JP3527059B2 - Inspection frame for forming legal frame and legal frame construction method using it - Google Patents

Inspection frame for forming legal frame and legal frame construction method using it

Info

Publication number
JP3527059B2
JP3527059B2 JP12358597A JP12358597A JP3527059B2 JP 3527059 B2 JP3527059 B2 JP 3527059B2 JP 12358597 A JP12358597 A JP 12358597A JP 12358597 A JP12358597 A JP 12358597A JP 3527059 B2 JP3527059 B2 JP 3527059B2
Authority
JP
Japan
Prior art keywords
frame
grid
inspection
mortar
inspection frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP12358597A
Other languages
Japanese (ja)
Other versions
JPH1046593A (en
Inventor
和正 柴田
要 堀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nisshoku Corp
Original Assignee
Nisshoku Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nisshoku Corp filed Critical Nisshoku Corp
Priority to JP12358597A priority Critical patent/JP3527059B2/en
Publication of JPH1046593A publication Critical patent/JPH1046593A/en
Application granted granted Critical
Publication of JP3527059B2 publication Critical patent/JP3527059B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、法枠形成用の検測枠
とこれを用いる法枠工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an inspection frame for forming a legal frame and a legal frame construction method using the same.

【0002】[0002]

【従来の技術】道路や造成地などの法面を緑化する工法
の一つに、例えば特公昭58−20338号公報に示さ
れる「法面安定工法」がある。この工法は、法面に金網
などの網状体を敷設した後、この網状体上に鉄筋を格子
状に敷設し、この格子状鉄筋にモルタルまたはコンクリ
ート(以下、モルタルなどと言う)を吹き付けてモルタ
ル等よりなる格子状法枠を形成するようにしたものであ
るので、従来のプレハブ式や現場打ち法枠工法などに比
べて、施工性や強度に優れているとともに、使用する器
材が少なく安価であるといった利点がある。
2. Description of the Related Art As one of the construction methods for greening the slopes of roads and land, there is the "slope stabilization method" disclosed in Japanese Patent Publication No. 58-20338. In this method, after laying a net-like body such as a wire net on the slope, laying reinforcing bars on this net-like body in a grid pattern, spraying mortar or concrete (hereinafter referred to as mortar etc.) on this grid-like reinforcing bar and mortar Since it is designed to form a grid-shaped method frame made of, etc., it is superior in workability and strength compared to the conventional prefabricated type and in-situ method frame construction method, and it uses less equipment and is cheaper. There is an advantage.

【0003】[0003]

【発明が解決しようとする課題】ところで、現行の土木
基準では、前記格子状鉄筋を覆うモルタルなどの厚み
(これを被り厚と言う)が鉄筋のどの面からも5cm以
上であることが、所要強度の格子状法枠を得るための品
質管理基準として義務付けられている。しかしながら、
前記現場打ち法枠工法は、型枠を用いない現場打ち法枠
工法であるとともに、モルタルなどの吹き付けは、法面
上の不安定な場所で現場作業として行われることから、
格子状鉄筋に対するモルタルなどの吹付け厚さや幅が不
均一となりやすく、所定寸法の格子状法枠を形成するの
に相当の熟練度を要するとともに、格子状法枠の寸法や
強度にバラツキを生じることを避けることができなかっ
た。
By the way, according to the current civil engineering standards, it is required that the thickness of the mortar covering the grid-like reinforcing bars (which is called the covering thickness) be 5 cm or more from any surface of the reinforcing bars. Mandatory as a quality control standard for obtaining a strong grid-like framework. However,
The cast-in-place method frame method is a cast-in-place method frame method that does not use a formwork, and the spraying of mortar and the like is performed as an on-site work in an unstable place on the slope,
The thickness and width of the mortar sprayed on the grid-shaped reinforcing bars tend to be non-uniform, which requires considerable skill to form a grid-shaped method frame of a predetermined size, and the grid-shaped method frame also varies in size and strength. I couldn't avoid it.

【0004】この発明は、上述の事柄に留意してなされ
たもので、型枠を用いない現場打ち法枠工法において、
規格通りの寸法および強度を有するモルタルなどよりな
る格子状法枠を熟練を要することなく簡単に形成するこ
とができる法枠形成用の検測枠(以下、単に検測枠と言
う)とこれを用いる法枠工法を提供することを目的とし
ている。
The present invention has been made in consideration of the above-mentioned matters, and in the in-situ casting method using no formwork,
An inspection frame for forming a legal frame (hereinafter simply referred to as an inspection frame) that can easily form a lattice-shaped method frame made of mortar having dimensions and strength according to the standard without requiring skill. The purpose is to provide the legal framework method to be used.

【0005】[0005]

【課題を解決するための手段】上記目的を達成するた
め、この発明の検測枠は、法面に網状体を敷設した後、
この網状体上に鉄筋を格子状に配置し、この格子状鉄筋
にモルタルまたはコンクリートを吹き付ける型枠を用い
ない現場打ち法枠工法におけるモルタルまたはコンクリ
ートよりなる格子状法枠の寸法を規制する法枠形成用の
検測枠であって、鉄筋によって形成される格子枠の一つ
の辺の長さよりも短く、この格子枠の長さ方向に適宜の
間隔をおいて設けられる所定の高さと幅とを有する一対
の正面視多角形状の第1部材と、これら二つの第1部材
どうしを連結する二つの第2部材とを備えたことを特徴
としている。
In order to achieve the above object, the inspection frame of the present invention has a structure in which a net-like body is laid on the slope,
Rebar is arranged in a grid pattern on the mesh body, using a mold which Ru spraying mortar or concrete to the grid-like reinforcing bar
One of the lattice frames formed by reinforcing bars , which is an inspection frame for forming a legal frame that regulates the size of a lattice-like frame made of mortar or concrete in the in-situ method
A pair of first members having a polygonal shape in a front view and having a predetermined height and width, which are shorter than the length of the sides of the lattice frame and are provided at appropriate intervals in the length direction of the lattice frame, and these two first members. It is characterized in that it is provided with two second members for connecting the two.

【0006】そして、この発明の法枠工法は、法面に網
状体を敷設した後、この網状体上に鉄筋を格子状に配置
し、その後、前記第1部材が前記鉄筋を跨ぐようにして
前記検測枠を配置した状態で、モルタルまたはコンクリ
ートを吹き付けることを特徴としている。
According to the method of frame construction of the present invention, after the net-like body is laid on the slope, the reinforcing bars are arranged on the net-like body in a grid pattern, and then the first member straddles the reinforcing bar. It is characterized in that mortar or concrete is sprayed while the inspection frame is arranged.

【0007】前記第1部材の下端部を折曲して沈み防止
部を形成してあってもよい。また、検測枠に鉄筋を浮設
保持する保持部材を着脱自在に設けるようにしてあって
もよい。
The lower end portion of the first member may be bent to form a sink preventing portion. Further, a holding member for floatingly holding the reinforcing bar may be detachably provided on the inspection frame.

【0008】[0008]

【作用】この発明で用いる検測枠Kは、例えば図4に示
すように、所定の高さH(例えば10cm)と幅W(例
えば30cm)とを有する正面視五角形状の一対の第1
部材1とこれら二つの第1部材1どうしを連結する二つ
の第2部材2とからなるとともに、第1部材1の両下端
部を例えば互いに向き合う方向に折曲して沈み防止部3
を形成してなるものである。この検測枠Kを構成する第
1部材1および第2部材2は、防錆加工を施した適宜太
さの針金よりなり、それら1,2は溶接またはハンダ付
けによって連結されている。したがって、検測枠Kの構
造が簡単で、その製作も容易であり、安価である。
As shown in FIG. 4, for example, the inspection frame K used in the present invention has a pair of first pentagonal shapes having a predetermined height H (for example, 10 cm) and width W (for example, 30 cm).
It is composed of a member 1 and two second members 2 connecting these two first members 1, and both lower end portions of the first member 1 are bent, for example, in directions facing each other, and a sinking prevention portion 3 is formed.
Is formed. The 1st member 1 and the 2nd member 2 which comprise this inspection frame K consist of the wire of the appropriate thickness which gave the rustproof process, and these 1 and 2 are connected by welding or soldering. Therefore, the structure of the inspection frame K is simple, its manufacture is easy, and it is inexpensive.

【0009】そして、法面4に所定のモルタルなどより
なる格子状法枠11を形成するに際しては、法面4を整
形した後、図1に示すように、法面4全体に菱形金網な
どの網状体5を敷設し、この網状体5上に鉄筋7を格子
状に配置する。そして、図2に示すように、検測枠K
を、第1部材1が鉄筋7を跨ぐようにして適宜の間隔を
おいて配置し、その後、図1および図3に示すように、
格子枠を形成する鉄筋7にモルタルなど10を吹き付け
るのである。
When forming the lattice-shaped method frame 11 made of a predetermined mortar or the like on the slope 4, the slope 4 is shaped, and then, as shown in FIG. The reticulated body 5 is laid, and the reinforcing bars 7 are arranged on the reticulated body 5 in a grid pattern. Then, as shown in FIG. 2, the inspection frame K
Are arranged at appropriate intervals so that the first member 1 straddles the reinforcing bar 7, and then, as shown in FIGS. 1 and 3,
Mortar 10 is sprayed onto the reinforcing bars 7 forming the lattice frame.

【0010】このようにすることにより、鉄筋7に対し
てモルタルなど10を所定幅および高さになるように正
確に吹き付けることができ、所定強度を有するモルタル
などよりなる格子状法枠11を法面4に確実に形成する
ことができる。
By doing so, the mortar or the like 10 can be accurately sprayed onto the reinforcing bar 7 so as to have a predetermined width and height, and the grid-like method frame 11 made of mortar or the like having a predetermined strength is formed. The surface 4 can be reliably formed.

【0011】[0011]

【実施例】図1〜図4は、この発明の検測枠およびこれ
を用いる法枠工法の一例を示すものである。まず、図4
において、Kは検測枠で、この検測枠Kは、所定の高さ
H(例えば10cm)と幅W(例えば30cm)とを有
する正面視五角形の一対の第1部材1とこれら二つの第
1部材1どうしを連結する二つの直線的な第2部材2と
から構成される。
1 to 4 show an example of an inspection frame and a method frame construction method using the same according to the present invention. First, FIG.
, K is an inspection frame, and this inspection frame K is a pair of first members 1 having a predetermined height H (for example, 10 cm) and a width W (for example, 30 cm) and having a pentagonal shape in a front view, and these two first members. It is composed of two linear second members 2 connecting one member 1 to each other.

【0012】すなわち、第1部材1および第2部材2
は、例えば防錆加工を施した適宜太さ(例えば直径4m
m)の針金よりなる。そして、第1部材1は、その正面
視が五角形(好ましくは左右対称形)になるように折曲
され、頂点から左右両側に下方にやや傾いた上辺1A,
1Aに連なる脚部1B,1Bの端部は例えば互いに向き
合う方向に折曲されて沈み防止部3を構成している。こ
の沈み防止部3の長さは、例えば3cm程度である。ま
た、第2部材2は、第1部材1の脚部1Bのほぼ中間位
置どうしを連結するもので、溶接またはハンダ付けによ
って第1部材1に固着されている。そして、この第2部
材2の長さLは、法面4上に鉄筋7によって形成される
格子枠の一つの辺の長さよりも短く(図1参照)、例え
ば30cm程度である。
That is, the first member 1 and the second member 2
Is an appropriate thickness (for example, a diameter of 4 m
m) wire. The first member 1 is bent so as to have a pentagonal shape (preferably left-right symmetric shape) when viewed from the front, and the upper side 1A slightly inclined downward from the apex to the left and right sides,
The end portions of the leg portions 1B and 1B connected to 1A are bent, for example, in directions facing each other to form a sunken portion 3. The length of the sunken portion 3 is, for example, about 3 cm. The second member 2 connects the substantially intermediate positions of the leg portions 1B of the first member 1 and is fixed to the first member 1 by welding or soldering. The length L of the second member 2 is shorter than the length of one side of the lattice frame formed by the reinforcing bars 7 on the slope 4 (see FIG. 1), for example, about 30 cm.

【0013】次に、この発明の法枠工法の一例につい
て、図1〜図3をも参照しながら説明する。予め整形さ
れた法面4に目合いが例えば5〜6cm程度の菱形金網
などの網状体5を敷設し、アンカー6を適宜の間隔で法
面4に打ち込んで網状体5を法面4に固定する(図2お
よび図3参照)。
Next, an example of the method frame method of the present invention will be described with reference to FIGS. A mesh 5 such as a diamond wire mesh having a mesh size of about 5 to 6 cm is laid on the pre-shaped slope 4 and anchors 6 are driven into the slope 4 at appropriate intervals to fix the mesh 5 to the slope 4. (See FIGS. 2 and 3).

【0014】前記網状体5の上に例えば直径が6〜10
mm程度の鉄筋7を一辺が1〜2m程度の格子状に組み
合わせて配置する(図1参照)。鉄筋7の交点には例え
ば直径16mm、長さ40〜50cm程度のアンカー8
を法面5から7〜8cm程度突出させた状態で打ち込
み、鉄筋7を適宜の結束線9を用いてアンカー8の突出
部に結束する(図2および図3参照)。なお、前記交点
と交点との間にも、例えば直径9mm、長さ30cm程
度のアンカー(図示してない)を法面4に打ち込み、交
点におけると同様に鉄筋7をアンカーに結束するのがよ
い。
A diameter of, for example, 6 to 10 is provided on the mesh body 5.
Reinforcing bars 7 having a size of about mm are combined and arranged in a lattice shape having one side of about 1 to 2 m (see FIG. 1). An anchor 8 having a diameter of 16 mm and a length of about 40 to 50 cm is provided at the intersection of the reinforcing bars 7.
Is driven in a state in which it projects from the slope 5 by about 7 to 8 cm, and the reinforcing bars 7 are bound to the projecting portion of the anchor 8 by using an appropriate binding wire 9 (see FIGS. 2 and 3). It should be noted that an anchor (not shown) having a diameter of 9 mm and a length of about 30 cm may be driven into the slope 4 between the intersections, and the reinforcing bars 7 may be bound to the anchors in the same manner as at the intersections. .

