JP2001288994A - Structure of connecting-hole forming section in tunnel - Google Patents

Structure of connecting-hole forming section in tunnel

Info

Publication number
JP2001288994A
JP2001288994A JP2000101885A JP2000101885A JP2001288994A JP 2001288994 A JP2001288994 A JP 2001288994A JP 2000101885 A JP2000101885 A JP 2000101885A JP 2000101885 A JP2000101885 A JP 2000101885A JP 2001288994 A JP2001288994 A JP 2001288994A
Authority
JP
Japan
Prior art keywords
opening
segment
segments
tunnel
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000101885A
Other languages
Japanese (ja)
Other versions
JP3801415B2 (en
Inventor
Tsutomu Konno
勉 今野
Katsuyuki Hayashi
勝幸 林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Original Assignee
Kubota Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp filed Critical Kubota Corp
Priority to JP2000101885A priority Critical patent/JP3801415B2/en
Publication of JP2001288994A publication Critical patent/JP2001288994A/en
Application granted granted Critical
Publication of JP3801415B2 publication Critical patent/JP3801415B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide the structure of a connecting-hole forming section in a tunnel in which strength at the place of the formation of an opening section is increased by using a connecting member without reducing the internal space of the tunnel at the place of the formation of the opening section. SOLUTION: In the structure of the connecting-hole forming section, in which the first segment S1 forming the opening section O for branching a connecting hole and a segment S3 for poles and the second segment S2 are installed to the tunnel T and a pair of indented sections for inserting the connecting members 20 are formed extending over the inner circumferential surfaces of the first and second segments S1, S2, the first segment S1 is composed of the first segments 1, 2 for an opening and the first segments 3, 4 for an intermediate section and the second segment S2 of the second segments 5, 6 for the opening and the second segments 7, 8 for the intermediate section, the first segments 1, 2 for the opening and the second segments 5, 6 for the opening have thick sections 18, and the indented sections, into which the connecting members 20 are inserted, are formed to the thick sections 18.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、多数のセグメント
を周方向および軸方向に並べて互いに連結することによ
り内壁を形成してあるトンネルに連絡孔分岐用の開口部
を形成するべく配置される第1セグメントと、前記開口
部を形成するべく開口部の坑口側と切羽側とに配置され
る一対の柱用セグメントと、その一対の柱用セグメント
をトンネルの周方向から挟む状態で、前記第1セグメン
トの坑口側と切羽側とに配置される一対の第2セグメン
トとを備え、前記開口部に対するトンネルの周方向にお
いて前記開口部を挟む状態で、一対の凹入部が、前記第
1と第2のセグメントの内周面にわたって設けられ、前
記一対の凹入部のそれぞれに連結部材が嵌入されて、そ
の一対の連結部材により前記第1と第2のセグメントが
互いに連結されているトンネルにおける連絡孔形成部の
構造に関する。
BACKGROUND OF THE INVENTION The present invention relates to a method for forming an opening for branching a communication hole in a tunnel having an inner wall formed by connecting a number of segments in a circumferential direction and an axial direction and connecting them together. A first segment, a pair of column segments arranged on the wellhead side and the face side of the opening to form the opening, and the first segment sandwiching the pair of column segments from the circumferential direction of the tunnel. A pair of second segments arranged on the wellhead side and the face side of the segment, and the pair of recesses are provided in the state where the opening is sandwiched in the circumferential direction of the tunnel with respect to the opening; And a connecting member is fitted into each of the pair of concave portions, and the first and second segments are connected to each other by the pair of connecting members. That relates to a structure of contact hole forming portion of the tunnel.

【0002】[0002]

【従来の技術】このような連絡孔形成部の構造は、例え
ば、地下鉄のトンネル工事などで実施されるもので、連
絡孔分岐用の開口部が形成される箇所では、当然、土圧
などのような外からの荷重に対する強度が低下する。そ
こで、その強度向上のため、上述したように、第1と第
2のセグメントの内周面にわたって凹入部を設け、その
凹入部に連結部材を嵌入して、開口部形成箇所での強度
向上を図っていたのであり、その具体的な構造として、
従来、図11に示すものが知られている。
2. Description of the Related Art Such a structure of a communication hole forming portion is carried out, for example, in a subway tunnel construction. The strength against such an external load is reduced. Therefore, in order to improve the strength, as described above, a concave portion is provided over the inner peripheral surfaces of the first and second segments, and a connecting member is fitted into the concave portion to improve the strength at the location where the opening is formed. The specific structure was as follows:
Conventionally, the one shown in FIG. 11 is known.

【0003】その公知の構造によれば、第1セグメント
を構成する一対の開口用第1セグメント1A,2Aが、
分岐用の開口部OをトンネルTの周方向から挟む状態
で、トンネルTの軸方向に複数列配置され、かつ、その
複数列配置された開口用第1セグメント1A,2Aの坑
口側と切羽側とに、第2セグメントを構成する一対の開
口用第2セグメント5A,6Aが配置されて、それら開
口用第1セグメント1A,2Aと開口用第2セグメント
5A,6Aの開口部O側の端縁には、開口部O側に開口
する凹入部18Aが設けられている。そして、坑口側と
切羽側とに位置する一対の開口用第2セグメント5A,
6Aの間には、それぞれ柱用セグメントSAが配設さ
れ、連結部材20Aが、開口用第1セグメント1A,2
Aの凹入部18Aに嵌入されるとともに、その連結部材
20Aの両端部が、開口用第2セグメント5A,6Aの
凹入部18Aと柱用セグメントSA端面との間に嵌入さ
れている。
According to the known structure, a pair of opening first segments 1A and 2A constituting the first segment are
A plurality of rows are arranged in the axial direction of the tunnel T with the opening O for branching sandwiched from the circumferential direction of the tunnel T, and the wellhead side and the face side of the opening first segments 1A and 2A arranged in the plurality of rows. And a pair of opening second segments 5A and 6A constituting the second segment are arranged, and the opening first O-side edges of the opening first segments 1A and 2A and the opening second segments 5A and 6A. Is provided with a recessed portion 18A that opens to the opening O side. And a pair of opening second segments 5A located on the wellhead side and the face side,
6A, a column segment SA is disposed, and the connecting member 20A is connected to the first opening segments 1A, 2A.
A is fitted into the recessed portion 18A of A, and both ends of the connecting member 20A are fitted between the recessed portion 18A of the second opening segments 5A and 6A and the end surface of the column segment SA.

