JP2001206670A - Suspension hook for crane - Google Patents

Suspension hook for crane

Info

Publication number
JP2001206670A
JP2001206670A JP2000015456A JP2000015456A JP2001206670A JP 2001206670 A JP2001206670 A JP 2001206670A JP 2000015456 A JP2000015456 A JP 2000015456A JP 2000015456 A JP2000015456 A JP 2000015456A JP 2001206670 A JP2001206670 A JP 2001206670A
Authority
JP
Japan
Prior art keywords
hook
hanging
trip
rod
lever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000015456A
Other languages
Japanese (ja)
Inventor
Seiichi Oyama
聖一 尾山
Yasuhiko Murakami
安彦 村上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanwa Tekki Corp
Kurihara Kogyo Co Ltd
Original Assignee
Sanwa Tekki Corp
Kurihara Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanwa Tekki Corp, Kurihara Kogyo Co Ltd filed Critical Sanwa Tekki Corp
Priority to JP2000015456A priority Critical patent/JP2001206670A/en
Publication of JP2001206670A publication Critical patent/JP2001206670A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a suspension hook for a crane capable of omitting the arrangement of a worker in a vertical shaft in the work for storing surplus soil in a sediment bucket and lowering it into the vertical shaft with the crane. SOLUTION: This suspension hook 1 compresses a hook body 2 locked with the inversion rope R of the sediment bucket B, a trip lever 3 rotatably provided on the hook body 2, and an operation rope 4 for rotating the trip lever 3 to a trip position. The suspension band T of the sediment bucket B loaded with surplus soil is hooked on a hook 6, the sediment bucket B is lowered into the vertical shaft with the open section of the hook 6 kept closed by a closing bar 8, then the operation rope 4 is pulled from above to rotate the trip lever 3 to the trip position, and the suspension band T is removed from the hook 6. The hook body 2 is hoisted together with the inversion rope R, and the sediment bucket B is inverted for unloading.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、基礎工事用の縦
坑の埋め戻し作業等、土砂を下方へ吊り降ろす作業に使
用されるクレーン用の吊り下げフックに関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a hanging hook for a crane used for hanging earth and sand downward such as backfilling a shaft for foundation work.

【0002】[0002]

【従来の技術】従来、例えば送電鉄塔の深礎基礎では地
中に中空の駆体部が構築される。この地中に形成される
縦坑としての中空部に、残土を埋め戻す作業は、土砂バ
ケットに残土を収容してクレーンで吊り降ろすことによ
り行われている。この作業では、クレーンの吊り下げフ
ックから土砂バケットの吊り帯を外すための作業員を1
名縦坑内に配置する必要がある。縦坑内は狭く、十分な
退避空間がないので作業員に危険が伴う。そこで、縦坑
内の作業員の配置を省略することにより危険を回避し又
作業を合理化する新たな工事方法が求められていた。
2. Description of the Related Art Conventionally, for example, on a deep foundation of a power transmission tower, a hollow driving unit is constructed underground. The operation of backfilling the remaining soil in the hollow part as a shaft formed in the ground is performed by storing the remaining soil in a sediment bucket and hanging it down with a crane. In this operation, one worker was required to remove the suspension band of the earth and sand bucket from the suspension hook of the crane.
It is necessary to place it in a well shaft. The inside of the shaft is narrow and there is not enough evacuation space. Therefore, there is a need for a new construction method that avoids danger and simplifies the work by omitting the arrangement of workers in the shaft.

【0003】[0003]

【発明が解決しようとする課題】従って、本発明は、土
砂バケットに残土を収容してクレーンで低所へ吊り降ろ
す作業において、縦坑内の作業員の配置を省略できる新
規なクレーン用吊り下げフックを提供することを課題と
している。
SUMMARY OF THE INVENTION Accordingly, the present invention relates to a novel hanging hook for a crane which can omit the arrangement of a worker in a vertical shaft in an operation of storing remaining soil in a sediment bucket and hanging it down to a low place by a crane. The challenge is to provide

【0004】[0004]

【課題を解決するための手段】本発明においては、上記
課題を解決するため、土砂バケットBの反転用ロープR
が係止されたフック本体2と、フック本体2に回動可能
に設けられた引き外しレバー3と、引き外しレバー3を
引き外し位置へ回動させるための操作ロープ4とを具備
させて吊り下げフック1を構成する。フック本体2に
は、上端においてクレーンに吊り止められる主桿5と、
主桿5の下端から側方へほぼレ字状を成すように延出し
たフック6とを具備させる。引き外しレバー3には、基
端部においてフック本体2の主桿5に枢支し、この基端
部からほぼV字状に分岐した閉鎖桿8と引き外し桿9と
を具備させる。引き外しレバー3は、それの閉鎖桿8
が、フック6と主桿5との間の開放部を閉鎖する元位置
と、引き外し桿9が吊り帯Tをフック6から引き外し、
かつ開放部を閉鎖する引き外し位置との間で回動可能に
構成する。引き外しレバー3には、上方から引くことで
引き外しレバー3を引き外し位置へ回動させる操作ロー
プ4の一端を係止する。引き外しレバー3上には、それ
とフック本体2との相対回転の動作を制御するためのプ
ランジャ摘み14を設ける。プランジャ摘み14は、常
時突出した先端をフック本体2の主桿5の側面に摺動可
能に弾性的に圧接させ、引き外しレバー3が引き外し位
置に到ったときに主桿5の側面から外れて突出し、元位
置への復帰を阻止し、かつ手動操作で先端を引込めるこ
とができるように構成する。残土等の荷を積んだ土砂バ
ケットBの吊り帯Tをフック6に掛け、閉鎖桿8でフッ
ク6の開放部を閉鎖した状態で土砂バケットBを下方の
荷降ろし位置へ吊り降ろした後、上方から操作ロープ4
を引いて外しレバー3を引き外し位置へ回動させること
により吊り帯Tをフック6から外す。フック本体2を反
転用ロープRと共に吊り上げることにより、土砂バケッ
トBを反転させて荷降ろしする。
In the present invention, in order to solve the above-mentioned problems, a reversing rope R for a sediment bucket B is provided.
The hook body 2 is provided with a hook body 2, a trip lever 3 rotatably provided on the hook body 2, and an operation rope 4 for turning the trip lever 3 to a trip position. The lower hook 1 is constituted. The hook body 2 has a main rod 5 suspended at the upper end from a crane,
A hook 6 extending laterally from the lower end of the main rod 5 so as to form a substantially rectangular shape. The trip lever 3 is provided at its base end with a closing rod 8 and a tripping rod 9 which are pivotally supported by the main rod 5 of the hook body 2 and branch off from the base end in a substantially V-shape. The release lever 3 has its closing rod 8
However, the original position at which the opening between the hook 6 and the main rod 5 is closed, and the release rod 9 pulls the suspension band T from the hook 6,
Further, it is configured to be rotatable between a trip position in which the opening is closed. One end of an operation rope 4 that locks the trip lever 3 to the trip position by pulling from above is locked to the trip lever 3. A plunger knob 14 is provided on the trip lever 3 to control the relative rotation between the trip lever 3 and the hook body 2. The plunger knob 14 slidably and elastically presses the protruding tip against the side surface of the main rod 5 of the hook body 2, and from the side of the main rod 5 when the trip lever 3 reaches the trip position. It is configured such that it protrudes off, prevents return to its original position, and allows the tip to be retracted manually. After hanging the hanging band T of the sediment bucket B loaded with the residual soil or the like on the hook 6 and suspending the open portion of the hook 6 with the closing rod 8 to lower the sediment bucket B to the lower unloading position, Operation rope 4 from
To remove the suspension band T from the hook 6 by rotating the release lever 3 to the release position. By lifting the hook body 2 together with the reversing rope R, the earth and sand bucket B is reversed and unloaded.

【0005】[0005]

【発明の実施の形態】図面を参照して本発明の実施形態
を説明する。図1はクレーン用吊り下げフックの正面
図、図2は同側面図、図3はクレーン用吊り下げフック
の一部の拡大断面図、図4は土砂バケットの吊り帯を外
す動作時のクレーン用吊り下げフックの正面図、図5は
本発明に係る吊り下げフックを用いた縦坑の埋め戻し作
業の手順を示す説明図である。
Embodiments of the present invention will be described with reference to the drawings. 1 is a front view of a hanging hook for a crane, FIG. 2 is a side view of the same, FIG. 3 is an enlarged cross-sectional view of a part of the hanging hook for a crane, and FIG. FIG. 5 is a front view of the hanging hook, and FIG. 5 is an explanatory view showing the procedure of backfilling a shaft using the hanging hook according to the present invention.

【0006】クレーン用吊り下げフック1は、図5に示
すように、土砂バケットBの吊り帯Tと反転用ロープR
とを掛け止め、土砂を縦坑Hの底へ吊り降ろすために使
用される。
As shown in FIG. 5, a hanging hook 1 for a crane includes a hanging band T of a sediment bucket B and a reversing rope R.
And used to suspend earth and sand to the bottom of the shaft H.

【0007】図1乃至図4において、2はフック本体、
3は引き外しレバー、4は操作ロープである。フック本
体2は、主桿5とフック6とを備える。主桿5は、上端
においてワイヤロープWを介してクレーンに吊り止めら
れ、下端には、土砂バケットBの反転用ロープRが係止
される。フック6は、主桿5の下端から側方へほぼレ字
状を成すように延出する。フック6の先端には、主桿5
と反対側へ突出した係合片7が設けられている。係合片
7は、吊り下げ状態において垂直に対してほぼ35度傾
斜した平坦な係合斜面7aを備えている。
1 to 4, reference numeral 2 denotes a hook body,
Reference numeral 3 denotes a release lever, and reference numeral 4 denotes an operation rope. The hook main body 2 includes a main rod 5 and a hook 6. The main rod 5 is suspended from the crane via a wire rope W at the upper end, and the reversing rope R of the earth and sand bucket B is locked at the lower end. The hook 6 extends laterally from the lower end of the main rod 5 so as to form a substantially rectangular shape. At the tip of the hook 6, the main rod 5
An engagement piece 7 protruding to the opposite side is provided. The engagement piece 7 has a flat engagement slope 7a that is inclined approximately 35 degrees with respect to the vertical in the suspended state.

【0008】引き外しレバー3は、2枚の同形の構成板
3aを、フック本体2を挟んでボルトナットで平行に間
隔をおいて組み立てたもので、基端部からほぼV字状に
二股に分岐した閉鎖桿8と引き外し桿9とを具備する。
引き外しレバー3は、基端部においてフック本体2の主
桿5に枢ピン10で枢支されており、閉鎖桿8が、フッ
ク6と主桿5との間の開放部を閉鎖する元位置(図1の
状態)と、引き外し桿9が吊り帯Tをフック6から引き
外し、かつ開放部を閉鎖する引き外し位置(図4の状
態)との間で回動可能である。引き外しレバー3は、主
桿5上に突設されたストッパ11により、元位置より図
1において反時計方向への回動を阻止されている。に閉
鎖桿8の先端部には、引き手12を介して、引き外しレ
バー3を回動操作するための操作ロープ4が係止され
る。
The trip lever 3 is formed by assembling two identical component plates 3a at intervals with a bolt and a nut across the hook body 2, and bifurcated in a substantially V-shape from the base end. A branch rod (8) and a trip rod (9) are provided.
The trip lever 3 is pivotally supported at its base end by a main pin 5 of the hook body 2 with a pivot pin 10, and the closing rod 8 closes the opening between the hook 6 and the main rod 5. 1 (a state in FIG. 1) and a tripping position in which the tripping rod 9 detaches the hanging band T from the hook 6 and closes the opening (the state in FIG. 4). The trip lever 3 is prevented from rotating counterclockwise in FIG. 1 from its original position by a stopper 11 protruding from the main rod 5. An operation rope 4 for rotating the tripping lever 3 is locked to the tip of the closing rod 8 via a puller 12.

【0009】引き外し桿9の途上から側方へ延出した枝
桿13には、プランジャ摘み14が取り付けられてい
る。プランジャ摘み14は、主桿5の側面に垂直に進退
自在に設けられ、常時突出した先端を主桿5の側面に摺
動可能に弾性的に圧接させるように付勢されている。プ
ランジャ摘み14の先端は、引き外しレバー3が引き外
し位置(図4)に到ったときに、主桿5の側面から外れ
て突出し、引き外しレバー3が元位置へ復帰するのを阻
止する。手動操作でプランジャ摘み14の先端を引込め
れば、引き外しレバー3を元位置へ復帰させることがで
きる。
A plunger knob 14 is attached to the branch rod 13 extending laterally from the middle of the trip rod 9. The plunger knob 14 is provided to be vertically movable on the side surface of the main rod 5, and is urged so as to elastically press the protruding tip slidably against the side surface of the main rod 5. The tip of the plunger knob 14 is disengaged from the side surface of the main rod 5 and protrudes when the trip lever 3 reaches the trip position (FIG. 4), and prevents the trip lever 3 from returning to the original position. . If the tip of the plunger knob 14 is pulled in manually, the trip lever 3 can be returned to the original position.

【0010】操作ロープ4の係止用の引き手12は、基
端において枢ピン15に固着されている。枢ピン15の
両端は、閉鎖桿8の先端部に枢支されている。枢ピン1
5の中央部には、その回転角度によりフック6の係合片
7に係合し、又は離脱する係合コマ16が設けられてい
る。係合コマ16は、係合片7の係合斜面7aに係合す
る平滑な係合面16aを備えている。従って、操作ロー
プ4を引いたとき、引き手12、枢ピン15と共に係合
コマ16が回転し、係合片7との係合が外れ、引き外し
レバー3の引き外し方向(図において時計方向)への回
動を許容するようになっている。
A pull 12 for locking the operation rope 4 is fixed to a pivot pin 15 at a base end. Both ends of the pivot pin 15 are pivotally supported by distal ends of the closing rod 8. Pivot pin 1
An engaging piece 16 is provided at the center of the hook 5 to be engaged with or disengaged from the engaging piece 7 of the hook 6 depending on its rotation angle. The engagement piece 16 has a smooth engagement surface 16a that engages with the engagement slope 7a of the engagement piece 7. Accordingly, when the operating rope 4 is pulled, the engaging piece 16 rotates together with the puller 12 and the pivot pin 15, disengaging from the engaging piece 7, and the releasing direction of the releasing lever 3 (clockwise in the figure). ) Is allowed.

【0011】図5(a)に示すように、荷を積んだ土砂
バケットBの吊り帯Tをフック6に掛け、閉鎖桿8でフ
ック6の開放部を閉鎖した状態(図1)で、土砂バケッ
トBを縦坑Hの底の荷降ろし位置へ吊り降ろす。
As shown in FIG. 5 (a), the hanging band T of the loaded sediment bucket B is hooked on the hook 6, and the opening portion of the hook 6 is closed with the closing rod 8 (FIG. 1). The bucket B is lowered to the unloading position at the bottom of the shaft H.

【0012】この後、図5(b)に示すように、地上か
ら操作ロープ4を引いて、引き外しレバー3を引き外し
位置(図4)へ回動させることにより吊り帯Tをフック
6から外す。この間、まず操作ロープ4に引かれて引き
手12が係合コマ16と共に回転し、係合片7との係合
が外れ、引き外しレバー3の回動が可能となる。引き外
しレバー3が引き外し位置(図4)まで回動し終わる
と、それまで主桿5の側面を摺動してきたプランジャ摘
み14の先端が主桿5の側面から外れて突出し、引き外
しレバー3が元位置へ復帰するのを阻止する。
Thereafter, as shown in FIG. 5 (b), by pulling the operation rope 4 from the ground and turning the trip lever 3 to the trip position (FIG. 4), the suspension band T is pulled from the hook 6. remove. During this time, first, the pull rope 12 is pulled by the operation rope 4 and rotates together with the engagement piece 16, disengagement from the engagement piece 7, and rotation of the release lever 3 becomes possible. When the trip lever 3 has been rotated to the trip position (FIG. 4), the tip of the plunger knob 14 that has slid on the side surface of the main rod 5 comes off the side surface of the main rod 5 and protrudes. 3 is prevented from returning to its original position.

【0013】次いで図5(c)に示すように、フック本
体2を反転用ロープRと共に吊り上げることにより、土
砂バケットBを反転させて荷降ろしする。
Next, as shown in FIG. 5 (c), by lifting the hook body 2 together with the reversing rope R, the earth and sand bucket B is reversed and unloaded.

【0014】[0014]

【発明の効果】以上のように、本発明においては、残土
等の荷を積んだ土砂バケットBの吊り帯Tをフック6に
掛け、閉鎖桿8でフック6の開放部を閉鎖した状態で土
砂バケットBを下方の荷降ろし位置へ吊り降ろした後、
上方から操作ロープ4を引いて引き外しレバー3を引き
外し位置へ回動させることにより、吊り帯Tをフック6
から外し、フック本体2を反転用ロープRと共に吊り上
げることにより、土砂バケットBを反転させて荷降ろし
する。従って、クレーンの吊り下げフック1から土砂バ
ケットBの吊り帯Tを外すための作業員を危険な縦坑内
に配置する必要がなく、作業を合理化することができる
という効果を有する。
As described above, in the present invention, the hanging band T of the earth and sand bucket B loaded with the residual soil and the like is hung on the hook 6 and the closing rod 8 closes the open portion of the hook 6 so that the earth and sand are closed. After lowering the bucket B to the lower unloading position,
By pulling the operation rope 4 from above and turning the trip lever 3 to the trip position, the hanging strap T is hooked to the hook 6.
The earth and sand bucket B is inverted and unloaded by lifting the hook body 2 together with the inverting rope R. Therefore, there is no need to arrange a worker for removing the hanging band T of the earth and sand bucket B from the hanging hook 1 of the crane in the dangerous vertical shaft, and the operation can be streamlined.

【図面の簡単な説明】[Brief description of the drawings]

【図1】クレーン用吊り下げフックの正面図である。FIG. 1 is a front view of a hanging hook for a crane.

【図2】クレーン用吊り下げフックの側面図である。FIG. 2 is a side view of a hanging hook for a crane.

【図3】クレーン用吊り下げフックの一部の拡大断面図
である。
FIG. 3 is an enlarged sectional view of a part of a hanging hook for a crane.

【図4】土砂バケットの吊り帯を外す動作時のクレーン
用吊り下げフックの正面図である。
FIG. 4 is a front view of a hanging hook for a crane during an operation of removing a hanging band of an earth and sand bucket.

【図5】本発明に係る吊り下げフックを用いた縦坑の埋
め戻し作業の手順を示す説明図である。
FIG. 5 is an explanatory view showing a procedure of backfilling a shaft using a hanging hook according to the present invention.

【符号の説明】[Explanation of symbols]

1 吊り下げフック 2 フック本体 3 引き外しレバー 4 操作ロープ 5 主桿 6 フック 7 係合片 8 閉鎖桿 9 引き外し桿 10 枢ピン 11 ストッパ 12 引き手 14 プランジャ摘み DESCRIPTION OF SYMBOLS 1 Hanging hook 2 Hook main body 3 Tripping lever 4 Operation rope 5 Main rod 6 Hook 7 Engagement piece 8 Closing rod 9 Tripping rod 10 Pivot pin 11 Stopper 12 Puller 14 Plunger knob

───────────────────────────────────────────────────── フロントページの続き (72)発明者 村上 安彦 東京都品川区南品川6丁目5番19号 三和 テッキ株式会社内 Fターム(参考) 3F004 CA01 CC04 CD09 DA02 DA07 EA35 LA08  ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Yasuhiko Murakami 6-5-19 Minamishinagawa, Shinagawa-ku, Tokyo F-term in Sanwa Tekki Co., Ltd. 3F004 CA01 CC04 CD09 DA02 DA07 EA35 LA08

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 土砂バケットの吊り帯と反転用ロープと
を掛け止め、土砂を下方へ吊り降ろすために使用される
クレーン用吊り下げフックであって、 上端において前記クレーンに吊り止められる主桿と、主
桿の下端から側方へほぼレ字状を成すように延出したフ
ックとを備えると共に、前記土砂バケットの反転用ロー
プが係止されたフック本体と、 基端部において前記フック本体の主桿に枢支され、この
基端部からほぼV字状に二股に分岐した閉鎖桿と引き外
し桿とを具備し、閉鎖桿が、フック本体のフックと主桿
との間の開放部を閉鎖する元位置と、引き外し桿が前記
吊り帯をフックから引き外し、かつ前記開放部を閉鎖す
る引き外し位置との間で回動可能に構成された引き外し
レバーと、 この引き外しレバーに一端が係止され、上方から引くこ
とによって引き外しレバーを引き外し位置へ回動させる
ための操作ロープと、 前記引き外しレバー上に設けられ、常時突出した先端を
前記フック本体の主桿の側面に摺動可能に弾性的に圧接
させ、引き外しレバーが引き外し位置に到ったときに主
桿の側面から外れて突出し、元位置への復帰を阻止し、
かつ手動操作で先端を引込めることができるように構成
されたプランジャ摘みとを具備し、 荷を積んだ前記土砂バケットの吊り帯をフックに掛け、
閉鎖桿でフックの開放部を閉鎖した状態で土砂バケット
を下方の荷降ろし位置へ吊り降ろした後、上方から操作
ロープを引いて外しレバーを引き外し位置へ回動させる
ことにより吊り帯をフックから外し、フック本体を吊り
上げることにより土砂バケットを反転させて荷降ろしす
るように構成したことを特徴とするクレーン用吊り下げ
フック。
1. A hanging hook for a crane used for hanging a hanging band of a sediment bucket and a reversing rope and hanging down the earth and sand, comprising: a main rod suspended at an upper end by the crane; A hook body extending substantially sideways from the lower end of the main rod, and a hook body to which a reversing rope of the earth and sand bucket is locked; and a hook body at a base end portion. It is pivotally supported by the main rod, and comprises a closing rod and a tripping rod that bifurcate in a substantially V-shape from the base end, and the closing rod defines an opening between the hook of the hook body and the main rod. A trip lever configured to be rotatable between an original position to be closed and a trip position in which the trip rod detaches the hanging band from the hook and closes the opening; and One end is locked, from above An operation rope for turning the trip lever to the trip position by pulling, and a tip provided on the trip lever and having a constantly protruding tip slidably on the side surface of the main rod of the hook body. When the release lever reaches the release position, it comes off from the side of the main rod and protrudes, preventing the return to the original position,
And a plunger knob configured so that the tip can be retracted by manual operation.Hang the hanging band of the loaded earth and sand bucket on a hook,
After hanging the earth and sand bucket to the lower unloading position with the opening part of the hook closed with the closing rod, pull the operating rope from above and remove the lever, and rotate the lever to the pulling position to move the hanging strap from the hook. A hanging hook for a crane, characterized in that the earth and sand bucket is inverted by unloading and lifting a hook body to unload.
【請求項2】 前記フック本体のフックの先端部に係合
片が突設され、前記引き外しレバーの閉鎖桿の先端部に
は、前記操作ロープを係止するための引き手を固着した
枢ピンが枢支され、この枢ピンには、その回転角度によ
り前記フックの係合片に係合し又は離脱する係合コマが
設けられ、 前記操作ロープを引いたとき、前記引き手、枢ピンと共
に係合コマが回転して前記フックの係合片との係合が外
れ、前記引き外しレバーの引き外し方向への回動を許容
するように構成したことを特徴とする請求項1に記載の
クレーン用吊り下げフック。
2. An engaging piece protruding from a tip of a hook of the hook body, and a pivot fixed to a tip of a closing rod of the trip lever for locking the operating rope. A pin is pivotally supported, and the pivot pin is provided with an engagement piece that engages with or disengages from the engagement piece of the hook depending on its rotation angle. When the operating rope is pulled, the puller, the pivot pin 2. The hook according to claim 1, wherein the engaging piece is rotated to disengage the hook from the engaging piece, and the turning lever is allowed to rotate in the pulling direction. 3. Hanging hooks for cranes.
JP2000015456A 2000-01-25 2000-01-25 Suspension hook for crane Pending JP2001206670A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000015456A JP2001206670A (en) 2000-01-25 2000-01-25 Suspension hook for crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000015456A JP2001206670A (en) 2000-01-25 2000-01-25 Suspension hook for crane

Publications (1)

Publication Number Publication Date
JP2001206670A true JP2001206670A (en) 2001-07-31

Family

ID=18542756

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000015456A Pending JP2001206670A (en) 2000-01-25 2000-01-25 Suspension hook for crane

Country Status (1)

Country Link
JP (1) JP2001206670A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PT106229A (en) * 2012-03-27 2013-09-27 Martinho & Santos Unipessoal Lda LOAD HOOK SECURITY SYSTEM ALWAYS OPEN
CN103612974A (en) * 2013-12-06 2014-03-05 攀枝花钢城集团有限公司 Rope locking device of lifting hook of crane
JP2015011802A (en) * 2013-06-27 2015-01-19 中国電力株式会社 High-voltage strain insulator
CN109879157A (en) * 2019-04-10 2019-06-14 贵州钢绳股份有限公司 A kind of 300 type I-beam wheel safty hoisting mechanisms

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PT106229A (en) * 2012-03-27 2013-09-27 Martinho & Santos Unipessoal Lda LOAD HOOK SECURITY SYSTEM ALWAYS OPEN
PT106229B (en) * 2012-03-27 2014-04-02 Martinho & Santos Unipessoal Lda LOAD HOOK SECURITY SYSTEM ALWAYS OPEN
JP2015011802A (en) * 2013-06-27 2015-01-19 中国電力株式会社 High-voltage strain insulator
CN103612974A (en) * 2013-12-06 2014-03-05 攀枝花钢城集团有限公司 Rope locking device of lifting hook of crane
CN109879157A (en) * 2019-04-10 2019-06-14 贵州钢绳股份有限公司 A kind of 300 type I-beam wheel safty hoisting mechanisms

Similar Documents

Publication Publication Date Title
JPH057495B2 (en)
JP2007153583A (en) Hook device
JP2001206670A (en) Suspension hook for crane
JP3383283B2 (en) Auto hook
JP2833674B2 (en) Hook device for lifting heavy objects
JP2007238262A (en) Winch removal method for crane and revolving super structure
JPH08277086A (en) Automatic hook
JP2612431B2 (en) Ball removal hook
JP3116263B2 (en) Automatic sling removal device for suspended loads
WO2001023280A1 (en) Drop-bottom container
JPH09328284A (en) Automatic slinging work detachment device for hung load
JP2004168321A (en) Bottom-open-type container
JPH02291391A (en) Pendent hook device for crane
JPH07215658A (en) Hoisting hook device for crane
JP3321145B2 (en) Open bottom container
JPH02286593A (en) Hanging hook of steel pipe for steel tower
CN212359142U (en) Movable material hopper that hangs for construction
JP5486185B2 (en) Clamshell bucket
US2013621A (en) Elevator
CN219523917U (en) Novel material transfer car (buggy)
JPH0595976U (en) Fulcrum moving bucket
JPH0715679U (en) Automatic ball removing and lifting device
US2476847A (en) Hoist hook
JPS5844151Y2 (en) Ladle tilting hook operation device equipped with a stopper
JPH02198998A (en) Slip-off preventing device for hook of suspension tool