【0015】そして、鉄筋7からなる格子枠の各辺のほ
ぼ中央に検測枠Kを、その第1部材1が鉄筋7を跨ぐよ
うにして網状体5上に配置する(図1および図2参
照)。この場合、第1部材1の下端に沈み防止部3が形
成されているので、法面4が盛土であるような場合、検
測枠Kが法面4から沈み込むことが防止される。
Then, the inspection frame K is arranged on the mesh body 5 so that the first member 1 straddles the reinforcing bar 7 at approximately the center of each side of the lattice frame composed of the reinforcing bar 7 (FIGS. 1 and 2). reference). In this case, since the sinking prevention portion 3 is formed at the lower end of the first member 1, the inspection frame K is prevented from sinking from the slope 4 when the slope 4 is embankment.

【0016】前記検測枠Kは、モルタルなど10の吹き
付け幅および吹き付け高さの目安となるものであるか
ら、格子枠の各辺に少なくとも一つ設けてあればよく、
この実施例のように、辺の長さが1〜2m、検測枠Kの
長さLが30cmのときは、各辺に一つの検測枠Kを設
けるだけでよい。また、前記辺の長さがより大きくなっ
たときは、前記寸法の検測枠Kを2以上設けてもよい
が、検測枠Kの長さLをより大きく(例えば1.3〜
1.5m程度)設定してもよい。
Since the inspection frame K serves as a guide for the spraying width and spraying height of the mortar 10 and the like, it is sufficient to provide at least one on each side of the lattice frame,
When the length of the side is 1 to 2 m and the length L of the inspection frame K is 30 cm as in this embodiment, it is only necessary to provide one inspection frame K on each side. Further, when the length of the side becomes larger, two or more inspection frames K having the above dimensions may be provided, but the length L of the inspection frame K is made larger (for example, 1.3 to
(About 1.5 m) may be set.

【0017】以上のように構成した格子状鉄筋7に、例
えば含水率が7〜8%程度の低スランプのモルタルなど
10をモルタルガン機などの土木用吹付機(図示してな
い)によって吹き付ける。この場合、鉄筋7によって形
成される格子枠の各辺には、モルタルなど10の吹き付
け幅および吹き付け高さの目安となる検測枠Kが設けて
いるので、この検測枠Kにしたがってモルタルなど10
の吹き付けを行うだけで、所定寸法のモルタルなどより
なる格子状法枠(以下、単に格子状法枠と言う)11を
容易に形成することができる。すなわち、この実施例に
おいては、下端幅30〜35cm、高さ10〜15cm
程度の格子状法枠11を形成することができ、所定寸法
および所定強度の格子状法枠11を確実に形成できるの
である。なお、図1および図3において、符号12はモ
ルタルなど10を吹き付けるためのノズルである。
On the grid-shaped reinforcing bar 7 constructed as described above, for example, a low-slump mortar 10 having a water content of about 7 to 8% is sprayed by a civil engineering sprayer (not shown) such as a mortar gun machine. In this case, since each side of the lattice frame formed by the reinforcing bars 7 is provided with an inspection frame K that serves as a guide for the spraying width and the spraying height of the mortar 10 and the like, the mortar and the like are in accordance with the inspection frame K. 10
It is possible to easily form a lattice-shaped method frame (hereinafter, simply referred to as a lattice-shaped method frame) 11 made of mortar or the like having a predetermined size by spraying. That is, in this embodiment, the lower end width is 30 to 35 cm and the height is 10 to 15 cm.
The grid-shaped method frame 11 having a certain degree can be formed, and the grid-shaped method frame 11 having a predetermined size and a predetermined strength can be reliably formed. 1 and 3, reference numeral 12 is a nozzle for spraying 10 such as mortar.

【0018】以上のようにして法面4に形成された格子
状法枠11内に、土壌、有機質材、保水材(土壌改良
材)などと芝草、野草、低木類、花などの種子とを混合
してなる植生材料を動力吹付け機などを用いて吹き付け
て植生層13(図1参照)を形成したり、また、これに
代えて、前記植生材料を粗目の袋体に充填した植生袋
(図示してない)を配置するなどして、従来不可能とさ
れていた岩盤法面などにも植生を導入することが可能と
なり、法面4の景観の向上および植生の根や茎などによ
る法面4の恒久的安定に寄与するところが大きい。
Soil, organic material, water retaining material (soil conditioner), etc. and seeds of turfgrass, wild grass, shrubs, flowers, etc. are placed in the lattice-shaped method frame 11 formed on the slope 4 as described above. The mixed vegetation material is sprayed using a power spraying machine or the like to form the vegetation layer 13 (see FIG. 1), or, instead of this, a vegetation bag in which a coarse bag is filled with the vegetation material. By arranging (not shown), it becomes possible to introduce vegetation even on rock slopes that were previously impossible, improving the landscape of slope 4 and roots and stems of vegetation. It largely contributes to the permanent stability of slope 4.

