JP2001214454A - Method of manufacturing concrete caisson on water and its equipment - Google Patents

Method of manufacturing concrete caisson on water and its equipment

Info

Publication number
JP2001214454A
JP2001214454A JP2000030233A JP2000030233A JP2001214454A JP 2001214454 A JP2001214454 A JP 2001214454A JP 2000030233 A JP2000030233 A JP 2000030233A JP 2000030233 A JP2000030233 A JP 2000030233A JP 2001214454 A JP2001214454 A JP 2001214454A
Authority
JP
Japan
Prior art keywords
caisson
concrete
water
floating body
supported
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000030233A
Other languages
Japanese (ja)
Inventor
Yasuhiro Oda
康弘 小田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Penta Ocean Construction Co Ltd
Original Assignee
Penta Ocean Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Penta Ocean Construction Co Ltd filed Critical Penta Ocean Construction Co Ltd
Priority to JP2000030233A priority Critical patent/JP2001214454A/en
Publication of JP2001214454A publication Critical patent/JP2001214454A/en
Pending legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method of manufacturing concrete caisson on water and its equipment which allow to manufacture large caissons on water surface with simple equipment and to manufacture an object with a structure which can easily manufacture a bottom plate and a foundation on the water floor integrally when installing the bottom plate. SOLUTION: A form 5 for the caisson is installed on water by being supported by a floating body 1 floating on the water. A hanger 9 for supporting the caisson is embedded in the form 5 and concrete is placed. The caisson which is manufactured while the hanger 9 for supporting the caisson is supported by the floating body 1 is hung. The form 5 is moved relatively toward the upper part of the caisson by letting out the hanger 9 for supporting the caisson and lowering the caisson into the water after waiting for hardening of the concrete. The next concrete is placed as a joint one after another.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、港湾における防波
堤、岸壁或いは護岸などに使用するコンクリートケーソ
ンを水上にて製作するコンクリートケーソン水上製作方
法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for producing a concrete caisson for use on a water surface, for producing a concrete caisson used for a breakwater, a quay or a seawall in a harbor.

【0002】[0002]

【従来の技術】従来、コンクリートケーソン製作は進水
用の斜路や昇降装置を備えた陸上のケーソン製作ヤード
や、水面上に浮かべた浮きドックなどのドライ空間にて
なされ、大型ケーソンの場合には、スライディング型枠
を使用し、底盤に連続させて隔壁及び周壁を所定高さず
つ上方に打ち継ぎして所定の大きさに成形するようにし
ている。
2. Description of the Related Art Conventionally, concrete caisson production has been performed in a dry space such as a caisson production yard having a ramp for launching and a lifting device, or a floating dock floating on the water surface. Using a sliding form, the partition wall and the peripheral wall are connected to the bottom plate at a predetermined height and spliced upward to form a predetermined size.

【0003】このようにして製造されるコンクリートケ
ーソンにあって、陸上の製作ヤードで製作されるもの
は、斜路や昇降装置等の進水位置まで水平搬送し、浮き
ドックで製作される場合は浮きドック自体を水中に沈
め、それぞれケーソンを進水させ、水面上に浮かべ、沈
設場所まで曳航するようにしている。
[0003] The concrete caisson manufactured in this way, which is manufactured in a production yard on land, is horizontally transported to a launching position such as a ramp or a lifting device, and is floated when manufactured in a floating dock. The docks themselves are submerged, each caisson is launched, floated on the surface of the water, and towed to the sink.

【0004】[0004]

【発明が解決しようとする課題】このような従来のコン
クリートケーソン製作方法の内、陸上のドライ空間で製
作する場合には、進水のための昇降装置や水平移動のた
めの装置が大重量に耐えるものである必要があり、その
設備に多くの費用を要するとともに大重量のケーソンの
陸上移動には多くの困難が伴う。また、製作ヤード近く
にケーソン設置現場がある場合が少なく、曳航に長時間
と多くの経費がかかる場合が多い。
Among the conventional methods for manufacturing a concrete caisson, when manufacturing in a dry space on land, a lifting device for launching and a device for horizontal movement are heavy. It must be able to withstand, the equipment is expensive and the heavy-duty caisson moving on land has many difficulties. In addition, there are few cases where caisson installation sites are located near the production yard, and in many cases, it takes a long time and a lot of expense to tow.

