JP2002011136A - Course for half pipe competition of snowboard, and its servicing device and method - Google Patents

Course for half pipe competition of snowboard, and its servicing device and method

Info

Publication number
JP2002011136A
JP2002011136A JP2000196221A JP2000196221A JP2002011136A JP 2002011136 A JP2002011136 A JP 2002011136A JP 2000196221 A JP2000196221 A JP 2000196221A JP 2000196221 A JP2000196221 A JP 2000196221A JP 2002011136 A JP2002011136 A JP 2002011136A
Authority
JP
Japan
Prior art keywords
course
maintenance
guide rail
pipe
competition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000196221A
Other languages
Japanese (ja)
Inventor
Noboru Soejima
昇 副島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2000196221A priority Critical patent/JP2002011136A/en
Publication of JP2002011136A publication Critical patent/JP2002011136A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Repair (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a course for half pipe competition of a snowboard for accurately and rapidly preparing a source surface conforming to a standard, and the servicing device and method of the course. SOLUTION: The servicing device and method of the course for half pipe competition consist of a course for half pipe sport where a guide rail for guiding a servicing device or the like for maintaining the course is installed around the outer periphery of the course for the half pipe competition snowboards, an automatic traveling servicing machine having a servicing means that is a device for maintaining the course for the half pipe competition of snowboards and forms a snow layer course surface, a slider that is provided so that it can travel on the guide rail, and a connecting device for connecting the servicing machine and the slider.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、スノーボードに
よるハーフパイプ競技用の競技場と、その競技場の整備
装置並びに整備方法の技術分野に属するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to the technical field of a stadium for a half-pipe competition using a snowboard, and a maintenance device and a maintenance method of the stadium.

【0002】[0002]

【従来の技術】従来、スノーボードのハーフパイプ競技
用のコースを造成する際には、パワーショベル等を利用
して予め地面にコース面に相似する凹入部を掘削し、大
量の雪を供給した後、規格に適合する雪層コース面を切
削して所望のコースを完成させていた。
2. Description of the Related Art Conventionally, when constructing a course for a half-pipe competition for snowboarding, a power shovel or the like is used to excavate a concave portion similar to the course surface on the ground in advance and supply a large amount of snow. The desired course was completed by cutting the snow layer course surface conforming to the standard.

【0003】しかしながら、在来の掘削手段によってコ
ース面を形成する場合には、コース面が凹凸状となった
り、寸法、形状が変動して異形状となる等の課題点があ
り、前記した規格に適合する雪層コース面を形成するに
は高度の熟練と長時間を要するという改善点が残されて
いた。
[0003] However, when a conventional excavating means is used to form a course surface, there are problems such as the unevenness of the course surface, and variations in size and shape resulting in irregular shapes. An improvement point that a high level of skill and a long time were required to form a snowy course surface conforming to the above was left.

【0004】[0004]

【発明が解決しようとする課題】この発明が解決しよう
とする課題点は次の如くである。
The problems to be solved by the present invention are as follows.

【0005】(1) 迅速で正確に規格に適合するハーフパ
イプ競技用のコース面を形成出来る。
(1) It is possible to quickly and accurately form a course surface for a half pipe competition conforming to the standard.

【0006】(2) 特別な技能を要することなく、容易に
所望のコース面を形成することが出来る。
(2) A desired course surface can be easily formed without requiring special skills.

【0007】(3) コース造成のためのコストの低減を図
る。
(3) To reduce the cost for creating the course.

【0008】(4) 汎用されている各種の掘削機械器具を
整備装置として採用することが出来る。
(4) Various types of excavating equipment commonly used can be employed as a maintenance device.

【0009】(5) ガイドレールを利用して次のような活
用を図ることが出来る。 簡易リフト。 エアドームや防風ネットの設置。 観客スタンドや広告類の設置。
(5) The following utilization can be achieved by using the guide rail. Simple lift. Installation of air domes and windproof nets. Installation of audience stands and advertisements.

【0010】[0010]

【課題を解決するための手段】前記した課題点を解決す
るための具体的な手段とその機能は次の如くである。
The specific means for solving the above-mentioned problems and their functions are as follows.

【0011】(1) ハーフパイプ競技用コースの外周辺に
コース面を形成する整備装置を案内するガイドレールが
設けられており、整備装置をガイドレールで誘導させて
コース面を形成させるものであるため、雪面の凹凸や、
その圧締の状態の変化に影響されることなく規格に適合
するコース面を造成出来るものである。
(1) A guide rail for guiding a maintenance device for forming a course surface is provided around the periphery of the half pipe competition course, and the maintenance device is guided by the guide rail to form a course surface. Therefore, unevenness on the snow surface,
The course surface conforming to the standard can be created without being affected by the change of the pressing state.

【0012】(2) 前記のガイドレールは、高さ調節並び
に取り外し可能であるため、コース面の形成のみなら
ず、監視、撮影等のような利用にも供しうるものであ
り、必要に応じては取り外してコース面の整備をもなし
うるものである。
(2) Since the guide rail is adjustable in height and removable, it can be used not only for forming a course surface but also for monitoring, photographing, and the like. Can be removed for maintenance of the course.

【0013】(3) ガイドレール上に自走式のスライダー
を配設して整備装置と連結させているので整備装置がガ
イドレール沿いに円滑に推進され、支障なくコース面の
造成工事を施工しうるものである。
(3) Since the self-propelled slider is arranged on the guide rail and connected to the maintenance device, the maintenance device is smoothly propelled along the guide rail, and the course surface is constructed without any trouble. It is a good thing.

【0014】(4) 連結装置の全長が変更出来るので工事
の種類に応じて整備装置等を所要の位置で推進させるこ
とが出来る。
(4) Since the total length of the connecting device can be changed, the maintenance device or the like can be propelled at a required position according to the type of construction.

【0015】(5) リモートコントロールにより整備装置
とスライダーを同期させて推進させうるので造成が容易
となり、低コストでのコース面の造成が可能となる。
(5) Since the maintenance device and the slider can be propelled in synchronization with each other by remote control, the formation can be facilitated, and the course surface can be formed at low cost.

【0016】[0016]

【発明の実施の形態】以下、この発明の内容を、図面に
示す実施の形態に基づいて説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The contents of the present invention will be described below based on embodiments shown in the drawings.

【0017】(実施の形態1) 1.ハーフパイプ競技場 (1) 構造 図1に示すように、この実施の形態に係るスノーボード
のハーフパイプ競技場(コース)1000の特徴的な点
は、降雪又は人工雪等を積み上げ、圧迫させて形成する
競技領域を包囲するように地面Eにガイドレール110
0を架設した点である。
(Embodiment 1) 1. Half-pipe stadium (1) Structure As shown in FIG. 1, a characteristic point of a half-pipe stadium (course) 1000 for a snowboard according to this embodiment is formed by stacking and compressing snowfall or artificial snow. Guide rail 110 on the ground E to surround the playing area
0 is installed.

【0018】即ち、好ましくは、傾斜角度αを約10度
〜15度程度に緩やかに傾斜した地面Eに高さ調節可能
な支持柱1200を平面的には長方形を呈するように、
例えば約3m〜5m間隔に点在するように竪設し、この
支持柱1200の各頂部を連結するように全体として無
端状であって、長手方向部1120及び短手方向部11
10からなっていて、長方形状を呈するように前記のガ
イドレール1100を連設したものである。
That is, preferably, the height-adjustable support pillar 1200 is formed on the ground E whose inclination angle α is gently inclined to about 10 to 15 degrees so as to have a rectangular shape in plan view.
For example, it is vertically installed so as to be scattered at intervals of about 3 m to 5 m, and is endless as a whole so as to connect the tops of the support columns 1200, and has a longitudinal section 1120 and a transverse section 11.
The guide rails 1100 are connected to each other so as to have a rectangular shape.

【0019】この構造を更に詳しく述べると図2に示す
如くである。
This structure is described in more detail in FIG.

【0020】即ち、支持柱1200を構成する昇降杆1
201と、この昇降杆1201を高さ変更可能に嵌挿す
る固定杆1202とで構成させ、昇降杆1201の頂部
をボルト等によりガイドレール1100に着脱可能に連
結し、固定杆1201の基部を基礎ブロック1210に
よって地面Eに安定的に埋設しており、固定杆1202
に螺設した止ネジ1203によって昇降杆1201を固
定杆1202に固設しうるものである。
That is, the lifting rod 1 constituting the support column 1200
201 and a fixed rod 1202 for inserting the elevating rod 1201 so that the height can be changed. The top of the elevating rod 1201 is detachably connected to the guide rail 1100 by a bolt or the like, and the base of the fixed rod 1201 is used as a base. The fixed rod 1202 is stably embedded in the ground E by the block 1210.
The lifting rod 1201 can be fixedly mounted on the fixed rod 1202 by a set screw 1203 screwed into the fixed rod 1202.

【0021】又、図3に示すように、前記のガイドレー
ル1100については、好ましくは、長方形状の短手方
向部1110の一部を開閉可能に構成している。
As shown in FIG. 3, the guide rail 1100 is preferably constructed such that a part of a rectangular short direction portion 1110 can be opened and closed.

【0022】即ち、短手方向部1110の一部を開閉枠
1111とし、その一端を固定枠1112にヒンジ11
13によって連結し、他端をロック部1114によって
連結させたものである。
That is, a part of the short-side portion 1110 is an opening / closing frame 1111, and one end of the opening / closing frame 1111 is attached to the fixed frame 1112 by a hinge 11.
13 and the other end is connected by a lock portion 1114.

【0023】このロック部1114については、機構的
には、各種の構成が設計されるが、この形態にあって
は、図4に示すようにガイドレール1100の頂面の平
坦性を損なわないように下面に当接材1114Aを連設
し、ボルト1114Bによって連結させるように構成し
たものを採用した。
Although various configurations are designed mechanically for the lock portion 1114, in this embodiment, the flatness of the top surface of the guide rail 1100 is not impaired as shown in FIG. A contact member 1114A is continuously provided on the lower surface of the base member and connected by a bolt 1114B.

【0024】(2) 使用法 このガイドレール1100の機能については、コース1
000の整備方法、並びに使用方法の欄において後述す
る。
(2) Usage The function of the guide rail 1100 is described in Course 1.
000 will be described later in the section of maintenance method and usage method.

【0025】2.整備装置 このコース1000の整備装置2000については、図
2に示されている。
2. Maintenance Device The maintenance device 2000 of the course 1000 is shown in FIG.

【0026】(1) 構造 即ち、この整備装置2000は、整備機2100とガイ
ドレール1100への連結装置2200とで構成されて
いる。
(1) Structure That is, the maintenance device 2000 includes a maintenance machine 2100 and a connecting device 2200 for connecting to the guide rail 1100.

【0027】 整備機2100 図2に示すように、ホイール又は無端軌条等によって自
走式とされた本体2110と、雪層整備手段2120と
で構成されており、本体2110に連結された雪層整備
手段2120は流体シリンダ等の作動手段2130によ
って、前後、高さ、傾斜方向にその姿勢を変更調節可能
とされている。
As shown in FIG. 2, a maintenance machine 2100 includes a main body 2110 made self-propelled by wheels or endless rails and the like, and a snow layer maintenance means 2120, and a snow layer maintenance connected to the main body 2110. The attitude of the means 2120 can be changed and adjusted in the front-back, height, and tilt directions by operating means 2130 such as a fluid cylinder.

【0028】(A) 本体2110 本体2110内部に設けたエンジン等の動力源2111
により、前後方向に推進可能であり、伝動手段2112
を介して雪層整備手段2120を作動しうるように構成
されており、制御手段2113によって、その動作を制
御出来るものであり、この制御手段2113について
は、キャビンを設けてオペレータによって操作させても
よいが、この実施の形態にあっては、リモートコントロ
ール出来るようにアンテナ2114が設けられており、
無線通信により遠隔のオペレータによるコントローラ4
000によって操作しうるように構成されている。
(A) Main body 2110 Power source 2111 such as an engine provided inside main body 2110
The transmission means 2112
It is configured so that the snow layer maintenance means 2120 can be operated via the control means, and the operation thereof can be controlled by the control means 2113. The control means 2113 can be operated by an operator by providing a cabin. In this embodiment, an antenna 2114 is provided so that remote control can be performed.
Controller 4 by remote operator by wireless communication
000.

【0029】又、この本体2110のシャシー2115
には、図5と図6に示すように、コ字形の連結枠211
6が突設されており、後述する連結手段2300に連結
可能とされている。
The chassis 2115 of the main body 2110
As shown in FIGS. 5 and 6, a U-shaped connecting frame 211 is provided.
6 are protruded and can be connected to a connecting means 2300 described later.

【0030】(B) 雪層整備手段2120 図2と図7に示すように、伝動手段2112を介して旋
回されるフレキシブル駆動軸2121に連結されたスク
リューコンベア2122と、その長手方向沿いの外周を
包囲する同様に可撓性を具備するカバー2123とで構
成され、カバー2123は、スクリューコンベア212
2によって雪層を切削しうるように雪面対向側を一部開
放させるように構成している。
(B) Snow layer maintenance means 2120 As shown in FIGS. 2 and 7, a screw conveyor 2122 connected to a flexible drive shaft 2121 which is turned via a transmission means 2112, and an outer periphery along the longitudinal direction thereof. And a similarly flexible cover 2123 that surrounds the screw conveyor 212.
2, the snow layer facing side is partially opened so that the snow layer can be cut.

【0031】(C) 作動手段2130 図2に示すように、第1、第2の流体シリンダ213
1、2132によってスクリューコンベア2121を高
さ方向、並びに傾斜方向に移動させうるものであり、前
記したコントローラ4000において遠隔操作しうるも
のである。
(C) Actuating means 2130 As shown in FIG. 2, the first and second fluid cylinders 213
The screw conveyor 2121 can be moved in the height direction and the inclined direction by the reference numerals 1 and 2132, and can be remotely operated by the controller 4000 described above.

【0032】 連結手段2300 図6に示すように、外端にナス環部2311、2321
を設け、内端に逆ネジ部2312、2322を設けた一
組の連結杆2310、2320の逆ネジ部2312、2
322を共軸的に対向させ、操作部2331を備えたタ
ーンバックル2330を螺合させたものである。
Connecting means 2300 As shown in FIG. 6, eggplant ring portions 2311 and 2321 are provided at the outer ends.
And a pair of connecting rods 2310, 2320 provided with reverse screw portions 2312, 2322 at the inner end.
322 are coaxially opposed, and a turnbuckle 2330 provided with an operation portion 2331 is screwed together.

【0033】尚、この連結手段2300については、そ
の最大の長さを変更させた異なる寸法の複数の連結手段
2300を予め用意することによって、各種のコース1
000の整備に柔軟に対応出来るものである。
The connecting means 2300 is prepared by preparing in advance a plurality of connecting means 2300 of different dimensions with the maximum length being changed so that various courses 1300 can be prepared.
000 can be flexibly accommodated.

【0034】(2) 使用法 この連結手段2300の使用法についても整備方法にお
いて後述する。
(2) Usage The usage of the connecting means 2300 will also be described later in the maintenance method.

【0035】(3) スライダー3000 図5に示すように、ガイドレール1100上に冠装され
て自走しうるスライダー3000は、その主枠3100
の頂面上に電動モータ3010と、この電動モータ30
10を駆動させるバッテリー3020並びに、その動作
を制御しうる制御部3030とを設けており、この制御
部3030のアンテナ3031は、前記コントローラ4
000から受信して操作されるものである。
(3) Slider 3000 As shown in FIG. 5, a slider 3000 which can be mounted on a guide rail 1100 and which can run on its own, has a main frame 3100.
An electric motor 3010 on the top surface of the
And a control unit 3030 that can control the operation of the controller 3030. The antenna 3031 of the control unit 3030
000 and is operated.

【0036】又、主枠3100の中空状の下部には、ガ
イドレール1100との間にローラーベアリング304
0、3050を介装させると共に、電動モータ3010
によって作動される駆動輪3060をガイドレール11
00の外側面に係合させるように配設している。
A roller bearing 304 is provided between the main frame 3100 and the guide rail 1100 at the hollow lower portion.
0, 3050 and the electric motor 3010
Drive wheel 3060 operated by guide rail 11
00 to be engaged with the outer surface.

【0037】又、ガイドレール1100の内側面に係合
される転動軸受3070をバネ等の弾性付勢体3080
により、ガイドレール1100方向に付勢させるように
配設している。
The rolling bearing 3070 engaged with the inner surface of the guide rail 1100 is provided with an elastic urging body 3080 such as a spring.
, So that it is urged toward the guide rail 1100.

【0038】更に、このスライダー3000の主枠31
00の外側であって、前記連結手段2300と連結され
る側には、ナス環部2311に係合される連結枠310
1を突設している。
Further, the main frame 31 of the slider 3000
00, on the side connected to the connection means 2300, a connection frame 310 engaged with the eggplant ring portion 2311 is provided.
1 is protruding.

【0039】尚、図8に示すように、主枠3100の頂
面には、監視カメラや広告、もしくはテント等を連設し
うるホルダー3102として止ボルト3103を備えた
平行枠や同様の固定具3101を配設したものである。
As shown in FIG. 8, on a top surface of the main frame 3100, a parallel frame having a fixing bolt 3103 as a holder 3102 capable of connecting a surveillance camera, an advertisement, a tent, or the like, or a similar fixing device. 3101 is provided.

【0040】3.コース整備手順 次に、基本的なコース1000の整備方法について説明
する。
3. Course Maintenance Procedure Next, a basic course 1000 maintenance method will be described.

【0041】(1) 掘削工程 図1と図3に示すガイドレール1100のロック部11
14を解放してヒンジ部1113を支点として開閉枠1
111を矢印(X)のように旋回させ、ここから整備装
置2000をガイドレール1100内に侵入させ、再び
開閉枠1111を閉じて無端状のガイドレール1100
に復帰させる(矢印(X’))。
(1) Excavation Step The lock portion 11 of the guide rail 1100 shown in FIGS. 1 and 3
14 to release the open / close frame 1 with the hinge portion 1113 as a fulcrum.
111 is turned as shown by the arrow (X), the maintenance device 2000 is caused to enter the guide rail 1100 from here, and the opening / closing frame 1111 is closed again to endless the guide rail 1100.
(Arrow (X ′)).

【0042】この場合、ガイドレール1100の高さ
は、必要に応じて止ネジ1203を操作して昇降杆12
01の高さを変更して整備装置2000の高さが互いに
整合するように調整する。
In this case, the height of the guide rail 1100 can be adjusted by operating the set screw 1203 if necessary.
The height of the maintenance device 2000 is adjusted by changing the height of the maintenance device 2000.

【0043】次いで、連結装置2300のナス環部23
11、2312をシャシー2115の連結枠2116
と、スライダー3000の連結枠3101に係合させ、
図6で示すようにターンバックル2330を旋回させて
ガイドレール1100と整備装置2000の間隔を調整
する(図2参照)。
Next, the eggplant ring portion 23 of the coupling device 2300
11 and 2312 to the connecting frame 2116 of the chassis 2115
And engage with the connection frame 3101 of the slider 3000,
As shown in FIG. 6, the turn buckle 2330 is turned to adjust the distance between the guide rail 1100 and the maintenance device 2000 (see FIG. 2).

【0044】その後、作動手段2130により、整備手
段2120の高さ方向を調整し、動力源2111により
整備装置2000を推進させつつスクリューコンベア2
121を旋回させ、地面(E)を掘削させ、図1に示す
ようなコース用凹溝(D)を形成する。
Thereafter, the height direction of the maintenance means 2120 is adjusted by the operating means 2130, and the screw conveyor 2 is moved while the maintenance apparatus 2000 is propelled by the power source 2111.
By turning 121, the ground (E) is excavated to form a course groove (D) as shown in FIG.

【0045】この間の操作は、コントローラ4000に
より遠隔操縦しうるものであって、アンテナ2114に
より受信させて整備装置2000を、例えば毎分2〜3
m程度の速さで推進しつつコース用凹溝(D)を順次掘
削施工するものであり、同時にアンテナ3031により
スライダー3000についても整備装置2000と等速
で推進されるように電動モータ3010を始動させるも
のである。
The operation during this time can be remotely controlled by the controller 4000, and is received by the antenna 2114 to cause the maintenance device 2000 to operate at a rate of, for example, two to three times per minute.
The course groove (D) is sequentially excavated while being propelled at a speed of about m, and at the same time, the electric motor 3010 is started by the antenna 3031 so that the slider 3000 is propelled at the same speed as the maintenance device 2000. It is to let.

【0046】これによって、整備装置2000がガイド
レール1100と所要の等距離位置で移動されるため、
コース用凹溝(D)は、図9に示すように一定の距離
(L1)位置で正確に掘削しうるものであり、後述する
雪層コース面(F)を精密な所定寸法で形成しうること
となるが、この点は後述する。
Thus, the maintenance device 2000 is moved at a required equidistant position with respect to the guide rail 1100.
As shown in FIG. 9, the course concave groove (D) can be accurately excavated at a predetermined distance (L1), and can form a snow layer course surface (F) described later with a precise predetermined dimension. This will be described later.

【0047】尚、このコース用凹溝(D)の寸法は、好
ましくは次の如くである。 ◎ 巾員 … 10m〜18m ◎ 全長 … 80m〜150m ◎ 壁の内高さ … 2m〜4m
The dimensions of the course groove (D) are preferably as follows. ◎ Width: 10m-18m ◎ Total length: 80m-150m ◎ Inner height of the wall: 2m-4m

【0048】この掘削作業の終了後は、開閉枠1111
を一時的に開放して整備装置2000をコース1000
外に退避させる。
After completion of the excavation work, the open / close frame 1111
To temporarily open the maintenance device 2000 to the course 1000
Evacuate outside.

【0049】又、掘削した土砂を搬出するには、ベルト
コンベア等の汎用されている搬出機を併用すればよいも
のであって、特に詳細な説明は割愛する。
In order to carry out the excavated earth and sand, a general-purpose carry-out machine such as a belt conveyor may be used in combination, and a detailed description thereof will be omitted.

【0050】又、このコース用凹溝(D)の掘削に当た
っては、汎用されている溝掘機やパワーショベル等を用
いても同様の効果が上げられることは言うまでもないこ
とであり、この場合、ガイドレール1100に連結させ
る連結装置2300に連結させる連結枠を別途溝掘機や
パワーショベルに用意すれば足りるものである。
In digging the course groove (D), it is needless to say that the same effect can be obtained by using a general-purpose digging machine, a power shovel, or the like. It is sufficient that a connection frame to be connected to the connection device 2300 to be connected to the guide rail 1100 be separately prepared for a trench machine or a power shovel.

【0051】尚、コース1000内に予めコース用凹溝
(D)を形成し、又、その表面にコンクリート等を塗設
して恒久的なコース用凹溝を用意しておいても差し支え
ないことは言うまでもないことである。
The course groove (D) may be formed in advance in the course 1000, and a permanent course groove may be prepared by coating concrete or the like on the surface. Needless to say.

【0052】(2) 雪供給工程 図10に示すように、大量の雪をダンプトラックで搬送
し、パワーショベルやブルドーザ等を利用してコース1
000に供給する(点線(H))。
(2) Snow supply step As shown in FIG. 10, a large amount of snow is transported by a dump truck, and a course 1 is applied using a power shovel, a bulldozer, or the like.
000 (dotted line (H)).

【0053】(3) 雪圧締工程 図10に示すように、ブルドーザ等で雪を圧締施工して
所要の密度と強度を有するようにする(一点破線
(S))。
(3) Snow Clamping Step As shown in FIG. 10, the snow is clamped with a bulldozer or the like to have the required density and strength (dashed line (S)).

【0054】(4) コース造成工程 図11に示すように、掘削工程と同様に整備装置200
0を連結装置2300によってガイドレール1100に
連係させて配置する。
(4) Course Building Process As shown in FIG.
0 is arranged in connection with the guide rail 1100 by the connecting device 2300.

【0055】この際、ガイドレール1100の高さにつ
いては、雪層の深さに応じて昇降杆1201の高さを変
更することによって調整するものであり、この点、掘削
工程において前記したのと同様に調整すればよい。
At this time, the height of the guide rail 1100 is adjusted by changing the height of the elevating rod 1201 in accordance with the depth of the snow layer. It may be adjusted similarly.

【0056】この状態でコントローラ4000により整
備装置2000とスライダー3000とを等速で推進さ
せつつ、フレキシブル駆動軸2121上のスクリューコ
ンベア2122によって雪を掘削し、順次雪層コース面
(F)を形成していくものであり、この間、作動手段2
130によりスクリューコンベア2122の高さや指向
方向を随時変更させて雪層コース面(F)を完成させる
ものである。
In this state, while the maintenance device 2000 and the slider 3000 are propelled at a constant speed by the controller 4000, snow is excavated by the screw conveyor 2122 on the flexible drive shaft 2121 to sequentially form a snow layer course surface (F). During this time, the operating means 2
The height and the direction of the screw conveyor 2122 are changed as needed by 130 to complete the snow course surface (F).

【0057】ところで、この工程においても整備装置2
000とガイドレール1100との間隔は、連結装置2
300によって完全に規制されているため、ガイドレー
ル1100沿いに移動されることとなる。
Incidentally, also in this process, the maintenance device 2
000 and the guide rail 1100 are connected by the connecting device 2
Since it is completely regulated by 300, it will be moved along guide rail 1100.

【0058】従って、スクリューコンベア2121につ
いても、ガイドレール1100との間隔が不変であるた
め、結局所定の一定の距離(L2)において精密に雪層
コース面(F)を掘削し、理想的なコース1000の造
成をなしうるものである。
Therefore, since the distance between the screw conveyor 2121 and the guide rail 1100 is not changed, the snow layer course surface (F) is precisely excavated at a predetermined constant distance (L2). It is possible to make 1000 formations.

【0059】尚、前記のように新規にコース1000を
造成する場合の他に、例えば競技により損傷されたコー
ス面を修復する際や、新たな降雪によってコース面が変
形した際等にも前記と同様に雪層コース面(F)を整備
出来ることは言うまでもないことである。
In addition to the case where the course 1000 is newly formed as described above, the above-mentioned case is also taken when, for example, repairing a course surface damaged by a game or when the course surface is deformed by new snowfall. Similarly, it goes without saying that the snow course surface (F) can be maintained.

【0060】従って、整備装置2000の走行方向につ
いて格別調整することなく、円滑で、しかも迅速に規格
に沿った寸法の雪層コース面(F)を正確に形成しうる
ものである。
Therefore, it is possible to form the snow course surface (F) smoothly and promptly and precisely in accordance with the standard without specially adjusting the running direction of the maintenance device 2000.

【0061】尚、掘削した雪については、前記の掘削工
程と同様に適宜排除すればよいものである。
Incidentally, the excavated snow may be appropriately removed similarly to the above-mentioned excavation step.

【0062】図8に示すスライダー3000の主枠31
00には、監視用、もしくは撮影用のカメラCAを搭載
させているので、競技における状況をガイドレール11
00上を移動するカメラCAによって視認出来ることと
なり、観客に臨場感を与えることが出来、実用性が高め
られる。
The main frame 31 of the slider 3000 shown in FIG.
Since 00 is equipped with a monitoring or photographing camera CA, the situation in the competition is described on the guide rail 11.
The image can be visually recognized by the camera CA moving over the image 00, giving the audience a sense of realism, and the practicality is enhanced.

【0063】(実施の形態2) 1.整備装置2000A 実施の形態2の整備装置2000Aが実施の形態1と相
違する主たる点は、雪層整備手段2120Aの自由端側
を連結装置2300Aを介してガイドレール1100A
に連係させた点である。
(Embodiment 2) Maintenance device 2000A The main difference between the maintenance device 2000A of the second embodiment and the first embodiment is that the free end side of the snow layer maintenance means 2120A is connected to the guide rail 1100A via the connecting device 2300A.
This is the point linked to

【0064】以下、その内容を図12乃至図14に基づ
いて説明するが、実施の形態1と共通する点は、符号に
(A)を付して表示するに止めた。
Hereinafter, the contents will be described with reference to FIGS. 12 to 14. However, the same points as in the first embodiment will be described by adding (A) to the reference numerals.

【0065】図12に示すように、整備機2100Aに
連結された整備手段2120Aにおけるフレキシブル駆
動軸2121A上には、スクリューコンベア2122A
を連設し、その外周には可撓性を具備するカバー212
3Aを被覆させた点では、実施の形態1と共通している
が、この実施の形態2にあっては、カバー2123Aの
自由端側に図13に示すような軸受ディスク2124A
を固設してフレキシブル駆動軸2121Aを軸支させる
と共に、その外周に連結枠2116Aを突設し、この連
結枠2116Aに図6に示すような連結装置2300A
の一方のナス環部2311Aを着脱可能に連結させたも
のである。
As shown in FIG. 12, a screw conveyor 2122A is provided on a flexible drive shaft 2121A of a maintenance means 2120A connected to a maintenance machine 2100A.
And a cover 212 having flexibility is provided on the outer periphery thereof.
In the second embodiment, the bearing disk 2124A as shown in FIG. 13 is provided on the free end side of the cover 2123A.
Is fixed to support the flexible drive shaft 2121A, and a connection frame 2116A is protruded from the outer periphery of the flexible drive shaft 2121A. A connection device 2300A as shown in FIG.
Is removably connected to one of the eggplant ring portions 2311A.

【0066】2.コース整備手順 次に、予めコース1000A内にコース用凹溝(D)が
形成されている場合のコース整備手順について説明す
る。
2. Course maintenance procedure Next, a course maintenance procedure in the case where the course groove (D) is formed in the course 1000A in advance will be described.

【0067】(1) 雪供給工程と雪圧締工程 この両工程は、図10において実施の形態1で説明した
のと変わりはない。
(1) Snow supply step and snow compaction step These two steps are the same as those described in the first embodiment in FIG.

【0068】(2) コース造成工程 図14に示すように、整備装置2000Aの整備手段2
120Aを連結装置2300Aによってガイドレール1
100Aに連係させて配置する。
(2) Course creation process As shown in FIG. 14, the maintenance means 2 of the maintenance device 2000A
120A is connected to the guide rail 1 by the connecting device 2300A.
It is arranged in association with 100A.

【0069】この際、ガイドレール1100Aの高さに
ついては、雪層の深さに応じて昇降杆1201Aの高さ
を変更することによって調整するものであり、この点、
実施の形態1と同様に調整すればよい。
At this time, the height of the guide rail 1100A is adjusted by changing the height of the elevating rod 1201A in accordance with the depth of the snow layer.
What is necessary is just to adjust similarly to Embodiment 1.

【0070】この状態でコントローラ4000Aにより
整備装置2000Aとスライダー3000Aとを等速で
推進させつつ、フレキシブル駆動軸2121A上のスク
リューコンベア2122Aによって雪を掘削し、順次雪
層コース面(F)を形成していくものである。
In this state, while the maintenance device 2000A and the slider 3000A are propelled at a constant speed by the controller 4000A, the snow is excavated by the screw conveyor 2122A on the flexible drive shaft 2121A, and the snow layer course surface (F) is sequentially formed. It is something that goes.

【0071】ところで、この工程において、スクリュー
コンベア2121Aについては、ガイドレール1100
Aとの間隔が不変であるため、結局所定の一定の距離
(L3)において精密に雪層を掘削し、理想的なコース
1000Aを造成しうるものである。
By the way, in this step, the screw rail 2121A is not
Since the distance from A is constant, the snow layer can be precisely excavated at a predetermined constant distance (L3), thereby forming an ideal course 1000A.

【0072】その他の点については、実施の形態1と変
わるところはないので重ねての説明は省略する。
The other points are the same as those in the first embodiment, and thus the description thereof will not be repeated.

【0073】(実施の形態3)図示しての説明は省略す
るが、コース面の周辺にガイドレール1100を配置し
たので、このガイドレール1100は、例えば次の利用
形態も容易に設計しうるものである。
(Embodiment 3) Although not shown in the drawings, the guide rails 1100 are arranged around the course surface, so that the guide rails 1100 can be easily designed, for example, in the following use modes. It is.

【0074】(1) ガイドレール1100を利用して競技
者等用の簡易リフトを設置する。
(1) A simple lift for a competitor or the like is installed using the guide rail 1100.

【0075】(2) ガイドレール1100に全天候型のエ
アドームを付設し、又は強風への対応策として防風ネッ
トを架設する。
(2) An all-weather air dome is attached to the guide rail 1100, or a windproof net is installed as a measure against strong winds.

【0076】(3) ガイドレール1100に広告や注意書
き等を表示させる。
(3) Display an advertisement, notice, etc. on the guide rail 1100.

【0077】[0077]

【発明の効果】この発明による顕著な効果は次の如くで
ある。
The remarkable effects of the present invention are as follows.

【0078】 整備装置をガイドレールに誘導させる
ので、規格に適合するコース面を精密で迅速に造成する
ことが出来る。
Since the maintenance device is guided to the guide rail, a course surface conforming to the standard can be accurately and quickly formed.

【0079】 ガイドレールの高さが変更出来るの
で、推積した雪量に関わりなく、常時整備用に供するこ
とが出来る。
Since the height of the guide rail can be changed, it can be always used for maintenance regardless of the amount of snow accumulated.

【0080】 ガイドレールが着脱可能であるから、
不使用時には取り外してコースを利用出来る。
Since the guide rail is detachable,
You can use the course by removing it when not in use.

【0081】 スライダーが整備装置と同期的に自走
出来るので、コース面の整備を円滑に実施出来る。
Since the slider can self-run in synchronization with the maintenance device, maintenance of the course surface can be performed smoothly.

【0082】 連結装置を調節して整備装置の位置を
自在に変更出来るので所望のコース面を形成出来る。
Since the position of the maintenance device can be freely changed by adjusting the connecting device, a desired course surface can be formed.

【0083】 競技中にカメラにより、常時所望の競
技を視認出来る。
During a game, a desired game can always be visually recognized by a camera.

【図面の簡単な説明】[Brief description of the drawings]

【図1】実施の形態1のスノーボードのハーフパイプ競
技場の斜視図。
FIG. 1 is a perspective view of a half pipe stadium of a snowboard according to a first embodiment.

【図2】実施の形態1の整備装置をコースのイ−イ横断
位置で捉えた説明図。
FIG. 2 is an explanatory view of the maintenance device according to the first embodiment at a position crossing the course along the line II.

【図3】図1のガイドレールの開閉説明図。FIG. 3 is an explanatory view of opening and closing of the guide rail in FIG. 1;

【図4】図3のロ−ロ断面図。FIG. 4 is a cross-sectional view taken along a roll of FIG. 3;

【図5】ガイドレールとスライダーの連結状態を示す縦
断面図。
FIG. 5 is a longitudinal sectional view showing a connection state of a guide rail and a slider.

【図6】図2の連結装置の縦断面図。FIG. 6 is a longitudinal sectional view of the connecting device of FIG. 2;

【図7】図2の整備手段のハ−ハ断面図。FIG. 7 is a sectional view of the maintenance means of FIG.

【図8】図5のスライダーの側面図。FIG. 8 is a side view of the slider of FIG. 5;

【図9】掘削工程説明図。FIG. 9 is an explanatory view of an excavation step.

【図10】雪供給工程説明図。FIG. 10 is an explanatory view of a snow supply step.

【図11】コース造成工程説明図。FIG. 11 is an explanatory view of a course creation process.

【図12】図2同様の実施の形態2の説明図。FIG. 12 is an explanatory view of Embodiment 2 similar to FIG. 2;

【図13】図12の整備手段のニ−ニ方向視図。FIG. 13 is a view as viewed in a direction of a line of the maintenance means of FIG. 12;

【図14】図12によるコース造成工程説明図。FIG. 14 is an explanatory view of a course creation step according to FIG. 12;

【符号の説明】[Explanation of symbols]

1000(A) コース F(A) コース面 1100(A) ガイドレール 2000(A) 整備装置 2100(A) 整備機 2120(A) 整備手段 2300(A) 連結装置 3000(A) スライダー 3102 取付手段(ホルダー) 1000 (A) Course F (A) Course surface 1100 (A) Guide rail 2000 (A) Maintenance device 2100 (A) Maintenance machine 2120 (A) Maintenance means 2300 (A) Connection device 3000 (A) Slider 3102 Mounting means ( holder)

Claims (13)

【特許請求の範囲】[Claims] 【請求項1】 スノーボードのハーフパイプ競技用コー
スにおいて、当該コースの外周辺にコースを整備する整
備装置等を案内するガイドレールを設置したハーフパイ
プ競技用コース。
1. A half-pipe competition course for a snowboard half-pipe competition in which a guide rail for guiding a maintenance device or the like for maintaining the course is installed around the periphery of the course.
【請求項2】 前記ガイドレールが少なくとも前記ハー
フパイプ競技用コースの雪層コース面に平行するように
配置された請求項1記載のハーフパイプ競技用コース。
2. The half pipe competition course according to claim 1, wherein said guide rail is arranged so as to be at least parallel to a snow layer course surface of said half pipe competition course.
【請求項3】 前記ガイドレールが地面に高さ調節可能
に配備された請求項1又は2のいずれか1項記載のハー
フパイプ競技用コース。
3. The half pipe competition course according to claim 1, wherein the guide rail is arranged on the ground so as to be adjustable in height.
【請求項4】 前記ガイドレールが地面から取り外し可
能に配備された請求項1又は2のいずれか1項記載のハ
ーフパイプ競技用コース。
4. The half pipe competition course according to claim 1, wherein the guide rail is provided so as to be detachable from the ground.
【請求項5】 前記ガイドレールが部分的に分離可能で
無端状に形成された請求項1乃至4のいずれか1項記載
のハーフパイプ競技用コース。
5. The half-pipe competition course according to claim 1, wherein the guide rail is formed so as to be partially separable and endless.
【請求項6】 スノーボードのハーフパイプ競技用コー
スを整備する装置であって、雪層コース面を形成するた
めの整備手段を具備する自走式の整備機と、前記ガイド
レールに移動可能に配設したスライダーと、前記整備機
と前記スライダーとを連結する連結装置とで構成された
ハーフパイプ競技用コースの整備装置。
6. An apparatus for maintaining a half-pipe competition course for snowboarding, comprising: a self-propelled maintenance machine having maintenance means for forming a snow course surface; and a movably arranged guide rail. A maintenance device for a half-pipe competition course, comprising a slider provided and a connecting device for connecting the maintenance machine and the slider.
【請求項7】 前記請求項6において、連結装置が整備
装置における整備手段と、前記スライダーとを連結する
ように構成されたハーフパイプ競技用コースの整備装
置。
7. The maintenance device for a half-pipe competition course according to claim 6, wherein the connection device connects the maintenance means in the maintenance device and the slider.
【請求項8】 前記整備手段が雪層を掘削しうる手段で
ある請求項6記載のハーフパイプ競技用コースの整備装
置。
8. The maintenance device for a half-pipe competition course according to claim 6, wherein the maintenance device is a device capable of excavating a snow layer.
【請求項9】 前記スライダーが前記整備機と等速で推
進可能に自走式に構成された請求項6又は7記載のハー
フパイプ競技用コースの整備装置。
9. The maintenance apparatus for a half-pipe competition course according to claim 6, wherein the slider is self-propelled so that the slider can be propelled at a constant speed with the maintenance machine.
【請求項10】 前記スライダーには、監視用カメラ、
標識、その他のハーフパイプ競技に係わる機械、器具等
を装着脱可能とする取付手段を付設した請求項9記載の
ハーフパイプ競技用コースの整備装置。
10. The surveillance camera,
The maintenance apparatus for a course for a half-pipe competition according to claim 9, further comprising a mounting means for attaching and detaching a sign, other machines, instruments and the like related to the half-pipe competition.
【請求項11】 前記連結装置が前記ガイドレールと前
記整備機との間隔を調整しうるように、その長手方向に
関する全長を変更可能に構成された請求項6又は7記載
のハーフパイプ競技用コースの整備装置。
11. The half-pipe competition course according to claim 6, wherein the connecting device is configured to be able to change the total length in the longitudinal direction so that the distance between the guide rail and the maintenance machine can be adjusted. Maintenance equipment.
【請求項12】 スノーボードのハーフパイプ競技用コ
ースを整備する方法であって、次の工程からなる整備方
法。 (1) 競技用コースに雪を推積させる。 (2) 前記の雪を圧締処理する。 (3) 競技用コース面に平行して配設したガイドレールに
誘導される整備機の整備手段により雪層を掘削してコー
ス面を形成する。
12. A method for preparing a half-pipe course for snowboarding, comprising the following steps. (1) Snowing the competition course. (2) The above snow is pressed. (3) The snow layer is excavated by the maintenance means of the maintenance machine guided by the guide rail arranged parallel to the competition course surface to form the course surface.
【請求項13】 前記請求項12の整備方法における工
程(1) の以前に、予めコース面に相似するコース用凹溝
を掘設する工程を付加した請求項12記載のハーフパイ
プ競技用コースの整備方法。
13. The half pipe competition course according to claim 12, wherein a step of digging a course groove similar to the course surface is added before step (1) in the maintenance method according to claim 12. Maintenance method.
JP2000196221A 2000-06-29 2000-06-29 Course for half pipe competition of snowboard, and its servicing device and method Pending JP2002011136A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000196221A JP2002011136A (en) 2000-06-29 2000-06-29 Course for half pipe competition of snowboard, and its servicing device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000196221A JP2002011136A (en) 2000-06-29 2000-06-29 Course for half pipe competition of snowboard, and its servicing device and method

Publications (1)

Publication Number Publication Date
JP2002011136A true JP2002011136A (en) 2002-01-15

Family

ID=18694759

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000196221A Pending JP2002011136A (en) 2000-06-29 2000-06-29 Course for half pipe competition of snowboard, and its servicing device and method

Country Status (1)

Country Link
JP (1) JP2002011136A (en)

Similar Documents

Publication Publication Date Title
US3377933A (en) Road laying machine
JP2961406B2 (en) Athletic field moving device
CN107190616A (en) Plastic sports ground construction method
US7172364B1 (en) Dropped curb finisher
JP2006095320A (en) Device and method for providing activity surface
US7824127B1 (en) Road repair tractor and method of using the same
JP2002011136A (en) Course for half pipe competition of snowboard, and its servicing device and method
JP4708265B2 (en) How to build a vegetation frame
JP3816498B2 (en) Continuous laying method of precast concrete plate
US20200054932A1 (en) Retractable surface system and method of installation for the retractable surface system
JP6998845B2 (en) Multipurpose stadium
JP2926023B2 (en) Excavation positioning device for excavator
KR100898806B1 (en) The construction method and apparatus for spreading materials for reinforcing theground for approach of equipments to the soft ground
CA2603648A1 (en) Method and device for improving a field, such as a field of grass
FR2839990A1 (en) Prefabricated Civil engineering structure for installing passage under rail track comprises portico with upper crosspiece connecting two vertical abutments extended by additional spans supported by cover plate on talus ridge
JP2001172972A (en) Laying and leveling thickness control system for fill
JP2002194705A (en) Continuous laying method for precast concrete slab
JP2001098636A (en) Free-grade street gutter construction method
CN216786749U (en) Cobblestone laying device for garden planning
JP3577581B2 (en) Sand formation method and mobile sand spreader on wide soft ground
JP2024143682A (en) Temporary facilities for constructing box structures
JP3174560B1 (en) Golf course bunker structure
CH671053A5 (en) Existing roadway covering method - uses portal truck on tracks either side and lowering prefab sections onto foundations
JPH0327042Y2 (en)
JPH08246712A (en) Temporary roof device