【0019】この発明は、上述の実施例に限られるもの
ではなく、種々に変形して実施できる。例えば図5に示
すように、両端にフック部14aを有するとともに、ほ
ぼ中央下端に谷部14bを有する正面視U字状の保持部
材14を用い、この保持部材14のフック部14aを第
1部材1の例えば上辺1Aに係合し、谷部14bによっ
て、鉄筋7を網状体5とともに浮設保持するようにして
もよい。この場合、保持部材14は防錆加工を施した針
金から構成してあればよく、さらに、鉄筋7の浮設高さ
を被り厚が規定値(5cm以上)となるように、各部材
の寸法を設定しておくことが望ましい。
The present invention is not limited to the above-mentioned embodiments, but can be modified in various ways. For example, as shown in FIG. 5, a U-shaped holding member 14 in a front view having hook portions 14a at both ends and a valley portion 14b at substantially the center lower end is used, and the hook portion 14a of the holding member 14 is a first member. It is also possible to engage with the upper side 1A of 1 and to hold the reinforcing bar 7 together with the mesh body 5 in a floating manner by the valley portion 14b. In this case, the holding member 14 may be made of rust-proof wire, and the size of each member should be such that the floating height of the reinforcing bar 7 is covered and the thickness becomes a specified value (5 cm or more). It is desirable to set.

【0020】図6は、図5の実施例において、鉄筋7の
みを浮設保持した実施態様を示している。このようにし
た場合、格子状法枠11での植生層13が5cm未満の
場合、網状体5が吹き付け基材としての植生材料の流亡
防止材として有効に作用する。
FIG. 6 shows an embodiment in which only the reinforcing bar 7 is floated and held in the embodiment of FIG. In this case, when the vegetation layer 13 in the grid-shaped method frame 11 is less than 5 cm, the mesh 5 effectively acts as a runoff prevention material for the vegetation material as the spraying base material.

【0021】また、図7に示すように、適宜のスペーサ
15を用いて、網状体5を浮設保持し、鉄筋7の被り厚
が規定値になるようにしてもよい。なお、前記スペーサ
15としては、例えばこの出願の出願人に係る昭和63
年意匠登録願第4418号の「法面保護用ラススペーサ
ー」や、同じく実公平5−42118号公報の「スペー
サーピン」を用いることができる。
Further, as shown in FIG. 7, an appropriate spacer 15 may be used to suspend and hold the mesh body 5 so that the covering thickness of the reinforcing bar 7 becomes a specified value. The spacer 15 may be, for example, the Showa 63
For example, “Lath spacer for slope protection” of Japanese Design Registration Application No. 4418 and “Spacer pin” of Japanese Utility Model Publication No. 5-42118 can be used.

【0022】そして、上記いずれの実施例においても、
検測枠Kを構成する第1部材1の正面視形状が五角形で
あったが、これに限られるものでなく、七角形以上の多
角形であってもよい。この場合、左右対称形であるのが
好ましい。
In any of the above embodiments,
Although the shape of the first member 1 forming the inspection frame K in the front view is a pentagon, the shape is not limited to this, and may be a polygon having a heptagon or more. In this case, it is preferably symmetrical.

【0023】また、図8に示すように、第1部材の正面
視形状を凹多角形とすることもできる。すなわち、第1
部材16として、上部に一つの凸部16aと二つの凹部
16bを有する凹多角形(左右対称形が好ましい)に形
成されている。このように構成された検測枠Kにおいて
も、上記各実施例と同様の効果があり、また、これを用
いた法枠工法においても同様の効果を奏する。
Further, as shown in FIG. 8, the front view shape of the first member may be a concave polygon. That is, the first
The member 16 is formed in a concave polygonal shape (a bilaterally symmetrical shape is preferable) having one convex portion 16a and two concave portions 16b on the upper portion. The inspection frame K configured in this way also has the same effects as those of the above-mentioned respective embodiments, and the same effect can be obtained in the legal frame construction method using the same.

【0024】この実施例の検測枠Kにおいては、図示す
るように、二つの凹部16bに2本の鉄筋8を安定に保
持できるので、所謂横ダブル配筋が可能となる。そし
て、法面4からの凸部16aの高さが例えば10cmで
あるとき、二つの凹部16bによって浮設保持される鉄
筋8の法面4からの高さを5cmとなるように設定する
ことが可能となる。また、この検測枠Kにおいては、第
1部材16の上部のほぼ中央16aが上方に突出し、さ
らに、この凸部16aの両側に形成される二つの凹部1
6bの他方にも凸部16cが形成されているので、モル
タルなど11の吹き付け時には、これらの凸部16a,
16cを目安にして吹き付ければ、所定の被り厚の格子
状法枠12を形成することができるといった利点があ
る。
In the inspection frame K of this embodiment, as shown in the drawing, the two rebars 8 can be stably held in the two recesses 16b, so that a so-called horizontal double rebar is possible. When the height of the convex portion 16a from the slope 4 is, for example, 10 cm, the height of the reinforcing bar 8 floated and held by the two concave portions 16b from the slope 4 can be set to be 5 cm. It will be possible. Further, in this inspection frame K, a substantially central portion 16a of the upper portion of the first member 16 projects upward, and further, two concave portions 1 formed on both sides of the convex portion 16a.
Since the convex portion 16c is also formed on the other side of 6b, when the mortar 11 or the like is sprayed, these convex portions 16a,
If 16c is sprayed as a guide, there is an advantage that the lattice-shaped method frame 12 having a predetermined covering thickness can be formed.

【0025】さらに、前記図8に示した検測枠Kにおい
ても、図6または図7に示すような保持部材14を用い
ることができ、鉄筋7をより多くかつ安定に保持するこ
とができる。したがって、広幅の格子状法枠を形成する
こともできる。
Further, in the inspection frame K shown in FIG. 8 as well, the holding member 14 as shown in FIG. 6 or 7 can be used, and more reinforcing bars 7 can be held. Therefore, it is possible to form a wide lattice-shaped frame.

【0026】そして、前記いずれの実施例においても、
検測枠Kにおける第1部材1,16の下端部を折曲して
沈み防止部3を形成してあったが、前記下端部を折曲し
ないでストレートな状態にしてあってもよいことは言う
までもない。
In any of the above embodiments,
Although the lower end portions of the first members 1 and 16 in the inspection frame K are bent to form the sunken portion 3, the lower end portion may be straight without bending. Needless to say.

【0027】また、前記いずれの実施例においても、検
測枠Kにおける第2部材2の設置高さは任意であるが、
鉄筋7の被り厚を確保したい場合は、第1部材1,16
の高い位置に固定するのが望ましい。さらに、第1部材
1,16は3以上設けてあってもよい。さらにそして、
検測枠Kをプラスチックによって一体成形によって形成
してあってもよい。
Further, in any of the above-mentioned embodiments, the installation height of the second member 2 in the inspection frame K is arbitrary,
When it is desired to secure the covering thickness of the reinforcing bar 7, the first members 1, 16
It is desirable to fix it at a high position. Furthermore, three or more first members 1 and 16 may be provided. And then
The inspection frame K may be integrally formed of plastic.

【0028】さらに、格子枠の一つの辺に設けられる鉄
筋7は必ずしも1本でなくても複数本でもよく、その場
合、鉄筋7の交点付近に4本の長目のアンカーを法面4
に打ち込み、鉄筋を井桁状に支承結束し、これを一段あ
るいは数段重ねるようにしてもよい。
Further, the number of the reinforcing bars 7 provided on one side of the lattice frame is not limited to one, and in this case, four long anchors are provided near the intersection of the reinforcing bars 7 and the slope 4
Alternatively, the reinforcing bars may be supported and bound in a cross beam shape, and the reinforcing bars may be stacked in one or several steps.

【0029】[0029]

【発明の効果】この発明は以上説明した通りであり、こ
の発明の検測枠は、構造が簡単であり、容易かつ安価に
製造できるとともに、その取扱いが簡単である。特に、
請求項に記載の検測枠においては、鉄筋の浮設保持機
能をも有するので、鉄筋保持用部材を別途設ける必要が
ない。そして、この検測枠を用いる法枠工法において
は、モルタルなどの吹き付けムラがなくなり、鉄筋のま
わりに所定の被り厚を有する規格通りの寸法および強度
を有するモルタルなどよりなる格子状法枠を容易に法面
に形成することができる。
The present invention is as described above, and the inspection frame of the present invention has a simple structure, can be manufactured easily and inexpensively, and is easy to handle. In particular,
In the inspection frame according to the third aspect, since it also has a function of holding the reinforcing bars in a floating state, it is not necessary to separately provide a reinforcing bar holding member. And in the method frame method using this inspection frame, there is no uneven spraying of mortar and the like, and a grid-like method frame made of mortar and the like having a specified size and strength with a predetermined covering thickness around the reinforcing bar is easy. It can be formed on the slope.

