JP2001032280A - Wale hanger sheet pile construction method - Google Patents

Wale hanger sheet pile construction method

Info

Publication number
JP2001032280A
JP2001032280A JP11205317A JP20531799A JP2001032280A JP 2001032280 A JP2001032280 A JP 2001032280A JP 11205317 A JP11205317 A JP 11205317A JP 20531799 A JP20531799 A JP 20531799A JP 2001032280 A JP2001032280 A JP 2001032280A
Authority
JP
Japan
Prior art keywords
stage
hook
sheet pile
tier
wale
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11205317A
Other languages
Japanese (ja)
Other versions
JP3949320B2 (en
Inventor
Kenichiro Miyazaki
健一郎 宮崎
Takeshi Umemoto
毅 梅本
Shigeharu Taniguchi
重春 谷口
Shinshi Hashimoto
伸資 橋本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Kokan Koji KK
Original Assignee
Nippon Kokan Koji KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Kokan Koji KK filed Critical Nippon Kokan Koji KK
Priority to JP20531799A priority Critical patent/JP3949320B2/en
Publication of JP2001032280A publication Critical patent/JP2001032280A/en
Application granted granted Critical
Publication of JP3949320B2 publication Critical patent/JP3949320B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PROBLEM TO BE SOLVED: To simplify construction of earth retaining by forming a first-tier hanging hole in a wale hanger sheet pile for hanging a first-tier hook and placing a wale on a first-tier wale mounting part formed in the first-tier hook. SOLUTION: Among sheet piles 1 arranged in line, two sheet piles spaced out at a certain distance are used as wale hanger sheet piles 2, and in each of them, a first-tier hanging hole 3 is formed in the upper part. A first-tier crook type hooking apparatus 10 is hooked in the first-tier hanging hole 3 for hanging a first-tier hook 9 formed of a steel plate. In the first-tier hook 9, a first-tier wale mounting part 11 protruding substantially horizontally is formed in the opposite direction to the first tier hooking apparatus 10. In the first-tier wale mounting part 11 formed in the wale hanger sheet pile 2, a wale 35 is placed so as to retain the earth by locking the facing wale 35 by means of a strut. In this way, installation of the wale 35 can be precisely carried out in a short time.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、開削溝掘削工事の
山留工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of excavating a trench for excavation.

【0002】[0002]

【従来の技術】従来、開削溝掘削工事の山留工法とし
て、ブラケット溶接法や、チェーン吊り法がある。
2. Description of the Related Art Conventionally, there are a bracket welding method and a chain suspension method as a ridge retaining method for an excavation trench excavation work.

【0003】前記のブラケット法は、図3に要部の概略
を示してあるように、掘削溝となる部分の、縁となる部
分の土留め線に沿って一線状に立設した矢板1(図では
片方の土留め線にそって立設した片方の矢板の列のみ示
す)のうち、ある区間離れた位置の2枚の矢板を腹起し
ハンガー矢板2としている。
[0003] In the bracket method, as shown schematically in FIG. 3, a sheet pile 1 (e.g., a straight line) is formed along a soil retaining line at an edge portion of an excavation groove. In the figure, only one row of sheet piles erected along one earth retaining line is shown), but two sheet piles at positions separated by a certain section are protruded to be hanger sheet piles 2.

【0004】そして、腹起しハンガー矢板2には、棚受
けの形状を持つ腹起し受けであるブラケット34を、溶
接して取付け、そのブラケット34の上に腹起し35を
載せ、対面する(図示してない)腹起し35を切梁(図
示してない)で抑止するようにした方法である。
[0004] Then, a bracket 34 which is a protruding support having a shape of a shelf receiver is attached to the protruding hanger sheet pile 2 by welding, and the protruding 35 is placed on the bracket 34 to face the protruding hanger sheet pile 2. This is a method in which the belly (not shown) is restrained by a cutting beam (not shown).

【0005】また、前記チェーン吊り法は、図4に要部
の概略を示してあるように、図3の矢板1と同様に一線
状に立設した矢板1のうち、ある区間離れた位置の4枚
の矢板(図4では2枚のみ示す)を腹起しハンガー矢板
2としている。
[0005] In addition, as shown in FIG. 4, the main part of the chain hanging method is the same as the sheet pile 1 shown in FIG. Four sheet piles (only two sheets are shown in FIG. 4) are protruded to form a hanger sheet pile 2.

【0006】そして、図4に示す腹起しハンガー矢板2
の丸穴42に、一端に一方のフック45を設け、他端に
他方のフック46を設けた短いチェーン43の一方のフ
ック45を引っ掛け、短いチェーン43の他方のフック
46は、短いチェーン43で一段目の腹起し35を抱く
ようにして、短いチェーン43の途中に他方のフック4
6を引っ掛けて、腹起し35を保持する方法である。
Then, the hanger sheet pile 2 shown in FIG.
Is hooked on one hook 45 of a short chain 43 provided with one hook 45 at one end and the other hook 46 at the other end. The other hook 46 of the short chain 43 is Hold the first stomach 35 in the middle of the short chain 43 and hold the other hook 4
This is a method of hooking 6 and holding the prone 35.

【0007】そして、二段目の腹起し35を保持するに
は、腹起しハンガー矢板2の丸穴42に、一方のフック
45を引っ掛けた長いチェーン44を、一段目の腹起し
35と腹起しハンガー矢板2の間を通した後、二段目の
腹起し35を抱えて保持する方法である。
[0007] In order to hold the second-stage upset 35, a long chain 44 with one hook 45 hooked into the round hole 42 of the upset hanger sheet pile 2 is attached to the first-stage upset 35. After passing through the hanger sheet pile 2, the second-stage belly 35 is held and held.

【0008】[0008]

【発明が解決しようとする課題】前記ブラケット溶接法
は、腹起しハンガー矢板2に、ブラケット34を溶接す
る位置を決め、そして、その位置にブラケット34を溶
接するので、ブラケット34の位置決めと、溶接に長時
間を要し、コストも高くなった。
In the bracket welding method, the position of welding the bracket 34 to the hanger sheet pile 2 is determined, and the bracket 34 is welded to that position. It took a long time to weld and the cost was high.

【0009】そして、チェーン吊り法は、腹起し35を
チェーンの輪に通すときに腹起し35を保持しておかな
ければならないので、重労働を必要とする。また、腹起
し35が回転し易く、切梁を対面する腹起し35間に設
置することが困難である。
[0009] The chain hanging method requires heavy labor because the belly 35 must be held when the belly 35 is passed through the loop of the chain. In addition, the bulge 35 is easy to rotate, and it is difficult to install the cut beam between the flares 35 facing each other.

【0010】さらに、腹起し35を水平に設置するに
は、チェーンに掛ける他方のフック46の位置が左右同
じ高さの位置でなければならないので、設置に熟練を要
する。さらに、二段の腹起し35を要する場合には、短
いチェーン43のほかに、長いチェーン44を用意して
同様に施工し、短いチェーン43と長いチェーン44を
区別して置かなければならず面倒である。
Further, in order to install the bulge 35 horizontally, the position of the other hook 46 to be hooked on the chain must be at the same height on the left and right, so that the installation requires skill. Further, when the two-stage bulging 35 is required, in addition to the short chain 43, a long chain 44 must be prepared and constructed in the same manner, and the short chain 43 and the long chain 44 must be placed separately. It is.

【0011】また、一段目の腹起し35と腹起しハンガ
ー矢板2との間に、二段目の腹起し35保持用の長いチ
ェーン44を通せる隙間を考慮しなければならず、施工
が複雑となるものである。
In addition, a gap between the first flank 35 and the hanger sheet pile 2 for passing the long chain 44 for holding the second flank 35 must be taken into consideration. Is complicated.

【0012】ところで、ガス配管工事などの開削溝掘削
は、迅速に行わなければならない。これは、掘削機によ
る掘削速度が矢板・腹起し・切梁による山留の施工速度
と調和して、初めて良好に達成されるからである。
By the way, excavation trench excavation such as gas piping work must be performed promptly. This is because the excavation speed achieved by the excavator is achieved satisfactorily for the first time in harmony with the construction speed of the pier by the sheet pile, the bulge, and the cutting beam.

【0013】本発明は、前記事項に鑑みなされたもので
あり、腹起しを設置すべき箇所の位置決めや、腹起しの
設置が、簡単で長時間を要することなく施工でき、重労
働や熟練も必要としない腹起しハンガー矢板工法とする
ことを課題とする。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned circumstances, and the positioning of a place where a belly is to be installed and the installation of the belly can be performed easily and without a long time. An object of the present invention is to make a hanger sheet pile method that does not require a stomach.

【0014】[0014]

【課題を解決するための手段】第1の発明は、一線状に
立設した矢板1のうち、ある区間離れた位置の2枚の矢
板を、腹起しハンガー矢板2とし、腹起しハンガー矢板
2は、上部に一段目吊り下げ用孔3をそれぞれ形成し、
一段目吊り下げ用孔3に、一段目フック9の一段目引っ
掛け具10を引っ掛けて、それぞれ一段目フック9を吊
り下げ、一段目フック9には一段目引っ掛け具10と反
対の向きに突出する一段目腹起し載置部11をそれぞれ
形成し、一段目腹起し載置部11に、腹起し35を載置
して、対面する腹起し35を切梁で抑止し山留をする腹
起しハンガー矢板工法とした。
According to a first aspect of the present invention, two sheet piles, which are spaced apart from each other by a certain distance, of a sheet pile 1 standing in a straight line are set as a hanger sheet pile 2 and a hanger sheet. The sheet pile 2 has a first-stage hanging hole 3 formed at an upper portion thereof,
The first-stage hooks 10 are hooked into the first-stage hanging holes 3, and the first-stage hooks 9 are suspended from the first-stage hooks 9. The first-stage hooks 9 project in the opposite direction to the first-stage hooks 10. The first-stage flared mounting portion 11 is formed, and the first-stage flared mounting portion 11 is provided with the flared portion 35, and the facing flared portion 35 is restrained by a cut beam to prevent the ridge. The hanger was hung with a sheet pile method.

【0015】第2の発明は、第1の発明において、一段
目フック9の下方に二段目フック19を配置し、一段目
フック9の下部と、二段目フック19の上部のいずれか
一方に、引っ掛け具13を形成し、いずれか他方に吊り
下げ用孔20を形成して、一段目フック9の下部に二段
目フック19をそれぞれ吊り下げ、二段目フック19に
は一段目腹起し載置部11と同一の向きに突出する二段
目腹起し載置部21をそれぞれ形成し、二段目腹起し載
置部21に腹起し35を載置して、対面する腹起し35
を切梁で抑止し山留をする腹起しハンガー矢板工法とし
た。
According to a second aspect of the present invention, in the first aspect, a second stage hook 19 is disposed below the first stage hook 9, and one of a lower portion of the first stage hook 9 and an upper portion of the second stage hook 19 is provided. A hook 13 is formed, and a hanging hole 20 is formed in one of the hooks, and a second hook 19 is hung below the first hook 9 respectively. A second-stage flared mounting portion 21 that projects in the same direction as the raised mounting portion 11 is formed, and a second-level flared mounting portion 21 is placed on the flared mounting portion 21 to face each other. 35
The hanger was piled up and the hangers were piled up.

【0016】第3の発明と第4の発明は、第1の発明と
第2の発明において、腹起しハンガー矢板2の上部に形
成した一段目吊り下げ用孔3を、上下方向の数箇所に形
成して、腹起しハンガー矢板工法とした。
According to the third and fourth inventions, in the first and second inventions, the first-stage hanging holes 3 formed in the upper part of the hanger sheet pile 2 are provided at several positions in the vertical direction. And the hangers were used as the sheet pile method.

【0017】第5の発明から第7の発明は、第1の発明
から第3の発明において、一段目腹起し載置部11と、
二段目腹起し載置部21に、前壁12を立設して、腹起
しハンガー矢板工法とした。
A fifth invention to a seventh invention are the first invention to the third invention, wherein the first-stage abdominal mounting portion 11 comprises:
The front wall 12 was erected on the second-stage protruding mounting portion 21 to protrude and use the hanger sheet pile method.

【0018】[0018]

【発明の実施の形態】以下図に基づいて本発明の実施の
形態の説明をする。図1及び図2は、本発明の腹起しハ
ンガー矢板工法の説明用の図で、要部の概略を示すもの
である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 and FIG. 2 are views for explaining the hang-up hanger sheet pile method of the present invention, and show the outline of the main part.

【0019】この実施の形態は、ガス配管工事などで地
面に形成される開削溝の両側縁の土留め線となる線に沿
って一線状に立設する矢板1で施工する(通常は矢板1
の列は、開削溝を挟むようにして2条の列となるが、図
では片側の土留線に沿って一線状に立設する1条の列の
みを示している。)。
In this embodiment, the sheet pile 1 is installed in a straight line along a line that serves as a soil retaining line on both side edges of a cut groove formed on the ground in gas piping work or the like (usually, a sheet pile 1).
Are two rows so as to sandwich the cut groove, but in the figure, only one row that stands in a straight line along one side of the retaining line is shown. ).

【0020】そして、この実施の形態の矢板は鋼製であ
る。一線状に立設した矢板1のうち、ある区間離れた位
置にある2枚の矢板を、腹起しハンガー矢板2としてい
る(図2では、ある区間離れた位置の片側の2枚の腹起
しハンガー矢板2を示し、他側の腹起しハンガー矢板は
示していない。)。
The sheet pile of this embodiment is made of steel. Of the sheet piles 1 erected in a straight line, two sheet piles located at a position separated by a certain section are set as hanger sheet piles 2 (in FIG. 2, two sheet piles on one side at a position separated by a certain section are shown). The hanger sheet pile 2 is shown, and the hanger sheet pile on the other side is not shown.)

【0021】そして、前記2枚の腹起しハンガー矢板2
には、上部に一段目吊り下げ用孔3をそれぞれ形成して
ある。そして、一段目吊り下げ用孔3に、鉤状に形成し
た一段目引っ掛け具10を引っ掛けて、鋼製の板状体で
形成した一段目フック9を、それぞれ吊り下げる。
Then, the two protruding hanger sheet piles 2
, A first-stage hanging hole 3 is formed in the upper part. Then, the first-stage hook 10 formed in a hook shape is hooked in the first-stage hanging hole 3 to suspend the first-stage hook 9 formed of a steel plate.

【0022】そして、一段目フック9には、一段目引っ
掛け具10と反対の向きに、略水平状に突出する一段目
腹起し載置部11を形成する。そして、ある区間離れた
位置にある2枚の腹起しハンガー矢板2に形成した一段
目腹起し載置部11に、腹起し35を載置して、対面す
る腹起し35を切梁で抑止して山留をする腹起しハンガ
ー矢板工法である。
The first-stage hook 9 is formed with a first-stage protruding mounting portion 11 projecting substantially horizontally in a direction opposite to the first-stage hook 10. Then, the bulging 35 is placed on the first flaring mounting portion 11 formed on the two flared hanger sheet piles 2 at a position apart by a certain section, and the facing flaring 35 is cut. It is a hanger sheet pile construction method in which a beam is restrained with a beam and a mountain is held.

【0023】前記一段目フック9の一段目吊り下げ用孔
3は、それぞれ1個のみとすることも、2個以上の多数
個とすることも可能である。また、一段目腹起し載置部
11のみに腹起し35を載置する、腹起し35が1段の
場合は、矢板の下端部を地盤に打ち込むなどして、矢板
の倒れを防ぐ。
The first-stage hook 9 may have only one first-stage hanging hole 3 or may have a large number of two or more. Further, the first-stage bulging is placed only on the mounting portion 11 and the bulging 35 is placed. When the bulging 35 is one stage, the lower end of the sheet pile is driven into the ground to prevent the sheet pile from falling down. .

【0024】二段目フック19を使用する場合は、一段
目フック9の下方に、鋼製の板状体で形成した二段目フ
ック19を配置し、一段目フック9の下部に鉤状に形成
した引っ掛け具13を形成し、二段目フック19の上部
に吊り下げ用孔20を形成して、一段目フック9の引っ
掛け具13を二段目フック19の吊り下げ用孔20に引
っ掛けて吊り下げる。
When the second-stage hook 19 is used, a second-stage hook 19 formed of a steel plate is disposed below the first-stage hook 9, and a hook-like shape is provided below the first-stage hook 9. The formed hook 13 is formed, a hanging hole 20 is formed above the second hook 19, and the hook 13 of the first hook 9 is hooked into the hanging hole 20 of the second hook 19. Be suspended.

【0025】そして、二段目フック19には、一段目腹
起し載置部11と同一の向きに、略水平状に突出する二
段目腹起し載置部21を形成して、この二段目腹起し載
置部21にも、二段目の腹起し35を載置して、この二
段目の腹起し35も切梁で抑止すると、矢板を安定して
抑止して、山留のできる腹起しハンガー矢板工法とな
る。
The second-stage hook 19 is formed with a second-stage protruding mounting portion 21 that projects substantially horizontally in the same direction as the first-stage protruding mounting portion 11. When the second-stage upset 35 is also placed on the second-stage upset mounting portion 21 and the second-stage upset 35 is also restrained by the cut beam, the sheet pile is stably suppressed. Then, it becomes the hang-up hanger sheet pile construction method that can do the mountain stay.

【0026】そして、前記引っ掛け具13を、二段目フ
ック19の上部に形成し、吊り下げ用孔20を一段目フ
ック9の下部に形成して、一段目フック9に二段目フッ
ク19を吊り下げるように形成する形態もある。
The hook 13 is formed above the second-stage hook 19, and a hanging hole 20 is formed below the first-stage hook 9, and the second-stage hook 19 is formed on the first-stage hook 9. There is also a form formed so as to be suspended.

【0027】腹起し35を所望の高さに吊り下げる場合
は、腹起しハンガー矢板2の上部に一段目吊り下げ用孔
3を、上下方向の多数の箇所(図1では6箇所)にそれ
ぞれ形成している。
In the case where the belly 35 is hung to a desired height, the first-stage hanging holes 3 are provided at the upper part of the hanger sheet pile 2 at a number of vertical positions (six in FIG. 1). Each is formed.

【0028】そして、数箇所に形成した一段目吊り下げ
用孔3のうち、腹起し35を所望の高さに吊り下げられ
る一段目吊り下げ用孔3に、鉤状に形成した一段目引っ
掛け具10を引っ掛けて、それぞれ鋼製の板状体で形成
した一段目フック9を吊り下げる。
Then, of the first-stage hanging holes 3 formed in several places, the hook-shaped first-stage hooks are hooked on the first-stage hanging holes 3 in which the belly 35 can be suspended at a desired height. The tool 10 is hooked, and the first-stage hook 9 formed of a steel plate is hung.

【0029】一段目腹起し載置部11と二段目腹起し載
置部21を、腹起し35を載置し易くする場合は、一段
目腹起し載置部11と二段目腹起し載置部21に、前壁
12を立設して、一段目腹起し載置部11と二段目腹起
し載置部21に載せた各腹起し35が簡単にずれること
の無いようにしている。
To make it easier to place the first-stage belly placement portion 11 and the second-stage belly placement portion 21 on the belly portion 35, the first-stage belly-up placement portion 11 and the second stage The front wall 12 is erected on the mounting portion 21 and the first prong portion 11 and the second prong 35 mounted on the mounting portion 21 can be easily placed. It does not shift.

【0030】[0030]

【発明の効果】本発明は、腹起しハンガー矢板2に一段
目吊り下げ用孔3を形成し、この一段目吊り下げ用孔3
に、一段目フック9の一段目引っ掛け具10を引っ掛け
て一段目フック9を吊り下げ、一段目フック9に形成し
た一段目腹起し載置部11に、腹起し35を載置するよ
うにしたものである。
According to the present invention, the first-stage hanging holes 3 are formed in the hanger sheet pile 2 protruding from the belly.
Then, the first-stage hook 9 is hung by hanging the first-stage hook 10 of the first-stage hook 9, and the first-stage flank mounting portion 11 formed on the first-stage hook 9 places the stomach 35 on the first-stage flank mounting portion 11. It was made.

【0031】したがって、腹起し35の設置が、現場で
の加工などを必要とせず、短時間で正確に、かつ、腹起
し35を回転させることなく施工できる。また、本発明
は、一段目フック9の下方に二段目フック19を配置し
て、一段目フック9の下部と、二段目フック19のいず
れか一方に、引っ掛け具13を形成し、いずれか他方に
吊り下げ用孔20を形成して、一段目フック9の下部に
二段目フック19を吊り下げ、二段目フック19に二段
目腹起し載置部21を形成したものである。
Therefore, the installation of the bulge 35 can be performed in a short time, accurately, and without rotating the bulge 35, without requiring any processing on site. Further, in the present invention, a second-stage hook 19 is arranged below the first-stage hook 9, and a hook 13 is formed at a lower portion of the first-stage hook 9 or at one of the second-stage hooks 19. On the other side, a hanging hole 20 is formed, a second-stage hook 19 is hung below the first-stage hook 9, and a second-stage abdomen is raised on the second-stage hook 19 to form a mounting portion 21. is there.

【0032】したがって、二段目の腹起し35の載置や
二段目の腹起し用の切梁の設置も簡単で地上から載置や
設置ができるので、開削溝内に作業員が入らなくても施
工でき、安全に施工できる。
Therefore, it is easy to place the second-stage flaring 35 and to install the second-stage flaring cutting beam, and it is possible to place and install from the ground. Can be constructed without entering, and can be constructed safely.

【0033】一段目吊り下げ用孔3を、上下方向の数箇
所に形成した発明は、腹起し35を、所望の高さに吊り
下げることが簡単にできる。一段目腹起し載置部11と
二段目腹起し載置部21に前壁12を立設した発明は、
一段目腹起し載置部11と二段目腹起し載置部21に載
置された腹起し35を確実に保持できる。
In the invention in which the first-stage hanging holes 3 are formed at several positions in the vertical direction, the belly 35 can be easily suspended at a desired height. The invention in which the front wall 12 is erected on the first-stage flared mounting portion 11 and the second-stage flared mounting portion 21,
It is possible to securely hold the first-stage flared mounting portion 11 and the second-stage flared mounting portion 21 mounted on the mounting portion 21.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施の形態の説明用の要部の概略の
分解斜視図
FIG. 1 is a schematic exploded perspective view of a main part for explanation of an embodiment of the present invention.

【図2】本発明の一実施の形態の説明用の概略の斜視図FIG. 2 is a schematic perspective view for explaining an embodiment of the present invention.

【図3】従来技術の説明用の斜視図FIG. 3 is a perspective view for explaining the prior art.

【図4】他の従来技術の説明用の分解斜視図FIG. 4 is an exploded perspective view for explaining another related art.

【符号の説明】[Explanation of symbols]

1 矢板 2 腹起しハンガー矢板 3 一段目吊り下げ用孔 9 一段目フック 10 一段目引っ掛け具 11 一段目腹起し載置部 12 前壁 13 引っ掛け具 19 二段目フック 20 吊り下げ用孔 21 二段目腹起し載置部 34 ブラケット 35 腹起し 42 丸穴 43 短いチェーン 44 長いチェーン 45 一方のフック 46 他方のフック REFERENCE SIGNS LIST 1 sheet pile 2 stomach hanger sheet pile 3 first-stage hanging hole 9 first-stage hook 10 first-stage hook 11 first-stage stomach placing portion 12 front wall 13 hook 19 second-stage hook 20 hanging hole 21 Second-stage flared mounting portion 34 Bracket 35 Belly protruded 42 Round hole 43 Short chain 44 Long chain 45 One hook 46 The other hook

───────────────────────────────────────────────────── フロントページの続き (72)発明者 谷口 重春 神奈川県横浜市鶴見区小野町88番地 日本 鋼管工事株式会社内 (72)発明者 橋本 伸資 神奈川県横浜市鶴見区小野町88番地 日本 鋼管工事株式会社内 Fターム(参考) 2D049 EA02 EA11 FB03 FB11 FC03 FE08  ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Shigeharu Taniguchi 88, Onocho, Tsurumi-ku, Yokohama-shi, Kanagawa Japan Inside Steel Pipe Works Co., Ltd. (72) Inventor Shinsuke Hashimoto 88, Onocho, Tsurumi-ku, Yokohama-shi, Kanagawa Japan Construction Co., Ltd. F term (reference) 2D049 EA02 EA11 FB03 FB11 FC03 FE08

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 一線状に立設した矢板1のうち、ある区
間離れた位置の2枚の矢板を、腹起しハンガー矢板2と
し、腹起しハンガー矢板2は、上部に一段目吊り下げ用
孔3をそれぞれ形成し、一段目吊り下げ用孔3に、一段
目フック9の一段目引っ掛け具10を引っ掛けて、それ
ぞれ一段目フック9を吊り下げ、一段目フック9には一
段目引っ掛け具10と反対の向きに突出する一段目腹起
し載置部11をそれぞれ形成し、一段目腹起し載置部1
1に、腹起し35を載置して、対面する腹起し35を切
梁で抑止し山留をする腹起しハンガー矢板工法。
1. A sheet pile 1 erected in a straight line, two sheet piles at a position apart from each other by a certain distance are used as a hanger sheet pile 2, and the upset hanger sheet pile 2 is suspended from the upper part by a first step. The first-stage hook 9 is hung in the first-stage hanging hole 3, and the first-stage hook 9 is hung in the first-stage hanging hole 3. The first-stage hook 9 is suspended in the first-stage hook 9. A first-stage protruding mounting portion 11 protruding in a direction opposite to the direction 10 is formed, and a first-stage protruding mounting portion 1 is formed.
First, a protruding hanger sheet pile method in which the protruding ridge 35 is placed, and the facing protruding ridge 35 is restrained by a cutting beam to make a ridge.
【請求項2】 一段目フック9の下方に二段目フック1
9を配置し、一段目フック9の下部と、二段目フック1
9の上部のいずれか一方に、引っ掛け具13を形成し、
いずれか他方に吊り下げ用孔20を形成して、一段目フ
ック9の下部に二段目フック19をそれぞれ吊り下げ、
二段目フック19には一段目腹起し載置部11と同一の
向きに突出する二段目腹起し載置部21をそれぞれ形成
し、二段目腹起し載置部21に腹起し35を載置して、
対面する腹起し35を切梁で抑止し山留をする請求項1
記載の腹起しハンガー矢板工法。
2. A second-stage hook 1 is provided below the first-stage hook 9.
9 and the lower part of the first-stage hook 9 and the second-stage hook 1
9, a hook 13 is formed on one of the upper parts,
A suspending hole 20 is formed in one of the other, and a second-stage hook 19 is suspended below the first-stage hook 9, respectively.
The second-stage hook 19 is formed with a second-stage flank mounting portion 21 projecting in the same direction as the first-stage flared mounting portion 11. Put up 35
2. The method according to claim 1, wherein the facing bulge 35 is restrained by a cutting beam to make a ridge.
The protruding hanger sheet pile method described.
【請求項3】 腹起しハンガー矢板2の上部に形成した
一段目吊り下げ用孔3を、上下方向の数箇所に形成した
請求項1又は請求項2記載の腹起しハンガー矢板工法。
3. The method of claim 1 or 2, wherein the first-stage hanging holes (3) formed in the upper part of the hanger sheet pile (2) are formed at several locations in the vertical direction.
【請求項4】 一段目腹起し載置部11と、二段目腹起
し載置部21に、前壁12を立設した請求項1から請求
項3のいずれかに記載した腹起しハンガー矢板工法。
4. The provoking device according to claim 1, wherein the front wall 12 is erected on the first protruding mounting portion 11 and the second protruding mounting portion 21. The hanger sheet pile method.
JP20531799A 1999-07-19 1999-07-19 Uprising hanger sheet pile method Expired - Fee Related JP3949320B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20531799A JP3949320B2 (en) 1999-07-19 1999-07-19 Uprising hanger sheet pile method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20531799A JP3949320B2 (en) 1999-07-19 1999-07-19 Uprising hanger sheet pile method

Publications (2)

Publication Number Publication Date
JP2001032280A true JP2001032280A (en) 2001-02-06
JP3949320B2 JP3949320B2 (en) 2007-07-25

Family

ID=16504957

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20531799A Expired - Fee Related JP3949320B2 (en) 1999-07-19 1999-07-19 Uprising hanger sheet pile method

Country Status (1)

Country Link
JP (1) JP3949320B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006037552A (en) * 2004-07-28 2006-02-09 Kajima Corp Wale mounting structure
KR100975033B1 (en) 2008-05-19 2010-08-30 (주) 아이제이컨티넨탈엔지니어링 Construction method of a soil retaining wall using PHC pile
GB2463079B (en) * 2008-09-02 2013-02-20 Balfour Beatty Plc Retaining wall
CN113373945A (en) * 2021-07-07 2021-09-10 中国十七冶集团有限公司 Pipeline engineering steel sheet pile supporting structure and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006037552A (en) * 2004-07-28 2006-02-09 Kajima Corp Wale mounting structure
JP4581536B2 (en) * 2004-07-28 2010-11-17 鹿島建設株式会社 Retaining wall structure
KR100975033B1 (en) 2008-05-19 2010-08-30 (주) 아이제이컨티넨탈엔지니어링 Construction method of a soil retaining wall using PHC pile
GB2463079B (en) * 2008-09-02 2013-02-20 Balfour Beatty Plc Retaining wall
CN113373945A (en) * 2021-07-07 2021-09-10 中国十七冶集团有限公司 Pipeline engineering steel sheet pile supporting structure and construction method thereof
CN113373945B (en) * 2021-07-07 2022-04-26 中国十七冶集团有限公司 Pipeline engineering steel sheet pile supporting structure and construction method thereof

Also Published As

Publication number Publication date
JP3949320B2 (en) 2007-07-25

Similar Documents

Publication Publication Date Title
JP2001032280A (en) Wale hanger sheet pile construction method
JPH02127305A (en) Boom type shelf
JP2008133596A (en) Scaffold for vertical shaft, and method for assembly and removal thereof
CN108895203A (en) A kind of pipeline mounting structures and its construction method for across pipe gallery
BG62265B1 (en) Supporting plate
JP6664728B1 (en) Deck plate fixing device and deck plate fixing device
JP2017008533A (en) Ceiling material fall prevention structure construction method
JP5089256B2 (en) Block hanger
JP2017190201A (en) Suspender
CN220487257U (en) A device for facing limit protection
JP2007146460A (en) Sheet pile type timbering structure for excavated groove
KR20130054642A (en) Lifting jig for lug of the heat recovery steam generator harp
JPH0989159A (en) Pipe line laying method, timbering method, and timbering assembling body
JP3193139U (en) Jig for lifting mountain retaining members
JPH11107523A (en) Hanging scaffold, method for constructing the same, and mounting bracket for standard pipe, etc.
CN219508549U (en) Centering installation device for pile foundation reinforcement cage
KR20140015980A (en) Method for constructing earth retaining wall using arch pannel
KR20110024554A (en) Support structures for retaining wall and construction method thereof
JP2019007214A (en) Lifting device and filling method
JPH0986867A (en) Hanger for construction of brace block
JP4994153B2 (en) Block construction method
JPH0646040U (en) Placing guide for oblique pile
JPH1122365A (en) Construction method of shaft and device therefor
JPS5865821A (en) Sheathing work and holding frame for excavated trench
JPH073238U (en) Temporary cable holder

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050207

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061222

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070116

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070316

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070410

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070418

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100427

Year of fee payment: 3

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100427

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100427

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100427

Year of fee payment: 3

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100427

Year of fee payment: 3

R370 Written measure of declining of transfer procedure

Free format text: JAPANESE INTERMEDIATE CODE: R370

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100427

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110427

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110427

Year of fee payment: 4

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110427

Year of fee payment: 4

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110427

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120427

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130427

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees