JP2001329504A - Form material and forming method for water permeable pavement - Google Patents

Form material and forming method for water permeable pavement

Info

Publication number
JP2001329504A
JP2001329504A JP2000155053A JP2000155053A JP2001329504A JP 2001329504 A JP2001329504 A JP 2001329504A JP 2000155053 A JP2000155053 A JP 2000155053A JP 2000155053 A JP2000155053 A JP 2000155053A JP 2001329504 A JP2001329504 A JP 2001329504A
Authority
JP
Japan
Prior art keywords
pavement
plate portion
ground
paved
permeable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000155053A
Other languages
Japanese (ja)
Inventor
Suguru Ito
英 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Forestry Co Ltd
Sumitomo Forestry Landscaping Co Ltd
Original Assignee
Sumitomo Forestry Co Ltd
Sumitomo Forestry Landscaping Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Forestry Co Ltd, Sumitomo Forestry Landscaping Co Ltd filed Critical Sumitomo Forestry Co Ltd
Priority to JP2000155053A priority Critical patent/JP2001329504A/en
Publication of JP2001329504A publication Critical patent/JP2001329504A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

PROBLEM TO BE SOLVED: To form a water permeable pavement easily and surely in a short term of works. SOLUTION: This form material has a first plate part and a second plate part which are provided, to form an L-shaped section, and plural holes are provided in one side plate part of the plate parts. In this water permeable pavement forming method, the form is set on the ground to be paved, with the plate part side having holes grounded, and with the other plate part side erected along the paved edge part of the ground to be paved, and the pavement material is laid on the ground to be paved of the grounded plate part side taking the erected plate part surface as a sheathing board surface. In the water permeable pavement forming method, the pavement material is laid on the ground to be paved of the grounded plate part side, and a water permeable surface layer is formed on the surface of the laid pavement material and the form material surface connected to the laid pavement material surface.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、雨水などの透水
性の良好な舗装体を容易に且つ確実に形成し得る型枠材
の提供並びに当該型枠材を用いた透水性舗装体の形成方
法の提供に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a mold material capable of easily and reliably forming a pavement having good water permeability such as rainwater, and a method of forming a water-permeable pavement using the mold material. Regarding the offer.

【0002】[0002]

【従来の技術】従来、歩道、車道、各種広場、運動場、
公園内設備設置場、駐車場、車庫内土間などの各種スペ
ースの舗装手段として、コンクリート舗装などの各種の
非透水性の舗装に代えて透水性を備えた舗装が求められ
る場合があった。
2. Description of the Related Art Conventionally, sidewalks, roads, various plazas, playgrounds,
As a pavement means for various spaces such as a facility installation site in a park, a parking lot, and a garage interior space, a pavement having water permeability may be required instead of various non-permeable pavements such as concrete pavement.

【0003】かかる透水性を有する舗装は、通例、舗装
対象地面の舗装縁に沿ってコンクリートブロックを並べ
て舗装縁部を前もって形成用意し、あるいは、この舗装
縁に沿って前もって舗装縁部をなすコンクリート縁を形
成用意し、この舗装縁部の内側に順次に舗装材を敷き並
べると共に、これに樹脂バインダーを散布して、この散
布した樹脂バインダーによって、該舗装材相互を接着一
体として舗装体を形成するようにしていた。
[0003] Such pavements having water permeability are usually prepared by forming concrete blocks along the pavement edge of the ground to be paved and forming the pavement edge in advance, or by forming the pavement edge in advance along the pavement edge. An edge is formed and prepared, a pavement material is sequentially laid inside the pavement edge portion, and a resin binder is sprayed on the pavement material. I was trying to do it.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、かかる
舗装体の形成方法にあっては、この舗装の形成に先立っ
て、前記舗装材の敷設に用いられる舗装縁部をコンクリ
ートブロックの並設により形成用意し、あるいは、該舗
装対象地面の縁部に沿って仮型枠を組み、この仮型枠に
コンクリートを打設養生して舗装縁部をなすコンクリー
ト縁を前もって形成用意する必要があるなど、透水性の
舗装体の形成に先立って、多くの器材並びに資材と、多
くの施工手間をかけて前処理をなす必要があり、コスト
面並びに工期面などにおいて難があった。
However, in such a method for forming a pavement, prior to the formation of the pavement, a pavement edge used for laying the pavement material is prepared by juxtaposing concrete blocks. Alternatively, it is necessary to form a temporary formwork along the edge of the ground to be paved, and to put concrete in the temporary formwork and cure the concrete form to form a pavement edge in advance so that water permeability is required. Prior to the formation of the pavement of nature, it is necessary to perform pretreatment with a lot of equipment and materials and a lot of construction work, which is difficult in terms of cost and construction period.

【0005】かかる点から、図15〜図17に示される
ように、舗装地面100に対して、貫板130をセット
すると共に、この貫板130の内側に砕石などの舗装材
111を敷き並べ、これに、樹脂バインダーを散布、養
生して、この各砕石などの舗装材111相互を接着一体
になすと共に、この樹脂バインダーの硬化を見計らっ
て、前記貫板130を取り外し、更に、この貫板130
の取り外し面と前記舗装材111の敷設面に表面化粧材
112を塗付することによって、透水性の化粧表面層を
有する透水性舗装体110を形成することが検討され
た。
[0005] From this point, as shown in FIGS. 15 to 17, a perforated plate 130 is set on the pavement ground 100, and a pavement material 111 such as crushed stone is laid inside the perforated plate 130. Then, a resin binder is sprayed and cured so that the pavement materials 111 such as crushed stones are integrally bonded to each other, and in view of curing of the resin binder, the perforated plate 130 is removed.
It has been studied to form a water-permeable pavement body 110 having a water-permeable decorative surface layer by applying a surface decorative material 112 to the surface to be removed and the surface on which the paving material 111 is laid.

【0006】しかしながら、かかる舗装体110の形成
方法にあっては、前記貫板130の内側に敷き並べた舗
装材111相互を、この舗装材111に散布した樹脂バ
インダーの硬化によって十分に接着、固定するまでの養
生期間を必要とし、前記貫板130を取り外して表面化
粧をなすまでの間に相当の工期を要する不具合が考えら
れた。
However, in the method of forming the pavement body 110, the pavement members 111 laid inside the through plate 130 are sufficiently bonded and fixed by the curing of the resin binder spread on the pavement member 111. It was considered that a curing period was required to complete the process, and a considerable period of work was required until the penetration board 130 was removed and the surface makeup was applied.

【0007】また、前記図15〜図17に示されると同
様の方法で図18及び図19で示される舗装体110を
形成し、この形成される舗装体110における舗装厚H
が、例えば、10cm以上となるように舗装体110を
形成した場合、前記舗装材111に散布された樹脂バイ
ンダーが貫板130の内側に敷設された舗装材111の
下方まで十分に届かず、該貫板130を取り外した際
に、この取り外し面の下方側から、舗装体110が崩れ
出す不具合が予想された。
A pavement 110 shown in FIGS. 18 and 19 is formed by the same method as that shown in FIGS. 15 to 17, and a pavement thickness H in the pavement 110 thus formed.
However, for example, when the pavement 110 is formed so as to be 10 cm or more, the resin binder sprayed on the pavement material 111 does not sufficiently reach below the pavement material 111 laid on the inner side of the through plate 130. When the penetration board 130 was removed, a problem that the pavement 110 collapsed from below the removal surface was expected.

【0008】この発明は、かかる従来の透水性の舗装体
の形成における不具合を解消するものであって、容易
に、しかも、短い工期で、透水性を効果的に備えた舗装
体を構成し得る型枠材の提供と、その簡易な透水性舗装
体の形成方法の提供を目的としている。
The present invention solves the problem in forming such a conventional water-permeable pavement, and can easily provide a pavement having water permeability effectively with a short construction period. It is an object of the present invention to provide a mold material and a simple method of forming a water-permeable pavement.

【0009】[0009]

【課題を解決するための手段】請求項1に記載の発明
は、前記の目的を達成するために、透水性舗装体の形成
に際して、舗装対象地面に備えられて舗装材の敷設に用
いられると共に該舗装体の一部とされる型枠材であっ
て、この型枠材が、L字状断面をなすように備えられる
第1の板部と第2の板部とを有すると共に該板部の少な
くとも一方側の板部に複数の孔を備えていることを特徴
とする型枠材としてある。
According to a first aspect of the present invention, in forming a permeable pavement, the invention is provided on a ground to be paved and used for laying a pavement material in order to achieve the above object. A formwork member that is a part of the pavement body, the formwork member having a first plate portion and a second plate portion provided so as to form an L-shaped cross section. A plurality of holes provided in at least one side of the plate portion.

【0010】また、請求項2に記載の発明は、前記の目
的を達成するために、L字状断面をなすように備えられ
る第1の板部と第2の板部とを有すると共に該板部の少
なくとも一方側の板部に複数の孔を備えている型枠材を
用意し、この型枠材を、舗装対象地面に対して前記孔を
備えている板部側を接地し且つ他方の板部側を該舗装対
象地面の舗装対象縁部に沿って起立させるようにセット
すると共に、この起立されている板部面を堰板面として
前記接地されている板部側の舗装対象地面に対して舗装
材を敷設することを特徴とする透水性舗装体の形成方法
としてある。
According to a second aspect of the present invention, in order to achieve the above object, there is provided a first plate portion and a second plate portion provided so as to form an L-shaped cross section. Prepare a form material having a plurality of holes in at least one side of the plate portion, ground this paving side with the hole with respect to the pavement target ground and the other side The plate portion side is set so as to stand up along the pavement target edge of the pavement target ground, and the upright plate portion surface is set as a weir plate surface on the grounded plate portion side pavement target ground. On the other hand, there is provided a method for forming a water-permeable pavement characterized by laying a pavement material.

【0011】このように構成される型枠材及び舗装法法
にあっては、舗装対象地面の縁部に沿って前記型枠材を
セットすると共に、この型枠材の内側に舗装材を敷設す
ることによって、任意の高さの略垂直な舗装側面を有す
る透水性の舗装体を容易に、且つ、確実に構成すること
ができる。
In the form material and the paving method configured as described above, the form material is set along the edge of the ground to be paved, and the paving material is laid inside the form material. By doing so, a water-permeable pavement having a substantially vertical pavement side surface of an arbitrary height can be easily and reliably formed.

【0012】また、請求項3に記載の発明は、前記目的
を達成するために、L字状断面をなすように備えられる
第1の板部と第2の板部とを有すると共に該板部の少な
くとも一方側の板部に複数の孔を備えている型枠材を用
意し、この型枠材を、舗装対象地面に対して前記孔を備
えている板部側を接地し且つ他方の板部側を該舗装対象
地面の舗装対象縁部に沿って起立させるようにセットす
ると共に、この起立されている板部面を堰板面として前
記接地されている板部側の舗装対象地面に対して舗装材
を敷設し、且つ、該敷設舗装材面及び該敷設舗装材面に
連続される前記型枠材面に透水性表面層を形成するよう
にしたことを特徴とする透水性舗装体の形成方法として
ある。
According to a third aspect of the present invention, in order to achieve the above object, a first plate portion and a second plate portion provided so as to form an L-shaped cross section are provided. Prepare a form material provided with a plurality of holes in at least one side of the plate portion, and ground this form member with respect to the ground to be paved with the side of the plate portion having the holes and the other plate The part side is set so as to stand up along the paving object edge of the paving object ground, and the upright plate part surface is used as a weir plate surface with respect to the grounded plate part side paving object ground. A permeable pavement, wherein a permeable surface layer is formed on the laid pavement surface and the formwork surface that is continuous with the laid pavement surface. There is a forming method.