【0004】[0004]

【発明が解決しようとする課題】この図11に示す従来
構造によれば、開口用第1セグメント1A,2Aからの
荷重を連結部材20Aが受止めて柱用セグメントSAへ
伝えるため、連結部材20Aに大きな強度が要求され、
そのため、連結部材20Aの断面形状が、かなり大きな
ものとなる。その断面形状の大きな連結部材20Aを開
口用の第1と第2セグメント1A,2A,5A,6Aの
端縁に形成の凹入部18A内へ嵌入する必要があるた
め、開口用の第1と第2セグメント1A,2A,5A,
6Aの径方向の厚み、つまり、肉厚T3が、図11の
(ロ)において右半分に示す、連絡孔分岐用開口部が形
成される箇所以外でのセグメントの肉厚T4よりも厚く
なり、それに伴って、開口部Oの形成箇所におけるトン
ネルの内径が小さくなるという問題がある。
According to the conventional structure shown in FIG. 11, the connecting member 20A receives the load from the opening first segments 1A and 2A and transmits it to the column segment SA. Requires high strength,
Therefore, the cross-sectional shape of the connecting member 20A becomes considerably large. Since it is necessary to fit the connecting member 20A having a large cross-sectional shape into the concave portion 18A formed at the edge of the first and second segments 1A, 2A, 5A, 6A for the opening, the first and the second for the opening are required. 2 segments 1A, 2A, 5A,
The thickness in the radial direction of 6A, that is, the thickness T3 is larger than the thickness T4 of the segment in the right half in FIG. Accordingly, there is a problem that the inner diameter of the tunnel at the location where the opening O is formed becomes small.

【0005】本発明は、このような従来の問題点に着目
したもので、その目的は、開口部形成箇所におけるトン
ネルの内部空間を小さくすることなく、従来のような連
結部材を使用して、開口部形成箇所における強度の向上
を図り得るトンネルにおける連絡孔形成部の構造を提供
することにある。
The present invention focuses on such a conventional problem, and its object is to use a conventional connecting member without reducing the internal space of a tunnel at a location where an opening is formed. It is an object of the present invention to provide a structure of a communication hole forming portion in a tunnel which can improve the strength at the opening forming portion.

【0006】[0006]

【課題を解決するための手段】〔構成〕請求項1の発明
の特徴構成は、図1〜図6に例示するごとく、多数のセ
グメントSを周方向および軸方向に並べて互いに連結す
ることにより内壁Wを形成してあるトンネルTに連絡孔
H分岐用の開口部Oを形成するべく配置される第1セグ
メントS1と、前記開口部Oを形成するべく開口部Oの
坑口側と切羽側とに配置される一対の柱用セグメントS
3と、その一対の柱用セグメントS3をトンネルTの周
方向から挟む状態で、前記第1セグメントS1の坑口側
と切羽側とに配置される一対の第2セグメントS2とを
備え、前記開口部Oに対するトンネルTの周方向におい
て前記開口部Oを挟む状態で、一対の凹入部19が、前
記第1と第2のセグメントS1,S2の内周面にわたっ
て設けられ、前記一対の凹入部19のそれぞれに連結部
材20が嵌入されて、その一対の連結部材20により前
記第1と第2のセグメントS1,S2が互いに連結され
ているトンネルにおける連絡孔形成部の構造であって、
前記第1セグメントS1が、トンネルTの周方向におい
て前記開口部Oを挟む状態で、その開口部Oに隣接して
配置される一対の開口用第1セグメント1,2と、その
一対の開口用第1セグメント1,2の間に配置される中
間用第1セグメント3,4とで構成され、前記第2セグ
メントS2が、前記柱用セグメントS3に隣接して配置
される一対の開口用第2セグメント5,6と、その一対
の開口用第2セグメント5,6の間に配置される中間用
第2セグメント7,8とで構成され、前記開口用第1セ
グメント1,2が、前記開口部Oに隣接した状態で、前
記中間用第1セグメント3,4の肉厚よりも厚い厚肉部
18を備え、前記開口用第2セグメント5,6が、前記
柱用セグメントS3に隣接した状態で、前記中間用第2
セグメント7,8の肉厚よりも厚い厚肉部18を備えて
いて、前記開口用第1セグメント1,2の厚肉部18の
中間と前記開口用第2セグメント5,6の厚肉部18の
中間とにわたって、前記凹入部19が設けられていると
ころにある。
According to a first aspect of the present invention, as shown in FIGS. 1 to 6, a plurality of segments S are arranged in a circumferential direction and an axial direction and connected to each other. A first segment S1 arranged to form an opening O for branching a communication hole H in a tunnel T in which W is formed, and a wellhead side and a face side of the opening O to form the opening O. A pair of pillar segments S to be arranged
3 and a pair of second segments S2 arranged on the wellhead side and face side of the first segment S1 with the pair of column segments S3 sandwiched from the circumferential direction of the tunnel T, and the opening portion A pair of recesses 19 are provided over the inner peripheral surfaces of the first and second segments S1 and S2 with the opening O sandwiched in the circumferential direction of the tunnel T with respect to O. A connecting hole is formed in a tunnel in which the first and second segments S1 and S2 are connected to each other by a pair of connecting members 20 and the pair of connecting members 20,
A pair of first segments 1 and 2 for openings arranged adjacent to the opening O in a state where the first segment S1 sandwiches the opening O in the circumferential direction of the tunnel T; The second segment S2 is composed of a pair of second opening segments disposed adjacent to the column segment S3. The first and second opening segments are composed of segments 5 and 6 and intermediate second segments 7 and 8 disposed between the pair of second opening segments 5 and 6, respectively. In the state adjacent to O, a thick part 18 thicker than the thickness of the intermediate first segments 3 and 4 is provided, and the opening second segments 5 and 6 are adjacent to the column segment S3. , The intermediate second
A thick portion 18 thicker than the thickness of the segments 7 and 8 is provided, and a middle portion between the thick portions 18 of the first segments 1 and 2 for opening and the thick portion 18 of the second segments 5 and 6 for opening. And the middle portion of the recess is provided with the concave portion 19.

【0007】請求項2の発明の特徴構成は、図6に例示
するごとく、前記一対の連結部材20が、型鋼により構
成されているところにある。
A characteristic feature of the second aspect of the present invention is that, as exemplified in FIG. 6, the pair of connecting members 20 are formed of a mold steel.

【0008】請求項3の発明の特徴構成は、図6に例示
するごとく、前記型鋼20が、トンネルTの周方向にお
いて互いに対向する前記凹入部19の側壁19aに接当
するフランジ部20aを備えているところにある。
As shown in FIG. 6, the feature of the invention according to claim 3 is that, as exemplified in FIG. 6, the shape steel 20 is provided with a flange portion 20 a which abuts on a side wall 19 a of the recess 19 which is opposed to each other in the circumferential direction of the tunnel T. Where it is.

【0009】なお、上述のように、図面との対照を便利
にするために符号を記したが、該記入により本発明は添
付図面の構成に限定されるものではない。
Note that, as described above, reference numerals are provided for convenience of comparison with the drawings, but the present invention is not limited to the configuration of the accompanying drawings by the entry.

【0010】〔作用及び効果〕請求項1の発明の特徴構
成によれば、連絡孔分岐用の開口部を形成するべく配置
される第1セグメントが、開口部を挟む状態で、その開
口部に隣接して配置される一対の開口用第1セグメント
と、その一対の開口用第1セグメントの間に配置される
中間用第1セグメントとで構成され、一対の柱用セグメ
ントを挟む状態で、前記第1セグメントの坑口側と切羽
側とに配置される一対の第2セグメントが、柱用セグメ
ントに隣接して配置される一対の開口用第2セグメント
と、その一対の開口用第2セグメントの間に配置される
中間用第2セグメントとで構成され、前記開口用第1セ
グメントと開口用第2セグメントが、開口部や柱用セグ
メントに隣接した状態で、中間用第1セグメントや中間
用第2セグメントの肉厚よりも厚い厚肉部を備え、その
開口用第1セグメントの厚肉部の中間と開口用第2セグ
メントの厚肉部の中間とにわたって、連結部材が嵌入さ
れる凹入部が設けられているので、各厚肉部の中間に設
けられた凹入部に比較的断面形状の大きな連結部材を嵌
入し、その連結部材により開口用第1セグメントからの
荷重を確実に受止めて柱用セグメントへ伝えることがで
きる。それでいて、各厚肉部は、一対の開口用第1セグ
メントと開口用第2セグメントにのみ設けるだけで済む
ため、開口部の形成箇所におけるトンネルの内径が極端
に小さくなることを回避することができる。
According to the first aspect of the present invention, the first segment, which is arranged to form the opening for branching the communication hole, is formed so as to sandwich the opening. A pair of adjacent first segments for opening, and a first intermediate segment disposed between the pair of first segments for opening, with the pair of column segments interposed therebetween; A pair of second segments arranged on the wellhead side and the face side of the first segment are between a pair of opening second segments arranged adjacent to the column segment and the pair of opening second segments. The first segment for opening and the second segment for opening are adjacent to the opening and the segment for pillar, and the first segment for intermediate and the second segment for intermediate segment A thick portion that is thicker than the thick portion, and a recessed portion into which the connecting member is fitted is provided between the middle of the thick portion of the first segment for opening and the middle of the thick portion of the second segment for opening. Therefore, a connecting member having a relatively large cross-sectional shape is fitted into the concave portion provided in the middle of each thick portion, and the connecting member reliably receives the load from the first segment for opening to the column segment. Can tell. However, since each thick portion only needs to be provided in the pair of the opening first segment and the opening second segment, it is possible to prevent the inside diameter of the tunnel at the location where the opening is formed from becoming extremely small. .

【0011】請求項2の発明の特徴構成によれば、凹入
部に嵌入される一対の連結部材が、型鋼により構成され
ているので、例えば、連結部材を断面矩形の中実体で構
成するのと比較して、連結部材の軽量化を図りながら、
開口用第1セグメントからの荷重を効果的に受止めて柱
用セグメントへ伝えることができる。
According to the characteristic configuration of the second aspect of the present invention, since the pair of connecting members to be fitted into the recessed portions are made of a mold steel, for example, the connecting members are made of a solid body having a rectangular cross section. In comparison, while reducing the weight of the connecting member,
The load from the opening first segment can be effectively received and transmitted to the column segment.

【0012】請求項3の発明の特徴構成によれば、連結
部材としての型鋼が、トンネルの周方向において互いに
対向する凹入部の側壁に接当するフランジ部を備えてい
るので、面積の大きなフランジ部を有効に利用して、開
口用第1セグメントからの荷重をより一層効果的に柱用
セグメントへと伝えることができる。
According to the characteristic feature of the third aspect of the present invention, since the section steel as the connecting member is provided with the flange portions abutting on the side walls of the recessed portions facing each other in the circumferential direction of the tunnel, the flange having a large area is provided. By effectively using the portion, the load from the opening first segment can be more effectively transmitted to the column segment.

【0013】[0013]

【発明の実施の形態】本発明によるトンネルにおける連
絡孔形成部の構造につき、その実施の形態を図面に基づ
いて説明する。このトンネルは、例えば、地下鉄、上下
水道、各種パイプライン用として使用されるもので、図
1および図2に示すように、多数のセグメントS,S
1,S2,S3が、トンネルTの周方向と軸方向に並べ
て配置され、互いに連結されることでトンネルTの内壁
Wが形成されていて、トンネルTの横側壁には、トンネ
ルTに連通する連絡孔Hを分岐させる開口部Oが設けら
れている。前記セグメントS,S1,S2,S3は、坑
口側から切羽側に向かって円筒状の内壁Wを形成するた
めに使用される通常のセグメントSと、その内壁Wに前
記開口部Oを形成するために使用される第1セグメント
S1、第2セグメントS2、ならびに、柱用セグメント
S3などで構成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a structure of a communication hole forming portion in a tunnel according to the present invention will be described with reference to the drawings. This tunnel is used, for example, for subways, water and sewage systems, and various pipelines. As shown in FIG. 1 and FIG.
The inner wall W of the tunnel T is formed by arranging 1, S2, and S3 side by side in the circumferential direction and the axial direction of the tunnel T, and is connected to each other. The lateral wall of the tunnel T communicates with the tunnel T. An opening O for branching the communication hole H is provided. The segments S, S1, S2, and S3 are a normal segment S used to form a cylindrical inner wall W from a wellhead side to a face side, and the opening O is formed in the inner wall W. , A first segment S1, a second segment S2, and a column segment S3 used for the vehicle.

【0014】第1セグメントS1は、図3の(イ)に示
すように、トンネルTの周方向において開口部Oを挟む
状態で、その開口部Oに隣接して配置される一対の開口
用第1セグメント1,2と、その一対の開口用第1セグ
メント1,2の間に配置される複数の中間用第1セグメ
ント3,4により構成されている。一対の開口用第1セ
グメント1,2は、周方向での長さが短い開口用第1セ
グメント1と、周方向での長さが長い開口用第1セグメ
ント2との2種類があり、その2種類の開口用第1セグ
メント1,2が、開口部Oを挟む状態に配置され、その
一対の開口用第1セグメント1,2の間に中間用第1セ
グメント3と、中間用第1セグメントとして機能するキ
ーセグメント4とが配置され、これらセグメント1,
2,3,4が図外のボルト・ナットにより連結されて、
開口部Oを除いて、全体が部分環状になるように構成さ
れている。
As shown in FIG. 3A, the first segment S1 has a pair of openings for opening arranged adjacent to the opening O in a state of sandwiching the opening O in the circumferential direction of the tunnel T. One segment 1, 2 and a plurality of intermediate first segments 3, 4 arranged between the pair of opening first segments 1, 2. The pair of opening first segments 1 and 2 are classified into two types, an opening first segment 1 having a short circumferential length and an opening first segment 2 having a long circumferential length. Two types of opening first segments 1 and 2 are arranged so as to sandwich the opening O, and an intermediate first segment 3 and an intermediate first segment between the pair of opening first segments 1 and 2. And a key segment 4 functioning as
2, 3, 4 are connected by bolts and nuts not shown,
Except for the opening O, the whole is configured to be partially annular.

【0015】このような部分環状の第1セグメントS1
が、トンネルTの軸方向に複数列、この実施形態では4
列並置されて、隣接する第1セグメントS1どうしも、
図外のボルト・ナットにより互いに連結されている。た
だし、隣接する第1セグメントS1間においては、長さ
の短い開口用第1セグメント1と長さの長い開口用第1
セグメント2とが、互いに隣接して交互に位置するよう
に配置され、それによって、各第1セグメントS1を構
成するセグメント1,2,3,4が、千鳥状に配置され
て互いに連結されて、開口部Oを形成するように構成さ
れ、その開口部Oの坑口側と切羽側には、一対の柱用セ
グメントS3が配置されている。
Such a partially annular first segment S1
Is a plurality of rows in the axial direction of the tunnel T. In this embodiment, four rows are provided.
The first segments S1 which are arranged side by side and adjacent to each other,
They are connected to each other by bolts and nuts not shown. However, between the adjacent first segments S1, the first segment 1 for the opening having a short length and the first segment 1 for the opening having a long length are provided.
The segments 2 are arranged so as to be adjacent to each other and alternately, whereby the segments 1, 2, 3, and 4 constituting each first segment S1 are arranged in a staggered manner and connected to each other, An opening O is formed, and a pair of column segments S3 are arranged on the wellhead side and the face side of the opening O.

【0016】第2セグメントS2は、図3の(ロ)に示
すように、トンネルTの周方向において柱用セグメント
S3を挟む状態で、第1セグメントS1の坑口側と切羽
側とに一対配置され、各第2セグメントS2も、柱用セ
グメントS3に隣接して配置される一対の開口用第2セ
グメント5,6、つまり、周方向長さの短い開口用第2
セグメント5と、周方向長さの長い開口用第2セグメン
ト6とが、柱用セグメントS3を挟む状態に配置され、
その一対の開口用第2セグメント5,6の間に複数の中
間用第2セグメント7と、中間用第2セグメントとして
機能するキーセグメント8とが配置され、これらセグメ
ント5,6,7,8、ならびに、柱用セグメントS3と
が図外のボルト・ナットにより連結されて、全体が環状
になるように構成されている。そして、この第2セグメ
ントS2と第1セグメントS1の間においても、長さの
短い開口用第1セグメント1に対して長さの長い開口用
第2セグメント6が、長い開口用第1セグメント2に対
して短い開口用第2セグメント5が、互いに隣接するよ
うに配置され、第1と第2のセグメントS1,S2も図
外のボルト・ナットにより互いに連結されている。
As shown in FIG. 3B, the second segment S2 is disposed in a pair on the wellhead side and the face side of the first segment S1 with the column segment S3 sandwiched in the circumferential direction of the tunnel T. Each of the second segments S2 also has a pair of second opening segments 5, 6 arranged adjacent to the column segment S3, that is, a second opening segment having a short circumferential length.
The segment 5 and the opening second segment 6 having a long circumferential length are arranged so as to sandwich the column segment S3,
A plurality of intermediate second segments 7 and a key segment 8 functioning as an intermediate second segment are arranged between the pair of opening second segments 5, 6, and these segments 5, 6, 7, 8, The column segment S3 is connected to the column segment S3 by bolts and nuts (not shown) so that the whole is formed in a ring shape. Further, also between the second segment S2 and the first segment S1, the second opening segment 6 having a longer length than the first segment 1 having a shorter opening becomes the first segment 2 having a longer opening. On the other hand, the short second opening segments 5 are arranged adjacent to each other, and the first and second segments S1 and S2 are also connected to each other by bolts and nuts (not shown).

【0017】2種類の開口用第1セグメント1,2は、
図3の(イ)に示すように、周方向での長さの違いはあ
るものの、構造的には殆ど同じであり、また、2種類の
開口用第2セグメント5,6も同様で、更に、長さの短
い開口用の第1と第2セグメント1,5はほぼ同一であ
り、また、長さの長い開口用の第1と第2セグメント
2,6もほぼ同一であるため、これらセグメント1,
2,5,6の詳細については、図4〜図6に基づいて一
括して説明する。なお、図4の(ロ)は、図4の(イ)
におけるロ−ロ線断面図であり、図5の(ロ)は、図5
の(イ)におけるロ−ロ線断面図である。
The two types of opening first segments 1 and 2 are:
As shown in FIG. 3A, although there is a difference in the length in the circumferential direction, the structure is almost the same, and the two types of second segments 5 and 6 for opening are also the same. The first and second segments 1, 5 for the short opening are substantially the same, and the first and second segments 2, 6 for the long opening are also substantially the same. 1,
Details of 2, 5, and 6 will be described collectively with reference to FIGS. Note that (b) of FIG. 4 is (a) of FIG.
FIG. 5B is a cross-sectional view taken along a line B in FIG.
FIG. 4 is a cross-sectional view taken along a line B in FIG.

【0018】これらセグメント1,2,5,6は、通
常、コルゲート型と称される多数の凹凸形状を備えたダ
クタイル鋳鉄製のセグメントで、長手方向に沿う左右一
対の板状の横側壁9,10と、その両横側壁9,10を
連結する板状の前壁11と後壁12、ならびに、外周壁
13などを備えて一体的に構成され、外周壁13には、
適宜、凹入穴14が設けられてコンクリートCが埋入さ
れている。そして、両横側壁9,10や前後壁11,1
2、ならびに、外周壁13は、複数の補強用リブ15に
よって互いに一体的に連結されて補強され、その両横側
壁9,10と前後壁11,12には、複数のボルト挿通
孔16が穿設され、外周壁13には、適宜、グラウト注
入孔17が設けられている。
These segments 1, 2, 5, 6 are segments made of ductile cast iron having a large number of irregularities called a corrugated type, and a pair of left and right plate-like side walls 9, along the longitudinal direction. 10 and a plate-shaped front wall 11 and a rear wall 12 connecting the two side walls 9 and 10, and an outer peripheral wall 13.
As appropriate, a concave hole 14 is provided and concrete C is embedded. Then, both side walls 9, 10 and front and rear walls 11, 1
2 and the outer peripheral wall 13 are integrally connected and reinforced by a plurality of reinforcing ribs 15, and a plurality of bolt insertion holes 16 are formed in both lateral side walls 9, 10 and front and rear walls 11, 12. The outer peripheral wall 13 is provided with a grout injection hole 17 as appropriate.

【0019】各セグメント1,2,5,6は、その前壁
11側の肉厚T1の方が後壁12側の肉厚T2よりも厚
く構成され、それによって、各セグメント1,2,5,
6の前壁11側に厚肉部18が形成されるとともに、そ
の厚肉部18の中間における内周面側には、両横側壁
9,10を横切る状態で、換言すると、各セグメント
1,2,5,6の長手方向に直交する状態で、凹入部1
9が形成されていて、その凹入部19内に、連結部材と
してのH型鋼20が嵌入可能に構成されている。そし
て、その凹入部19の側壁19a、つまり、各セグメン
ト1,2,5,6の長手方向において互いに対向する一
対の側壁19aに対し、H型鋼20のフランジ部20a
が接当するように構成され、その側壁19aには、複数
のボルト孔21が穿設されている。
Each of the segments 1, 2, 5, 6 has a thickness T1 on the front wall 11 side larger than a thickness T2 on the rear wall 12 side. ,
6, a thick portion 18 is formed on the front wall 11 side, and on the inner peripheral surface in the middle of the thick portion 18 in a state of crossing both lateral side walls 9, 10, in other words, each segment 1, In the state perpendicular to the longitudinal direction of 2, 5, 6
9 is formed, and an H-shaped steel 20 as a connecting member can be fitted into the recess 19. Then, the flange portion 20a of the H-section steel 20 is placed on the side wall 19a of the recess 19, that is, on a pair of side walls 19a facing each other in the longitudinal direction of each of the segments 1, 2, 5, and 6.
, And a plurality of bolt holes 21 are formed in the side wall 19a.

【0020】中間用の第1と第2セグメント3,7は、
殆ど同じ構造で、両セグメント3,7共、図7に示すよ
うに、長手方向に位置する前後壁が互いに平行なもの
と、図8に示すように、一方の前後壁が傾斜して後述す
るキーセグメント4,8に隣接するものとの2種類があ
り、かつ、前後壁が傾斜しているものは、図8に示すも
のと、図8とは逆方向に傾斜しているものとがあるが、
それ以外についてはほぼ同一であるため、図7と図8に
基づいて一括して説明する。なお、図7の(ロ)は、図
7の(イ)におけるロ−ロ線断面図、図8の(ロ)は、
図8の(イ)におけるロ−ロ線断面図である。
The first and second intermediate segments 3, 7 are:
Both the segments 3 and 7 have almost the same structure, and the front and rear walls located in the longitudinal direction are parallel to each other as shown in FIG. 7, and one of the front and rear walls is inclined as shown in FIG. There are two types, one adjacent to the key segments 4 and 8, and the front and rear walls are inclined. One is shown in FIG. 8 and the other is inclined in the opposite direction to FIG. But,
Since the other parts are almost the same, they will be described collectively with reference to FIGS. 7B is a cross-sectional view taken along the line B-B of FIG. 7A, and FIG.
FIG. 9 is a cross-sectional view taken along the line B-B in FIG.

【0021】これら中間用セグメント3,7も、通常、
コルゲート型と称されるダクタイル鋳鉄製のセグメント
で、長手方向に沿う左右一対の板状の横側壁22,23
と、その両横側壁22,23を連結する板状の前後壁2
4,25、ならびに、外周壁26などにより一体的に構
成され、図7に示す前後壁24,25が互いに平行なも
のと、図8に示す前後壁24,25の一方が傾斜したも
のとの2種類があり、前後壁24,25の一方が傾斜し
たものは、図8に示すものと、図8とは逆方向に傾斜し
たものとがある。そして、いずれの種類においても、そ
の外周壁26には、凹入穴27が設けられてコンクリー
トCが埋入され、補強用リブ28によって補強され、そ
の両横側壁22,23と前後壁24,25には、複数の
ボルト挿通孔29が穿設され、外周壁26には、グラウ
ト注入孔30が設けられていて、その肉厚が、開口用の
第1と第2セグメント1,2,5,6における後壁12
側の肉厚T2と同じ肉厚T2に構成されている。
These intermediate segments 3 and 7 are also usually
A pair of ductile cast iron segments called corrugated type, and a pair of left and right plate-like side walls 22 and 23 along the longitudinal direction.
And a plate-shaped front and rear wall 2 connecting the two side walls 22 and 23 thereof.
The front and rear walls 24 and 25 shown in FIG. 7 are parallel to each other, and one of the front and rear walls 24 and 25 shown in FIG. There are two types, one in which one of the front and rear walls 24, 25 is inclined, the one shown in FIG. 8 and the one inclined in the opposite direction to FIG. In either case, a concave hole 27 is provided in the outer peripheral wall 26, concrete C is embedded therein, and the concrete C is reinforced by a reinforcing rib 28, and both lateral side walls 22, 23 and front and rear walls 24, 24 are provided. 25, a plurality of bolt insertion holes 29 are formed, and a grout injection hole 30 is provided in the outer peripheral wall 26, and the thickness of the grout injection hole 30 is set to the first and second segments 1, 2, 5 for opening. , 6 rear wall 12
The thickness T2 is the same as the thickness T2 on the side.

【0022】第1セグメントS1と第2セグメントS2
におけるキーセグメント4,8は、殆ど同一の構造で、
これらキーセグメント4,8も、通常、コルゲート型と
称されるダクタイル鋳鉄製であって、図9に示すよう
に、トンネルTの周方向に沿う左右一対の板状の横側壁
31,32と、その両横側壁31,32を連結する傾斜
した板状の前後壁33,34、ならびに、外周壁35な
どにより一体的に構成され、外周壁35には、凹入穴3
6が設けられてコンクリートCが埋入され、補強用リブ
37によって補強されるとともに、両横側壁31,32
と前後壁33,34には、複数のボルト挿通孔38が穿
設され、その肉厚が、開口用の第1と第2セグメント
1,2,5,6における後壁12側の肉厚T2と同じ肉
厚T2に構成されている。なお、この図9においても、
図9の(ロ)は、図9の(イ)におけるロ−ロ線断面図
である。
First segment S1 and second segment S2
Key segments 4 and 8 have almost the same structure,
These key segments 4 and 8 are also made of a ductile cast iron usually called a corrugated type, and as shown in FIG. 9, a pair of left and right plate-like side walls 31 and 32 along the circumferential direction of the tunnel T, The front and rear inclined walls 33 and 34 connecting the two side walls 31 and 32 are integrally formed with an outer peripheral wall 35 and the like.
6, concrete C is embedded and reinforced by reinforcing ribs 37, and both side walls 31, 32 are provided.
A plurality of bolt insertion holes 38 are formed in the front and rear walls 33 and 34, and the thickness of the bolts 38 is the thickness T2 of the first and second segments 1, 2, 5, 6 for opening on the rear wall 12 side. And has the same thickness T2. Note that, in FIG.
FIG. 9B is a cross-sectional view taken along the line B-B of FIG.

【0023】一対の柱用セグメントS3も、通常、コル
ゲート型と称されるダクタイル鋳鉄製であって、図10
に示すように、長手方向に沿う左右一対の板状の横側壁
39,40と、その両横側壁39,40を連結する板状
の前後壁41,42、ならびに、外周壁43などにより
一体的に構成され、外周壁43には、凹入穴44が設け
られてコンクリートCが埋入され、補強用リブ45によ
って補強され、その両横側壁39,40と前後壁41,
42には、複数のボルト挿通孔46が穿設され、外周壁
43には、グラウト注入孔47が設けられ、その肉厚
が、開口用の第1と第2セグメント1,2,5,6にお
ける前壁11側の肉厚T1と同じ肉厚T1に構成されて
いる。なお、この図10においても、図10の(ロ)
は、図10の(イ)におけるロ−ロ線断面図である。
The pair of column segments S3 is also made of a ductile cast iron usually called a corrugated type.
As shown in FIG. 5, a pair of left and right plate-shaped side walls 39, 40 along the longitudinal direction, plate-shaped front and rear walls 41, 42 connecting the both side walls 39, 40, and an outer peripheral wall 43 are integrally formed. In the outer peripheral wall 43, a concave hole 44 is provided, concrete C is embedded and reinforced by a reinforcing rib 45, and both lateral side walls 39, 40 and front and rear walls 41, 41 are provided.
A plurality of bolt insertion holes 46 are drilled in the hole 42, and a grout injection hole 47 is formed in the outer peripheral wall 43. The thickness of the grout injection hole 47 is the first and second segments 1, 2, 5, 6 for opening. Is the same thickness T1 as the thickness T1 on the front wall 11 side. In FIG. 10, (b) of FIG.
FIG. 11 is a sectional view taken along the line 2-2 in FIG.

【0024】通常のセグメントSについては、本発明の
要旨と直接関係がないため、詳細な説明は割愛するが、
この通常のセグメントSも、通常、コルゲート型と称さ
れるダクタイル鋳鉄製のセグメントやキーセグメントな
どで構成され、かつ、その肉厚が、開口用の第1と第2
セグメント1,2,5,6における後壁12側の肉厚T
2と同じ肉厚T2に構成されていて、各セグメントがボ
ルト・ナットにより互いに連結可能に構成されている。
Since the ordinary segment S has no direct relation to the gist of the present invention, a detailed description thereof will be omitted.
The normal segment S is also formed of a ductile cast iron segment or a key segment usually referred to as a corrugated type, and has a wall thickness of the first and second openings.
Thickness T on the rear wall 12 side in the segments 1, 2, 5, 6
2, and each segment can be connected to each other by bolts and nuts.

【0025】つぎに、上述した各種のセグメントを使用
してトンネルTや連絡孔Hのための開口部Oを形成する
施工手順について説明する。従来と同様に、トンネルを
掘削しながら、通常のセグメントSを使用して、つま
り、多数のセグメントを周方向および軸方向に並べ、か
つ、互いに連結しながら、坑口側から切羽側へとトンネ
ルTの内壁Wを形成する。開口部Oの形成箇所において
は、柱用セグメントS3を開口部Oの坑口側に配置し
て、ボルト・ナットにより隣接するセグメントSに連結
する。その柱用セグメントS3をトンネルTの周方向か
ら挟む状態で、開口用第2セグメント5,6を配置し、
ボルト・ナットを使用して、各開口用第2セグメント
5,6を隣接するセグメントSに連結するとともに、柱
用セグメントS3にも連結する。そして、その一対の開
口用第2セグメント5,6の間に中間用第2セグメント
7を配置し、最後に、キーセグメント8を配置して、ボ
ルト・ナットによって、それらセグメント7,8を隣接
するセグメントSに連結するとともに、各セグメント
7,8どうしも互いに連結する。
Next, a description will be given of a construction procedure for forming an opening O for the tunnel T and the communication hole H using the various segments described above. As before, using a normal segment S while drilling a tunnel, i.e., arranging a number of segments circumferentially and axially and connecting them together, the tunnel T Is formed. At the location where the opening O is formed, the column segment S3 is arranged on the wellhead side of the opening O and connected to the adjacent segment S by a bolt and a nut. In a state where the pillar segment S3 is sandwiched from the circumferential direction of the tunnel T, the opening second segments 5, 6 are arranged,
Using the bolts and nuts, the second segments 5, 6 for opening are connected to the adjacent segment S and also to the column segment S3. Then, the intermediate second segment 7 is arranged between the pair of opening second segments 5 and 6, and finally the key segment 8 is arranged, and these segments 7 and 8 are adjacent to each other by bolts and nuts. While being connected to the segment S, the segments 7 and 8 are also connected to each other.

【0026】その後、開口用第2セグメント5,6に隣
接させて開口用第1セグメント1,2を配置するのであ
るが、長さの短い開口用第2セグメント5に対しては長
い開口用第1セグメント2を隣接させ、長い開口用第2
セグメント6に対しては短い開口用第1セグメント1を
隣接させて配置し、ボルト・ナットを使用して、各開口
用第1セグメント1,2を開口用第2セグメント5,6
に連結するとともに、その一対の開口用第1セグメント
1,2の間に中間用第1セグメント3やキーセグメント
4を配置し、ボルト・ナットによって、それらセグメン
ト3,4を隣接する中間用第2セグメント7やキーセグ
メント8に連結し、かつ、各セグメント3,4どうしも
連結する。このような作業を繰り返して、第1セグメン
トS1を4列配設し、切羽側にも、柱用セグメントS3
を配置し、かつ、開口用第2セグメント5,6や中間用
第2セグメント7、ならびに、キーセグメント8を配置
して連結するとともに、その第2セグメントS2に対し
て通常のセグメントSを連結する。
After that, the first opening segments 1 and 2 are arranged adjacent to the second opening segments 5 and 6, but the second opening segment 5 having a shorter length has a longer opening second segment 5. One segment 2 is adjacent and the second for the long opening
A short first opening segment 1 is arranged adjacent to the segment 6, and each opening first segment 1, 2 is connected to the second opening segments 5, 6 using bolts and nuts.
And the intermediate first segment 3 and the key segment 4 are arranged between the pair of opening first segments 1 and 2 and the segments 3 and 4 are connected to each other by the bolts and nuts. It is connected to the segment 7 and the key segment 8, and each of the segments 3 and 4 is also connected. By repeating such operations, the first segments S1 are arranged in four rows, and the column segments S3 are also provided on the face side.
And the second segments 5 and 6 for opening, the second segment 7 for middle and the key segment 8 are arranged and connected, and the normal segment S is connected to the second segment S2. .

【0027】その際、短い開口用第1セグメント1と長
い開口用第1セグメント2とを交互に隣接させ、かつ、
短い開口用第1セグメント1に対して長い開口用第2セ
グメント6を、長い開口用第1セグメント2に対して短
い開口用第2セグメント5を隣接させることにより、各
セグメントが千鳥状に連結されて開口部Oが形成され
る。それによって、開口用第1セグメント1,2と開口
用第2セグメント5,6とが、トンネルTの軸方向に並
設されて、それら開口用セグメント1,2,5,6の内
周面に設けられた凹入部19が、トンネルTの周方向に
おいて開口部Oを挟む状態で、上下に一対並ぶことにな
り、その一対の凹入部19間にわたってそれぞれH型鋼
20を嵌入する。
At this time, the first segments for short openings 1 and the first segments for long openings 2 are alternately adjacent to each other, and
By adjoining the long opening second segment 6 to the short opening first segment 1 and the short opening second segment 5 to the long opening first segment 2, the segments are connected in a staggered manner. Thus, an opening O is formed. As a result, the opening first segments 1 and 2 and the opening second segments 5 and 6 are arranged side by side in the axial direction of the tunnel T, and are formed on the inner peripheral surfaces of the opening segments 1, 2, 5 and 6. The provided recessed portions 19 are vertically arranged in a pair with the opening O sandwiched in the circumferential direction of the tunnel T, and the H-shaped steel 20 is fitted between the pair of recessed portions 19 respectively.

【0028】このH型鋼20の嵌入に際しては、図6に
示すように、H型鋼20のフランジ部20aが凹入部1
9の側壁19aに接当するように嵌入し、側壁19aに
設けたボルト孔21を利用して、そのH型鋼20に対し
てボルト・ナットにより各開口用セグメント1,2,
5,6を連結する。それによって、トンネルTの周方向
において開口部Oを挟む状態で、その開口部Oに厚肉部
18が隣接した状態で、開口用第1セグメント1,2が
配設され、かつ、柱用セグメントS3に厚肉部18が隣
接した状態で、開口用第2セグメント5,6が配設され
ることになり、その開口用第1セグメント1,2と開口
用第2セグメント5,6の厚肉部18の中間にわたって
凹入部19が設けられているので、その厚肉部18に設
けられた凹入部19に比較的断面形状の大きな連結部材
20を嵌入することができ、しかも、その厚肉部18
は、開口用第1セグメント1,2と開口用第2セグメン
ト5,6に設けるだけで済むため、開口部Oの形成箇所
におけるトンネルTの内径が極端に小さくなることが回
避される。
When the H-shaped steel 20 is inserted, as shown in FIG.
9, so as to be in contact with the side wall 19 a, and using the bolt holes 21 provided in the side wall 19 a, the opening segments 1, 2, 2, and 2 are bolted to the H-shaped steel 20 by bolts and nuts.
5 and 6 are connected. Thereby, the opening first segments 1 and 2 are arranged in a state where the thick portion 18 is adjacent to the opening O in a state where the opening O is sandwiched in the circumferential direction of the tunnel T, and the column segment is With the thick portion 18 adjacent to S3, the second segments 5, 6 for opening are disposed, and the first segments 1, 2 for opening and the second segments 5, 6 for opening are thick. Since the concave portion 19 is provided in the middle of the portion 18, the connecting member 20 having a relatively large cross-sectional shape can be fitted into the concave portion 19 provided in the thick portion 18. 18
Need only be provided in the first segments 1 and 2 for opening and the second segments 5 and 6 for opening, so that the inside diameter of the tunnel T at the location where the opening O is formed is prevented from becoming extremely small.

【0029】〔別実施形態〕 (1)先の実施形態では、第1セグメントS1を構成す
る一対の開口用第1セグメント1,2を長さの異なる2
種類のセグメントで構成した例を示したが、これら一対
の開口用第1セグメント1,2を同一長さで同一構造の
セグメントで構成することもでき、また、第2セグメン
トS2を構成する一対の開口用第2セグメント5,6に
おいても同様であり、更に、一対の開口用第1セグメン
ト1,2と一対の開口用第2セグメント5,6とを、全
て同一長さで同一構造のセグメントで構成することもで
きる。また、第1セグメントS1を4列並置して開口部
Oを形成した例を示したが、第1セグメントS1の並置
列数については任意であり、第1セグメントS1におけ
るトンネルTの軸方向幅を広くすることにより、1列の
第1セグメントS1によって開口部Oを形成することも
できる。
[Another Embodiment] (1) In the above embodiment, a pair of opening first segments 1 and 2 constituting the first segment S1 are formed of two different lengths.
Although an example in which the first segment 1 and the second segment 1 are configured with segments having the same length and the same structure can be used as the pair of first segments 1 and 2 for the opening, a pair of segments forming the second segment S2 may be used. The same applies to the opening second segments 5 and 6. Further, the pair of opening first segments 1 and 2 and the pair of opening second segments 5 and 6 are all segments having the same length and the same structure. It can also be configured. In addition, although the example in which the first segments S1 are arranged in four rows to form the openings O is shown, the number of rows in the first segments S1 is arbitrary, and the axial width of the tunnel T in the first segments S1 is reduced. By increasing the width, the opening O can be formed by the first segments S1 in one row.

【0030】(2)先の実施形態では、第1セグメント
S1を構成する開口用と中間用の第1セグメント1,
2,3,4、第2セグメントS2を構成する開口用と中
間用の第2セグメント5,6,7,8、柱用セグメント
S3、ならびに、通常のセグメントSの全てをコルゲー
ト型と称されるダクタイル鋳鉄製のセグメントで構成し
た例を示したが、これらセグメントの一部または全部を
コルゲート型以外のセグメント、例えば、外周壁と複数
の補強用の主桁などを備えた鋼鉄製や鋳鉄製のセグメン
ト、あるいは、コンクリート製のセグメントなどに置き
換えて実施することもできる。
(2) In the above embodiment, the opening and intermediate first segments 1 and 1 constituting the first segment S1
2, 3, 4, the opening and intermediate second segments 5, 6, 7, 8, and the column segment S3, which constitute the second segment S2, and the normal segment S are all called corrugated types. Although an example in which the segment is made of ductile cast iron segments is shown, some or all of these segments are segments other than corrugated type, for example, steel or cast iron having an outer peripheral wall and a plurality of main girders for reinforcement. The present invention can be implemented by replacing a segment or a concrete segment.

【0031】(3)先の実施形態では、連結部材20と
してH型鋼を使用した例を示したが、中実の棒状体や中
空の筒状体を使用することもでき、また、型鋼を使用す
る場合、H型鋼以外にも、チャンネル状の型鋼やアング
ル状の型鋼など、各種形状の型鋼を使用することができ
る。
(3) In the above embodiment, the example in which the H-shaped steel is used as the connecting member 20 has been described. However, a solid rod or a hollow cylindrical body can be used. In this case, besides the H-shaped steel, various shapes such as a channel-shaped steel and an angle-shaped steel can be used.

【図面の簡単な説明】[Brief description of the drawings]

【図1】トンネル内側からの連絡孔形成部の正面図FIG. 1 is a front view of a communication hole forming portion from the inside of a tunnel.

【図2】トンネルにおける連絡孔形成部の斜視図FIG. 2 is a perspective view of a communication hole forming part in a tunnel.

【図3】第1セグメントと第2セグメントの端面図FIG. 3 is an end view of a first segment and a second segment.

【図4】開口用セグメントの平面図と断面図FIG. 4 is a plan view and a sectional view of an opening segment.

【図5】開口用セグメントの平面図と断面図FIG. 5 is a plan view and a sectional view of an opening segment.

【図6】開口用セグメントの要部の斜視図FIG. 6 is a perspective view of a main part of the opening segment.

【図7】中間用セグメントの平面図と断面図FIG. 7 is a plan view and a sectional view of an intermediate segment.

【図8】中間用セグメントの平面図と断面図FIG. 8 is a plan view and a cross-sectional view of an intermediate segment.

【図9】キーセグメントの平面図と断面図FIG. 9 is a plan view and a sectional view of a key segment.

【図10】柱用セグメントの平面図と断面図FIG. 10 is a plan view and a sectional view of a column segment.

【図11】従来の連絡孔形成部を示す正面図と側面図FIG. 11 is a front view and a side view showing a conventional communication hole forming portion.

【符号の説明】[Explanation of symbols]

1,2 開口用第1セグメント 3,4 中間用第1セグメント 5,6 開口用第2セグメント 7,8 中間用第2セグメント 18 厚肉部 19 凹入部 19a 凹入部の側壁 20 連結部材としての型鋼 20a 型鋼のフランジ部 H 連絡孔 O 開口部 S セグメント S1 第1セグメント S2 第2セグメント S3 柱用セグメント T トンネル W トンネルの内壁 1, 1st segment for opening 3, 4 1st segment for intermediate 5, 6 2nd segment for opening 7, 8 2nd segment for intermediate 18 Thick portion 19 Recessed portion 19a Side wall of recessed portion 20 Mold steel as connecting member 20a Flange section of section steel H Connection hole O Opening S segment S1 First segment S2 Second segment S3 Column segment T Tunnel W Inner wall of tunnel

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 多数のセグメントを周方向および軸方向
に並べて互いに連結することにより内壁を形成してある
トンネルに連絡孔分岐用の開口部を形成するべく配置さ
れる第1セグメントと、 前記開口部を形成するべく開口部の坑口側と切羽側とに
配置される一対の柱用セグメントと、 その一対の柱用セグメントをトンネルの周方向から挟む
状態で、前記第1セグメントの坑口側と切羽側とに配置
される一対の第2セグメントとを備え、 前記開口部に対するトンネルの周方向において前記開口
部を挟む状態で、一対の凹入部が、前記第1と第2のセ
グメントの内周面にわたって設けられ、 前記一対の凹入部のそれぞれに連結部材が嵌入されて、
その一対の連結部材により前記第1と第2のセグメント
が互いに連結されているトンネルにおける連絡孔形成部
の構造であって、 前記第1セグメントが、トンネルの周方向において前記
開口部を挟む状態で、その開口部に隣接して配置される
一対の開口用第1セグメントと、その一対の開口用第1
セグメントの間に配置される中間用第1セグメントとで
構成され、 前記第2セグメントが、前記柱用セグメントに隣接して
配置される一対の開口用第2セグメントと、その一対の
開口用第2セグメントの間に配置される中間用第2セグ
メントとで構成され、 前記開口用第1セグメントが、前記開口部に隣接した状
態で、前記中間用第1セグメントの肉厚よりも厚い厚肉
部を備え、 前記開口用第2セグメントが、前記柱用セグメントに隣
接した状態で、前記中間用第2セグメントの肉厚よりも
厚い厚肉部を備えていて、 前記開口用第1セグメントの厚肉部の中間と前記開口用
第2セグメントの厚肉部の中間とにわたって、前記凹入
部が設けられているトンネルにおける連絡孔形成部の構
造。
1. A first segment arranged to form an opening for branching a communication hole in a tunnel having an inner wall formed by connecting a number of segments in a circumferential direction and an axial direction to each other, and the opening. A pair of pillar segments arranged on the wellhead side and the face side of the opening to form a portion, and a state in which the pair of pillar segments are sandwiched from the circumferential direction of the tunnel, And a pair of second segments disposed on both sides of the tunnel, with the pair of recessed portions being inner peripheral surfaces of the first and second segments while sandwiching the opening in the circumferential direction of the tunnel with respect to the opening. A connecting member is fitted into each of the pair of concave portions,
A structure of a communication hole forming portion in a tunnel in which the first and second segments are connected to each other by the pair of connecting members, wherein the first segment sandwiches the opening in a circumferential direction of the tunnel. A pair of opening first segments arranged adjacent to the opening, and a pair of opening first segments.
An intermediate first segment arranged between the segments, wherein the second segment is a pair of opening second segments arranged adjacent to the column segment and a pair of opening second segments. A first thickening portion that is thicker than a thickness of the first middle segment in a state where the first opening segment is adjacent to the opening. The opening second segment is provided with a thick portion that is thicker than the intermediate second segment in a state adjacent to the column segment, and the opening first segment has a thick portion. The structure of the communication hole forming part in the tunnel in which the recess is provided in the middle of the middle of the second segment and the middle of the thick part of the second segment for opening.
【請求項2】 前記一対の連結部材が、型鋼により構成
されている請求項1に記載のトンネルにおける連絡孔形
成部の構造。
2. The structure of a communication hole forming part in a tunnel according to claim 1, wherein said pair of connecting members are made of a steel shape.
【請求項3】 前記型鋼が、トンネルの周方向において
互いに対向する前記凹入部の側壁に接当するフランジ部
を備えている請求項2に記載のトンネルにおける連絡孔
形成部の構造。
3. The structure of a communication hole forming part in a tunnel according to claim 2, wherein the steel mold has a flange part which comes into contact with a side wall of the concave part facing each other in a circumferential direction of the tunnel.
JP2000101885A 2000-04-04 2000-04-04 Structure of connecting hole forming part in tunnel Expired - Fee Related JP3801415B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000101885A JP3801415B2 (en) 2000-04-04 2000-04-04 Structure of connecting hole forming part in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000101885A JP3801415B2 (en) 2000-04-04 2000-04-04 Structure of connecting hole forming part in tunnel

Publications (2)

Publication Number Publication Date
JP2001288994A true JP2001288994A (en) 2001-10-19
JP3801415B2 JP3801415B2 (en) 2006-07-26

Family

ID=18615851

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000101885A Expired - Fee Related JP3801415B2 (en) 2000-04-04 2000-04-04 Structure of connecting hole forming part in tunnel

Country Status (1)

Country Link
JP (1) JP3801415B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008156997A (en) * 2006-12-26 2008-07-10 Ohbayashi Corp Segment piece, lining body having this segment piece and tunnel
EP2325436A3 (en) * 2009-11-24 2015-06-10 Ed. Züblin AG Tubing segment next to a transverse gallery designed for non-directional drilling of drilling rods

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008156997A (en) * 2006-12-26 2008-07-10 Ohbayashi Corp Segment piece, lining body having this segment piece and tunnel
EP2325436A3 (en) * 2009-11-24 2015-06-10 Ed. Züblin AG Tubing segment next to a transverse gallery designed for non-directional drilling of drilling rods

Also Published As

Publication number Publication date
JP3801415B2 (en) 2006-07-26

Similar Documents

Publication Publication Date Title
US7572084B2 (en) Precast arch structure with skewed ends
KR100661916B1 (en) Concrete culvert capable of reinforcement shear force and buckling thereof
JP2001288994A (en) Structure of connecting-hole forming section in tunnel
JP4083758B2 (en) segment
JP4121524B2 (en) Steel pipe connection structure
JP2004285823A (en) Floor slab bridge and floor slab unit
JP2000002095A (en) Segment
JPH09268890A (en) Segment for tunnel lining
JP3122245B2 (en) Segment joint structure
JPH07252996A (en) Steel segment
JP4960214B2 (en) Tunnel opening structure
JP3257501B2 (en) Tunnel lining
JP3707976B2 (en) Columnar
JP7275368B2 (en) Composite structure
JP2544851Y2 (en) Composite structural members
JPS5820717Y2 (en) concrete structure
JP2002122000A (en) Structure of tunnel liner and method of fabricating it
JPH0455599A (en) Concrete segment and connecting structure thereof
WO2008088195A1 (en) Coupler for steel reinforcement
JP2001003691A (en) Lining construction of tunnel with rectangular cross section
JP4381567B2 (en) Joint structure of concrete structure
KR100340634B1 (en) A Sound Proof Panel
JP2000204893A (en) Segment
JPH0474520B2 (en)
JP2005113534A (en) Connecting structure of wall surface block body

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040430

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060413

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060425

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees