JP2001303560A - Method for processing head of concrete pile - Google Patents

Method for processing head of concrete pile

Info

Publication number
JP2001303560A
JP2001303560A JP2000122057A JP2000122057A JP2001303560A JP 2001303560 A JP2001303560 A JP 2001303560A JP 2000122057 A JP2000122057 A JP 2000122057A JP 2000122057 A JP2000122057 A JP 2000122057A JP 2001303560 A JP2001303560 A JP 2001303560A
Authority
JP
Japan
Prior art keywords
concrete pile
head
concrete
ground
split
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000122057A
Other languages
Japanese (ja)
Other versions
JP3368254B2 (en
Inventor
Morishige Akiyama
森重 秋山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2000122057A priority Critical patent/JP3368254B2/en
Publication of JP2001303560A publication Critical patent/JP2001303560A/en
Application granted granted Critical
Publication of JP3368254B2 publication Critical patent/JP3368254B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily crush and remove in a very short time the head of a concrete pile protruding out of the ground. SOLUTION: A plurality of vertical holes 17 are cut in the top 1b of the concrete pile 1 protruding out of the ground 3. Tapered split plates formed of a material harder than the concrete pile 1 are fitted into the vertical holes 17 and enlargers are forcibly press fitted in between the split plates to crush the head of the concrete pile 1. Thereafter, a plurality of horizontal holes 27 are cut in the remainder 25 left on the head la of the concrete pile 1. The split plates are fitted into the horizontal holes 27 and the enlargers are forcibly press fitted in between the split plates to crush the remainder 25 of the concrete pile 1.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明はコンクリート杭の頭
部処理方法に係り、特に、地盤を堀削った基礎孔にコン
クリート材料を流し込んで打ち杭形成されたコンクリー
ト杭の頭部を処理する方法の改良に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of treating a head of a concrete pile, and more particularly to a method of treating a head of a concrete pile formed by pouring a concrete material into a foundation hole obtained by excavating the ground. Regarding improvement.

【0002】[0002]

【従来の技術】鉄筋コンクリート施工の建物では、地盤
に形成するコンクリート杭と地上に施工する鉄筋コンク
リート柱とを当初から一体的にコンクリート打設して施
工すると、下部より上部の強度が弱くなる等の観点か
ら、コンクリート杭を予め形成した後、これに鉄筋コン
クリート柱を連結施工するのが一般的である。
2. Description of the Related Art In a reinforced concrete construction building, if a concrete pile formed on the ground and a reinforced concrete pillar constructed on the ground are integrally cast from the beginning, the strength of the upper part becomes lower than that of the lower part. Therefore, it is common to form a concrete pile in advance, and then connect a reinforced concrete pillar to this.

【0003】従来、このようなコンクリート杭1は、図
15に示すように、例えば地盤3に縦方向に堀削った基
礎孔5に鉄筋かご7を入れるとともに、コンクリート材
料を流し込んで固めて施工され、地表9から突出したコ
ンクリート杭1の頭部1aをブレーカと呼ばれる削岩機
11で強打しながら少しずつ粉砕除去し、鉄筋かご7の
上部を露出させる頭部処理を行う必要があった。図15
中の符号3aは地盤3より硬い支持地盤である。
Conventionally, as shown in FIG. 15, such a concrete pile 1 is constructed by, for example, placing a reinforcing steel cage 7 in a foundation hole 5 dug vertically in a ground 3 and pouring a concrete material into it. In addition, the head 1a of the concrete pile 1 protruding from the ground surface 9 was required to be crushed and removed little by little while banging it with a rock drill 11 called a breaker to expose the upper part of the reinforcing steel cage 7. FIG.
Reference numeral 3a in the inside is a supporting ground harder than the ground 3.

【0004】そして、頭部1aの除去処理を行ったコン
クリート杭1に対し、図示しない建物基礎部をコンクリ
ート施工するとともに、鉄筋かご7と鉄筋を連結して鉄
筋コンクリート柱等を組立てていた。
Then, the concrete foundation 1 (not shown) is concretely constructed on the concrete pile 1 from which the head 1a has been removed, and a reinforced concrete column or the like is assembled by connecting the reinforcing bar 7 and the reinforcing bar.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、一度固
まったコンクリート杭1の頭部を削岩機11によって粉
砕除去する作業は、極めて大きな労力と長い時間が必要
で、例えば直径約2mのコンクリート杭1の頭部を上か
ら約1m程度粉砕除去する場合でも、1日半程度を要す
る重労働であった。
However, the work of pulverizing and removing the head of the concrete pile 1 once hardened by the rock drill 11 requires extremely large labor and a long time. For example, the concrete pile 1 having a diameter of about 2 m is required. Even if the head was ground and removed about 1 m from above, it took about one and a half days.

