端まで最後の埋戻しを行なえば、工事は完了
である。このように、たて壁2の上端の延長パネル7
は、最終の工程で連結すれば足りる。
Then, when the construction is advanced and the extension panel 7 at the upper end is carried in and connected in the final step of the backfilling construction, and the final backfilling is performed up to the upper end of the extension panel 7, the construction is completed. Thus, the extension panel 7 at the upper end of the vertical wall 2
Need only be connected in the final step.

【0024】このように、L字状本体3からなるプレキ
ャストコンクリート規格品擁壁の最小寸法のみを製造し
ておき、また底版側の延長パネル5とたて壁2側の延長
パネル7は、各種規格寸法に対応してプレキャスト製造
しておく。
As described above, only the minimum dimensions of the precast concrete standard retaining wall composed of the L-shaped main body 3 are manufactured, and the extension panel 5 on the bottom slab side and the extension panel 7 on the vertical wall 2 side are various types. Precast manufacturing is performed according to the standard dimensions.

【0025】その後、現場測量に基づいた施工図に合わ
せて、最適寸法の延長パネル5と7をL字状本体3の底
版1先端とたて壁2上端に連結金具等で連結した状態
で、現場へ搬入し、据え付け工事に入る。
Then, in accordance with the construction drawing based on the on-site survey, the extension panels 5 and 7 of the optimal dimensions are connected to the bottom end of the bottom plate 1 and the upper end of the wall 2 of the L-shaped main body 3 by connecting fittings or the like. Carry in the site and start installation work.

【0026】また、施工図面等の遅れ、その他の遅れが
生じた場合は、L字状本体3の底版1先端の延長パネル
5のみ、先に連結しておいた状態で、現場へ搬入し、据
え付工事を進める。その結果、擁壁製品の待ちが無くな
る。あるいは、短縮できる。
If there is a delay in construction drawings or other delays, only the extension panel 5 at the tip of the bottom plate 1 of the L-shaped main body 3 is transported to the site in a state where it has been connected first, Proceed with installation work. As a result, there is no need to wait for retaining wall products. Alternatively, it can be shortened.

【0027】その後の埋め戻し工事中に、たて壁2の上
端の延長パネル7を連結し、その上端まで埋戻すこと
で、工事が完了する。
During the subsequent backfilling work, the extension panel 7 at the upper end of the vertical wall 2 is connected and backfilled to the upper end, thereby completing the work.

【0028】また、本発明によると、現場における工事
の途中で設計変更が生じた際にも、迅速に対応できる。
すなわち、擁壁の壁高を高くしたい場合は、最適寸法の
延長パネル5、7を継ぎ足せば足りる。逆に、壁高を低
くしたい場合は、延長パネル5、7を取り外せばよい。
Further, according to the present invention, it is possible to promptly cope with a design change occurring during construction on site.
That is, when it is desired to increase the wall height of the retaining wall, it is sufficient to add the extension panels 5 and 7 having the optimal dimensions. Conversely, when the wall height is to be reduced, the extension panels 5 and 7 may be removed.

【0029】したがって、延長パネル5、7は、必ずし
も工場で連結する必要はなく、臨機応変に現場で連結し
てもよい。
Therefore, the extension panels 5 and 7 do not always need to be connected at the factory, but may be connected at the site as needed.

【0030】図2は、連結手段6の第一実施形態を示す
斜視図である。図2(1)の場合は、たて壁2と延長パ
ネル7の内面に、取付板10、11がそれぞれ埋設さ
れ、コンクリート内部で鉄筋4と溶接されている。すな
わち、溶接した状態で、プレキャスト成型して、埋め込
んでおく。
FIG. 2 is a perspective view showing a first embodiment of the connecting means 6. In the case of FIG. 2A, mounting plates 10 and 11 are respectively buried on the inner surfaces of the vertical wall 2 and the extension panel 7, and are welded to the reinforcing bar 4 inside the concrete. That is, in a welded state, it is precast molded and embedded.

【0031】そして、延長パネル7を連結する際に、連
結プレート12をボルト・ナット13で取付板10、1
1に固定することで、たて壁2の上端に延長パネル7を
継ぎ足す。
When connecting the extension panel 7, the connecting plate 12 is connected to the mounting plates 10, 1 by bolts and nuts 13.
1, the extension panel 7 is added to the upper end of the vertical wall 2.

【0032】(2)のように、底版1の先端に延長パネ
ル5を連結する場合も、全く同様に、予め埋設され、底
版1、延長パネル5の上面に一部突出している取付板1
0、11に連結プレート12を重ねて、ボルト・ナット
13で固定することで、底版1に延長パネル5を継ぎ足
す。
In the case where the extension panel 5 is connected to the tip of the bottom plate 1 as in (2), the mounting plate 1 which is buried in advance and partially protrudes from the upper surfaces of the bottom plate 1 and the extension panel 5 is exactly the same.
The extension panel 5 is added to the bottom slab 1 by superimposing the connection plate 12 on 0 and 11 and fixing with the bolts and nuts 13.

【0033】なお、底版1およびたて壁2と延長パネル
5、7との継ぎ目14は、段継ぎ構造が適している。
The joint 14 between the bottom plate 1 and the vertical wall 2 and the extension panels 5 and 7 preferably has a step joint structure.

【0034】図3は、延長パネルの各種実施形態であ
り、埋戻し地表面が傾斜地の場合は、たて壁2上端に連
結する延長パネルとしては、7aのように上縁が傾斜し
た形状をプレキャス成型しておく。
FIG. 3 shows various embodiments of the extension panel. In the case where the backfilled ground surface is a sloping ground, the extension panel connected to the upper end of the vertical wall 2 has a shape in which the upper edge is inclined like 7a. Precast molded.

【0035】図4から図6は、連結手段6としてアング
ル15を用いる場合であり、図5のようなアングル15
の1辺を図6のような延長パネルの表面に重ねて、ボル
ト・ナットで固定してある。
FIGS. 4 to 6 show a case where the angle 15 is used as the connecting means 6, and the angle 15 shown in FIG.
Is placed on the surface of the extension panel as shown in FIG. 6 and fixed with bolts and nuts.

【0036】すなわち、図4のように、ロングナット1
6の内端を内部鉄筋4に溶接した状態で埋設し、外端は
平プレート17に溶接してある。したがって、アングル
15の底辺を図6のような平プレート17の上に重ねた
状態で、図5のように、座金18の上からボルト19を
図6のロングナット16のメネジ孔にねじ込んで固定す
る。
That is, as shown in FIG.
6 is embedded in a state where the inner end is welded to the inner reinforcing bar 4 and the outer end is welded to the flat plate 17. Therefore, with the bottom of the angle 15 superimposed on the flat plate 17 as shown in FIG. 6, the bolt 19 is screwed into the female screw hole of the long nut 16 from FIG. I do.

【0037】図7から図9は、スリーブ継手を用いる実
施形態である。図7、図8のように、底版1とたて壁2
の中の鉄筋4の先端がスリーブ継手20の一端に挿入さ
れている。そして他端には、延長パネル5、7中の鉄筋
21の先端が挿入されている。このように、スリーブ継
手20の両端から鉄筋4、21を挿入した状態で、スリ
ーブ継手20の一端側からグラウト材を充填し硬化させ
ると、鉄筋同士が連結される。
7 to 9 show an embodiment using a sleeve joint. 7 and 8, the bottom plate 1 and the vertical wall 2
The tip of the reinforcing bar 4 is inserted into one end of the sleeve joint 20. At the other end, the tip of the reinforcing bar 21 in the extension panels 5 and 7 is inserted. When the grout material is filled and hardened from one end of the sleeve joint 20 in a state where the reinforcing bars 4 and 21 are inserted from both ends of the sleeve joint 20, the reinforcing bars are connected to each other.

【0038】したがって、図9のように、スリーブ継手
20の中に挿入できるように、延長パネル5、7から鉄
筋21の先端を突出させておく。
Therefore, as shown in FIG. 9, the tip of the reinforcing bar 21 is projected from the extension panels 5 and 7 so that it can be inserted into the sleeve joint 20.

