Prior art keywords
pile
reinforced concrete
main
head
pile head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11184366A
Other languages
Japanese (ja)
Inventor
Naohiko Hashimoto
尚彦 橋本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Original Assignee
Maeda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp filed Critical Maeda Corp
Priority to JP11184366A priority Critical patent/JP2001011852A/en
Publication of JP2001011852A publication Critical patent/JP2001011852A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a reinforced concrete pile for pile foundation work capable of facilitating the chipping of a pile head after a reinforced concrete pile is driven or developed in the ground. SOLUTION: A reinforced concrete pile 10 has at least a plurality of main bars arranged inside thereof, and it is constituted of a pile head 13 provided to the end on the opposite side to the driving end in the ground and removed after the reinforced concrete pile 10 is driven in the ground and a pile main body section 12 monolithically formed in the pile head 13 in succession. the ends of the main bars 11 arranged in the pile main body section 12 enter the inside of the pile head 13 from the pipe main body section 12, and the length of the ends 11a of the main bars 11 located in the pile head 13 is the length necessary for connecting another reinforcing bar used as an anchor when the pile head 13 is removed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は杭地業用の鉄筋コン
クリート製杭に関し、更に詳細には杭頭のはつりを容易
に行えるように改良された杭地業用の鉄筋コンクリート
製杭に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a reinforced concrete pile for a pile ground business, and more particularly to a reinforced concrete pile for a pile ground industry improved so that a pile head can be easily suspended.

【0002】[0002]

【従来の技術】基礎を支持する地盤が軟弱で支持力が不
足する場合、基礎直下の地盤が硬くてもその層が薄くて
下層が軟弱な場合、或いは同一建築物が異質の層にまた
がるような場合には、一般に杭地業が用いられる。
2. Description of the Related Art When the ground supporting the foundation is soft and the supporting capacity is insufficient, when the ground immediately below the foundation is hard, the layer is thin and the lower layer is soft, or the same building straddles different layers. In such cases, the pile industry is generally used.

【0003】このような杭地業に用いられる杭として
は、既製杭と場所打ち杭があり、既製杭は、打撃、振
動、圧入などの機械的エネルギーを与えて地盤中に打ち
込むもので、他方、場所打ち杭は、地盤に穴をあけ、コ
ンクリート又は鉄筋コンクリートの杭をその場で造成す
るものである。
[0003] There are two types of piles used in the pile foundation industry: ready-made piles and cast-in-place piles. The ready-made piles are driven into the ground by applying mechanical energy such as impact, vibration, press-fitting, and the like. Cast-in-place piles are used to make holes in the ground and create concrete or reinforced concrete piles on the spot.

【0004】ところで、既製杭の場合、前述したように
機械的エネルギーを与えて地盤中に打ち込んだ後にその
上端部である杭頭をはつる(破壊してコンクリート部分
を除去する)。従来、この杭頭のはつりは、はつりのみ
やハンマー等による手作業と、油圧式機械を用いる方法
で行われるのが一般的であった。
[0004] In the case of a ready-made pile, as described above, mechanical energy is applied to drive the pile into the ground, and then the pile head, which is the upper end, is peeled off (the concrete part is removed by breaking). Conventionally, the hanging of the pile head is generally performed by a manual operation using only the hanging or a hammer and a method using a hydraulic machine.

【0005】このような杭頭のはつりは、はつり上部の
コンクリートを下部の杭部分(主体部)に損傷を与えな
いように壊し、壊された杭頭内から露出した主筋は、基
礎フーチングにアンカーする所定の長さを保って、余分
を切り取り除去する。
[0005] In such a pile head suspension, the concrete at the top of the suspension is broken so as not to damage the lower pile part (main part), and the main bar exposed from the broken pile head is anchored to the foundation footing. Then, the extra length is cut off and removed.

【0006】これに対して、場所打ち杭の場合は、地盤
に穴をあけ、コンクリート又は鉄筋コンクリートの杭を
その場で造成するものであるが、杭造成後の地盤掘削時
における杭主体部上端を保護する目的で、当該上端部に
「余盛りコンクリート」を打設して結果的に杭頭を形成
していた。従って、場所打ち杭でも、杭造成後に地盤を
所定深さまで掘削し、その後、杭頭のはつりが前述した
と同様な方法で行われていた。
On the other hand, in the case of a cast-in-place pile, a hole is drilled in the ground, and a concrete or reinforced concrete pile is formed on the spot. For the purpose of protection, "extra-heavy concrete" was cast on the upper end to form a pile head as a result. Therefore, in the case of cast-in-place piles, the ground is excavated to a predetermined depth after the pile formation, and thereafter, the pile head is suspended in the same manner as described above.

【0007】[0007]

【発明が解決しようとする課題】しかしながら、既製杭
或いは場所打ち杭に係わらず、杭地業用の鉄筋コンクリ
ート製杭における杭頭のはつりは、非常に面倒な作業
で、工期や工事コストに大きな影響を及ぼしていた。そ
れと言うのも、杭頭に杭主体部からの主筋が延びてきて
いるためで、鉄筋が配筋された杭頭のコンクリート部分
を破壊して取り除き、主筋を露出させることは非常に手
間が掛かる重労働であった。
However, irrespective of ready-made piles or cast-in-place piles, the hanging of the pile head in the reinforced concrete piles for the pile ground industry is a very troublesome work, and has a great effect on the construction period and construction cost. Was exerted. Because the main reinforcement from the main part of the pile is extending to the pile head, it takes a lot of time to break and remove the concrete part of the pile head where the reinforcement is arranged and expose the main reinforcement. It was hard work.

【0008】最近では、前述したように杭頭はつり用の
油圧式機械も開発され、或いは撤去する杭頭のコンクリ
ート部分にクラックが入りやすいように予め膨張剤をコ
ンクリートに混入したり、更には図7に示されるように
杭頭1を形成しているコンクリート1aと主筋2の付着
力を低減させるために杭頭1に入り込む主筋端部2aに
プラスチック製のキャップ3を被せる等、種々の工夫が
なされており、はつり作業の労力は多少軽減されてい
る。
Recently, a hydraulic machine for hanging a pile head has been developed as described above, or an expanding agent has been mixed in the concrete in advance so that cracks can easily enter the concrete portion of the pile head to be removed. As shown in FIG. 7, in order to reduce the adhesive force between the concrete 1a forming the pile head 1 and the main bar 2, a plastic cap 3 is put on the main bar end 2a that enters the pile head 1 and so on. This has been done, and the labor for hanging work has been somewhat reduced.

【0009】本発明の目的は、かかる従来の問題点を解
決するためになされたもので、地盤に鉄筋コンクリート
製の杭を打ち込み或いは造成した後の杭頭のはつりを容
易に行うことができる杭地業用の鉄筋コンクリート製杭
を提供することにある。
SUMMARY OF THE INVENTION An object of the present invention is to solve such a conventional problem, and a pile ground in which a pile head made of a reinforced concrete pile is driven into the ground or can be easily suspended. An object of the present invention is to provide a reinforced concrete pile for industry.

【0010】[0010]

【課題を解決するための手段】本発明は杭地業用の鉄筋
コンクリート製杭であり、前述した技術的課題を解決す
るために以下のように構成されている。すなわち、本発
明は、内部に少なくとも複数の主筋が配置された鉄筋コ
ンクリート杭であって、地盤への打込み端部とは反対側
の端部に設けられ、鉄筋コンクリート杭が地盤に打ち込
まれた後に除去される杭頭と、この杭頭に連続して一体
的に形成される杭主体部とから構成され、杭主体部の内
部に配筋された主筋の端部が、杭主体部から杭頭内に入
り込み、杭頭内に位置する主筋の端部長さが、杭頭が除
去された時にアンカーとなる別な鉄筋を接続するのに必
要な長さ分であることを特徴とする。
SUMMARY OF THE INVENTION The present invention relates to a reinforced concrete pile for use in the pile industry, and is constructed as follows to solve the above-mentioned technical problems. That is, the present invention is a reinforced concrete pile in which at least a plurality of main reinforcing bars are arranged, provided at an end opposite to the driving end to the ground, and removed after the reinforced concrete pile is driven into the ground. The pile head and the pile main part formed continuously and integrally with the pile head, and the end of the main reinforcement arranged inside the pile main part is moved from the pile main part to the inside of the pile head. The end length of the main reinforcing bar located inside the pile head is the length required to connect another reinforcing bar serving as an anchor when the pile head is removed.

【0011】<本発明における具体的構成>本発明にお
ける杭地業用の鉄筋コンクリート製杭は、前述した必須
の構成要素からなるが、その構成要素が具体的に以下の
ような場合であっても成立する。その具体的構成要素と
は、杭主体部から杭頭内に入り込んでいる主筋の端部に
保護キャップが被せられていることを特徴とする。
<Specific Configuration in the Present Invention> The reinforced concrete pile for the piling industry according to the present invention comprises the above-mentioned essential components, and even if the components are specifically as follows: To establish. The concrete component is characterized in that a protective cap is put on an end of a main bar that enters the pile head from the pile main portion.

【0012】本発明における杭地業用の鉄筋コンクリー
ト製杭は、前述した技術的課題を解決するために更に以
下のように構成されている。すなわち、本発明は、内部
に少なくとも複数の主筋が配置された鉄筋コンクリート
製杭であって、地盤への打込み端部とは反対側の端部に
設けられ、鉄筋コンクリート杭が地盤に打ち込まれた後
に除去される杭頭と、この杭頭に連続して一体的に形成
される杭主体部とから構成され、鉄筋コンクリート杭の
内部に配筋される主筋が杭主体部の内部にのみ配筋さ
れ、杭主体部と杭頭との連接部における杭主体部端面に
は、杭頭が除去された時にアンカーとなる別な鉄筋を杭
主体部に取り付ける連結装置が配置されていることを特
徴とする。
[0012] The reinforced concrete pile for pile construction in the present invention is further configured as follows in order to solve the above-mentioned technical problems. That is, the present invention relates to a reinforced concrete pile in which at least a plurality of main reinforcing bars are arranged, provided at an end opposite to the driving end to the ground, and removed after the reinforced concrete pile is driven into the ground. And the main reinforcement that is formed integrally with the pile head, and the main reinforcement that is arranged inside the reinforced concrete pile is arranged only inside the pile main part. A connection device for attaching another reinforcing bar serving as an anchor when the pile head is removed to the pile main portion is arranged on an end face of the pile main portion in a connection portion between the main portion and the pile head.