【0030】そして、請求項2に記載の発明によれば、
法面が盛土で形成されているような場合であっても、検
測枠の沈みを防止でき、前記モルタルなどよりなる格子
状法枠を所定寸法に確実に形成できる。
According to the invention of claim 2,
Even when the slope is formed by embankment, it is possible to prevent the inspection frame from sinking, and it is possible to reliably form the grid-shaped slope frame made of the mortar or the like in a predetermined size.

【0031】さらに、請求項3に記載の発明によれば、
鉄筋の保持位置がより確実に行われる。
Further, according to the invention of claim 3,
The holding position of the reinforcing bar is performed more reliably.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の現場打ち法枠工法の一例を示す図で
ある。
FIG. 1 is a diagram showing an example of a cast-in-place method frame construction method of the present invention.

【図2】前記工法の要部を示す図である。FIG. 2 is a diagram showing a main part of the construction method.

【図3】前記工法の要部を示す正面図である。FIG. 3 is a front view showing a main part of the construction method.

【図4】この発明の検測枠の一例を示す斜視図である。FIG. 4 is a perspective view showing an example of the inspection frame of the present invention.

【図5】
この発明の検測枠の他の例を示す断面図である。
[Figure 5]
It is sectional drawing which shows the other example of the inspection frame of this invention.

【図6】
図5で示した検測枠による鉄筋の他の浮設態様を
示す断面図である。
[Figure 6]
It is sectional drawing which shows the other floating mode of the reinforcing bar by the inspection frame shown in FIG.

【図7】
網状体の他の浮設態様を示す断面図である。
[Figure 7]
It is sectional drawing which shows the other floating mode of a mesh body.

【図8】
この発明の検測枠の他の例を示す断面図である。
[Figure 8]
It is sectional drawing which shows the other example of the inspection frame of this invention.

【符号の説明】[Explanation of symbols]

1…第1部材、2…第2部材、3…沈み防止部、4…法
面、5…網状体、7…鉄筋、10…モルタルまたはコン
クリート、11…格子状法枠、14…保持部材、16…
第1部材、16a…凸部、16b…凹部、K…検測枠。
DESCRIPTION OF SYMBOLS 1 ... 1st member, 2 ... 2nd member, 3 ... Sinking prevention part, 4 ... Slope, 5 ... Reticulated body, 7 ... Reinforcing bar, 10 ... Mortar or concrete, 11 ... Lattice method frame, 14 ... Holding member, 16 ...
1st member, 16a ... convex part, 16b ... concave part, K ... inspection frame.

フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E02D 17/20 104 Continuation of front page (58) Fields surveyed (Int.Cl. 7 , DB name) E02D 17/20 104

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 法面に網状体を敷設した後、この網状体
上に鉄筋を格子状に配置し、この格子状鉄筋にモルタル
またはコンクリートを吹き付ける型枠を用いない現場打
ち法枠工法におけるモルタルまたはコンクリートよりな
る格子状法枠の寸法を規制する法枠形成用の検測枠であ
って、鉄筋によって形成される格子枠の一つの辺の長さ
よりも短く、この格子枠の長さ方向に適宜の間隔をおい
て設けられる所定の高さと幅とを有する一対の正面視多
角形状の第1部材と、これら二つの第1部材どうしを連
結する二つの第2部材とを備えたことを特徴とする法枠
形成用の検測枠。
After laying claim: 1. A method surface reticulated body, this Rebar on meshwork arranged in a grid pattern, scene punching without using the mold of Ru spraying mortar or concrete to the grid-like reinforcing bar
The length of one side of the grid frame formed by the reinforcing bar, which is the inspection frame for forming the grid frame that regulates the size of the grid-like frame made of mortar or concrete in the construction method.
Is shorter than the pair of first members each having a polygonal shape in a front view and having a predetermined height and width, which are provided at appropriate intervals in the length direction of the lattice frame, and connect these two first members together. An inspection frame for forming a legal frame, comprising two second members.
【請求項2】 第1部材の下端部を折曲して沈み防止部
を形成してなる請求項1に記載の法枠形成用の検測枠。
2. The inspection frame for forming a legal frame according to claim 1, wherein the lower end of the first member is bent to form a sunken portion.
【請求項3】 第1部材に鉄筋を浮設保持する保持部材
を着脱自在に設けてなる請求項1または2に記載の法枠
形成用の検測枠。
3. The inspection frame for forming a legal frame according to claim 1, wherein a holding member for floatingly holding the reinforcing bar is detachably provided on the first member.
【請求項4】 請求項1〜3のいずれかに記載の検測枠
を用いる法枠工法であって、法面に網状体を敷設した
後、この網状体上に鉄筋を格子状に配置し、その後、第
1部材が前記鉄筋を跨ぐようにして前記検測枠を配置し
た状態で、モルタルまたはコンクリートを吹き付けるこ
とを特徴とする法枠工法。
4. A method frame method using the inspection frame according to any one of claims 1 to 3, wherein a reticulated body is laid on the slope, and then the reinforcing bars are arranged in a grid on the reticulated body. After that, a mortar or concrete is sprayed in a state in which the first member is arranged so as to straddle the reinforcing bars and the mortar or concrete is sprayed.
JP12358597A 1997-04-26 1997-04-26 Inspection frame for forming legal frame and legal frame construction method using it Expired - Fee Related JP3527059B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12358597A JP3527059B2 (en) 1997-04-26 1997-04-26 Inspection frame for forming legal frame and legal frame construction method using it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12358597A JP3527059B2 (en) 1997-04-26 1997-04-26 Inspection frame for forming legal frame and legal frame construction method using it