【0005】一方、浮きドックを使用する場合は、ケー
ソン設置現場近くの水面を使用でき、且つ進水作業が容
易である等の利点があるが、ケーソンを搭載した状態で
浮上、沈降ができる構造とする必要上、設備が大掛かり
となり、その建造及び維持管理に多大の経費を要すると
いう問題があった。
On the other hand, when a floating dock is used, there is an advantage that the water surface near the caisson installation site can be used, and the launching work is easy. In addition, there is a problem that the equipment becomes large-scale, and the construction and maintenance of the equipment require a large amount of expense.

【0006】更に、この種の従来の方法では、ケーソン
自体の浮力で水上に浮上させて曳航する必要上、底面を
閉鎖する底盤が必要となり、設置現場で水底の基礎と一
体に底板を後打ちすることができず、基礎との一体化が
容易ではないという問題があった。
Further, in the conventional method of this kind, it is necessary to float on the water by the buoyancy of the caisson itself and tow, and a bottom plate for closing the bottom surface is required. There was a problem that integration with the foundation was not easy.

【0007】本発明は、このような従来の問題に鑑み、
簡単な装置で水面上において大型のケーソンが製造で
き、底盤を設置時に水底基礎と一体に構築することが可
能な構造のものが容易に製造できるコンクリートケーソ
ン水上製作方法及びその装置の提供を目的としてなされ
たものである。
The present invention has been made in view of such a conventional problem,
With the aim of providing a concrete caisson surface manufacturing method and a device capable of manufacturing a large caisson on the water surface with a simple device and easily manufacturing a structure capable of being constructed integrally with a submarine foundation at the time of installation of a bottom plate. It was done.

【0008】[0008]

【課題を解決するための手段】上述の如き従来の問題を
解決し、所期の目的を達成するための本発明に係るコン
クリートケーソン水上製作方法の特徴は、水面上に浮上
させた浮体に支持させて水面上にケーソン成形型枠を設
置し、該型枠内にコンクリートを打設して所定高さ分の
ケーソンを成形すると同時に、該ケーソンにケーソン支
持用吊材を固定し、前記ケーソン支持用吊材を前記浮体
に支持させて製作されるケーソンを吊持ちさせ、前記コ
ンクリートの固化を待ってケーソン支持用吊材を延長さ
せて前記ケーソンを水中に降下させることにより前記型
枠をケーソン上方に相対移動させて次のコンクリートを
順次打ち継ぐことにある。
SUMMARY OF THE INVENTION A feature of the concrete caisson water making method according to the present invention for solving the above-mentioned conventional problems and achieving the intended object is that the method is supported by a floating body floating above the water surface. Then, a caisson forming form is set on the water surface, concrete is poured into the form to form a caisson of a predetermined height, and at the same time, a caisson supporting hanging material is fixed to the caisson, and the caisson support is fixed. The caisson manufactured by supporting the hanging material on the floating body is hung, the caisson supporting hanging material is extended after the concrete is solidified, and the caisson is lowered into the water so that the formwork is raised above the caisson. To move the next concrete one after another.

【0009】尚、両端を浮体に支持させて水面上方に吊
持ち用梁を複数設置し、該梁にケーソン支持用吊材及び
ケーソン成形型枠を支持させること、浮体には上下に貫
通したケーソン吊降ろし用空間を備え、該空間内にケー
ソンを吊り下げて順次降下させることが好ましい。
In addition, a plurality of hanging beams are installed above the water surface with both ends supported by a floating body, and the caisson supporting hanging material and the caisson forming form are supported by the beams. It is preferable that a space for hanging is provided, and a caisson is hung in the space and sequentially lowered.

【0010】また本発明に係るコンクリートケーソン製
作装置の特徴は、水面上に浮上させた浮体と、該浮体に
支持させた吊持ち手段と、該吊持ち手段に支持されたケ
ーソン成形型枠と、該型枠内にて順次成形されるケーソ
ンを前記吊持ち手段に対して吊持ちさせる吊材と、該吊
材をケーソン降下方向に繰り出す吊降ろし手段とを備え
たことにある。
The concrete caisson manufacturing apparatus according to the present invention is characterized in that a floating body floated on the water surface, hanging means supported by the floating body, a caisson forming form supported by the hanging means, It is provided with a suspending member for suspending the caisson sequentially formed in the mold frame with respect to the suspending means, and a suspending means for extending the suspending member in the caisson descending direction.

【0011】尚、浮体は平面がコ字状に形成され、一辺
側が開放されたケーソン吊降ろし用空間を備え、該吊降
ろし空間の上方に、ケーソン成形型枠及びケーソン支持
用吊材を支持させる複数の梁を横架させることが好まし
い。
The floating body is provided with a caisson hanging space having a U-shaped flat surface and an open side, and the caisson forming form and the caisson supporting hanging material are supported above the hanging space. Preferably, a plurality of beams are laid horizontally.

【0012】[0012]

【発明の実施の形態】次に本発明の実施の形態を図面に
ついて説明する。
Embodiments of the present invention will now be described with reference to the drawings.

【0013】図において、1は本発明装置を構成してい
る浮体である。この浮体1は平面がコ字状に形成されて
一辺側が開放されたケーソン吊降ろし空間2が形成され
ており、その空間2の上方にケーソン吊持ち手段を構成
する複数の梁3,3……が、それぞれの両端を浮体表面
から立ち上げた立ち上り部4に支持させて横架されてい
る。
In FIG. 1, reference numeral 1 denotes a floating body constituting the apparatus of the present invention. The floating body 1 is formed with a caisson hanging space 2 having a U-shaped plane and an open side, and a plurality of beams 3, 3... Constituting caisson hanging means above the space 2. Are suspended laterally with both ends thereof supported by a rising portion 4 rising from the surface of the floating body.

【0014】空間2の上方には梁3,3……及び立ち上
り部4に支持させてケーソン外周の縦向きの周壁及びケ
ーソン内の隔壁を成形するためのケーソン成形型枠装置
5が備えられている。この型枠装置5は、ケーソン側壁
の外面を成形する外型枠6、該側壁の内面及び隔壁の表
面を形成する内型枠7及びこれらの型枠を支持する型枠
保持機構8とからなり、型枠保持機構8には、成形され
たケーソン表面から各型枠を離反させる脱型機構(図示
せず)が備えられたものを使用している。
Above the space 2, there is provided a caisson forming form device 5 for supporting the beams 3, 3... And the rising portion 4 to form a vertical wall around the outer periphery of the caisson and a partition in the caisson. I have. The formwork apparatus 5 includes an outer formwork 6 for forming the outer surface of the caisson side wall, an inner formwork 7 for forming the inner surface of the side wall and the surface of the partition, and a form holding mechanism 8 for supporting these forms. The mold holding mechanism 8 is provided with a mold release mechanism (not shown) for separating each mold from the surface of the formed caisson.

【0015】型枠装置5には上記の他、所定高さ分のコ
ンクリート打設後、型枠を上方に移動させてコンクリー
トを打ち継ぎながら、角筒状のコンクリート構造物を下
部から順次成形するスライディング型枠が使用できる。
[0015] In addition to the above, after the concrete of a predetermined height is poured into the formwork device 5, while the formwork is moved upward and the concrete is spliced, a rectangular tubular concrete structure is sequentially formed from the lower part. Sliding formwork can be used.

【0016】各梁3,3……には、異型棒鋼からなるケ
ーソン吊持ちさせるためのケーソン支持用吊材9を、下
方に向けて繰り出しすことができる吊降ろし手段9が多
数所定間隔毎に設置されている。この吊降ろし手段に
は、一例として通称クライミングジャッキと称されてい
る油圧を用いた装置が使用できる。
Each of the beams 3, 3,... Is provided with a large number of suspension means 9 for suspending a caisson supporting material 9 made of a deformed steel bar at predetermined intervals. is set up. As the suspension means, for example, a device using hydraulic pressure, commonly called a climbing jack, can be used.

【0017】次に、上記装置を使用した本発明に係るコ
ンクリートケーソンの水上構築方法にいて説明する。
Next, a method for constructing a concrete caisson on the water according to the present invention using the above apparatus will be described.

【0018】先ず、図1に示すように浮体1を水面上に
浮かべ、型枠装置4を所定の形状にコンクリート成形空
間が形成されるように組み立て、各型枠間のコンクリー
ト打設部11の底部を底面型枠12で閉鎖するととも
に、コンクリート打設部11内に、吊降ろし手段10よ
り垂下させた吊材9の下端を挿入する。
First, as shown in FIG. 1, the floating body 1 is floated on the water surface, and the formwork device 4 is assembled so that a concrete molding space is formed in a predetermined shape. The bottom is closed by the bottom form 12 and the lower end of the hanging material 9 suspended by the hanging means 10 is inserted into the concrete placing part 11.

【0019】次いで、吊材9が挿入された型枠内のコン
クリート打設部11内に一定高さ分のコンクリート13
を打設し、該コンクリート13に吊材9の下端を定着さ
せる。
Next, concrete 13 having a predetermined height is placed in concrete placing portion 11 in the form in which hanging material 9 is inserted.
And fix the lower end of the hanging material 9 to the concrete 13.

【0020】尚、吊材9下端に抜け止め用の定着具(図
示せず)を固着してもよい。
Incidentally, a fixing device (not shown) for retaining may be fixed to the lower end of the hanging member 9.

【0021】このようにして所定高さ分だけ底盤のない
ケーソンAを形成し、コンクリート固化を待って型枠装
置5を脱型、即ち、底面型枠12を外すとともに各型枠
6,7をコンクリート面から離反する方向に動作させ
る。これによって成形されたケーソンAは吊材9によっ
て梁3,3……から吊り下げられた状態となる。
A caisson A without a bottom is formed by a predetermined height in this way, and after the concrete is solidified, the formwork device 5 is released, that is, the bottom formwork 12 is removed and each of the formworks 6, 7 is removed. Operate in the direction away from the concrete surface. The caisson A thus formed is suspended from the beams 3, 3.

【0022】この状態で各吊降ろし手段10を作動させ
て吊材9をゆっくりと下方に繰り出し、ケーソンAの上
端が型枠6,7の下縁梢上方に至るまで該ケーソンAを
降下させる。然る後、型枠6,7を再度所定の形状に組
み、次の成形高さまでコンクリートを打設する。
In this state, each of the hanging means 10 is operated to slowly pull out the hanging material 9 and lower the caisson A until the upper end of the caisson A reaches above the lower edges of the lower frames 6 and 7. Thereafter, the molds 6 and 7 are assembled again into a predetermined shape, and concrete is poured to the next molding height.

【0023】このように、型枠の組み立て、コンクリー
トの打設、脱型、ケーソンの降下を順次一定高さ分づつ
行って上方にコンクリートを打ち継ぎ、最終高さまで成
形する。また、吊材9は一定長さのものをカプラ−(図
示せず)等の連結具を使用して上方に順次連結しつつ順
次下方に繰り出す。
As described above, the assembling of the formwork, the casting of the concrete, the removal of the mold, and the lowering of the caisson are sequentially performed at a constant height, and the concrete is spliced upward to form the final height. Further, the hanging members 9 are sequentially extended upward while being sequentially coupled upward using a coupling tool such as a coupler (not shown).

【0024】このようにして成形されるケーソンAは、
成形途中において水中に順次沈み、これに浮力が作用す
るため、使用する浮体は、完成されたケーソンの全重量
から浮力を差し引いた分を支えることとなる。
The caisson A thus formed is
Since it sinks in water in the middle of molding and exerts buoyancy on it, the floating body used supports the amount obtained by subtracting the buoyancy from the total weight of the completed caisson.

【0025】このようにして製作されたケーソンAは、
浮体1に支持させて水中に吊り下げた状態で必要な設置
場所に曳航し、吊降ろし手段10によって水底に降下さ
せ、図6に示すように底部に水中コンクリートを打設す
ることにより、水底に予め設置した杭等の基礎構造物1
4と一体に底盤15を成形することができる。
The caisson A thus manufactured is
In the state of being supported by the floating body 1 and suspended in the water, it is towed to a required installation place, lowered to the bottom of the water by the hanging means 10, and poured underwater concrete into the bottom as shown in FIG. Foundations 1 such as piles installed in advance
The bottom plate 15 can be formed integrally with the bottom plate 4.

【0026】尚、浮体1をコ字状に形成しているため、
例えば図7に示すように岸壁20に接して係留した状態
でケーソン製作することができ、資材の搬入が容易とな
る。
Since the floating body 1 is formed in a U-shape,
For example, as shown in FIG. 7, a caisson can be manufactured in a state moored in contact with the quay 20, and the material can be easily carried in.

【0027】また、防波堤等のケーソン設置現場におい
て、図8に示すように既設ケーソン21に連続させた位
置でケーソンを製作し、そのまま沈設することもでき、
曳航が不要となり、防波堤が陸続きである場合には既存
ケーソンを資材搬入路として使用できる。
At a caisson installation site such as a breakwater, a caisson can be manufactured at a position connected to the existing caisson 21 as shown in FIG.
Towing is not required, and the existing caisson can be used as a material loading route when the breakwater is connected to land.

【0028】[0028]

【発明の効果】上述のように、本発明に係るコンクリー
トケーソン製作方法及びその装置にあっては、水面上に
浮上させた浮体に支持させて水面上にケーソン成形型枠
を設置し、該型枠内にコンクリートを打設して所定高さ
分のケーソンを成形すると同時に、該ケーソンにケーソ
ン支持用吊材を固定し、前記ケーソン支持用吊材を前記
浮体に支持させて成形されるケーソンを吊持ちさせ、前
記コンクリートの固化を待ってケーソン支持用吊材を下
方に繰り出して前記ケーソンを水中に降下させることに
より前記型枠をケーソン上方に相対移動させて次のコン
クリートを順次打ち継ぐようにしたことにより、ケーソ
ンはその完成時に浮体に支持されて水中に吊り下げられ
たこととなり、従来のように進水作業が不要となり、そ
のための設備も省略されるため、従来に比べて低コスト
でケーソン製造が可能となる。
As described above, in the method and apparatus for manufacturing a concrete caisson according to the present invention, a caisson forming form is installed on a water surface while being supported by a floating body floating on the water surface. At the same time as casting a caisson of a predetermined height by casting concrete in the frame, a caisson supporting suspension is fixed to the caisson, and a caisson formed by supporting the caisson supporting suspension on the floating body is formed. Hanging, waiting for the concrete to solidify, pulling out the caisson support hanging material and lowering the caisson into water so that the formwork is relatively moved above the caisson so that the next concrete is successively inherited When the caisson was completed, the caisson was supported by a floating body and hung underwater. Because it is, it is possible to caisson manufactured at lower cost than before.

【0029】また、底盤を持たないケーソンの製造が容
易となり、水底への設置に際し、底盤を基礎構造物と一
体に成形することが容易となり、安定性の高い設置が容
易にできるケーソンが製造できる。
In addition, it becomes easy to manufacture a caisson having no bottom plate, and it is easy to form the bottom plate integrally with the substructure when installing the caisson on the water bottom, so that a caisson that can be easily installed with high stability can be manufactured. .

【0030】更に、両端を浮体に支持させて水面上方に
吊持ち用梁を複数設置し、該梁にケーソン支持用吊材及
びケーソン成形型枠を支持させることにより、型枠は水
面上の比較的低い位置にあって常に一定の高さに置くこ
となり、高所作業がなくなって作業性が良くなる。
Furthermore, a plurality of hanging beams are installed above the water surface with both ends supported by a floating body, and the caisson supporting hanging material and the caisson forming form are supported by the beams, so that the form can be compared with the water surface. It is always located at a fixed height at a relatively low position, so that work at high places is eliminated and workability is improved.

【0031】更に、浮体は平面がコ字状に形成され、一
辺側開放されたケーソン吊降ろし用空間を備え、該空間
内にケーソンを吊り下げて順次降下させることにより、
海面より高くなるケーソンの設置工事が可能となる。
Further, the floating body has a U-shaped flat surface and is provided with a caisson hanging space open on one side, and the caisson is hung in the space and lowered sequentially,
Caisson installation work that is higher than the sea level will be possible.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係るコンクリートケーソン水上製作装
置の一例の平面図である。
FIG. 1 is a plan view of an example of a concrete caisson floating apparatus according to the present invention.

【図2】同上の縦断面図である。FIG. 2 is a longitudinal sectional view of the same.

【図3】図1に示す装置を使用したコンクリートケーソ
ン水上製作方法における型枠装置の初期組み立て後、1
段目コンクリート打設状態を示す断面図である。
FIG. 3 shows an initial assembly of a formwork device in a concrete caisson surface manufacturing method using the device shown in FIG.
It is sectional drawing which shows a stage concrete pouring state.

【図4】同上の1段目成形ケーソンの降下状態を示す断
面図である。
FIG. 4 is a cross-sectional view showing a lowered state of the first-stage caisson according to the first embodiment.

【図5】同上の完成ケーソン曳航時の状態を示す断面図
である。
FIG. 5 is a sectional view showing a state when the completed caisson is towed.

【図6】同上のケーソン設置状態の1例の断面図であ
る。
FIG. 6 is a cross-sectional view of an example of the caisson installed state in the same.

【図7】岸壁に接岸状態で製作及び曳航を示す平面図で
ある。
FIG. 7 is a plan view showing production and towing in a state of berthing on a quay.

【図8】堤体設置現場での製作状態を示す平面図であ
る。
FIG. 8 is a plan view showing a production state at a bank body installation site.

【符号の説明】[Explanation of symbols]

A ケーソン 1 浮体 2 ケーソン吊降ろし空間 3 立ち上り部 4 支柱 5 ケーソン成形型枠装置 6 外型枠 7 内型枠 8 型枠保持機構 9 吊材 10 吊降ろし手段 11 コンクリート打設部 12 底面型枠 13 コンクリート 14 基礎構造物 15 底盤 20 岸壁 21 既設ケーソン DESCRIPTION OF SYMBOLS A Caisson 1 Floating body 2 Caisson hanging space 3 Stand-up part 4 Prop 5 Caisson forming formwork device 6 Outer formwork 7 Inner formwork 8 Formwork holding mechanism 9 Hanging material 10 Suspension means 11 Concrete casting section 12 Bottom formwork 13 Concrete 14 Foundation 15 Basement 20 Quay 21 Existing caisson

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】水面上に浮上させた浮体に支持させて水面
上にケーソン成形型枠を設置し、該型枠内にコンクリー
トを打設して所定高さ分のケーソンを成形すると同時
に、該ケーソンにケーソン支持用吊材を固定し、前記ケ
ーソン支持用吊材を前記浮体に支持させて製作されるケ
ーソンを吊持ちさせ、前記コンクリートの固化を待って
ケーソン支持用吊材を延長させて前記ケーソンを水中に
降下させることにより前記型枠をケーソン上方に相対移
動させて次のコンクリートを順次打ち継ぐことを特徴と
してなるコンクリートケーソン水上製作方法。
1. A caisson forming formwork is installed on a water surface while being supported by a floating body floating on the water surface, and concrete is poured into the formwork to form a caisson of a predetermined height. The caisson supporting hanging material is fixed to the caisson, the caisson manufactured by supporting the caisson supporting hanging material on the floating body is suspended, and the caisson supporting hanging material is extended after the concrete is solidified. A method for manufacturing a concrete caisson on water, comprising: moving the form relative to the upper part of the caisson by lowering the caisson into water;
【請求項2】両端を浮体に支持させて水面上方に吊持ち
用梁を複数設置し、該梁にケーソン支持用吊材及びケー
ソン成形型枠を支持させてなる請求項1に記載のコンク
リートケーソン水上製作方法。
2. The concrete caisson according to claim 1, wherein a plurality of hanging beams are installed above the water surface with both ends supported by a floating body, and the caisson supporting hanging material and the caisson forming form are supported by the beams. Water production method.
【請求項3】浮体は平面がコ字状に形成され、一辺側が
開放されたケーソン吊降ろし用空間を備え、該空間内に
ケーソンを吊り下げて順次降下させる請求項1若しくは
2に記載のコンクリートケーソン水上製作方法。
3. The concrete according to claim 1, wherein the floating body has a U-shaped flat surface, and has a caisson hanging space with one side open, and the caisson is hung in the space to descend sequentially. Caisson water production method.
【請求項4】水面上に浮上させた浮体と、該浮体に支持
させた吊持ち手段と、該吊持ち手段に支持されたケーソ
ン成型型枠と、該型枠内にて順次成形されるケーソンを
前記吊持ち手段に対して吊持ちさせる吊材と、該吊材を
ケーソン降下方向に繰り出す吊降ろし手段とを備えてな
るコンクリートケーソン水上製作装置。
4. A floating body floated on the water surface, a suspending means supported by the floating body, a caisson molding form supported by the suspending means, and a caisson formed sequentially in the form. A concrete caisson water making apparatus, comprising: a suspending member for suspending the suspending member with respect to the suspending means; and a suspending means for extending the suspending member in a caisson descending direction.
【請求項5】浮体は平面がコ字状に形成され、一辺側が
開放されたケーソン吊降ろし用空間を備え、該吊降ろし
空間の上方に、ケーソン成型型枠及びケーソン支持用吊
材を支持させる複数の梁を横架させてなる請求項4に記
載のコンクリートケーソン水上製作装置。
5. A floating body having a U-shaped flat surface and a caisson hanging space having an open side, and a caisson molding form and a caisson supporting hanging material are supported above the hanging space. 5. The concrete caisson surfacing apparatus according to claim 4, wherein a plurality of beams are laid horizontally.
JP2000030233A 2000-02-02 2000-02-02 Method of manufacturing concrete caisson on water and its equipment Pending JP2001214454A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000030233A JP2001214454A (en) 2000-02-02 2000-02-02 Method of manufacturing concrete caisson on water and its equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000030233A JP2001214454A (en) 2000-02-02 2000-02-02 Method of manufacturing concrete caisson on water and its equipment

Publications (1)

Publication Number Publication Date
JP2001214454A true JP2001214454A (en) 2001-08-07

Family

ID=18555274

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000030233A Pending JP2001214454A (en) 2000-02-02 2000-02-02 Method of manufacturing concrete caisson on water and its equipment

Country Status (1)

Country Link
JP (1) JP2001214454A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101041361B1 (en) * 2008-07-29 2011-06-15 박진화 Construction SystemFor Concrete Sunken Well Using A Pontoon
JP2016088443A (en) * 2014-11-10 2016-05-23 清水建設株式会社 Marine work system of undersea structure and marine constructing method
KR102612922B1 (en) * 2022-06-09 2023-12-11 지에스건설 주식회사 Manufacturing apparatus for caisson having steel mold and manufacturing method using the same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101041361B1 (en) * 2008-07-29 2011-06-15 박진화 Construction SystemFor Concrete Sunken Well Using A Pontoon
JP2016088443A (en) * 2014-11-10 2016-05-23 清水建設株式会社 Marine work system of undersea structure and marine constructing method
KR102612922B1 (en) * 2022-06-09 2023-12-11 지에스건설 주식회사 Manufacturing apparatus for caisson having steel mold and manufacturing method using the same

Similar Documents

Publication Publication Date Title
GB1574784A (en) Method and apparatus for casting tanks in water
KR101746097B1 (en) Construction method for caisson block and structure of caisson blocks
KR20140009925A (en) Harbor structures construction equipment and it's construction method
JP4745496B2 (en) Floating formwork support and construction method of water structure
JP2001214454A (en) Method of manufacturing concrete caisson on water and its equipment
KR101031571B1 (en) Method for constructing seperating type caisson
JP3263049B2 (en) Caisson manufacturing and transporting apparatus and method
EP0029044B1 (en) A method of carrying out slip form casting of concrete structures under water and apparatus for carrying out the method
JP2001214419A (en) Method for setting up ocean stricture using caisson
JP2001214418A (en) Method for producing and installing concrete caisson on water surface
JPH1046597A (en) Execution work method of steel shell caisson
CN101748752B (en) Construction method of pronated style tunnel bridge
JP2868725B2 (en) Seawall repair method
JP5588929B2 (en) Offshore structure construction method and offshore structure
KR100884050B1 (en) Method for building well foundation of bridge using pontoon
CN213772982U (en) Open-self type collecting hopper device of open caisson
JP2920170B2 (en) Caisson manufacturing method
JP2001003332A (en) Immersion method for caisson and floater for immersing the caisson
JP2008082095A (en) Construction method of caisson skeleton
JP5910961B2 (en) Construction method of pier structure
JPS6319337A (en) Floating dock for production and installation of caisson
JP3170670B2 (en) Construction method for floating structures
JP3443789B2 (en) Bearing base of sliding bearing for underwater tunnel and method of constructing it
US3608320A (en) Method and apparatus for constructing a concrete wall structure in open water
JP3268199B2 (en) Floating body launch equipment