Slope frame work and construction method therefor

Info

Publication number
JP2000160568A
JP2000160568A JP10333575A JP33357598A JP2000160568A JP 2000160568 A JP2000160568 A JP 2000160568A JP 10333575 A JP10333575 A JP 10333575A JP 33357598 A JP33357598 A JP 33357598A JP 2000160568 A JP2000160568 A JP 2000160568A
Authority
JP
Japan
Prior art keywords
slope
tires
waste tires
tire
waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10333575A
Other languages
Japanese (ja)
Inventor
Yoshihide Sakai
吉秀 境
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP10333575A priority Critical patent/JP2000160568A/en
Publication of JP2000160568A publication Critical patent/JP2000160568A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide an inexpensively constructible and durable slope frame in a slope surface protective work. SOLUTION: A slope frame work covers a surface 1 of slope with a slope frame composed of mutually connected plural waste tires 13 arranged by being successively laid all over on the surface 1 of slope and an infilling material filled between the adjacent waste tires 13 of the slope frame and on the inside of the tires 13. The waste tires 13 are successively laid all over on the surface 1 of slope from a toe of slope, the slope frame is constructed by connecting the mutual respective waste tires 13, and the infilling material is filled between the waste tires 13 adjacent in an arranging state and on the inside of the tires 13 to be integrated in a layer shape to cover the surface 1 of slope.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は法枠工及びその構築
方法に係り、特に法面保護工に用いられ、経済的で耐久
性に富む法枠工及びその構築方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and a method for constructing a method, and more particularly, to a method and a method for constructing a method for constructing a method for protecting a slope, which is economical and has high durability.

【0002】[0002]

【従来の技術】従来、表面侵食を受けやすい法面では、
法面保護工としてコンクリートブロック枠工が採用され
ることが多い。このコンクリートブロック枠工は、雨水
による侵食や風化の著しい土質などでガリ侵食などを未
然に防止したい場合や、植生に不適な土質であって、周
辺の環境条件から緑化が必要とされる場合や、湧水のあ
る切土法面、標準法面勾配より急な盛土法面、植生を行
っても表面が崩落するおそれのある場合等に有効とされ
ている。
2. Description of the Related Art Conventionally, on a slope which is susceptible to surface erosion,
Concrete block framing is often employed as slope protection. This concrete block framing works when it is necessary to prevent gully erosion due to erosion or weathering due to rainwater, or when soil is unsuitable for vegetation and greening is required due to surrounding environmental conditions. It is effective on cut slopes with spring water, embankment slopes that are steeper than the standard slope, and when the surface may collapse even if vegetation is performed.

【0003】図7は従来の一般的なコンクリートブロッ
ク枠工の構成を示した概略断面図である。切土法面50
の法尻に施工された基礎コンクリート51(法留コンク
リート)上には図8に示したような、細長形状のコンク
リートブロック52が組み上げられている。各コンクリ
ートブロック52は平面的に格子状をなすように法面5
0上に配列され、交点位置53での噛み合い形状を利用
して格子形状が保持されるようになっている。
FIG. 7 is a schematic sectional view showing the structure of a conventional general concrete block framing method. Cut slope 50
As shown in FIG. 8, an elongated concrete block 52 as shown in FIG. Each concrete block 52 has a slope 5
The lattice shape is maintained by using the meshing shape at the intersection point 53.

【0004】また、法面50に沿って積み上げられたコ
ンクリートブロック52の交点53付近にはアンカーピ
ン54が打設されている。このアンカーピン54によ
り、組み立てられたコンクリートブロック52がずれな
いようになっている。このアンカーピン54には長さ
0.5〜1.0m程度の鉄筋が利用され、その頭部はコ
ンクリートブロック52の一部に緊結されたり、充填モ
ルタルで固定され、コンクリートブロック52の変状を
阻止できるようになっている。
[0004] An anchor pin 54 is cast near an intersection 53 of the concrete blocks 52 stacked along the slope 50. The anchor pin 54 prevents the assembled concrete block 52 from shifting. The anchor pin 54 is made of a reinforcing bar having a length of about 0.5 to 1.0 m, and its head is fixed to a part of the concrete block 52 or fixed with a filling mortar to deform the concrete block 52. It can be stopped.

【0005】さらに、コンクリートブロック52で区画
された露出地盤55を被覆するように中詰め材56が充
填されている。中詰め材56には客土材として現地発生
土が使用されている。その他、現場状況に応じて中詰め
材に栗石、平板ブロック、ポーラスコンクリート等が適
用されることもある。
Further, a filling material 56 is filled so as to cover the exposed ground 55 partitioned by the concrete blocks 52. For the filling material 56, locally generated soil is used as a customer soil material. In addition, chestnut, flat block, porous concrete, etc. may be applied to the filling material depending on the site conditions.

【0006】[0006]

【発明が解決しようとする課題】ところで、コンクリー
トブロック枠工に使用されるコンクリートブロックはプ
レキャストコンクリート製品であるため、材料単価が高
い。また、1個のコンクリートブロックも重く、法面上
に配置する際にクレーン等の揚重機を用いる必要があ
る。このため傾斜地等で揚重機の乗り入れのできない地
域では、作業性が著しく低下する。さらに、寒冷地等に
おいて、凍上の影響を受けて枠工が浮き上がってブロッ
クが変状をきたすという問題もある。すなわち、凍結領
域に打設されたアンカーピンが地盤の凍上とともに浮き
上がった際、アンカーピンに固定されている法枠がアン
カーピンと一体的に浮き上がってしまう現象が多く確認
されている。このときコンクリートブロックは剛性が大
きいので、凍上時や融解に伴う沈下時に浮き上がり、沈
下等に変形追従できず、ブロック同士が競ったり、捻り
が加わったりしてコンクリートブロックが破損してしま
うおそれもある。
However, since the concrete block used for the concrete block framing is a precast concrete product, the material unit price is high. In addition, one concrete block is also heavy, and it is necessary to use a lifting machine such as a crane when arranging it on the slope. For this reason, workability is significantly reduced in an area where a crane cannot be used, such as on a slope, or the like. Further, there is a problem that in a cold region or the like, the framing work is lifted by the influence of frost and the block is deformed. That is, it has been confirmed that when the anchor pin placed in the freezing area rises with the frost heave of the ground, the law frame fixed to the anchor pin floats integrally with the anchor pin. At this time, since the concrete block has high rigidity, it floats up during frost heaving or subsidence due to thawing, and cannot follow the subsidence, etc., and the blocks may compete with each other or torsion may damage the concrete block. .

【0007】そこで、本発明の目的は上述した従来の技
術が有する問題点を解消し、入手が容易で安価なリサイ
クル材料を使用し、かつ柔軟性を有するとともに、耐久
性を有する法枠工及びその構築方法を提供することにあ
る。
Therefore, an object of the present invention is to solve the above-mentioned problems of the prior art, to use a readily available and inexpensive recycled material, and to have a flexible and durable method. It is to provide a construction method.

【0008】[0008]

【課題を解決するための手段】上記目的を達成するため
に、本発明は、法面上に順次敷き詰められ配列されると
ともに、互いに連結された複数本の廃タイヤからなる法
枠と、該法枠の隣接している廃タイヤ間及びタイヤ内部
に充填された中詰め材とで前記法面を被覆するようにし
たことを特徴とする。
SUMMARY OF THE INVENTION In order to achieve the above object, the present invention relates to a law frame comprising a plurality of waste tires which are sequentially laid and arranged on a slope and which are connected to each other. It is characterized in that the slope is covered between the waste tires adjacent to the frame and the filling material filled in the tire.

【0009】この法枠工は、法尻から法面上に順次廃タ
イヤを敷き詰め、各廃タイヤ同士を連結して法枠を構築
するとともに、配列状態で隣接した廃タイヤ間及びタイ
ヤ内部に中詰め材を充填し、層状に一体化させて前記法
面を被覆するように構築することを特徴とする。
In this method, the waste tires are laid one after another on the slope from the bottom of the slope, and the waste tires are connected to each other to construct a legal framework. It is characterized in that it is filled with a filling material, integrated into a layer, and constructed so as to cover the slope.

【0010】[0010]

【発明の実施の形態】以下、本発明の法枠工及びその構
築方法の一実施の形態について、添付図面を参照して説
明する。図1は本発明による法枠工10を法面1に構築
した実施の形態を示した全体断面図である。法面1下端
の法尻位置にはプレキャストコンクリート製の法留コン
クリート2が設置されている。この法留コンクリート2
は前面が所定の根入れ深さとなるように現地盤を掘り込
んで構築されている。また、本実施の形態では図2に拡
大したように、法面の地盤面3上に排水マット4が敷設
されている。この排水マット4は地盤面からの湧水を流
下させる流路空間を確保する目的で敷設されている。排
水マット4には所定厚(例えば1cm程度)の多孔空間
が得られるように樹脂繊維を、立体的に成形したマット
が使用されている。この排水マット4は平面荷重に対し
て前記多孔空間が保持できる程度の剛性を有しており、
後述する廃タイヤが敷き並べられた状態でもその厚さが
確保される。この排水マット4により地盤面3と後述す
る廃タイヤとの間には空気層が介在するため、冬期にお
いて枠工の凍上防止効果を期待することができる。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view showing an embodiment of a method for constructing a method according to the present invention. FIG. 1 is an overall sectional view showing an embodiment in which a sill 10 according to the present invention is constructed on a slope 1. At the bottom end of the slope 1, a method casting concrete 2 made of precast concrete is installed. This method concrete 2
Is constructed by digging a local board so that the front surface has a predetermined depth. In this embodiment, a drainage mat 4 is laid on the sloped ground surface 3 as enlarged in FIG. The drainage mat 4 is laid for the purpose of securing a channel space for flowing down spring water from the ground surface. As the drainage mat 4, a mat in which resin fibers are three-dimensionally formed so as to obtain a porous space having a predetermined thickness (for example, about 1 cm) is used. This drainage mat 4 has such a rigidity that the porous space can be held against a plane load,
The thickness is secured even when waste tires described later are laid. Since an air layer is interposed between the ground surface 3 and the waste tire described later by the drain mat 4, an effect of preventing frost heaving of the framing work can be expected in winter.

【0011】さらに地盤面3上に敷設された排水マット
4上には廃タイヤ13が法面に沿って積み上げられるよ
うにして敷き詰められている。ここで、廃タイヤ13と
は、乗用車等の車両用タイヤとして使用されていたもの
であって、トレッドの摩耗により乗用に不適とされて廃
棄されたタイヤのうち、原形利用(プロダクトリサイク
ル)を意図して使用されたタイヤをさすものとする。廃
タイヤ13の最下列は前述したように、法尻工としての
法留コンクリート2に支持されている。このとき各廃タ
イヤ13は所定長さのタイヤ固定ピン19により地盤面
3に固定支持されている。タイヤ固定ピン19はタイヤ
のサイドウォールをタイヤ内側から排水マット4も貫通
するようにして地盤中に定着されている。タイヤ固定ピ
ン19としては所定径の鉄筋を定着長さを確保できる長
さに切断して使用することができる。また、各廃タイヤ
13同士は図3(a)に示したように、連結ボルトナッ
ト18により連結されている。これにより廃タイヤは一
体化され、法枠が構成される。さらに、この廃タイヤ法
枠内及び隣接したタイヤ間には中詰め材14が充填され
ている。本実施の形態では現地発生土が使用されている
が、法面の状況に応じて植生袋、土嚢、栗石等を適宜選
定して使用することが好ましい。
Further, on the drain mat 4 laid on the ground surface 3, waste tires 13 are laid so as to be stacked along the slope. Here, the waste tire 13 is used as a vehicle tire such as a passenger car, and is intended to use the original form (product recycling) among the tires which are unsuitable for riding due to wear of the tread and discarded. Tires that have been used. As described above, the lowermost row of the waste tires 13 is supported by the method concrete 2 as a method of digging. At this time, each waste tire 13 is fixedly supported on the ground surface 3 by a tire fixing pin 19 having a predetermined length. The tire fixing pin 19 is fixed in the ground so that the drain mat 4 also penetrates the sidewall of the tire from the inside of the tire. The tire fixing pin 19 can be used by cutting a reinforcing bar having a predetermined diameter into a length that can secure a fixing length. Further, as shown in FIG. 3A, the waste tires 13 are connected by connecting bolts and nuts 18. As a result, the waste tires are integrated to form a legal frame. Further, a filling material 14 is filled in the waste tire frame and between adjacent tires. In this embodiment, locally generated soil is used, but it is preferable to select and use a vegetation bag, a sandbag, a chestnut stone or the like as appropriate according to the situation of the slope.

