JP2000170176A - Execution method of foundation and its positioning jig - Google Patents

Execution method of foundation and its positioning jig

Info

Publication number
JP2000170176A
JP2000170176A JP10348786A JP34878698A JP2000170176A JP 2000170176 A JP2000170176 A JP 2000170176A JP 10348786 A JP10348786 A JP 10348786A JP 34878698 A JP34878698 A JP 34878698A JP 2000170176 A JP2000170176 A JP 2000170176A
Authority
JP
Japan
Prior art keywords
foundation
positioning
jig
jigs
display
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10348786A
Other languages
Japanese (ja)
Inventor
Katsutoshi Sugihara
勝利 杉原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEKISUI HAAMONEETO SEKO GIJUTS
Sekisui Chemical Co Ltd
Sekisui Harmonate Seko Gijutsu Center:Kk
Original Assignee
SEKISUI HAAMONEETO SEKO GIJUTS
Sekisui Chemical Co Ltd
Sekisui Harmonate Seko Gijutsu Center:Kk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEKISUI HAAMONEETO SEKO GIJUTS, Sekisui Chemical Co Ltd, Sekisui Harmonate Seko Gijutsu Center:Kk filed Critical SEKISUI HAAMONEETO SEKO GIJUTS
Priority to JP10348786A priority Critical patent/JP2000170176A/en
Publication of JP2000170176A publication Critical patent/JP2000170176A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

PROBLEM TO BE SOLVED: To stabilize the position precision of a foundation, facilitate execution and lessen an error by setting a plurality of positioning jig on a batten board set around the foundation to be constructed and positioning the foundation. SOLUTION: A pile 2 is set to be driven around a foundation 2 to be constructed, and a batten board 3 comprising a wooden plate is nail-driven on the pile 2 to be attached horizontally. The positioning jig of the foundation for a girder 4 and the positioning jig of the foundation for a gable end 4B are set and fixed on the batten board 3. A size being a reference is measured and positioned from a reference position on each positioning jig 4, 4B, matched to the hole and a nail is driven on the batten board 3. A thumbscrew is tightened and the jigs 4, 4B are firmly fixed. A nail is driven on the corresponding hole while a display is viewed if necessary. Further, a leveling string 6 is tied on the nail to be tightened. Thereby position precision of a foundation form, an anchor bolt or the like for determining the inner and outer sizes of the foundation can be improved as compared with a case disusing the jig.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、基礎の施工方法及
びその位置決め治具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a foundation construction method and a positioning jig thereof.

【0002】[0002]

【従来の技術】従来、基礎の施工においては、基礎を築
造すべき場所の周りに、杭を打ち、この杭に水貫を取り
付け、この水貫に水糸を張って、基礎の内外の位置、ア
ンカーボルトの位置などの位置決めをしていた。
2. Description of the Related Art Conventionally, in the construction of a foundation, a pile is driven around a place where the foundation is to be built, a water line is attached to the pile, and a water thread is stretched on the water line, so that the inside and outside of the foundation can be positioned. , Positioning of anchor bolts, etc.

【0003】そして、これらの位置決めは、基準位置か
ら全てスケール(巻尺)で追い出すことにより決め、そ
の位置の水貫に釘打ちしたり、墨を打ち、水糸を掛けて
いた。この水貫上に決めた位置には、何の位置かの表示
は殆どされなかった。また、表示をする場合も、その表
示は手書きによるもので、その水貫は、前の表示が書か
れたままで、何度も使い回すのが普通であった。
[0003] The positioning is determined by expulsion from a reference position with a scale (a tape measure), and nails, black ink, and water lines are applied to the water line at that position. There was almost no indication of what position was set at the position determined above the water. Also, in the case of display, the display is handwritten, and the Mizuki is usually used many times with the previous display being written.

【0004】このように、従来の基礎の施工において
は、水貫上での位置決めの治具は、殆どなく、位置を決
めた後の、型枠上に設置するアンカーボルト位置決め治
具が、特公平6−94672号公報などに記載されてい
る程度である。
[0004] As described above, in the conventional foundation construction, there is almost no jig for positioning on the water pier, and an anchor bolt positioning jig which is installed on a form after the position is determined is a special feature. This is the degree described in Japanese Patent Publication No. Hei 6-94672.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、上記の
従来技術では、基準位置から全てスケールで追い出すこ
とにより水貫上に位置を決めていたので、寸法の測定誤
差が生じ易く、また、測り間違いにより、アンカーボル
トなどの位置精度が低下する問題があった。
However, in the above-mentioned prior art, since the position is determined on the water through by expulsion from the reference position on a scale, it is easy to cause a measurement error in dimensions. However, there is a problem that the positional accuracy of the anchor bolts and the like is reduced.

【0006】また、スケールで測りながら、その位置に
釘打ちしていたので、正確な位置に釘打ちするために
は、慎重にやらざるを得ず、例えば、標準の床面積15
0m2の住宅で約60本の釘を打たなければならず、施
工工数が増大する問題があった。
In addition, since nailing was performed at that position while measuring with a scale, in order to nail at an accurate position, it was necessary to do it carefully.
Approximately 60 nails had to be hammered in a 0 m 2 house, which led to a problem of an increase in the number of construction steps.

【0007】また、水貫上に決めた位置に、何の位置か
の表示をしなかったり、表示をする場合も、その表示は
手書きによるもので、その水貫は何度も使い回していた
ので、表示が重なってを見間違い易く、水糸の掛け間違
いが発生し、基礎の寸法精度不良を誘発する問題があっ
た。
[0007] In addition, when no position is displayed or displayed at a position determined on the water line, the display is handwritten and the water line is used many times. Therefore, there is a problem that the indications are easily overlapped and it is easy to misunderstand, and a wrong hooking of the water thread occurs, which causes a defect in dimensional accuracy of the foundation.

【0008】本発明は、上記従来技術の問題を解消し、
基礎の位置精度が安定し、施工が容易で、間違いの少な
い基礎の施工方法及びその位置決め治具を提供すること
を目的とする。
The present invention solves the above-mentioned problems of the prior art,
It is an object of the present invention to provide a foundation construction method and a positioning jig thereof, in which the foundation has a stable positioning accuracy, is easy to construct, and has few errors.

【0009】[0009]

【課題を解決するための手段】請求項1記載の発明は、
築造すべき基礎の周りに設置した水貫に、複数の位置決
め治具を設置して基礎の位置を決める基礎の施工方法で
あって、この位置決め治具に、互いに所定の寸法関係を
有する複数の位置決め部とこの各位置決め部に対応する
表示を設けておき、水貫に設置する上記各位置決め治具
を、基準位置からその治具の所定の位置決め部を位置決
めすることにより、位置決めして設置固定してから、こ
の各位置決め治具の位置決め部と表示を用いて水糸を張
り、基礎の位置を決めることを特徴とする基礎の施工方
法である。
According to the first aspect of the present invention,
A method of constructing a foundation that determines the position of a foundation by installing a plurality of positioning jigs on a water bank installed around a foundation to be built, and a plurality of positioning jigs having a predetermined dimensional relationship with each other. A positioning section and a display corresponding to each of the positioning sections are provided, and each of the positioning jigs to be installed in the water bank is positioned and fixed by positioning a predetermined positioning section of the jig from a reference position. Then, a water thread is stretched using the positioning portion and the display of each positioning jig, and the position of the foundation is determined.

【0010】請求項2記載の発明は、互いに所定の寸法
関係を有する複数の位置決め部とこの位置決め部に対応
する表示が設けられたことを特徴とする基礎の位置決め
治具である。
According to a second aspect of the present invention, there is provided a base positioning jig provided with a plurality of positioning portions having a predetermined dimensional relationship and a display corresponding to the positioning portions.

【0011】本発明において位置決め部とは、位置決め
するための孔、突起、溝、及び線などの記入、印刷など
のことである。
In the present invention, the positioning section refers to writing, printing, and the like of holes, projections, grooves, and lines for positioning.

【0012】本発明において互いに所定の寸法関係を有
する複数の位置決め部としては、基礎の外側端の位置、
基礎の内側端の位置、アンカーボルト芯の位置など、予
め互いの位置関係が決まっているもの、の治具上での寸
法関係を示す位置決め部のことである。
In the present invention, the plurality of positioning portions having a predetermined dimensional relationship include the position of the outer end of the foundation,
This is a positioning portion that indicates a dimensional relationship on a jig of a member whose positional relationship is determined in advance, such as the position of the inner end of the foundation and the position of the anchor bolt core.

【0013】本発明において位置決め部に対応する表示
とは、位置決め部が何の位置を決めるものであるかを示
す、文字、記号、色、マークなどが付されたものであ
る。
In the present invention, the display corresponding to the positioning unit is a character, a symbol, a color, a mark, or the like, which indicates what position the positioning unit determines.

【0014】[0014]

【作用】請求項1記載の基礎の施工方法は、築造すべき
基礎の周りに設置した水貫に、複数の位置決め治具を設
置して基礎の位置を決めるから、従来の治具を用いない
場合に比べて、基礎の内外の寸法を決める基礎型枠やア
ンカーボルトなどの位置精度が向上する。
In the method for constructing a foundation according to the first aspect, a plurality of positioning jigs are installed on a water bank installed around the foundation to be built and the position of the foundation is determined, so that a conventional jig is not used. Compared with the case, the positional accuracy of the base formwork and the anchor bolts for determining the inner and outer dimensions of the foundation is improved.

【0015】請求項1記載の基礎の施工方法は、上記位
置決め治具として、互いに所定の寸法関係を有する複数
の位置決め部とこの各位置決め部に対応する表示を設け
た位置決め治具を用いるから、全ての位置を順次追い出
す場合に比べて、最初からの位置決め個所が減少し、位
置決めの作業工数が減るとともに、これに伴い寸法誤差
が小さくなり、また、表示により水糸の掛け間違いが減
るとともに水糸掛けが容易になり、水糸掛けの作業工数
が減少する。
In the method for constructing a foundation according to the first aspect, a plurality of positioning parts having a predetermined dimensional relationship and a positioning jig provided with an indication corresponding to each of the positioning parts are used as the positioning jig. Compared to the case where all positions are sequentially driven out, the number of positioning points from the beginning is reduced, the number of man-hours for positioning is reduced, and the dimensional error is reduced accordingly. Yarn hooking becomes easy, and the number of man-hours for water thread hooking is reduced.

【0016】また、請求項1記載の基礎の施工方法は、
水貫に設置する上記各位置決め治具を、基準位置からそ
の治具の所定の位置決め部を位置決めすることにより、
位置決めして設置固定してから、基礎の位置を決めるか
ら、各治具の位置精度が向上し、全体として、基礎の位
置精度が安定したものになる。
Further, the method for constructing a foundation according to claim 1 is as follows.
By positioning each of the positioning jigs to be installed in the mizukan, a predetermined positioning portion of the jig from a reference position,
Since the position of the foundation is determined after the positioning and installation and fixing, the positional accuracy of each jig is improved, and the positional accuracy of the foundation is stabilized as a whole.

【0017】請求項2記載の基礎の位置決め治具は、互
いに所定の寸法関係を有する複数の位置決め部とこの位
置決め部に対応する表示を設けたから、この治具を位置
決めすれば、全ての位置を追い出す場合に比べて、最初
からの位置決め個所を減少させることができ、位置決め
の作業工数が減るとともに、これに伴い寸法誤差が小さ
くなり、また、表示を利用することにより、水糸の掛け
間違いが減るとともに水糸掛けが容易になり、水糸掛け
の作業工数を減少させることができる。
According to the second aspect of the present invention, the positioning jig for the foundation is provided with a plurality of positioning portions having a predetermined dimensional relationship and a display corresponding to the positioning portions. Compared to the case of driving out, the number of positioning points from the beginning can be reduced, the man-hours for positioning are reduced, and the dimensional error is reduced accordingly. As the number decreases, the hooking of the thread becomes easy, and the number of man-hours for hooking the thread can be reduced.

【0018】[0018]

【発明の実施の形態】以下、本発明の実施の形態につい
て図面を参照しながら詳細に説明する。図1は本発明の
実施例である基礎の施工方法を説明する平面図、図2は
本発明の実施例である基礎の位置決め治具の平面図、図
3はその正面図、図4は水貫に上記基礎の位置決め具を
設置固定した状態を示す縦断面図、図5は上記基礎の位
置決め治具の使用状態を示す一部切り欠き斜視図であ
る。
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a plan view for explaining a foundation construction method according to an embodiment of the present invention, FIG. 2 is a plan view of a foundation positioning jig according to an embodiment of the present invention, FIG. 3 is a front view thereof, and FIG. FIG. 5 is a longitudinal sectional view showing a state in which the positioning tool of the foundation is installed and fixed to the pier, and FIG. 5 is a partially cutaway perspective view showing a usage state of the positioning tool of the foundation.

【0019】図1において、築造すべき基礎1の周り
に、杭2、2…が打ち込まれて設置され、この杭2、2
…に、木板からなる水貫3が釘打ちされて水平に取り付
けられている。この水貫3に、桁用の基礎の位置決め治
具4、4…及び妻用の基礎の位置決め治具4B、4B、
…が設置固定されている。
In FIG. 1, piles 2, 2,... Are driven and installed around a foundation 1 to be built.
, A wooden board 3 is nailed and mounted horizontally. The positioning jigs 4, 4... For the girder and the positioning jigs 4B, 4B for the base for the wife
... is fixed.

【0020】桁用の基礎の位置決め治具4は、図2、図
3及び図4に示すように、L形のアングル材からなる本
体41と、この両端部に溶接されたプレート42と、こ
のプレート41に溶接されたナット43に螺着された蝶
ねじ44とからなる。これらは錆びないように全てステ
ンレス鋼からなる。L形の本体41とプレート42とに
より、図4に示すように、下方に開口したコ字形状の水
貫装着部421が形成されており、水貫3に装着して固
定ができるようになっている。
As shown in FIGS. 2, 3 and 4, the positioning jig 4 as a foundation for a girder includes a main body 41 made of an L-shaped angle material, a plate 42 welded to both ends thereof, and A thumb screw 44 screwed onto a nut 43 welded to the plate 41. These are all made of stainless steel so as not to rust. As shown in FIG. 4, the L-shaped main body 41 and the plate 42 form a U-shaped water penetrating mounting portion 421 opened downward, and can be mounted on the water penetrating member 3 and fixed. ing.

【0021】本体41には、その上板411に位置決め
部としての位置決め孔451〜456が11個穿設され
ている。これらの位置決め孔451〜456に対応し
て、側板412にその表示46がされたラベルが貼られ
ている。
The main body 41 is provided with 11 positioning holes 451 to 456 as positioning portions in an upper plate 411 thereof. Labels indicating the indication 46 are attached to the side plates 412 corresponding to the positioning holes 451 to 456.

【0022】上記上板411は幅が35mmで長さが6
00mmであり、上記位置決め孔451〜456は、釘
が挿通可能な直径2mmの円孔である。中央の孔451
がセンター(出隅アンカーボルト芯)用であり、その両
側から左右に順次、孔452、452が桁々アンカーボ
ルト芯用であり、孔453、453が妻基礎外端用であ
り、孔454、454が妻基礎内端用であり、孔45
5、455が妻中基礎端用であり、456、456が桁
玄関アンカーボルト芯用である。センターの孔451か
ら孔452は35mmの寸法関係にある。以下センター
の孔451からの寸法が、孔453で60mm、孔45
4で100mm、孔455で135mm、孔456で1
90mmになっている。
The upper plate 411 has a width of 35 mm and a length of 6 mm.
The positioning holes 451 to 456 are circular holes having a diameter of 2 mm through which nails can be inserted. Center hole 451
Is for the center (outer corner anchor bolt core), and holes 452, 452 are for the anchor bolt core digit by digit from left and right from both sides thereof, and holes 453, 453 are for the outer end of the wife base, and hole 454, 454 is for the inner end of the wife's foundation,
5 and 455 are for the end of the base of the wife, and 456 and 456 are for the girder entrance anchor bolt core. The hole 451 to the hole 452 in the center have a dimensional relationship of 35 mm. Hereinafter, the dimension from the center hole 451 is 60 mm in the hole 453,
4 for 100 mm, hole 455 for 135 mm, hole 456 for 1
90 mm.

【0023】上板411には、この孔451〜456と
平行にスリット孔47、47が設けられている。スリッ
ト孔47は、釘が挿通可能な幅2mmになっている。こ
のスリット孔47は、寸法関係の決まっている上記孔4
51〜456とは異なる位置に水糸を張る場合に、任意
の位置に釘を挿入して水貫に打って対応するためにあ
る。
The upper plate 411 is provided with slit holes 47, 47 parallel to the holes 451 to 456. The slit hole 47 has a width of 2 mm through which a nail can be inserted. The slit hole 47 is provided in the hole 4 having a predetermined dimensional relationship.
When a water thread is stretched at a position different from that of 51 to 456, a nail is inserted at an arbitrary position to hit the water line.

【0024】上記側板412は高さが80mmであり、
上記孔451〜456の位置及び位置決めの用途に対応
して、図3に示すように、側板412の表面に、表示4
6をラベルへの印刷の形でしてある。すなわち、「セン
ター出隅アンカー」の表示461、「桁々アンカー芯」
の表示462、「妻基礎外端」の表示463、「妻基礎
内端」の表示464、「妻中基礎端」の表示465、
「桁玄関アンカー」の表示466、及び「桁」「用」の
表示467がしてある。
The side plate 412 has a height of 80 mm,
According to the position of the holes 451 to 456 and the purpose of positioning, as shown in FIG.
6 is in the form of printing on a label. That is, the display 461 of “center-out corner anchor”, the “digit anchor core”
Display 462, display "463 of the outside end of wife", display 464 of "the inside end of wife base", display 465 of "the end of wife base",
There is a display 466 of "digit entrance anchor" and a display 467 of "digit" and "for".

【0025】妻用の基礎の位置決め治具4Bも、孔の位
置と寸法関係及び表示が若干異なるが、桁用の基礎の位
置決め治具4とほぼ同様になっている。
The positioning jig 4B of the base for the wife is almost the same as the positioning jig 4 of the foundation for the girder, though the position, the dimensional relationship and the display of the holes are slightly different.

【0026】次に、基礎の施工方法の手順について説明
する。前工程の遣り方として、敷地の基準位置から、ト
ランシットによって、図1に示すように、4隅の杭2、
2…の位置を決めて打ち、杭2に水貫3、3…を水平に
固定し、直角だしをしておく。
Next, the procedure of the foundation construction method will be described. As shown in FIG. 1, as a method of using the pre-process, a stake 2 at four corners from a reference position of the site by transit,
Determine the position of 2 ... and hit it, fix the water banks 3, 3 ... to the pile 2 horizontally, and do a right angle stocking.

【0027】1)桁用の基礎の位置決め治具4、4…と
妻用の基礎の位置決め治具4B、4B…を割付に合わせ
て水貫3に仮セットする。
1) Temporarily setting the positioning jigs 4, 4... Of the foundation for the girder and the positioning jigs 4B, 4B.

【0028】2)上記各位置決め治具4、4Bの各1台
につき、基準になる寸法(例えば、センター又は桁々ア
ンカーボルト芯)を基準位置から測り位置を決めて、そ
の孔(例えば、孔451又は452)に合わせて、図4
に示すように、釘5を水貫3に打つ。
2) For each of the positioning jigs 4 and 4B, a reference dimension (for example, a center or a digit anchor bolt core) is measured from a reference position to determine a position, and a hole (for example, a hole) is determined. 451 or 452) and FIG.
As shown in FIG.

【0029】3)それから、蝶ねじ44を締め込み、治
具4、4B…をしっかりと固定する。
3) Then, the thumb screws 44 are tightened to firmly fix the jigs 4, 4B.

【0030】4)必要に応じて、表示46を見ながら、
該当する孔に釘5を打ち込む。
4) If necessary, while watching the display 46,
The nail 5 is driven into the corresponding hole.

【0031】5)次に釘5に水糸6を縛り付けて、図
1、図5に示すように、張る。
5) Next, a water thread 6 is tied to the nail 5 and stretched as shown in FIGS.

【0032】図1の例では、水糸6は、アンカーボルト
芯に張った状態を示している。中央の桁用の位置決め治
具4、4の桁々アンカーボルト芯用の孔452、452
と桁玄関用アンカーボルト芯用の孔456に釘5を打
ち、水糸6、6、6が張ってある。4隅の桁用の位置決
め治具4、4、4、4の出隅アンカーボルト芯用の孔4
51に釘5を打ち、水糸6が張ってある。同様に、中央
の妻用の位置決め治具4B、4Bでは、桁基礎アンカー
ボルト芯用の孔を用い、4隅の妻用の位置決め治具4
B、4B、4B、4Bでは、出隅アンカーボルト芯用の
孔を用いて、水糸6が張ってある。
FIG. 1 shows a state in which the water thread 6 is stretched around the anchor bolt core. Holes 452, 452 for the anchor bolt cores of the positioning jigs 4, 4 for the center girder
The nail 5 is driven into the hole 456 for the anchor bolt core for the girder entrance, and the water threads 6, 6, 6 are stretched. Outer corner anchoring bolt core holes 4 of positioning jigs 4, 4, 4, 4 for 4 corner spar
A nail 5 is hit on 51 and a water thread 6 is stretched. Similarly, the center jig positioning jigs 4B and 4B use holes for the girder foundation anchor bolt cores, and use the four corner wife positioning jigs 4B.
In B, 4B, 4B, and 4B, the water thread 6 is stretched using the hole for the anchor bolt at the outside corner.

【0033】更に、必要に応じて、基礎の内端、外端な
どを位置決めして、水糸を張り、基礎の型枠である内
枠、外枠を設置し、コンクリートを打ち、アンカーボル
トを水糸6、6の交点に設置して、基礎を築造するので
ある。
Further, if necessary, the inner end and the outer end of the foundation are positioned, a water thread is stretched, an inner frame and an outer frame which are the formwork of the foundation are installed, concrete is struck, and anchor bolts are tightened. It is installed at the intersection of the water threads 6, 6 to build the foundation.

【0034】この基礎の施工方法は、築造すべき基礎1
の周りに設置した水貫3に、12個の位置決め治具4、
4B…を設置して基礎1の位置を決めるから、従来の治
具を用いない場合に比べて、基礎の内外の寸法を決める
基礎型枠やアンカーボルトなどの位置精度が向上する。
The method of constructing this foundation is as follows.
12 positioning jigs 4 on Mizuki 3 installed around
4B are set and the position of the foundation 1 is determined, so that the positional accuracy of the base formwork and the anchor bolts for determining the inside and outside dimensions of the foundation is improved as compared with the case where the conventional jig is not used.

【0035】この基礎の施工方法は、上記位置決め治具
4、4Bとして、互いに所定の寸法関係を有する11個
の位置決め孔451〜456部と、この各位置決め孔4
51〜456に対応する表示461〜466を設けたも
のを用いるから、全ての位置(約60)を順次追い出す
場合に比べて、最初からの位置決め個所が12個に減少
し、位置決めの作業工数が減る。これに伴い寸法誤差が
小さくなり、また、表示46により、水糸6の掛け間違
いが減るとともに水糸掛けが容易になり、水糸掛けの作
業工数が減少する。
The method of constructing the foundation is as follows. As the positioning jigs 4 and 4B, eleven positioning holes 451 to 456 having a predetermined dimensional relationship are provided.
Since the display provided with the displays 461 to 466 corresponding to 51 to 456 is used, the number of positioning positions from the beginning is reduced to 12 compared to the case where all the positions (approximately 60) are sequentially driven out, and the number of man-hours for positioning is reduced. decrease. As a result, the dimensional error is reduced, and the display 46 reduces errors in hooking the water thread 6 and facilitates the hooking of the water thread, thereby reducing the number of man-hours for hooking the water thread.

【0036】また、この基礎の施工方法は、水貫3に設
置する上記各位置決め治具4、4Bを、基準位置からそ
の治具4、4Bの所定の位置決め孔(例えば、孔45
1)を位置決めすることにより、位置を決めて設置固定
してから、基礎の位置を決めるから、各治具4、4Bの
位置精度が向上し、全体として、基礎の位置精度が安定
したものになる。
Further, in the method of constructing the foundation, the positioning jigs 4 and 4B to be installed in the Mizuki 3 are moved from the reference position to predetermined positioning holes (for example, holes 45) of the jigs 4 and 4B.
Since the position of 1) is determined, the position is determined and fixed, and then the position of the foundation is determined. Therefore, the position accuracy of each jig 4, 4B is improved, and the position accuracy of the foundation is stabilized as a whole. Become.

【0037】この基礎の位置決め治具4、4Bは、互い
に所定の寸法関係を有する11個の位置決め孔451〜
456とこれらに対応する表示461〜466を設けた
から、この治具4、4Bを位置決めすれば、全ての位置
を追い出す場合に比べて、最初からの位置決め個所を減
少させることができ、位置決めの作業工数が減るととも
に、これに伴い寸法誤差が小さくなり、また、表示46
1〜466を利用することにより、水糸6の掛け間違い
が減るとともに水糸掛けが容易になり、水糸掛けの作業
工数を減少させることができる。
The positioning jigs 4 and 4B of the foundation have eleven positioning holes 451 to 451 having a predetermined dimensional relationship with each other.
Since 456 and the corresponding displays 461 to 466 are provided, if the jigs 4 and 4B are positioned, the number of positions to be positioned from the beginning can be reduced as compared with the case where all the positions are driven out. As the man-hour is reduced, the dimensional error is reduced accordingly.
By using 1 to 466, mistakes in hooking the water thread 6 are reduced, and the hooking of the water thread is facilitated, and the number of man-hours for hooking the water thread can be reduced.

【0038】また、基礎の位置決め治具4、4Bが、下
方に開口したコ字形状の水貫装着部421と固定用の蝶
ねじ44を有しているから、水貫3への装着による仮設
置と固定が短時間に簡単にできる。
Further, since the positioning jigs 4 and 4B of the foundation have the U-shaped water penetration mounting portion 421 opened downward and the thumb screw 44 for fixing, the temporary positioning jigs 4 and 4B are temporarily attached to the water penetration 3. Installation and fixing can be done easily in a short time.

【0039】また、表示46をラベルを貼り付けること
により行なうので、付け変えが容易である。
Further, since the display 46 is performed by attaching a label, it is easy to change the label.

【0040】この基礎の施工方法は、桁用の基礎の位置
決め治具4と妻用の基礎の位置決め治具4Bとの2種類
を使用するので、全てを1種類の治具で位置決めする場
合に比べて、各治具の位置決め孔の数が減り、表示も識
別が明瞭になり、位置決め孔の確認が容易になり、作業
能率が向上する。
In this method of applying the foundation, two types of positioning jigs 4 for the foundation for the girder and 4 B for the foundation for the wife are used. Therefore, when all are positioned by one type of jig. In comparison, the number of positioning holes of each jig is reduced, the display is also clearly identified, the positioning holes are easily confirmed, and work efficiency is improved.

【0041】以上、本発明の実施例を説明したが、本発
明は上記実施例に限定されるものではなく、本発明の要
旨を逸脱しない範囲の設計変更等があっても本発明に含
まれる。例えば、位置決め用の孔451〜456に代え
て、水糸の取り付け易い形状の突起であってもよい。ま
た、表示46はラベルへの印刷に代えて、側板412に
消えないように刻印してもよい。
Although the embodiment of the present invention has been described above, the present invention is not limited to the above-described embodiment, and includes any design change or the like without departing from the scope of the present invention. . For example, instead of the positioning holes 451 to 456, a protrusion having a shape that allows easy attachment of a water thread may be used. The display 46 may be engraved on the side plate 412 so as not to disappear, instead of being printed on the label.

【0042】[0042]

【発明の効果】請求項1記載の基礎の施工方法は、水貫
に複数の位置決め治具を設置して基礎の位置を決めるか
ら、従来の治具を用いない場合に比べて、基礎の内外の
寸法を決める基礎型枠やアンカーボルトなどの位置精度
を向上させることができる。
According to the method for constructing a foundation according to the first aspect of the present invention, a plurality of positioning jigs are installed in a water bank to determine the position of the foundation. It is possible to improve the positional accuracy of the base formwork, the anchor bolts, and the like that determine the dimensions of the base.

【0043】また、請求項1記載の基礎の施工方法は、
上記位置決め治具として複数の位置決め部とこれに対応
する表示を設けたものを用いるから、全ての位置を順次
追い出す場合に比べて、位置決めの作業工数が減るとと
もに、これに伴い寸法誤差が小さくなり、また、表示に
より水糸掛けが正確、容易になり、水糸掛けの作業工数
を減少させることができる。
Further, the method for constructing a foundation according to claim 1 is as follows.
Since the positioning jig uses a plurality of positioning parts and a corresponding display, the number of man-hours for positioning is reduced and the dimensional error is reduced as compared with a case where all positions are sequentially driven out. In addition, the display makes the hooking operation accurate and easy, and the man-hour for the hooking operation can be reduced.

【0044】更に、請求項1記載の基礎の施工方法は、
水貫に設置する上記各位置決め治具を、基準位置から位
置決めして設置固定してから、基礎の位置を決めるか
ら、各治具の位置精度が向上し、全体として、基礎の位
置精度を安定させることができる。
Further, the method for constructing a foundation according to claim 1 is as follows.
Since the positioning jigs to be installed in the Mizuki are positioned from the reference position and fixed after installation, the position of the foundation is determined, so the positional accuracy of each jig is improved, and the positioning accuracy of the foundation as a whole is stable Can be done.

【0045】請求項2記載の基礎の位置決め治具は、所
定の寸法関係を有する複数の位置決め部とこれに対応す
る表示を設けたから、この治具を位置決めすれば、全て
の位置を追い出す場合に比べて、位置決めの作業工数が
減るとともに、これに伴い寸法誤差が小さくなり、ま
た、表示を利用することにより、水糸の掛け間違いが減
るとともに水糸掛けが容易になり、水糸掛けの作業工数
を減少させることができ、基礎の位置決めを正確にで
き、その作業工数を大幅に減らすことができる。
The positioning jig according to the second aspect of the present invention is provided with a plurality of positioning portions having a predetermined dimensional relationship and a display corresponding to the positioning portions. In comparison, the number of man-hours for positioning is reduced, the dimensional error is reduced accordingly, and by using the display, mistakes in hooking the water thread are reduced and the hooking of the water thread is facilitated. The man-hour can be reduced, the positioning of the foundation can be accurately performed, and the work man-hour can be greatly reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施例である基礎の施工方法を説明す
る平面図である。
FIG. 1 is a plan view for explaining a foundation construction method according to an embodiment of the present invention.

【図2】本発明の実施例である基礎の位置決め治具の平
面図である。
FIG. 2 is a plan view of a positioning jig of a base according to an embodiment of the present invention.

【図3】本発明の実施例である基礎の位置決め治具の正
面図である。
FIG. 3 is a front view of a positioning jig of a foundation according to an embodiment of the present invention.

【図4】水貫に上記基礎の位置決め具を設置固定した状
態を示す縦断面図である。
FIG. 4 is a longitudinal sectional view showing a state in which the positioning tool of the foundation is installed and fixed in a water line.

【図5】上記基礎の位置決め治具の使用状態を示す一部
切り欠き斜視図である。
FIG. 5 is a partially cutaway perspective view showing a use state of the positioning jig of the foundation.

【符号の説明】 1 基礎 2 杭 3 水貫 4 桁用の基礎の位置決め治具 4B 妻用の基礎の位置決め治具 451〜456 位置決め孔(位置決め部) 46(461〜466) 表示 5 釘 6 水糸[Description of Signs] 1 Foundation 2 Pile 3 Mizuki 4 Positioning jig for foundation for 4 girder 4B Positioning jig for foundation for wife 451-456 Positioning hole (positioning portion) 46 (461-466) Display 5 Nail 6 Water yarn

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 築造すべき基礎の周りに設置した水貫
に、複数の位置決め治具を設置して基礎の位置を決める
基礎の施工方法であって、この位置決め治具に、互いに
所定の寸法関係を有する複数の位置決め部とこの各位置
決め部に対応する表示を設けておき、水貫に設置する上
記各位置決め治具を、基準位置からその治具の所定の位
置決め部を位置決めすることにより、位置決めして設置
固定してから、この各位置決め治具の位置決め部と表示
を用いて水糸を張り、基礎の位置を決めることを特徴と
する基礎の施工方法。
1. A method of constructing a foundation for determining a position of a foundation by installing a plurality of positioning jigs on a water bank installed around a foundation to be built, wherein the positioning jigs have predetermined dimensions. A plurality of positioning portions having a relationship and a display corresponding to each of the positioning portions are provided, and the respective positioning jigs to be installed in the water bank are positioned at a predetermined positioning portion of the jig from a reference position, A method for constructing a foundation, characterized in that, after positioning and installation and fixing, a water thread is stretched using the positioning portion and the display of each positioning jig to determine the position of the foundation.
【請求項2】 互いに所定の寸法関係を有する複数の位
置決め部とこの位置決め部に対応する表示が設けられた
ことを特徴とする基礎の位置決め治具。
2. A basic positioning jig comprising a plurality of positioning portions having a predetermined dimensional relationship with each other and a display corresponding to the positioning portions.
JP10348786A 1998-12-08 1998-12-08 Execution method of foundation and its positioning jig Pending JP2000170176A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10348786A JP2000170176A (en) 1998-12-08 1998-12-08 Execution method of foundation and its positioning jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10348786A JP2000170176A (en) 1998-12-08 1998-12-08 Execution method of foundation and its positioning jig

Publications (1)

Publication Number Publication Date
JP2000170176A true JP2000170176A (en) 2000-06-20

Family

ID=18399361

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10348786A Pending JP2000170176A (en) 1998-12-08 1998-12-08 Execution method of foundation and its positioning jig

Country Status (1)

Country Link
JP (1) JP2000170176A (en)

Similar Documents

Publication Publication Date Title
US4149320A (en) Building construction measuring tape
US7644510B2 (en) Framing layout tape
US4095343A (en) Building layout templates
US5407182A (en) Spacing jig
US20070107339A1 (en) Method of accurately positioning anchor bolt to foundation by swing-type anchor bolt
US6494015B1 (en) Deck building tool method and apparatus
US6935041B2 (en) Modular framing tool
US20070011959A1 (en) Shear wall template
US20020083606A1 (en) Offset level
JP2000170176A (en) Execution method of foundation and its positioning jig
JP2012021319A (en) Centering fixture
JP4247562B1 (en) Tightening device
US20020038518A1 (en) Layout system and method used in the erection of building structures
WO2022014506A1 (en) Batter board installation method, batter board installation program and surveying system
US6880261B1 (en) Flexible and collapsible construction geometry tool
JPH0754348A (en) Anchor bolt positioning device
JP2000073574A (en) Building foundation inspecting jig
JP3699548B2 (en) Anchor bolt installation bracket set
JP5963100B1 (en) Pitch display tape, member fixing method using the same, and pitch defining method
US6397487B1 (en) Construction tape
JP2546943Y2 (en) Anchor bolt measuring jig
US20020157269A1 (en) Measuring instrument
JPH063226A (en) Ascertaining method for accuracy during assembly of structure
JP2006030148A (en) Tape measure for marking
JP3514133B2 (en) Anchor bolt protrusion length inspection jig