【0039】このように3種類の連結構造を例示してあ
るが、これら3種類の連結構造に限定されるものではな
い。
Although three types of connection structures have been described above, the present invention is not limited to these three types of connection structures.

【0040】なお、本発明は、ほぼ直角の底版とたて壁
を有するプレキャストコンクリート擁壁であれば、L
型、逆L型、逆T型、控え壁式擁壁などすべての擁壁に
適用できることは言うまでもない。
The present invention relates to a precast concrete retaining wall having a substantially right-angled bottom plate and a vertical wall.
It is needless to say that the present invention can be applied to all types of retaining walls such as a type, an inverted L type, an inverted T type, and a retaining wall type retaining wall.

【0041】[0041]

【発明の効果】請求項1の方法のように、底版とたて壁
を有するプレキャストコンクリート擁壁の本体と各種寸
法の延長パネルを予め工場生産しておき、各現場の状況
に応じて、前記各延長パネルを選択して、前記本体の各
先端に継ぎ足して使用するため、工場で予め量産してお
くことが可能となり、製品のコストを低減できる。しか
も、連結作業だけであるから、コンクリートの養生期間
なども不要となり、短時間に対応できる。
According to the method of the first aspect, the main body of the precast concrete retaining wall having the bottom slab and the vertical wall and the extension panels of various dimensions are produced in a factory in advance, and according to the situation at each site, Since each extension panel is selected and used after being added to each end of the main body, mass production can be performed in advance at a factory, and the cost of the product can be reduced. In addition, since it is only the connection work, the curing time of the concrete is not required, and it is possible to respond in a short time.

【0042】請求項2の方法によると、プレキャストコ
ンクリート擁壁の本体は、規格寸法の最小寸法のみを工
場生産しておき、また各延長パネルは各種規格寸法に応
じて工場生産しておくので、大量生産によるコスト低減
がより効果的に実現できる。
According to the method of the second aspect, the main body of the precast concrete retaining wall is factory-manufactured only for the minimum standard size, and each extension panel is factory-produced according to various standard sizes. Cost reduction by mass production can be realized more effectively.

【0043】請求項3の方法によると、前記本体の底版
の先端のみ、予め延長パネルを継ぎ足した状態で現場に
搬入して、埋戻し工事を始め、埋戻し工事の最中に、た
て壁の上端に延長パネルを継ぎ足して完成するので、た
て壁上端に延長パネルを継ぎ足してない、半完成品をい
ち早く納品して、先に埋戻し工事を始められるので、工
期短縮が可能となる。
According to a third aspect of the present invention, only the tip of the bottom plate of the main body is carried into the site with an extension panel added thereto in advance, and the backfilling work is started. The extension panel is added to the upper end of the wall, and the extension panel is not added to the upper end of the wall. The semi-finished product can be delivered promptly and the backfill work can be started first, so that the construction period can be shortened.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明によるL字状のプレキャストコンクリ
ート擁壁を用いて施工した後の断面図である。
FIG. 1 is a cross-sectional view after construction using an L-shaped precast concrete retaining wall according to the present invention.

【図2】 連結手段の第一実施形態を示す拡大斜視図で
ある。
FIG. 2 is an enlarged perspective view showing a first embodiment of the connecting means.

【図3】 第一実施形態における延長パネルを例示する
斜視図である。
FIG. 3 is a perspective view illustrating an extension panel according to the first embodiment.

【図4】 アングルで連結したL字状擁壁の実施形態を
示す断面図である。
FIG. 4 is a sectional view showing an embodiment of an L-shaped retaining wall connected by an angle.

【図5】 図4のアングル連結構造の詳細を示す拡大斜
視図である。
FIG. 5 is an enlarged perspective view showing details of the angle connection structure of FIG. 4;

【図6】 埋設ロングナットの表面側を示す拡大斜視図
である。
FIG. 6 is an enlarged perspective view showing a surface side of an embedded long nut.

【図7】 スリーブ継手で連結したL字状擁壁の実施形
態を示す断面図である。
FIG. 7 is a sectional view showing an embodiment of an L-shaped retaining wall connected by a sleeve joint.

【図8】 スリーブ継手による連結構造の詳細を示す拡
大斜視図である。
FIG. 8 is an enlarged perspective view showing details of a connection structure using a sleeve joint.

【図9】 スリーブ継手で連結される延長パネルを例示
する斜視図である。
FIG. 9 is a perspective view illustrating an extension panel connected by a sleeve joint.

【符号の説明】[Explanation of symbols]

A 敷モルタル B 基礎コンクリート C 基礎栗石 1 底版 2 たて壁 3 L字状の本体 4 埋設鉄筋 5 底版の延長パネル 6 連結手段 7 たて壁の延長パネル 9 地表面 8 裏込め土 10、11 取付板 12 連結プレート 13 ボルト・ナット 14 継ぎ目 15 アングル 16 ロングナット 17 平プレート 18 座金 19 ボルト 20 スリーブ継手 21 鉄筋 Reference Signs List A mortar B foundation concrete C foundation stone 1 bottom plate 2 vertical wall 3 L-shaped main body 4 buried reinforcing bar 5 bottom panel extension panel 6 connecting means 7 vertical wall extension panel 9 ground surface 8 backfill soil 10,11 installation Plate 12 Connecting plate 13 Bolt / Nut 14 Seam 15 Angle 16 Long nut 17 Flat plate 18 Washer 19 Bolt 20 Sleeve joint 21 Reinforcing bar

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 底版とたて壁を有するプレキャストコン
クリート擁壁の本体を予め工場生産しておくと共に、 本体の底版先端に継ぎ足す底版延長パネルも、たて壁上
端に継ぎ足すたて壁延長パネルも、プレキャストコンク
リート部材として工場生産して準備しておき、 各現場の状況に応じて、前記の各延長パネルを選択し
て、前記本体の各先端に連結手段で継ぎ足して使用する
ことを特徴とするプレキャストコンクリート擁壁の構築
方法。
1. A precast concrete retaining wall body having a bottom slab and a vertical wall is preliminarily manufactured in a factory, and a bottom slab extension panel to be added to the tip of the bottom slab of the main body is also extended to an upper end of the vertical wall. Panels are also produced and prepared as precast concrete members at the factory, and according to the situation at each site, each of the extension panels is selected and added to each tip of the main body by connecting means and used. How to build a precast concrete retaining wall.
【請求項2】 底版とたて壁を有するプレキャストコン
クリート擁壁本体の各種規格寸法の最小寸法を予め工場
生産しておくと共に、 本体の底版先端に継ぎ足す底版延長パネルも、たて壁上
端に継ぎ足すたて壁延長パネルも、プレキャストコンク
リート部材として、各種規格寸法に応じて工場生産して
準備しておき、 各現場の状況に応じて、前記本体の各先端に前記各延長
パネルを連結手段で継ぎ足して使用することを特徴とす
る請求項1に記載のプレキャストコンクリート擁壁の構
築方法。
2. A precast concrete retaining wall main body having a bottom slab and a vertical wall is manufactured at a factory in advance with minimum dimensions of various standard dimensions, and a bottom slab extension panel to be added to a tip of the bottom slab of the main body is provided at an upper end of the vertical wall. The extension panel is also prepared as a precast concrete member by factory production according to various standard dimensions, and the extension panel is connected to each end of the main body according to the situation at each site. The method for constructing a precast concrete retaining wall according to claim 1, wherein the precast concrete retaining wall is used after being added.
【請求項3】 底版とたて壁を有するプレキャストコン
クリート擁壁の本体を予め工場生産しておくと共に、 本体の底版先端に継ぎ足す底版延長パネルも、たて壁上
端に継ぎ足すたて壁延長パネルも、プレキャストコンク
リート部材として、各種寸法に応じて工場生産して準備
しておき、 前記本体の底版の先端のみ、予め延長パネルを継ぎ足し
た状態で現場に搬入して、埋戻し工事を始め、埋戻し工
事の途中で、たて壁の上端に延長パネルを継ぎ足すこと
を特徴とするプレキャストコンクリート擁壁の施工方
法。
3. A precast concrete retaining wall body having a bottom slab and a vertical wall is preliminarily manufactured in a factory, and a bottom slab extension panel to be added to the tip of the bottom slab of the main body is also extended at the upper end of the vertical wall. Panels are also factory-prepared and prepared according to various dimensions as precast concrete members.Only the tip of the bottom plate of the main body is transported to the site with extension panels added in advance, and backfilling work is started, A method for constructing a precast concrete retaining wall, characterized in that an extension panel is added to the upper end of a vertical wall during backfilling work.
JP2000238507A 2000-08-07 2000-08-07 Method for construction and execution of concrete retaining wall by means of precast concrete member Pending JP2002054161A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000238507A JP2002054161A (en) 2000-08-07 2000-08-07 Method for construction and execution of concrete retaining wall by means of precast concrete member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000238507A JP2002054161A (en) 2000-08-07 2000-08-07 Method for construction and execution of concrete retaining wall by means of precast concrete member

Publications (1)

Publication Number Publication Date
JP2002054161A true JP2002054161A (en) 2002-02-20

Family

ID=18730198

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000238507A Pending JP2002054161A (en) 2000-08-07 2000-08-07 Method for construction and execution of concrete retaining wall by means of precast concrete member

Country Status (1)

Country Link
JP (1) JP2002054161A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7673485B2 (en) 2001-10-23 2010-03-09 Sumitomo Metal Industries, Ltd. Hot press forming method
JP2012162972A (en) * 2011-01-17 2012-08-30 Eisho Tsusho Co Ltd Ballast stop block assembly
KR101501733B1 (en) * 2014-05-30 2015-03-18 대한이.이엔.씨(주) The eco-friendly precast l type retaining wall fixed with an anchor
KR102388496B1 (en) * 2021-10-27 2022-04-20 (주)코리아에스이 Extension panel of cut retaining wall and its construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7673485B2 (en) 2001-10-23 2010-03-09 Sumitomo Metal Industries, Ltd. Hot press forming method
JP2012162972A (en) * 2011-01-17 2012-08-30 Eisho Tsusho Co Ltd Ballast stop block assembly
KR101501733B1 (en) * 2014-05-30 2015-03-18 대한이.이엔.씨(주) The eco-friendly precast l type retaining wall fixed with an anchor
KR102388496B1 (en) * 2021-10-27 2022-04-20 (주)코리아에스이 Extension panel of cut retaining wall and its construction method

Similar Documents

Publication Publication Date Title
KR100788623B1 (en) Top-down method using precast-concrete colum
JP2002054161A (en) Method for construction and execution of concrete retaining wall by means of precast concrete member
CN112663788B (en) Assembled rapid construction method
JPH06316942A (en) Precast product for foundation of steel tower, and construction of steel tower therewith
KR20100121865A (en) Method for constructing building using prc integrating method
KR20030040687A (en) panel for external underground wall of building, structure and construction method using the same
KR100456192B1 (en) Composition of precast concrete wall and precast concrete column for outdoor to sustain external force
JPH0932014A (en) Method of execution for retaining wall
CN211714178U (en) Prefabricated reinforced concrete house frame
KR20090006320A (en) Retaining wall structure for expanding road
JPS61233131A (en) Foundation structure of pole
CN104088580B (en) A kind of Combined gate having enough to meet the need use and preparation method thereof
JP3039260B2 (en) Building method using PC members
KR101530601B1 (en) Method for a patterned concrete pannel and method for manufacturing a retaining wall including the same, and patterned concrete pannel
KR200266585Y1 (en) panel for external underground wall of building and external underground wall- structure using the same
JP2002339380A (en) Retaining-wall structure and its assembly construction method
JP2920490B2 (en) Method of manufacturing panel-joined caisson and panel-joined caisson
JPH04111813A (en) Retaining wall structure and its construction
JPH0452815B2 (en)
JP2005002585A (en) Capital member and rcft pole construction method using the same
JPH11324323A (en) Construction method for building
JPH07247610A (en) Beam for building using pc wall
KR101779399B1 (en) the hybrid precast concrete beam connecting structure for a horizontal extending a building and the construction method thereof
JP3115096B2 (en) Concrete foundation construction method
KR20030034379A (en) A Wall Frame and a Method for Constructing Buildings Using the Same