【0012】法面1に沿って積み上げられた廃タイヤ1
3は、盛土斜面のように勾配が緩い場合には、タイヤ同
士を連結するだけで安定した法枠を構成する。したがっ
て、タイヤ固定ピン19は法面勾配に応じて使用するか
を判断すればよい。また、タイヤ固定ピン19の頭部は
保護層表面から十分な深さ(約30cm)の土中にある
ので凍上の影響を受けにくい。
Waste tires 1 stacked along the slope 1
No. 3 forms a stable legal frame only by connecting tires when the gradient is gentle like an embankment slope. Therefore, it is sufficient to determine whether to use the tire fixing pin 19 according to the slope of the slope. In addition, the head of the tire fixing pin 19 is in the soil at a sufficient depth (about 30 cm) from the surface of the protective layer, and therefore is not easily affected by frost.

【0013】なお、タイヤの寸法の規格は各種あるが、
ほぼ同等の直径、トレッド幅を有している廃タイヤ13
を揃えて敷き詰める方が施工性がよい。しかし、一般的
な乗用車用タイヤであって多少のサイズ違いのものは問
題なく使用できる。また、トラック用タイヤ、軽自動車
用タイヤのようにサイズが大幅に違う廃タイヤ13は法
面端部での寸法調整や下段部分での安定性の確保のため
に使用することが好ましい。
Although there are various standards for tire dimensions,
Waste tire 13 having substantially the same diameter and tread width
It is more workable to lay them all together. However, general passenger car tires having slightly different sizes can be used without any problem. Further, it is preferable to use waste tires 13 having greatly different sizes, such as tires for trucks and mini-vehicles, in order to adjust the dimensions at the end of the slope and to ensure stability at the lower part.

【0014】図2は廃タイヤ13の積み上げ状態を拡大
して示した部分断面図である。同図に示したように、廃
タイヤ13の上側には覆土層15が形成されている。こ
の覆土層15は現場発生土を層厚5〜10cmの均一な
層厚に撒き出し転圧した層で、廃タイヤ13の火災を防
止する防火層としての役割を果たしている。また、この
覆土層15の安定のために覆土層15の表面は金網16
で覆われている。
FIG. 2 is an enlarged partial sectional view showing a stacked state of the waste tires 13. As shown in the figure, a soil covering layer 15 is formed above the waste tire 13. The soil cover layer 15 is a layer formed by spreading the soil generated in the field to a uniform layer thickness of 5 to 10 cm and rolling, and plays a role as a fire protection layer for preventing a fire of the waste tire 13. In order to stabilize the soil covering layer 15, the surface of the soil covering layer 15 is
Covered with.

【0015】図3は廃タイヤ13同士を連結する手段を
例示したものである。図3(a)ではタイヤのトレッド
同士が接触する部分に設けられた貫通孔(図示せず)を
利用してボルトナット18による連結を行っている。貫
通孔の強度を保持するために必要に応じて廃タイヤを切
断して作ったパッチを補強部分に宛うようにしてもよ
い。図3(b)は金属製連結プレート28をタイヤのサ
イドウォールに宛い、ボルト止めしてタイヤ同士を連結
するようにした変形例を示した図である。この例によれ
ば、廃タイヤ13を並べた後に、連結しようとするタイ
ヤのサイドウォールに孔をあけて連結プレート28を取
り付けることができるので、作業性が向上する。
FIG. 3 exemplifies means for connecting the waste tires 13 to each other. In FIG. 3A, the connection by the bolt and nut 18 is performed using a through-hole (not shown) provided in a portion where the treads of the tire come into contact with each other. If necessary, a patch made by cutting a waste tire may be directed to the reinforcing portion in order to maintain the strength of the through hole. FIG. 3B is a diagram showing a modification in which the metal connecting plate 28 is addressed to the sidewall of the tire and is bolted to connect the tires. According to this example, after arranging the waste tires 13, the connection plate 28 can be attached by making a hole in the sidewall of the tire to be connected, so that workability is improved.

【0016】次に、図4〜図6を参照して法枠工10の
構築方法について説明する。まず、図4に示したよう
に、所定法勾配に整形した法面1上に排水マット4を敷
設し、法尻工としての法留コンクリート2を前面に所定
根入れ深さが確保できるように構築する。この法留コン
クリート2には排水工(図示せず)を施しておき、排水
マット4内を流下してきた湧水を排水層に排水させるこ
とが好ましい。この後、下端ガイドとなる法留コンクリ
ート2の列に沿って廃タイヤ13を敷設する。各廃タイ
ヤ13は必要に応じてタイヤ固定ピン19で地山に固定
し、これと並行して各タイヤ同士を図3に示した連結方
法により順次互いに連結していく。また、各廃タイヤ1
3間およびサイドウォールで囲まれたタイヤ内部に中詰
め材14としての現場発生土を充填する。これにより廃
タイヤ13を主体として全体として一体的な法枠が法面
上に形成される(図5参照)。中詰め材14は廃タイヤ
13によって区画された多数の空間内に充填されている
ため、降雨等によって流失しにくくなっている。また各
タイヤが連結され法枠全体が一体化して適度な重量とな
るので、法面の安定性の向上が図られる。
Next, a method of constructing the framing frame 10 will be described with reference to FIGS. First, as shown in FIG. 4, a drainage mat 4 is laid on a slope 1 shaped to a predetermined slope, so that a predetermined depth of penetration is ensured at the front of a settlement concrete 2 as a forehead work. To construct. It is preferable that a drainage work (not shown) is performed on the method concrete 2 so that the spring water flowing down the drainage mat 4 is drained to a drainage layer. Thereafter, the waste tire 13 is laid along the row of the method concrete 2 serving as the lower end guide. The waste tires 13 are fixed to the ground with tire fixing pins 19 as necessary, and in parallel with this, the tires are sequentially connected to each other by the connection method shown in FIG. In addition, each waste tire 1
The in-situ generated soil as the filling material 14 is filled into the space between the three and inside the tire surrounded by the sidewall. As a result, a legal frame integrally formed with the waste tire 13 as a whole is formed on the slope (see FIG. 5). Since the middle filling material 14 is filled in a large number of spaces defined by the waste tires 13, it is difficult for the middle filling material 14 to be washed away by rainfall or the like. In addition, since the tires are connected to each other and the entire legal frame is integrated to have an appropriate weight, stability of the slope is improved.

【0017】さらに廃タイヤ13部分の火災を防止する
ために、図6に示したように、防火層としての覆土層1
5を形成する。この覆土層15は廃タイヤ13が地表面
に露出しない程度の厚さに設定すればよく、具体的には
5〜10cm程度の層厚に現場発生土を撒き出して転圧
することが好ましい。さらに覆土層15の上を金網16
で覆う。この金網16は図2に示したように鋼棒を加工
したアンカーピン17により覆土層表面に定着するよう
になっている。このときアンカーピン17は先端を尖ら
せておくことで廃タイヤ13のサイドウォールを貫通さ
せて地盤内に定着させることもできる。
Further, as shown in FIG. 6, a soil covering layer 1 as a fire protection layer is provided to prevent a fire in the waste tire 13 portion.
5 is formed. The soil covering layer 15 may be set to such a thickness that the waste tire 13 is not exposed to the ground surface. Specifically, it is preferable to scatter the soil generated on site to a layer thickness of about 5 to 10 cm and compact it. Further, a wire mesh 16 is placed on the soil covering layer 15.
Cover with. As shown in FIG. 2, the wire net 16 is fixed on the surface of the soil covering layer by an anchor pin 17 formed by processing a steel rod. At this time, the anchor pin 17 can be fixed in the ground by penetrating the sidewall of the waste tire 13 by sharpening the tip.

【0018】また、プレキャストコンクリート製の法留
コンクリート2に代えて場所打ちコンクリート施工、蛇
かごの設置によっても適正な法留工を行うことができ
る。なお、法面が長期にわたって露出することが予定さ
れている場合には、覆土層15の流失、金網16の腐食
防止の保護のために、覆土層の上に張芝や種子吹付けに
よる緑化を行い、さらに金網を被せるようにしてもよ
い。
Also, instead of the cast concrete 2 made of precast concrete, cast-in-place concrete and installation of a serpentine cage can be used to carry out proper cast work. If the slope is to be exposed for a long period of time, greening is performed on the covering layer by spraying with a turf or seeds to protect the covering layer 15 from erosion and the wire mesh 16 from corrosion. Then, a wire mesh may be further covered.

【0019】以上の法枠工10は、タイヤ固定ピン等の
固定手段による固定の程度を考慮することで種々の法勾
配に設定された盛土、切土法面に適用できることはいう
までもない。また、重機等を必要せずに施工できるた
め、既存の法面崩壊に対する緊急復旧工事としてこの法
枠工を迅速な作業によって適用できる。
It goes without saying that the above framing method 10 can be applied to embankment and cut slopes set to various slopes in consideration of the degree of fixing by fixing means such as tire fixing pins. In addition, since the construction can be carried out without using heavy equipment and the like, the construction work can be quickly applied as an emergency restoration work for the existing slope collapse.

【0020】[0020]

【発明の効果】以上に述べたように、廃タイヤを、法面
に沿って連結しながら敷設することにより、耐久性を備
えた法枠工を安価にかつ安全な作業によって構築するこ
とができるという効果を奏する。また、資源リサイクル
の観点からも廃タイヤのプロダクトリサイクルの一環と
して望ましい効果が期待できる。
As described above, by laying waste tires while connecting them along the slopes, a durable legal framework can be constructed at low cost and safely. This has the effect. Also, from the viewpoint of resource recycling, desirable effects can be expected as part of product recycling of waste tires.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による法枠工の一実施の形態を示した全
体断面図。
FIG. 1 is an overall cross-sectional view showing an embodiment of a framing method according to the present invention.

【図2】図1に示した法枠工の一部を拡大して示した拡
大断面図。
FIG. 2 is an enlarged cross-sectional view showing a part of the frame work shown in FIG. 1 in an enlarged manner.

【図3】廃タイヤの連結方法の例を示した模式説明図。FIG. 3 is a schematic explanatory view showing an example of a method of connecting waste tires.

【図4】法枠工の構築状態を模式的に示した状態説明図
(その1)。
FIG. 4 is a state explanatory view schematically showing a state of construction of a framing work (part 1).

【図5】法枠工の構築状態を模式的に示した状態説明図
(その2)。
FIG. 5 is a state explanatory view schematically showing a state of construction of the framing work (part 2).

【図6】法枠工の構築状態を模式的に示した状態説明図
(その3)。
FIG. 6 is a state explanatory view schematically showing a state of construction of the framing work (part 3).

【図7】従来のコンクリートブロック法枠工の構成の一
例を示した断面図。
FIG. 7 is a sectional view showing an example of the configuration of a conventional concrete block method frame work.

【図8】図7に例示したコンクリートブロックの組立状
態を部分的に示した正面図。
FIG. 8 is a front view partially showing an assembled state of the concrete block illustrated in FIG. 7;

【符号の説明】[Explanation of symbols]

1 法面 2 法留コンクリート 4 排水マット 13 廃タイヤ 14 中詰め材 15 覆土層 16 金網 18 連結ボルトナット 19 タイヤ固定ピン DESCRIPTION OF SYMBOLS 1 Slope 2 Method concrete 4 Drain mat 13 Waste tire 14 Filling material 15 Cover layer 16 Wire mesh 18 Connecting bolt and nut 19 Tire fixing pin

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】法面上に順次敷き詰められ配列されるとと
もに、互いに連結された複数本の廃タイヤからなる法枠
と、該法枠の隣接している廃タイヤ間及びタイヤ内部に
充填された中詰め材とで前記法面を被覆するようにした
ことを特徴とする法枠工。
1. A law frame comprising a plurality of waste tires which are sequentially spread and arranged on a slope and connected to each other, and filled between adjacent waste tires of the law frame and inside the tire. A method of constructing a sloping frame, wherein the slope is covered with a filling material.
【請求項2】法尻から法面上に順次廃タイヤを敷き詰
め、各廃タイヤ同士を連結して法枠を構築するととも
に、配列状態で隣接した廃タイヤ間及びタイヤ内部に中
詰め材を充填し、層状に一体化させて前記法面を被覆す
るようにしたことを特徴とする法枠工の構築方法。
2. A waste tire is spread over the slope from the bottom of the slope, and the waste tires are connected to each other to form a legal framework, and a filling material is filled between adjacent waste tires in the arrangement state and inside the tire. And a method of constructing a method of constructing a method of forming a frame, wherein the method is characterized by being integrated in layers to cover the slope.
JP10333575A 1998-11-25 1998-11-25 Slope frame work and construction method therefor Pending JP2000160568A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10333575A JP2000160568A (en) 1998-11-25 1998-11-25 Slope frame work and construction method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10333575A JP2000160568A (en) 1998-11-25 1998-11-25 Slope frame work and construction method therefor

Publications (1)

Publication Number Publication Date
JP2000160568A true JP2000160568A (en) 2000-06-13

Family

ID=18267587

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10333575A Pending JP2000160568A (en) 1998-11-25 1998-11-25 Slope frame work and construction method therefor

Country Status (1)

Country Link
JP (1) JP2000160568A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100509643B1 (en) * 2001-09-21 2005-08-23 학교법인 인하학원 Method for greening of slope by waist-tire
JP2008208694A (en) * 2007-02-27 2008-09-11 Nippon Solid Co Ltd Civil engineering mat
CN104164884A (en) * 2014-08-26 2014-11-26 湖北工业大学 Slope protection and dyke strengthening method for compound system
CN110205979A (en) * 2019-04-03 2019-09-06 北部湾大学 A kind of artificial sandbank protective equipment and its construction method of resource utilization type
CN114775660A (en) * 2022-06-02 2022-07-22 国网福建省电力有限公司电力科学研究院 Tower footing slope vegetation restoration structure and restoration method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100509643B1 (en) * 2001-09-21 2005-08-23 학교법인 인하학원 Method for greening of slope by waist-tire
JP2008208694A (en) * 2007-02-27 2008-09-11 Nippon Solid Co Ltd Civil engineering mat
CN104164884A (en) * 2014-08-26 2014-11-26 湖北工业大学 Slope protection and dyke strengthening method for compound system
CN104164884B (en) * 2014-08-26 2016-09-28 湖北工业大学 A kind of combined system bank protection dyke strengthening method
CN110205979A (en) * 2019-04-03 2019-09-06 北部湾大学 A kind of artificial sandbank protective equipment and its construction method of resource utilization type
CN114775660A (en) * 2022-06-02 2022-07-22 国网福建省电力有限公司电力科学研究院 Tower footing slope vegetation restoration structure and restoration method

Similar Documents

Publication Publication Date Title
US5160215A (en) Ground surfacing and erosion control device
CN209958164U (en) Foam light soil high-fill roadbed widening structure
CN110306565B (en) Road ecological slope protection system and construction method
CN210262555U (en) Light soil road structure
JP2000160568A (en) Slope frame work and construction method therefor
AU2018216633B2 (en) Method of constructing a foundation
JP2628294B2 (en) Reinforcement method of gas station foundation ground
RU2541993C2 (en) Georeinforcing system based on tyres
CN216514911U (en) High fill roadbed structure
KR200197327Y1 (en) Drainage
KR20060108900A (en) Slope-protect weight block for prevent degradation
KR200389250Y1 (en) Slope-Protect Weight Block for Prevent Degradation
CN111501459B (en) Roadbed structure of mountain road and construction method thereof
JPH09154420A (en) Weed proofing mat and its execution
JP3721490B2 (en) Water shielding sheet protective layer and construction method thereof
JP5367052B2 (en) Road shoulder protection block, road shoulder structure and cast-in-place concrete formwork
CN111827030A (en) High-fill embankment structure and construction method
KR100884391B1 (en) Abreast wall having enhanced supply function on the top of retaining wall and construction method thereof
KR100968518B1 (en) Construction method of reinforced green retaining wall
CN110172984B (en) Roadbed high slope construction method in bedding and landslide complex geological environment
RU2270900C2 (en) Slope consolidation method
US11555284B1 (en) Integrating articulated concrete blocks with gabion/reno cages
CN209759923U (en) Asphalt pavement cushion structure
KR200287888Y1 (en) Structure for reinforcing a slope
CN212801052U (en) High embankment structure of filling

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050419

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070622

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070627

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20071023