【0013】また、本発明における杭地業用の鉄筋コン
クリート製杭では、連結装置がリング状の連結板と、こ
の連結板の一方の面に取り付けられ、杭主体部内に埋設
されている筒状をした多数のソケットとを備え、これら
のソケットは、杭頭が除去された時にアンカーとなる別
な鉄筋を連結板の他方の面側から接続するための連結穴
とされていることを特徴とする。
Further, in the reinforced concrete pile for the pile industry according to the present invention, the connecting device includes a ring-shaped connecting plate and a cylindrical shape attached to one surface of the connecting plate and embedded in the main portion of the pile. A large number of sockets, and these sockets are connection holes for connecting another reinforcing bar serving as an anchor when the pile head is removed from the other surface side of the connection plate. .

【0014】本発明における杭地業用の鉄筋コンクリー
ト製杭によると、これを地盤の所定箇所に打ち込んだ
後、従来の方法、例えばはつりのみやハンマー、或いは
油圧式機械を用いて杭頭をはつる。この発明の杭地業用
鉄筋コンクリート製杭では、杭主体部に配筋された主筋
の端部が杭頭に僅かな長さ分しか伸長していない。
According to the reinforced concrete pile for the pile industry according to the present invention, the pile is driven into a predetermined portion of the ground, and then the pile head is removed by a conventional method, for example, using only a suspension, a hammer, or a hydraulic machine. . In the reinforced concrete pile for the piling industry according to the present invention, the end of the main reinforcement arranged in the pile main portion extends only a small length to the pile head.

【0015】杭主体部から杭頭に入り込んでいる主筋端
部の長さは、杭頭がはつられて主筋端部が露出された時
に、例えば基礎フーチングにアンカーする所定長さの別
の鉄筋を後付けし得る程度とされている。従って、杭頭
の内部には事実上配筋がない状態となり、そのため杭頭
のはつりに主筋の存在が大きく影響することがなく、杭
頭のはつりを容易に且つ短時間に行うことができる。
[0015] The length of the end of the main reinforcement entering the pile head from the pile main portion is determined by, for example, adding another reinforcing bar having a predetermined length anchored to the foundation footing when the pile head is detached and the main reinforcement end is exposed. It can be retrofitted. Therefore, there is practically no reinforcing bars inside the pile head, so that the presence of the main reinforcement does not greatly affect the hanging of the pile head, and the hanging of the pile head can be performed easily and in a short time.

【0016】また、鉄筋コンクリート杭の内部に配筋さ
れる主筋が杭主体部の内部にのみ配筋され、杭主体部と
杭頭との連接部における杭主体部端面には、杭頭が除去
された時にアンカーとなる別な鉄筋を杭主体部に取り付
ける連結装置が配置されている本発明の杭地業用鉄筋コ
ンクリート製杭では、杭頭にまったく主筋がないことか
ら、杭頭のはつりをより簡単に行うことができる。
Further, the main reinforcing bar arranged inside the reinforced concrete pile is arranged only inside the pile main portion, and the pile head is removed from the end face of the pile main portion at the connecting portion between the pile main portion and the pile head. In the reinforced concrete pile for pile foundation of the present invention, in which a connecting device for attaching another reinforcing bar serving as an anchor to the pile main part at the time of the pile is not used, the pile head has no main reinforcing bar, so that the pile head can be easily suspended. Can be done.

【0017】[0017]

【発明の実施の形態】以下、本発明における杭地業用の
鉄筋コンクリート製杭を図に示される実施形態について
更に詳細に説明する。図1には本発明の第1の実施形態
に係る杭地業用の鉄筋コンクリート製杭10が示されて
いる。第1の実施形態は既製杭を例にしている。
BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, the embodiment shown in the drawings of a reinforced concrete pile according to the present invention will be described in more detail. FIG. 1 shows a reinforced concrete pile 10 for a pile ground business according to a first embodiment of the present invention. The first embodiment exemplifies a ready-made pile.

【0018】杭地業用の鉄筋コンクリート製杭10は、
内部に少なくとも複数の主筋11が配置された杭主体部
12を備えている。地盤中に打ち込まれる鉄筋コンクリ
ート製杭10の先端部である杭主体部12の下端部とは
反対側の端部に、杭主体部12に連続して一体的に杭頭
13が形成されている。この杭頭13には、杭主体部1
2に配筋された主筋11の端部11aが入り込んでい
る。
The reinforced concrete pile 10 for the pile ground business is
The pile main body 12 in which at least a plurality of main bars 11 are arranged is provided. A pile head 13 is formed integrally with the pile main portion 12 at the end opposite to the lower end of the pile main portion 12 which is the tip of the reinforced concrete pile 10 driven into the ground. This pile head 13 has a pile main body 1
The end 11a of the main bar 11 arranged in 2 is inserted.

【0019】杭頭13に入り込んでいる主筋11の端部
11aは、隣接する主筋11に対して交互にその長さが
変えられている。すなわち、ある主筋11の端部11a
における杭頭13への入り込み長さが短い場合には、こ
の主筋11に隣接する主筋11の端部11aにおける杭
頭13への入り込み長さは、先の主筋の入り込み長さよ
り相対して長くされている。
The end 11a of the main bar 11 that has entered the pile head 13 is alternately changed in length with respect to the adjacent main bar 11. That is, the end 11a of a certain main bar 11
In the case where the penetration length into the pile head 13 is short, the penetration length into the pile head 13 at the end 11a of the main reinforcement 11 adjacent to the main reinforcement 11 is made relatively longer than the penetration length of the preceding main reinforcement. ing.

【0020】しかし、全体としては、杭主体部12から
出た主筋11の端部11aが杭頭13内に入り込んでい
る長さは、従来の鉄筋コンクリート製杭よりも格段に短
くなている。これにより、鉄筋コンクリート製杭10が
地盤中に打ち込まれた後、杭頭13のコンクリート部分
13aを壊す際、その内部に入り込んでいる主筋11の
端部総量が少ないため、コンクリート部分13aの取り
壊しが非常に容易となる。
However, as a whole, the length of the end 11a of the main bar 11 coming out of the pile main portion 12 and entering the pile head 13 is much shorter than the conventional reinforced concrete pile. Thereby, when the concrete portion 13a of the pile head 13 is broken after the reinforced concrete pile 10 is driven into the ground, the concrete portion 13a is very difficult to demolish because the total amount of the ends of the main bars 11 that have entered the inside is small. Will be easier.

【0021】この鉄筋コンクリート製杭10では、前述
したように地盤中に打ち込まれた後に杭頭13のコンク
リート部分13aが壊されて内部の主筋端部11aが露
出されると、杭主体部12の上端から突出している主筋
の端部を、基礎フーチングにアンカーとして使用できる
長さに確保しなければならない。そこで、この主筋11
の端部に、実質的にアンカーとなる別な鉄筋を接続す
る。
In the reinforced concrete pile 10, as described above, when the concrete portion 13 a of the pile head 13 is broken after being driven into the ground and the inner main bar end portion 11 a is exposed, the upper end of the pile main portion 12 is formed. The end of the main bar that protrudes from the base bar must be long enough to be used as an anchor for the foundation footing. Therefore, this main line 11
Is connected to another end which is substantially an anchor.

【0022】この実施形態に係る鉄筋コンクリート製杭
10の場合では、アンカー筋となる別な鉄筋の接続方法
として圧接接続が採用される。すなわち、この鉄筋コン
クリート製杭10では、これが地盤に打ち込まれた後に
杭頭13のコンクリート部分13aが除去され、露出し
た主筋11の各端部にアンカーとなる別な鉄筋を圧接に
より接続しやすくするため、杭頭13内での隣接する主
筋端部の相互長さを予め変えているのである。
In the case of the reinforced concrete pile 10 according to this embodiment, a pressure welding connection is adopted as a method of connecting another reinforcing bar serving as an anchor bar. That is, in the reinforced concrete pile 10, the concrete portion 13 a of the pile head 13 is removed after the pile is driven into the ground, and another reinforcing bar serving as an anchor is easily connected to each end of the exposed main bar 11 by pressure welding. The mutual length of the adjacent main bar ends in the pile head 13 is changed in advance.

【0023】図2には、本発明の第2の実施形態に係る
杭地業用の鉄筋コンクリート製杭20が示されている。
この鉄筋コンクリート製杭20は、前述した第1の実施
形態と同様に内部に少なくとも複数の主筋21が配置さ
れた杭主体部22を備えている。地盤中に打ち込まれる
鉄筋コンクリート製杭20の先端部である杭主体部22
の下端部とは反対側の端部に、杭主体部22に連続して
一体的に杭頭23が形成されている。この杭頭23に
は、杭主体部22に配筋された主筋21の端部21aが
僅かな長さだけ入り込んでいる。
FIG. 2 shows a reinforced concrete pile 20 for a pile construction business according to a second embodiment of the present invention.
The reinforced concrete pile 20 includes a pile main body 22 in which at least a plurality of main reinforcements 21 are arranged similarly to the first embodiment described above. Pile main part 22 which is the tip of reinforced concrete pile 20 driven into the ground
A pile head 23 is formed integrally with the pile main body 22 at the end opposite to the lower end of the pile. The end 21a of the main bar 21 arranged in the pile main portion 22 enters the pile head 23 by a small length.

【0024】杭主体部22に配筋された主筋21の端部
21aが杭頭23に入り込む長さは、鉄筋コンクリート
製杭20が地盤に打ち込まれた後に杭頭23のコンクリ
ート部分23aが除去され、露出した主筋21の各端部
21aにアンカーとなる別な鉄筋を溶接で接続するのに
必要最低限の長さとされている。そして、図3に拡大し
て示されるようにこの主筋21における杭頭23に入り
込んでいる端部21aには筒状をしたプラスチック製の
キャップ24が被せられている。
The length of the end 21a of the main reinforcement 21 arranged in the pile main portion 22 into the pile head 23 is such that the concrete portion 23a of the pile head 23 is removed after the reinforced concrete pile 20 is driven into the ground. The length is the minimum length necessary for connecting another reinforcing bar serving as an anchor to each end 21a of the exposed main bar 21 by welding. As shown in an enlarged manner in FIG. 3, an end 21a of the main bar 21 which enters the pile head 23 is covered with a cylindrical plastic cap 24.

【0025】このように主筋21における杭頭23に入
り込んでいる端部21aにキャップ24を被せておく
と、杭頭23を形成しているコンクリート部分23aと
主筋端部との付着性はほどんど無いため、杭頭と杭主体
部との区画線25付近でコンクリートにクラックや切込
み部を入れるなどして杭頭23を上方へ引き上げると簡
単に杭主体部22から杭頭23のコンクリート部分23
aを分離除去することができる。
When the cap 24 is put on the end 21a of the main bar 21 which has entered the pile head 23, the adhesion between the concrete portion 23a forming the pile head 23 and the main bar end is almost eliminated. Since there is no pile portion 23, the concrete portion 23 of the pile head 23 can be easily moved from the pile main portion 22 by raising the pile head 23 upward by making a crack or a notch in the concrete near the division line 25 between the pile head and the pile main portion.
a can be separated and removed.

【0026】杭頭23のコンクリート部分23aを杭主
体部22から分離除去した後は、杭主体部22から突出
している主筋21の端部21aにアンカー筋となる別な
鉄筋が溶接で接続され、これが基礎フーチング用のアン
カーとして利用される。
After the concrete portion 23a of the pile head 23 is separated and removed from the pile main portion 22, another reinforcing bar serving as an anchor bar is connected to the end 21a of the main reinforcement 21 projecting from the pile main portion 22 by welding. This is used as an anchor for basic footing.

【0027】前述した第1及び第2の実施形態に係る杭
地業用の鉄筋コンクリート製杭では、杭頭13、23を
はつった後に杭主体部12、22の上端から突出してい
る主筋11、21の端部にアンカーとなる別な鉄筋を圧
接及び溶接により接続する例であったが、その接続方法
としては、機械式継手による接続であって良い。
In the reinforced concrete piles for the pile ground industry according to the first and second embodiments described above, the main reinforcing bars 11 projecting from the upper ends of the pile main portions 12 and 22 after the pile heads 13 and 23 are attached. In the example described above, another reinforcing bar serving as an anchor is connected to the end portion 21 by pressure welding and welding, but a connecting method using a mechanical joint may be used.

【0028】図4には、本発明の第3の実施形態に係る
杭地業用の鉄筋コンクリート製杭30が示されている。
この鉄筋コンクリート製杭30は、前述した第1の実施
形態と同様に内部に少なくとも複数の主筋31が配置さ
れた杭主体部32を備えている。地盤中に打ち込まれる
鉄筋コンクリート製杭30の先端部である杭主体部32
の下端部とは反対側の端部に、杭主体部32に連続して
一体的に杭頭33が形成されている。
FIG. 4 shows a reinforced concrete pile 30 for pile construction according to a third embodiment of the present invention.
The reinforced concrete pile 30 includes a pile main portion 32 in which at least a plurality of main reinforcements 31 are arranged as in the first embodiment described above. Pile main part 32 which is the tip of reinforced concrete pile 30 driven into the ground
A pile head 33 is formed integrally with the pile main portion 32 at an end opposite to the lower end.

【0029】杭主体部32に配筋された主筋31の端部
は、杭主体部32と杭頭33との境界部36で終端して
おり、杭頭33に主筋31の端部は及んでいない。しか
し、杭主体部32と杭頭33との境界部36における杭
主体部端面には、杭頭33が除去された時にアンカー筋
となる別な鉄筋を杭主体部32に取り付ける連結装置3
4が配置されている。
The end of the main bar 31 arranged in the pile main portion 32 terminates at the boundary 36 between the pile main portion 32 and the pile head 33, and the end of the main bar 31 extends over the pile head 33. Not in. However, on the end face of the pile main portion at the boundary portion 36 between the pile main portion 32 and the pile head 33, a connecting device 3 for attaching another reinforcing bar serving as an anchor bar to the pile main portion 32 when the pile head 33 is removed.
4 are arranged.

【0030】この連結装置34は、図5及び図6に示さ
れるようにリング状の連結板34aからなり、この連結
板34aの一方の面には杭主体部32内に埋設されてる
筒状をした多数のソケット34bが取り付けられてい
る。これらの各ソケット34bは、杭頭33が除去され
た時にアンカー筋となる別な鉄筋35を連結板34aの
他方の面側から螺合接続するためのネジ穴34cとされ
ている。
The connecting device 34 comprises a ring-shaped connecting plate 34a as shown in FIGS. 5 and 6, and has a cylindrical shape embedded in the pile main portion 32 on one surface of the connecting plate 34a. Many sockets 34b are attached. Each of these sockets 34b is a screw hole 34c for screwing another reinforcing bar 35 serving as an anchor bar when the pile head 33 is removed from the other surface side of the connecting plate 34a.

【0031】このような鉄筋コンクリート製杭30によ
れば、鉄筋コンクリート製杭30が地盤に打ち込まれた
後に杭頭33と杭主体部32との境界部36付近でコン
クリートにクラックや切込み部を入れるなどして杭頭3
3を上方へ引き上げる。杭頭33内には前述したように
主筋31の端部が及んでいないため、杭主体部32から
杭頭33を簡単に分離除去することができる。
According to such a reinforced concrete pile 30, after the reinforced concrete pile 30 is driven into the ground, cracks or cuts are made in the concrete near the boundary 36 between the pile head 33 and the pile main portion 32. Pile head 3
3 is pulled up. Since the end of the main bar 31 does not extend into the pile head 33 as described above, the pile head 33 can be easily separated and removed from the pile main body 32.

【0032】杭頭33が杭主体部32からが除去される
と、図6に示されるように杭主体部32の上端面には連
結装置34の連結板34aが露出し、その表面に形成さ
れているネジ穴34c内に、アンカーとなる別な鉄筋3
5が螺合され、杭主体部32の上端面からあたかも主筋
が突出しているようにされる。
When the pile head 33 is removed from the pile main portion 32, the connecting plate 34a of the connecting device 34 is exposed on the upper end surface of the pile main portion 32 as shown in FIG. Another reinforcing bar 3 serving as an anchor in the screw hole 34c
5 are screwed together so that the main bar projects from the upper end surface of the pile main body 32.

【0033】なお、連結装置34におけるソケット34
bのネジ穴34cは、杭頭33の形成時に適当な蓋をし
て閉鎖するか、或いはその内部に詰め物をしておき、コ
ンクリートが入らないようにしておくことが必要であ
る。
The socket 34 in the connecting device 34
It is necessary that the screw hole 34c of b be closed with a suitable lid when the pile head 33 is formed, or that the inside thereof be padded to prevent concrete from entering.

【0034】前述した各実施形態に係る杭地業用の鉄筋
コンクリート製杭は、所謂既製杭(予め工場等で形成さ
れた鉄筋コンクリート製の杭)を例にして説明された
が、本発明は既製杭に限らず、場所打ち杭にも同様に適
用できることは言うまでもない。むしろ、実際には、こ
の発明を場所打ち杭に適用することの方が有用であると
考えられる。
The reinforced concrete pile for the pile industry according to each of the above-described embodiments has been described as an example of a so-called ready-made pile (a reinforced concrete pile formed in advance in a factory or the like). Needless to say, the present invention can be similarly applied to a cast-in-place pile. Rather, in practice, it would be more useful to apply the invention to cast-in-place piles.

【0035】[0035]

【発明の効果】以上説明したように、本発明の杭地業用
の鉄筋コンクリート製杭によれば、杭頭の内部には事実
上配筋がない状態となることから、杭頭のはつりに主筋
の存在が大きく影響することがなく、地盤に鉄筋コンク
リート製の杭を打ち込み或いは造成した後の杭頭のはつ
りを容易に且つ短時間に行うことができる。
As described above, according to the reinforced concrete pile for the pile ground business of the present invention, since there is virtually no reinforcement inside the pile head, the main reinforcement is attached to the suspension of the pile head. The pile head is not easily affected in a short time after a pile made of reinforced concrete is driven or formed in the ground without greatly affecting the existence of the pile.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明における第1の実施形態に係る杭地業用
の鉄筋コンクリート製杭の上部を部分的に示す概略的な
断面図である。
FIG. 1 is a schematic cross-sectional view partially showing an upper part of a reinforced concrete pile for pile construction according to a first embodiment of the present invention.

【図2】本発明における第2の実施形態に係る杭地業用
の鉄筋コンクリート製杭の上部を部分的に示す概略的な
断面図である。
FIG. 2 is a schematic cross-sectional view partially showing an upper part of a reinforced concrete pile for pile ground industry according to a second embodiment of the present invention.

【図3】図2に示される第2の実施形態に係る杭地業用
の鉄筋コンクリート製杭の杭主体部と杭頭の境界部付近
における主筋端部の構成を部分的に示す拡大断面図であ
る。
FIG. 3 is an enlarged cross-sectional view partially showing a configuration of an end of a main reinforcing bar near a boundary between a pile main portion and a pile head of a reinforced concrete pile for pile foundation according to the second embodiment shown in FIG. 2; is there.

【図4】本発明における第3の実施形態に係る杭地業用
の鉄筋コンクリート製杭の上部を部分的に示す概略的な
断面図である。
FIG. 4 is a schematic cross-sectional view partially showing an upper part of a reinforced concrete pile for pile construction according to a third embodiment of the present invention.

【図5】図4に示される杭地業用の鉄筋コンクリート製
杭に使用されるアンカー筋連結装置を示す斜視図であ
る。
FIG. 5 is a perspective view showing an anchor rebar connecting device used for the reinforced concrete pile shown in FIG. 4 for the pile ground industry.

【図6】図4に示される第3の実施形態に係る杭地業用
の鉄筋コンクリート製杭において杭頭を除去した後、杭
主体部端面に存在するアンカー筋連結装置にアンカー筋
を螺合する状態を拡大して示す部分的な断面図である。
FIG. 6 shows a third embodiment of the reinforced concrete pile according to the third embodiment shown in FIG. 4, in which a pile head is removed, and then an anchor bar is screwed into an anchor bar connecting device existing on the end face of the pile main portion. It is a partial sectional view expanding and showing a state.

【図7】従来使用されている杭地業用の鉄筋コンクリー
ト製杭の上部を部分的に破断して示す概略的な正面図で
ある。
FIG. 7 is a schematic front view showing a part of an upper part of a conventionally used reinforced concrete pile for a pile ground industry partially broken away.

【符号の説明】[Explanation of symbols]

10 鉄筋コンクリート製杭 11 主筋 11a 主筋端部 12 杭主体部 13 杭頭 13a コンクリート部分 20 鉄筋コンクリート製杭 21 主筋 21a 主筋端部 22 杭主体部 23 杭頭 23a コンクリート部分 24 キャップ 30 鉄筋コンクリート製杭 31 主筋 31a 主筋端部 32 杭主体部 33 杭頭 23a コンクリート部分 34 アンカー筋連結装置 34a 連結板 34b ソケット 34c ネジ穴(連結穴) 35 アンカー筋 Reference Signs List 10 reinforced concrete pile 11 main reinforcement 11a main reinforcement end 12 pile main part 13 pile head 13a concrete part 20 reinforced concrete pile 21 main reinforcement 21a main reinforcement end 22 pile main part 23 pile head 23a concrete part 24 cap 30 reinforced concrete pile 31 main reinforcement 31a main reinforcement End 32 Pile main body 33 Pile head 23a Concrete part 34 Anchor bar connecting device 34a Connecting plate 34b Socket 34c Screw hole (connecting hole) 35 Anchor bar

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 内部に少なくとも複数の主筋が配置され
た鉄筋コンクリート杭であって、 地盤への打込み端部とは反対側の端部に設けられ、前記
鉄筋コンクリート杭が地盤に打ち込まれた後に除去され
る杭頭と、この杭頭に連続して一体的に形成される杭主
体部とから構成され、前記杭主体部の内部に配筋された
主筋の端部が、前記杭主体部から前記杭頭内に入り込
み、前記杭頭内に位置する前記主筋の端部長さが、前記
杭頭が除去された時にアンカーとなる別な鉄筋を接続す
るのに必要な長さ分であることを特徴とする杭地業用の
鉄筋コンクリート製杭。
1. A reinforced concrete pile having at least a plurality of main reinforcing bars disposed therein, the reinforced concrete pile being provided at an end opposite to a driving end into the ground, being removed after the reinforced concrete pile is driven into the ground. And a pile main portion formed continuously and integrally with the pile head, and an end of a main reinforcing bar arranged inside the pile main portion is separated from the pile main portion by the pile main portion. It is characterized in that the end length of the main reinforcing bar that enters the head and is located in the pile head is a length necessary for connecting another reinforcing bar serving as an anchor when the pile head is removed. Piles made of reinforced concrete for the piling industry.
【請求項2】 前記杭主体部から前記杭頭内に入り込ん
でいる前記主筋の端部に保護キャップが被せられている
ことを特徴とする請求項1に記載の杭地業用の鉄筋コン
クリート製杭。
2. The reinforced concrete pile according to claim 1, wherein a protective cap is put on an end of the main reinforcing bar that enters the pile head from the pile main portion. .
【請求項3】 内部に少なくとも複数の主筋が配置され
た鉄筋コンクリート製杭であって、 地盤への打込み端部とは反対側の端部に設けられ、前記
鉄筋コンクリート杭が地盤に打ち込まれた後に除去され
る杭頭と、この杭頭に連続して一体的に形成される杭主
体部とから構成され、前記鉄筋コンクリート杭の内部に
配筋される前記主筋が前記杭主体部の内部にのみ配筋さ
れ、前記杭主体部と前記杭頭との境界部における前記杭
主体部端面には、前記杭頭が除去された時にアンカーと
なる別な鉄筋を前記杭主体部に取り付ける連結装置が配
置されていることを特徴とする杭地業用の鉄筋コンクリ
ート製杭。
3. A reinforced concrete pile having at least a plurality of main reinforcing bars disposed therein, the pile being provided at an end opposite to a driving end into the ground, and removed after the reinforced concrete pile is driven into the ground. And a main pile portion formed continuously and integrally with the pile head, and the main reinforcing bars arranged inside the reinforced concrete pile are arranged only inside the main pile portion. A connection device that attaches another reinforcing bar serving as an anchor when the pile head is removed to the pile main body is disposed on the pile main body end surface at the boundary between the pile main body and the pile head. Pile made of reinforced concrete for the pile industry.
【請求項4】 前記連結装置が、リング状の連結板と、
この連結板の一方の面に取り付けられ、前記杭主体部内
に埋設されている筒状をした多数のソケットとを備え、
これらのソケットは、前記杭頭が除去された時にアンカ
ーとなる別な鉄筋を前記連結板の他方の面側から接続す
るための連結穴とされていることを特徴とする請求項3
に記載の杭地業用の鉄筋コンクリート製杭。
4. The connecting device, comprising: a ring-shaped connecting plate;
A large number of cylindrical sockets attached to one surface of the connection plate and embedded in the pile main body,
4. A connection hole for connecting another reinforcing bar serving as an anchor when the pile head is removed from the other surface side of the connection plate.
4. A reinforced concrete pile for use in piles according to 1.
JP11184366A 1999-06-29 1999-06-29 Reinforced concrete pile for pile foundation work Pending JP2001011852A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11184366A JP2001011852A (en) 1999-06-29 1999-06-29 Reinforced concrete pile for pile foundation work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11184366A JP2001011852A (en) 1999-06-29 1999-06-29 Reinforced concrete pile for pile foundation work

Publications (1)

Publication Number Publication Date
JP2001011852A true JP2001011852A (en) 2001-01-16

Family

ID=16151980

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11184366A Pending JP2001011852A (en) 1999-06-29 1999-06-29 Reinforced concrete pile for pile foundation work

Country Status (1)

Country Link
JP (1) JP2001011852A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58153816A (en) * 1982-03-08 1983-09-13 Hasegawa Komuten Co Ltd Reinforced cap device for pile head
JPS62163534U (en) * 1986-04-09 1987-10-17
JPH06280254A (en) * 1993-03-29 1994-10-04 Kajima Corp Pile head treatment construction of precast concrete pile
JPH08296225A (en) * 1995-04-26 1996-11-12 Taisei Corp Precast concrete pile and method for integrally constructing precast concrete pile and foundation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58153816A (en) * 1982-03-08 1983-09-13 Hasegawa Komuten Co Ltd Reinforced cap device for pile head
JPS62163534U (en) * 1986-04-09 1987-10-17
JPH06280254A (en) * 1993-03-29 1994-10-04 Kajima Corp Pile head treatment construction of precast concrete pile
JPH08296225A (en) * 1995-04-26 1996-11-12 Taisei Corp Precast concrete pile and method for integrally constructing precast concrete pile and foundation

Similar Documents

Publication Publication Date Title
JP6936613B2 (en) Masonry reinforcement structure and reinforcement method
JP4771244B2 (en) Connection joint between steel pipe pile and concrete pile, connection pile structure between steel pipe pile and concrete pile, construction method of connection pile between steel pipe pile and concrete pile
JP2003119775A (en) Construction of foundation pile
JP2001011852A (en) Reinforced concrete pile for pile foundation work
JP2001032409A (en) Joining method and joining structure of precast reinforced concrete aseismatic wall
JP2009293222A (en) Construction joint portion forming implement, and construction method for construction joint portion of underground wall
JP3776330B2 (en) Seismic walls of existing buildings and construction methods
JP4623577B2 (en) How to build cast-in-place piles
JP2003055985A (en) Connecting method of column to pile
KR200402857Y1 (en) A concrete pile the head reinforcement utilized by steel pipe and cohesion construction with foundation concrete
JP2004316207A (en) Structure for connecting earth retaining wall with floor slab, and construction method therefor
JPH0243848B2 (en)
JP4117209B2 (en) Bridge pier / Abutment base combined reinforcement structure
JP3069068B2 (en) Injection forming material for concrete reverse joint
KR20020089033A (en) Construction Method of Complex Pile Consisting Prestressed spun High strength Concrete Pile and Steel Pipe Pile
JP2003268785A (en) Pile foundation
JP3843045B2 (en) Rock construction method for jacket structure
JP2879726B2 (en) Pile head joint structure between ready-made concrete pile and foundation slab
JP2564465B2 (en) Ready-made pile burying method
JPH05132927A (en) Construction method of underground continuous wall
JPS63184613A (en) Removing work of pc steel strand of earth anchor
KR100696298B1 (en) Connection detail and its construction method between abutment and H-pile in integral abutment bridge
JPS6138015A (en) Sheathing work
JPH04182509A (en) Land slide protection structure
JPH1136325A (en) Connection structure of pile head of existing concrete pile and foundation slab concrete

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060426

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071217

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080122

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20080617