【0013】このように構成される舗装法法にあって
は、前記特長に併せて、側面部を含めた表面部に透水性
表面層を備えた透水性舗装体を養生期間をおくことな
く、確実、且つ、容易に形成することができる。
[0013] In the pavement method configured as described above, in addition to the above-described features, a water-permeable pavement having a water-permeable surface layer on a surface portion including a side portion can be prepared without leaving a curing period. It can be formed reliably and easily.

【0014】[0014]

【発明の実施の形態】以下、本発明の典型的な各実施の
形態に係る型枠材及び透水性舗装体の形成方法について
詳細に説明する。
BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, a method for forming a formwork material and a water-permeable pavement according to typical embodiments of the present invention will be described in detail.

【0015】図1〜図7は、典型的な第1の実施の形態
に係る型枠材30及び該型枠材30を用いた透水性舗装
体Aの各形成方法を示したものであり、図6は、当該実
施の形態に係る型枠材30を、その接地する側を代えて
用いた状態を、図7は、当該実施の形態に係る型枠材3
0を他の構成からなる舗装対象地面Bに用いて透水性舗
装体Aを構成する適用例を、更に、図8〜図12は、典
型的な第2の実施の形態に係る型枠材30及び当該型枠
材30を用いた透水性舗装体Aの形成方法を示したもの
である。図13は、かかる各種の実施の形態に係る型枠
材30を用いて構成される透水性舗装体Aを上方から見
て、また、図14は、この各実施の形態に係る型枠材3
0を用いて構成される各種の透水性舗装体Aを斜め上方
から見て示している。
FIGS. 1 to 7 show a method of forming a mold member 30 and a water-permeable pavement A using the mold member 30 according to a typical first embodiment. FIG. 6 shows a state in which the form member 30 according to the embodiment is used in place of the grounding side, and FIG. 7 shows a state in which the form member 3 according to the embodiment is used.
FIG. 8 to FIG. 12 show an application example in which a water-permeable pavement A is configured by using the pavement 0 as a pavement target ground B having another configuration. And a method of forming a water-permeable pavement A using the form material 30. FIG. 13 is a top view of a water-permeable pavement A constituted by using the form material 30 according to the various embodiments, and FIG. 14 is a diagram illustrating the form material 3 according to each of the embodiments.
0 shows various permeable pavements A formed from a diagonally upper side.

【0016】この典型的な実施の形態に係る型枠材30
は、透水性舗装体Aの形成に際して、舗装対象地面Bに
備えられて舗装材Wの敷設に用いられると共に該舗装体
Aの一部とされる型枠材30であって、この型枠材30
が、L字状断面をなすように備えられる第1の板部31
と第2の板部32とを有すると共に該板部の少なくとも
一方側の板部に複数の孔33を備えている構成としてあ
り、この型枠材30を、舗装対象地面Bに対して前記孔
33を備えている板部側を接地し且つ他方の板部側を該
舗装対象地面Bの舗装対象縁部Baに沿って起立させる
ようにセットすると共に、この起立されている板部面を
堰板面として前記接地されている板部側の舗装対象地面
Bに対して舗装材Wを敷設して透水性舗装体Aを形成す
る。
The form member 30 according to this typical embodiment
Is a formwork material 30 that is provided on the ground B to be paved and is used for laying the pavement material W and is a part of the pavement A when forming the permeable pavement A. 30
Are provided so as to form an L-shaped cross section.
And a second plate portion 32, and a plurality of holes 33 are provided in at least one plate portion of the plate portion. 33 is set so as to be grounded, and the other plate side is set up so as to rise along the paved edge Ba of the ground B to be paved. The paving material W is laid on the ground B to be paved on the side of the grounded plate portion as a plate surface to form the permeable pavement A.

【0017】また、前記型枠材30の起立されている板
部面を堰板面として敷設される前記舗装材Wの面と、該
面に連続する前記型枠材30の面とに透水性表面層20
を形成して透水性舗装体Aを形成する。
Further, the surface of the paving material W laid with the plate portion surface of the form material 30 standing up as a weir plate surface and the surface of the form material 30 continuous with the surface are water permeable. Surface layer 20
To form the permeable pavement A.

【0018】かかる透水性舗装体Aの構成に用いられる
型枠材30は、舗装対象地面Bに対して透水性舗装体A
を形成する際に、舗装材Wを敷設する際の堰板面を提供
すると共に、形成される透水性舗装体Aの一部をなして
当該透水性舗装体Aにおける側端面を構成する所謂捨て
型枠材としてある。
The formwork material 30 used in the construction of the permeable pavement A has a permeable pavement A with respect to the ground B to be paved.
When forming the pavement material W, it provides a weir plate surface when laying the pavement material W, and constitutes a part of the formed water-permeable pavement A, and constitutes a side end surface in the water-permeable pavement A, so-called throwaway. As a formwork material.

【0019】かかる型枠材30は、舗装対象地面Bに形
成を予定される透水性舗装体Aの各形態に適合する形
状、寸法を備え、且つ、舗装材Wの敷設に都合良く対応
し得る形状、寸法並びに強度を備えたものとして用意さ
れる。
The form member 30 has a shape and a size suitable for each form of the permeable pavement A to be formed on the ground B to be paved, and can suitably cope with the laying of the pavement material W. It is prepared as having shape, size and strength.

【0020】また、この透水性舗装体Aの形成に用いら
れる型枠材30は、舗装対象地面Bに敷設される舗装材
Wと一体になって当該透水性舗装体Aの構成に都合の良
い素材によって構成される。かかる型枠材30は、例え
ば、各種のコンクリート製型枠材30や、各種のプラス
チック製型枠材30や、各種のセラミックス製型枠材3
0などとして構成用意される。かかる型枠材30は、例
えば、ガラス繊維強化コンクリートや炭素繊維強化コン
クリートなどの、所謂、繊維強化コンクリート製のもの
を用いることができる。また、かかる型枠材30は、例
えば、ガラス繊維強化プラスチックなどの各種の繊維強
化プラスチック製のものを用いることができる。
The formwork material 30 used for forming the water-permeable pavement A is integrated with the pavement material W laid on the ground B to be paved, which is convenient for the structure of the water-permeable pavement A. It is composed of materials. Examples of the form material 30 include various concrete form materials 30, various plastic form materials 30, and various ceramic form materials 3.
The configuration is prepared as 0 or the like. As the formwork member 30, for example, a so-called fiber reinforced concrete material such as glass fiber reinforced concrete or carbon fiber reinforced concrete can be used. Further, as the formwork member 30, for example, those made of various fiber reinforced plastics such as glass fiber reinforced plastic can be used.

【0021】かかる型枠材30は、L字状断面をなすよ
うに備えられている第1の板部31と第2の板部32と
を有し、そのいずれか一方側の板部に複数個の孔33を
備えた構成としてあり、この孔33の備えられている側
を舗装対象地面Bに接地状態にしてセットし、この接地
されている板部側上に舗装材Wを敷設して当該型枠材3
0と共に透水性舗装体Aを形成するように用いられる。
The form member 30 has a first plate portion 31 and a second plate portion 32 provided so as to form an L-shaped cross section. The side provided with the holes 33 is set in a ground contact state with the ground B to be paved, and the pavement material W is laid on the grounded plate portion side. The formwork material 3
0 to form a permeable pavement A.

【0022】かかる典型的な型枠材30は、比較的長尺
状をなす第1の板部31及び第2の板部32の各板部を
一連に且つ断面がL字状をなすように備えられた構成と
してあり、細長い板状をなす第1の板部31と同様に細
長い板状をなす第2の板部32とを断面がL字状をなす
ように一連に有する構成としてある
In such a typical form member 30, the first plate portion 31 and the second plate portion 32, each of which is relatively long, are connected in series so as to form an L-shaped cross section. It has a configuration in which the first plate portion 31 having an elongated plate shape and the second plate portion 32 having an elongated plate shape in a similar manner are provided in series so as to have an L-shaped cross section.

【0023】かかる型枠材30に備えられる孔33は、
この型枠材30上に形成される透水性舗装体Aに滲み込
んだ雨水などを都合良く当該型枠材30の下方に流し出
す手段として機能されると共に、この型枠材30を舗装
対象地面Bの面に杭40などを用いて止め付ける際にお
ける当該杭40の差し入れ用の孔として用いることがで
きる。
The hole 33 provided in the form member 30 is
In addition to functioning as a means for draining rainwater or the like that has permeated into the permeable pavement A formed on the formwork 30 below the formwork 30, the formwork 30 is placed on the ground to be paved. It can be used as a hole for inserting the stake 40 when the stake 40 is fixed to the surface B using the stake 40 or the like.

【0024】この型枠材30に備えられる孔33は、こ
の型枠材30を構成する第1の板部31及び第2の板部
32のいずれか一方側の板部に設けてあれば良く、その
両方に設けてあってもよい。
The holes 33 provided in the form member 30 may be provided in any one of the first plate portion 31 and the second plate portion 32 constituting the form member 30. , May be provided in both.

【0025】また、この型枠材30を構成する第1の板
部31及び第2の板部32における各板幅を、同一の幅
にしてあっても良く、また、該第1の板部31と第2の
板部32との各板幅を夫々に異なる板幅に構成してあっ
てもよい。
The first plate portion 31 and the second plate portion 32 constituting the form member 30 may have the same width, and the first plate portion 31 and the second plate portion 32 may have the same width. The plate widths of the first plate portion 31 and the second plate portion 32 may be different from each other.

【0026】かかる孔33を、その第1の板部31及び
第2の板部32の両方の板部に備える型枠材30にあっ
ては、この型枠材30を構成する第1の板部31及び第
2の板部32の任意の側の板部を、前記舗装対象地面B
に対して接地状態にセットして用いることができる。か
かる型枠材30のセットは、例えば、この型枠材30を
舗装対象値面B上に並べ置いた状態にセットしてあって
も、また、例えば、この接地側にある孔33に前記杭4
0を挿通して該舗装対象地面Bに固定するようにセット
してあってもよい。また、この場合に、この第1の板部
31及び第2の板部32を、その板幅が互いに異なる板
幅を備えたものとして構成用意し、この異なる板幅の第
1の板部31及び第2の板部32の任意の側を前記舗装
対象地面Bに接地してセットすることによって、当該一
種類の型枠材30を用いて、舗装材Wの各種の敷設高さ
に対応した型枠面を構成することができる。
In the form member 30 having the holes 33 in both the first plate portion 31 and the second plate portion 32, the first plate forming the form member 30 The plate portion on any side of the portion 31 and the second plate portion 32 is connected to the ground B to be paved.
Can be used in a grounded state. The set of the formwork members 30 may be set, for example, in a state where the formwork members 30 are arranged on the pavement target value plane B, or may be set in the hole 33 on the ground side, for example. 4
0 may be inserted and fixed to the ground B to be paved. In this case, the first plate portion 31 and the second plate portion 32 are prepared so as to have plate widths different from each other, and the first plate portion 31 having the different plate width is prepared. By setting an arbitrary side of the second plate portion 32 to the ground B to be paved and setting the ground, the one kind of the form member 30 is used to correspond to various laying heights of the paving material W. Formwork surfaces can be configured.

【0027】まず、図1〜図5に示される型枠材30’
及び当該型枠材30’を用いた透水性舗装体Aの形成方
法について説明する。
First, the form member 30 'shown in FIGS.
A method for forming the permeable pavement A using the formwork material 30 'will be described.

