JP2001171976A - Jib crane - Google Patents

Jib crane

Info

Publication number
JP2001171976A
JP2001171976A JP36293499A JP36293499A JP2001171976A JP 2001171976 A JP2001171976 A JP 2001171976A JP 36293499 A JP36293499 A JP 36293499A JP 36293499 A JP36293499 A JP 36293499A JP 2001171976 A JP2001171976 A JP 2001171976A
Authority
JP
Japan
Prior art keywords
concrete structure
plate
backing plate
jib crane
push
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP36293499A
Other languages
Japanese (ja)
Other versions
JP4587413B2 (en
Inventor
Katsuji Imada
勝治 今田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nihon Kensetsu Kogyo Co Ltd
Original Assignee
Nihon Kensetsu Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nihon Kensetsu Kogyo Co Ltd filed Critical Nihon Kensetsu Kogyo Co Ltd
Priority to JP36293499A priority Critical patent/JP4587413B2/en
Publication of JP2001171976A publication Critical patent/JP2001171976A/en
Application granted granted Critical
Publication of JP4587413B2 publication Critical patent/JP4587413B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a jib crane capable of being removably erected over the upper part of a concrete structural body. SOLUTION: This jib crane is provided with a portal basement part 2 striding across the upper part of a concrete structural body, and with press-bolts 3 to be attached to both its leg parts forming the portal basement part, which hold and fix the concrete structural body with stiffening plates from both the surfaces by way of spherical bushes.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明が属する技術分野】本発明は、コンクリート構造
物の上部に仮設されるジブクレーンに関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a jib crane temporarily installed on a concrete structure.

【0002】[0002]

【従来の技術】プラントやビルの建設にあたって、資材
を取り込むためにジブクレーンを仮設して利用すること
が多い。ジブクレーンをコンクリート構造物の上に仮設
する場合には、コンクリート構造物に多数のアンカーボ
ルトを仮に打設し、それを用いてジブクレーンの基礎部
をコンクリート構造物に固定する。資材を吊ったときジ
ブクレーンの基礎部にかかるモーメントに対抗するため
には、アンカーボルトを広い範囲に打設する必要がある
が、コンクリート構造物の形状が壁状である場合などに
は、その上面のみでは強度的に不足し、その側面にもア
ンカーボルトを配することが必要となる。
2. Description of the Related Art When constructing a plant or a building, a jib crane is often used temporarily to take in materials. When a jib crane is temporarily installed on a concrete structure, a large number of anchor bolts are temporarily installed on the concrete structure, and the foundation is fixed to the concrete structure using the anchor bolts. In order to counter the moment applied to the jib crane foundation when the materials are suspended, it is necessary to drive the anchor bolts over a wide area, but when the concrete structure is a wall, Is not sufficient in terms of strength, and it is necessary to arrange anchor bolts on its side.

【0003】しかし、多数の、しかも、上面と両側面で
は90゜あるいは180゜方向の異なるアンカーボルト
に、基礎部を正確に合わせるのは困難であり、ジブクレ
ーンの仮設作業は長時間と多くの人手を要する作業であ
った。しかも、高所における作業であるため、安全上も
問題となることが多かった。また、仮設されたジブクレ
ーンは工事終了後に撤去されるが、その際多数のアンカ
ーボルトを切断し、跡を残さないようにコンクリート面
の養生をするのも大変であった。
[0003] However, it is difficult to accurately align the foundation with a large number of anchor bolts which are different from each other at 90 ° or 180 ° on the upper surface and both sides, and the temporary work of the jib crane requires a long time and many manual operations. It was an operation that required In addition, since the operation is performed at a high place, the safety is often a problem. In addition, the temporary jib crane is removed after the construction is completed. At that time, it was also difficult to cut many anchor bolts and cure the concrete surface so as not to leave traces.

【0004】一般的に工事用機材を取り付け取り外し容
易に仮設する方法として、基礎部をクランプ方式とし
て、そこに設けたボルトで固定対象物を挟みつけて固定
する方法があるが、上述のようなケースでは、表面が十
分に平滑でないコンクリート面を固定対象物としてボル
トで挟みつけて、ジブクレーンが必要とする反力や摩擦
力が十分得られるかが疑問であり、実用に供されていな
かった。
In general, as a method of attaching and detaching construction equipment easily and temporarily, a method of fixing the object to be fixed with a bolt provided on the base portion using a clamp system as described above is known. In the case, it was questioned whether a concrete surface whose surface was not sufficiently smooth was sandwiched between bolts as a fixing object and the reaction force and frictional force required by the jib crane could be sufficiently obtained, and it was not put to practical use.

【0005】[0005]

【発明が解決しようとする課題】本発明が解決しようと
する課題は、コンクリート構造物の上部に取り付け取り
外し容易に仮設できるジブクレーンを提供することにあ
る。
SUMMARY OF THE INVENTION It is an object of the present invention to provide a jib crane which can be easily attached to and detached from an upper part of a concrete structure.

【0006】[0006]

【課題を解決するための手段】本発明は、コンクリート
構造物の上部をまたぐ門型の基礎部を持ち、門型を構成
する両脚に、球面ブッシュを介して当て板でコンクリー
ト構造物を両面から挟みつけて固定する押しボルトを設
けたジブクレーンである。
According to the present invention, a concrete structure is provided on both sides of a portal structure by means of a contact plate via spherical bushes on both legs of the portal structure. It is a jib crane provided with push bolts to pinch and fix.

【0007】一般にコンクリート構造物の上部にジブク
レーンを仮設して資材を取り込む場合には、コンクリー
ト構造物が壁状を成し、その壁を乗り越える形で資材を
取り込むことが多い。ジブクレーンの基礎部を、そのコ
ンクリート壁をまたぐ門型に形成し、その門型を形成す
る両脚の部分に内側に向かって押す押しボルトを設け、
各押しボルトは球面ブッシュを介して当て板を持ち、そ
の当て板でコンクリート壁面を押して、コンクリート構
造物を両側から挟みつけることにより固定するジブクレ
ーンである。
In general, when a jib crane is temporarily installed above a concrete structure to take in materials, the concrete structure often forms a wall shape and takes in materials in a manner to get over the wall. The base of the jib crane is formed in a gate shape that straddles the concrete wall, and push bolts that push inward are provided on both legs forming the gate shape,
Each push bolt is a jib crane having a backing plate via a spherical bush, pressing the concrete wall surface with the backing plate, and clamping the concrete structure from both sides.

【0008】押しボルトで直接コンクリート壁面を押す
のではなく、各押しボルトに球面ブッシュを介して当て
板を設け、その当て板でコンクリート壁面を押すことに
より、表面が必ずしも十分に平滑でないコンクリート面
に対しても各押しボルトの当たり面が順応し、コンクリ
ートの支圧応力とコンクリート壁面と当て板間の摩擦力
をフルに活用できる。したがって、押しボルトの締め付
けトルク管理さえ確実に行えば、各押しボルトが負担す
べき反力および摩擦力が十分に確保できる。
[0008] Instead of directly pressing the concrete wall surface with the push bolt, a pressing plate is provided on each push bolt via a spherical bush, and the concrete wall is pressed by the pressing plate, so that the concrete surface is not necessarily sufficiently smooth. On the other hand, the contact surface of each push bolt adapts, and the bearing force of concrete and the frictional force between the concrete wall and the caul plate can be fully utilized. Therefore, if the tightening torque of the push bolts is properly controlled, the reaction force and the frictional force to be borne by each push bolt can be sufficiently secured.

【0009】本発明により、 コンクリート構造物に
アンカーボルトを仮に打設する必要が無いので、打設作
業および撤去時の切断や養生作業が必要無くなり、
ジブクレーンの基礎部をアンカーボルトに合わせる作
業、それも、90゜あるいは180゜方向の異なるアン
カーボルトに合わせる長時間の人手がかかる作業が無く
なり、 結果的にジブクレーンの仮設作業が取り付
け、取り外しの両面でより容易になり、かつ、 安全
に作業ができるという効果が得られる。
According to the present invention, it is not necessary to temporarily install an anchor bolt on a concrete structure, so that the installation work and the cutting and curing work at the time of removal become unnecessary.
The work of fitting the jib crane base to the anchor bolts, which also requires long hours of work to match the 90 ° or 180 ° different anchor bolts, eliminates the temporary work of the jib crane for both installation and removal. This has the effect of being easier and safer to work.

【0010】また、本発明は、コンクリート構造物の上
部をまたぐ門型の基礎部を持ち、門型を構成する両脚
に、球面ブッシュを介して当て板でコンクリート構造物
を両面から挟みつけて固定する押しボルトを設けたジブ
クレーンであって、押しボルトがコンクリート構造物を
挟みつける方向と直角方向に配したアンカーボルトを有
するジブクレーンである。
[0010] The present invention also has a portal-type base portion that straddles the upper part of the concrete structure, and the concrete structure is fixed to both legs constituting the portal structure by sandwiching the concrete structure from both sides with a swash plate via a spherical bush. The present invention relates to a jib crane provided with push bolts, and an anchor bolt arranged in a direction perpendicular to a direction in which the push bolts sandwich a concrete structure.

【0011】上述の通り、一般にコンクリート構造物の
上部にジブクレーンを仮設して資材を取り込む場合に
は、コンクリート構造物が壁状を成していることが多
い。このような壁状のコンクリート構造物の上面にのみ
アンカーボルトを打設してジブクレーンを固定しようと
するとき、壁厚方向にはジブクレーンのポストの中心か
らアンカーボルトまで十分な距離が取れないため、上面
に立てたアンカーボルトのみでは基礎部にかかるモーメ
ントに抗しきれないので従来は側面にまでアンカーボル
トを打っていたが、壁の長手方向には十分な距離を取れ
るのでその必要が無い場合が多い。このような場合に、
壁厚方向のみ押しボルトで挟みつけて必要な反力を持た
せ、長手方向はコンクリート構造物上面に打設したアン
カーボルトにより、基礎部にかかるモーメントを受け
る。アンカーボルトの位置は、ジブクレーンのポストの
中心から見て、コンクリート壁の長手方向、すなわち、
押しボルトがコンクリート構造物を挟みつける方向に対
し直角方向になる。
As described above, in general, when a jib crane is temporarily installed above a concrete structure to take in materials, the concrete structure often has a wall shape. When trying to fix the jib crane by placing an anchor bolt only on the upper surface of such a wall-shaped concrete structure, there is not enough distance from the center of the jib crane post to the anchor bolt in the wall thickness direction, In the past, anchor bolts on the top surface alone could not withstand the moment applied to the foundation, so hitherto the anchor bolts were hit on the side, but there is a case where it is not necessary because there is a sufficient distance in the longitudinal direction of the wall Many. In such a case,
A necessary reaction force is imparted by being sandwiched between the push bolts only in the wall thickness direction, and a moment acting on the foundation is received in the longitudinal direction by the anchor bolts which are cast on the upper surface of the concrete structure. The position of the anchor bolts is in the longitudinal direction of the concrete wall,
The direction is perpendicular to the direction in which the push bolt sandwiches the concrete structure.

【0012】本発明により、 アンカーボルトは押し
ボルトがコンクリート構造物を挟みつける方向と直角方
向にのみ配されるので、すべての方向に配する従来の方
法に比べ大幅に数が減少し、それだけ打設作業および撤
去時の切断や養生作業が少なくなり、 アンカーボル
トはコンクリート構造物の上面のみにあるので、ジブク
レーンの基礎部をアンカーボルトに合わせる作業は、従
来の90゜あるいは180゜方向の異なるアンカーボル
トに合わせる場合に比べきわめて容易になると言う効果
が得られ、その結果、上述のとの効果が得られる。
According to the present invention, the number of anchor bolts is significantly reduced as compared with the conventional method in which the push bolts are arranged in all directions since the push bolts are arranged only in a direction perpendicular to the direction in which the concrete structure is sandwiched. Cutting and curing work during installation and removal are reduced, and since the anchor bolts are only on the upper surface of the concrete structure, the work of aligning the jib crane base with the anchor bolts requires a different anchor in the conventional 90 ° or 180 ° direction. An effect is obtained that is extremely easy as compared with the case where the bolt is fitted, and as a result, the effect described above is obtained.

【0013】また、本発明は,柱状のコンクリート構造
物の上部をまたぐ直交する二つの門型を組み合わせた基
礎部,あるいは,その四つの脚部を隣同士連結してなる
柱状コンクリート構造物の上部を覆う四角の鞘状の基礎
部を持ち,四つの脚部に、球面ブッシュを介して当て板
でコンクリート構造物を四面から挟みつけて固定する押
しボルトを設けたジブクレーンである。
[0013] The present invention also relates to a base portion formed by combining two orthogonal portals straddling the upper portion of a columnar concrete structure, or an upper portion of a columnar concrete structure formed by connecting four legs thereof to each other. This is a jib crane having a square sheath-shaped base portion that covers the concrete structure, and provided on four legs with push bolts for sandwiching and fixing the concrete structure from all sides with a swash plate via spherical bushes.

【0014】コンクリート構造物が壁状ではなく柱状の
場合,そのコンクリート構造物の上部にジブクレーンを
仮設する場合には、基礎部を2個の門型が直交する形に
構成し、あるいは、その四つの脚部を隣同士連結して柱
状コンクリートの上端部を覆う四角の鞘状に構成し、そ
れら四つの脚部に押しボルトを設け、四方向から球面ブ
ッシュを介し当て板を有する押しボルトでコンクリート
構造物を挟みつけて固定する構成をとることにより、上
述のからの効果が得られる。
When the concrete structure is not a wall but a column, and a jib crane is temporarily installed on the concrete structure, the foundation is formed so that two portals are orthogonal to each other. The two legs are connected to each other to form a square sheath that covers the upper end of the columnar concrete, and the four legs are provided with push bolts. By adopting a configuration in which the structure is sandwiched and fixed, the above effects can be obtained.

【0015】さらに本発明は、上述の各種ジブクレーン
において、各当て板に、脚部から突出するガイドを設
け、当て板がそのガイドに当たることなく自由に傾ける
ように、その厚さ方向で大きさを変えた当て板を有する
ジブクレーンである。
Further, according to the present invention, in each of the above-mentioned various jib cranes, a guide protruding from a leg is provided on each patch plate, and the size in the thickness direction is adjusted so that the patch plate is freely tilted without hitting the guide. It is a jib crane with a changed backing plate.

【0016】球面ブッシュを介して当て板でコンクリー
ト構造物を両面から挟みつけて固定する押しボルトを設
けた上述の各種ジブクレーンにおいて、資材を吊ったと
き基礎部にかかるモーメントにより、脚部から突き出て
球面ブッシュに至る押しボルトの先端部分には上向きあ
るいは下向きの曲げモーメントが生じ、押しボルトと脚
部に刻まれた雌ねじ部との間でかじりや膠着を生じ、以
後の締め付けトルクの管理やジブクレーンの解体に支障
を生じることがある。脚部から突き出している長さを短
くすれば曲げモーメントの影響は緩和できるが、基礎部
やコンクリート構造物の製作精度を考えれば、短くする
には限度がある。
In the above-mentioned various jib cranes provided with the push bolts for sandwiching and fixing the concrete structure from both sides with the backing plate via the spherical bush, the material protrudes from the legs by the moment applied to the base when the material is hung. An upward or downward bending moment is generated at the tip of the push bolt that reaches the spherical bush, causing galling or sticking between the push bolt and the female thread cut into the leg, and controlling the subsequent tightening torque and controlling the jib crane. Disassembly may be hindered. The effect of the bending moment can be reduced by shortening the length protruding from the leg, but there is a limit to the shortening in view of the manufacturing accuracy of the foundation and the concrete structure.

【0017】そこで、当て板の寸法にピッタリの合った
大きさのガイドを脚部から突出させ、そのガイドに十分
な強度を持たせて、押しボルトの先端部分を曲げる力、
すなわち、当て板の中心を押しボルトの中心からずらす
ような力がかかったときにその力を当て板からガイドを
介して脚部に直接伝えることにより、資材を吊ったとき
に押しボルトにかかる曲げモーメントを減少させる。そ
のためには、当て板が押しボルトにより前進あるいは後
進するときは抵抗にならぬように、また、曲げモーメン
トが生じて当て板の中心がわずかに変位したときに当て
板に接触して荷重を受け止めるように、ガイドの内法は
当て板の寸法にわずかな隙間分を加算して決められる。
Therefore, a guide having a size that is suitable for the size of the backing plate is protruded from the leg, and the guide is given sufficient strength to bend the tip of the push bolt.
In other words, when a force is applied that shifts the center of the backing plate from the center of the push bolt, the force is transmitted directly from the backing plate to the legs via the guides, thereby bending the push bolt when hanging the material. Decrease moment. For this purpose, when the backing plate is moved forward or backward by the push bolt, it does not become a resistance, and when the bending moment occurs, the center of the backing plate is slightly displaced and contacts the backing plate to receive the load. As described above, the inner method of the guide is determined by adding a small gap to the dimension of the backing plate.

【0018】一方、当て板は球面ブッシュを介して押し
ボルトに接続され、コンクリート構造物の表面に順応し
て傾かなければならない。また、当て板はその強度上の
要求から相当の厚さを有している。従って、当て板の厚
さ方向の寸法を一定とすれば、傾いたときにその角部が
わずかな隙間しかないガイドの内面に当たり、傾く動作
が阻害される。そこで、当て板が傾いてもガイドの内面
に当たらぬように当て板の厚さ方向の寸法を変える、す
なわち、当て板の厚さ方向において、球面ブッシュによ
る回転の中心に最も近いところの当て板の寸法をガイド
の内法にピッタリ合わせ、それ以外のところは傾いても
当たらない範囲で寸法を小さくすることにより、自由な
傾きと当て板のわずかな変化による接触と言う二つの要
求を満たすことができる。
The caul plate, on the other hand, is connected to the push bolt via a spherical bush and must be tilted to conform to the surface of the concrete structure. Further, the backing plate has a considerable thickness due to its strength requirement. Therefore, if the size of the backing plate in the thickness direction is fixed, the corner portion of the backing plate will hit the inner surface of the guide having only a small gap when tilted, and the tilting operation will be inhibited. Therefore, the dimension in the thickness direction of the caul plate is changed so that the caul plate does not hit the inner surface of the guide even if the caul plate is inclined, that is, the caul plate closest to the center of rotation by the spherical bush in the caul plate thickness direction. Satisfies the two requirements of free inclination and contact due to slight change of the caulking plate by making the dimensions of the guide perfect for the guide's internal method, and reducing the dimensions of the other parts so that they do not hit even if they are inclined. Can be.

【0019】本発明により、 押しボルトと脚部の雌
ねじ部のかじりや膠着を防ぎ、かつ、 当て板の自由
な傾きを保証して、押しボルトが負担すべき反力および
摩擦力が十分確保できるという効果が得られる。
According to the present invention, galling and sticking of the push bolt and the female screw portion of the leg portion are prevented, and a free inclination of the backing plate is ensured, so that the reaction force and friction force to be borne by the push bolt can be sufficiently secured. The effect is obtained.

【0020】[0020]

【発明の実施の形態】本発明の実施の形態について、図
面を参照しながら以下に説明する。なお、本発明は、か
かる実施に形態に限定されず、本発明の範囲内でその具
体的構造に種々の変更を加えて良いことは言うまでも無
い。
Embodiments of the present invention will be described below with reference to the drawings. Note that the present invention is not limited to such an embodiment, and it goes without saying that various changes may be made to the specific structure within the scope of the present invention.

【0021】図1は、本発明の実施の一形態の側面図で
ある。ジブクレーン1は、チェーンブロック等の揚重機
器11を支持するジブ12とそれを支えるポスト13、
及び、基礎部2からなり、チェーンブロック等の揚重機
器11で吊り上げられた資材(図示せず)は、揚重機器
11がジブ12に沿って走行することにより、また、ポ
スト13に設けられた旋回機構14によりジブ12を回
転することにより手繰り寄せられ、所定の位置に吊り降
ろされる。
FIG. 1 is a side view of an embodiment of the present invention. The jib crane 1 includes a jib 12 for supporting a lifting device 11 such as a chain block and a post 13 for supporting the same.
The material (not shown), which is composed of the base portion 2 and is lifted by the lifting device 11 such as a chain block, is provided on the post 13 by the traveling of the lifting device 11 along the jib 12. The jib 12 is pulled by rotating the jib 12 by the swiveling mechanism 14, and is suspended at a predetermined position.

【0022】基礎部2の構成を明確にするために、図1
のA−A矢視図を図2に、図2のB−B矢視図を図3に
示す。基礎部2は天井部21とその両端から下に伸びる
脚部22よりなり、コンクリート構造物15をまたぐよ
うに門型に形成された板23とその強度を補強する補強
板24、及び、基礎部2とポスト13をつなぐ天板25
の組み合わせで構成される。門型に形成された板23の
両脚部には、基礎部に必要な反力と摩擦力を生み出すに
十分な数の押しボルト3が配される。押しボルト3を締
め付けたときの反力に応じて板23を補強する補強版2
4の形状、板厚及び枚数が決められる。これら押しボル
ト3には、球面ブッシュ(図2、図3には、表示されて
いない。)を介して当て板4が取り付けられており、締
め付けトルクを管理しながら押しボルト3を締め付ける
ことにより、当て板4がコンクリート構造物15の壁面
に順応した形で両側からコンクリート構造物15を挟み
つけて、ジブクレーン1を固定させる。
In order to clarify the structure of the base 2, FIG.
2 is shown in FIG. 2 and FIG. 3 is a view taken in the direction of arrow BB in FIG. The base part 2 is composed of a ceiling part 21 and legs 22 extending downward from both ends thereof, a gate-shaped plate 23 straddling the concrete structure 15, a reinforcing plate 24 for reinforcing the strength thereof, and a base part. Top plate 25 connecting 2 and post 13
Composed of A sufficient number of push bolts 3 are provided on both legs of the gate-shaped plate 23 to generate a reaction force and a frictional force required for the base portion. Reinforcement plate 2 for reinforcing plate 23 according to the reaction force when tightening push bolt 3
The shape, plate thickness, and number of sheets are determined. Each of the push bolts 3 is provided with a backing plate 4 via a spherical bush (not shown in FIGS. 2 and 3). By tightening the push bolt 3 while controlling the tightening torque, The jib crane 1 is fixed by sandwiching the concrete structure 15 from both sides with the backing plate 4 adapted to the wall surface of the concrete structure 15.

【0023】押しボルト3と球面ブッシュ、当て板4の
組み合わせの一例を図4に示す。球面ブッシュは球面の
一部を切り出した形からなる雄32とその球面部分にピ
ッタリ合った凹面部分を有する雌35の組み合わせから
なり、両者は容易に摺動することにより軸方向のずれを
吸収しつつ,一方から押す力を他方に伝え合う部品であ
る。ここに、押しボルト3の先端部31には、球面ブッ
シュの雄32が押え板33及び止めネジ34により固定
され、一方、当て板4には球面ブッシュの雌35が固定
されている。球面ブッシュの雄32と雌35がバラバラ
にならないように、はずれ止め板37が球面ブッシュの
雄32を取り囲む形で押えネジ38により当て板4に取
り付けられている。
FIG. 4 shows an example of a combination of the push bolt 3, the spherical bush, and the backing plate 4. The spherical bush is composed of a combination of a male 32 having a shape obtained by cutting out a part of a spherical surface and a female 35 having a concave portion which is perfectly fitted to the spherical portion, and both easily absorb axial displacement by sliding easily. It is a part that transmits the pushing force from one side to the other. Here, the male part 32 of the spherical bush is fixed to the tip part 31 of the push bolt 3 by a holding plate 33 and a set screw 34, while the female part 35 of the spherical bush is fixed to the backing plate 4. A retaining plate 37 is attached to the backing plate 4 by a holding screw 38 so as to surround the male 32 of the spherical bush so that the male 32 and female 35 of the spherical bush do not fall apart.

【0024】この構成をとることにより、コンクリート
構造物の表面が、例え、押しボルト3の軸方向に対し直
角な平面でなくても、その表面に順応して当て板4は方
向を変え、押しボルト3を締め付けることにより発生す
る力は当て板4を通して、無駄なくコンクリート構造物
に伝えられる。
By adopting this configuration, even if the surface of the concrete structure is not a plane perpendicular to the axial direction of the push bolt 3, the contact plate 4 changes its direction according to its surface, The force generated by tightening the bolt 3 is transmitted to the concrete structure through the backing plate 4 without waste.

【0025】図5は、本発明の他の実施の一形態の側面
図の基礎部を取り出した図面である。図5のC−C矢視
図を図6に示す。本実施の形態の基礎部5は、コンクリ
ート構造物15をまたぐように門型に形成された板51
とその強度を補強する補強板52、及び、基礎部5とポ
スト13をつなぐ天板53の組み合わせで構成され、門
型に形成された板51の両脚部には、基礎部に必要な反
力と摩擦力を生み出すに十分な数の押しボルト3が配さ
れ、これら押しボルト3には、球面ブッシュを介して当
て板4が取り付けられているところは、前述のケースの
基礎部2と同様である。これら構成要素に加えて、本実
施例の基礎部5では、押しボルト3がコンクリート構造
物15を挟みつける方向と直角方向、すなわち、コンク
リート構造物15の壁の長手方向にアンカーボルト6を
配され、上記門型部からアンカーボルト6に向かって受
け板55を有する側板54を伸ばし、アンカーボルト6
にナット61で受け板55を締め付けて基礎部5を固定
する。
FIG. 5 is a drawing showing a base portion of a side view of another embodiment of the present invention. FIG. 6 is a view taken along the line CC of FIG. The base part 5 of the present embodiment includes a gate-shaped plate 51 that straddles the concrete structure 15.
And a reinforcing plate 52 that reinforces the strength thereof, and a combination of a top plate 53 that connects the base portion 5 and the post 13. Both legs of the portal-shaped plate 51 have reaction forces required for the base portion. And a sufficient number of push bolts 3 to generate a frictional force, and these push bolts 3 are provided with a backing plate 4 via a spherical bushing in the same manner as the base part 2 of the case described above. is there. In addition to these components, in the base portion 5 of the present embodiment, the anchor bolts 6 are arranged in a direction perpendicular to the direction in which the push bolt 3 sandwiches the concrete structure 15, that is, in the longitudinal direction of the wall of the concrete structure 15. Then, the side plate 54 having the receiving plate 55 is extended from the portal section toward the anchor bolt 6, and the anchor bolt 6
The base plate 5 is fixed by tightening the receiving plate 55 with the nut 61.

【0026】本実施例に拠れば、アンカーボルトを基礎
部の固定に使用するものの、アンカーボルトのみに頼っ
た従来工法に比べ、アンカーボルトの数は大幅に減り、
かつ、その数少ないアンカーボルトがコンクリート構造
物の上面という一つの面のみに植えられるので、基礎部
をアンカーボルトに合わせるのが格段に容易になる。
According to this embodiment, although the anchor bolts are used for fixing the base portion, the number of anchor bolts is greatly reduced as compared with the conventional construction method relying only on the anchor bolts.
In addition, since the few anchor bolts are planted on only one surface, that is, the upper surface of the concrete structure, it is much easier to align the foundation with the anchor bolts.

【0027】図7は、本発明のさらに別の実施の一形態
の基礎部の側面図、図8はそのD−D矢視図である。こ
の実施の形態では、コンクリート構造物16は柱状をな
し、ジブクレーンの基礎部7はその上部を覆う鞘状の板
71とその強度を補強する補強板72、及び、基礎部7
とポスト13をつなぐ天板73の組み合わせで構成さ
れ、鞘上に形成された板71の脚部には、基礎部に必要
な反力と摩擦力を生み出すに十分な数の押しボルト3が
配されている。これら押しボルト3には、球面ブッシュ
(図示省略)を介して当て板4が取り付けられていると
ころは、前述のケースの基礎部と同様である。このケー
スは、固定対象物であるコンクリート構造物が柱状であ
ったため、その上部をまたぐ二つの門型の基礎部を互い
に直交して配してその隣同士の脚部を連結し、各脚部の
強度を連結により強化した場合とも考えられる。
FIG. 7 is a side view of a base part of still another embodiment of the present invention, and FIG. 8 is a view of the base part taken along the line DD. In this embodiment, the concrete structure 16 has a columnar shape, and the base part 7 of the jib crane has a sheath-like plate 71 covering its upper part, a reinforcing plate 72 for reinforcing its strength, and a base part 7.
And a top plate 73 that connects the post 13 and the legs of the plate 71 formed on the sheath are provided with a sufficient number of push bolts 3 to generate a reaction force and a frictional force necessary for the base portion. Have been. The place where the contact plate 4 is attached to these push bolts 3 via a spherical bush (not shown) is the same as the base part of the case described above. In this case, since the concrete structure to be fixed was columnar, two portal-type foundations straddling the upper part were arranged orthogonally to each other, and the legs adjacent to each other were connected. It is also conceivable that the strength of is increased by coupling.

【0028】四面に設けられた押しボルト3をトルク管
理しながら締め付けることにより、アンカーボルトを用
いずに容易にジブクレーンの固定ができる。
By tightening the push bolts 3 provided on the four surfaces while controlling the torque, the jib crane can be easily fixed without using anchor bolts.

【0029】当て板にガイドを設けた場合のガイドと当
て板の組み合わせの一例を図9に示す。(a)図は正面
図を示し、(b)図はそのE−E矢視図を示す。 押しボルトの先端部分31には球面ブッシュの雄32が
固定され、それと組み合わさる雌35が当て板40に固
定されている。押しボルトと当て板40がバラバラにな
らないようにはずれ止め板39が押えネジ38により当
て板40に取り付けられている。当て板40に近接して
ガイド45が門型に形成された板23に固定されてい
る。ガイドの形状は、当て板40の中心が押しボルトの
中心からずれるような変位があったときに接触して、そ
の力を受け止めるものであるから、当て板の形状に合わ
せて決められる。一般には、この例のように当て板は円
盤状に形成されるので、ガイドはそれを取り囲む円環の
形状を採る。資材を吊ったとき基礎部にかかるモーメン
トにより生ずる当て板の変位は、上向き、又は、下向き
のいずれかであるから、ガイドは、完全な円環ではなく
て図のように円環の上下の部分のみ取り出した形状でも
その効果としては同じであり、ガイドを設置するときの
作業の容易性を考えると、このように上下に分割するの
が望ましい。
FIG. 9 shows an example of a combination of a guide and a contact plate when a guide is provided on the contact plate. (A) shows a front view, and (b) shows the EE arrow view. The male part 32 of the spherical bush is fixed to the tip part 31 of the push bolt, and the female part 35 to be combined therewith is fixed to the backing plate 40. A retaining plate 39 is attached to the contact plate 40 by a holding screw 38 so that the push bolt and the contact plate 40 do not fall apart. A guide 45 is fixed to the gate-shaped plate 23 in the vicinity of the backing plate 40. The shape of the guide is determined according to the shape of the backing plate 40 because the guide comes into contact when the center of the backing plate 40 is displaced from the center of the push bolt and receives the force. Generally, since the backing plate is formed in a disk shape as in this example, the guide takes the shape of a ring surrounding the guide plate. Since the displacement of the caul plate caused by the moment applied to the base when the material is suspended is either upward or downward, the guide is not a complete ring, but the upper and lower parts of the ring as shown in the figure. The effect is the same even when the shape is taken out only, and it is preferable to divide the guide vertically in consideration of the easiness of the work when installing the guide.

【0030】当て板40が、押し当てられるコンクリー
ト構造物の表面に従って傾いた状態を、二点鎖線43で
示す。ガイドを設ける目的から、当て板40とガイド4
5の隙間は、両者が触れない範囲で加工上可能な限り狭
くすべきであるが、狭くすると、当て板が傾いた状態4
3では、当て板の側面がガイドに接触してしまう可能性
がある。そこで、接触を避け自由な傾きを保証するた
め、当て板40の厚さ方向にその形状を変化させる。 この図の場合には、球面ブッシュによる当て板の回転の
中心は、当て板の背面側、すなわち、はずれ止め板39
がついている側にあるので、当て板40の背面部の外径
をベースとして、わずかな隙間を持たせるようにガイド
45の内径を設定し、当て板40の板厚の中間部分には
円周状のくぼみ42を設けて、傾いた状態43において
ガイド45との接触を回避する。さらに、傾いてもガイ
ドと接触しない当て板40の表面部は背面部の外径と同
じにしている。当て板を円盤状とすることにより、側面
のくぼみの加工も容易である。
The state in which the backing plate 40 is inclined according to the surface of the concrete structure to be pressed is indicated by a two-dot chain line 43. For the purpose of providing a guide, the backing plate 40 and the guide 4
The gap of 5 should be as narrow as possible in the processing without touching them, but if it is made narrower, the contact plate may be tilted.
In the case of 3, there is a possibility that the side surface of the backing plate comes into contact with the guide. Therefore, in order to avoid contact and ensure a free inclination, the shape of the backing plate 40 is changed in the thickness direction. In the case of this figure, the center of rotation of the contact plate by the spherical bush is on the back side of the contact plate, that is, the stopper plate 39.
The inner diameter of the guide 45 is set so as to have a slight gap based on the outer diameter of the back part of the backing plate 40, A recess 42 is provided to avoid contact with the guide 45 in the inclined state 43. Further, the surface portion of the backing plate 40 that does not contact the guide even when inclined is the same as the outer diameter of the back portion. By forming the backing plate in a disk shape, it is easy to process the depression on the side surface.

【0031】本実施の形態を採用することにより、上述
の、の効果に加えて、 当て板の製作およびガイ
ドの取り付けが容易であると言う効果が得られる。
By adopting this embodiment, in addition to the above-described effects, an effect is obtained that the manufacture of the backing plate and the mounting of the guide are easy.

【0032】[0032]

【発明の効果】本発明により、コンクリート構造物にア
ンカーボルトを仮に打設する必要が無くなり、あるい
は、打設するにしてもその本数が大幅に減少するので、
打設作業および撤去時の切断や養生作業が無くなり、あ
るいは、減少し、ジブクレーンの基礎部をアンカーボル
トに合わせる作業、特に、90゜あるいは180゜方向
の異なるアンカーボルトに合わせる長時間の人手がかか
る作業が無くなり、結果的にジブクレーンの仮設作業が
取り付け取り外しの両面でより容易になり、かつ、安全
に作業ができるという効果が得られる。また、本発明に
より、押しボルトと脚部の雌ねじ部のかじりや膠着を防
ぎ、かつ、当て板の自由な傾きを保証して押しボルトが
負担すべき反力および摩擦力が十分確保できるという効
果が得られる。
According to the present invention, it is no longer necessary to temporarily lay anchor bolts on a concrete structure, or even if they are laid, the number of anchor bolts is greatly reduced.
Eliminating or reducing the cutting and curing work at the time of casting and removal, it takes a long time to adjust the jib crane base to the anchor bolts, especially to adjust the anchor bolts at different angles of 90 ° or 180 °. As a result, there is an effect that the temporary work of the jib crane is easier in both mounting and dismounting, and the work can be performed safely. Further, according to the present invention, it is possible to prevent the push bolt and the female screw portion of the leg portion from galling or sticking, and to ensure a free inclination of the backing plate to sufficiently secure a reaction force and a frictional force to be borne by the push bolt. Is obtained.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の一形態の側面図である。FIG. 1 is a side view of an embodiment of the present invention.

【図2】図1のA−A矢視図である。FIG. 2 is a view taken along the line AA of FIG. 1;

【図3】図2のB−B矢視図である。FIG. 3 is a view taken in the direction of arrows BB in FIG. 2;

【図4】押しボルト3と球面ブッシュ、当て板4の組み
合わせの一例を示す図面である。
4 is a drawing showing an example of a combination of a push bolt 3, a spherical bush, and a contact plate 4. FIG.

【図5】本発明の他の実施の一形態の基礎部の側面図で
ある。
FIG. 5 is a side view of a base according to another embodiment of the present invention.

【図6】図5のC−C矢視図である。6 is a view taken in the direction of the arrows CC in FIG. 5;

【図7】本発明のさらに別の実施の一形態の基礎部の側
面図である。
FIG. 7 is a side view of a base part of still another embodiment of the present invention.

【図8】図7のD−D矢視図である。FIG. 8 is a view as seen in the direction of arrows DD in FIG. 7;

【図9】ガイドを設けた場合のガイドと当て板の組み合
わせの一例を示す図面である。
FIG. 9 is a drawing showing an example of a combination of a guide and a backing plate when a guide is provided.

【符号の説明】[Explanation of symbols]

1 ジブクレーン 2 基礎部 3 押しボルト 4 当て板 5 基礎部 6 アンカーボルト 7 基礎部 11 揚重機器 12 ジブ 13 ポスト 14 旋回機構 15 コンクリート構造物 16 柱状のコンクリート構造物 21 天井部 22 脚部 23 門型に形成された板 24 補強板 25 天板 31 押しボルトの先端部 32 球面ブッシュの雄 33 押え板 34 止めネジ 35 球面ブッシュの雌 37 はずれ止め板 38 押えネジ 39 はずれ止め板 40 厚さ方向に寸法を変えた当て板 42 同当て板の円周状のくぼみ 43 同当て板が傾いた状態 45 ガイド 51 門型に形成された板 52 補強板 53 天板 54 側板 55 受け板 61 ナット 71 鞘状に形成された板 72 補強板 73 天板 DESCRIPTION OF SYMBOLS 1 Jib crane 2 Base part 3 Push bolt 4 Backing plate 5 Base part 6 Anchor bolt 7 Base part 11 Lifting equipment 12 Jib 13 Post 14 Swivel mechanism 15 Concrete structure 16 Columnar concrete structure 21 Ceiling part 22 Leg part 23 Gate type 24 Reinforcement plate 25 Top plate 31 Tip end of push bolt 32 Male of spherical bush 33 Holding plate 34 Set screw 35 Female of spherical bush 37 Lock plate 38 Lock screw 39 Lock plate 40 Thickness in the thickness direction 42 Circumferential depression of the abutment plate 43 State in which the abutment plate is inclined 45 Guide 51 Plate formed in a gate shape 52 Reinforcement plate 53 Top plate 54 Side plate 55 Receiving plate 61 Nut 71 Sheath shape Formed plate 72 Reinforcement plate 73 Top plate

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 コンクリート構造物の上部をまたぐ門型
の基礎部を持ち、門型を構成する両脚に、球面ブッシュ
を介して当て板でコンクリート構造物を両面から挟みつ
けて固定する押しボルトを設けたジブクレーン。
1. A push bolt which has a gate-shaped base part straddling the upper part of a concrete structure, and fixes the concrete structure by sandwiching the concrete structure from both sides with a backing plate via spherical bushes on both legs constituting the gate shape. Jib crane provided.
【請求項2】 押しボルトがコンクリート構造物を挟み
つける方向と直角方向に配したアンカーボルトを有する
請求項1のジブクレーン。
2. The jib crane according to claim 1, wherein the push bolt has an anchor bolt arranged in a direction perpendicular to a direction in which the concrete structure is sandwiched.
【請求項3】 柱状のコンクリート構造物の上部をまた
ぐ直交する二つの門型を組み合わせた基礎部,あるい
は,その四つの脚部を隣同士連結してなる柱状コンクリ
ート構造物の上部を覆う四角の鞘状の基礎部を持ち,四
つの脚部に、球面ブッシュを介して当て板でコンクリー
ト構造物を四面から挟みつけて固定する押しボルトを設
けたジブクレーン。
3. A square base covering the upper part of a pillar-shaped concrete structure formed by connecting two orthogonal portals straddling the upper part of a pillar-shaped concrete structure or a pillar-shaped concrete structure having four legs connected to each other. A jib crane that has a sheath-shaped foundation and is provided with push bolts on its four legs that clamp and fix concrete structures from four sides with a patch plate via spherical bushes.
【請求項4】 各当て板に、脚部から突出するガイドを
設け、当て板がそのガイドに当たることなく自由に傾け
るように、その厚さ方向で大きさを変えた当て板を有す
る請求項1から請求項3のジブクレーン。
4. A backing plate, wherein each backing plate is provided with a guide projecting from a leg, and the backing plate has a backing plate whose size is changed in the thickness direction so that the backing plate can be freely tilted without hitting the guide. The jib crane according to claim 3.
JP36293499A 1999-12-21 1999-12-21 Jib crane Expired - Fee Related JP4587413B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP36293499A JP4587413B2 (en) 1999-12-21 1999-12-21 Jib crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP36293499A JP4587413B2 (en) 1999-12-21 1999-12-21 Jib crane

Publications (2)

Publication Number Publication Date
JP2001171976A true JP2001171976A (en) 2001-06-26
JP4587413B2 JP4587413B2 (en) 2010-11-24

Family

ID=18478103

Family Applications (1)

Application Number Title Priority Date Filing Date
JP36293499A Expired - Fee Related JP4587413B2 (en) 1999-12-21 1999-12-21 Jib crane

Country Status (1)

Country Link
JP (1) JP4587413B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008006573A1 (en) * 2006-07-11 2008-01-17 Wolffkran Ag Method for assembling a tower crane
CN102118085A (en) * 2009-12-31 2011-07-06 肖功宽 Coil inserting device of simple mechanical hoisting motor stator
CN103738648A (en) * 2013-12-23 2014-04-23 柳州乘龙专用车有限公司 Oscillating arm type special wire feeder hanger

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4882656U (en) * 1972-01-11 1973-10-08
JPS537073U (en) * 1976-07-05 1978-01-21
JPS58152794A (en) * 1982-03-06 1983-09-10 東芝プラント建設株式会社 Post type crane

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4882656U (en) * 1972-01-11 1973-10-08
JPS537073U (en) * 1976-07-05 1978-01-21
JPS58152794A (en) * 1982-03-06 1983-09-10 東芝プラント建設株式会社 Post type crane

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008006573A1 (en) * 2006-07-11 2008-01-17 Wolffkran Ag Method for assembling a tower crane
CN102118085A (en) * 2009-12-31 2011-07-06 肖功宽 Coil inserting device of simple mechanical hoisting motor stator
CN103738648A (en) * 2013-12-23 2014-04-23 柳州乘龙专用车有限公司 Oscillating arm type special wire feeder hanger

Also Published As

Publication number Publication date
JP4587413B2 (en) 2010-11-24

Similar Documents

Publication Publication Date Title
CN112459468A (en) Template for building pouring construction
JP2001171976A (en) Jib crane
KR101332415B1 (en) Maintain distance device of concrete mold
JP2008291442A (en) Temporary bearing member and construction method of precast concrete floor slab
KR101047809B1 (en) Mold support for easy assembly and disassembly
CN209293427U (en) A kind of centering type is to tensing fixing bolt external member
CN214834907U (en) Prefabricated assembled post hoist and mount counterpoint installing the system
CN205343431U (en) Prefabricated wall body grout sleeve strip solid matter exposes accurate positioning die of reinforcing bar
KR20200041503A (en) Clamping device for panel form
CN105369897A (en) Support of seismic isolation cushion
CN215368739U (en) Building construction is anchor clamps for stereotype
CN216289884U (en) Liftable and rotatable fixing support for cable laying
CN211277181U (en) Telegraph pole base machining die
CN220487122U (en) Quick installing and removing fastening device for templates
JPH10237876A (en) Anchor bolt support
CN220666951U (en) Formwork support reinforcing device for ground ring beam
CN214194941U (en) Full-prefabricated assembled balcony beam slab
CN209942046U (en) Grouting sleeve fixing tool
JP2005240286A (en) Implement and method for positioning precast concrete column
CN116240984B (en) Built-in fitting connection structure for curtain wall
CN209924465U (en) Steel column displacement adjusting device
JP5877993B2 (en) Pile head joint structure
KR102439876B1 (en) Pipe supporter for supporting structure load
CN214517290U (en) Pile head reinforcing steel bar bending auxiliary tool for cast-in-place pile
CN220247216U (en) Auxiliary device for butt joint installation of inclined column

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061206

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091015

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091110

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091222

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091222

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100408

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100415

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100903

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100906

R150 Certificate of patent or registration of utility model

Ref document number: 4587413

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130917

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees