JP2001302178A - Horizontal jib type crane - Google Patents

Horizontal jib type crane

Info

Publication number
JP2001302178A
JP2001302178A JP2000125692A JP2000125692A JP2001302178A JP 2001302178 A JP2001302178 A JP 2001302178A JP 2000125692 A JP2000125692 A JP 2000125692A JP 2000125692 A JP2000125692 A JP 2000125692A JP 2001302178 A JP2001302178 A JP 2001302178A
Authority
JP
Japan
Prior art keywords
trolley
cable
hanging
length
horizontal jib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000125692A
Other languages
Japanese (ja)
Inventor
Yoshio Ogura
好雄 小倉
Masami Ito
正己 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2000125692A priority Critical patent/JP2001302178A/en
Publication of JP2001302178A publication Critical patent/JP2001302178A/en
Pending legal-status Critical Current

Links

Landscapes

  • Control And Safety Of Cranes (AREA)
  • Jib Cranes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a horizontal jib type crane capable of preventing a cable suspended from a traverse trolley from being twisted. SOLUTION: This horizontal jib type crane 30 comprises a traverse trolley 8 reciprocatably displacing between two pulleys 46 through an extended cable 48. A suspended cable 12 with a sling is suspended from the trolley 8 through a sheave 10. The suspended cable 12 is guided to a windup winch through fixed sheaves 20a and 20b at the tip of a jib. A length adjusting device 32 with two sheave groups 36a and 36b is installed on the way to the windup winch. A distance between the sheave groups 36a and 36b is varied in connection with the rotation of the pulley 46 and, when the trolley 8 is displaced a wound-up length of the suspended cable 12 between the sheave groups 36a and 36b is increased and decreased, and the length of the suspended cable 12 suspended from the trolley 8 is kept unchanged.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、高層ビル等の建設
工事において資材の揚重運搬等に使用される水平ジブ式
クレーンに関し、特に水平ジブに沿って走行する横行ト
ロリーから垂下される吊索の撚れを防止する技術に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a horizontal jib crane used for lifting and transporting materials in construction work of a high-rise building and the like, and more particularly, to a hanging line suspended from a trolley traveling along a horizontal jib. The present invention relates to a technique for preventing twisting.

【0002】[0002]

【従来の技術】建設現場において資材の搬送に使用され
るクレーンとして、水平方向に張り出したジブを備えた
水平ジブ式クレーンが知られている。図4は、代表的な
水平ジブ式クレーンの構成を簡略的に示したものであ
る。水平ジブ式クレーン2は、建設現場等に立設された
タワーマスト4と、これより水平に張り出されたジブ6
とを備えている。水平ジブ6はタワーマスト4の上方に
設けられたA型フレーム(ガイサポート)5の頂部5a
から延出されたワイヤー7により支持されている。また
水平ジブ6は、タワーマスト4に対して旋回自在に設け
られ、タワーマスト4を中心に形成される360度の領
域をカバーするようになっている。水平ジブ6には、長
手方向に沿って往復移動する横行トロリー8が設けら
れ、この横行トロリー8から吊索12がU字形に垂下さ
れている。吊索12は、横行トロリー8に設けられた2
つのガイドシーブ10a,10bの間から垂下されてい
て、そのU字形の下端部には、動滑車14を介してフッ
クやバケット等からなる吊具16が取付けられている。
この吊具16には、搬送対象となる建設資材等が係合さ
れる。
2. Description of the Related Art As a crane used for transporting materials at a construction site, there has been known a horizontal jib crane provided with a jib projecting horizontally. FIG. 4 schematically shows the configuration of a typical horizontal jib crane. The horizontal jib crane 2 includes a tower mast 4 erected at a construction site or the like, and a jib 6 projecting horizontally from the tower mast 4.
And The horizontal jib 6 is a top 5a of an A-type frame (guy support) 5 provided above the tower mast 4.
Supported by a wire 7 extending from The horizontal jib 6 is provided so as to be pivotable with respect to the tower mast 4 and covers a 360-degree area formed around the tower mast 4. The horizontal jib 6 is provided with a transverse trolley 8 which reciprocates along the longitudinal direction, and a hanging cable 12 is hung from the transverse trolley 8 in a U-shape. The suspension cable 12 is provided on a trolley
A hanging member 16 such as a hook or a bucket is attached to a lower end of the U-shape of the guide sheave 10a, 10b via a movable pulley 14 at a lower end thereof.
A construction material or the like to be transported is engaged with the hanger 16.

【0003】吊索12は、横行トロリー8からジブ先端
部6aとジブ根元部6bとへそれぞれ延出されている。
ジブ6の根元部分6bへと延出された吊索12は、その
端部がタワーマスト4の近傍に突設された接続部18に
固定されている。一方、ジブ先端部6bへと延出された
吊索12は、そこに設けられた固定シーブ10a,10
bを介してフレーム5の頂部5aへと案内され、そこに
設置された中継ドラム22から巻上ウインチ24を経由
して巻取ドラム26へと接続されている。巻上ウインチ
24の駆動により、吊索12が巻取ドラム26から繰り
出されたり巻き取られたりして、吊具16が昇降され、
吊荷が揚げ下ろしされる。
The hanging cable 12 extends from the trolley 8 to a jib tip 6a and a jib root 6b.
The end of the suspension cable 12 extending to the root portion 6 b of the jib 6 is fixed to a connection portion 18 protruding near the tower mast 4. On the other hand, the suspension cable 12 extending to the jib tip 6b is provided with fixed sheaves 10a, 10 provided there.
b, it is guided to the top 5a of the frame 5, and is connected from the relay drum 22 installed there to the winding drum 26 via the hoisting winch 24. By the driving of the hoisting winch 24, the hanging cable 12 is unwound or wound up from the winding drum 26, and the hanging tool 16 is raised and lowered.
The suspended load is unloaded.

【0004】一方、横行トロリー8がジブ6の根元部6
bに向かって移動したときには、図5に示すように、吊
索12が進行方向前方から一方のシーブ10aを介して
下端の動滑車14を通り他方のシーブ10bへと案内さ
れ、横行トロリー8の進行方向後方へと送出される。横
行トロリー8の左側に配索された吊索12の長さL1と
右側に配索された吊索12の長さL2の和は等しいか
ら、横行トロリー8が移動しても、吊索12のU字形の
部分の長さは変わらず、吊具16の吊長Hが変動せずに
済む。このため、吊荷を水平に搬送することができる。
On the other hand, the trolley 8 is connected to the base 6 of the jib 6.
5, the suspension cable 12 is guided from the front in the traveling direction to the other sheave 10b through the moving sheave 14 at the lower end via one sheave 10a, as shown in FIG. It is sent backward in the traveling direction. Since the sum of the length L1 of the suspension cable 12 arranged on the left side of the trolley 8 and the length L2 of the suspension cable 12 arranged on the right side of the trolley 8 is equal, even if the trolley 8 moves, The length of the U-shaped portion does not change, and the hanging length H of the hanging tool 16 does not need to change. Therefore, the suspended load can be transported horizontally.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、このよ
うな構成の水平ジブ式クレーンにあっては、特に高層ビ
ル等の屋上部に設置され、地面からきわめて高い位置、
例えば地上100mぐらいから資材等の揚げ降ろしをす
る場合、揚重行程が非常に長いため、シーブ10a,1
0bから垂下された吊索12自体やその先端の吊具16
が風などに煽られて2本の吊索12が自然と撚れてしま
うことがある。吊索12が撚れてしまうと、吊索12を
横行トロリー8の進行方向前方から後方へ送り出すこと
ができず、横行トロリー8の走行を中断せざるを得なか
ったり、吊索12の巻下げ・巻上げ作業ができない。こ
の場合、いちいち吊索12の撚れを解く作業を行わなけ
ればならず、搬送作業が中断されて搬送スケジュールを
うまく消化できない場合が生じかねない。
However, the horizontal jib crane having such a structure is installed particularly on the roof of a high-rise building or the like, and is located at an extremely high position above the ground.
For example, when lifting and lowering materials and the like from about 100 m above the ground, the sheave 10a, 1
0b, the hanging cable 12 itself and the hanging tool 16 at the tip thereof.
There is a case where the two suspension cables 12 are naturally twisted by the wind or the like. If the suspension cable 12 is twisted, the suspension cable 12 cannot be sent out from the front in the traveling direction of the traversing trolley 8 to the rear, and the traveling of the traveling trolley 8 must be interrupted, or the suspension cable 12 is lowered.・ Unable to wind up. In this case, the work of untwisting the suspension cable 12 must be performed each time, and the transfer operation may be interrupted and the transfer schedule may not be able to be properly digested.

【0006】本発明は、このような事情に鑑みてなされ
たもので、その目的は、横行トロリーから垂下される吊
索に撚れが生じないような水平ジブ式クレーンを提供す
ることにある。
The present invention has been made in view of such circumstances, and an object of the present invention is to provide a horizontal jib crane in which a suspension cable hanging from a trolley does not twist.

【0007】[0007]

【課題を解決するための手段】かかる目的を達成するた
めに本発明の水平ジブ式クレーンにあっては、水平方向
に張り出した水平ジブと、この水平ジブに沿って走行す
る横行トロリーと、この横行トロリーから吊具を吊下ろ
す吊索と、前記吊索を巻上・巻下げする巻上ウインチと
を備えた水平ジブ式クレーンにおいて、前記横行トロリ
ーの変位量および変位方向を検出する変位検出手段と、
前記吊索の吊長が変動しないように、前記変位検出手段
の検出結果に応じて、前記横行トロリーと前記巻上ウイ
ンチとの間の前記吊索の長さを調節する長さ調節手段と
を備えた構成にした。
In order to achieve the above object, a horizontal jib crane according to the present invention comprises a horizontal jib projecting in the horizontal direction, a transverse trolley running along the horizontal jib, and a horizontal jib. In a horizontal jib crane provided with a hanging line for hanging a hanging tool from a traversing trolley and a hoisting winch for hoisting and lowering the hanging line, displacement detecting means for detecting a displacement amount and a displacement direction of the traversing trolley. When,
Length adjusting means for adjusting the length of the hanging cable between the traversing trolley and the hoisting winch according to the detection result of the displacement detecting means so that the hanging length of the hanging cable does not fluctuate. The configuration was provided.

【0008】この構成により本発明では、横行トロリー
が水平ジブに沿って変位しても、長さ調節手段がその変
位方向および変位量に応じて横行トロリーと巻上ウイン
チとの間の吊索の長さを伸ばしたり短くしたりして増減
調節するから、吊索の吊長が変動することはなく、吊荷
を水平に搬送することができる。しかも、吊索の横行ト
ロリーから吊具にかけては、横行トロリーが変位して
も、従来のように送られることがないため、吊索に撚れ
が生じる心配もなく、作業を安全かつ速やかに行うこと
ができる。超高層建築物の建設現場において好適に適用
することができる。
With this configuration, according to the present invention, even if the transverse trolley is displaced along the horizontal jib, the length adjusting means adjusts the length of the hanging cable between the transverse trolley and the hoisting winch according to the displacement direction and the displacement amount. Since the length is increased or decreased to increase or decrease the length, the hanging length of the hanging cable does not change, and the suspended load can be transported horizontally. Moreover, even if the trolley is displaced from the trolley to the hanging device, the trolley is not sent as in the conventional case, so that there is no risk of twisting of the trolley and the work is performed safely and promptly. be able to. The present invention can be suitably applied to a construction site of a high-rise building.

【0009】特に、前記変位検出手段が、前記横行トロ
リーを往復移動させるトロリー駆動手段の駆動量および
駆動方向を検知して、前記横行トロリーの変位方向およ
び変位量を検出することで、横行トロリーの変位方向な
らびに変位量を別途検出手段を設けなくても簡単に検出
することができる。
In particular, the displacement detecting means detects the driving amount and the driving direction of the trolley driving means for reciprocating the trolley, and detects the displacement direction and the moving amount of the trolley, thereby detecting the displacement of the trolley. The displacement direction and the displacement amount can be easily detected without separately providing a detecting means.

【0010】また、前記長さ調節手段は、相互に間隔を
あけて配置された少なくとも1対の滑車を備え、これら
の滑車間に前記吊索が巻き付けられ、これらの滑車間の
間隔を前記変位検出手段の検出結果に応じて調節するこ
とで、滑車間の間隔変動量が小さくても、吊索の巻付数
に応じて吊索の長さ変動量を大きく確保することがで
き、きわめて長い吊索であっても、その長さの調節を簡
単に行うことができる。
[0010] The length adjusting means may include at least one pair of pulleys spaced from each other, and the hanging cable may be wound between the pulleys, and the distance between the pulleys may be changed by the displacement. By adjusting according to the detection result of the detecting means, even if the distance variation between pulleys is small, it is possible to secure a large amount of variation in the length of the suspension cable according to the number of windings of the suspension cable, and it is extremely long. Adjustment of the length of the suspension cable can be easily performed.

【0011】[0011]

【発明の実施の形態】以下に本発明に係る水平ジブ式ク
レーンの実施形態について説明する。図1および図2
は、本発明にかかる水平ジブ式クレーンの一実施形態を
示したものである。なお、これら図1および図2におい
ては、従来と同一の構成要素については同一の符号を付
すものとする。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a horizontal jib crane according to the present invention will be described below. 1 and 2
1 shows an embodiment of a horizontal jib crane according to the present invention. In FIGS. 1 and 2, the same components as those in the related art are denoted by the same reference numerals.

【0012】この水平ジブ式クレーン30は、建設現場
等に立設されたタワーマスト4の中間部から水平に張り
出して設けられた水平ジブ6と、この水平ジブ6に沿っ
て往復移動する横行トロリー8とを備える。タワーマス
ト4上のA型フレーム(ガイサポート)5の頂部5aと
水平ジブ6との間にはワイヤー7が張設され、水平ジブ
6を支えている。横行トロリー8にはガイドシーブ10
が設けられ、このガイドシーブ10から吊索12が垂下
されている。吊索12の下端部には、吊具としてフック
17が取り付けられている。
The horizontal jib crane 30 includes a horizontal jib 6 which is provided to extend horizontally from an intermediate portion of a tower mast 4 erected at a construction site or the like, and a traverse trolley which reciprocates along the horizontal jib 6. 8 is provided. A wire 7 is stretched between the top 5 a of the A-type frame (guy support) 5 on the tower mast 4 and the horizontal jib 6 to support the horizontal jib 6. Guide sheave 10 on trolley 8
Is provided, and a hanging cable 12 is hung from the guide sheave 10. A hook 17 is attached to the lower end of the hanging cable 12 as a hanging tool.

【0013】吊索12は、横行トロリー8からジブ先端
部6aへと延出され、そこに設けられた固定シーブ20
a,20bを介してフレーム頂部5aへ向けて案内され
ている。フレーム頂部5aには中継ドラム22が設置さ
れ、この中継ドラム22に吊索12が巻回され、巻上ウ
インチ24を経由して巻取ドラム26へと案内されてい
る。巻上ウインチ24を駆動することで、吊索12を巻
取ドラム26から繰り出したり巻取ドラム26に巻き取
ったりして、フック17の吊位置Hを変更し、吊荷の揚
げ下ろしを行う。
The hanging cable 12 extends from the traversing trolley 8 to the jib tip 6a, and a fixed sheave 20 provided thereat.
a and 20b to the frame top 5a. A relay drum 22 is installed on the frame top 5 a, and the suspension cable 12 is wound around the relay drum 22 and guided to a winding drum 26 via a hoisting winch 24. By driving the hoisting winch 24, the hoisting line 12 is pulled out from the winding drum 26 or wound on the winding drum 26 to change the hanging position H of the hook 17 and to lift and lower the suspended load.

【0014】このような構成の水平ジブ式クレーン30
では、水平ジブ6に沿って横行トロリー8が移動する
と、横行トロリー8と固定シーブ20aとの距離が変化
した分だけ、吊索12の吊長Hも変動してしまう。そこ
で、本実施の形態では、横行トロリー8と巻上ウインチ
24との間の吊索12の経路上に、当該吊索12の長さ
を増減調節する長さ調節装置(長さ調節手段)を設け、
横行トロリー8の変位に応じて吊索12の長さを調節す
るようにしている。この長さ調節装置の一実施形態を図
2に簡略的に示す。
The horizontal jib crane 30 having the above-described structure is used.
In this case, when the trolley 8 moves along the horizontal jib 6, the suspension length H of the suspension cable 12 also changes by an amount corresponding to the change in the distance between the trolley 8 and the fixed sheave 20a. Therefore, in the present embodiment, a length adjusting device (length adjusting means) for increasing or decreasing the length of the hanging cable 12 is provided on the path of the hanging cable 12 between the traversing trolley 8 and the hoisting winch 24. Provided,
The length of the suspension cable 12 is adjusted according to the displacement of the traversing trolley 8. One embodiment of this length adjustment device is schematically shown in FIG.

【0015】長さ調節装置32は、相互に間隔をあけて
上下に配置された2つの滑車群36a,36bを備え
る。各滑車群36a,36bは、複数の滑車34を相互
に平行に重ねて配列して構成されている。各滑車群36
a,36bの滑車34は、これらを両側から挟み込んで
設けられたコの字状の連結部材38a,38bによって
相互に一体的に連結されている。これら2つの滑車群3
6a,36bの間には吊索12が巻回されている。吊索
12は滑車群36a,36b間を往復して配索され、各
滑車34毎に巻き付けられている。これら滑車群36
a,36b間の間隔が広がったり狭くなったりすること
で、滑車群36a,36b間に巻き付けられる吊索12
の長さが変動され、巻上ウインチ24と横行トロリー8
との間の吊索12の長さが増減調節される。吊索12の
変動量は、滑車群36a,36bの間隔変動量に対し
て、吊索12の巻回数に比例して倍増される。すなわ
ち、例えば、吊索12の巻付数が4回であれば、吊索1
2の変動量は、滑車群36a,36b間の変動幅に対し
て約8倍になる。このように滑車群36a,36b間の
間隔変動量に対して、吊索12の長さ調節量を大きく取
れるから、きわめて長い吊索12であっても、その長さ
の調節を簡単に行うことができる。
The length adjusting device 32 includes two pulley groups 36a and 36b arranged above and below at a distance from each other. Each of the pulley groups 36a and 36b is configured by arranging a plurality of pulleys 34 in parallel with each other. Each pulley group 36
The pulleys 34a and 36b are integrally connected to each other by U-shaped connecting members 38a and 38b provided so as to sandwich them from both sides. These two pulley groups 3
The hanging cable 12 is wound between 6a and 36b. The suspension cable 12 is routed back and forth between the pulley groups 36a and 36b, and is wound around each of the pulleys 34. These pulley groups 36
The distance between the pulley groups 36a and 36b is increased by increasing or decreasing the distance between the pulley groups 36a and 36b.
Of the hoisting winch 24 and the trolley 8
And the length of the sling 12 between them is increased or decreased. The amount of fluctuation of the suspension cable 12 is doubled in proportion to the number of turns of the suspension cable 12 with respect to the amount of fluctuation of the interval between the pulley groups 36a and 36b. That is, for example, if the number of windings of the suspension cable 12 is four, the suspension cable 1
The fluctuation amount of 2 is about eight times the fluctuation width between the pulley groups 36a and 36b. As described above, the length adjustment amount of the sling line 12 can be made large with respect to the fluctuation amount of the interval between the pulley groups 36a and 36b. Therefore, even if the sling line 12 is extremely long, the length can be easily adjusted. Can be.

【0016】これら2つの滑車群36a,36b間の間
隔は、横行トロリー8の変位方向および変位量に応じて
変動するようになっている。つまり、上側の滑車群36
aはその連結部材38aから上向きに延出された支持部
材39を介してA型フレーム5の頂部5aに一体的に固
定され、下側の滑車群36bは、上側の滑車群36aに
対して吊索12を介して吊下げられて支持された形にな
っている。下側の滑車群36bの連結部材38bからは
これよりチェーン42が垂下されていて、このチェーン
42が、横行トロリー8を往復移動させるトロリー駆動
機構40に係合されている。
The distance between the two groups of pulleys 36a and 36b varies in accordance with the direction and amount of displacement of the trolley 8. That is, the upper pulley group 36
a is integrally fixed to the top 5a of the A-type frame 5 via a support member 39 extending upward from the connecting member 38a, and the lower pulley group 36b is suspended from the upper pulley group 36a. It is suspended and supported via a cable 12. A chain 42 hangs down from the connecting member 38b of the lower pulley group 36b, and the chain 42 is engaged with a trolley drive mechanism 40 that reciprocates the traverse trolley 8.

【0017】ここで、トロリー駆動機構40は、横行ト
ロリー8の走行経路の両端部にそれぞれ配置された2つ
のプーリー46と、これら2つのプーリー46間に掛け
渡された牽索48とを備える。牽索48はその両端部が
横行トロリー8の両側部にそれぞれ接続されている。プ
ーリー46がモータ等により回転駆動されることによっ
て、横行トロリー8が往復移動される。横行トロリー8
の移動方向および移動量は、プーリー46の回転方向お
よび回転量に応じて決定される。下側の滑車群36bか
ら延出されたチェーン42は、一方のプーリー46に連
動して回転駆動する回転軸50にスプロケット52を介
して係合され、プーリー46が回転されると、その回転
方向および回転量に応じてチェーン42が繰り出された
り巻き取られたりする。
Here, the trolley drive mechanism 40 includes two pulleys 46 disposed at both ends of the traveling path of the traversing trolley 8, respectively, and a towing 48 bridged between the two pulleys 46. Both ends of the tow line 48 are connected to both sides of the trolley 8, respectively. The trolley 8 is reciprocated by the pulley 46 being driven to rotate by a motor or the like. Rolling trolley 8
Is determined according to the rotation direction and the rotation amount of the pulley 46. The chain 42 extended from the lower pulley group 36b is engaged via a sprocket 52 with a rotating shaft 50 that is driven to rotate in conjunction with one of the pulleys 46, and when the pulley 46 is rotated, its rotation direction is changed. The chain 42 is fed or wound up according to the rotation amount.

【0018】本実施の形態では、横行トロリー8をジブ
先端部6aへ移動させる方向にプーリー46が回転した
ときには、チェーン42がスプロケット52に巻き取ら
れて、下側の滑車群36bが上側の滑車群36aから離
間して相互の間隔が拡大して、滑車群36a,36b間
の吊索12の巻取量が増えるようになっている。また、
横行トロリー8をジブ先端部6aから遠ざける方向にプ
ーリー46が回転したときには、チェーン42がスプロ
ケット52から繰り出され、下側の滑車群36bが上側
の滑車群36aへと接近して相互の間隔が縮小され、滑
車群間36a,36bの吊索12の巻取量が減少するよ
うになっている。なお、チェーン42がスプロケット5
2から繰り出されるときの下側の滑車群36bの上昇
は、そのときに吊索12に作用している引張力による。
チェーン42の引張力が緩むと、この緊張力により下側
の滑車群36bが上方へと引っ張られて、上側の滑車群
36aに向けて上昇する。
In this embodiment, when the pulley 46 rotates in the direction to move the traverse trolley 8 to the jib tip 6a, the chain 42 is wound around the sprocket 52, and the lower pulley group 36b is moved to the upper pulley group. The distance between the pulley groups 36a and 36b is increased by increasing the distance between the pulley groups 36a and 36b by increasing the distance between the pulley groups 36a and 36b. Also,
When the pulley 46 rotates in a direction to move the trolley 8 away from the jib tip 6a, the chain 42 is extended from the sprocket 52, and the lower group of pulleys 36b approaches the upper group of pulleys 36a to reduce the distance therebetween. As a result, the winding amount of the suspension cable 12 between the pulley groups 36a and 36b is reduced. The chain 42 is connected to the sprocket 5
The lifting of the lower pulley group 36b when the pulley group 36b is pulled out from the pulley 2 is due to the pulling force acting on the suspension cable 12 at that time.
When the pulling force of the chain 42 is loosened, the lower pulley group 36b is pulled upward by this tension and rises toward the upper pulley group 36a.

【0019】図3は、下側の滑車群36bを昇降させる
機構の他の実施形態を示したものである。この機構は、
下側の滑車群36bをその昇降方向に沿って案内するガ
イド部材60と、下側の滑車群36bから下向きに延出
したラック部材62と、このラック部材62に係合され
るピニオンギア64とから構成される。ガイド部材60
は、長手方向に沿って断面凹形状に成形された長尺な部
材からなり、当該下側の滑車群36bの連結部材38b
の両側にそれぞれ設けられ、当該下側の滑車群36bを
両側から挟み込むようにして当該下側の滑車群36bの
横揺れを規制している。また、ラック部材62は、その
上端部が下側の滑車群36bの連結部材38bに一体的
に接合されているとともに、その表面に長手方向に沿っ
てギア部62aが形成されている。このギア部62aに
はピニオンギア64外周のギア部64aが係合されてい
る。ピニオンギア64は、プーリー46に連動して回転
駆動する回転軸50に一体的に設けられ、プーリー46
が回転駆動すると、ピニオンギア64が回転駆動してラ
ック部材62を介して下側の滑車群36bが昇降駆動さ
れるようになっている。
FIG. 3 shows another embodiment of a mechanism for raising and lowering the lower pulley group 36b. This mechanism is
A guide member 60 for guiding the lower group of pulleys 36b along the vertical direction, a rack member 62 extending downward from the lower group of pulleys 36b, and a pinion gear 64 engaged with the rack member 62; Consists of Guide member 60
Is composed of a long member formed into a concave cross section along the longitudinal direction, and the connecting member 38b of the lower pulley group 36b
Are provided on both sides of the lower pulley group 36b so as to sandwich the lower pulley group 36b from both sides, thereby restricting the roll of the lower pulley group 36b. The rack member 62 has an upper end integrally joined to the connecting member 38b of the lower pulley group 36b, and has a gear portion 62a formed on the surface thereof along the longitudinal direction. A gear portion 64a on the outer periphery of the pinion gear 64 is engaged with the gear portion 62a. The pinion gear 64 is provided integrally with the rotating shaft 50 that is driven to rotate in conjunction with the pulley 46.
Is driven to rotate, the pinion gear 64 is driven to rotate, and the lower pulley group 36b is driven up and down via the rack member 62.

【0020】横行トロリー8の変位量と吊索12の長さ
の増減量とは一致するように設定されている。この設定
は、例えば滑車群間36a,36bの吊索12の巻回数
や、プーリー46に対する出力軸50のギヤ比やスプロ
ケット52の歯数等を適宜設定することにより行う。こ
れにより、横行トロリー8が移動しても、その移動量に
応じて、吊索12の長さが増減調節されるので、横行ト
ロリー8からフック17までの吊索12の吊長を変動さ
せずに済む。また、吊索12の横行トロリー8からフッ
ク17までの部分については、横行トロリー8の移動と
ともに送られることがないため、従来のように、吊索1
2が撚れたりすることはない。横行トロリー8の走行中
の作業安全性を十分に確保することができる。
The amount of displacement of the trolley 8 and the amount of increase or decrease in the length of the suspension cable 12 are set so as to coincide with each other. This setting is performed by appropriately setting the number of turns of the suspension cable 12 between the pulley groups 36a and 36b, the gear ratio of the output shaft 50 to the pulley 46, the number of teeth of the sprocket 52, and the like. As a result, even if the trolley 8 moves, the length of the suspension cable 12 is adjusted in accordance with the amount of movement, so that the suspension length of the suspension cable 12 from the trolley 8 to the hook 17 is not changed. Only In addition, the portion of the suspension cable 12 from the trolley 8 to the hook 17 is not sent with the movement of the trolley 8, so that the suspension cable 1 is different from the conventional one.
2 does not twist. Work safety during traveling of the traversing trolley 8 can be sufficiently ensured.

【0021】[0021]

【発明の効果】本発明にかかる水平ジブ式クレーンによ
れば、横行トロリーがジブに沿って移動しても、横行ト
ロリーの移動量に応じて、長さ調節手段が横行トロリー
と巻上ウインチとの間の吊索の経路長を増減調節するか
ら、吊索の吊長が変動することはなく、吊荷を水平に搬
送することができる。しかも、横行トロリーの移動に伴
い吊索が送られることはないから、従来のように吊索が
撚れたりする心配がない。吊荷の搬送作業を滞りなく速
やかに十分に安全に行うことができる。
According to the horizontal jib crane according to the present invention, even if the trolley moves along the jib, the length adjusting means adjusts the length of the trolley and the hoisting winch according to the amount of movement of the trolley. In this case, the length of the hanging rope is increased or decreased, so that the hanging length of the hanging rope does not change, and the suspended load can be transported horizontally. In addition, since the sling is not sent along with the movement of the trolley, there is no fear that the sling is twisted as in the related art. The work of transporting the suspended load can be performed quickly and sufficiently safely without delay.

【0022】また、横行トロリーの駆動手段の駆動量お
よび駆動方向を検出すれば、別途、横行トロリーの変位
方向ならびに変位量を直接検出する手段が不要になり、
検出を簡単に行うことができる。
Further, if the driving amount and the driving direction of the driving means of the traversing trolley are detected, a separate means for directly detecting the displacement direction and the displacement amount of the trolley becomes unnecessary.
Detection can be performed easily.

【0023】また、相互に間隔をあけて配置された少な
くとも1対の滑車間に吊索を巻回し、これら滑車間の間
隔を前記変位検出手段の検出結果に応じて調節すること
で、滑車間の間隔変動幅に対し、吊索の巻数に応じて吊
索の長さ調節幅を大きく確保することができ、きわめて
長い吊索であっても、その長さの調節を簡単に行うこと
ができる。
[0023] Further, by winding a suspension cable between at least one pair of pulleys spaced apart from each other and adjusting the distance between these pulleys according to the detection result of the displacement detecting means, the distance between the pulleys can be reduced. The length adjustment width of the suspension cable can be ensured large according to the number of turns of the suspension cable, and the length of the suspension cable can be easily adjusted even for extremely long suspension cables. .

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明にかかる水平ジブ式クレーンの一実施形
態を示した外観図である。
FIG. 1 is an external view showing an embodiment of a horizontal jib crane according to the present invention.

【図2】本発明にかかる水平ジブ式クレーンの一実施形
態の構成を概略的に示した概略構成図である。
FIG. 2 is a schematic configuration diagram schematically showing a configuration of an embodiment of a horizontal jib crane according to the present invention.

【図3】本発明にかかる水平ジブ式クレーンの長さ調節
装置の他の駆動方式を示した正面図および側面図であ
る。
FIG. 3 is a front view and a side view showing another driving method of the length adjusting device of the horizontal jib crane according to the present invention.

【図4】従来の代表的な水平ジブ式クレーンの構成を概
略的に示した概略構成図である。
FIG. 4 is a schematic configuration diagram schematically showing a configuration of a conventional typical horizontal jib crane.

【図5】図3の水平ジブ式クレーンの横行トロリーが移
動したときの構成を示した概略構成図である。
5 is a schematic configuration diagram showing a configuration of the horizontal jib crane of FIG. 3 when a traverse trolley moves.

【符号の説明】[Explanation of symbols]

4 タワーマスト 6 ジブ 8 横行トロリー 10 シーブ 12 吊索 16 吊具 20a,20b シーブ 22 中継ドラム 24 巻取ウインチ 26 巻取ドラム 32 長さ調節装置 34 滑車 40 トロリー駆動機構 42 チェーン 46 プーリー 52 スプロケット Reference Signs List 4 Tower mast 6 Jib 8 Traversing trolley 10 Sheave 12 Hanging cable 16 Hanging tool 20a, 20b Sheave 22 Relay drum 24 Take-up winch 26 Take-up drum 32 Length adjuster 34 Pulley 40 Trolley drive mechanism 42 Chain 46 Pulley 52 Sprocket

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 水平方向に張り出した水平ジブと、この
水平ジブに沿って走行する横行トロリーと、この横行ト
ロリーから吊具を吊下ろす吊索と、前記吊索を巻上・巻
下げする巻上ウインチとを備えた水平ジブ式クレーンに
おいて、 前記横行トロリーの変位量および変位方向を検出する変
位検出手段と、前記吊索の吊長が変動しないように、前
記変位検出手段の検出結果に応じて、前記横行トロリー
と前記巻上ウインチとの間の前記吊索の長さを調節する
長さ調節手段とを備えたことを特徴とする水平ジブ式ク
レーン。
1. A horizontal jib extending in a horizontal direction, a trolley running along the horizontal jib, a hanging cable for hanging a hanging tool from the trolley, and a winding for hoisting and lowering the hanging cable. In a horizontal jib crane provided with an upper winch, a displacement detecting means for detecting a displacement amount and a displacement direction of the traversing trolley, and according to a detection result of the displacement detecting means so that a hanging length of the hanging cable does not change. And a length adjusting means for adjusting the length of the suspension cable between the traverse trolley and the hoisting winch.
【請求項2】 前記変位検出手段は、前記横行トロリー
を往復移動させるトロリー駆動手段の駆動量および駆動
方向を検知して、前記横行トロリーの変位方向および変
位量を検出することを特徴とする請求項1に記載の水平
ジブ式クレーン。
2. The displacement detecting means detects a driving amount and a driving direction of a trolley driving means for reciprocally moving the trolley, and detects a displacement direction and a displacement amount of the trolley. Item 2. A horizontal jib crane according to item 1.
【請求項3】 前記長さ調節手段は、相互に間隔をあけ
て配置された少なくとも1対の滑車を備え、これらの滑
車間に前記吊索が巻き付けられ、これらの滑車間の間隔
を前記変位検出手段の検出結果に応じて調節することを
特徴とする請求項1または2に記載の水平ジブ式クレー
ン。
3. The length adjusting means comprises at least one pair of pulleys spaced apart from each other, the sling being wrapped between the pulleys, and displacing the distance between the pulleys. The horizontal jib crane according to claim 1, wherein the adjustment is performed according to a detection result of the detection unit.
JP2000125692A 2000-04-26 2000-04-26 Horizontal jib type crane Pending JP2001302178A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000125692A JP2001302178A (en) 2000-04-26 2000-04-26 Horizontal jib type crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000125692A JP2001302178A (en) 2000-04-26 2000-04-26 Horizontal jib type crane

Publications (1)

Publication Number Publication Date
JP2001302178A true JP2001302178A (en) 2001-10-31

Family

ID=18635600

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000125692A Pending JP2001302178A (en) 2000-04-26 2000-04-26 Horizontal jib type crane

Country Status (1)

Country Link
JP (1) JP2001302178A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007037980A (en) * 2005-06-30 2007-02-15 Sakai Medical Co Ltd Lower limb exercise equipment
CN103395702A (en) * 2013-08-19 2013-11-20 中联重科股份有限公司 Lifting mechanism and crane with same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007037980A (en) * 2005-06-30 2007-02-15 Sakai Medical Co Ltd Lower limb exercise equipment
CN103395702A (en) * 2013-08-19 2013-11-20 中联重科股份有限公司 Lifting mechanism and crane with same

Similar Documents

Publication Publication Date Title
US9016486B2 (en) Traveling crane having traveler and hoisting winch
TW200538382A (en) Method for installing an elevator, and elevator delivery assembly
CN112585077B (en) Lift extension type elevator for construction
JP3271726B2 (en) Jib crane hoisting rope adjustment method and device
KR20010021248A (en) Crane apparatus
JP2001302178A (en) Horizontal jib type crane
US4491228A (en) Floating sheave type pendant pay-out system for pendant supported boom
CN112479032A (en) Gantry crane
JP2621587B2 (en) High head construction crane
JP2001302179A (en) Horizontal jib type crane
JP6393954B2 (en) Crane overhead structure system and crane manufacturing method
JPH1059700A (en) Lift device not rocking suspended load
JP2001122405A (en) Hoist gear of stacker crane
CN219469477U (en) Profile conveying device
JP6208069B2 (en) Crane manufacturing method and crane overhead structure system
KR970003510B1 (en) Tower crane
JP2001302171A (en) Hoisting jig
CN113415722A (en) Anti-swing lifting mechanism, lifting device and gantry crane
KR890006838Y1 (en) Gondola cage with rope drum and driving device
JPH10279229A (en) Elevator for construction work
JPH05162971A (en) Ceiling crane
JPS6344072A (en) Method of lifting and lowering gondola
JPH04256690A (en) Transport device of gathered material for overhead installation
JPH07285782A (en) Crane with suspension tool
JPH11322231A (en) Working elevator

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20040922