【0028】この図示例に係る型枠材30’は、断面が
L字状をなすように略直角に連続されている第1の板部
31及び第2の板部32を備えた構成としてある。ま
た、この第1の板部31及び第2の板部32を夫々に、
直角四辺形状をなす長方形板としてあり、しかも、この
各第1の板部31及び第2の板部32を同一長さで、第
1の板部31の板幅を第2の板部32の板幅よりも幅の
広い板幅としてある。また、この第1の板部31と第2
の板部32との連続部を略断面三角形状をなすように屈
曲部側に膨らみ出した厚肉部34としてあると共に、こ
の各第1の板部31及び第2の板部32の夫々に孔33
を備えた構成としてある。
The form member 30 'according to the illustrated example is provided with a first plate portion 31 and a second plate portion 32 which are continuous at substantially right angles so as to form an L-shaped cross section. . Also, the first plate portion 31 and the second plate portion 32 are respectively
Each of the first plate portion 31 and the second plate portion 32 has the same length, and the width of the first plate portion 31 is the same as that of the second plate portion 32. The board width is wider than the board width. The first plate portion 31 and the second
A continuous portion with the plate portion 32 is formed as a thick portion 34 bulging to the bent portion side so as to form a substantially triangular cross section, and each of the first plate portion 31 and the second plate portion 32 is Hole 33
Is provided.

【0029】かかる構成からなる型枠材30’は、形成
を予定される透水性舗装体Aにおける舗装材Wの敷設高
さに対応して、前記第1の板部31及び第2の板部32
の何れか一方側を選択して、舗装対象地面Bに接地させ
ると共に、この設置側にある前記型枠材30’の板部に
ある孔33に挿通した杭40を当該舗装対象地面Bに刺
挿して固定用いられる。
The form member 30 'having the above-described structure corresponds to the first plate portion 31 and the second plate portion corresponding to the laying height of the pavement material W in the permeable pavement A to be formed. 32
Is selected and grounded on the ground B to be paved, and the pile 40 inserted through the hole 33 in the plate portion of the formwork 30 'on the installation side is inserted into the ground B to be paved. It is inserted and fixed.

【0030】また、この図示例に係る型枠材30’にあ
っては、前記第1の板部31及び第2の板部32の夫々
の長手方向を向いた側縁の外側部が面取り面31a、面
取り面32aとされており、形成される透水性舗装体A
における側端面の上縁に沿って、この型枠材30’の面
取り面31a、32aによって都合よく形成し、また、
この面取り面31a、32aをガイドとして、この面取
り面31a、32aに沿って透水性表面層20に面取り
面を形成することができる。
In the form member 30 'according to the illustrated example, the outer sides of the longitudinal edges of the first plate portion 31 and the second plate portion 32 are chamfered. 31a, a chamfered surface 32a, and a permeable pavement A to be formed
Along the upper edge of the side end surface at is conveniently formed by the chamfered surfaces 31a, 32a of this formwork material 30 ',
Using the chamfered surfaces 31a and 32a as a guide, a chamfered surface can be formed on the water-permeable surface layer 20 along the chamfered surfaces 31a and 32a.

【0031】なお、ここで型枠材30’の取り付けに用
いられる杭40は、前記型枠材30’の孔33に挿通さ
れて前記舗装対象地面Bに差し入れ得るものであれば、
いかなる形状、寸法のものとして構成してあってもよ
く、また、いかなる素材によって構成してあってもよ
い。この図示例に係る杭40は、例えば、プラスチック
材やステンレス材などの錆び出さない素材によって形成
用意される。かかる典型的な杭40は、例えば、前記孔
33に挿通可能で、且つ先端の尖っている軸部41と、
前記孔33から抜け出されない大きさの頭部42とを備
えたものとして構成される。
The stake 40 used for attaching the form member 30 'can be inserted into the hole 33 of the form member 30' and inserted into the ground B to be paved.
It may be configured as any shape and size, and may be configured from any material. The pile 40 according to the illustrated example is formed and prepared from a material that does not rust, such as a plastic material or a stainless material. Such a typical stake 40 is, for example, a shaft portion 41 that can be inserted into the hole 33 and has a sharp tip.
A head 42 having a size that does not fall out of the hole 33 is provided.

【0032】かかる型枠材30’を用いた透水性舗装体
Aの形成にあっては、前記型枠材30’の一方側の板部
を舗装対象地面Bに対して接地状態にし、且つ、他方側
の板部を、この舗装対象地面Bに構成される透水性舗装
体Aの側端部を形成するように当該舗装対象地面Bの舗
装対象縁部Baに沿って起立するように該型枠材30’
を前記杭40を用いて当該舗装対象地面Bに取り付け
て、舗装材Wの敷設に用いられる型枠を形成し、この舗
装対象地面Bに取り付けられている型枠材30’におけ
る前記起立側の板部面を堰板面として、この舗装対象地
面Bに接地して備えられている板部側上に舗装材Wを敷
設して当該透水性舗装体Aを形成する。
In the formation of the permeable pavement A using the form member 30 ', the plate portion on one side of the form member 30' is brought into contact with the ground B to be paved, and The mold on the other side is erected along the paved edge Ba of the paved ground B so as to form a side end of the permeable pavement A formed on the paved ground B. Frame material 30 '
Is attached to the pavement target ground B using the pile 40 to form a formwork used for laying the pavement material W, and the formwork 30 ′ attached to the pavement target ground B is on the upright side. The permeable pavement A is formed by laying the pavement material W on the plate side provided on the ground B to be paved with the plate portion surface as a weir plate surface.

【0033】このように舗装対象地面Bに形成される透
水性舗装体Aは、前記型枠材30’における前記起立側
にある板部面を堰板面として該起立側にある板部の上端
縁又はその途中まで前記舗装材Wを敷設することによっ
て該透水性舗装体Aを形成するようにしてあっても良
い。また、この起立側にある前記板部面を堰板面として
敷設される舗装材Wの面に、この起立側にある前記板部
面を堰板面として透水性表面層を形成する舗装材Wを敷
均して該透水性舗装体Aを形成するようにしてあっても
よい。また、前記型枠材30’の一方の起立側にある板
部面を堰板面として、この起立側にある板部の上端と面
一となるように前記舗装材Wを敷設し、この敷設舗装材
Wの面と、この舗装材Wの面に連続されている前記型枠
材30’の面とに透水性表面層20を形成するように舗
装材Wを敷均して該透水性舗装体Aを形成するようにし
てあってもよい。
The permeable pavement A formed on the ground B to be paved in this way has the upper surface of the plate portion on the upright side with the plate portion surface on the upright side of the formwork 30 'as a weir plate surface. The permeable pavement A may be formed by laying the pavement material W to the edge or halfway thereof. A pavement material W that forms a water-permeable surface layer on the surface of the paving material W laid with the plate portion surface on the upright side as a weir plate surface and the plate portion surface on the upright side as a weir plate surface To form the permeable pavement A. Further, the paving material W is laid so that the plate portion surface on one upright side of the formwork member 30 'is a weir plate surface and is flush with the upper end of the plate portion on the upright side. The pavement material W is spread on the surface of the pavement material W and the surface of the formwork material 30 ′ continuous with the surface of the pavement material W so as to form the water-permeable surface layer 20. The body A may be formed.

【0034】かかる透水性舗装体Aの形成に用いられる
型枠材30’は、この型枠材30’単独で、又は、この
型枠材30’を一連に連続して、または、この型枠材3
0’を互いに向き合わせて、又は、この型枠材30’を
環状に連続させて用いられる。この図示例にあっては、
前記舗装対象地面Bにおける舗装対象縁部Baに該型枠
材30’の第2の板部32を位置付けるように該舗装対
象地面Bに前記杭40を用いて前記型枠材30の第1の
板部31を固定することによって舗装材Wの敷設に用い
られる型枠を形成し、この各型枠材30’の第2の板部
32間に舗装材Wを敷設することによって透水性舗装体
Aを形成するようにしてある。
The formwork 30 'used for forming the water-permeable pavement A may be the formwork 30' alone, or a series of the formwork 30 ', or the formwork 30'. Lumber 3
0 'are faced to each other, or this form member 30' is used continuously in an annular shape. In this illustrated example,
Using the pile 40 on the paving target ground B so as to position the second plate portion 32 of the formwork material 30 ′ on the paving target edge Ba on the paving target ground B, the first of the formwork members 30. By fixing the plate portion 31, a formwork used for laying the paving material W is formed, and by laying the paving material W between the second plate portions 32 of each of the formwork materials 30 ', the permeable pavement body is formed. A is formed.

【0035】なお、この舗装対象地面Bに備えられる型
枠材30’は、この舗装対象地面Bに形成される透水性
舗装体Aの周側縁に対応した舗装対象縁部Baに沿って
備えられるものであって、この形成される透水性舗装体
Aの周側縁の全周に亙るように当該型枠材30’を舗装
対象地面Bに接地用意して該型枠材30’で囲まれる舗
装対象地面Bに舗装材Wを敷設して当該透水性舗装体A
を形成するようにしてあってもよい。また、この舗装対
象地面Bに備えられる型枠材30’を、この舗装対象地
面Bに形成される透水性舗装体Aの周側縁の一部に対応
した舗装対象縁部Baに沿って備え、この舗装対象縁部
Baの一部に沿って接地用意された該型枠材30’にお
ける起立側の板部面を堰板面として舗装材Wを敷設する
ことによって、当該透水性舗装体Aを形成するようにし
てあってもよい。
The formwork material 30 'provided on the ground B to be paved is provided along the edge Ba to be paved corresponding to the peripheral edge of the permeable pavement A formed on the ground B to be paved. The form member 30 ′ is prepared to be grounded on the ground B to be paved so as to cover the entire peripheral edge of the permeable pavement A to be formed, and is surrounded by the form member 30 ′. The paving material W is laid on the ground B to be paved, and the permeable pavement A
May be formed. Also, the formwork material 30 'provided on the ground B to be paved is provided along the edge Ba to be paved corresponding to a part of the peripheral edge of the permeable pavement A formed on the ground B to be paved. By laying the pavement material W with the upright-side plate portion surface of the formwork material 30 ′ prepared for grounding along a part of the pavement target edge Ba as a weir plate surface, the permeable pavement A May be formed.

【0036】図2〜図5は、かかる型枠材30’を用い
た透水性舗装体Aの典型的な形成方法を示すものであ
る。この図示例に係る透水性舗装体Aの形成方法にあっ
ては、まず、この透水性舗装体Aを形成する地面を掘削
し、この掘削地面Bbに割り栗石1aを敷き込み、その
掘削段差面Bc内の当該掘削地面Bbを舗装対象地面B
として構成する。
FIGS. 2 to 5 show a typical method of forming a water-permeable pavement A using such a frame member 30 '. In the method of forming the permeable pavement A according to the illustrated example, first, the ground on which the permeable pavement A is formed is excavated, and the digging ground Bb is laid with the rubble stone 1a. The excavated ground Bb in Bc is the pavement ground B
It is constituted as.

【0037】かかる掘削地面Bbは、形成される透水性
舗装体Aの形態に対応したものとして掘削用意されるも
のであって、任意の形状の陥凹部、例えば、帯状の陥凹
部として構成され、あるいは、四角形状や円形状などの
任意の形状の陥凹部として形成用意される。
The excavated ground Bb is prepared for excavation corresponding to the form of the permeable pavement A to be formed, and is formed as a concave portion having an arbitrary shape, for example, a band-shaped concave portion. Alternatively, it is formed and prepared as a concave portion having an arbitrary shape such as a square shape or a circular shape.

【0038】かかる掘削段差面Bcを有する掘削地面B
bとして用意された舗装対象地面Bに対して、前記型枠
材30’を前記掘削段差面Bcに沿った掘削地面Bbを
当該舗装対象地面Bの舗装対象縁部Baとして、前記型
枠材30’の第2の板部32を該掘削段差面Bcに沿っ
て起立状態に添装し、且つ第1の板部31を該舗装対象
縁部Baにおける前記割り栗石1aに添装状態に接地し
て、この第1の板部31の孔33に挿通した杭40を舗
装対象地面Bに刺挿して、該舗装対象縁部Baに沿って
該型枠材30’を順次に連続するように設ける。
Excavated ground B having such excavated step surface Bc
For the paving target ground B prepared as b, the excavated ground Bb along the excavated step surface Bc is used as the paved target edge Ba of the paving target ground B, and ', The second plate portion 32 is attached to the erected state along the excavation step surface Bc, and the first plate portion 31 is grounded to be attached to the split stone 1a at the pavement target edge Ba. Then, the pile 40 inserted into the hole 33 of the first plate portion 31 is inserted into the pavement target ground B, and the formwork members 30 ′ are provided so as to be sequentially continuous along the pavement target edge Ba. .

【0039】このように舗装対象地面Bに備えられた型
枠材30’における前記第2の板部32の第1の板部3
1側を向いている面を堰板面として、この型枠材30’
における第1の板部31の上を含む舗装対象地面Bの
面、この図示例にあっては、該型枠材30’の第2の板
部32の内側に舗装材Wを敷設して透水性舗装体Aを形
成する。
The first plate portion 3 of the second plate portion 32 in the formwork member 30 'provided on the ground B to be paved as described above.
The surface facing one side is defined as a weir plate surface, and
In the illustrated example, the pavement material W is laid on the surface of the ground to be paved B including the upper surface of the first plate portion 31 in the second plate portion 32 of the formwork member 30 '. The pavement body A is formed.

【0040】この型枠材30’の第2の板部32で囲ま
れる内側に敷設される舗装材Wは、典型的には、各種の
砕石などの舗装材Wであって、この型枠材30’の第2
の板部32の内側に敷設される舗装材Wを樹脂接着材に
よって相互に接着一体として当該型枠材30’と共に透
水性舗装体Aを形成する。また、この第2の板部32の
内側に敷設された前記舗装材W上に、透水性表面層20
を形成する舗装材Wを敷均して透水性舗装体Aを形成す
る。
The pavement material W laid on the inside surrounded by the second plate portion 32 of the form material 30 'is typically a pavement material W such as various crushed stones. 30 'second
The pavement material W laid inside the plate portion 32 is integrally bonded together with a resin adhesive to form a water-permeable pavement A together with the formwork material 30 '. Further, the water-permeable surface layer 20 is provided on the pavement material W laid inside the second plate portion 32.
To form a water-permeable pavement A.

【0041】なお、前記型枠材30’は、この型枠材3
0’を杭40を用いて舗装対象地面Bに固定した状態で
用いているが、この型枠材30’のセットされる該舗装
対象地面Bが砕石の締め固み面などのように強固な舗装
対象地面Bである場合、当該型枠材30’を前記杭40
によって該舗装対象地面Bに固定することなく、該舗装
対象地面Bに単に並べ置いた状態で、この型枠材30’
における起立されている前記第2の板部で囲まれた内側
に舗装材Wを敷設するようにしてあってもよい。
It should be noted that the form member 30 ′ is
0 'is used with the pile 40 fixed to the ground B to be paved. However, the ground B to be paved with the formwork 30' is strong such as a compacted surface of crushed stone. In the case of the ground B to be paved, the formwork material 30 ′ is
Without being fixed to the ground B to be paved by this, the form member 30 ′ is simply placed on the ground B to be paved.
The pavement material W may be laid on the inside surrounded by the second plate portion standing up.

【0042】かかる型枠材30’を用いた透水性舗装体
Aの典型的な一具体例を説明する。
A typical specific example of the permeable pavement A using the form member 30 'will be described.

【0043】まず、地面の一部を掘削して段差面Bcを
有する掘削地面Bbを舗装対象地面Bとして、この掘削
地面Bb面の前記段差面Bcに連続する部分を深めに掘
削して該部に割り栗石1aを敷き込み、路床1などの舗
装対象地面Bを形成する。ついで、この舗装対象地面B
における前記段差面Bcに連続する部分に前記型枠材3
0’における第1の板部31を、該型枠材30’におけ
る第2の板部32を該段差面Bcに沿わせるように接地
し、この第1の板部31を杭40を用いて該舗装対象地
面Bとしての路床1に固定する。なお、ここで、前記型
枠材30’のセットされる路床1が割り栗石1aなどに
よって強固に構成されていることから、該路床1に対し
て、前記型枠材30’を杭40で固定することなく、該
路床1上に置き並べるようにセットして用いるようにし
てもよい。
First, a part of the ground is excavated, and an excavated ground Bb having a stepped surface Bc is set as a pavement target ground B, and a portion of the excavated ground Bb surface continuous with the stepped surface Bc is excavated deeper. To form a ground B to be paved such as a subgrade 1. Then, the ground B to be paved
In the portion continuous with the step surface Bc in
The first plate portion 31 at 0 ′ is grounded so that the second plate portion 32 of the form member 30 ′ is along the stepped surface Bc. It is fixed to the subgrade 1 as the ground B to be paved. Here, since the subgrade 1 on which the formwork 30 ′ is set is made of a solid material such as the split stone 1 a, the formwork 30 ′ is attached to the subgrade 1 by the pile 40. It may be set and used so as to be lined up on the subgrade 1 without fixing with.

【0044】次いで、この路床1などの舗装対象地面B
の面に、粒径が100mm以下の範囲にある多様な粒径
の砕石からなる砕石集合物Waを締固めて下層路盤など
の下部舗装層11を構成し、この下部舗装層11の上
に、粒径が5mm〜20mmの範囲にある砕石からなる
砕石集合物Wbを、該砕石集合物Wbが前記型枠材3
0’における第2の板部32の上端縁と面一となるよう
に敷設して締固めると共に、該砕石集合物Wb上から反
応性樹脂を散布、硬化させて上層路盤などの上部舗装層
12を形成して、雨水などの液体の透過性を有する路盤
などの舗装本体部10を形成し、更に、反応性樹脂及び
粒径が3mm〜7mmの範囲にある小石からなる小石集
合物Wcとの混合物を前記上部舗装層12及び前記型枠
材30’の第2の板部32の上端面と側面とに所要厚さ
となるように塗り付けて雨水などの液体の透過性を有す
る透水性表面層20を形成する。
Next, the ground B to be paved such as the subgrade 1
On the surface of the surface, a crushed stone aggregate Wa made of crushed stones having various particle diameters in a range of 100 mm or less is compacted to form a lower pavement layer 11 such as a lower roadbed. On the lower pavement layer 11, A crushed stone aggregate Wb made of crushed stone having a particle size in the range of 5 mm to 20 mm is used as the crushed stone aggregate Wb.
In addition to laying it down so as to be flush with the upper end edge of the second plate portion 32 at 0 ′ and compacting, the reactive resin is sprayed and hardened on the crushed stone aggregate Wb to form an upper pavement layer 12 such as an upper roadbed. To form a pavement main body 10 such as a roadbed having permeability for liquids such as rainwater, and a reactive resin and a pebble aggregate Wc made of pebbles having a particle size in a range of 3 mm to 7 mm. The mixture is applied to the upper pavement layer 12 and the upper end surface and the side surface of the second plate portion 32 of the formwork material 30 ′ so as to have a required thickness, and a water-permeable surface layer having a permeability of a liquid such as rainwater. 20 is formed.

【0045】なお、この図示例に係る透水性舗装体Aの
形成方法にあっては、舗装材Wとして、前記砕石集合物
Wa、砕石集合物Wb、小石集合物Wcを前記形態にお
いて用いているが、前記舗装材Wを前記形態以外の形態
で用いてあってもよく、また、前記舗装材Wの全部を用
いることなく、その一部を用いて透水性舗装体Aを形成
するようにしてあってもよい。また、前記舗装材Wに他
の舗装材を加えて透水性舗装体Aを形成するようにして
あってもよく、更に、前記舗装材以外の舗装材によって
透水性舗装体Aを形成するようにしてあってもよい。
In the method of forming the permeable pavement A according to the illustrated example, the crushed stone aggregate Wa, the crushed stone aggregate Wb, and the pebble aggregate Wc are used as the pavement material W in the above-described embodiment. However, the pavement material W may be used in a form other than the above-described form, and the permeable pavement A is formed by using a part of the pavement material W without using the entirety of the pavement material W. There may be. Further, another pavement material may be added to the pavement material W to form the permeable pavement A. Further, the permeable pavement A may be formed by a pavement material other than the pavement material. May be.

【0046】ここで下部舗装層11を構成する砕石集合
物Waは、粒径が100mm以下の範囲にある多様な粒
径の砕石の集合物、典型的には、0.001mmの粒径
から100mmの粒径に到る各種大きさの砕石の集合体
が用いられる。
Here, the crushed stone aggregate Wa constituting the lower pavement layer 11 is an aggregate of crushed stones having various particle diameters within a range of 100 mm or less, typically from a particle diameter of 0.001 mm to 100 mm. Aggregates of crushed stones of various sizes up to the particle size are used.

【0047】かかる砕石集合物Waとしては、例えば、
クラッシャランが用いられる。また、かかる砕石集合物
Waは、粒径100mmの砕石が通過する篩の篩下の砕
石の集合物として用意される。また、かかる砕石集合物
Waとして、例えば、粒径100mmの砕石から0.0
01mmの微細砕石までの大、中、小さまざまの粒径か
らなる砕石を適当な比率、例えば、連続粒度分布の状
態、あるいは不連続粒度分布の状態で備えた、所謂、粒
度調整砕石として用意される。
As such crushed stone aggregate Wa, for example,
Crusher orchids are used. The crushed stone aggregate Wa is prepared as an aggregate of crushed stones under a sieve through which crushed stone having a particle size of 100 mm passes. Further, as the crushed stone aggregate Wa, for example, a crushed stone having a particle size of 100 mm
Crushed stones of various sizes, large, medium and small, up to a fine crushed stone of 01 mm are provided in an appropriate ratio, for example, in a state of continuous particle size distribution, or in a state of discontinuous particle size distribution, so-called as a so-called particle size adjusted crushed stone. You.

【0048】かかる砕石集合物Waを前記路床1などの
舗装対象地面B上に前記型枠材30’の第2の板部32
の板面を堰板面として敷設すると共に、これを、例え
ば、ロードローラ、タイヤローラ、タンピングローラな
どのローラの自重による締固め手段、振動ローラ、振動
コンパクタなどのローラの自重と遠心力による締固め手
段、ランマ、タンパなどの衝撃による締固め手段などの
任意の締固め手段によって締固め、駐車場、車庫内土
間、歩道、各種広場、運動場、公園内設備設置場などの
舗装体にあっては、当該締固め砕石集合物Waの厚さが
30mm〜200mmとなるように当該下部舗装層11
を構成する。
The crushed stone aggregate Wa is placed on the ground B to be paved, such as the subgrade 1, on the second plate portion 32 of the formwork member 30 '.
The plate surface is laid as a weir plate surface, and it is compacted by the self-weight of rollers, such as a load roller, a tire roller, and a tamping roller; Compacting by any compacting means such as compacting means, compaction means by impact such as rammer, tamper, etc., on pavements such as parking lots, garage soil, sidewalks, various plazas, playgrounds, park equipment installation places, etc. Lower pavement layer 11 such that the thickness of the compacted crushed stone aggregate Wa is 30 mm to 200 mm.
Is configured.

【0049】かかる下部舗装層11は、この下部舗装層
11を備えて構成される透水性舗装体Aの使用用途、こ
の下部舗装層11を構成する砕石集合物Waの粒度分布
の形態、当該砕石集合物Waを構成する砕石の性状、構
成される透水性舗装体Aの備えられる路床1などの舗装
対象地面Bの性状などによって、当該締固め構成される
下部舗装層11の厚さを設定する。
The lower pavement layer 11 is used for the water-permeable pavement A having the lower pavement layer 11, the form of the particle size distribution of the crushed stone aggregate Wa constituting the lower pavement layer 11, the crushed stone. The thickness of the lower pavement layer 11 constituted by compaction is set according to the properties of the crushed stone constituting the aggregate Wa, the properties of the ground B to be paved such as the subgrade 1 provided with the permeable pavement A constituted, and the like. I do.

【0050】このように舗装対象地面B上に構成される
下部舗装層11は、前記型枠材30’の第2の板部32
面を堰板面として該舗装対象地面B上に敷設された砕石
集合物Waが適宜の締固め手段によって締固められるこ
とによって、前記型枠材30’と該舗装対象地面Bとに
対して密着し、しかも、構成各砕石間に遊び隙間を残さ
ない態様で構成される。
As described above, the lower pavement layer 11 formed on the ground B to be paved is provided with the second plate portion 32 of the formwork material 30 '.
The crushed stone aggregate Wa laid on the surface B to be paved with the surface as a weir plate surface is compacted by an appropriate compacting means, so that the form material 30 ′ and the ground B to be paved are brought into close contact with each other. In addition, the configuration is such that no play gap is left between the crushed stones.

【0051】かかる態様で舗装対象地面B上に備えられ
る下部舗装層11は、この下部舗装層11を備えて構成
される透水性舗装体Aの沈下を効果的に防止し、しか
も、散布処理される反応性樹脂を捕捉するように機能
し、この下部舗装層11上に構成される上部舗装層12
及び透水性表面層20と共に優れた圧縮強度及び曲げ強
度を透水性舗装体Aにもたらす。
The lower pavement layer 11 provided on the ground B to be paved in this manner effectively prevents the water-permeable pavement A provided with the lower pavement layer 11 from subsidence and is subjected to a spraying treatment. The upper pavement layer 12 which functions to capture the reactive resin, and is formed on the lower pavement layer 11
And the water-permeable pavement A together with the water-permeable surface layer 20 to provide excellent compressive strength and bending strength.

【0052】かかる下部舗装層11上に備えられる上部
舗装層12は、粒径が5mm〜20mmの範囲にある砕
石からなる砕石集合物Wbを、当該下部舗装層11上
に、前記型枠材30’の第2の板部32面を堰板面とし
て所要厚さとなるように敷設し且つ締固め状態とし、更
に、この砕石集合物Wb上から、所要量の反応性樹脂を
散布し、この散布反応性樹脂を硬化させることによって
構成してあり、この下部舗装層11と砕石集合物Wbと
によって構成される舗装本体部10が、雨水などの液体
の透過性を備えたものとして構成される。
The upper pavement layer 12 provided on the lower pavement layer 11 is provided with a crushed stone aggregate Wb made of crushed stone having a particle size in the range of 5 mm to 20 mm on the lower pavement layer 11 and the formwork material 30. The second plate portion 32 ′ is laid as a weir plate surface so as to have a required thickness and is in a compacted state. Further, a required amount of reactive resin is sprayed on the crushed stone aggregate Wb. It is constituted by curing the reactive resin, and the pavement main body 10 constituted by the lower pavement layer 11 and the crushed stone aggregate Wb is constituted as having a permeability of liquid such as rainwater.

【0053】かかる上部舗装層12を構成する砕石集合
物Wbは、粒径が5mm〜20mmの範囲に整えられた
砕石の集合物が用いられる。かかる砕石集合物Wbは、
例えば、粒径が20mm又はこれよりも小さい粒径の砕
石の通過する篩で篩い選別した篩下の砕石であって、し
かも、5mmの粒径又はこれよりも大きい粒径の砕石が
篩上に残る篩による篩い選別において篩上にある砕石の
集合物が用いられる。
As the crushed stone aggregate Wb constituting the upper pavement layer 12, an aggregate of crushed stones having a particle size of 5 mm to 20 mm is used. Such crushed stone aggregate Wb is
For example, a crushed stone having a particle size of 20 mm or smaller, which is sieved under a sieve through which a crushed stone having a particle size of 20 mm or smaller, and a crushed stone having a particle size of 5 mm or larger is placed on the sieve. Aggregates of crushed stones on the sieve are used in the screening by the remaining sieve.

【0054】かかる砕石集合物Wbを、前記型枠材3
0’の第2の板部32面を堰板面として下部舗装層11
上に敷設すると共に、これを、例えば、ロードローラ、
タイヤローラ、タンピングローラなどのローラの自重に
よる締固め手段、振動ローラ、振動コンパクタなどのロ
ーラの自重と遠心力による締固め手段、ランマ、タンパ
などの衝撃による締固め手段などの任意の締固め手段に
よって締固め、典型的には、該上部舗装層12の上面が
前記第2板部32の上端面と面一となり、しかも、その
厚さが30mm〜100mmとなるように調整して上部
舗装層12を構成する。
[0054] The crushed stone aggregate Wb is
The lower pavement layer 11 has the surface of the second plate portion 32 of 0 'as a weir plate surface.
And lay it on top of, for example, a road roller,
Arbitrary compaction means such as compaction means by the own weight of rollers such as tire rollers and tamping rollers, compaction means by the own weight and centrifugal force of rollers such as vibration rollers and vibration compactors, compaction means by impact of rammer, tamper, etc. Typically, the upper pavement layer 12 is adjusted so that the upper surface of the upper pavement layer 12 is flush with the upper end surface of the second plate portion 32 and the thickness thereof is 30 mm to 100 mm. 12.

【0055】この下部舗装層11上に備えられる上部舗
装層12は、該上部舗装層12を備えて構成される透水
性舗装体Aの用途、この上部舗装層12を構成する砕石
集合物Wbの粒径、当該砕石集合物Wbの性状、及び、
用いられる反応性樹脂の性状、及び散布量などによっ
て、その厚さが設定される。
The upper pavement layer 12 provided on the lower pavement layer 11 is used for the water-permeable pavement A provided with the upper pavement layer 12 and for the crushed stone aggregate Wb constituting the upper pavement layer 12. Particle size, properties of the crushed stone aggregate Wb, and
The thickness of the reactive resin is set according to the properties of the reactive resin used and the amount of the resin to be sprayed.

【0056】このように下部舗装層11上に敷設され、
且つ、適宜の締固めの手段によって、厚さが30mm〜
100mmとなるように締固め調整されて構成された砕
石集合物Wb上から所要量の反応性樹脂を散布し、且
つ、これを硬化させることによって上部舗装層12を構
成し、前記下部舗装層11と共に透水性舗装体Aの舗装
本体部10を構成する。
Thus, it is laid on the lower pavement layer 11,
And, by appropriate compacting means, the thickness is 30 mm or more.
A required amount of a reactive resin is sprayed on the crushed stone aggregate Wb, which has been compacted and adjusted to have a thickness of 100 mm, and is hardened to form the upper pavement layer 12 and the lower pavement layer 11 Together, they constitute the pavement main body 10 of the permeable pavement A.

【0057】かかる上部舗装層12上から散布される反
応性樹脂は、この散布された反応性樹脂によって上部舗
装層12における砕石集合物Wbが効果的に固定され、
且つ、構成される上部舗装層12が所期の透水性を備え
る態様、即ち、砕石集合物Wbの各砕石間に雨水などの
液体の通過に適した空隙を生ずる量を散布する。かかる
反応性樹脂の散布は、例えば、駐車場、車庫内土間、歩
道、各種広場、運動場、公園内設備設置場などの舗装体
にあっては、固形分量で、2Kg/m2〜5Kg/m2
の範囲内における任意の量を、当該上部舗装層12上か
ら散布して、硬化される当該反応性樹脂によって当該上
部舗装層12の砕石集合物Wbを固定一体化する。
As for the reactive resin sprayed from above the upper pavement layer 12, the crushed stone aggregate Wb in the upper pavement layer 12 is effectively fixed by the sprayed reactive resin,
In addition, the upper pavement layer 12 to be configured is provided with the desired water permeability, that is, an amount that forms a gap suitable for the passage of liquid such as rainwater between the crushed stones of the crushed stone aggregate Wb is sprayed. Such a reactive resin is sprayed on a pavement such as a parking lot, a garage floor, a sidewalk, various plazas, an athletic field, and a facility installation site in a park, for example, in a solid content of 2 kg / m 2 to 5 kg / m. Two
Is scattered over the upper pavement layer 12 to fix and integrate the crushed stone aggregate Wb of the upper pavement layer 12 with the reactive resin to be hardened.

【0058】かかる反応性樹脂は、例えば、散布過程で
モノマーまたはプレポリマーの液状のものとして用いら
れると共に、硬化過程で、硬化剤などによって、附加反
応又は重・縮合することで各砕石相互を硬化接着状態と
する各種の反応性樹脂が用いられる。
The reactive resin is used, for example, in the form of a liquid monomer or prepolymer in a spraying process, and in a curing process, an additive reaction or polycondensation with a curing agent or the like cures each crushed stone. Various reactive resins to be in an adhesive state are used.

【0059】このように締固められた砕石集合物Wb上
に散布される反応性樹脂は、例えば、施工作業性などの
点から、これを溶剤で希釈し、上部舗装層12上から適
宜の散布手段、例えば、ジョウロやスプレーガンなどに
よって散布し、この反応性樹脂が、舗装本体部10を構
成する各砕石面を伝って流下し、各砕石間に、雨水など
の液体の透過隙間を残した態様で、各砕石相互を一体に
固定し得るように、その性状を調整して用いる。
The reactive resin sprayed on the crushed stone aggregate Wb compacted in this way is diluted with a solvent, for example, from the viewpoint of workability and the like, and is appropriately sprayed from the upper pavement layer 12. The reactive resin is sprayed by means, for example, a jar or a spray gun, and flows down along each crushed stone surface constituting the pavement main body portion 10, leaving a permeation gap for liquid such as rainwater between each crushed stone. In this embodiment, the properties of the crushed stones are adjusted so that the crushed stones can be fixed together.

【0060】かかる反応性樹脂は、例えば、全体が10
0重量%となるように、グリシジル基含有アクリル樹脂
を1〜A重量%と、ビスフェノールA型エポキシ樹脂を
1〜B重量%と、ポリアミン樹脂を1〜C重量%とを混
合して得られる反応性樹脂を用いることができる。
Such a reactive resin is, for example, 10
A reaction obtained by mixing 1 to A weight% of a glycidyl group-containing acrylic resin, 1 to B weight% of a bisphenol A type epoxy resin, and 1 to C weight% of a polyamine resin so as to be 0 weight%. Resin can be used.

【0061】更に、かかる反応性樹脂は、例えば、ビス
フェノールA型エポキシ樹脂を50〜90重量%と、水
溶性ポリアミン樹脂10〜50重量%とを混合して得ら
れる反応性樹脂を用いることができる。
Further, as the reactive resin, for example, a reactive resin obtained by mixing 50 to 90% by weight of a bisphenol A type epoxy resin and 10 to 50% by weight of a water-soluble polyamine resin can be used. .

【0062】このようにして前記型枠材30’で区画さ
れた前記舗装対象地面B上に所要厚さで構成される下部
舗装層11と上部舗装層12とによって、この下部舗装
層11を構成する砕石集合物Waにおける各砕石間と、
上部舗装層12を構成する砕石集合物Wbにおける各砕
石間に、雨水の通過される間隙を備えた態様の舗装本体
部10を構成する。
The lower pavement layer 11 is constituted by the lower pavement layer 11 and the upper pavement layer 12 each having a required thickness on the pavement ground B partitioned by the formwork material 30 '. Between each crushed stone in the crushed stone aggregate Wa,
The pavement main body 10 is configured so as to have a gap through which rainwater passes between crushed stones in the crushed stone aggregate Wb constituting the upper pavement layer 12.

【0063】かかる舗装本体部10の形成に連続して、
当該舗装本体部10の構成に用いられる前記反応性樹脂
の硬化を待つことなく、または、この舗装本体部10の
形成後任意の時期に、前記型枠材30’における第2の
板部32面を堰板面として敷設された前記舗装材Wによ
る舗装本体部10上と、該第2板部32の上端面及び側
面とに透水性表面層20を形成する。
Following the formation of the pavement main body 10,
Without waiting for the curing of the reactive resin used in the configuration of the pavement main body 10, or at any time after the formation of the pavement main body 10, the surface of the second plate part 32 of the formwork material 30 ' The water permeable surface layer 20 is formed on the pavement main body 10 made of the pavement material W laid with the damping plate surface and the upper end surface and side surfaces of the second plate portion 32.

【0064】かかる舗装本体部10面及び第2の板部3
2面上に形成される透水性表面層20は、粒径が3mm
〜7mmの範囲にある小石からなる小石集合物Wcと反
応性樹脂との混合物を、前記上部舗装層12面と、該面
に連続されている前記第2板部32の上端面及び側面と
に所要厚さとなるように敷均すことによって構成され
る。
The surface of the pavement main body 10 and the second plate 3
The water-permeable surface layer 20 formed on the two surfaces has a particle size of 3 mm.
A mixture of the pebble aggregate Wc made of pebbles having a size of about 7 mm and the reactive resin is applied to the upper pavement layer 12 surface and the upper end surface and side surfaces of the second plate portion 32 continuous with the surface. It is constructed by flattening to the required thickness.

【0065】ここで、透水性表面層20を構成する小石
集合物Wcは、例えば、粒径が7mmの小石又はこれよ
り小さい粒径の小石が通過する篩を用いて篩った篩下の
小石であって、しかも、3mmの粒径の小石又はこれよ
り大きい粒径の小石が篩上に残る篩で篩った際に篩上に
残る粒径の小石の集合物として用意される。
Here, the pebble aggregate Wc constituting the water-permeable surface layer 20 is, for example, a pebble having a particle diameter of 7 mm or a pebble under a sieve sieved using a sieve through which a pebble having a smaller particle diameter passes. In addition, a pebble having a particle size of 3 mm or a larger particle size is prepared as an aggregate of pebbles having a particle size remaining on the sieve when sieved with the sieve remaining on the sieve.

【0066】かかる小石は、岩石が自然現象によって細
粒化されたもの、岩石が人工的に粉砕されて細粒化され
たものなどの、いかなる経緯によって細粒化された岩石
であっても良く、また、いかなる形態からなるものであ
っても良く、いかなる石質からなるものであっても良
い。例えば、深成岩、半深成岩、火山岩などの各種岩石
を人工的に砕いて得られる各種の砕石、自然に存在する
川砂利、海砂利、山砂利などの各種の砂利などが用いら
れる。
Such pebbles may be rocks that have been finely divided in any way, such as those in which rocks have been refined by natural phenomena and those in which rocks have been artificially crushed. Also, it may be of any form, and may be of any stone type. For example, various crushed stones obtained by artificially crushing various rocks such as plutonic rocks, semi-plutonic rocks, and volcanic rocks, and various types of gravel such as naturally occurring river gravel, sea gravel, and mountain gravel are used.

【0067】前記小石は、かかる岩石が自然の作用によ
って細かくされた砂利単体及び岩石がクラッシャーなど
によって人工的に砕かれて細かくされた砕石単体を称
し、これらの砂利の集合物、砕石の集合物、及び、これ
らの砂利と砕石の混合された集合物を小石集合物Wcと
称している。
The above-mentioned pebbles refer to a single piece of gravel obtained by reducing such a rock by natural action and a single piece of crushed stone obtained by artificially crushing a rock by a crusher or the like. , And the aggregate in which the gravel and the crushed stone are mixed is referred to as a pebble aggregate Wc.

【0068】ここで用いられる反応性樹脂は、例えば、
前記小石集合物Wcとの混合の過程でモノマーまたはプ
レポリマーの液状のものとして用いられると共に、硬化
剤などによって、附加反応、又は、重・縮合して当該小
石集合物Wcを構成する小石相互を硬化固定状態とする
各種の反応性樹脂が用いられる。
The reactive resin used here is, for example,
In the process of mixing with the pebble aggregate Wc, it is used as a liquid of a monomer or a prepolymer, and the pebbles forming the pebble aggregate Wc by addition reaction or polycondensation by a curing agent or the like. Various reactive resins to be cured and fixed are used.

【0069】かかる反応性樹脂は、例えば、NCO含有
アクリル樹脂を40重量%〜95重量%と、ヘキサメチ
レンジイソシアネート誘導体を5重量%〜60重量%と
の混合物が用いられる。
As the reactive resin, for example, a mixture of an NCO-containing acrylic resin of 40% by weight to 95% by weight and a hexamethylene diisocyanate derivative of 5% by weight to 60% by weight is used.

【0070】かかる小石集合物Wcの所要量と、反応性
樹脂の所要量とをミキサーなどの適宜の混練手段によっ
て混合、練り混ぜ、この混合、練り混ぜた混合物を、前
記上部舗装層12の上面と、該面に連続する第2の板部
32の上端面及び側面とに、連続して所定の厚さとなる
ようにコテ塗りなどの手法で敷均し、反応性樹脂で接着
硬化された前記小石集合物Wcによる透水性表面層20
を形成する。
The required amount of the pebble aggregate Wc and the required amount of the reactive resin are mixed and kneaded by an appropriate kneading means such as a mixer, and the mixed and kneaded mixture is mixed with the upper surface of the upper pavement layer 12. And the upper surface and the side surface of the second plate portion 32 continuous with the surface are spread by a technique such as ironing so as to have a predetermined thickness continuously, and the adhesive resin cured with a reactive resin is used. Permeable surface layer 20 made of pebble aggregate Wc
To form

【0071】かかる透水性表面層20は、例えば、駐車
場、車庫内土間、歩道、各種広場、運動場、公園内設備
設置場などの舗装体にあっては、前記上部舗装層12の
面と、この面に連続する第2の板部32の上端面及び側
面に対する敷均し厚が5mm〜20mmとなるように、
前記混合物を前記各面に連続して塗り付けて形成する。
なお、この透水性表面層20の形成において、その隅縁
に沿った部分、即ち、該透水性表面層20の上面と側面
との間に、前記型枠材30における面取り面32aに沿
って面取り状の面を形成する。
For example, in the case of a pavement such as a parking lot, a yard in a garage, a sidewalk, various plazas, an athletic field, a facility installation site in a park, etc., The second plate portion 32 continuous to this surface has an average thickness of 5 mm to 20 mm with respect to the upper end surface and the side surface,
The mixture is formed by continuously applying the mixture to the respective surfaces.
In the formation of the water-permeable surface layer 20, the portion along the corner, that is, between the upper surface and the side surface of the water-permeable surface layer 20, is chamfered along the chamfered surface 32a of the formwork material 30. Form a surface of a shape.

【0072】このように前記上部舗装層12の上面と第
2の板部32の上端面及び側面とに形成される透水性表
面層20は、この透水性表面層20を備えて形成される
透水性舗装体Aの使用用途、当該透水性表面層20を構
成する小石集合物Wcの形態及び石質、当該透水性表面
層20の固定手段とし用いられる反応性樹脂の性状及び
配合量、当該透水性表面層20の構成される舗装本体部
10の形態などによって、当該上部舗装層12上に敷均
し形成される厚さを設定する。
As described above, the water permeable surface layer 20 formed on the upper surface of the upper pavement layer 12 and the upper end surface and the side surface of the second plate portion 32 is formed by the water permeable surface layer 20 provided with the water permeable surface layer 20. Use of the permeable pavement A, form and stone quality of the pebble aggregate Wc constituting the water permeable surface layer 20, properties and amount of the reactive resin used as a fixing means of the water permeable surface layer 20, water permeability The thickness of the flat pavement layer 12 formed on the upper pavement layer 12 is set in accordance with the form of the pavement main body 10 including the conductive surface layer 20.

【0073】かかる小石集合物Wcに配合される反応性
樹脂は、この混合される反応性樹脂によって透水性表面
層20を構成する小石集合物Wcの各小石が相互に所期
の圧縮強度及び曲げ強度を備えるように固定され、しか
も、該小石集合物Wcにおける各小石間に、雨水などの
透過に好適な間隙を生ずる最適な配合量となるように、
当該小石集合物Wcに配合して用いられる。
The reactive resin blended in the pebble aggregate Wc is such that the pebbles of the pebble aggregate Wc constituting the water-permeable surface layer 20 are formed with the desired compressive strength and bending strength by the mixed reactive resin. It is fixed so as to have strength, and furthermore, between the pebbles in the pebble aggregate Wc, so as to have an optimal blending amount that produces a gap suitable for permeation of rainwater or the like.
It is used by being blended into the pebble aggregate Wc.

【0074】かかる反応性樹脂の配合量は、例えば、駐
車場、車庫内土間、歩道、各種広場、運動場、公園内設
備設置場などの舗装体にあっては、粒径が3mm〜7m
mの範囲にある小石集合物Wcを100重量部に対し
て、当該反応性樹脂を3重量部〜10重量部の範囲で適
宜調整しながら混合して、夫々の目的に対応して、5m
m〜20mmの厚さとなるように、前記上部舗装層12
の上面と前記第2の板部32の上端面及び側面に敷均
し、所期の透水性と圧縮強度及び曲げ強度を有し、しか
も、自然石様の表面を備えた透水性舗装体Aを形成す
る。
The amount of the reactive resin to be mixed is, for example, in the case of a pavement such as a parking lot, a yard in a garage, a sidewalk, various plazas, a playground, and a facility installation site in a park, the particle size is 3 mm to 7 m.
m, and the reactive resin is mixed with 100 parts by weight of the pebble aggregate Wc in a range of 3 parts by weight to 10 parts by weight as appropriate for each purpose.
m to 20 mm in thickness.
And the upper surface and the side surface of the second plate portion 32, have the desired water permeability, compressive strength and bending strength, and have a natural stone-like surface. To form

【0075】このようにして構成される透水性舗装体A
は、透水性表面層20から下方に向けて侵入する雨水な
どが、この透水性表面層20の層を介して上部舗装層1
2及び下部舗装層11から舗装対象地面Bを構成する路
床1に向けて流下されると共に、この透水性表面層2
0、上部舗装層12及び下部舗装層11の各層における
水平方向に向けて移動可能とされる。また、前記型枠材
30’の第1の板部31面に流下された前記雨水など
は、この第1の板部31の孔33から都合よく前記舗装
対象地面Bに向けて流下される。また、この型枠材3
0’の第2の板部32面の側面に添って備えられる透水
性表面層20に侵入する雨水などは、この透水性表面層
20層を流下して前記舗装対象地面Bに案内されると共
に、前記透水性舗装体Aに侵入した雨水などは、前記第
2の板部32の孔33から該透水性表面層20に案内さ
れて前記舗装対象地面Bに導かれる。
The permeable pavement A constructed as described above
In the upper pavement layer 1, rainwater or the like penetrating downward from the water-permeable surface layer 20 passes through the water-permeable surface layer 20.
2 and the lower pavement layer 11 flow down toward the subgrade 1 constituting the ground B to be paved, and the water-permeable surface layer 2
0, each of the upper pavement layer 12 and the lower pavement layer 11 can be moved in the horizontal direction. The rainwater or the like that has flowed down to the surface of the first plate portion 31 of the formwork member 30 ′ flows down the hole 33 of the first plate portion 31 toward the ground B to be paved conveniently. In addition, this form material 3
Rainwater or the like that enters the water-permeable surface layer 20 provided along the side surface of the second plate portion 32 of the 0 ′ flows down the water-permeable surface layer 20 and is guided to the ground B to be paved. Rainwater or the like that has entered the permeable pavement A is guided from the hole 33 of the second plate portion 32 to the permeable surface layer 20 and is guided to the pavement target ground B.

【0076】図6に示される透水性舗装体Aは、前記型
枠材30’における第2の板部32の側を前記舗装対象
地面Bに接地した状態として、この第2の板部32の孔
33から杭40を舗装対象地面Bに刺挿して該第2の板
部32を舗装対象地面Bに止め付け、この型枠材30’
の第1の板部31を当該舗装対象地面Bの舗装対象縁部
Baに沿って起立するようになし、この第1の板部31
面を堰板面として舗装材Wを敷設した当該型枠材30’
の他の適用例を示したものであって、前記図2〜図5で
示される型枠材30’の適用例と異なる立ち上がり幅を
有する透水性舗装体Aを当該舗装対象地面Bに形成する
ものである。
The permeable pavement A shown in FIG. 6 has the form plate 30 ′ with the side of the second plate portion 32 grounded to the ground B to be paved. The second plate portion 32 is fastened to the ground B to be paved by inserting the pile 40 into the ground B to be paved through the hole 33, and the form member 30 'is formed.
Of the first plate portion 31 along the paved object edge Ba of the ground B to be paved.
Form material 30 'on which the paving material W is laid with the surface as a weir plate surface
Which shows another application example, in which a water-permeable pavement A having a rising width different from the application example of the formwork material 30 ′ shown in FIGS. 2 to 5 is formed on the ground B to be paved. Things.

【0077】この型枠材30’を用いた透水性舗装体A
の形成方法は、前記図2図5で示される型枠材30’を
用いた透水性舗装体Aの形成方法における型枠材30’
の第1の板部31に代えて、第2の板部32を舗装対象
地面Bに接地した状態で該舗装対象地面Bに固定して透
水性舗装体Aを形成するようにした以外の当該型枠材3
0’の構成並びに当該透水性舗装体Aの形成方法を、前
記図1〜図5において示される型枠材30’の構成及び
透水性舗装体Aの形成方法と同一又は実質的に同一とし
てあり、前記型枠材30’の構成及び透水性舗装体Aの
形成方法と同一の構成部分及び同一の形成方法部分に同
一の番号を付して、その説明を省略する。
A water-permeable pavement A using this form member 30 '
The method of forming the mold 30 'in the method of forming the water-permeable pavement A using the mold 30' shown in FIG.
In place of the first plate portion 31, the second plate portion 32 is fixed to the paving target ground B in a state where the second plate portion 32 is in contact with the paving target ground B to form the permeable pavement A. Formwork material 3
The structure of the water permeable pavement A and the method of forming the water permeable pavement A are the same as or substantially the same as the structure of the formwork material 30 ′ and the method of forming the water permeable pavement A shown in FIGS. The same reference numerals are given to the same components and the same forming method as those of the structure of the formwork member 30 'and the method of forming the permeable pavement A, and the description thereof will be omitted.

【0078】図7に示される透水性舗装体Aは、前記図
1〜図5において示される透水性舗装体Aにおいて、型
枠材30’の備えられる舗装対象地面Bとして掘削地面
Bbに割り栗石1aを敷き込むことなく、該掘削地面B
bを舗装対象地面Bとして、これに直接型枠材30’の
第1の板部31を接地状態とし、この第1の板部31の
孔33に杭40を刺挿して該型枠材30’を該舗装対象
地面Bに固定し、この型枠材30’における第2の板部
32を該舗装対象地面Bの舗装対象縁部Baに沿うよう
に設けると共に、この第2の板部32面を堰板面として
舗装材Wを敷設して透水性舗装体Aを形成するようにし
た以外の型枠材30’の構成及び透水性舗装体Aの形成
方法を、前記図1〜図5に示される型枠材30’の構成
及び透水性舗装体Aの形成方法と同一又は実質的に同一
の構成及び形成方法としてある。従って、前記図1〜図
5で示される型枠材30’の構成及び透水性舗装体Aの
形成方法と同一又は実質的に同一の部分は同一の番号を
付して、その説明を省略する。
The permeable pavement A shown in FIG. 7 is different from the permeable pavement A shown in FIGS. 1 to 5 in that it is divided into an excavated ground Bb as a pavement ground B provided with a form member 30 '. 1a, without excavating the excavated ground B
b as the ground B to be paved, the first plate portion 31 of the formwork member 30 ′ is directly brought into contact with the ground B, and the pile 40 is inserted into the hole 33 of the first plate portion 31 to insert the pile 40. ′ Is fixed to the ground B to be paved, and the second plate 32 of the formwork 30 ′ is provided along the edge Ba to be paved of the ground B to be paved, and the second plate 32 The structure of the formwork material 30 ′ and the method of forming the water-permeable pavement A other than forming the water-permeable pavement A by laying the pavement material W with the surface as the weir plate surface are described in FIGS. And the same or substantially the same structure and method as the method of forming the permeable pavement A shown in FIG. Therefore, the same or substantially the same parts as those in the configuration of the formwork member 30 ′ and the method of forming the water-permeable pavement A shown in FIGS. 1 to 5 are denoted by the same reference numerals, and description thereof is omitted. .

【0079】次いで、図8〜図12で示される型枠材3
0”及び当該型枠材30”を用いた透水性舗装体Aの形
成方法について説明する。
Next, the form material 3 shown in FIGS.
A method for forming the water-permeable pavement A using the form material 0 "and the form material 30" will be described.

【0080】この図示例に係る型枠材30”は、断面が
L字状をなすように略直角に連続されている第1の板部
31及び第2の板部32を備えており、しかも、この型
枠材30”を構成する第1の板部31が環状板の一部を
なすように構成される円弧板状としてあると共に、前記
第2の板部32を該第1の板部31の長手方向にある一
側縁から該第1の板部31に直角に且つ一体に連続され
ている湾曲板状に構成してあり、該第1の板部31の側
を舗装対象地面Bに接地させて、この第1の板部31に
ある孔33に挿通した杭40を当該舗装対象地面Bに刺
挿して該型枠材30”舗装対象地面Bに取り付け用いる
ようにした以外の構成及び当該型枠材30”を用いた透
水性舗装体Aの形成方法を、前記図1〜図7で示される
型枠材30’の構成及び該型枠材30’を用いた透水性
舗装体Aの形成方法と同一又は実質的に同一としてあ
る。
The form member 30 ″ according to the illustrated example includes a first plate portion 31 and a second plate portion 32 that are continuous at substantially right angles so that the cross section forms an L shape. The first plate portion 31 constituting the form member 30 "is formed in an arc-shaped plate shape so as to form a part of an annular plate, and the second plate portion 32 is formed of the first plate portion. The first plate portion 31 is formed into a curved plate shape that is continuous at right angles and integrally with the first plate portion 31 from one side edge in the longitudinal direction of the first plate portion 31. And the pile 40 inserted through the hole 33 in the first plate portion 31 is inserted into the ground B to be paved and attached to the formwork 30 "on the ground B to be paved. And a method of forming a water-permeable pavement A using the formwork material 30 ″, the structure of the formwork material 30 ′ shown in FIGS. And the same or substantially the same as the method of forming the permeable pavement A using the formwork material 30 '.

【0081】従って、前記図1〜図7で示される型枠材
30’の構成及び透水性舗装体Aの形成方法と同一又は
実質的に同一の部分は同一の番号を付して、その説明を
省略する。
Therefore, the same or substantially the same parts as those in the construction of the formwork member 30 'and the method of forming the water-permeable pavement A shown in FIGS. Is omitted.

【0082】このように湾曲された状態で起立されてい
る型枠材30”における第2の板部32を舗装対象地面
Bの舗装対象縁部Baに沿って備えつけると共に、この
第2の板部32面を堰板面として舗装材Wを該第1の板
部31の側に敷設することによって、この型枠材30”
における第2の板部32の曲面形状を湾曲周側縁とする
透水性舗装体Aを形成することができる。
The second plate portion 32 of the formwork member 30 ″ that is erected in the curved state is provided along the paved edge Ba of the ground B to be paved, and the second plate 32 is provided. By laying the pavement material W on the side of the first plate portion 31 with the surface of the portion 32 serving as a weir plate surface, the form material 30 ″ is formed.
The water-permeable pavement A having the curved surface shape of the second plate portion 32 at the curved peripheral side edge can be formed.

【0083】なお、この図示例にあっては、一種類の湾
曲した形態の型枠材30”が示されているが、この図示
例の型枠材30”における第1の板部31の環状板の湾
曲の度合いの異なる各種の湾曲状態に構成された第1の
板部31を有する型枠材30”や、第2の板部32を該
図示例における第2の板部32の備えつけ側と反対側に
ある第1の板部31の長手方向の側縁に沿って設けるよ
うにして構成される型枠材30”や、前記第1の板部3
1を屈曲する環板状に構成して該第1の板部31に備え
られる第2の板部32を屈曲状に連続した板部とする型
枠材30”などの各種の任意の形状の型枠材30”を構
成し、これらの一種又は二種以上と前記図1〜図7に示
される型枠材30’などを適宜組み合わせて、当該透水
性舗装体Aの形成用の型枠を形成し、この形成型枠の内
側に前記舗装材Wを敷設して透水性舗装体Aを形成す
る。
In the illustrated example, one kind of curved form member 30 ″ is shown, but the annular shape of the first plate portion 31 in the form member 30 ″ of the illustrated example is shown. Forming material 30 "having a first plate portion 31 configured in various curved states having different degrees of plate curvature, and a second plate portion 32 provided with a second plate portion 32 in the illustrated example. Form member 30 "which is provided along the longitudinal side edge of the first plate portion 31 on the opposite side to the first plate portion 31;
1 is formed into an annular plate shape, and the second plate portion 32 provided in the first plate portion 31 is formed into a bent continuous plate portion. Forming material 30 "is formed, and one or more of these are appropriately combined with the forming material 30 'shown in FIGS. 1 to 7 to form a forming form for the water-permeable pavement A. The permeable pavement A is formed by laying the paving material W inside the forming mold.

【0084】図13は、前記の型枠材30’及び型枠材
30”などの各型枠材を用いて透水性舗装体Aの形成用
の型枠を構成し、この形成型枠内に前記舗装材Wを敷設
して透水性舗装体Aを形成した状態を示したものであっ
て、この透水性舗装体Aの形成方法にあっては、前記型
枠材30’及び型枠材30”を、互いに、その接地面側
にある板部を内側にし、且つ、その起立側にある板部を
外側にして、互いに該起立側の板部が向き合うように舗
装対象地面Bに杭40を用いて固定し、この互いに向き
合って備えられる各型枠材30’、型枠材30”におけ
る夫々の起立側の板部間に前記舗装材Wを敷設して透水
性舗装体Aを構成したものである。
FIG. 13 shows a form for forming a water-permeable pavement A using each form material such as the form material 30 ′ and the form material 30 ″. FIG. 4 shows a state in which the paving material W is laid to form a water-permeable pavement A. In the method of forming the water-permeable pavement A, the form material 30 ′ and the form material 30 are used. With the plate portion on the ground surface side inside and the plate portion on the upright side outside, and place the pile 40 on the ground B to be paved so that the plate portions on the upright side face each other. The permeable pavement A is constructed by laying the pavement material W between the respective upright side plate portions of the form materials 30 ′ and the form materials 30 ″ which are provided and fixed to each other. It is.