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP6186597A Division JP2748261B2 (en) 1994-07-16 1994-07-16 Inspection frame for legal frame formation

Publications (2)

Publication Number Publication Date
JPH1046593A JPH1046593A (en) 1998-02-17
JP3527059B2 true JP3527059B2 (en) 2004-05-17

Family

ID=14864240

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12358597A Expired - Fee Related JP3527059B2 (en) 1997-04-26 1997-04-26 Inspection frame for forming legal frame and legal frame construction method using it

Country Status (1)

Country Link
JP (1) JP3527059B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008115565A (en) * 2006-11-01 2008-05-22 Nisshoku Corp Reinforcing bar fixing tool for slope frame and surface of slope reinforcing construction method by use of it and surface of slope reinforcing structural body
JP5506110B2 (en) * 2011-03-16 2014-05-28 日本植生株式会社 Inspection frame manufacturing method, inspection frame and slope protection method
JP5506113B2 (en) * 2012-05-25 2014-05-28 日本植生株式会社 Inspection frame manufacturing method, inspection frame and slope protection method
JP5506112B2 (en) * 2012-05-25 2014-05-28 日本植生株式会社 Inspection frame manufacturing method, inspection frame and slope protection method
JP5506114B2 (en) * 2012-05-25 2014-05-28 日本植生株式会社 Inspection frame, slope protection method and structure using the same
JP5685331B2 (en) * 2014-01-27 2015-03-18 日本植生株式会社 Inspection frame manufacturing method, inspection frame and slope protection method
JP5685329B2 (en) * 2014-01-27 2015-03-18 日本植生株式会社 Inspection frame, slope protection method and structure using the same

Also Published As

Publication number Publication date
JPH1046593A (en) 1998-02-17

Similar Documents

Publication Publication Date Title
JP3527059B2 (en) Inspection frame for forming legal frame and legal frame construction method using it
JP3527058B2 (en) Inspection frame for forming legal frame and legal frame construction method using it
JP2694326B2 (en) Cast-in-place method
JP3119291B2 (en) Construction method of cast-in-place frame
JP3008144U (en) Inspection frame for forming a legal frame with a reinforcing bar holding member
JP3443275B2 (en) Inspection frame for forming legal frame and legal frame method using it
JP2855263B2 (en) A frame for forming a legal frame and a legal frame method using the same
JPH0827800A (en) Inspection frame for forming slope frame and slope framework method using it
JP3007853U (en) Inspection frame for forming legal frame
JP3658060B2 (en) Inspection frame for on-site casting frame formation
JP3088648U (en) Inspection frame for legal frame formation
JP2748260B2 (en) Inspection frame for legal frame formation
JP2694331B2 (en) Inspection frame for legal frame formation and legal frame construction method using it
JP3008215U (en) Inspection frame for forming a legal frame provided with a reinforcing bar holding member
JPH0820955A (en) Inspection form for making slope form and slope form method by use thereof
JP2627878B2 (en) Cast-in-place method
JP3025094U (en) Frame for forming legal frame
JP2694327B2 (en) Cast-in-place method
JP2627879B2 (en) Cast-in-place method
JPH09144008A (en) Measuring coil for forming cast-in-place sloped form
JP3008622U (en) Inspection frame for forming a legal frame with a reinforcing bar holding member
JP2627877B2 (en) Cast-in-place method
JP2748262B2 (en) Inspection frame for forming a legal frame provided with a reinforcing bar holding member and a legal frame construction method using the same
JP3014435U (en) Frame for forming legal frame
JPH09144012A (en) Cast-in-place slope protection frame work

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20031215

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20040107

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040217

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040218

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090227

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090227

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100227

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110227

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120227

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120227

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130227

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130227

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140227

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees