Prior art keywords
beams
slope
vertical
parallel
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000043399A
Other languages
Japanese (ja)
Other versions
JP4338864B2 (en
Inventor
Fumio Seki
文夫 関
Norihiko Yamazaki
紀彦 山崎
Choichi Soda
暢一 曽田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Taisei Corp
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp, Shimizu Construction Co Ltd, Shimizu Corp filed Critical Taisei Corp
Priority to JP2000043399A priority Critical patent/JP4338864B2/en
Publication of JP2001234544A publication Critical patent/JP2001234544A/en
Application granted granted Critical
Publication of JP4338864B2 publication Critical patent/JP4338864B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To make a simplified impression of a slope surface by visually emphasizing one beam group extending from a high location to a low location of the slope surface, out of intersecting beams forming slope protective works. SOLUTION: The slope protective works are formed like a lattice, constituted of a plurality of longitudinal beams 2 extending from the high location to the low location of the slope surface 1, and arranged in parallel with each other, and a plurality of transverse beams 3 extending in a direction that intersects the longitudinal beams 2, and arranged in parallel with each other, and anchored to the slope surface 1 by anchor members 4. Each longitudinal beam 2 is constituted of a plurality of thin beams 2a arranged in parallel with each other so as to be spaced an interval away from each other, and the thin beams 2a are formed of cast-in-place concrete. On the other hand, each transverse beam 2 is formed of a PCa member and arranged so as to be lower in height than the longitudinal beams 2. Further, each anchor member 4 is arranged at a location between the thin beams 2a and corresponding to an intersection between the longitudinal beam 2 and the transverse beam 3.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、切り通し道路の
側方などに形成されるのり面を保護するのり面保護工に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a slope protection method for protecting a slope formed on a side of a cut-through road.

【0002】[0002]

【従来の技術】従来、この種ののり面保護工は、のり面
に沿って水平方向に形成された横梁と、この横梁と直角
に交叉してのり面に沿って上下方向に形成された縦梁と
からなり、前記縦梁と横梁とは幅及び高さが同等をなし
ていて、全体として格子状をなすものがあった。
2. Description of the Related Art Conventionally, this kind of slope protection work has been carried out by using a horizontal beam formed in a horizontal direction along a slope, and a vertical beam formed in a vertical direction along the slope crossing the horizontal beam at right angles. Some vertical beams and horizontal beams have the same width and height, and have a lattice shape as a whole.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、従来の
のり面保護工は、縦梁と横梁の高さ及び幅が同等であっ
たために、縦方向の線と横方向の線に強弱がなく、格子
状であることが視覚的に強調され、見た目に複雑な印象
を与えるという不具合があった。また、上記のようなの
り面保護工は、のり面に型枠を配置した後にコンクリー
トを場所打ちして形成するか、コンクリートの吹きつけ
により形成することが多いが、コンクリートの場所打ち
の場合には、横梁に生コンクリートを打設するときに、
生コンクリートを横梁の型枠に投入した後、これを型枠
に沿って水平方向に移動させながら均す作業に手間がか
かった。すなわち、横梁は水平方向に延びて配設されて
いるため、投入された生コンクリートを水平方向に移動
させるにはシャベル等の道具を用いて人力により行うし
かなく、そのための多くの手間を要するために作業効率
が思わしくなかった。
However, in the conventional slope protection method, since the height and width of the vertical beam and the horizontal beam are equal, the vertical line and the horizontal line have no strength and the grid is There is a problem that the shape is visually emphasized and gives a complicated impression to the eye. In addition, slope protection works as described above are often formed by placing concrete in place after placing the formwork on the slope, or by spraying concrete, but in the case of cast-in-place concrete, When pouring ready-mixed concrete on the cross beam,
After putting the ready-mixed concrete into the horizontal beam formwork, it took time and effort to level it while moving it horizontally along the formwork. In other words, since the cross beams extend in the horizontal direction, the only way to move the input ready-mixed concrete in the horizontal direction is to perform it manually using tools such as a shovel, which requires much labor. The work efficiency was not good.

【0004】この発明は、かかる従来技術の不具合を解
消するためになされたものであり、その目的は、交差す
る両梁のうちのり面の上下方向に延びる一方の梁を視覚
的に強調することにより、のり面にすっきりさせた印象
を与えることにあり、またその目的は、場所打ちのコン
クリートを用いる場合には生コンクリートの打設を容易
にして構築作業の効率を向上させることにある。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned disadvantages of the prior art, and has as its object to visually emphasize one of two intersecting beams extending in a vertical direction of a slope. The purpose of the present invention is to give a clean impression to the slope, and to improve the efficiency of construction work by facilitating the placement of ready-mixed concrete when cast-in-place concrete is used.

【0005】[0005]

【課題を解決するための手段】前記の目的のために、請
求項1に記載ののり面の保護工は、のり面の上下方向に
向けられて相互に平行に配された複数の縦梁と、該縦梁
と交差する方向に向けられて相互に平行に配された複数
の横梁とで格子状に形成され、定着部材で前記のり面に
定着されるのり面保護工であって、前記縦梁を、間隙を
隔てて平行に配される複数の細梁により構成するととも
に、前記横梁を、予め成形された部材を設置することに
より前記縦梁よりも低く形成している。
For this purpose, a slope protection device according to claim 1 comprises a plurality of vertical beams which are arranged in parallel with each other and are oriented in the vertical direction of the slope. A slope protecting means formed in a lattice shape by a plurality of horizontal beams arranged in parallel with each other in a direction intersecting with the vertical beam, and fixed to the slope by a fixing member, The beam is constituted by a plurality of narrow beams arranged in parallel with a gap therebetween, and the horizontal beam is formed lower than the vertical beam by installing a member formed in advance.

【0006】こののり面保護工は横梁が水平に延び且つ
縦梁が横梁に十字状に直交して、垂直及び水平の梁から
なる格子状をなすものを典型的な例として想定している
が、縦梁は、前記のようにのり面に正対したときにのり
面に沿って垂直方向に延びる形態を含め、一端がのり面
の上位にあり且つ他端がのり面の下位にあれば、右下が
り又は左下がりに傾斜している形態も含むものとする。
また縦梁を構成する複数の細梁は長手方向の少なくとも
一部において底部で相互に結合されているものとしても
よい。
[0006] In this slope protection work, it is typically assumed that the cross beam extends horizontally and the vertical beam crosses the cross beam at right angles to the cross beam to form a lattice shape composed of vertical and horizontal beams. The vertical beam, including the form extending vertically along the slope when facing the slope as described above, if one end is above the slope and the other end is below the slope, This also includes a form that is inclined downward or to the left.
Further, the plurality of narrow beams constituting the vertical beam may be connected to each other at the bottom at least in a part of the longitudinal direction.

【0007】横梁を構成する予め形成された部材として
は、プレキャストコンクリート部材又は鋼材が用いられ
る。鋼材としては形鋼が好適である。縦梁を場所打ちの
コンクリートで形成する場合には、のり面に横梁用の前
記部材を配置し且つ縦梁用の型枠を配置した後に、型枠
内に生コンクリートを打設することにより、縦梁と横梁
とを接合するものとする。縦梁に場所打ちコンクリート
を使用しない場合には、主筋及びこれに巻き付けた金網
に対してコンクリートを吹きつけて縦梁を構成する。
As the preformed member constituting the cross beam, a precast concrete member or a steel material is used. Shaped steel is preferred as the steel material. When the vertical beam is formed of cast-in-place concrete, after arranging the member for the horizontal beam on the slope and arranging the formwork for the vertical beam, by pouring ready-mixed concrete into the formwork, The vertical and horizontal beams are to be joined. When cast-in-place concrete is not used for the vertical beam, the vertical beam is formed by spraying concrete on the main reinforcement and the wire mesh wound around the main reinforcement.

【0008】定着部材としては、地盤内に埋設したアン
カーと縦梁とを連結することにより縦梁をのり面に定着
できる構造のものであれば、慣用されている各種のもの
を採用することができる。かくして形成されるのり面保
護工は、縦梁を場所打ちコンクリートにより構成した場
合は、型枠内の上部に生コンクリートを投入することに
より、重力と生コンクリートの流動性を利用して型枠内
を下部に至るまで生コンクリートを移動させることがで
きる。このため、シャベル等の道具を用いて生コンクリ
ートを型枠内で均す作業に大きな力を必要としないし、
また横梁には生コンクリートを使用しないから、のり面
保護工の構築作業を効率化できる。
As the fixing member, various types of commonly used members can be employed as long as the structure can fix the vertical beam to the slope by connecting the anchor buried in the ground and the vertical beam. it can. When the vertical beam is made of cast-in-place concrete, the slope protection work thus formed uses the gravity and the fluidity of the ready-mixed concrete by pouring ready-mixed concrete into the upper part of the formwork. The fresh concrete can be moved down to the bottom. For this reason, a large force is not required for the work of leveling the ready-mixed concrete in the formwork using tools such as a shovel,
In addition, since ready-mixed concrete is not used for the cross beams, the construction work of the slope protection work can be made more efficient.

【0009】また縦梁は複数の細梁からなるため、縦梁
に沿って複数の陰影が形成されて、縦梁の存在が視覚的
に強調される一方、横梁は縦梁よりも低く形成されてい
るために、横梁の視覚的な印象は低くなる。このため、
のり面保護工は縦の線が強調されるために見た目にもす
っきりした印象を与えることになる。特に、縦梁と横梁
とに囲まれたのり面に草本類及び木本類が繁ることにな
ると、高さの低い横梁が草類に隠れることになるから、
縦梁のみが見えることになって、前記のすっきりした印
象は強化される。
Further, since the vertical beam is composed of a plurality of narrow beams, a plurality of shadows are formed along the vertical beam to visually emphasize the existence of the vertical beam, while the horizontal beam is formed lower than the vertical beam. Therefore, the visual impression of the cross beam is low. For this reason,
The slope protector gives the appearance a clean impression because the vertical lines are emphasized. In particular, when grasses and woody plants grow on the slope surrounded by vertical beams and horizontal beams, low horizontal beams will be hidden by grass.
Since only the vertical beams are visible, the above-mentioned clean impression is enhanced.

【0010】請求項2に記載ののり面の保護工は、請求
項1における縦梁と横梁の交点で前記両細梁の間に定着
部材を配置したものである。これによれば、請求項1の
前記作用に加えて、定着部材の頭部が両細梁の間にある
ため、これが目立たないから見た目に煩雑な印象を与え
ることがない。請求項3に記載ののり面の保護工は、請
求項1に記載のものと、産業上の利用分野及び解決しよ
うとする課題を同一にするものである。すなわち、のり
面に沿って一端が上方を向き他端が下方を向いた斜め方
向に延び且つ相互に平行に配された複数の大梁と、この
大梁と交差してこの大梁と逆の斜め方向に向けられての
り面に沿って相互に平行に配された複数の小梁とで斜め
格子状に形成されるのり面保護工であって、前記小梁を
前記大梁よりも低くしたものである。
According to a second aspect of the present invention, a fixing member is disposed between the narrow beams at the intersection of the vertical beam and the horizontal beam. According to this, in addition to the above-described operation of the first aspect, since the head of the fixing member is located between the two narrow beams, the fixing member is not conspicuous and does not give a complicated impression to the user. The slope protection work described in claim 3 is the same as the one described in claim 1 in terms of the industrial application field and the problem to be solved. That is, a plurality of girders extending in an oblique direction with one end facing upward and the other end facing downward along the slope, and in a diagonal direction opposite to the girders, intersecting with the girders. A slope protection work formed in a diagonal lattice shape with a plurality of small beams arranged in parallel with each other along the directed slope surface, wherein the small beams are lower than the large beams.

【0011】こののり面保護工は、いずれも斜め方向で
あって相互に反対方向に延びてX状に交差する大梁と小
梁からなり、両梁により菱形の枠が形成されるものを典
型的な例として想定している。そして、大梁及び小梁が
いずれも一端が上方で下端が下方を向いた斜め方向に延
びているため、少なくとも大梁を場所打ちコンクリート
で形成した場合は、請求項1きの前記説明におけるもの
と同様に、重力と生コンクリートの流動性を利用して型
枠内を下部に至るまで生コンクリートを移動させること
ができるため、シャベル等の道具を用いて生コンクリー
トを型枠内で均す作業を効率化できる。小梁に場所打ち
のコンクリートを用いた場合にも同様である。
[0011] This slope protection work is typically composed of a large beam and a small beam that are oblique and extend in mutually opposite directions and intersect in an X-shape, and a rhombic frame is formed by both beams. It is assumed as a simple example. Since both the girder and the girder extend in an oblique direction with one end being upward and the lower end being directed downward, at least when the girder is formed of cast-in-place concrete, the same as in the above description of claim 1 In addition, using the gravity and the fluidity of the ready-mixed concrete, the ready-mixed concrete can be moved to the bottom of the formwork to the bottom, making it easier to level the ready-mixed concrete inside the formwork using tools such as shovels. Can be The same applies to the case where cast-in-place concrete is used for the small beams.

【0012】また、大梁とこれより低い小梁との組み合
わせとしたため、大梁による大きく強調された陰影と小
梁による小さい陰影とが形成されて、規律ある陰影をの
り面に形成することができるから、見た目にもすっきり
した印象を与えることになる。この発明においても、請
求項1と同じく、のり面に草本類及び木本類が繁ること
になると、高さの低い小梁が草類に隠れることになるか
ら、大梁のみが見えることになって、前記のすっきりし
た印象は強化される。
[0012] Further, since the combination of the girder and the lower girder is used, a greatly emphasized shading by the girder and a small shading by the girder are formed, so that a regular shading can be formed on the slope. It will give a clean impression to the appearance. Also in this invention, as in the case of claim 1, when grasses and woody plants grow on the slope, small beams having a low height are hidden by grasses, so that only large beams can be seen. The refreshed impression is enhanced.

【0013】請求項4に記載されたのり面保護工は、請
求項3において、前記大梁と小梁とが交差する部位の上
側で当該部位の間近な位置に定着部材を配置したもので
ある。定着部材としては、請求項1において用いるもの
と同様に慣用のものを用いるものとする。この発明では
定着部材をX状に交差する両梁の上側間近な前記位置に
配置するから、定着部材の頭部が両梁の影になって目立
たないことになり、のり面の前記すっきりした印象を保
つことができる。
According to a fourth aspect of the present invention, in the third aspect, the fixing member is disposed at a position above and close to a portion where the large beam and the small beam intersect. As the fixing member, a commonly used fixing member is used as in the first embodiment. In the present invention, since the fixing member is arranged at the position close to the upper side of both beams intersecting in an X shape, the head of the fixing member becomes inconspicuous as a shadow of the both beams, and the clean impression of the slope surface is reduced. Can be kept.

【0014】請求項5に記載されたのり面保護工は、請
求項3の前記のり面を切り通し道路の側方に形成し、前
記大梁を、その下端位置がその上端位置よりも前記道路
における車両の進行方向前方となる方向に斜めに配置し
たものである。前記の進行方向とは、上りの車線と下り
の車線が形成される対面通行の切り通し道路であるとき
には、近いほうの車線における車両の進行方向とする。
また、切り通し道路は典型的には道路の左右両方にのり
面が形成されるが、道路に片側にのみのり面が形成され
る場合も含むものとする。
According to a fifth aspect of the present invention, there is provided a slope protection device which cuts through the slope of the third aspect and is formed on a side of a road, and the large beam is provided at a lower end position of the vehicle on the road than at an upper end position thereof. Are arranged diagonally in the forward direction of the traveling direction. The traveling direction is a traveling direction of a vehicle in a nearer lane when the road is a two-way road where an up lane and a down lane are formed.
In addition, the cut-through road is typically formed with a slope on both the left and right sides of the road, but also includes a case where the road has a slope on only one side.

【0015】この請求項の発明によれば、視覚的に強調
される大梁が、走行する車両から見て、手前上方から前
方下方に延びているため、大梁の見かけの角度をのり面
の傾斜角度と錯覚して、実際ののり面よりも見かけのう
えではのり面の傾斜角度を緩く印象づけられる。したが
って、車両の乗員が側方ののり面から受ける圧迫感が減
少して開放感が増加することになる。
According to the present invention, since the girder which is visually emphasized extends from the upper front to the lower front as viewed from the traveling vehicle, the apparent angle of the girder is changed to the inclination angle of the slope. This gives the illusion that the slope angle of the slope is smaller than the actual slope. Therefore, the feeling of pressure received by the occupant of the vehicle from the side surface is reduced, and the feeling of opening is increased.

【0016】[0016]

【本発明の実施の形態】図1は、この発明の第1の実施
形態を示す斜視図である。のり面1は切り通しの側面を
なすものや土盛りの斜面など各種のものに適用できる。
かかるのり面1には縦梁2が相互に平行且つ所定間隔で
多数設けられるとともに、横梁3も相互に平行且つ所定
間隔で多数設けられる。
FIG. 1 is a perspective view showing a first embodiment of the present invention. The slope 1 can be applied to various things such as a cut side surface and a slope of an embankment.
A large number of longitudinal beams 2 are provided on the slope 1 at a predetermined interval, and a large number of horizontal beams 3 are provided at a predetermined interval.

【0017】横梁3は、2本の平行な小梁3aからな
り、両小梁3aはプレキャストコンクリート部材から構
成されてのり面1に設置されるもので、いずれものり面
1において水平方向に延びている。3本又は4本の小梁
3aから1本の横梁3を形成してもよいし、1本の小梁
により1本の横梁3を形成してもよい。縦梁2は、2本
の平行な細梁2aを所定の間隔をおいて平行に配置して
構成されるが、3本又は4本の細梁2aによって1本の
縦梁2を形成してもよい。両細梁2aは横梁3に直交さ
せてのり面1に配置され、よってこの実施形態では縦梁
2と横梁3とに囲まれた方形の多数の枠が形成される。
The cross beam 3 is composed of two parallel small beams 3a, and both small beams 3a are made of precast concrete members and are installed on the slope 1 and extend horizontally in any one of the slopes 1. ing. One transverse beam 3 may be formed from three or four small beams 3a, or one transverse beam 3 may be formed by one small beam. The vertical beam 2 is configured by arranging two parallel narrow beams 2a in parallel at a predetermined interval, but one vertical beam 2 is formed by three or four narrow beams 2a. Is also good. The two narrow beams 2a are arranged on the slope 1 perpendicular to the horizontal beams 3, so that in this embodiment, a large number of rectangular frames surrounded by the vertical beams 2 and the horizontal beams 3 are formed.

【0018】細梁2aはいずれも場所打ちのコンクリー
トからなり、横梁3との交差部において縦梁2と横梁3
とが一体に結合していて、この交差部に定着部材4が施
され、これによって縦梁2及び横梁3をのり面1に固定
している。定着部材4の頭部(アンカーキャップ)の高
さは縦梁2の上端と大体において同一レベルか、縦梁2
より僅かに高い程度となっている。
Each of the narrow beams 2a is made of cast-in-place concrete, and at the intersection with the horizontal beam 3, the vertical beam 2 and the horizontal beam 3 are formed.
Are fixedly joined to each other, and a fixing member 4 is provided at the intersection, thereby fixing the vertical beam 2 and the horizontal beam 3 to the slope 1. The height of the head (anchor cap) of the fixing member 4 is substantially the same as the upper end of the vertical beam 2
It is slightly higher.

【0019】のり面1には厚層基材用のラス網5が敷設
され、その上に縦梁2の細梁2a用の型枠がのり面1に
沿って上下方向に長く配置されるとともに、プレキャス
トコンクリート部材又は鋼材からなる横梁3が配置され
る。前記型枠内には細梁2aのための主筋6と、これを
取り巻く帯筋7とが配筋され、当該型枠内に生コンクリ
ートが打設される。
A lath net 5 for a thick layer base material is laid on the slope 1, and a formwork for the narrow beam 2 a of the vertical beam 2 is vertically arranged along the slope 1 on the lath net 5 for the thick layer base material. A cross beam 3 made of a precast concrete member or a steel material is arranged. A main bar 6 for the thin beam 2a and a band bar 7 surrounding the main bar 6 are arranged in the form, and ready-mixed concrete is poured into the form.

【0020】生コンクリートを型枠の上部に投入すれ
ば、型枠は上下方向に連続しているため、重力と生コン
クリートの流動性を利用して型枠内を下部に至るまで生
コンクリートを移動させることができる。このため、シ
ャベル等の道具を用いて生コンクリートを型枠内で均す
作業に大きな力を必要とすることなく、コンクリートの
打設をすることができる。
When the ready-mixed concrete is put into the upper part of the form, the form is continuous in the vertical direction, so that the ready-mixed concrete moves to the lower part in the form using gravity and the fluidity of the ready-mixed concrete. Can be done. For this reason, concrete can be poured without using a tool such as a shovel to level the ready-mixed concrete in the formwork, requiring a large force.

【0021】かかるコンクリートの硬化によって細梁2
aの生成と、これと横梁3との接合を行うことができ
る。また、同時に縦梁2の一部をなす定着部材4の座板
4aも前記コンクリートによって同時に形成することが
できる。前記コンクリートの硬化後に、縦梁2と横梁3
に囲まれたのり面1には前記ラス網5上に覆土8を施
し、必要に応じてここに植物を植えつける。前記覆土8
には肥料と草類の種を混入しておけば、後日、のり面1
上に草類が成長することになる。なお、覆土8には草本
類や木本類の種を混入しておく他、これに苗木を植えつ
けてもよいことは勿論である。
The hardening of the concrete causes the thin beams 2
The generation of “a” and the joining of the “a” with the cross beam 3 can be performed. At the same time, the seat plate 4a of the fixing member 4 forming a part of the vertical beam 2 can be formed simultaneously with the concrete. After the concrete has hardened, the vertical beam 2 and the horizontal beam 3
A covering 8 is applied to the lath net 5 on the slope 1 surrounded by the above, and a plant is planted here if necessary. The earth covering 8
If fertilizer and grass seeds are mixed in, the slope 1
Grass will grow on it. It is needless to say that seedlings may be planted in the cover soil 8 in addition to seeds of herbs and trees.

【0022】かかる縦梁2は2本の細梁2aからなるた
め、縦梁2に沿って複数の影が形成されて、縦梁2の存
在が視覚的に強調されるとともに、1本の縦梁2の強度
を大にできるから、これに対応して縦梁2の数を減少さ
せて各縦梁2の間隔を広げることができる。一方、横梁
3は縦梁2よりも低く形成されているために、横梁3の
視覚的な印象は低くなる。このため、この実施形態で
は、のり面1の煩雑な感じが低減されて縦の線が強調さ
れるために見た目にもすっきりした印象を与えることに
なる。
Since the vertical beam 2 is composed of two narrow beams 2a, a plurality of shadows are formed along the vertical beam 2 to visually enhance the existence of the vertical beam 2 and to form one vertical beam. Since the strength of the beams 2 can be increased, the number of the vertical beams 2 can be correspondingly reduced and the interval between the vertical beams 2 can be increased. On the other hand, since the cross beam 3 is formed lower than the vertical beam 2, the visual impression of the cross beam 3 is low. For this reason, in this embodiment, since the complicated feeling of the slope 1 is reduced and the vertical lines are emphasized, a clear impression is given to the appearance.

【0023】特に、縦梁2と横梁3とに囲まれたのり面
1に草類が繁ることになると、高さの低い横梁3が草類
に隠れることになるから、縦梁2のみが見えることにな
って、前記のすっきりした印象はさらに強化される。な
お、この第1の実施形態では、各細梁2aを場所打ちコ
ンクリートにより構成したが、主筋7に金網を巻き付
け、その外側から吹きつけコンクリートを施すことによ
って各細梁2aを形成することもできる。
In particular, when grass grows on the slope 1 surrounded by the vertical beam 2 and the horizontal beam 3, the low horizontal beam 3 is hidden by the grass, so that only the vertical beam 2 is visible. As a result, the clean impression is further enhanced. In the first embodiment, each narrow beam 2a is formed of cast-in-place concrete. However, each narrow beam 2a can be formed by winding a wire mesh around the main reinforcing bar 7 and spraying concrete from outside. .

【0024】図2,図3は、この発明の第2の実施形態
を示す図である。この実施形態は、のり面1に沿って斜
め方向に延び且つ相互に平行な大梁12と、これに交差
して大梁12とともにX字状をなし且つ大梁12よりも
高さ及び幅が小さい小梁13とで斜め格子状に形成され
る。大梁12は、一端が上方を向き他端が下方を向いた
斜め方向に延びており、小梁13は、大梁12と交差し
てこの大梁12と逆の斜め方向に向けられてのり面1に
沿って相互に平行に配されている。ここでは、大梁12
と小梁13は前記第1実施形態の縦梁2をなす細梁2a
と同様に場所打ちのコンクリートからなるが、これらは
主筋及びこれに巻き付けた金網を補強筋とした吹きつけ
コンクリートにより構成してもよい。また、小梁13は
前記第1実施形態の横梁3を形成する小梁3aと同様に
プレキャストコンクリート部材又は鋼材から構成するこ
ともできる。
FIGS. 2 and 3 show a second embodiment of the present invention. In this embodiment, a girder 12 extending obliquely along the slope 1 and parallel to each other, and a small girder intersecting with the girder 12 and forming an X shape with the girder 12 and having a smaller height and width than the girder 12 13 and 13 form an oblique lattice. The girder 12 extends in an oblique direction with one end facing upward and the other end facing downward, and the small girder 13 intersects the girder 12 and is directed in an oblique direction opposite to the girder 12 on the slope 1. Along with each other. Here, the girder 12
And the small beam 13 are narrow beams 2a forming the vertical beam 2 of the first embodiment.
As in the case of the above, cast-in-place concrete is used, but these may be formed by sprayed concrete having a main reinforcing bar and a wire mesh wound around the main reinforcing bar. Further, the small beam 13 can be made of a precast concrete member or a steel material similarly to the small beam 3a forming the cross beam 3 of the first embodiment.

【0025】大梁12と小梁13を場所打ちコンクリー
トにより形成する場合は、第1実施形態の縦梁2と同様
に、のり面1上に敷設したラス網5の上面に型枠を配置
するとともに、その内部に図示しない主筋と帯筋7を配
筋したうえ、前記型枠内に生コンクリートを投入する。
ここでは、大梁12,小梁13の各型枠はのり面1に沿
って上下方向に長いため、第1実施形態と同様に生コン
クリートの打設作業の効率はよいし、大梁12と小梁1
3を一体に結合した状態で形成することができるのは勿
論である。
When the large beam 12 and the small beam 13 are formed by cast-in-place concrete, similarly to the vertical beam 2 of the first embodiment, a formwork is arranged on the upper surface of the lath net 5 laid on the slope 1 and After arranging a main bar and a band bar (not shown) therein, ready-mixed concrete is put into the formwork.
Here, since the formwork of the girder 12 and the girder 13 is long in the vertical direction along the slope 1, the efficiency of the work of placing the ready-mixed concrete is good as in the first embodiment. 1
3 can be formed in a state of being integrally connected.

【0026】また小梁13をプレキャストコンクリート
部材で形成する場合には、大梁12の型枠を形成すると
きに、当該プレキャストコンクリート部材を小梁13の
位置に配置しておき、その後に大梁12の前記生コンク
リートを打設すれば、大梁12と小梁13とは一体に結
合される。小梁13を場所打ちのコンクリートで形成す
る場合も同様であるが、大梁12と小梁13との交点に
間近な上側ののり面1に定着部材4の座板4aを同時に
生コンクリートで形成することもできる。こうすれば、
定着部材4の頭部(キャップ)が両梁12,13の陰に
あって目立ちにくいから、視覚的に煩雑さが減少する。
When the beam 13 is formed of a precast concrete member, the precast concrete member is placed at the position of the beam 13 when forming the formwork of the beam 12, and then the beam 12 is formed. When the ready-mixed concrete is cast, the large beams 12 and the small beams 13 are integrally connected. The same applies to the case where the small beam 13 is formed of cast-in-place concrete. However, the seat plate 4a of the fixing member 4 is simultaneously formed of fresh concrete on the upper slope 1 near the intersection of the large beam 12 and the small beam 13. You can also. This way,
Since the head (cap) of the fixing member 4 is inconspicuous behind the beams 12 and 13, the visual complexity is reduced.

【0027】前記大梁12と小梁13に囲まれた菱形の
部分はラス網5上に覆土8が施され、これに草本類や木
本類が生成される点は前記第1の実施形態と同様であ
る。この実施形態によれば、大梁12とこれより低い小
梁13との組み合わせとしたため、大梁12による大き
い陰影と小梁13による小さい陰影とが形成されて、規
律ある陰影をのり面に形成することができるから、見た
目にもすっきりした印象を与えることになる。また、第
1の実施形態と同じく、のり面1に草類が繁ることにな
ると、高さの低い小梁13が草類に隠れることになるか
ら、大梁12のみが見えることになって、前記のすっき
りした印象は強化される。
The diamond-shaped portion surrounded by the girder 12 and the girder 13 is covered with earth 8 on the lath net 5, and herbs and trees are generated. The same is true. According to this embodiment, since the combination of the girder 12 and the smaller girder 13 is used, a large shading by the girder 12 and a small shading by the girder 13 are formed, and a regular shading is formed on the slope. Can give a clean impression to the appearance. Further, similarly to the first embodiment, when the grass grows on the slope 1, the small beam 13 having a low height is hidden by the grass, so that only the large beam 12 can be seen. The refreshing impression is enhanced.

【0028】さらに、この実施形態では、前記のり面1
を切り通し道路14の側方に形成するとともに、前記大
梁12を、その下端位置がその上端位置よりも前記道路
14における車両の進行方向(矢印A)に前方となる方
向に斜めにしてある。これにより、のり面1の実際の傾
斜角度θ1に比較して、車両の乗員から見るのり面1の
見かけの角度θ2が小さく見える。すなわち、視覚的に
強調される大梁12が、走行する車両から見て、手前上
方から前方下方に延びているため、大梁12の見かけの
角度θ2をのり面1の傾斜角度θ1と錯覚して、実際の
のり面1よりも見かけのうえではのり面1の傾斜角度を
緩く印象づけられる。したがって、車両の乗員が側方の
のり面1から受ける圧迫感が減少して開放感が増加する
ことになる。特に道路14が高速道路の場合には、車両
が高速で走行するために、動体視力により側方の視力が
大になって前記錯覚が顕著になりやすいから、前記傾斜
角度を緩く印象づける効果は大である。
Further, in this embodiment, the slope 1
Is formed on the side of the road 14, and the girder 12 is inclined so that its lower end position is forward of the upper end position in the traveling direction of the vehicle on the road 14 (arrow A). As a result, the apparent angle θ2 of the slope 1 seen from the occupant of the vehicle is smaller than the actual inclination angle θ1 of the slope 1. That is, since the girder 12 that is visually emphasized extends from the upper front to the lower front as viewed from the traveling vehicle, the apparent angle θ2 of the girder 12 is illusioned with the inclination angle θ1 of the slope 1, The inclination angle of the slope 1 can be impressed more loosely than the actual slope 1. Therefore, the feeling of pressure received by the occupant of the vehicle from the side surface 1 decreases, and the feeling of opening increases. In particular, when the road 14 is an expressway, since the vehicle runs at a high speed, the visual acuity on the side is increased by the dynamic visual acuity, and the illusion is likely to be remarkable. Therefore, the effect of loosely impressing the inclination angle is large. It is.

【0029】なお、図2は道路14に近いのり面1のみ
を表しているが、のり面1はさらに上方に連続するもの
とし、したがって大梁12と小梁13とで形成される菱
形の枠は上方にさらに連続していることは勿論である。
Although FIG. 2 shows only the slope 1 near the road 14, the slope 1 is assumed to continue further upward. Therefore, the diamond-shaped frame formed by the large beam 12 and the small beam 13 is Of course, it is further continued upward.

【0030】[0030]

【発明の効果】以上説明したように、請求項1の発明に
よれば、縦梁は複数の細梁からなるため、縦梁に沿って
複数の影が形成されて、縦梁の存在が視覚的に強調され
る一方、横梁は縦梁よりも低く形成されているために、
横梁の視覚的な印象は低くなるから、のり面保護工は縦
の線が強調されるために見た目にもすっきりした印象を
与えることになる。特に、縦梁と横梁とに囲まれたのり
面に草類が繁ることになると、高さの低い横梁が草類に
隠れることになるから、縦梁のみが見えることになって
前記のすっきりした印象は強化される効果がある。
As described above, according to the first aspect of the present invention, since the longitudinal beam is composed of a plurality of narrow beams, a plurality of shadows are formed along the longitudinal beam, and the existence of the longitudinal beam is visually recognized. While the horizontal beam is formed lower than the vertical beam,
Since the visual impression of the cross beams will be lower, the slope protection will also give the appearance a cleaner impression because the vertical lines are emphasized. Particularly, when grass grows on the slope surrounded by the vertical beam and the horizontal beam, the low horizontal beam will be hidden by the grass, so that only the vertical beam can be seen and the above refreshing The impression has the effect of being strengthened.

【0031】また、縦梁を場所打ちのコンクリートによ
り構成する場合は、重力と生コンクリートの流動性を利
用して型枠内を下部に至るまで生コンクリートを移動さ
せることができるから、シャベル等の道具を用いて生コ
ンクリートを型枠内で均す作業に大きな力を必要とする
ことなく、のり面保護工の構築作業を効率化できる効果
がある。
When the vertical beam is made of cast-in-place concrete, the ready-mixed concrete can be moved to the lower part in the formwork by utilizing gravity and the fluidity of the ready-mixed concrete. There is an effect that the construction work of the slope protection work can be made more efficient without requiring a large force for the work of leveling the ready-mixed concrete in the formwork using the tool.

【0032】また、請求項2の発明によれば、請求項1
の前記効果に加えて、定着部材の頭部が両細梁の間にあ
るため、これが目立たないから見た目に煩雑な印象を与
えることがないという効果がある。また、請求項3の発
明によれば、大梁とこれより低い小梁との組み合わせと
したため、大梁による大きい陰影と小梁による小さい陰
影とが形成されて、規律ある陰影をのり面に形成するこ
とができるから、見た目にもすっきりした印象を与える
ことになる。さらに、請求項1と同じく、のり面に草類
が繁ることになると、高さの低い小梁が草類に隠れるこ
とになるから、大梁のみが見えることになって、前記の
すっきりした印象は強化される効果がある。
Further, according to the invention of claim 2, according to claim 1
In addition to the above-mentioned effects, since the head of the fixing member is located between the narrow beams, the fixing member is inconspicuous and does not give a complicated impression to the eyes. According to the third aspect of the present invention, since a large beam and a smaller beam are used in combination, a large shadow due to the large beam and a small shadow due to the small beam are formed, and a regular shadow is formed on the slope. Can give a clean impression to the appearance. Furthermore, as in the case of claim 1, when grass grows on the slope, the small beams having a low height are hidden by the grass, so that only the large beams can be seen, and the clean impression is Has the effect of being strengthened.

【0033】また、大梁及び小梁がいずれも一端が上方
で下端が下方を向いた斜め方向に延びているため、少な
くとも大梁の型枠内の上部に生コンクリートを投入する
工法とすれば、請求項1における縦梁と同様に、重力と
生コンクリートの流動性を利用して型枠内を下部に至る
まで生コンクリートを移動させることができるため、同
様に構築作業を効率化できる。
Further, since both the large beam and the small beam extend in an oblique direction with one end thereof being upward at one end and the lower end thereof being directed downward, a method of pouring ready-mixed concrete at least into the upper part of the formwork of the large beam is required. As in the case of the vertical beams in the item 1, the ready-mixed concrete can be moved to the lower part in the formwork by utilizing gravity and the fluidity of the ready-mixed concrete, so that the construction work can be efficiently performed.

【0034】また、請求項4の発明によれば、請求項3
の前記効果に加えて、定着部材をX状に交差する両梁の
上側間近な前記位置に配置するから、定着部材の頭部が
両梁の影になって目立たないことになり、のり面の前記
すっきりした印象を十分に保つことができる効果があ
る。さらに、請求項5の発明によれば、請求項3の前記
効果に加えて、視覚的に強調される大梁が、走行する車
両から見て手前上方から前方下方に延びているため、大
梁の見かけの角度をのり面の傾斜角度と錯覚して、実際
ののり面よりも見かけのうえではのり面の傾斜角度を緩
く印象づけられる。したがって、車両の乗員が側方のの
り面から受ける圧迫感が減少して開放感が増加すること
になる効果がある。
Further, according to the invention of claim 4, according to claim 3,
In addition to the above-described effect, since the fixing member is arranged at the position close to the upper side of both beams crossing in an X shape, the head of the fixing member is inconspicuous as a shadow of both beams, and the There is an effect that the refreshing impression can be sufficiently maintained. According to the fifth aspect of the present invention, in addition to the effect of the third aspect, the girder which is visually emphasized extends from the upper front to the lower front as viewed from the traveling vehicle, so that the girder looks like a girder. Is illusioned with the slope angle of the slope, so that the slope angle of the slope can be impressed more loosely than the actual slope. Therefore, there is an effect that the feeling of pressure received by the occupant of the vehicle from the side surface is reduced and the feeling of opening is increased.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明の第1の実施形態を示す、一部を切欠
した斜視図である。
FIG. 1 is a partially cutaway perspective view showing a first embodiment of the present invention.

【図2】この発明の第2の実施形態を示す、一部を切欠
した斜視図である。
FIG. 2 is a partially cutaway perspective view showing a second embodiment of the present invention.

【図3】第2の実施形態の大梁と小梁の正面図である。FIG. 3 is a front view of a girder and a girder of the second embodiment.

【符号の説明】[Explanation of symbols]

1 のり面 2 縦梁 2a 細梁 3 横梁 3a 小梁 4 定着部材 5 ラス網 12 大梁 13 小梁 14 道路 A 進行方向 DESCRIPTION OF SYMBOLS 1 Slope 2 Vertical beam 2a Narrow beam 3 Horizontal beam 3a Small beam 4 Fixing member 5 Lath net 12 Large beam 13 Small beam 14 Road A Traveling direction

───────────────────────────────────────────────────── フロントページの続き (72)発明者 山崎 紀彦 東京都新宿区西新宿一丁目25番1号 大成 建設株式会社内 (72)発明者 曽田 暢一 東京都新宿区西新宿一丁目25番1号 大成 建設株式会社内 Fターム(参考) 2D044 DA25 DA33 DB22 DC04 DC12 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Norihiko Yamazaki 1-25-1, Nishishinjuku, Shinjuku-ku, Tokyo Inside Taisei Construction Co., Ltd. (72) Inventor Junichi Soda 1-25-1, Nishishinjuku, Shinjuku-ku, Tokyo No. Taisei Corporation F term (reference) 2D044 DA25 DA33 DB22 DC04 DC12

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 のり面の上下方向に向けられて相互に平
行に配された複数の縦梁と、該縦梁と交差する方向に向
けられて相互に平行に配された複数の横梁とで格子状に
形成され、定着部材で前記のり面に定着されるのり面保
護工であって、前記縦梁を、間隙を隔てて平行に配され
る複数の細梁により構成するとともに、前記横梁を、予
め成形された部材を設置することにより前記縦梁よりも
低く形成したことを特徴とするのり面保護工。
1. A plurality of vertical beams which are arranged in parallel with each other in the vertical direction of the slope and a plurality of horizontal beams which are arranged in parallel with each other in a direction intersecting with the vertical beams. A slope protection work formed in a lattice shape and fixed to the slope by a fixing member, wherein the vertical beam is constituted by a plurality of thin beams arranged in parallel with a gap therebetween, and the horizontal beam is formed. A slope protection work characterized in that the member is formed lower than the vertical beam by installing a member formed in advance.
【請求項2】 前記縦梁と横梁の交点で前記両細梁の間
に定着部材を配置したことを特徴とする請求項1に記載
ののり面保護工。
2. The slope protection device according to claim 1, wherein a fixing member is disposed between the narrow beams at an intersection of the vertical beams and the horizontal beams.
【請求項3】 のり面に沿って一端が上方を向き他端が
下方を向いた斜め方向に延び且つ相互に平行に配された
複数の大梁と、この大梁と交差してこの大梁と逆の斜め
方向に向けられてのり面に沿って相互に平行に配された
複数の小梁とで斜め格子状に形成されるのり面保護工で
あって、前記小梁を前記大梁よりも低く形成したことを
特徴とするのり面保護工。
3. A plurality of girders extending in an oblique direction along the slope with one end pointing upward and the other end pointing downward, and arranged in parallel with each other; A slope protection work formed in a diagonal lattice with a plurality of small beams arranged in parallel with each other along the slope in an oblique direction, wherein the small beams are formed lower than the large beams. Slope protection work characterized by the following.
【請求項4】 前記大梁と小梁とが交差する部位の上側
で当該部位の間近な位置に定着部材を配置したことを特
徴とする請求項3に記載ののり面保護工。
4. The slope protection work according to claim 3, wherein a fixing member is disposed at a position above and close to a portion where the large beam and the small beam intersect.
【請求項5】 前記のり面を切り通し道路の側方に形成
し、前記大梁を、その下端位置がその上端位置よりも前
記道路における車両の進行方向前方となる方向に斜めに
配置したことを特徴とする請求項3に記載ののり面保護
工。
5. The vehicle according to claim 5, wherein the slope is cut through and formed on a side of the road, and the girder is disposed obliquely in a direction in which a lower end position thereof is forward of a vehicle traveling direction on the road from an upper end position thereof. The slope protection method according to claim 3, wherein
JP2000043399A 2000-02-21 2000-02-21 Grip protection Expired - Fee Related JP4338864B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000043399A JP4338864B2 (en) 2000-02-21 2000-02-21 Grip protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000043399A JP4338864B2 (en) 2000-02-21 2000-02-21 Grip protection

Publications (2)

Publication Number Publication Date
JP2001234544A true JP2001234544A (en) 2001-08-31
JP4338864B2 JP4338864B2 (en) 2009-10-07

Family

ID=18566323

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000043399A Expired - Fee Related JP4338864B2 (en) 2000-02-21 2000-02-21 Grip protection

Country Status (1)

Country Link
JP (1) JP4338864B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100646A (en) * 2017-05-23 2017-08-29 梁美欣 The additional fixing structure of loess tunnel
CN113174976A (en) * 2021-05-12 2021-07-27 核工业华南花都建设工程公司 Greening structure is administered to soil slope

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147446A (en) * 2013-03-27 2013-06-12 成都兴蜀勘察基础工程公司 Visible-beam and hidden-rib lattice anchor cable foundation pit supporting structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100646A (en) * 2017-05-23 2017-08-29 梁美欣 The additional fixing structure of loess tunnel
CN113174976A (en) * 2021-05-12 2021-07-27 核工业华南花都建设工程公司 Greening structure is administered to soil slope
CN113174976B (en) * 2021-05-12 2021-12-07 核工业华南花都建设工程公司 Greening structure is administered to soil slope

Also Published As

Publication number Publication date
JP4338864B2 (en) 2009-10-07

Similar Documents

Publication Publication Date Title
JP2001234544A (en) Slope protective works
JP2736842B2 (en) Stairs sound insulation greening method
JP3527059B2 (en) Inspection frame for forming legal frame and legal frame construction method using it
JP2001279679A (en) Slope face protective work
JP3156912B2 (en) Slope member for slope protection method
JPH0827793A (en) Reinforced earth structure
JP4416910B2 (en) Slope protection work
JPH1129935A (en) Method for protecting face of slope and wire netting for use therein
JP2983450B2 (en) Decorative form material, decorative form for retaining wall, and method of construction
JP2599700B2 (en) Cast-in-place method using simple trapezoid formwork
JP2001032289A (en) Soil dressing and lining blocks, and their execution method
JPH0421764B2 (en)
JP2001348881A (en) Slope frame structure, slope frame construction method and frame inside greening method
JPH0513780Y2 (en)
JP2748261B2 (en) Inspection frame for legal frame formation
JP2748260B2 (en) Inspection frame for legal frame formation
JPH08134922A (en) Simple stabilizing construction method for slope
JPH10252070A (en) Reinforcing earthen wall surface structure
JP3205279B2 (en) Tile roof ridge structure
JPH09144009A (en) Measuring frame for forming cast-in-place sloped form
JP3538578B2 (en) Wall mounting structure
JPH10252084A (en) Method and element for protecting and reinforcing retaining wall
JP3527058B2 (en) Inspection frame for forming legal frame and legal frame construction method using it
JPH08218385A (en) Method for constructing cast-in-place slope frame
JPH0581338U (en) Terrace-shaped retaining wall with a pot for vegetation

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060927

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080904

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081209

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090116

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090609

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090701

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120710

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130710

Year of fee payment: 4

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130710

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150710

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150710

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees