JP2002013688A - Gas cut-off device and gas cut-off method using the device - Google Patents

Gas cut-off device and gas cut-off method using the device

Info

Publication number
JP2002013688A
JP2002013688A JP2000195687A JP2000195687A JP2002013688A JP 2002013688 A JP2002013688 A JP 2002013688A JP 2000195687 A JP2000195687 A JP 2000195687A JP 2000195687 A JP2000195687 A JP 2000195687A JP 2002013688 A JP2002013688 A JP 2002013688A
Authority
JP
Japan
Prior art keywords
bag
gas
communication hole
base
insertion device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000195687A
Other languages
Japanese (ja)
Inventor
Kenji Kaminaga
建史 神長
Masutoshi Ookawa
増敏 大川
Toshihide Nabuchi
利秀 名渕
Masahiro Ito
政広 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KYOWAKENKO CO Ltd
Tokyo Gas Co Ltd
Osaki Precision Co Ltd
Original Assignee
KYOWAKENKO CO Ltd
Tokyo Gas Co Ltd
Osaki Precision Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KYOWAKENKO CO Ltd, Tokyo Gas Co Ltd, Osaki Precision Co Ltd filed Critical KYOWAKENKO CO Ltd
Priority to JP2000195687A priority Critical patent/JP2002013688A/en
Publication of JP2002013688A publication Critical patent/JP2002013688A/en
Pending legal-status Critical Current

Links

Landscapes

  • Pipe Accessories (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a gas cut-off device, capable of eliminating troublesome character of a work and to provide a gas cut-off method using the device. SOLUTION: A gas cut-off device is operated during repair of existing line P; an expandable and shrinkable bag is introduced in the end part of the spot to be repaired of the line P; and the bag is expanded to cutoff a flow of gas. A bag insertion device 1, comprising a base part 3A having a peripheral wall 3A formed of a transparent substance; a bag insertion part 3B formed integrally in a position facing the peripheral wall 3A and communicating with the interior of the base part 3A; and a gas dispersion part 3C extending from the interior of the base part 3A toward the outside and provided at an end part on the external side with an on-off valve 7 is situated on a pedestal 2, in correspondence to a communication hole formed in a position where a bag is inserted in the line P.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、ガス遮断装置およ
びこれを用いたガス遮断工法に関し、さらに詳しくは、
管路を流通するガスをバッグを管路内に挿入する際の挿
入装置およびこれを用いた挿入方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a gas shut-off device and a gas shut-off method using the same.
The present invention relates to an insertion device for inserting a gas flowing through a pipeline into a bag and to an insertion method using the same.

【0002】[0002]

【従来の技術】従来、地中に敷設されているガス管路の
補修を行う工法の一例として、図5に示すような工法が
行われている。まず、漏洩等が発生している補修対象箇
所の周辺を開削して、作業ピットを形成する。次に補修
対象箇所Xの上流側及び下流側に、エアバッグAを管路
L内に導入するための連通孔Bを開口し、該連通孔Bよ
りエアバッグAを収縮した状態で管路内に導入し、導入
完了後に該エアバッグAを管路内で膨張させてガスの流
通を遮断する。そして前記エアバッグAの位置より外側
に、バイパス管Cを形成するための連通孔Dを形成し、
該連通孔Dをバイパス管Cで結び、ガスの供給を確保し
た後に補修作業を行う。
2. Description of the Related Art Conventionally, as an example of a method for repairing a gas pipeline laid underground, a method as shown in FIG. 5 is performed. First, a work pit is formed by excavating the area around a repair target location where a leak or the like has occurred. Next, a communication hole B for introducing the airbag A into the pipeline L is opened on the upstream side and the downstream side of the repair target location X, and the airbag A is contracted from the communication hole B in the pipeline. After the introduction is completed, the airbag A is inflated in the pipeline to cut off the gas flow. A communication hole D for forming a bypass pipe C is formed outside the position of the airbag A,
The communication hole D is connected by a bypass pipe C, and after the supply of gas is secured, repair work is performed.

【0003】エアバッグAを管路内に挿入するための連
通孔を形成する場合には、管路における連通孔形成位置
を穿孔機によって穿孔し、穿孔後、その連通孔をプラグ
栓等によって封止したうえでエアバッグを挿入するため
のバッグ挿入装置が管路外周面に設置される。上記穿孔
作業に加えて穿孔後に管路内に落下した切粉の除去作業
は管路内からのガスの流出を防止しながら行うことが必
要であり、このため、穿孔機が設置される台座にビニー
ルなどの透明樹脂で構成された作業用バッグを取付、そ
の作業用バッグ内で穿孔作業や切粉除去作業が行われて
いる。一方、エアバッグAを管路内に挿入する際には、
バッグ挿入装置を管路外周面に装着し、プラグ栓を抜き
取った後、バッグ挿入装置を介してバッグを管路内に挿
入するようになっている。
In order to form a communication hole for inserting the airbag A into the conduit, a position where the communication hole is formed in the conduit is pierced by a punch, and after piercing, the communication hole is sealed with a plug stopper or the like. A bag insertion device for inserting the airbag after stopping is installed on the outer peripheral surface of the pipeline. In addition to the above-mentioned drilling work, it is necessary to perform the work of removing the chips that have fallen into the pipeline after the drilling while preventing the gas from flowing out of the pipeline. A work bag made of a transparent resin such as vinyl is attached, and perforation work and chip removal work are performed in the work bag. On the other hand, when inserting the airbag A into the pipeline,
After the bag insertion device is mounted on the outer peripheral surface of the pipeline and the plug is removed, the bag is inserted into the pipeline via the bag insertion device.

【0004】[0004]

【発明が解決しようと課題】上記従来の工法では作業用
バッグ内での作用が煩雑化するという不具合があった。
すなわち、作業用バッグを用いた場合には穿孔後の連通
孔を封止した状態でバッグ挿入装置を装着し、再度作業
用バッグを装着してバッグ挿入時でのガスの漏出を防止
することが必要となり、作業手順が繁雑となる。しか
も、バッグ挿入時には、遮断用としてのバッグへのエア
通路用パイプに加えてバッグの並置位置間に流出する、
いわゆる、越ガスを管路外部に放散するための放散通路
用パイプを設けることもあり、この場合には上記プラグ
栓を抜き取るための工具に加えて作業用バッグ内に複数
の通路用パイプを配備することになるが、作業用バッグ
の容積が小さいとこの要求を満たすことができず、各工
程毎に作業用バッグを付け替える作業が必要となる。
However, the conventional construction method described above has a disadvantage that the operation in the work bag is complicated.
That is, when a work bag is used, the bag insertion device is mounted in a state where the communication hole after perforation is sealed, and the work bag is mounted again to prevent gas leakage when the bag is inserted. Required, and the work procedure becomes complicated. Moreover, when the bag is inserted, it flows out between the juxtaposed positions of the bag in addition to the pipe for the air passage to the bag for blocking.
In some cases, a so-called diffusion pipe for dispersing the overgas to the outside of the pipeline may be provided.In this case, a plurality of pipes for the passage are provided in the work bag in addition to the tool for extracting the plug plug. However, if the volume of the work bag is small, this requirement cannot be satisfied, and an operation of replacing the work bag for each process is required.

【0005】本発明の目的は、上記従来のガス遮断工法
における問題に鑑み、作業の繁雑性を解消することがで
きるガス遮断装置およびこれを用いたガス遮断工法を提
供することにある。
[0005] An object of the present invention is to provide a gas shut-off device and a gas shut-off method using the gas shut-off device which can eliminate the complexity of work in view of the problems in the conventional gas shut-off method.

【0006】[0006]

【課題を解決するための手段】この目的を達成するた
め、請求項1記載の発明は、既設管路を修理する際に、
該管路の補修対象箇所の端部に膨張・収縮可能なバッグ
を導入し、該バッグを膨張させてガスの流通を遮断する
ガス遮断装置であって、上記管路内へのバッグ挿入位置
に形成される連通孔に対応して台座上に一体化された透
明体からなる周壁を備えた基部と、該周壁にて正対する
位置に一体化され該基部内に連通するバッグ挿入部と、
上記基部内から外部に向けて延長されて外部側端部に開
閉弁が設けられているガス放散部とを備えたバッグ挿入
装置を備えたことを特徴としている。
In order to achieve this object, according to the first aspect of the present invention, when repairing an existing pipeline,
A gas shut-off device for introducing an inflatable / contractible bag at an end of a repair target portion of the pipeline, inflating the bag and shutting off gas flow, wherein the bag is inserted into the pipeline at a position where the bag is inserted. A base having a peripheral wall made of a transparent body integrated on the pedestal corresponding to the formed communication hole, and a bag insertion portion integrated at a position facing the peripheral wall and communicating with the base,
It is characterized in that a bag insertion device is provided which includes a gas diffusion portion which is extended from the inside of the base to the outside and has an opening / closing valve provided at an end on the outside side.

【0007】請求項2記載の発明は、既設管路を修理す
る際に、該管路の補修対象箇所の端部に膨張・収縮可能
なバッグを導入し、該バッグを膨張させてガスの流通を
遮断するガス遮断工法であって、上記管路内へのバッグ
挿入位置に形成される連通孔に対応して台座上に一体化
された透明体からなる周壁を備えた基部と、該周壁にて
正対する位置に一体化され該基部内に連通するバッグ挿
入部と、上記基部内から外部に向けて延長されて外部側
端部に開閉弁が設けられているガス放散部とを備えたバ
ッグ挿入装置を準備し、上記連通孔穿孔後に行われる上
記連通孔の封止完了後に上記バッグ挿入装置を上記連通
孔に対応して管路に装着し、該バッグ挿入装置内で上記
封止に用いられたプラグ栓の抜き取り、バッグの挿入お
よびバッグ間に流出するガスの放散作業をそれぞれ行う
ことを特徴としている。
According to the second aspect of the present invention, when repairing an existing pipeline, an inflatable / contractible bag is introduced into an end of a repair target portion of the pipeline, and the bag is inflated to distribute gas. A base part having a peripheral wall made of a transparent body integrated on a pedestal corresponding to a communication hole formed at a bag insertion position in the pipe, and A bag insertion part which is integrated at a position facing directly and communicates with the inside of the base, and a gas diffusion part extended from inside the base to the outside and provided with an on-off valve at an external end. Prepare an insertion device, after completion of the sealing of the communication hole performed after drilling the communication hole, attach the bag insertion device to a conduit corresponding to the communication hole, and use the bag insertion device for the sealing in the bag insertion device Remove plug plugs, insert bags and flow between bags It is characterized by performing for gas dissipation work, respectively.

【0008】請求項3記載の発明は、上記バッグ挿入装
置には、内部に挿通されたプラグ栓抜き取り工具が装備
されていることを特徴としている。
The invention according to claim 3 is characterized in that the bag insertion device is provided with a plug plug removal tool inserted therein.

【0009】[0009]

【作用】請求項1乃至3記載の発明では、連通孔形成後
にバッグ挿入装置を管路に装着することでそのバッグ挿
入装置の内部において連通孔形成後の作業が全て行え
る。特に、連通孔形成後にバッグを挿入する際には連通
孔を封止しているプラグ栓の抜き取りに続いてバッグの
挿入、さらには管路内に挿入されたバッグ間に流出する
ガス、いわゆる越ガスの放散作業をそれぞれ同じ箇所で
あるバッグ挿入装置の基部において行えるので、作業毎
にガスの遮断のための部材、いわゆる作業用バッグの付
け替えを行う必要がない。
According to the first to third aspects of the present invention, by attaching the bag insertion device to the conduit after the formation of the communication hole, all the operations after the formation of the communication hole can be performed inside the bag insertion device. In particular, when inserting the bag after the formation of the communication hole, the removal of the plug stopper sealing the communication hole, the insertion of the bag, and the gas flowing out between the bags inserted into the pipeline, the so-called overflow Since the gas dissipating work can be performed at the same place, that is, at the base of the bag insertion device, there is no need to replace a member for shutting off gas, that is, a so-called working bag, for each work.

【0010】[0010]

【発明の実施の形態】以下、図示実施例により本発明の
実施の形態を説明する。図1は、本発明実施例によるガ
ス遮断装置に用いられるバッグ挿入装置の構成を説明す
るための模式的な外観図であり、同図においてバッグ挿
入装置1は、管路Pにおいてバッグ挿入用として形成さ
れる連通孔に対応する位置に着座される台座2と、この
台座1上に設けられている基部3とを備えている。上記
バッグ挿入装置1の詳細な構成は図2以降に示されてい
る。図2において、台座2は管路Pの径方向に張り出す
係止部2Aを備えており、これら係止部2A間に掛け止
められるチェーン4を管路Pの外周面に掛け回すことで
管路Pに装着される。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a schematic external view for explaining the configuration of a bag insertion device used in a gas shut-off device according to an embodiment of the present invention. In FIG. 1, a bag insertion device 1 is used for inserting a bag in a pipeline P. The pedestal 2 includes a pedestal 2 seated at a position corresponding to the formed communication hole, and a base 3 provided on the pedestal 1. The detailed configuration of the bag insertion device 1 is shown in FIG. In FIG. 2, the pedestal 2 is provided with locking portions 2A that project in the radial direction of the pipeline P, and a chain 4 hung between the locking portions 2A is hung around the outer peripheral surface of the pipeline P to form a pipe. Mounted on road P.

【0011】台座2の上面には基部3が一体化されてお
り、この基部3はアクリル酸樹脂などを用いた透明体か
らなる筒状周壁3Aを備えている。筒状周壁3Aの上面
は開放されており、蓋部材5によって塞がれることで基
部3の内部を密封できるようになっている。筒状周壁3
Aにおける中心を挟んで正対する位置には、図1および
図3に示すように、基部3の内部に連通する一端部から
他端部が斜め上方に向けて延長された筒状部材からなる
バッグ挿入部3Bが設けられており、バッグ挿入部3B
の先端開口端はバッグの非挿入時、蓋部材6によって塞
がれている。筒状周壁3Aにおけるバッグ挿入部3Bの
位置と直角な位置には、図1および図2に示すように基
部3の内部空間と連通する一端から基部3の径方向に延
長された他端を有するパイプで構成されたガス放散部3
C(図1,図4参照)が設けられており、他端開口は開
閉弁であるコック6が取り付けられている。コック6
は、開閉操作に応じて基部3の内部空間と外部との連通
状態を設定できるようになっており、開放された場合に
は基部3の内部空間に溜まったガスを外部に放散するこ
とができる。
A base 3 is integrated on the upper surface of the pedestal 2, and the base 3 has a cylindrical peripheral wall 3A made of a transparent material using acrylic acid resin or the like. The upper surface of the cylindrical peripheral wall 3A is open, and the inside of the base 3 can be sealed by being closed by the lid member 5. Cylindrical peripheral wall 3
As shown in FIGS. 1 and 3, a bag formed of a cylindrical member having one end communicating with the inside of the base 3 and the other end extending diagonally upward, as shown in FIGS. An insertion portion 3B is provided, and the bag insertion portion 3B is provided.
Is closed by the lid member 6 when the bag is not inserted. At a position perpendicular to the position of the bag insertion portion 3B on the cylindrical peripheral wall 3A, as shown in FIGS. 1 and 2, there is another end extending in the radial direction of the base 3 from one end communicating with the internal space of the base 3. Gas dispersing part 3 composed of pipe
C (see FIGS. 1 and 4) is provided, and a cock 6 as an on-off valve is attached to the other end opening. Cook 6
Can set the state of communication between the internal space of the base 3 and the outside according to the opening and closing operation, and when opened, the gas accumulated in the internal space of the base 3 can be diffused to the outside. .

【0012】一方、筒状周壁3Aの上面を塞ぐ蓋部材3
Cには、管路Pに形成される連通孔を封止するためのプ
ラグ栓を抜き取りおよび取付るための工具であるマグネ
ットで構成されたボックスレンチ8およびバッグの誘導
用工具9(図2参照)がそれぞれその一端を基部3の内
部に位置させるようにして装備されており、筒状周壁3
Aの上面を塞いだ際には、上記各工具の一端部が基部3
の内部空間内に位置した状態で基部3の内部空間が密封
される。
On the other hand, a cover member 3 for closing the upper surface of the cylindrical peripheral wall 3A
C has a box wrench 8 composed of a magnet which is a tool for extracting and attaching a plug plug for sealing a communication hole formed in the conduit P, and a bag guiding tool 9 (see FIG. 2). ) Are arranged such that one end thereof is located inside the base portion 3, and the cylindrical peripheral wall 3 is provided.
When the upper surface of A is closed, one end of each of the above tools is
The internal space of the base 3 is sealed in a state where the internal space is located within the internal space.

【0013】本実施例は以上のような構成のバッグ挿入
装置を1を用いて次の手順が実行さえる。 (1)遮断箇所の上流側および下流側の所要位置に連通
孔を穿孔する。 この作業では、従来と同様に作業用バッグが穿孔機の台
座に取り付けられ、穿孔後、予め作業用バッグ内に挿入
しておいたマグネットなどの切粉除去工具により管路内
に落下した切粉を除去する。 (2)連通孔の封止 この作業は作業用バッグ内に配備してあるプラグ栓によ
り連通孔を封止する。
In this embodiment, the following procedure can be executed by using the bag insertion device 1 having the above-described configuration. (1) Drill a communication hole at a required position on the upstream and downstream sides of the cutoff point. In this work, the work bag is attached to the pedestal of the drilling machine as in the past, and after the drilling, the chips that have fallen into the pipeline with the chip removal tool such as a magnet previously inserted into the work bag. Is removed. (2) Sealing the communication hole In this work, the communication hole is sealed with a plug stopper provided in the work bag.

【0014】(3)バッグの挿入作業 この作業は本実施例の特徴とする作業内容であり、プラ
グ栓によって封止されている連通A内に対応してバッグ
挿入装置1が管路に装着され、バッグが挿入される。バ
ッグ挿入装置1には、基部3の筒状周壁3Aに位置する
バッグ挿入部3Bおよびガス放散部3C、さらには蓋部
材5に装備されているプラグ栓の抜き取り工具8および
バッグ誘導用の工具9が予め配置されているので、バッ
グ挿入装置1を装着後に従来のような作業用バッグの付
け替えを行う必要がない。バッグ挿入作業時には、ま
ず、バッグ挿入装置1の蓋部材5に有する抜き取り工具
8を用いて連通孔を封止しているプラグ栓を抜き取る。
次いで、バッグ挿入部3Bに有する蓋部材6を取り外し
て図示しないバッグを挿通する。バッグ挿通時にはバッ
グ誘導用の工具9を用いてバッグの挿入方向先端を連通
孔に向けて指向させることで連通孔に対するバッグの挿
入を容易に行うことができる。特に基部3の筒状周壁3
Aが透明体であるので、外部からバッグの挿入位置を確
認することができ、バッグの挿入作業を容易化すること
ができる。
(3) Bag Insertion Operation This operation is a characteristic operation of the present embodiment, and the bag insertion device 1 is mounted on the pipe corresponding to the communication A sealed by the plug stopper. , The bag is inserted. The bag insertion device 1 includes a bag insertion portion 3B and a gas diffusion portion 3C located on the cylindrical peripheral wall 3A of the base 3, and a plug stopper removal tool 8 and a bag guiding tool 9 provided on the lid member 5. Are arranged in advance, so that it is not necessary to replace the work bag as in the related art after the bag insertion device 1 is mounted. At the time of the bag insertion operation, first, the plug stopper sealing the communication hole is extracted using the extraction tool 8 provided on the lid member 5 of the bag insertion device 1.
Next, the cover member 6 of the bag insertion portion 3B is removed, and a bag (not shown) is inserted. When the bag is inserted, the tip of the bag in the insertion direction is directed toward the communication hole using the bag guiding tool 9, so that the bag can be easily inserted into the communication hole. Especially the cylindrical peripheral wall 3 of the base 3
Since A is a transparent body, the insertion position of the bag can be confirmed from the outside, and the operation of inserting the bag can be facilitated.

【0015】(4)越ガスの放散 この作業は、管路内に挿入されたバッグが膨張され、所
定圧力を以て管路内面に密着している状態が確認された
場合に、バッグ間に流出する越ガスが連通孔を介してバ
グ挿入装置1の基部3内に入り込んだ場合を想定してお
り、基部3の内部に流出した越ガスをガス放散部3Cに
よって管路外部に放散、いわゆる、大気放散する。この
場合には、ガス放散部3Cに放散部に向けて延長された
ホースを連結し、コック7を開放することで行われる。
(4) Dispersion of gas overflow This operation is performed when the bag inserted into the pipeline is inflated and it is confirmed that the bag is in close contact with the inner surface of the pipeline at a predetermined pressure, and flows out between the bags. It is assumed that the overgas enters the base 3 of the bag insertion device 1 through the communication hole, and the overgas that has flowed out of the base 3 is diffused to the outside of the pipeline by the gas diffusion unit 3C, that is, the so-called atmosphere. Dissipate. In this case, this is performed by connecting a hose extended toward the gas diffusion section to the gas diffusion section 3C and opening the cock 7.

【0016】一方、管路内での遮断を解除する場合に
は、バッグ挿入装置1を介して管路内に挿入されている
バッグを収縮させ、バッグ挿入部3Bを介して引き出し
たうえで抜き取り工具8を用いてプラグ栓を連通孔に取
付る。この作業が終了するとバグ挿入装置1を管路Pか
ら取り外す。
On the other hand, to release the cutoff in the pipeline, the bag inserted into the pipeline through the bag insertion device 1 is contracted, pulled out through the bag insertion portion 3B, and then removed. The plug is attached to the communication hole using the tool 8. When this operation is completed, the bug insertion device 1 is removed from the pipeline P.

【0017】以上のような実施例によれば、バッグ挿入
装置1において作業内容に応じた工具類および必要な構
成が予め備えられているので作業内容毎に連通孔を露呈
させる必要がない。このため、連通孔を露呈させるよう
なバッグの付け替え作業がないので、作業時間を短縮す
ることができる。
According to the above-described embodiment, since the tools and necessary components according to the work content are provided in the bag insertion device 1 in advance, it is not necessary to expose the communication hole for each work content. Therefore, there is no need to replace the bag so as to expose the communication hole, so that the operation time can be reduced.

【0018】[0018]

【発明の効果】請求項1乃至3記載の発明によれば、連
通孔形成後にバッグ挿入装置を管路に装着することでそ
のバッグ挿入装置の内部において連通孔形成後の作業が
全て行える。特に、連通孔形成後にバッグを挿入する際
には連通孔を封止しているプラグ栓の抜き取りに続いて
バッグの挿入、さらには管路内に挿入されたバッグ間に
流出するガス、いわゆる越ガスの放散作業をそれぞれ同
じ箇所であるバッグ挿入装置の基部において行えるの
で、作業毎にガスの遮断のための部材、いわゆる作業用
バッグの付け替えを行う必要がない。これにより、付け
嘉永による作業の繁雑性をなくして作業効率を向上させ
ることが可能となる。
According to the first to third aspects of the present invention, the work after the formation of the communication hole can be performed inside the bag insertion device by mounting the bag insertion device in the pipeline after the formation of the communication hole. In particular, when inserting the bag after the formation of the communication hole, the removal of the plug stopper sealing the communication hole, the insertion of the bag, and the gas flowing out between the bags inserted into the pipeline, the so-called overflow Since the gas dissipating work can be performed at the same place, that is, at the base of the bag insertion device, there is no need to replace a member for shutting off gas, that is, a so-called working bag, for each work. As a result, it is possible to improve the working efficiency by eliminating the complexity of the work by Katsuki Katsuki.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明実施例によるガス遮断装置に用いられる
バッグ挿入装置の構成を説明するための模式的な外観図
である。
FIG. 1 is a schematic external view illustrating a configuration of a bag insertion device used in a gas shut-off device according to an embodiment of the present invention.

【図2】図1に示したバッグ挿入装置の詳細を説明する
ために管路正面から見た部分的な断面図である。
FIG. 2 is a partial cross-sectional view of the bag insertion device shown in FIG.

【図3】図1に示したバッグ挿入装置の詳細を説明する
ために管路側面から見た部分的な断面図である。
FIG. 3 is a partial cross-sectional view of a bag insertion device shown in FIG.

【図4】図1に示したバッグ挿入装置の詳細を説明する
ための平面図である。
FIG. 4 is a plan view for explaining details of the bag insertion device shown in FIG. 1;

【図5】従来のガス遮断工法を説明するための模式図で
ある。
FIG. 5 is a schematic view for explaining a conventional gas shutoff method.

【符号の説明】[Explanation of symbols]

1 バッグ挿入装置 2 台座 3 基部 3A 筒状周壁 3B バッグ挿入部 3C ガス放散部 5,6 蓋部材 7 開閉弁 8 プラグ栓抜き取り用工具であるソケ
ットレンチ 9 バッグ誘導用工具 P 管路
DESCRIPTION OF SYMBOLS 1 Bag insertion device 2 Pedestal 3 Base 3A Cylindrical peripheral wall 3B Bag insertion part 3C Gas diffusion part 5, 6 Lid member 7 On-off valve 8 Socket wrench which is a plug plug removal tool 9 Bag guiding tool P Pipe line

───────────────────────────────────────────────────── フロントページの続き (72)発明者 神長 建史 東京都渋谷区神南一丁目8番10号 協和建 興株式会社内 (72)発明者 大川 増敏 東京都大田区仲池上二丁目19番6号 大肯 精密株式会社内 (72)発明者 名渕 利秀 東京都港区海岸一丁目5番20号 東京瓦斯 株式会社内 (72)発明者 伊藤 政広 東京都港区海岸一丁目5番20号 東京瓦斯 株式会社内 Fターム(参考) 3H025 DA02 DB18 DC02 DD01  ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Takeshi Kancho 1-8-10 Jinnan, Shibuya-ku, Tokyo Inside Kyowa Kenko Kogyo Co., Ltd. No. 6 Inside Oogai Seimitsu Co., Ltd. (72) Inventor Toshihide Nabuchi 1-5-20 Kaigan, Minato-ku, Tokyo Tokyo Gas Co., Ltd. (72) Inventor Masahiro Ito 1-5-20 Kaigan, Minato-ku, Tokyo No. Tokyo Gas Co., Ltd. F-term (reference) 3H025 DA02 DB18 DC02 DD01

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 既設管路を修理する際に、該管路の補修
対象箇所の端部に膨張・収縮可能なバッグを導入し、該
バッグを膨張させてガスの流通を遮断するガス遮断装置
であって、 上記管路内へのバッグ挿入位置に形成される連通孔に対
応して台座上に一体化された透明体からなる周壁を備え
た基部と、該周壁にて正対する位置に一体化され該基部
内に連通するバッグ挿入部と、上記基部内から外部に向
けて延長されて外部側端部に開閉弁が設けられているガ
ス放散部とを備えたバッグ挿入装置を備えたことを特徴
とするガス遮断装置。
1. A gas shut-off device for introducing an inflatable / contractible bag into an end of a repair target portion of an existing pipeline when repairing the existing pipeline, and inflating the bag to shut off gas flow. A base having a peripheral wall made of a transparent body integrated on a pedestal corresponding to a communication hole formed at a position where the bag is inserted into the conduit, and integrally formed at a position facing the peripheral wall. And a bag insertion device having a bag insertion portion which is formed and communicates with the inside of the base portion, and a gas diffusion portion extended from the inside of the base portion to the outside and provided with an on-off valve at an external end. A gas shut-off device characterized by the above-mentioned.
【請求項2】 既設管路を修理する際に、該管路の補修
対象箇所の端部に膨張・収縮可能なバッグを導入し、該
バッグを膨張させてガスの流通を遮断するガス遮断工法
であって、 上記管路内へのバッグ挿入位置に形成される連通孔に対
応して台座上に一体化された透明体からなる周壁を備え
た基部と、該周壁にて正対する位置に一体化され該基部
内に連通するバッグ挿入部と、上記基部内から外部に向
けて延長されて外部側端部に開閉弁が設けられているガ
ス放散部とを備えたバッグ挿入装置を準備し、 上記連通孔穿孔後に行われる上記連通孔の封止完了後に
上記バッグ挿入装置を上記連通孔に対応して管路に装着
し、該バッグ挿入装置内で上記封止に用いられたプラグ
栓の抜き取り、バッグの挿入およびバッグ間に流出する
ガスの放散作業をそれぞれ行うことを特徴とするガス遮
断工法。
2. A gas shut-off method in which an inflatable / contractible bag is introduced at an end of a repair target portion of an existing pipeline when the existing pipeline is repaired, and the bag is inflated to shut off gas flow. A base having a peripheral wall made of a transparent body integrated on a pedestal corresponding to a communication hole formed at a position where the bag is inserted into the conduit, and integrally formed at a position facing the peripheral wall. A bag insertion device having a bag insertion portion that is formed and communicates with the inside of the base, and a gas diffusion portion that is extended toward the outside from the inside of the base and provided with an on-off valve at the outside end is prepared. After the completion of the sealing of the communication hole performed after the formation of the communication hole, the bag insertion device is attached to the pipeline corresponding to the communication hole, and the plug plug used for the sealing is removed in the bag insertion device. , Insertion of bags and diffusion of gas flowing out between bags Gas shutoff method, which comprises carrying out, respectively.
【請求項3】 上記バッグ挿入装置には、内部に挿通さ
れたプラグ栓抜き取り工具が装備されていることを特徴
とする請求項2記載のガス遮断工法。
3. The gas shut-off method according to claim 2, wherein said bag insertion device is provided with a plug stopper removal tool inserted therein.
JP2000195687A 2000-06-29 2000-06-29 Gas cut-off device and gas cut-off method using the device Pending JP2002013688A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000195687A JP2002013688A (en) 2000-06-29 2000-06-29 Gas cut-off device and gas cut-off method using the device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000195687A JP2002013688A (en) 2000-06-29 2000-06-29 Gas cut-off device and gas cut-off method using the device

Publications (1)

Publication Number Publication Date
JP2002013688A true JP2002013688A (en) 2002-01-18

Family

ID=18694305

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000195687A Pending JP2002013688A (en) 2000-06-29 2000-06-29 Gas cut-off device and gas cut-off method using the device

Country Status (1)

Country Link
JP (1) JP2002013688A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100812215B1 (en) * 2006-09-22 2008-03-13 주식회사 삼천리 Apparatus by using air bag for preventing leaking of gases in gas pipe
KR100834859B1 (en) 2006-11-28 2008-06-04 주식회사 경동도시가스 Fluid cut-off device for pipe line and pipe constructing method using the same
KR20120130071A (en) * 2011-05-20 2012-11-28 제너럴 일렉트릭 캄파니 Drain apparatus
CN104712874A (en) * 2013-12-13 2015-06-17 中国石油天然气集团公司 Buried natural gas pipeline earth-surface overflowing drainage cover and application method
CN105067195A (en) * 2015-09-14 2015-11-18 中船黄埔文冲船舶有限公司 Pipeline water filling test sealing isolation device and application method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100812215B1 (en) * 2006-09-22 2008-03-13 주식회사 삼천리 Apparatus by using air bag for preventing leaking of gases in gas pipe
KR100834859B1 (en) 2006-11-28 2008-06-04 주식회사 경동도시가스 Fluid cut-off device for pipe line and pipe constructing method using the same
KR20120130071A (en) * 2011-05-20 2012-11-28 제너럴 일렉트릭 캄파니 Drain apparatus
JP2012241904A (en) * 2011-05-20 2012-12-10 General Electric Co <Ge> Discharging device
KR101981797B1 (en) * 2011-05-20 2019-05-23 제너럴 일렉트릭 캄파니 Drain apparatus
CN104712874A (en) * 2013-12-13 2015-06-17 中国石油天然气集团公司 Buried natural gas pipeline earth-surface overflowing drainage cover and application method
CN105067195A (en) * 2015-09-14 2015-11-18 中船黄埔文冲船舶有限公司 Pipeline water filling test sealing isolation device and application method thereof

Similar Documents

Publication Publication Date Title
JP2002013688A (en) Gas cut-off device and gas cut-off method using the device
JP3824145B2 (en) Piping blocking method and piping blocking case body
JP3611825B2 (en) Pipe line blocking method
JP3090580B2 (en) Rust prevention method for branch entrance and closing device for rust prevention work
JPH0947910A (en) Removing device for metal chip or powder cut in fluid tube
JP4650853B2 (en) Metal chip removal device in fluid pipe
JP3035600U (en) Perforation obturator for resin pipes
KR102289673B1 (en) Device for removing chip
JP2001271983A (en) Gas shut-off device
JP2006138369A (en) Active pipe branching method
KR100812215B1 (en) Apparatus by using air bag for preventing leaking of gases in gas pipe
JP3572294B2 (en) Bag introduction guide pipe and pipe cutoff method
KR100834859B1 (en) Fluid cut-off device for pipe line and pipe constructing method using the same
JPS6325238B2 (en)
JP4091290B2 (en) Radiation tube installation jig and installation method
CN218761525U (en) Prevent leaking atmospheric pressure isolating valve convenient to salvage
JP2008281042A (en) Active pipe branching/blocking method
JPH1030749A (en) Method for welding existing gas piping having coated layer on inner surface
KR200330200Y1 (en) Plugging Machine, which is also used for Chip Remover
JP4656368B2 (en) Continuous flow closure method
JP2007113595A (en) Gas cutoff fixture, water taking-out device removal work method using it, and joint replacement work method
JP2007010077A (en) Gas shut-off technique for regeneration-repaired pipeline
JPH0566555U (en) Device for inserting test equipment into gas conduits
JPS6222035B2 (en)
KR200251631Y1 (en) fluid blocking apparatus for pipe line