【0006】しかも、作業者は、振動を伴って強打しな
がら動作する削岩機11を長時間にわたってコンクリー
ト杭1に押当てる必要があることから、身体的に好まし
いものではなかった。
In addition, since the operator needs to press the rock drill 11 operating while slamming with vibration against the concrete pile 1 for a long time, it is not physically desirable.

【0007】本発明はそのような従来の欠点を解決する
ためになされたもので、コンクリート杭にあって地盤か
ら突出した当該頭部を、極めて短時間かつ簡単に粉砕除
去することが可能な頭部処理方法を提供するものであ
る。
The present invention has been made in order to solve such a conventional drawback, and a head capable of extremely easily and easily crushing and removing the head protruding from the ground in a concrete pile. It is intended to provide a method of processing a section.

【0008】[0008]

【課題を解決するための手段】そのような課題を解決す
るために本発明は、地盤から突出するコンクリート杭の
頂部から複数の縦孔を所定の間隔を置いて環状又は円弧
状に設け、そのコンクリート杭より硬質材料から縦長か
つ先端を先細りに形成した一対の分割棒を当該先端から
その縦孔にはめ、外部からそれら分割棒間に拡開具を強
制圧入し、それら分割棒間を押し広げるようにして上記
コンクリート杭を砕き、そのコンクリート杭の頭部砕き
残部に複数の横孔を所定の間隔を置いて設け、それら分
割棒を当該先端からその横孔にはめ、外部からそれら分
割棒間に拡開具を強制圧入し、それら分割棒間を押し広
げるようにして頭部砕き残部を砕くことにより当該コン
クリート杭の頭部を除去する方法である。
In order to solve such a problem, the present invention is to provide a plurality of vertical holes at predetermined intervals from a top of a concrete pile projecting from the ground in an annular or arcuate shape. Insert a pair of split rods formed from a hard material from a hard material into a vertically elongated and tapered tip into the vertical hole from the tip, forcibly press-fit a spreader between the split rods from the outside, and push between the split rods. The concrete pile is crushed, and a plurality of lateral holes are provided at predetermined intervals in the remaining portion of the concrete pile head crushing, the dividing rods are fitted into the lateral holes from the tip, and between the dividing rods from outside. This is a method of removing the head of the concrete pile by forcibly press-fitting the spreader and squeezing the remainder of the crushed head so as to push between the divided rods.

【0009】そして、本発明では、上記縦孔の先端がコ
ンクリート杭の外側に向けた状態で斜に形成することが
好ましい。
In the present invention, it is preferable that the end of the vertical hole is formed obliquely with the tip facing the outside of the concrete pile.

【0010】[0010]

【発明の実施の形態】以下本発明の実施の形態を図面を
参照して説明する。なお、従来例と共通する部分には同
一の符号を付す。
Embodiments of the present invention will be described below with reference to the drawings. Note that the same reference numerals are given to portions common to the conventional example.

【0011】まず、本発明を実施する打ち杭(アース
杭)形のコンクリート杭の施工方法を簡単に説明する。
図2〜図6はそのコンクリート杭の施工方法を説明する
工程を示す図である。
First, a method of constructing a concrete pile of a driven pile (earth pile) for carrying out the present invention will be briefly described.
2 to 6 are views showing steps for explaining the concrete pile construction method.

【0012】図2において、地盤3を縦方向に例えば支
持地盤3aに至るまでボーリングし、円中空状の基礎孔
5を形成する。このボーリングは、中掘工法、プレボー
リング工法、アースドリル工法又はオールケーシング工
法その他、従来公知の工法で行う。
In FIG. 2, the ground 3 is drilled in the longitudinal direction to, for example, the support ground 3a, and a hollow base hole 5 is formed. This boring is performed by a conventionally known method, such as a middle digging method, a pre-boring method, an earth drill method, an all casing method, or the like.

【0013】基礎孔5の形成とともに又は予め、図3に
示すように、複数の主鉄筋7aを環状に配置し、この主
鉄筋7aについて長手方向所定の間隔毎にリング状の帯
鉄筋7bを溶接して一体化し、細長いかご形に形成した
鉄筋かご7を用意しておく。この鉄筋かご7は、基礎孔
5の深さより多少長い寸法を有している。
Along with the formation of the foundation hole 5 or in advance, as shown in FIG. 3, a plurality of main reinforcing bars 7a are arranged in a ring shape, and a ring-shaped band reinforcing bar 7b is welded to the main reinforcing bars 7a at predetermined intervals in the longitudinal direction. Then, a reinforcing cage 7 formed into an elongated cage shape is prepared. The rebar cage 7 has a dimension slightly longer than the depth of the foundation hole 5.

【0014】基礎孔5内には、図4に示すように、その
内壁が崩れないように、鋼鉄製の筒型ケーシング13を
地表9側から圧入して補強し、その中空部に図3の鉄筋
かご7をほぼ同芯円状に挿入する。
As shown in FIG. 4, a steel cylindrical casing 13 is press-fitted from the ground surface 9 side into the foundation hole 5 so that its inner wall does not collapse, as shown in FIG. The rebar basket 7 is inserted substantially concentrically.

【0015】筒型ケーシング13は地表9より1〜数m
突出した状態で施工し、鉄筋かご7も筒型ケーシング1
3内において地表9より突出した状態で施工する。
The cylindrical casing 13 is 1 to several meters from the ground surface 9.
It is constructed in a protruding state, and the reinforcing bar 7 is also a cylindrical casing 1
It is constructed in a state where it protrudes from the ground surface 9 within 3.

【0016】その後、図5に示すように、基礎孔5内に
公知のコンクリート材料15を従来公知の工法で打設し
て固化させ、図6に示すように、筒型ケーシング13を
抜取ってコンクリート杭1が完成する(図1A参照)。
Thereafter, as shown in FIG. 5, a known concrete material 15 is poured into the foundation hole 5 by a conventionally known method and solidified, and as shown in FIG. 6, the cylindrical casing 13 is removed. The concrete pile 1 is completed (see FIG. 1A).

【0017】次に、本発明に係るコンクリート杭1の頭
部処理方法を説明する。まず、図7および図8に示すよ
うに、コンクリート杭1の頭部1aの頂部(上端面)1
bにおいて、鉄筋かご7を形成する複数の主鉄筋7a先
端で形成される仮想円の内側領域にて、図示しないドリ
ルを用いてコンクリート杭1の軸方向(長手方向)に沿
った複数の縦孔17を切削形成する(図1B参照)。
Next, a method of treating the head of the concrete pile 1 according to the present invention will be described. First, as shown in FIGS. 7 and 8, the top (top end) 1 of the head 1 a of the concrete pile 1
b, a plurality of vertical holes along the axial direction (longitudinal direction) of the concrete pile 1 by using a drill (not shown) in a region inside an imaginary circle formed by the tips of the plurality of main reinforcing bars 7a forming the reinforcing bar cage 7. 17 is formed by cutting (see FIG. 1B).

【0018】これら複数の縦孔17は、主鉄筋7aで形
成される仮想円から数十cm内側に想定した同芯円上に
環状又は円弧条に位置し、かつ個々の縦孔17が隣合う
主鉄筋7a間においてその間を経て外側へ向け頂部(上
端面)1bから斜めになるように切削する。
The plurality of vertical holes 17 are located in an annular or arcuate shape on a concentric circle supposed to be several tens cm inside the virtual circle formed by the main reinforcing bar 7a, and the individual vertical holes 17 are adjacent to each other. The main reinforcing bars 7a are cut obliquely from the top (upper end surface) 1b toward the outside through the space therebetween.

【0019】例えば、直径2mのコンクリート杭1にお
いて、これの縦孔17は内径5〜7cm、深さ60cm
で、コンクリート杭1の軸方向に対して30°〜50°
の角度(θ)で斜めに形成する。
For example, in a concrete pile 1 having a diameter of 2 m, the vertical hole 17 has an inner diameter of 5 to 7 cm and a depth of 60 cm.
And 30 ° to 50 ° with respect to the axial direction of the concrete pile 1
At an angle (θ).

【0020】この縦孔17には、図9Aに示すように、
コンクリート杭1より硬い材料、例えば鋼鉄材料を半割
状にして先細りに形成した分割棒、例えば一対のセリヤ
板19を、図8のようにその先細り先端からはめ込み、
更に、図9Bに示すように、コンクリート杭1より硬い
材料、例えばセリヤ板19と同様に鋼鉄材料を先細りに
形成した拡開板、例えばセリヤ21を、図8のように一
対のセリヤ板19の間にはめ込み、ハンマ具23によっ
て強制的にセリヤ21を強打し、これをセリヤ板19の
間へ深く圧入する(図1C参照)。
In this vertical hole 17, as shown in FIG. 9A,
As shown in FIG. 8, a hardened material, for example, a steel material, such as a steel material, which is formed into a half-split shape and tapered into a split bar, for example, a pair of seria plates 19, is fitted from the tapered tip as shown in FIG.
Further, as shown in FIG. 9B, a material harder than the concrete pile 1, for example, an expanded plate formed by tapering a steel material like the seria plate 19, for example, a seria 21 is placed between the pair of seria plates 19 as shown in FIG. Then, the ceria 21 is forcibly struck with the hammer 23 and is pressed deeply into the space between the ceria plates 19 (see FIG. 1C).

【0021】ハンマ具23としては、コンプレッサによ
ってセリヤ21を自動的かつ連続的に強打できる、例え
ばブレーカ等が好適する。
As the hammer tool 23, a breaker, for example, which can automatically and continuously strike the ceria 21 by a compressor is preferable.

【0022】すると、縦孔17の周囲は、セリヤ21に
よって一対のセリヤ板19間が強制的に拡開され、主に
主鉄筋7a周囲およびこれより外側のコンクリート杭1
が部分的に砕かれる。
Then, the periphery of the vertical hole 17 is forcibly expanded between the pair of ceria plates 19 by the ceria 21, and mainly around the main reinforcing bar 7 a and the concrete pile 1 outside this.
Is partially crushed.

【0023】環状に形成された全ての縦孔17につい
て、セリヤ板19とセリヤ21を用いて同様に砕くと、
図10に示すように、鉄筋かご7の主鉄筋7a周囲から
外側のコンクリート部が粉砕除去され、主鉄筋7aで囲
まれた内側領域に円錐台形状の砕き残部25が残る。
When all the vertical holes 17 formed in a ring are crushed in the same manner using the ceria plate 19 and the ceria 21,
As shown in FIG. 10, the outer concrete portion is crushed and removed from the periphery of the main reinforcing bar 7 a of the reinforcing bar cage 7, and a truncated cone-shaped remaining portion 25 remains in an inner region surrounded by the main reinforcing bar 7 a.

【0024】なお、本明細書の図面では、コンクリート
杭1を砕いた跡を直線で描いているが、実際は凹凸にな
ることは周知である。
In the drawings of the present specification, the trace of crushing the concrete pile 1 is drawn with a straight line, but it is well known that the trace actually becomes uneven.

【0025】次いで、図10および図11に示すよう
に、円錐台形の砕き残部25に、図示しないドリルを用
いてコンクリート杭1の軸方向と直交する方向に、かつ
コンクリート杭1の中心に向けて複数の横孔27を、所
定の間隔を置いて環状に切削する(図1D参照)。
Next, as shown in FIG. 10 and FIG. 11, a not-shown drill is used to drill the remaining portion 25 of the truncated cone in a direction perpendicular to the axial direction of the concrete pile 1 and toward the center of the concrete pile 1. The plurality of lateral holes 27 are cut into a ring at predetermined intervals (see FIG. 1D).

【0026】その横孔27には、上述した一対のセリヤ
板19を図11のようにその先細り先端からはめ込み、
セリヤ21をセリヤ板19の間にはめ込み、ハンマ具2
3によって強制的に強打してセリヤ21をセリヤ板19
の間へ深く圧入する。
The pair of seria plates 19 described above are fitted into the lateral holes 27 from the tapered ends as shown in FIG.
Insert the seria 21 between the seria plates 19 and set the hammer 2
3 forcibly crush the cellar 21 to the cellar plate 19
Press deeply into the space.

【0027】すると、横孔27の周囲は、セリヤ21に
よって一対のセリヤ板19間が強制的に拡開され、砕き
残部25の主に上側へ部分的に砕かれて除去され、図1
2に示すように、コンクリート杭1の頭部処理が完成す
る(図1E参照)。
Then, the periphery of the horizontal hole 27 is forcibly expanded between the pair of ceria plates 19 by the ceria 21 and partially crushed upward mainly of the remaining crushed portion 25 to be removed.
As shown in FIG. 2, the head treatment of the concrete pile 1 is completed (see FIG. 1E).

【0028】なお、コンクリート杭1の寸法や砕き残部
25の寸法によっては、図示はしないが、上述した縦孔
17に類似した縦孔を砕き残部25の頂部から適宜切削
形成し、セリヤ21およびセリヤ板19をその縦孔に強
制挿入して砕く手法を併用すると、砕き残部25の除去
が容易となる。
Although not shown, depending on the size of the concrete pile 1 and the size of the crushing remaining portion 25, a vertical hole similar to the above-described vertical hole 17 is appropriately cut and formed from the top of the crushing remaining portion 25. When the technique of forcibly inserting the plate 19 into the vertical hole and crushing is also used, the removal of the remaining crushing portion 25 becomes easy.

【0029】そして、頭部1aの除去処理を行ったコン
クリート杭1に対し、図示はしないが、上述したように
建物基礎部をコンクリート形成するとともに、鉄筋かご
7と鉄筋を連結して鉄筋コンクリート柱等を組立てる。
Although not shown, the concrete foundation 1 is formed on the concrete pile 1 from which the head 1a has been removed, as described above. Assemble

【0030】本発明の実施に当っては、図8に示すよう
に、コンクリート杭1の頭部1aにあって頂部1bから
崩す位置までに相当する位置に、環状の横溝Uをカッタ
ーで30〜100mmの深さで切削し、コンクリート材
料15を膨張させてその組織を脆弱にさせる薬剤をこの
横溝Uおよびこの近傍に塗付し、除去する部分の位置決
めと粉砕の容易化、更に見栄えの向上を図ると良い。
In the embodiment of the present invention, as shown in FIG. 8, the annular lateral groove U is cut with a cutter at a position corresponding to the position from the top 1b to the collapsed position on the head 1a of the concrete pile 1. A cutting agent is cut to a depth of 100 mm, and a chemical agent for expanding the concrete material 15 to weaken the structure is applied to the lateral groove U and the vicinity thereof, thereby facilitating the positioning of the portion to be removed and the crushing, and further improving the appearance. It is good to try.

【0031】このように本発明のコンクリート杭の頭部
処理方法では、地盤3から突出するコンクリート杭1の
頂部1bから複数の縦孔17を所定の間隔で環状に設
け、先端を先細りに形成した鋼鉄製の一対のセリヤ板1
9を先端からその縦孔17にはめ、それらセリヤ板19
間に鋼鉄製のセリヤ21を強制的に圧入してハンマ具2
3にてそれらセリヤ板19間を押し広げるようにしてコ
ンクリート杭1を部分的に粉砕後、その頭部1aに残っ
た砕き残部25に複数の横孔27を所定の間隔を置いて
環状に設け、それらセリヤ板19を当該先端からその横
孔27にはめ、外部からそれらセリヤ板19間にセリヤ
21を強制圧入してハンマ具23で押し広げるようにし
て砕き残部25を砕いてその頭部を除去する。
As described above, in the method for treating the head of a concrete pile according to the present invention, a plurality of vertical holes 17 are provided annularly at predetermined intervals from the top 1b of the concrete pile 1 projecting from the ground 3, and the tip is tapered. A pair of steel seria 1
9 into the vertical hole 17 from the tip,
Forcibly press the steel seria 21 between the hammers 2
3, the concrete pile 1 is partially crushed so as to push the gap between the seriae plates 19, and a plurality of lateral holes 27 are provided at predetermined intervals in an annular shape in the crushing remaining portion 25 remaining on the head 1a. Then, the seria plate 19 is inserted into the lateral hole 27 from the tip, the seria 21 is forcibly press-fitted from outside to the seria plate 19 and spread by a hammer tool 23 to crush the remaining portion 25 and the head thereof. Remove.

【0032】そのため、セリヤ板19間に挿入したセリ
ヤ21をハンマ具23で強い力で数回叩くと、簡単に縦
孔17周辺のコンクリート杭1が砕かれて除去される
し、砕き残部25も横孔27を形成し、セリヤ板19、
セリヤ21、ブレーカやコンプレッサからなるハンマ具
23を用いて同様に簡単に砕いて除去できる。
Therefore, when the seria 21 inserted between the seria plates 19 is hit with a hammer 23 several times with a strong force, the concrete pile 1 around the vertical hole 17 is easily crushed and removed, and the remaining crush 25 is also removed. A horizontal hole 27 is formed, and the ceria plate 19,
Similarly, it can be easily crushed and removed using a hammer tool 23 composed of a cellia 21, a breaker or a compressor.

【0033】従って、従来のように削岩機11でコンク
リート杭1の頭部1aを少しずつ砕いて除去する方法に
比べ、極めて短時間かつ簡単に粉砕除去することが可能
となり、これまで1日半を要していた作業が半日程度に
短縮され、極めて高効率となる。
Therefore, compared with the conventional method in which the head 1a of the concrete pile 1 is gradually crushed and removed by the rock drill 11, it is possible to crush and remove the head 1a in a very short time and easily. The work that required half was reduced to about half a day, resulting in extremely high efficiency.

【0034】上述した実施の形態は、鉄筋かご7を埋設
するように有する鉄筋入りコンクリート杭1の頭部処理
を示すものであるが、本発明はこれに限定されず、鉄筋
かご7を埋設しない鋼管杭タイプのコンクリート杭1に
おいても実施可能である。
In the above-described embodiment, the treatment of the head of the concrete pile 1 with the reinforcing bars having the reinforcing bars 7 embedded therein is shown. However, the present invention is not limited to this, and the reinforcing bars 7 are not embedded. The present invention is also applicable to a steel pipe pile type concrete pile 1.

【0035】すなわち、上述した図4のように、基礎孔
5内に地表9側から鋼鉄製の筒型ケーシング13を圧入
して補強し、その基礎孔5を挟むようにH鋼29を地盤
3に打込み、鉄筋かご7を挿入しない基礎孔5内に公知
のコンクリート材料15を従来公知の工法で打設して固
化させ、図13および図14に示すように、コンクリー
ト杭1を施工する。
That is, as shown in FIG. 4 described above, a steel cylindrical casing 13 is press-fitted into the foundation hole 5 from the ground surface 9 side to reinforce it, and the H steel 29 is placed on the ground 3 so as to sandwich the foundation hole 5. Then, a known concrete material 15 is poured into the foundation hole 5 in which the reinforcing cage 7 is not inserted by a conventionally known method and solidified, and the concrete pile 1 is constructed as shown in FIGS. 13 and 14.

【0036】そして、図13に示すように、コンクリー
ト杭1の頂部1bから上述した縦孔17を同様に切削形
成し、セリヤ板19、セリヤ21およびハンマ具23を
用いてコンクリート杭1の頭部1aを砕く。
Then, as shown in FIG. 13, the above-described vertical hole 17 is similarly cut and formed from the top 1b of the concrete pile 1, and the head of the concrete pile 1 is formed using the ceria plate 19, the ceria 21 and the hammer 23. Crush 1a.

【0037】さらに、図14に示すように、円錐台形の
砕き残部25(図13では破線で示す。)に対し、上述
した横孔27を円弧状に複数個切削形成し、セリヤ板1
9、セリヤ21およびハンマ具23を用いてコンクリー
ト杭1の頭部1aを砕けば処理が完成する(図13では
一点鎖線で示す。)。
Further, as shown in FIG. 14, a plurality of the above-described transverse holes 27 are cut and formed in an arc shape in the truncated conical portion 25 (indicated by a broken line in FIG. 13).
9, the processing is completed by crushing the head 1a of the concrete pile 1 using the ceria 21 and the hammer 23 (indicated by a dashed line in FIG. 13).

【0038】このように、本発明においては、コンクリ
ート杭1の頂部1bから切削する横孔27は環状に限ら
ず円弧状で形成しても良いし、縦孔17についても環状
に限らず円弧状(直線状又は曲線状も含む)で形成して
も良い。要は、施工したコンクリート杭1の頭部1aの
形状に応じて決定すれば良い。
As described above, in the present invention, the horizontal hole 27 cut from the top 1b of the concrete pile 1 may be formed not only in an annular shape but also in an arc shape, and the vertical hole 17 is not limited to an annular shape but in an arc shape. (Including a straight line or a curved line). In short, what is necessary is just to determine according to the shape of the head 1a of the constructed concrete pile 1.

【0039】また、縦孔17も、上述したように斜に切
削形成する例に限らず、コンクリート杭1の寸法や形状
に応じて、縦方向に沿って形成することも可能である。
Further, the vertical hole 17 is not limited to the example formed by cutting obliquely as described above, but may be formed along the vertical direction according to the size and shape of the concrete pile 1.

【0040】さらに、セリヤ板19も2個一対のものに
限らず、複数個(例えば3個)一対のものでも可能であ
るし、セリヤ板19もこれに限らず他の分割板で実施可
能である。
Further, the number of the pair of transmission plates 19 is not limited to two, and a pair of plural (for example, three) transmission plates is also possible. The transmission plate 19 is not limited to this and can be implemented by another divided plate. is there.

【0041】さらにまた、セリヤ板19もセリヤ21に
合せて任意の形状のものを用いることが可能であるし、
セリヤ21に限らずセリヤ板19を拡開できる拡開具で
実施可能である。
Further, it is possible to use the seria plate 19 of any shape according to the seria 21,
The present invention is not limited to the area 21 and can be implemented with an expanding device that can expand the area plate 19.

【0042】[0042]

【発明の効果】以上説明したように本発明のコンクリー
ト杭の頭部処理方法では、地盤から突出するコンクリー
ト杭の頂部から複数の縦孔を環状又は円弧状に設け、そ
のコンクリート杭より硬質材料から縦長かつ先端を先細
りに形成した一対の分割棒を当該先端からその縦孔には
め、外部からそれら分割棒間に拡開具を強制圧入してそ
れら分割棒間を押し広げるようにして上記コンクリート
杭を砕き、その頭部砕き残部に複数の横孔を所定の間隔
を置いて設け、それら分割棒を当該先端からその横孔に
はめ、外部からそれら分割棒間に拡開具を強制圧入して
それら分割棒間を押し広げるようにして頭部砕き残部を
砕いてその頭部を除去するから、従来のように削岩機で
コンクリート杭の頭部を少しずつ砕いて除去する方法に
比べ、1/3以下の短い時間で簡単に粉砕除去すること
が可能となり、作業者の労働環境を向上させることがで
きる。そして、上記縦孔をコンクリート杭の外側に向け
て斜に形成する方法では、より確実かつ簡単にそのコン
クリート杭の頭部を粉砕除去可能で、処理の生産性がよ
り一層向上する効果がある。
As described above, in the method for treating the head of a concrete pile according to the present invention, a plurality of vertical holes are formed in an annular or arc shape from the top of the concrete pile projecting from the ground, and the concrete pile is made of a harder material than the concrete pile. The pair of split rods having a vertically elongated and tapered tip are fitted into the vertical holes from the tip, and a forcing tool is forcibly inserted between the split rods from the outside so as to push and spread the gap between the split rods. A plurality of horizontal holes are provided at predetermined intervals in the remaining portion of the crushed head, the split rods are fitted into the horizontal holes from the front end, and a spreader is forcibly press-fitted between the split rods from the outside to divide them. Since the head is crushed and the remaining part is removed by pushing the rods apart, the head of the concrete pile is crushed little by little with a rock drill as in the conventional method. Less than It is possible to easily pulverized removed in a short time, it is possible to improve the operator's working environment. In the method in which the vertical hole is formed obliquely toward the outside of the concrete pile, the head of the concrete pile can be crushed and removed more reliably and easily, and there is an effect that the productivity of the treatment is further improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る頭部処理方法の工程を示す図であ
る。
FIG. 1 is a diagram showing steps of a head processing method according to the present invention.

【図2】コンクリート杭を施工する方法を示す縦断面図
である。
FIG. 2 is a longitudinal sectional view showing a method of constructing a concrete pile.

【図3】コンクリート杭に用いる鉄筋かごを示す概略斜
視図である。
FIG. 3 is a schematic perspective view showing a reinforcing cage used for a concrete pile.

【図4】コンクリート杭を施工する方法を示す縦断面図
である。
FIG. 4 is a longitudinal sectional view showing a method of constructing a concrete pile.

【図5】コンクリート杭を施工する方法を示す縦断面図
である。
FIG. 5 is a longitudinal sectional view showing a method of constructing a concrete pile.

【図6】完成したコンクリート杭を示す縦断面図であ
る。
FIG. 6 is a longitudinal sectional view showing a completed concrete pile.

【図7】本発明に係る頭部処理方法の実施の形態を示す
上面図である。
FIG. 7 is a top view showing an embodiment of a head processing method according to the present invention.

【図8】本発明に係る頭部処理方法の実施の形態を示す
要部縦断面図である。
FIG. 8 is a vertical sectional view of a main part showing an embodiment of a head processing method according to the present invention.

【図9】本発明の頭部処理方法に用いる分割棒および拡
開具を示す斜視図である。
FIG. 9 is a perspective view showing a dividing rod and a spreader used in the head treatment method of the present invention.

【図10】本発明に係る頭部処理方法の実施の形態を示
す側面図である。
FIG. 10 is a side view showing an embodiment of the head processing method according to the present invention.

【図11】本発明に係る頭部処理方法の実施の形態を示
す上面図である。
FIG. 11 is a top view showing an embodiment of the head processing method according to the present invention.

【図12】本発明の頭部処理方法によって頭部の処理が
完成したコンクリート杭を示す要部側面図である。
FIG. 12 is a main part side view showing a concrete pile on which head processing is completed by the head processing method of the present invention.

【図13】本発明に係る頭部処理方法の他の実施の形態
を示す要部縦断面図である。
FIG. 13 is a vertical sectional view of a main part showing another embodiment of the head processing method according to the present invention.

【図14】図13の頭部処理方法を示す要部上面図であ
る。
14 is a main part top view showing the head processing method of FIG. 13;

【図15】従来のコンクリート杭の頭部処理方法を説明
するための縦断面図である。
FIG. 15 is a longitudinal sectional view for explaining a conventional method for treating the head of a concrete pile.

【符号の説明】[Explanation of symbols]

1 コンクリート杭 1a コンクリート杭の頭部 1b コンクリート杭の頂部 3 地盤 3a 支持地盤 5 基礎孔 7 鉄筋かご 7a 主鉄筋 7b 帯鉄筋 9 地表 11 削岩機 13 ケーシング 15 コンクリート材料 17 縦孔 19 セリヤ板(分割棒) 21 セリヤ(拡開具) 23 ハンマ具(ブレーカ) 25 砕き残部 27 横孔 29 H鋼 U 横溝 DESCRIPTION OF SYMBOLS 1 Concrete pile 1a Concrete pile head 1b Concrete pile top 3 Ground 3a Supporting ground 5 Foundation hole 7 Reinforcing cage 7a Main reinforcing bar 7b Band reinforcing bar 9 Ground surface 11 Rock drill 13 Casing 15 Concrete material 17 Vertical hole 19 21) Seria (spreading tool) 23 Hammer tool (breaker) 25 Remains of crushing 27 Side hole 29 H steel U Side groove

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 地盤に打杭されたコンクリート杭にあっ
て前記地盤から突出した当該頭部の処理方法において、 前記頂部から複数の縦孔を所定の間隔を置いて環状又は
円弧状に設ける第1の工程と、 前記コンクリート杭より硬質材料から縦長かつ先端を先
細りに形成した一対の分割棒を当該先端から前記縦孔に
はめ込み、外部から前記分割棒間に拡開具を強制圧入
し、前記分割棒間を押し広げるようにして前記コンクリ
ート杭を砕く第2の工程と、 前記コンクリート杭の頭部砕き残部に、複数の横孔を所
定の間隔を置いて設ける第3の工程と、 前記分割棒を当該先端から前記横孔にはめ込み、外部か
ら前記分割棒間に拡開具を強制圧入し、前記分割棒間を
押し広げるようにして前記コンクリート杭の頭部砕き残
部を砕く第4の工程と、 を具備することを特徴とするコンクリート杭の頭部処理
方法。
1. A method for treating a head of a concrete pile driven into the ground and protruding from the ground, wherein a plurality of vertical holes are provided at predetermined intervals from the top in an annular or arcuate shape. Step 1, a pair of split rods formed from a harder material than the concrete pile and having an elongated and tapered tip is fitted into the vertical hole from the tip, and a spreader is forcibly press-fitted between the split rods from the outside, and the split is performed. A second step of crushing the concrete pile so as to spread the gap between the rods; a third step of providing a plurality of lateral holes at predetermined intervals in the remaining crushed head of the concrete pile; A fourth step of fitting the spreader into the lateral hole from the tip, forcibly press-fitting a spreader between the split bars from the outside, and crushing the remaining portion of the concrete pile head crushing so as to push and spread between the split bars, With Head processing method of concrete piles which is characterized in that.
【請求項2】 前記第1の工程は、先端を外側に向けた
斜の前記縦孔を形成するものである請求項1記載のコン
クリート杭の頭部処理方法。
2. The method according to claim 1, wherein the first step is to form the oblique vertical hole with its tip directed outward.
JP2000122057A 2000-04-24 2000-04-24 Concrete pile head treatment method Expired - Fee Related JP3368254B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000122057A JP3368254B2 (en) 2000-04-24 2000-04-24 Concrete pile head treatment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000122057A JP3368254B2 (en) 2000-04-24 2000-04-24 Concrete pile head treatment method

Publications (2)

Publication Number Publication Date
JP2001303560A true JP2001303560A (en) 2001-10-31
JP3368254B2 JP3368254B2 (en) 2003-01-20

Family

ID=18632584

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000122057A Expired - Fee Related JP3368254B2 (en) 2000-04-24 2000-04-24 Concrete pile head treatment method

Country Status (1)

Country Link
JP (1) JP3368254B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021143463A (en) * 2020-03-10 2021-09-24 五洋建設株式会社 Pile head treatment method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111101516B (en) * 2020-01-17 2021-06-29 中冶交通建设集团有限公司 Pile head breaking device and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021143463A (en) * 2020-03-10 2021-09-24 五洋建設株式会社 Pile head treatment method
JP7335842B2 (en) 2020-03-10 2023-08-30 五洋建設株式会社 Pile head processing method

Also Published As

Publication number Publication date
JP3368254B2 (en) 2003-01-20

Similar Documents

Publication Publication Date Title
JP2001303560A (en) Method for processing head of concrete pile
JP7107723B2 (en) Construction method of cast-in-place concrete pile and cast-in-place concrete pile
KR101105853B1 (en) Constructing method of cast-in-place concrete pile using mold case
JP2009235807A (en) Dismantling and removal construction method of underground structure
JP3120801U (en) Drilling tool
JP2002371552A (en) Rotary press-in steel pipe pile, rotary press-in reinforced concrete pile, and method of manufacturing rotary press-in steel pipe pile and rotary pres-in reinforced concrete pile
KR20110111637A (en) Down hole and steel pressing apparatus for rock base and method using the same
JP3115700B2 (en) Perforator
KR20190032173A (en) Rotational penetration pile unit
JPH08120671A (en) Remover of underground pile
KR102566443B1 (en) Vibration-Free Rock Crushing with 3 Free-face Excavation Method
JP3306460B2 (en) Pile driving method
KR100555210B1 (en) Steel pipe casing for cast-in-place concrete pile using vibro hammer and method for constructing cast-in-place concrete pile using the same
WO2015108098A1 (en) Dismantling method
JP2003213675A (en) Wall pile
JP3115446U (en) Leaderless civil engineering foundation machine
JP7061919B2 (en) How to build cast-in-place concrete piles
JP2009007832A (en) Crushing apparatus
JP2022129955A (en) Removal method of existing concrete pile
JPH05156629A (en) Construction method for pile
JP6411031B2 (en) Dismantling method
JP2006265888A (en) Sand pile creating method and sand pile creating machine
JPH07189248A (en) Method of pit excavation construction of foundation ground and device thereof
JP6549407B2 (en) Pile construction method
JPH07301005A (en) Demolition method of foundation

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081108

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111108

Year of fee payment: 9