JP2000220291A - Work scaffolding for steel framed building structure and removing method thereof - Google Patents

Work scaffolding for steel framed building structure and removing method thereof

Info

Publication number
JP2000220291A
JP2000220291A JP11022063A JP2206399A JP2000220291A JP 2000220291 A JP2000220291 A JP 2000220291A JP 11022063 A JP11022063 A JP 11022063A JP 2206399 A JP2206399 A JP 2206399A JP 2000220291 A JP2000220291 A JP 2000220291A
Authority
JP
Japan
Prior art keywords
column
frame
scaffold
shaped
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11022063A
Other languages
Japanese (ja)
Inventor
Sadami Watabe
定巳 渡部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KYOAIGUMI KK
Original Assignee
KYOAIGUMI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KYOAIGUMI KK filed Critical KYOAIGUMI KK
Priority to JP11022063A priority Critical patent/JP2000220291A/en
Publication of JP2000220291A publication Critical patent/JP2000220291A/en
Pending legal-status Critical Current

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily build up a scaffolding required to fit a cross beam member at a steel framed building structure site, at a low cost without danger. SOLUTION: Collar members 6 with bolt holes are fitted in the opposed positions near the beam member fitting position of a rectangular column 1 to be erected, so that the collar parts are put in the horizontally protruding state. Angles 7 of 1600 mm-1900 mm in length are bolt-fastened and fixed to the collar members 6 orthogonally to the lengthwise direction of the column 1 and in the state of holding the column 1. With the angles 7 as base members, the appropriate number of angles 7 of 500 mm-1900 mm in length are used to form a box frame, and a footboard is fitted to the lower face part of the box frame to constitute a scaffolding for fitting the beam member.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は鉄骨建築構造物用工
事足場とその取外し方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction scaffold for steel building structures and a method for removing the same.

【0002】[0002]

【従来の技術】鉄骨建築構造物用足場の作業現場では立
設したコラムに対し梁材を繋ぎ合わせたり、溶接したり
する作業を行うための足場を設ける必要がある。この足
場作りは専ら立設したコラムに対する後付け作業として
行われており、繋ぎ箇所となる夫々れの多数箇所で必要
とされる。
2. Description of the Related Art At the work site of a scaffold for a steel building structure, it is necessary to provide a scaffold for joining or welding beams to an erect column. This scaffolding is performed exclusively as a post-installation work for columns that are erected, and is required at each of a number of connecting points.

【0003】[0003]

【発明が解決しようとする課題】上記の足場取付け作業
は、多数のコラムが複雑に入り込んだり、また階層が順
次高くなったりすると機材の持上げなどの作業性に種々
な支障を生じて取付け作業に時間が掛かったり、危険で
あったりする問題がある。また、使用後の取除き作業に
も同様な問題を生じさせるものとなっている。本発明は
上記問題点を解決せんとするものである。
In the scaffold mounting operation described above, when a large number of columns enter into a complicated manner or when the height of the floor is gradually increased, various problems occur in the workability such as lifting of equipment, and the mounting operation is difficult. There are problems that are time-consuming and dangerous. In addition, a similar problem occurs in the removal operation after use. The present invention has been made to solve the above problems.

【0004】[0004]

【課題を解決するための手段】本発明は立設する角柱コ
ラムの梁材取付け付近の対向する位置に、ボルト孔付き
鍔部材をその鍔部が水平な突出状態となるよう取付け、
該部材に対し長さ1600mm〜1900mmとなした
山型アングルを、コラムの長さ方向と直交し、且つこれ
を挟む状態にボルト締めして固定し、上記山型アングル
を基材として長さ500mm〜1900mmの山型アン
グルを適当数使用して桝枠を作成すると共に、桝枠下面
部には踏板を取付けて梁材取付け用の足場となすのであ
る。
According to the present invention, a flange member having a bolt hole is attached to an upright prism column at an opposed position near a beam material attachment so that the flange portion projects horizontally.
A mountain-shaped angle having a length of 1600 mm to 1900 mm is fixed to the member by bolting in a state perpendicular to the length direction of the column and sandwiching the angle. An appropriate number of angles of up to 1900 mm are used to form a sash, and a tread is attached to the underside of the sash to form a scaffold for mounting beams.

【0005】而して、その足場の取外しでは、基材とし
た山型アングルの鍔部材箇所に於いて、ボルトナットを
取外すと共に、該取外し部に対し山型アングルと鍔部材
を外方から一定の間隙下に挟持する断面コ字状となした
紐付き挟持具を取付け、一方桝枠を断面I型梁の下部張
出し鍔に対し、コ字状の引掛具を使用して滑車と共に取
付け、且つ滑車にはロープを使用して桝枠を吊下げるよ
うになし、この状態で紐付き挟持具の紐を引張って挟持
具を取外した後、滑車のロープを緩めて桝枠を降下さ
せ、あとI型梁から引掛具を滑車ごとロープと共に外方
へ向けて引張ることにより手作業で簡便に取外すことの
できるものである。
In the removal of the scaffold, the bolt and nut are removed at the flange member portion of the angled angle serving as the base material, and the angled angle and the flanged member are fixed to the removed portion from the outside. At the same time, the frame frame is attached to the lower overhang of the I-shaped cross section with the pulley using a U-shaped hooking tool, and the pulley In this state, use a rope to suspend the cell frame. In this state, pull the cord of the corded clip and remove the clip, then loosen the pulley rope to lower the cell frame, and then use the I-beam. By pulling the hook together with the rope outward together with the pulley, the hook can be easily removed manually.

【0006】[0006]

【発明の実施の形態】図1は本発明の実施状態説明図、
図2A,Bは角柱コラムに対し工事用足場を取付ける状
態説明図である。1は鉄骨建築構造物の角柱コラム、2
は該角柱コラム1の1階或いは2階などのフロアーを構
成する横梁材の取付け相当位置へ設けてなる工事用足場
の桝枠である。
FIG. 1 is an explanatory view of an embodiment of the present invention.
2A and 2B are explanatory diagrams of a state in which a scaffold for construction is attached to a prism column. 1 is a prism column of a steel building structure, 2
Reference numeral denotes a frame of a construction scaffold provided at a position corresponding to the attachment of cross beams constituting the first or second floor of the prismatic column 1.

【0007】本発明に於いて上記角柱コラム1に於ける
工事用足場の取付けは、初めに角柱コラム1を倒した状
態で、長さ寸法500mm〜1900mmとなした山型
アングルを適宜組合せながらボルトとナットの使用で桝
枠2に組立てるのであり、具体的には初めに角柱コラム
1を一定高さの架台3,3を使用して水平状体に載置
し、該角柱コラム1に対し横梁材4の取付け相当位置m
に於ける対向箇所へ、ボルト孔5付き鍔部材6をその鍔
部6aが水平な突出状態となるように取付ける(図2A
参照)
In the present invention, the installation of the scaffold for construction in the above-mentioned prism column 1 is carried out by firstly lowering the prism column 1 and appropriately combining a mountain angle having a length dimension of 500 mm to 1900 mm with a bolt. And the nuts are used to assemble into the square frame 2. Specifically, first, the prism column 1 is placed on a horizontal body using the mounts 3 and 3 having a fixed height, and Mounting position m of material 4
The flange member 6 with the bolt hole 5 is attached to the opposing portion in FIG.
reference)

【0008】而して、上記鍔部材6の鍔部6aに対し、
長さ寸法1600mm〜1900mmの山型アングルの
一対7,7をコラムの長さ方向と直交する状態にボルト
8及びナット9を使用して取付けるのであり、次に該山
型アングル7,7を基材として、長さ寸法を500mm
〜1900mmとなした山型アングル7を適宜取捨選択
し、且つ同じくボルトナットの使用で相互に組付けて行
くことにより桝枠2を構成する。
[0008] With respect to the flange 6a of the flange member 6,
A pair of angled angles 7 and 7 having a length of 1600 mm to 1900 mm are attached using bolts 8 and nuts 9 in a state perpendicular to the longitudinal direction of the column. As material, length dimension is 500mm
The angle frame 7 having a length of about 1900 mm is appropriately selected and assembled with each other by using bolts and nuts.

【0009】このさい、桝枠2の構成で手摺などは梁材
の取付けられる方向によって、その一部が邪魔とならな
いよう、安全面を損なわない範囲で取除いたものとなし
たものが作成される。而して、底枠の箇所には金網板1
0を脱着自在に取付けたものとなしてある。(図3参
照)
At this time, in the construction of the box frame 2, the handrails and the like are formed according to the mounting direction of the beams so that a part of the handrails is removed as far as the safety surface is not impaired so as not to be in the way. You. Thus, the wire mesh plate 1
0 is detachably attached. (See Fig. 3)

【0010】上記に於ける桝枠2の構成素材として専ら
山型アングルを使用し、且つこれをボルトナットの使用
で脱着させるようにするのは、軽量ながら必要強度の保
持された桝枠を安価且つ簡単に組立て、また取外しや分
解までを容易ならしめるためである。
In order to use a mountain angle exclusively as a constituent material of the above-mentioned frame 2 and to attach and detach it by using bolts and nuts, it is possible to use a lightweight, low-strength frame which is maintained at the required strength. In addition, it is intended to easily assemble and to facilitate removal and disassembly.

【0011】本発明では上記の如くして、各コラム1に
於ける横梁材4の取付け相当箇所に対し、各コラムを横
置状態下で工事用足場の桝枠2を取付けたものとなし、
あとこれをクレーンの使用で吊上げ建築構造物の立設位
置へ固定して行くのであり、通常コラム1の長さ寸法は
2階相当分の長さであるため、それ以上の階層となると
順次その上へ継足して行くようにするのである。(図1
参照)
According to the present invention, as described above, the square frame 2 of the scaffold for construction is attached to a place corresponding to the attachment of the cross beam member 4 in each column 1 while each column is placed horizontally.
After that, this is fixed to the standing position of the lifting building structure by using a crane. Usually, the length of the column 1 is equivalent to the second floor, so if it becomes a higher level, it will be Try to add to the top. (Figure 1
reference)

【0012】而して、上記角柱コラム1の立設により、
本発明では直ちに該桝枠2の使用により横梁材4の取付
け作業が行われるのであり、迅速に作業を遂行できるも
のとなる。図3は梁材4の取付け作業状態図を示すもの
である。次に上記桝枠を使用して梁材4取付けが終了
し、該桝枠を取外すにさいしては、次に如くして行われ
る。
[0012] By erection of the prism column 1,
In the present invention, the work of attaching the cross beam member 4 is immediately performed by using the square frame 2, so that the work can be quickly performed. FIG. 3 shows a state diagram of the work of attaching the beam 4. Next, the mounting of the beam member 4 is completed using the above-mentioned frame, and the removal of the frame is performed as follows.

【0013】先ず図4A及びBに示す如く桝枠2の対向
する一対の山型アングルに夫々れロープ12の一端を括
り付け、各ロープ12を滑車13に通して垂らすのであ
り、このさい該ロープ12は山型アングルと接触する付
近でこれを山型アングルに1回廻して垂下させてある。
これは垂下ロープ12の滑車外れを防止すること、及び
後述する桝枠降ろしのさいに緩徐な降下が行われるよう
にするためである。なお、滑車13は梁材4の下方鍔部
4aに対し一対のコ字状引掛具14にロープ10を介し
て取付けると共に、該引掛具14の1つには後述する作
業終了時に該引掛具を含む滑車13を取除くために使用
するロープ10が取付けてある。
First, as shown in FIGS. 4A and 4B, one end of each rope 12 is tied to a pair of opposed angled angles of the box frame 2 and each rope 12 is passed through a pulley 13 to hang the rope. Numeral 12 indicates the vicinity of the angle of contact with the angle of the mountain, which is turned once around the angle of the angle of the mountain to hang down.
This is to prevent the hanging rope 12 from coming off the pulley and to make a slow descent when lowering the box frame described later. The pulley 13 is attached to the lower flange portion 4a of the beam 4 via a pair of U-shaped hooking devices 14 via the ropes 10, and one of the hooking devices 14 is provided with the hooking device at the end of a later-described operation. A rope 10 is used which is used to remove the pulley 13 including.

【0014】次に上記作業が終了すると鍔部材6の箇所
に取付けてある基材とした山型アングル7,7のボルト
8及びナット9を取外すのであり、そして該部に対し図
5に示す如き挟み具16を該山型アングルと鍔部材箇所
に対し外方から挿入するようにして、一時的な安全が確
保されるものとなし、且つこれにはロープ17を取付け
たものとなして置く。
Next, when the above operation is completed, the bolts 8 and nuts 9 of the angled angles 7, 7 serving as the base material attached to the location of the flange member 6 are removed, and the portions are removed as shown in FIG. The clip 16 is inserted from the outside into the angle of the angle and the flange member, so that temporary safety is ensured, and the rope 17 is attached to this.

【0015】而して、作業者は桝枠2から梯子を使用し
て降りると共に、図6に示す如く二人の作業者で滑車1
3から垂らしたロープ12を手に持った状態で上記挟み
具16のロープ17を少し横向きの外方へ向けて引張る
ようにすることにより、これを外して下方へ引き落とす
のであり、これによりロープ12には桝枠2の荷重が滑
車を介して掛かるものとなり、順次該ロープ12を緩め
ることにより桝枠2が次第に降下するものとなるのであ
る。
Thus, the worker descends from the box frame 2 by using a ladder, and at the same time, as shown in FIG.
By pulling the rope 17 of the clip 16 slightly outward while holding the rope 12 hanging from the hand 3, the rope 17 is detached and pulled down. , The load of the cell frame 2 is applied via the pulley, and the cell frame 2 gradually descends by loosening the rope 12 sequentially.

【0016】一方、桝枠2が床面へ降下到達すると、最
後に上記滑車13を取除くのであるが、これには図7に
示す如く滑車13を梁材4の下方鍔部4aに対し係止さ
せてなるコ字状の引掛具15を、これに取付けて垂下さ
せてあるロープ15を少し横向きの外方へ向け引張るよ
うにすることにより、梁材4の鍔部4aから簡単に外し
て下方へ落下させることのできるものとなる。
On the other hand, when the box frame 2 reaches the floor, the pulley 13 is finally removed. In this case, the pulley 13 is engaged with the lower flange 4a of the beam 4 as shown in FIG. The U-shaped hooking device 15 that is stopped is easily detached from the flange 4a of the beam member 4 by pulling the hanging rope 15 attached to the hanging device 15 slightly outward. It can be dropped down.

【0017】他方、上記により床面上へ降下させた桝枠
2は、枠組みされてなる山型アングル相互のボルトナッ
トを順次取外すことにより分解し、簡便に単材となして
外部へ取出すことのできるものとなるのであり、外部の
地上では再びこれを使用して新しく立設するコラムに対
し、その横置状態で同様に取付け、繰返し使用に供せし
めるのである。
On the other hand, the box frame 2 which has been lowered onto the floor surface as described above is disassembled by sequentially removing the bolts and nuts between the framed angles, and is easily taken out as a single piece. It can be used again, and it is used again on the outside ground, and it is similarly mounted in a horizontally laid state on a newly erected column, so that it can be repeatedly used.

【0018】[0018]

【発明の効果】本発明は以上の通り構成するものであっ
て、角柱コラムに対する工事用足場となる桝枠を角柱コ
ラムを立設する前の倒した状態で、即ち地面上で山型ア
ングルとボルト及びナットなどの使用により、簡便な脱
着自在の構成に取付けたものとなすのであり、従って従
来の立設したコラムに対する足場作りに比べて迅速且つ
危険を伴うことなく簡便に行えるものとなって作業性の
向上に寄与すること大ならしめるものである。また、使
用後の除去作業も何らクレーンなど使用することなく、
手作業で簡便に行えるものとなるものである。
The present invention is configured as described above, and the square frame serving as a construction scaffold for the prismatic column is laid down before the prismatic column is erected, that is, the square frame is formed on the ground. By using bolts and nuts, it can be mounted in a simple and detachable configuration, and therefore can be performed quickly and without danger as compared with the conventional scaffolding for an upright column. This is a great way to improve workability. Also, the removal work after use without using any crane etc.
This can be easily performed manually.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施状態説明図である。FIG. 1 is an explanatory diagram of an embodiment of the present invention.

【図2】角柱コラムに対し工事用足場の桝枠を取付ける
状態説明図である。
FIG. 2 is an explanatory view showing a state in which a square frame of a construction scaffold is attached to a prismatic column.

【図3】上記桝枠を使用して梁材を取付けた状態説明図
である。
FIG. 3 is an explanatory view showing a state in which a beam member is attached using the square frame.

【図4】桝枠の取外し作業を示すものである。FIG. 4 shows the work of removing the box frame.

【図5】桝枠の取外し作業を示すものである。FIG. 5 shows the work of removing the box frame.

【図6】桝枠の取外し作業を示すものである。FIG. 6 shows the work of removing the box frame.

【図7】滑車の取外し作業を示すものである。FIG. 7 shows a pulley removal operation.

【符号の説明】[Explanation of symbols]

1 角柱コラム 2 工事用足場の桝枠 3 架台 4 梁材 5 ボルト孔 6 鍔部材 7 山型アングル 8 ボルト 9 ナット 11 金網板 12 ロープ 13 滑車 14 引掛具 15 ロープ 16 挟み具 17 ロープ 18 ロープ DESCRIPTION OF SYMBOLS 1 prismatic column 2 construction frame of construction scaffold 3 frame 4 beam 5 bolt hole 6 flange member 7 angle angle 8 bolt 9 nut 11 wire mesh plate 12 rope 13 pulley 14 hook 15 rope 16 pinching 17 rope 18 rope

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 立設する角柱コラムの梁材取付け付近の
対向する位置に、ボルト孔付き鍔部材をその鍔部が水平
な突出状態となるよう取付け、該部材に対し長さ160
0mm〜1900mmとなした山型アングルを、コラム
の長さ方向と直交し、且つこれを挟む状態にボルト締め
して固定し、上記山型アングルを基材として長さ500
mm〜1900mmの山型アングルを適当数使用して桝
枠を作成すると共に、桝枠下面部には踏板を取付けて梁
材取付け用の足場となしたことを特徴とする鉄骨建築構
造物用工事足場。
1. A flange member having a bolt hole is mounted at an opposed position near a beam material of a standing prism column so that the flange portion projects horizontally, and has a length of 160 mm.
A mountain-shaped angle of 0 mm to 1900 mm is fixed by bolting the column perpendicular to the length direction of the column and sandwiching the column-shaped angle.
Construction work for steel building structures, characterized by using a suitable number of mountain-shaped angles of 1 mm to 1900 mm to create a frame, and attaching a tread to the bottom of the frame to provide a scaffold for mounting beams. scaffold.
【請求項2】 基材とした山型アングルの鍔部材箇所に
於いて、ボルトナットを取外すと共に、該取外し部に対
し山型アングルと鍔部材を外方から一定の間隙下に挟持
する断面コ字状となした紐付き挟持具を取付け、一方桝
枠を断面I型梁の下部張出し鍔に対し、コ字状の引掛具
を使用して滑車と共に取付け、且つ滑車にはロープを使
用して桝枠を吊下げるようになし、この状態で紐付き挟
持具の紐を引張って挟持具を取外した後、滑車のロープ
を緩めて桝枠を降下させ、あとI型梁から引掛具を滑車
ごとロープと共に外方へ向けて引張ることにより取外す
ようになすことを特徴とする請求項1記載の鉄骨建築構
造物用工事足場の取外し方法。
2. A cross section for removing a bolt and a nut at a flange member portion of an angled angle serving as a base material and holding the angled angle and a flanged member from the outside under a predetermined gap with respect to the removed portion. Attach the string-shaped holding device with a string, and attach the square frame to the lower overhang of the I-shaped cross section together with the pulley using a U-shaped hook, and use a rope for the pulley to The frame is hung, and in this state, after pulling the cord of the clipping device with a string to remove the clipping device, loosen the pulley rope and lower the truss frame. 2. The method according to claim 1, wherein the scaffold is detached by pulling the scaffold outward.
JP11022063A 1999-01-29 1999-01-29 Work scaffolding for steel framed building structure and removing method thereof Pending JP2000220291A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11022063A JP2000220291A (en) 1999-01-29 1999-01-29 Work scaffolding for steel framed building structure and removing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11022063A JP2000220291A (en) 1999-01-29 1999-01-29 Work scaffolding for steel framed building structure and removing method thereof

Publications (1)

Publication Number Publication Date
JP2000220291A true JP2000220291A (en) 2000-08-08

Family

ID=12072455

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11022063A Pending JP2000220291A (en) 1999-01-29 1999-01-29 Work scaffolding for steel framed building structure and removing method thereof

Country Status (1)

Country Link
JP (1) JP2000220291A (en)

Similar Documents

Publication Publication Date Title
CN111764629A (en) Method for mounting and dismounting inclined roof hanging basket without counterweight
JP3181041U (en) Mounting member for scaffolding for bridge
JP2000282691A (en) Construction method for mounting member on inner wall of high-rise, tower structure, and scaffold device
KR100483898B1 (en) Rail handrail clamping device of construction site
CN106948603A (en) Wall plate member switching mechanism and its method for turning
JP2012002030A (en) Temporary scaffold for slope face and installation method of the same
JP3950800B2 (en) Suspension scaffold
JP6661142B1 (en) Hanging scaffold
JP6166870B2 (en) Pillar standing method and pillar
JPH09195228A (en) Build-up trestle for bridge pier reinforcing work and its using method
JP2000220291A (en) Work scaffolding for steel framed building structure and removing method thereof
JP3671061B2 (en) Suspension staircase and its temporary method
JP7122080B2 (en) temporary scaffolding
JPH09296610A (en) Outside curing unit
KR100508125B1 (en) A safety way equipment for a tower crane and installing methods thereof
JPS6041387Y2 (en) Hanging jig for scaffolding
JPH0755777B2 (en) Elevator installation method and installation work floor equipment
JP2002021336A (en) Curing unit for construction of steel beam
JP2000219483A (en) Overhead crane installation structure
JP2001159234A (en) Construction method for suspended scaffold and sleeper member for suspended scaffold
JP2002227404A (en) Scaffolding device for shape steel material
JP2843042B2 (en) Steel framing unit scaffolding method
JP2513480Y2 (en) Assembly scaffolding
JPH0559809A (en) Hanging scaffolding
JP3001876U (en) Lifting mechanism for stage equipment