【0085】更に、図14は、かかる型枠材30を用い
て構成される各種の透水性舗装体Aの典型例を示したも
のであって、玄関口に到るアプローチ通路A1や、この
通路A1の玄関口に備えられる玄関ポーチA2や、建物
に沿って備えられる各種ポーチA3や、通路A1を道路
と連絡する階段部A4などの各種の踏み込み路面などの
構成例が示されている。
Further, FIG. 14 shows a typical example of various permeable pavements A formed by using such a form member 30, and shows an approach path A1 reaching the entrance and an approach path A1. A configuration example of an entrance porch A2 provided at the entrance of A1, various porches A3 provided along a building, and various stepped road surfaces such as a stair portion A4 connecting a passage A1 to a road is shown.

【0086】[0086]

【発明の効果】この発明にかかる型枠材は、透水性舗装
体の形成に際して、舗装対象地面に備えられて舗装材の
敷設に用いられると共に該舗装体の一部とされる型枠材
であって、この型枠材が、L字状断面をなすように備え
られる第1の板部と第2の板部とを有すると共に該板部
の少なくとも一方側の板部に複数の孔を備えた構成とし
てあり、また、該型枠材を用いた透水性舗装体の形成方
法は、該型枠材を、舗装対象地面に対して前記孔を備え
ている板部側を接地し且つ他方の板部側を該舗装対象地
面の舗装対象縁部に沿って起立させるようにセットする
と共に、この起立されている板部面を堰板面として前記
接地されている板部側の舗装対象地面に対して舗装材を
敷設するようにしてあることから、任意の高さの略垂直
な舗装側面を有する透水性の舗装体を容易に、しかも、
確実に形成提供できる利点を有している。
The formwork material according to the present invention is a formwork material which is provided on the ground to be paved and used for laying the pavement material and is a part of the pavement material when forming the permeable pavement. The form material has a first plate portion and a second plate portion provided so as to form an L-shaped cross section, and has a plurality of holes in at least one plate portion of the plate portion. The method for forming a water-permeable pavement using the form material is such that the form material is grounded on the side of the plate portion provided with the hole with respect to the ground to be paved, and the other is formed. The plate portion side is set so as to stand up along the pavement target edge of the pavement target ground, and the upright plate portion surface is set as a weir plate surface on the grounded plate portion side pavement target ground. Because it is designed to lay pavement material, it has a nearly vertical pavement side of any height Easily permeability of the pavement, moreover,
It has the advantage that it can be reliably formed and provided.

【0087】また、この発明に係る透水性舗装体の形成
方法を、前記接地されている板部側の舗装対象地面に対
して舗装材を敷設し、且つ、該敷設舗装材面及び該敷設
舗装材面に連続される前記型枠材面に透水性表面層を形
成することによって、前記特長に併せて、側面部を含め
た表面部に透水性表面層を備えた透水性舗装体を養生期
間をおくことなく、確実に、しかも、容易に形成できる
利点を有している。
Further, the method for forming a water-permeable pavement according to the present invention is characterized in that a pavement material is laid on the ground to be paved on the side of the grounded plate portion, and the laid pavement surface and the laid pavement surface are laid. By forming a water-permeable surface layer on the form material surface that is continuous with the material surface, the water-permeable pavement having the water-permeable surface layer on the surface portion including the side surface portion is cured in accordance with the above-mentioned features. It has the advantage that it can be formed reliably and easily without any additional steps.

【図面の簡単な説明】[Brief description of the drawings]

【図1】典型的な一実施の形態に係る型枠材の斜視図FIG. 1 is a perspective view of a form material according to a typical embodiment.

【図2】同型枠材を用いた典型的な一実施の形態に係る
透水性舗装体の形成方法の一工程を示す断面図
FIG. 2 is a cross-sectional view showing one step of a method for forming a water-permeable pavement according to a typical embodiment using the same frame material.

【図3】同他の工程の一を示す断面図FIG. 3 is a sectional view showing one of the other steps.

【図4】同更に他の工程の一を示す断面図FIG. 4 is a cross-sectional view showing one of the other steps.

【図5】同構成された透水性舗装体を示す断面図FIG. 5 is a sectional view showing the permeable pavement having the same configuration.

【図6】同構成された他の透水性舗装体を示す断面図FIG. 6 is a sectional view showing another permeable pavement having the same configuration.

【図7】同構成された更に他の透水性舗装体を示す断面
FIG. 7 is a sectional view showing still another permeable pavement having the same configuration.

【図8】典型的な他の実施の形態に係る型枠材の斜視図FIG. 8 is a perspective view of a formwork material according to another exemplary embodiment.

【図9】同型枠材を用いた典型的な一実施の形態に係る
透水性舗装体の形成方法の一工程を示す断面図
FIG. 9 is a sectional view showing one step of a method for forming a water-permeable pavement according to a typical embodiment using the same frame material.

【図10】同他の工程の一を示す断面図FIG. 10 is a sectional view showing one of the other steps.

【図11】同更に他の工程の一を示す断面図FIG. 11 is a sectional view showing one of the other steps.

【図12】同構成された透水性舗装体を示す断面図FIG. 12 is a sectional view showing a permeable pavement having the same configuration.

【図13】構成される透水性舗装体の一例を示す平面図FIG. 13 is a plan view showing an example of a constructed water-permeable pavement.

【図14】透水性舗装体の構成の典型例を示す斜視図FIG. 14 is a perspective view showing a typical example of a configuration of a permeable pavement.

【図15】従来の透水性舗装体の構成の一工程を示す断
面図
FIG. 15 is a cross-sectional view showing one process of a configuration of a conventional permeable pavement.

【図16】同従来の透水性舗装体の構成の他の一工程を
示す断面図
FIG. 16 is a sectional view showing another step of the configuration of the conventional permeable pavement.

【図17】同従来の透水性舗装体の断面図FIG. 17 is a sectional view of the conventional permeable pavement.

【図18】同従来の他の透水性舗装体の構成の一工程を
示す断面図
FIG. 18 is a sectional view showing one step of the configuration of another permeable pavement of the related art.

【図19】同従来の透水性舗装体の断面図FIG. 19 is a sectional view of the conventional permeable pavement.

【符号の説明】[Explanation of symbols]

A 透水性舗装体 B 舗装対象地面 Ba 舗装対象縁部 W 舗装材 20 透水性表面層 30 型枠材 31 第1の板部 32 第2の板部 33 孔 Reference Signs List A Permeable pavement body B Pavement target ground Ba Pavement target edge W Pavement material 20 Permeable surface layer 30 Formwork material 31 First plate portion 32 Second plate portion 33 Hole

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 透水性舗装体の形成に際して、舗装対象
地面に備えられて舗装材の敷設に用いられると共に該舗
装体の一部とされる型枠材であって、 この型枠材が、L字状断面をなすように備えられる第1
の板部と第2の板部とを有すると共に該板部の少なくと
も一方側の板部に複数の孔を備えていることを特徴とす
る型枠材。
When forming a permeable pavement, a formwork material is provided on the ground to be paved, used for laying a pavement material, and is used as a part of the pavement material. The first provided to form an L-shaped cross section
And a second plate portion, and at least one of the plate portions has a plurality of holes.
【請求項2】 L字状断面をなすように備えられる第1
の板部と第2の板部とを有すると共に該板部の少なくと
も一方側の板部に複数の孔を備えている型枠材を用意
し、この型枠材を、舗装対象地面に対して前記孔を備え
ている板部側を接地し且つ他方の板部側を該舗装対象地
面の舗装対象縁部に沿って起立させるようにセットする
と共に、この起立されている板部面を堰板面として前記
接地されている板部側の舗装対象地面に対して舗装材を
敷設することを特徴とする透水性舗装体の形成方法。
2. A first device provided to have an L-shaped cross section.
A plate material having a plate portion and a second plate portion, and having a plurality of holes in at least one plate portion of the plate portion, is prepared. The plate portion side having the hole is grounded, and the other plate portion side is set so as to stand up along the paved object edge of the paved object ground. A method for forming a water-permeable pavement, comprising laying a pavement material on a ground to be paved on the side of the plate portion grounded as a surface.
【請求項3】 L字状断面をなすように備えられる第1
の板部と第2の板部とを有すると共に該板部の少なくと
も一方側の板部に複数の孔を備えている型枠材を用意
し、この型枠材を、舗装対象地面に対して前記孔を備え
ている板部側を接地し且つ他方の板部側を該舗装対象地
面の舗装対象縁部に沿って起立させるようにセットする
と共に、この起立されている板部面を堰板面として前記
接地されている板部側の舗装対象地面に対して舗装材を
敷設し、且つ、該敷設舗装材面及び該敷設舗装材面に連
続される前記型枠材面に透水性表面層を形成するように
したことを特徴とする透水性舗装体の形成方法。
3. A first member provided to form an L-shaped cross section.
A plate material having a plate portion and a second plate portion, and having a plurality of holes in at least one plate portion of the plate portion, is prepared. The plate portion side having the hole is grounded, and the other plate portion side is set so as to stand up along the paved object edge of the paved object ground. A paving material is laid on the ground to be paved on the side of the plate portion grounded as a surface, and a permeable surface layer is provided on the laid paving material surface and the formwork surface that is continuous with the laid paving material surface. A method for forming a water-permeable pavement, characterized in that a pavement is formed.
JP2000155053A 2000-05-25 2000-05-25 Form material and forming method for water permeable pavement Pending JP2001329504A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000155053A JP2001329504A (en) 2000-05-25 2000-05-25 Form material and forming method for water permeable pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000155053A JP2001329504A (en) 2000-05-25 2000-05-25 Form material and forming method for water permeable pavement

Publications (1)

Publication Number Publication Date
JP2001329504A true JP2001329504A (en) 2001-11-30

Family

ID=18660054

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000155053A Pending JP2001329504A (en) 2000-05-25 2000-05-25 Form material and forming method for water permeable pavement

Country Status (1)

Country Link
JP (1) JP2001329504A (en)

Similar Documents

Publication Publication Date Title
US20110064517A1 (en) Reinforced pervious concrete
WO1997013923A1 (en) Method for constructing block paving
KR100778045B1 (en) Block equipped with drainage and ventilation function, its producing method, and block mult-layer formed from materialization of the blocks
CN1981090A (en) Water-permeable paving and method for producing a paving
KR100500957B1 (en) Road side ditch having seepage paving-material and construction method of the same
JP4746654B2 (en) Surface layer body and surface layer construction method
US6439805B1 (en) Method of stabilizing the ground in road construction work
KR100889252B1 (en) Block having a load divergence function and manufacturing and road constructing method for the same
JP4149592B2 (en) Pavement structure
JP2909929B2 (en) How to build a block pavement
KR200291922Y1 (en) Road side ditch having seepage paving-material
JP2001329504A (en) Form material and forming method for water permeable pavement
CN110983886B (en) Combined type town road
EP0859084A2 (en) Paving area with rainwater removal
KR100907751B1 (en) Packaging method using soybeans
CN218203637U (en) Urban road pavement structure
DE202010003569U1 (en) Base layer, base plate, base plate arrangement and sandwich structure
CN217026541U (en) Multifunctional asphalt pavement structure
CN113622241B (en) Municipal road engineering pavement construction process
JP2002309503A (en) Block pavement and construction method therefor
JP3362841B2 (en) How to repair earth-based pavement
KR20050116769A (en) Mortar type soil pavement method
US20050166544A1 (en) Structural components formed using a system for recycling wet concrete and uses thereof
KR20230064567A (en) Filling layer drainage method for sidewalk block
Seeley et al. Specification of Roads and Pavings

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070514

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081215

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090106

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20090512