JP2000177791A - Transportation method for construction material, and tent for transporting construction material - Google Patents

Transportation method for construction material, and tent for transporting construction material

Info

Publication number
JP2000177791A
JP2000177791A JP10355937A JP35593798A JP2000177791A JP 2000177791 A JP2000177791 A JP 2000177791A JP 10355937 A JP10355937 A JP 10355937A JP 35593798 A JP35593798 A JP 35593798A JP 2000177791 A JP2000177791 A JP 2000177791A
Authority
JP
Japan
Prior art keywords
tent
frame
building
transportation
building materials
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10355937A
Other languages
Japanese (ja)
Inventor
Masanori Yokoo
雅憲 横尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP10355937A priority Critical patent/JP2000177791A/en
Publication of JP2000177791A publication Critical patent/JP2000177791A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To make transportation, storage and protection of construction materials simply and appropriately by a method wherein necessary construction materials only are brought into a transportation tent, and after the tent for transportation is mounted on a transport means and transported to a construction site of a dwelling, the tent is lowered from the transport means to the ground of the construction site. SOLUTION: Assembly of a transportation tent is made at a factory manufacturing construction materials A, and supports 41, 42 are erected on a frame- shaped hanging frame 21 and the supports are connected with one another with guardrails 7. The lower ends of arch members 81, 82 are inserted into the upper ends of the supports 41, 42, and pins of connecting rails 85 are inserted into holding pieces of the supports and the arch members. Furthermore, a tent frame 2 is entirely covered with a tent canvas. Then necessary construction materials only are brought into the transportation tent. Ropes are passed to flanges 22 provided at the hanging frame 21, and the tent is hoisted with a crane and transferred to a truck. After that, the tent is transported by trick to a construction site and unloaded on the ground with the crane.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、住宅の建築現場へ
の建築資材の輸送方法及びこの輸送方法に使用する建築
資材輸送用テントに係る。特に、本発明は、建築資材の
輸送作業を簡略化するための対策に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for transporting building materials to a building site of a house and a tent for transporting building materials used in the method. In particular, the present invention relates to measures for simplifying the work of transporting building materials.

【0002】[0002]

【従来の技術】従来より、工業化住宅の建築工事におい
ては、建築資材の生産工場で生産された各種建築資材
が、建築工事の段階に応じて建築現場に輸送される。例
えば、住宅の基礎工事、屋根工事、外装工事が終了した
段階になると、生産工場から床仕上げ材や内装材等の建
築資材がそれぞれ複数のパレットに載せられた状態でト
ラックにより建築現場に輸送される。
2. Description of the Related Art Conventionally, in building construction of an industrialized house, various building materials produced in a building material production factory are transported to a building site according to the stage of the building work. For example, at the stage when the foundation work, roof work, and exterior work of a house are completed, building materials such as floor finishing materials and interior materials are transported from a production factory to a building site by trucks on a plurality of pallets. You.

【0003】建築現場に輸送された建築資材は、トラッ
クから降ろされ、この建築現場内の所定の保管場所に保
管される。例えば、トラックから降ろされた建築資材を
住宅屋外の保管場所に置きビニルシート等によって覆っ
て雨水から保護するように保管している。また、屋根葺
き工事が完全に終了しておれば、住宅屋内で雨を凌ぐこ
とができるので、これら建築資材を屋内に保管してい
る。
[0003] The building materials transported to the building site are unloaded from the truck and stored in a predetermined storage place in the building site. For example, building materials dropped from a truck are placed in a storage place outside a house, covered with a vinyl sheet or the like, and stored so as to be protected from rainwater. Also, if the roofing work is completely completed, it is possible to survive the rain inside the house, so these building materials are stored indoors.

【0004】[0004]

【発明が解決しようとする課題】ところが、従来の建築
資材の輸送方法にあっては、以下のような不具合があっ
た。先ず、生産工場の各生産ラインで生産された各種建
築資材のそれぞれをパレットに載せ、各パレットの各々
をトラックに積み込むといった積み込み作業が必要であ
った。同様に、建築現場においては、輸送された各パレ
ットをトラックから降ろし、各建築資材を保管場所まで
運ぶといった作業が必要であった。これらの作業は、煩
雑であり、作業者の多大な労力を要し、作業者の負担が
大きかった。そればかりでなく、積み込み及び降ろし作
業に長い時間を要し、建築作業を円滑に行うのに大きな
妨げとなっていた。
However, the conventional method of transporting building materials has the following disadvantages. First, it was necessary to load various building materials produced on each production line of a production factory on a pallet, and load each pallet on a truck. Similarly, at a construction site, it was necessary to unload each transported pallet from a truck and transport each building material to a storage location. These operations are complicated, require a great deal of labor from the operator, and put a heavy burden on the operator. In addition, the loading and unloading operations take a long time, which greatly hinders smooth construction work.

【0005】また、上述したように、建築資材を屋内に
置いた場合、この建築資材が邪魔になって、それ以後の
建築作業が行い難くなってしまう。例えば床仕上げ工事
を行う際、建築資材を屋内の片隅に一旦移動させた状態
で一部の床仕上げ工事を行い、その後、建築資材を屋内
の他の片隅に移動させて他の部分の床仕上げ工事を行う
といった作業が必要になる。つまり、この屋内に置かれ
た建築資材が建築作業性を著しく阻害することになる。
[0005] Further, as described above, when a building material is placed indoors, the building material hinders the building work after that. For example, when performing floor finishing work, part of the floor finishing work is performed while the building material is temporarily moved to one corner of the room, and then the building material is moved to another corner of the room to finish the floor of the other part. Work such as performing construction is required. In other words, building materials placed indoors significantly impair building workability.

【0006】特に、内装作業は建築工事の最終段階で行
われるので、内装材が建築工事の最終段階まで屋内に置
かれることになる。内装材は汚れてしまうと商品価値が
無くなるので、この汚れに関しては特に注意を要する。
このため、この屋内で内装材を移動させる際には、汚さ
ないように細心の注意を払う必要があり、これも作業者
の大きな負担となっていた。
In particular, since the interior work is performed at the final stage of the construction work, the interior material is placed indoors until the final stage of the construction work. If the interior material is soiled, its commercial value is lost.
For this reason, when moving the interior material inside the room, it is necessary to pay close attention to prevent the interior material from being soiled, which also places a heavy burden on the operator.

【0007】本発明は、かかる点に鑑みてなされたもの
であり、その目的とするところは、建築資材の輸送作業
を簡素化すると共に、建築資材が建築作業の邪魔になる
といったことがなく、しかも建築資材を雨水から確実に
保護することができるようにすることにある。
[0007] The present invention has been made in view of the above points, and an object of the present invention is to simplify the work of transporting building materials and to prevent the building materials from interfering with the building work. Moreover, it is intended to ensure that building materials can be protected from rainwater.

【0008】[0008]

【課題を解決するための手段】−発明の概要− 上記目的を達成するために、本発明は、建築資材を生産
工場から建築現場まで輸送するに際し、各種建築資材を
1つの輸送用テント内に搬入しておき、テントごと建築
現場まで輸送するようにしている。
Means for Solving the Problems-Summary of the Invention- In order to achieve the above object, the present invention provides a method of transporting building materials from a production factory to a building site, in which various building materials are stored in one transport tent. They are brought in and transported together with the tent to the building site.

【0009】−解決手段− 具体的に、本発明が講じた建築資材の輸送方法は、先
ず、建築資材の生産工場において、輸送先の建築現場で
必要とする建築資材のみを輸送用テント内に搬入する。
その後、上記輸送用テントを輸送手段に乗せて住宅の建
築現場まで輸送する。更に、この輸送後、上記輸送用テ
ントを、輸送手段から建築現場の地面に降ろすようにし
ている。
-Solution Means- Specifically, the method of transporting building materials according to the present invention is as follows. First, in a building material production factory, only the building materials required at the building site of the transport destination are placed in a transport tent. Bring in.
Thereafter, the transport tent is loaded on a transport means and transported to a building site of a house. Further, after this transportation, the transportation tent is lowered from the transportation means to the ground at the building site.

【0010】第2の解決手段は、上記輸送方法に使用す
る建築資材輸送用テントに係る。つまり、複数のポール
材が組み合わされて籠型に形成されたテントフレーム
と、このテントフレームを上方から覆うテント幕とを備
えた建築資材保管テントを採用する。この建築資材保管
テントのテントフレームには、このテントフレーム及び
テント幕を一体として吊り下げることが可能な吊り下げ
部が設けられている。そして、建築資材保管テントは、
この吊り下げ部により吊り下げられて輸送手段に乗せら
れるようになっている。
A second solution relates to a tent for transporting building materials used in the above-mentioned transportation method. That is, a building material storage tent having a basket-shaped tent frame formed by combining a plurality of pole materials and a tent curtain covering the tent frame from above is employed. The tent frame of the building material storage tent is provided with a hanging portion capable of hanging the tent frame and the tent curtain integrally. And the building material storage tent,
The suspension unit suspends the vehicle and puts it on a transportation means.

【0011】これら特定事項により、建築資材を生産工
場から建築現場まで輸送する際には、先ず、生産工場に
おいて、輸送先の建築現場で必要とする建築資材のみが
輸送用テント内に搬入される。このテントは、トラック
等の輸送手段に乗せられ、住宅の建築現場まで輸送され
る。建築現場においては、テントを輸送手段から地面に
降ろす。従来では、輸送手段に対して各種建築資材を載
せたパレットの各々の積み降ろし作業を行う必要があっ
た。本発明では、各種建築資材をまとめて積み降ろしす
ることができるため、この建築資材の積み降ろし作業が
簡素になる。また、建築現場にテントが降ろされた後に
あっては、作業者は、必要に応じてテントから建築資材
を取り出して建築作業を行う。つまり、建築中の住宅内
に建築資材を保管する必要はなく、建築資材が工事の邪
魔になるといったことがない。このため、住宅屋内での
作業性が良好である。また、夜間等にあっては、建築資
材はテントにより雨水等から保護されることになる。
According to these specific items, when building materials are transported from a production factory to a construction site, first, at the production factory, only the building materials required at the destination construction site are carried into the transport tent. . The tent is put on a transportation means such as a truck and transported to a residential building site. At the construction site, the tent is lowered from the vehicle to the ground. Heretofore, it has been necessary to load and unload pallets on which various building materials are placed on a transportation means. According to the present invention, since various building materials can be loaded and unloaded at once, the work of loading and unloading the building materials is simplified. Further, after the tent is dropped down on the building site, the worker takes out building materials from the tent as needed and performs building work. In other words, there is no need to store building materials in the house under construction, and the building materials do not interfere with the construction. For this reason, the workability inside the house is good. Also, at night or the like, building materials are protected from rainwater and the like by tents.

【0012】第3の解決手段は、上記第2の解決手段に
おいて、テントフレームの底部に吊り下げフレームを設
けている。また、吊り下げ部として、この吊り下げフレ
ームに設けられて輸送手段に乗せられる際及び輸送手段
から降ろされる際に吊り下げ用のロープが係止されるロ
ープ係止具を採用している。
According to a third aspect, in the second aspect, a hanging frame is provided at a bottom of the tent frame. In addition, as the suspension portion, a rope locking member that is provided on the suspension frame and that locks a suspension rope when the transport frame is put on or taken off from the transport unit is employed.

【0013】この特定事項により、テントを輸送手段に
乗せる際及び輸送手段から降ろす際には、ロープ係止具
に係止されたロープによってテント全体が吊り下げられ
て行われる。特に、このテントの吊り下げをクレーン等
を利用して行えば、作業者の労力を大幅に軽減できる。
According to this specific matter, when the tent is put on the transportation means and unloaded from the transportation means, the entire tent is suspended by the ropes locked by the rope locking members. In particular, if the tent is suspended using a crane or the like, the labor of the operator can be greatly reduced.

【0014】第4の解決手段は、上記第2の解決手段に
おいて、テントフレームに、複数本の支柱と、これら支
柱間に掛け渡された手摺りとを備えさせる。上記支柱
に、この支柱の外面との間で差し込み空間を形成する平
面視コ字状の係止具を設ける一方、手摺りに、上記差し
込み空間に上方から差し込み可能な楔部材を設ける。こ
の楔部材を差し込み空間に差し込むことにより、支柱間
に手摺りを掛け渡している。
According to a fourth aspect of the present invention, in the above second aspect, the tent frame includes a plurality of columns and a handrail bridged between the columns. The above-mentioned strut is provided with a U-shaped locking member which forms an insertion space with the outer surface of the strut, and a handrail is provided with a wedge member which can be inserted into the insertion space from above in the handrail. By inserting this wedge member into the insertion space, a handrail is spanned between the columns.

【0015】この特定事項により、支柱と手摺りとの連
結構造として、ボルト等の締結手段を使用する必要がな
い。このため、支柱と手摺りとの連結作業が容易で且つ
短時間に行うことができる。また、住宅の建築後に、テ
ントフレームを分解する際においても、差し込み空間か
ら楔部材を抜き取るだけで済むので、この分解作業が容
易で且つ短時間に行える。
According to this specific matter, it is not necessary to use fastening means such as bolts as a connecting structure between the column and the handrail. For this reason, the connecting work between the support and the handrail can be performed easily and in a short time. Also, when the tent frame is disassembled after the construction of the house, it is only necessary to remove the wedge member from the insertion space, so that the disassembly operation can be performed easily and in a short time.

【0016】[0016]

【発明の実施の形態】以下、本発明の実施の形態を図面
に基づいて説明する。図1は本実施形態に係る建築資材
輸送用テント1(以下、単にテントと言う)内に建築資
材Aが保管されている状態を示している。この図1のよ
うに、本テント1は、テントフレーム2の外側をテント
幕3により覆った構成となっている。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 shows a state in which a building material A is stored in a building material transport tent 1 (hereinafter, simply referred to as a tent) according to the present embodiment. As shown in FIG. 1, the tent 1 has a configuration in which a tent curtain 3 covers the outside of a tent frame 2.

【0017】−テントフレーム2の説明− 先ず、テントフレーム2について説明する。図2〜図4
はテントフレーム2の全体を示している。図2は平面
図、図3は側面図、図4は正面図である。このテントフ
レーム2は、例えば長さが4.5m、幅が1.5m、高
さが2.3mである。このテントフレーム2の長さ寸法
は、テント1内に収容される建築資材Aの長さ寸法に略
一致するか又はこの建築資材Aよりも僅かに長い寸法に
設定されている。
-Description of Tent Frame 2- First, the tent frame 2 will be described. 2 to 4
Indicates the entire tent frame 2. 2 is a plan view, FIG. 3 is a side view, and FIG. 4 is a front view. The tent frame 2 has a length of 4.5 m, a width of 1.5 m, and a height of 2.3 m, for example. The length of the tent frame 2 is set substantially equal to or slightly longer than the length of the building material A housed in the tent 1.

【0018】テントフレーム2は、テント1の底部を構
成する吊り下げフレーム21の上面に、ポール材で成る
8本の支柱41,42が立設されている。上記吊り下げ
フレーム21は、図5に示すように、H型鋼でなりテン
ト1の長手方向に延びる一対の第1フレーム21A,2
1Aと、この両第1フレーム21A,21Aの端部同士
を連結し、断面が矩形状の第2フレーム21B,21B
とを備えている。各第1フレーム21A,21Aの上面
の2箇所にはロープ係止具として上方に延びるフランジ
部22,22が突設されている。これらフランジ部2
2,22の突設位置は、第1フレーム21Aの両端位置
から所定寸法を存したテント長手方向の中央側の位置で
ある。このフランジ部22にはテント長手方向に貫通す
る円形の開口22aが形成されている。この開口22a
は、本テント1を吊り下げる際に図示しないロープ又は
このロープに取り付けられた金具が係止される。
The tent frame 2 has eight supporting columns 41 and 42 made of pole material on the upper surface of a hanging frame 21 constituting the bottom of the tent 1. As shown in FIG. 5, the hanging frame 21 is made of H-shaped steel and has a pair of first frames 21 </ b> A, 2 </ b> A extending in the longitudinal direction of the tent 1.
1A and the second frames 21B, 21B having a rectangular cross section by connecting the ends of the first frames 21A, 21A to each other.
And At two places on the upper surface of each of the first frames 21A, 21A, flange portions 22, 22 which protrude upward as rope anchors are protruded. These flanges 2
The projecting positions 2 and 22 are positions on the center side in the longitudinal direction of the tent having a predetermined dimension from both end positions of the first frame 21A. The flange portion 22 has a circular opening 22a penetrating in the longitudinal direction of the tent. This opening 22a
When the tent 1 is suspended, a rope (not shown) or a metal fitting attached to the rope is locked.

【0019】上記支柱41,42のうち4本は、テント
フレーム2の四隅部分に位置するコーナ支柱41であ
る。その他の支柱はセンタ支柱42である。これらセン
タ支柱42は、テントフレーム2の長手方向で対向する
上記一対のコーナ支柱41,41間に等間隔を存して2
本ずつ配置されている。各支柱41,42の下端は上記
吊り下げフレーム21の第1フレーム21A上に締結さ
れている。
Four of the columns 41 and 42 are corner columns 41 located at the four corners of the tent frame 2. The other support is a center support 42. The center supports 42 are arranged at equal intervals between the pair of corner supports 41, 41 facing each other in the longitudinal direction of the tent frame 2.
Books are arranged one by one. The lower ends of the columns 41, 42 are fastened on the first frame 21A of the hanging frame 21.

【0020】コーナ支柱41には、図7(a),(b)
に示すように、第1及び第2の2種類のコーナ支柱41
A,41Bがある。これらコーナ支柱41A,41B
は、上下方向の複数箇所に手摺り係止具51,52が設
けられている。この手摺り係止具51,52は、図7に
示すように、平面視コ字型のブラケットで成り、コーナ
支柱41A,41Bの一方向の外周面に設けられた第1
係止具51と、この第1係止具51が設けられている面
に直交する方向の外周面に設けられた第2係止具52と
を備えている。これら係止具51,52がコーナ支柱4
1A,41Bの上下方向の3箇所に設けられている(図
3及び図4参照)。これにより、コーナ支柱41A,4
1Bの外面と係止具51、52との間に差し込み空間B
が形成されている。尚、第2係止具52は、第1係止具
51の下側に位置している。図7(a)に示すように、
第1コーナ支柱41Aにあっては、第2係止具52が、
第1係止具51の配設位置に対して平面視時計回り方向
に90°捩じられた位置に設けられている。一方、図7
(b)に示すように、第2コーナ支柱41Bにあって
は、第2係止具52が、第1係止具51の配設位置に対
して平面視反計回り方向に90°捩じられた位置に設け
られている。
7 (a) and 7 (b)
As shown in the figure, first and second two types of corner posts 41 are provided.
A, 41B. These corner supports 41A, 41B
Are provided with handrail locks 51 and 52 at a plurality of positions in the vertical direction. As shown in FIG. 7, the handrail locking members 51 and 52 are formed of U-shaped brackets in plan view, and are provided on the outer peripheral surfaces of the corner posts 41A and 41B in one direction.
The locking tool 51 includes a locking tool 51 and a second locking tool 52 provided on an outer peripheral surface in a direction orthogonal to a surface on which the first locking tool 51 is provided. These locking tools 51 and 52 are
1A and 41B are provided at three positions in the vertical direction (see FIGS. 3 and 4). Thereby, the corner supports 41A, 4
1B and an insertion space B between the outer surface of
Are formed. The second locking tool 52 is located below the first locking tool 51. As shown in FIG.
In the first corner support 41A, the second locking tool 52 is
The first locking tool 51 is provided at a position twisted 90 ° clockwise in a plan view with respect to the arrangement position of the first locking tool 51. On the other hand, FIG.
As shown in (b), in the second corner support 41 </ b> B, the second locking member 52 is twisted by 90 ° in the counterclockwise direction in plan view with respect to the disposition position of the first locking member 51. Provided at the specified position.

【0021】図8に示すように、センタ支柱42にも同
様の第1係止具51及び第2係止具52が設けられてい
る。また、このセンタ支柱42には、上記第1係止具5
1が設けられている面とは反対側の外周面に同様の第1
係止具51が設けられている。
As shown in FIG. 8, a similar first locking tool 51 and a second locking tool 52 are provided on the center support column 42 as well. In addition, the first support 5 is attached to the center support 42.
1 is provided on the outer peripheral surface opposite to the surface on which
A locking tool 51 is provided.

【0022】これら支柱41A,41B,42の配置状
態としては、第1係止具51,51同士、第2係止具5
2,52同士がそれぞれ互いに対向するようになってい
る。つまり、テント1の長手方向及び幅方向で第1コー
ナ支柱41Aと第2コーナ支柱41Bとが互いに対向す
るように配置されている。また、センタ支柱42は、第
2係止具52がテント1の内側を向くように配置されて
いる。
The arrangement of the pillars 41A, 41B, 42 is such that the first locking members 51, 51, the second locking member 5
2 and 52 are opposed to each other. That is, the first corner support 41A and the second corner support 41B are arranged so as to face each other in the longitudinal direction and the width direction of the tent 1. In addition, the center support 42 is arranged so that the second locking tool 52 faces the inside of the tent 1.

【0023】各支柱41A,41B,42間には手摺り
7が架設されている。この手摺り7は、図9に示すよう
に、各支柱41,42の間隔寸法に略一致する長さ寸法
を有するパイプ材でなる。手摺り7の両端部には下向き
に延びる楔部材71,71が設けられている。この楔部
材71は、下方に向かって先細りとなる楔形で成り、上
記各支柱41,42に設けられた係止具51,52の差
し込み空間Bに差し込み可能である。このため、この手
摺り7の楔部材71,71が、各支柱41,42の係止
具51,52の差し込み空間Bに差し込まれることで、
この手摺り7が支柱41,42間に掛け渡されて、この
支柱41,42同士を連結する構成となっている。尚、
図9では、コーナ支柱41及びセンタ支柱42の各第1
係止具51,51に楔部材71,71が差し込まれて、
これら支柱41,42の間に手摺り7が掛け渡される場
合の差し込み動作を示している。
A handrail 7 is provided between the columns 41A, 41B and 42. As shown in FIG. 9, the handrail 7 is formed of a pipe material having a length substantially corresponding to the interval between the columns 41 and 42. Wedge members 71, 71 extending downward are provided at both ends of the handrail 7. The wedge member 71 is formed in a wedge shape that tapers downward, and can be inserted into the insertion space B of the locking members 51 and 52 provided on the columns 41 and 42. For this reason, the wedge members 71, 71 of the handrail 7 are inserted into the insertion spaces B of the locking members 51, 52 of the columns 41, 42, so that
The handrail 7 is stretched between the columns 41 and 42 to connect the columns 41 and 42 to each other. still,
In FIG. 9, each of the first corner support 41 and the first center support 42 is shown.
The wedge members 71, 71 are inserted into the locking members 51, 51,
The insertion operation when the handrail 7 is stretched between the columns 41 and 42 is shown.

【0024】図10は、コーナ支柱41(本図に示すも
のは第1コーナ支柱41A)における手摺り7,7の係
止状態を示す平面図であり、図11は、センタ支柱42
における手摺り7,7,7の係止状態を示す平面図であ
る。このように、各支柱41A,41B,42間に手摺
り7,7,…が掛け渡され、この支柱41A,41B,
42及び手摺り7で囲まれた空間がテント内空間となる
ように構成されている。
FIG. 10 is a plan view showing a state in which the handrails 7, 7 are locked at a corner support 41 (the first support 41A shown in the figure), and FIG.
It is a top view which shows the locking state of the handrails 7, 7, 7 in FIG. In this way, the handrails 7, 7,... Are hung between the columns 41A, 41B, 42, and the columns 41A, 41B,.
The space surrounded by 42 and the handrail 7 is configured to be a space inside the tent.

【0025】この手摺り7の配設位置としては、図3に
示すように、テント1の長手方向で対向する支柱41
A,41B,42同士の間の上下方向3箇所(合計18
箇所)、図4に示すように、テント1の幅方向で対向す
る支柱41A,41B,42同士の間の上下方向3箇所
(合計12箇所)である。尚、このテント1の幅方向で
対向する支柱41A,41B,42同士の間に掛け渡さ
れている手摺り7は、テント1内に保管される建築資材
Aが載置される部分となる。このため、この部分の手摺
り7にはスポンジ等の弾性材72が巻き付けられてお
り、建築資材Aの保護を図っている。
As shown in FIG. 3, the position of the handrail 7 is set at a column 41 facing the longitudinal direction of the tent 1.
A, 41B, 42, three places in the vertical direction (total 18
As shown in FIG. 4, there are three places in the vertical direction between the columns 41A, 41B, and 42 facing each other in the width direction of the tent 1 (a total of 12 places). The handrail 7 spanned between the struts 41A, 41B and 42 facing each other in the width direction of the tent 1 is a portion where the building material A stored in the tent 1 is placed. For this reason, an elastic material 72 such as a sponge is wound around the handrail 7 in this portion, thereby protecting the building material A.

【0026】テント1の幅方向で対向する各支柱41
A,41B,42間には,パイプ材が半円弧状に湾曲さ
れて成るアーチ材81,82が掛け渡されている。これ
らアーチ材81,82は、両下端が支柱41A,41
B,42の内径よりも小径に形成されており、この両下
端部分が支柱41A,41B,42の上端部分に差し込
まれることで一対の支柱41A,41B,42間に掛け
渡されている。また、各アーチ材81,82は、その上
端位置から僅かに下側の位置同士を連結する補強材88
によって補強されている(図4参照)。
Each column 41 facing in the width direction of the tent 1
Between A, 41B, and 42, arch members 81, 82 each formed by bending a pipe material in a semicircular arc are bridged. These arch materials 81 and 82 have pillars 41A and 41 at both lower ends.
B and 42 are formed to have a smaller diameter than the inner diameter, and both lower end portions are inserted into upper end portions of the columns 41A, 41B and 42 so as to span between the pair of columns 41A, 41B and 42. In addition, each arch material 81, 82 is a reinforcing material 88 that connects positions slightly lower from the upper end position.
(See FIG. 4).

【0027】また、このアーチ材81,82は、コーナ
支柱41A,41B間に掛け渡されるエンドアーチ材8
1と、センタ支柱42,42間に掛け渡されるセンタア
ーチ材82とがある。
The arch members 81 and 82 are provided with end arch members 8 which are bridged between the corner posts 41A and 41B.
1 and a center arch material 82 spanned between the center posts 42,42.

【0028】図12に示すように、エンドアーチ材81
は、上端部近傍位置の3箇所に、テント内側に向かって
水平方向に突出した係止片83が設けられている。この
係止片83の中央部には上下方向に貫通する貫通孔84
が形成されている。一方、センタアーチ材82の上端部
近傍位置の3箇所には、テントの両外側に向かって水平
方向に突出した上記と同様の係止片83,83が設けら
れている。この係止片83,83の中央部にも上下方向
に貫通する貫通孔84が形成されている。
As shown in FIG. 12, the end arch material 81
Are provided with locking pieces 83 projecting horizontally toward the inside of the tent at three positions near the upper end. A through hole 84 penetrating in the vertical direction is formed at the center of the locking piece 83.
Are formed. On the other hand, at the three positions near the upper end portion of the center arch material 82, the same locking pieces 83, 83 that protrude in the horizontal direction toward both outer sides of the tent are provided. A through-hole 84 is formed at the center of each of the locking pieces 83, 83 so as to penetrate in the vertical direction.

【0029】また、本テントフレーム2には、各アーチ
材81,82同士を連結する連結桟85が設けられてい
る。この連結桟85は、図12に示すように、各アーチ
材81,82同士の間隔寸法に略一致した長さ寸法を有
するパイプ材の両端が偏平状に加工されて成り、この偏
平部分86の下面に、上記貫通孔84の径よりも僅かに
小径のピン87が突設されている。そして、この各ピン
87が係止片83の貫通孔84に上方から差し込まれる
ことで、各アーチ材81,82同士が連結桟85によっ
て連結されている。
The tent frame 2 is provided with a connecting bar 85 for connecting the arch members 81 and 82 to each other. As shown in FIG. 12, the connecting bar 85 is formed by processing both ends of a pipe material having a length substantially equal to the interval between the arch materials 81 and 82 into a flat shape. A pin 87 having a diameter slightly smaller than the diameter of the through hole 84 protrudes from the lower surface. Each of the pins 87 is inserted into the through hole 84 of the locking piece 83 from above, so that the arch members 81 and 82 are connected to each other by the connecting bar 85.

【0030】以上のようにして、吊り下げフレーム2
1,各支柱41,42、手摺り7、アーチ材81,8
2、連結桟85が一体的に組み合わされて籠型のテント
フレーム2が構成されている。
As described above, the suspension frame 2
1, each support 41, 42, handrail 7, arch material 81, 8
2. The basket-shaped tent frame 2 is formed by integrally combining the connecting bars 85.

【0031】特に、上記手摺り7は、建築現場の足場を
構成する部材を流用している。 −テント幕3の説明− 次にテント幕3について説明する。このテント幕3は、
複数枚の防火布が縫い合わされて構成されている。この
テント幕3の形状は、図1に示すように、上記テントフ
レーム2の外形形状に沿うように設計されている。ま
た、このテント幕3は、テント1の幅方向に延びる面を
開放できるように、この面の左右両側に上下方向に延び
るファスナ31が設けられている。つまり、このファス
ナ31を開放した状態では、このテント1の幅方向に延
びる面に沿うテント幕32がテント1の扉として機能す
るようになっている。図1は、このファスナ31を開放
して、このテント幕32を巻き上げた状態(扉を開けた
状態)を示している。更に、このテント幕3には、この
巻き上げた状態を維持するためにテント幕32を保持す
るフック(図示省略)が設けられている。このフックと
しては、従来より周知のものが使用されている。
In particular, the handrail 7 uses members constituting a scaffold at a construction site. —Description of Tent Curtain 3— Next, the tent curtain 3 will be described. This tent curtain 3
A plurality of fireproof cloths are sewn together. The shape of the tent curtain 3 is designed to conform to the outer shape of the tent frame 2 as shown in FIG. The tent curtain 3 is provided with fasteners 31 extending in the vertical direction on both left and right sides of the tent 1 so that the surface extending in the width direction of the tent 1 can be opened. That is, in a state where the fastener 31 is opened, the tent curtain 32 along the surface extending in the width direction of the tent 1 functions as a door of the tent 1. FIG. 1 shows a state in which the fastener 31 is opened and the tent curtain 32 is rolled up (the door is opened). Further, the tent curtain 3 is provided with a hook (not shown) for holding the tent curtain 32 in order to maintain the rolled-up state. Conventionally known hooks are used as the hooks.

【0032】−建築資材Aの輸送動作の説明− 次に、上述の如く構成されたテント1を使用して建築資
材Aを生産工場から建築現場へ輸送する際の動作につい
て説明する。
Description of Transport Operation of Building Material A Next, an operation of transporting the building material A from the production factory to the building site using the tent 1 configured as described above will be described.

【0033】先ず、テント1の組立作業について説明す
る。このテント1の組立ては建築資材Aの生産工場内に
おいて行われる。枠状の吊り下げフレーム21の上面に
各支柱41A,41B,42を立設し、この各支柱41
A,41B,42の係止具51,52の差し込み空間B
に手摺り7,7,…の楔部材71を上方から差し込んで
いく。これにより、手摺り7,7,…によって各支柱4
1A,41B,42同士を連結する。また、各支柱41
A,41B,42の上端部にアーチ材81,82の下端
部を差し込み、これによって、テント幅方向で対向する
支柱41A,41B,42間にアーチ材81,82を掛
け渡す。更に、これらアーチ材81,82の係止片83
に連結桟85のピン87を挿通する。これにより、各支
柱41A,41B,42、手摺り7、アーチ材81,8
2、連結桟85が一体的に組み合わされて図2〜図4に
示すような籠型のテントフレーム2が完成する。上記楔
部材71の差し込み作業等は例えばハンマを使用して行
われる。
First, the operation of assembling the tent 1 will be described. The assembling of the tent 1 is carried out in a building material A production factory. The columns 41A, 41B, and 42 are erected on the upper surface of the frame-shaped hanging frame 21, and the columns 41A, 41B, and 42 are provided.
A, insertion spaces B of the locking tools 51, 52 of 41B, 42
The wedge members 71 of the handrails 7, 7,... Are inserted from above. Thus, each support 4 is made up of the handrails 7, 7,.
1A, 41B and 42 are connected to each other. In addition, each pillar 41
The lower ends of the arch members 81 and 82 are inserted into the upper ends of A, 41B and 42, whereby the arch members 81 and 82 are bridged between the struts 41A, 41B and 42 facing each other in the tent width direction. Further, locking pieces 83 of these arch materials 81 and 82 are provided.
, The pin 87 of the connecting bar 85 is inserted. Thereby, each support | pillar 41A, 41B, 42, the handrail 7, arch material 81,8.
2. The connecting bar 85 is integrally combined to complete the basket-shaped tent frame 2 as shown in FIGS. The work of inserting the wedge member 71 and the like is performed using, for example, a hammer.

【0034】このテントフレーム2の完成後、テント幕
3によりテントフレーム2全体を覆う。これにより、テ
ント1の内部空間は、テント幕3により外界から遮断さ
れ、降雨時等にあっても、この内部空間に雨水が入り込
むことはない。このようにしてテント1が完成する。
After the completion of the tent frame 2, the tent curtain 3 covers the entire tent frame 2. As a result, the internal space of the tent 1 is shielded from the outside by the tent curtain 3, so that rainwater does not enter the internal space even when it rains. Thus, the tent 1 is completed.

【0035】このようにして構成されたテント1の内部
に、輸送先の建築現場で必要とする建築資材Aのみをテ
ント1の内部空間に搬入する。つまり、テント1のファ
スナ31を開けて扉となるテント幕32を巻き上げ、こ
の巻き上げたテント幕32をフックにより保持してお
く。これにより、テント1の幅方向の面が開放された状
態になる。この状態で、建築資材Aをテント1内に搬入
する。例えば、建築現場において基礎工事、屋根工事、
外装工事が終了した段階である場合には、床仕上げ材や
内装材等の建築資材がテント1内に搬入される。この搬
入作業としては、幅方向に延びる複数の手摺り7(弾性
材72が巻かれた手摺り7)の上側に載置された状態で
収容される。また、テント1の内部空間は、この幅方向
に延びる手摺り7によって上下3層に区画されており、
この各保管空間に対して、建築資材Aの種類別に搬入し
ていく。例えば、最下層に床仕上げ工事用の資材を、中
間層に電気設備工事用の資材を、最上層に内装工事用の
資材をそれぞれ搬入する。この搬入後は、テント1のフ
ァスナ31を閉じ、テント1の内部空間を外界から遮断
する。
In the tent 1 constructed in this way, only the building material A required at the construction site of the transport destination is carried into the tent 1 internal space. That is, the fastener 31 of the tent 1 is opened to wind up the tent curtain 32 serving as a door, and the wound tent curtain 32 is held by the hook. As a result, the surface of the tent 1 in the width direction is opened. In this state, the building material A is carried into the tent 1. For example, foundation work, roof work,
When the exterior work is completed, building materials such as floor finishing materials and interior materials are carried into the tent 1. As this carrying-in work, it is accommodated in a state where it is placed above a plurality of handrails 7 extending in the width direction (handrails 7 around which the elastic material 72 is wound). The inner space of the tent 1 is divided into upper and lower three layers by a handrail 7 extending in the width direction.
The building material A is carried into each storage space according to the type of the building material A. For example, a material for floor finishing work is transported to the lowermost layer, a material for electrical installation work is transported to the middle layer, and a material for interior work is transported to the uppermost layer. After the carry-in, the fastener 31 of the tent 1 is closed to shut off the internal space of the tent 1 from the outside.

【0036】次に、この建築資材Aが搬入されたテント
1の輸送動作について説明する。先ず、図6に示すよう
に、吊り下げフレーム21の各フランジ部22にロープ
R又はロープRに取り付けた金具を引っ掛ける。図6に
示すようにクレーンCによりテント1を吊り上げ、この
テント1をトラックに載置する。
Next, the operation of transporting the tent 1 into which the building material A has been carried in will be described. First, as shown in FIG. 6, the rope R or a metal fitting attached to the rope R is hooked on each flange portion 22 of the hanging frame 21. As shown in FIG. 6, the tent 1 is lifted by the crane C, and the tent 1 is placed on a truck.

【0037】このトラックによりテント1を建築現場ま
で輸送し、この建築現場において、上記と同様にしてク
レーンCにより、建築現場の地面にテント1を降ろす。
このようにして、建築資材Aが建築現場まで輸送された
ことになる。
The tent 1 is transported by the truck to the construction site, and the tent 1 is lowered on the construction site by the crane C in the same manner as described above.
Thus, the building material A has been transported to the building site.

【0038】建築現場では、作業者が、テント1のファ
スナ31を開口し、建築中の住宅に必要な建築資材Aを
テント1から取り出して建築工事を行う。
At the construction site, the worker opens the fastener 31 of the tent 1 and takes out the building material A necessary for the house under construction from the tent 1 to perform construction work.

【0039】また、夜間や工事を行わない日には、テン
ト1のファスナ31を閉鎖し、テント1の内部空間への
雨水や夜露の浸入を阻止する。これにより、建築資材A
を確実に保護することができる。特に、壁紙等の内装材
に関しては、雨水等によって汚れた場合、商品価値が無
くなってしまうので、本テント1内に保管することによ
って、この汚れを確実に阻止することができる。
Further, at night or on a day when construction is not performed, the fastener 31 of the tent 1 is closed to prevent infiltration of rainwater or night dew into the internal space of the tent 1. Thereby, the building material A
Can be reliably protected. In particular, since the interior material such as wallpaper is soiled by rainwater or the like, the commercial value thereof is lost. By storing the interior material in the tent 1, the stain can be surely prevented.

【0040】住宅の建築工事が終了した後には、テント
1を解体することになる。この解体作業としては、先
ず、テント幕3をテントフレーム2から外す。その後、
連結桟85のピン87を係止片83の貫通孔84から上
方へ引き抜く。また、各アーチ材81,82を支柱41
A,41B,42から上方へ引き抜く。更に、手摺り7
の楔部材71を係止具51,52の内部空間Bから引き
抜く。これら引き抜き作業もハンマを使用して行われ
る。このようにして、各支柱41A,41B,42、手
摺り7、アーチ材81,82、連結桟85が互いに切り
離されてテント1が解体される。
After the construction of the house is completed, the tent 1 is dismantled. In this dismantling operation, first, the tent curtain 3 is removed from the tent frame 2. afterwards,
The pin 87 of the connecting bar 85 is pulled upward from the through hole 84 of the locking piece 83. In addition, each arch material 81, 82 is
A, 41B, and 42 are pulled upward. Furthermore, handrail 7
The wedge member 71 is pulled out from the internal space B of the locking members 51 and 52. These drawing operations are also performed using a hammer. In this manner, the columns 41A, 41B, 42, the handrail 7, the arch members 81, 82, and the connecting bar 85 are separated from each other, and the tent 1 is dismantled.

【0041】以上説明したように、本実施形態のテント
1によれば、建築資材Aを生産工場から建築現場まで輸
送するに際し、各種建築資材Aをテント1内に搬入して
おき、このテント1ごと建築現場まで輸送することがで
きる。従来では、トラック等の輸送手段に対して各種建
築資材を載せたパレットの各々の積み降ろし作業を行う
必要があった。特に、建築現場では、降ろされた建築資
材を所定の保管場所まで運ぶ作業が必要であった。本形
態では、各種建築資材をまとめてトラックに積み降ろし
できるため、この建築資材の積み降ろし作業が簡素にな
る。その結果、作業者の労力を軽減できると共に、建築
資材の積み降ろし作業の作業時間の短縮化を図ることが
できて、建築工事全体としての工期を短縮できる。ま
た、建築現場にテント1が降ろされた後にあっては、建
築資材Aを雨水等から保護したまま建築中の住宅の屋外
に置くことができる。従来は、屋根葺き工事が終了した
後には、建築資材を建築中の住宅の屋内に置いていたた
め、この建築資材が邪魔になって、それ以後の建築作業
が行い難かった。本形態では、建築資材Aの保護と住宅
の良好な建築作業性の確保とを両立することができる。
As described above, according to the tent 1 of the present embodiment, when the building material A is transported from the production factory to the building site, various building materials A are carried into the tent 1, and the tent 1 Can be transported to the building site. Heretofore, it has been necessary to load and unload pallets on which various building materials are placed on a transportation means such as a truck. In particular, at a construction site, it was necessary to carry the unloaded building materials to a predetermined storage location. In this embodiment, since various building materials can be collectively loaded and unloaded on the truck, the work of loading and unloading the building materials is simplified. As a result, the labor of the worker can be reduced, the working time for loading and unloading the building materials can be reduced, and the construction period of the entire building work can be shortened. Further, after the tent 1 is dropped on the building site, the building material A can be placed outdoors of the house under construction while protecting the building material A from rainwater or the like. Conventionally, after the roofing work was completed, the building materials were placed inside the house under construction, so that the building materials hindered the subsequent building work. In this embodiment, both protection of the building material A and ensuring good building workability of the house can be achieved at the same time.

【0042】また、テントフレーム2はボルト止め等の
手段を一切使用していないので、その組み立て作業及び
解体作業が極めて容易であり、その組み立て作業時間及
び解体作業時間も短くて済む。
Further, since the tent frame 2 does not use any means such as bolting, the assembling work and the disassembling work are extremely easy, and the assembling work and the dismantling work time can be shortened.

【0043】また、上記手摺り7は建築現場の足場を構
成する部材が流用されているため、手摺り7をテント専
用の部材として個別に作製しておく必要はなく、テント
1のコストの削減を図ることができる。また、各支柱4
1,42等のその他の部材に対しても足場を構成する部
材を流用すれば、更なるコストの削減を図ることができ
る。
Further, since the members forming the scaffold at the construction site are used as the handrails 7, it is not necessary to separately manufacture the handrails 7 as members dedicated to the tent, and the cost of the tent 1 can be reduced. Can be achieved. In addition, each pillar 4
If the members forming the scaffold are used for other members such as 1, 42, the cost can be further reduced.

【0044】尚、本実施形態では、テント1を吊り上げ
てトラックに積み込むようにしていた。本発明は、これ
に限らず、テント1を台車上に載置し、牽引により建築
現場まで運搬するようにしてもよい。
In this embodiment, the tent 1 is lifted and loaded on a truck. The present invention is not limited to this, and the tent 1 may be placed on a cart and transported to the building site by towing.

【0045】また、本実施形態では、支柱41A,41
B,42、手摺り7、アーチ材81,82、連結桟85
を互いに差し込み動作により組み付けることでテントフ
レーム2を構成していた。本発明は、これに限らず、こ
れらをボルト止め等の締結手段によって組み付けるよう
にしてもよい。
In this embodiment, the columns 41A, 41
B, 42, handrail 7, arch materials 81, 82, connecting bar 85
And the tent frame 2 is constructed by assembling them with each other by an insertion operation. The present invention is not limited to this, and these may be assembled by fastening means such as bolting.

【0046】[0046]

【発明の効果】以上のように、本発明によれば、以下の
ような効果が発揮される。
As described above, according to the present invention, the following effects are exhibited.

【0047】請求項1及び請求項2記載の発明では、建
築資材を生産工場から建築現場まで輸送するに際し、各
種建築資材を1つの輸送用テント内に搬入しておき、テ
ントごと建築現場まで輸送するようにしている。従来で
は、トラック等の輸送手段に対して各種建築資材を載せ
たパレットの各々の積み降ろし作業を行う必要があっ
た。特に、建築現場では、降ろされた建築資材を所定の
保管場所まで運ぶ作業が必要であった。本発明では、各
種建築資材をまとめて積み降ろしできるため、この建築
資材の積み降ろし作業が簡素になる。その結果、作業者
の労力を軽減できると共に、建築資材の積み降ろし作業
の作業時間の短縮化を図ることができて、建築工事全体
としての工期を短縮できる。また、建築現場にテントが
降ろされた後にあっては、建築資材を雨水等から保護し
たまま建築中の住宅の屋外に置くことができる。従来
は、屋根葺き工事が終了した後には、建築資材を建築中
の住宅の屋内に置いていたため、この建築資材が邪魔に
なって、それ以後の建築作業が行い難かった。本発明で
は、建築資材の保護と住宅の良好な建築作業性の確保と
を両立することができる。
According to the first and second aspects of the invention, when building materials are transported from a production factory to a building site, various building materials are carried into one transport tent, and the entire tent is transported to the building site. I am trying to do it. Heretofore, it has been necessary to load and unload pallets on which various building materials are placed on a transportation means such as a truck. In particular, at a construction site, it was necessary to carry the unloaded building materials to a predetermined storage location. According to the present invention, since various building materials can be collectively loaded and unloaded, the work of loading and unloading the building materials is simplified. As a result, the labor of the worker can be reduced, the working time for loading and unloading the building materials can be reduced, and the construction period of the entire building work can be shortened. Also, after the tent has been lowered to the building site, the building material can be placed outside the house under construction while protecting the building materials from rainwater and the like. Conventionally, after the roofing work was completed, the building materials were placed inside the house under construction, so that the building materials hindered the subsequent building work. ADVANTAGE OF THE INVENTION According to this invention, protection of building materials and ensuring of favorable construction workability of a house can be compatible.

【0048】請求項3記載の発明では、テントを輸送手
段に乗せる際及び輸送手段から降ろす際には、ロープ係
止具に係止されたロープによってテント全体を吊り下げ
ることができるようにしている。これによりテントの輸
送作業を具体化でき、本発明の実用性の向上を図ること
ができる。特に、テントの吊り下げをクレーン等を利用
して行えば、作業者の労力を大幅に軽減することができ
る。
According to the third aspect of the invention, when the tent is put on the transportation means and when the tent is lowered from the transportation means, the entire tent can be suspended by the ropes locked by the rope locking members. . Thereby, the work of transporting the tent can be embodied, and the practicality of the present invention can be improved. In particular, if the tent is suspended using a crane or the like, the labor of the operator can be greatly reduced.

【0049】請求項4記載の発明では、テントフレーム
を構成する支柱と手摺りとの連結構造として、手摺りに
設けた楔部材を、支柱に設けた係止具の差し込み空間に
差し込むようにしている。このため、支柱と手摺りとの
連結構造として、ボルト等の締結手段を使用する必要が
ない。その結果、支柱と手摺りとの連結作業が容易で且
つ短時間に行うことができる。また、住宅の建築後に、
テントフレームを分解する際においても、この分解作業
が容易で且つ短時間に行える。これによっても効率の良
い建築工事が行え、工事期間の短縮化を図ることができ
る。
According to the fourth aspect of the present invention, a wedge member provided on the handrail is inserted into a space for inserting a locking member provided on the support post as a connecting structure between the support and the handrail constituting the tent frame. I have. For this reason, it is not necessary to use fastening means such as bolts as a connecting structure between the column and the handrail. As a result, the connecting work between the support and the handrail can be performed easily and in a short time. Also, after building the house,
When disassembling the tent frame, this disassembling operation can be performed easily and in a short time. This also enables efficient construction work and shortens the construction period.

【図面の簡単な説明】[Brief description of the drawings]

【図1】実施形態に係る建築資材輸送用テントの斜視図
である。
FIG. 1 is a perspective view of a tent for transporting building materials according to an embodiment.

【図2】テントフレームの平面図である。FIG. 2 is a plan view of a tent frame.

【図3】テントフレームの側面図である。FIG. 3 is a side view of the tent frame.

【図4】テントフレームの正面図である。FIG. 4 is a front view of a tent frame.

【図5】吊り下げフレームの斜視図である。FIG. 5 is a perspective view of a hanging frame.

【図6】テントの吊り下げ状態を示す図である。FIG. 6 is a diagram showing a suspended state of a tent.

【図7】(a)は第1コーナ支柱の斜視図、(b)は第
2コーナ支柱の斜視図である。
7A is a perspective view of a first corner support, and FIG. 7B is a perspective view of a second corner support.

【図8】センタ支柱の斜視図である。FIG. 8 is a perspective view of a center support.

【図9】支柱に対する手摺りの係止作業を説明するため
の図である。
FIG. 9 is a diagram for explaining the work of locking a handrail to a support.

【図10】コーナ支柱における手摺りの係止状態を示す
平面図である。
FIG. 10 is a plan view showing a state in which a handrail is locked at a corner support.

【図11】センタ支柱における手摺りの係止状態を示す
平面図である。
FIG. 11 is a plan view showing a state in which a handrail is locked on a center support.

【図12】アーチ材に対する連結桟の係止動作を説明す
るための図である。
FIG. 12 is a view for explaining the locking operation of the connecting bar to the arch material.

【符号の説明】[Explanation of symbols]

1 建築資材輸送用テント 2 テントフレーム 21 吊り下げフレーム 22 フランジ部(ロープ係止具) 3 テント幕 41 コーナ支柱 42 センタ支柱 51 第1係止具 52 第2係止具 7 手摺り 71 楔部材 B 差し込み空間 DESCRIPTION OF SYMBOLS 1 Tent for transporting building materials 2 Tent frame 21 Suspended frame 22 Flange portion (rope locking device) 3 Tent curtain 41 Corner support 42 Center support 51 First locking device 52 Second locking device 7 Handrail 71 Wedge member B Insertion space

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 建築資材の生産工場において、輸送先の
建築現場で必要とする建築資材のみを輸送用テント内に
搬入した後、 上記輸送用テントを輸送手段に乗せて住宅の建築現場ま
で輸送し、 この輸送後、上記輸送用テントを、輸送手段から建築現
場の地面に降ろすことを特徴とする建築資材の輸送方
法。
Claims 1. At a building material production plant, after only building materials required at a construction site of a transport destination are carried into a tent for transportation, the tent for transportation is carried on a transportation means and transported to a building site of a house. After this transportation, the transportation tent is lowered from the transportation means to the ground at the building site.
【請求項2】 複数のポール材が組み合わされて籠型に
形成されたテントフレームと、このテントフレームを上
方から覆うテント幕とを備えており、 上記テントフレームには、テントフレーム及びテント幕
を一体として吊り下げることが可能な吊り下げ部が設け
られており、 この吊り下げ部により吊り下げられて輸送手段に乗せら
れることを特徴とする建築資材輸送用テント。
2. A tent frame formed by combining a plurality of pole materials in a basket shape, and a tent curtain covering the tent frame from above, the tent frame including a tent frame and a tent curtain. A tent for transporting building materials, comprising a hanging portion that can be hung as a unit, and being hung by the hanging portion and put on a transportation means.
【請求項3】 請求項2記載の建築資材輸送用テントに
おいて、 テントフレームの底部には、吊り下げフレームが設けら
れており、 吊り下げ部は、この吊り下げフレームに設けられ、輸送
手段に乗せられる際及び輸送手段から降ろされる際に吊
り下げ用のロープが係止されるロープ係止具であること
を特徴とする建築資材輸送用テント。
3. The tent for transporting building materials according to claim 2, wherein a suspension frame is provided at a bottom portion of the tent frame, and the suspension portion is provided on the suspension frame and mounted on a transportation means. A tent for transporting building materials, characterized in that the tent is a rope-locking device for locking a hanging rope when the rope is suspended from a transportation means.
【請求項4】 請求項2記載の建築資材輸送用テントに
おいて、 テントフレームは、複数本の支柱と、これら支柱間に掛
け渡された手摺りとを備えており、 上記支柱には、この支柱の外面との間で差し込み空間を
形成する平面視コ字状の係止具が設けられている一方、 手摺りには上記差し込み空間に上方から差し込み可能な
楔部材が設けられており、 この楔部材が差し込み空間に差し込まれることにより、
支柱間に手摺りが掛け渡されていることを特徴とする建
築資材輸送用テント。
4. The tent for transporting building materials according to claim 2, wherein the tent frame includes a plurality of pillars and a handrail bridged between the pillars. While a U-shaped locking member that forms an insertion space with the outer surface of the handrail is provided, the handrail is provided with a wedge member that can be inserted from above into the insertion space, By inserting the member into the insertion space,
A tent for transporting building materials, characterized in that handrails are stretched between the columns.
JP10355937A 1998-12-15 1998-12-15 Transportation method for construction material, and tent for transporting construction material Pending JP2000177791A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10355937A JP2000177791A (en) 1998-12-15 1998-12-15 Transportation method for construction material, and tent for transporting construction material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10355937A JP2000177791A (en) 1998-12-15 1998-12-15 Transportation method for construction material, and tent for transporting construction material

Publications (1)

Publication Number Publication Date
JP2000177791A true JP2000177791A (en) 2000-06-27

Family

ID=18446504

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10355937A Pending JP2000177791A (en) 1998-12-15 1998-12-15 Transportation method for construction material, and tent for transporting construction material

Country Status (1)

Country Link
JP (1) JP2000177791A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008532874A (en) * 2005-03-21 2008-08-21 フェデックス コーポレイション Device for containing and / or calming a flame
CN110789815A (en) * 2019-11-08 2020-02-14 徐州曹氏化工机械制造有限公司 Movable steel structure anti-corrosion groove

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008532874A (en) * 2005-03-21 2008-08-21 フェデックス コーポレイション Device for containing and / or calming a flame
JP2012110747A (en) * 2005-03-21 2012-06-14 Federal Express Corp Device for containing and/or suppressing fire
CN110789815A (en) * 2019-11-08 2020-02-14 徐州曹氏化工机械制造有限公司 Movable steel structure anti-corrosion groove

Similar Documents

Publication Publication Date Title
JP4282745B1 (en) Building unit with temporary reinforcement member, unit building, and construction method of unit building
US20060048458A1 (en) Storm shelter and vault with transport system
JP3579816B2 (en) Multipurpose stage for building frame
JP2000177791A (en) Transportation method for construction material, and tent for transporting construction material
JP4914527B1 (en) Building equipment for building and building construction method for building
JP2000179187A (en) Tent for storing building materials
US10883286B2 (en) Building debris containment system
JP3190616B2 (en) Seismic room
KR100928341B1 (en) Crane lifting frame using truss member
JP5439084B2 (en) Fixing structure of bay window and its construction method
JPH0732469Y2 (en) Portable box
JP2736616B2 (en) Building unit
JP2718188B2 (en) Building exterior wall mounting method
JP3526030B2 (en) How to transport panels for exterior walls
JP2002347763A (en) Temporary structure transporting container and method of transporting temporary structure
JP2872995B1 (en) Opening / closing building block for temporary building
JP3177905B2 (en) Installation structure and installation method of external curing coating
JP2849355B2 (en) Exterior wall construction method and preset exterior wall used for it
KR200379642Y1 (en) Roof frame of warmth keeping cover for constructing a structure
JP2880884B2 (en) Moving scaffold for wall construction
JPH0217091Y2 (en)
JP3227328B2 (en) Partition structure
EP1111143B1 (en) Lifting of horizontally cast on-site wall panels
JP6038994B2 (en) Building unit cover and building unit covered with building unit cover
JP3499019B2 (en) Basement building unit and method for forming basement retaining wall

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050121

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050208

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050621