JP2000160544A - Drain driving construction method and device therefor - Google Patents

Drain driving construction method and device therefor

Info

Publication number
JP2000160544A
JP2000160544A JP10342790A JP34279098A JP2000160544A JP 2000160544 A JP2000160544 A JP 2000160544A JP 10342790 A JP10342790 A JP 10342790A JP 34279098 A JP34279098 A JP 34279098A JP 2000160544 A JP2000160544 A JP 2000160544A
Authority
JP
Japan
Prior art keywords
drain material
remaining
casting pipe
depth
drain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10342790A
Other languages
Japanese (ja)
Other versions
JP3139706B2 (en
Inventor
Mikio Nakagawa
川 幹 雄 中
Tomohiro Isoda
田 知 広 磯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Fudo Tetra Corp
Original Assignee
Kajima Corp
Fudo Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp, Fudo Construction Co Ltd filed Critical Kajima Corp
Priority to JP10342790A priority Critical patent/JP3139706B2/en
Publication of JP2000160544A publication Critical patent/JP2000160544A/en
Application granted granted Critical
Publication of JP3139706B2 publication Critical patent/JP3139706B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

PROBLEM TO BE SOLVED: To perform execution work by consistently controlling a process of reliably driving a drain material to the prescribed remaining depth by redriving the driving material after detecting the co-rise by confirming remaining of the drain material when pulling out a driving pipe. SOLUTION: A tachometer 11 for measuring the feed length of a drain material 1 by rotating by contacting with the drain material 1 and a depth indicator 12 for measuring the depth of a driving pipe 2 are provided. Then, a drain driving construction method is provided with a pullout starting time remaining confirming process in which the drain material 1 penetrates through the driving pipe 2, an anchor 3 is attached to the tip to be locked on the driving pipe 2, and the drain material 1 is intruded in the ground G together with the driving pipe 2 to detect remaining of the anchor 3 when starting pullout of the driving pipe 2 by reaching the prescribed remaining depth, a pullout time remaining confirming process of detecting remaining of the drain material 1 at pullout time and a redriving process of driving back these up to the prescribed remaining depth by stopping pullout after detecting the co-rise of the anchor 3 in the remaining confirming process at these pullout starting time and the co-rise of the drain material 1 in the pullout time remaining confirming process.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、軟弱地盤中に含ま
れる水を排出して地盤安定化をはかるため、例えばファ
イバードレーン材のような細長いドレーン材を打設管に
係止して土中に貫入し、そのファイバードレーン材を所
定残置深度に残して打設管を引抜くドレーン打設工法の
改良に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for stabilizing a ground by discharging water contained in a soft ground. The present invention relates to an improvement in a drain casting method of pulling out a casting pipe while leaving the fiber drain material at a predetermined remaining depth.

【0002】[0002]

【従来の技術】軟弱地盤中に例えばファイバードレーン
材を打設することにより、軟弱粘性土中に含まれる水を
排出して地盤の安定化を促進するファイバードレーン工
法は知られている。
2. Description of the Related Art There is known a fiber drain construction method in which, for example, a fiber drain material is poured into a soft ground to discharge water contained in the soft viscous soil to promote the stabilization of the ground.

【0003】従来、このファイバードレーン工法におい
ては、ファイバードレーン材を打設管の先端に係合させ
て地盤中に打ち込み、打設管を引抜いてドレーン材を地
盤中に残置させているが、引抜きの際にドレーン材が共
上りすることがあり、このような場合にはドレーン材の
再打設が必要になる。
Conventionally, in this fiber drain method, a fiber drain material is engaged with the tip of a casting pipe and driven into the ground, and the casting pipe is pulled out to leave the drain material in the ground. In this case, the drain material may rise together, and in such a case, it is necessary to re-install the drain material.

【0004】したがって、ファイバードレーン材を打設
して打設管を引抜く際にはドレーン材の残置を確認する
必要があり、これまでにこれに関する技術がいくつか開
示されている。例えば本出願人によって、特公昭63−
49006号公報及び特公平2−27486号公報にド
レーン材の残置位置確認方法及びその方法に関する技術
が開示されている。この公知技術は、ドレーン材に所定
間隔で複数の被検知手段を設け、それを検知手段で検知
することで残置を確認するものであり、有効なものであ
るが、多くの被検知手段を設ける必要であり、また、残
置を確認するだけの技術であって、共上りを検出した場
合の対応等を含むものではない。
Therefore, it is necessary to confirm the remaining of the drain material when the fiber drain material is cast and the casting tube is pulled out, and several techniques related to this have been disclosed. For example, according to the present applicant,
Japanese Patent Publication No. 49006 and Japanese Patent Publication No. 2-27486 disclose a method of confirming the remaining position of the drain material and a technique relating to the method. This known technique is to provide a plurality of detection means at predetermined intervals in a drain material, and to confirm the remaining by detecting the detection means by the detection means, which is effective, but provides many detection means. It is necessary and is a technique only for confirming the remaining data, and does not include a countermeasure in the case of detecting a rising edge.

【0005】[0005]

【発明が解決しようとする課題】本発明は打設管の引抜
きの際にドレーン材の残置を確認し、共上りを検出した
ら再打設を行て確実に所定残置深度にドレーン材を打設
する工程を一貫管理して施工するドレーン打設工法及び
その装置を提供することを目的としている。
SUMMARY OF THE INVENTION In the present invention, the drain material is confirmed to remain at the time of pulling out the casting tube, and when the rise is detected, re-implantation is performed to surely drive the drain material to a predetermined remaining depth. It is an object of the present invention to provide a drain driving method and an apparatus for performing a process by integrally controlling a process of performing the drain driving.

【0006】[0006]

【課題を解決するための手段】本発明のドレーン打設工
法によれば、ドレーン材を打設管に係止して土中に貫入
し、そのドレーン材を所定残置深度に残して打設管を引
抜くドレーン打設工法において、ドレーン材に接触回転
してそのドレーン材の送り長さ及び戻り長さを測定する
回転計と打設管の深度を測定する深度計とを設け、前記
打設管にドレーン材を貫通しその先端にアンカーを付設
して打設管に係止し、打設管と共にドレーン材を土中に
貫入し、所定残置深度に達し打設管引抜きを開始する際
にアンカーの残置を検出する引抜開始時残置確認工程
と、引抜き時にドレーン材の残置を検出する引抜時残置
確認工程とを有している。
According to the drain casting method of the present invention, the drain material is engaged with the casting pipe and penetrates into the soil, leaving the drain material at a predetermined remaining depth. In the drain casting method, a tachometer for rotating the drain material in contact with the drain material and measuring the feed length and the return length of the drain material and a depth gauge for measuring the depth of the casting pipe are provided. When penetrating the drain material into the pipe, attaching an anchor to its tip and locking it to the casting pipe, penetrating the drain material together with the casting pipe into the soil, reaching the predetermined residual depth and starting pulling out the casting pipe The method includes a removal confirmation process at the time of drawing start for detecting the anchor remaining, and a drawing removal remaining confirmation process for detecting the drain material at the time of drawing.

【0007】そして、前記引抜開始時残置確認工程は打
設管の先端にアンカーを検出するセンサーを設け、打設
管引抜きを開始してもアンカーを検出し続けた場合にア
ンカー共上りと判断するようになっている。
In the pull-out start remaining confirmation step, a sensor for detecting an anchor is provided at the tip of the casting pipe, and it is determined that the anchor is going up when the anchor continues to be detected even after starting the pull-out of the casting pipe. It has become.

【0008】また、前記引抜時残置確認工程は前記深度
計による打設管深度と回転計によるドレーン材の送り長
さ及び戻り長さとからドレーン材共上りを判断するよう
になっている。
In the pulling-out remaining confirmation step, the drain material coupling is determined from the driving pipe depth by the depth meter and the feed length and return length of the drain material by the tachometer.

【0009】また、引抜開始時残置確認工程でのアンカ
ーの共上りまたは引抜時残置確認工程でのドレーン材の
共上りを検知したら引抜きを中止し、打設管先端のセン
サーがアンカーを検出するまでドレーン材と打設管とを
相対的に移動させ(ドレーン材を巻き戻してもよく或い
は打設管をさらに貫入してもよく、または両者と併用し
てもよい)、その時点から打設管を引抜き開始深度まで
再貫入し、再度打設管引抜きを開始するようになってい
る。
[0009] Further, when the rise of the anchor in the pulling start residual confirmation step or the rise of the drain material in the pulling residual confirmation step is detected, the drawing is stopped and the sensor at the tip of the casting pipe detects the anchor. The drain material and the casting pipe are relatively moved (the drain material may be unwound, the casting pipe may be further penetrated, or both may be used together), and from that point on, the casting pipe may be used. Is re-penetrated to the drawing starting depth, and the drawing of the casting pipe is started again.

【0010】本発明のドレーン打設装置によれば、ドレ
ーン材を打設管に係止して土中に貫入し、そのドレーン
材を所定残置深度に残して打設管を引抜くドレーン打設
装置において、ドレーン材に接触回転してそのドレーン
材の送り長さ及び戻り長さを測定する回転計と打設管の
深度を測定する深度計とを設け、前記ドレーン材は打設
管を貫通しその先端にアンカーを付設して打設管に係止
しており、打設管の先端にセンサーを設けて打設管引抜
き開始時にアンカーの残置を検出する引抜開始時残置確
認手段と、前記回転計と深度計との測定値から引抜時の
ドレーン材残置を検出する引抜時残置確認手段とを設け
ている。
According to the drain casting apparatus of the present invention, the drain casting is performed by locking the drain material into the casting pipe and penetrating into the soil, and pulling out the casting pipe while leaving the drain material at a predetermined remaining depth. In the apparatus, there is provided a tachometer for measuring the feed length and the return length of the drain material in contact with the drain material to rotate, and a depth gauge for measuring the depth of the casting pipe, wherein the drain material penetrates the casting pipe. An anchor is attached to the tip of the casting pipe and locked to the casting pipe, and a sensor is provided at the tip of the casting pipe to detect a remaining anchor at the time of starting the casting pipe withdrawal. There is provided a withdrawal-residual confirmation means for detecting the drain material withdrawal at the time of withdrawal from the measured values of the tachometer and the depth gauge.

【0011】したがって、本発明によれば、深度計から
の深度データ、回転計からのドレーン材の残置長、セン
サーのアンカー検知による引抜開始時の共上り発生の有
無、及び深度計と回転計とによる深度及び残置長から引
抜時の共上り発生の有無の各項目を管理してファイバー
ドレーン打設が施工され、共上り発生の場合は再打設が
行われて確実に所定残置深度にドレーン材の打設が行わ
れる。
Therefore, according to the present invention, the depth data from the depth gauge, the remaining length of the drain material from the tachometer, the presence / absence of co-occurrence at the time of starting pulling out by the sensor detection of the anchor, and the depth meter and the tachometer Fiber draining is performed by managing each item of whether or not co-incidence occurs at the time of pulling out from the depth and remaining length by pulling, and if co-occurrence occurs, re-driving is performed and drain material is surely kept at the specified remaining depth Is performed.

【0012】本発明で使用されるドレーン材は任意であ
り、合成樹脂の板状体、細長い繊維物質の帯状体等が通
常用いられている。
The drain material used in the present invention is optional, and a plate-like body of a synthetic resin, a belt-like body of an elongated fibrous substance, and the like are usually used.

【0013】[0013]

【発明の実施の形態】以下、図面を参照して本発明の実
施形態をファイバードレーンを用いた場合について説明
する。図1において、打設機10によって地盤Gに打設
される打設管2にはファイバードレーン材1が貫通さ
れ、そのファイバードレーン材1の先端にはアンカー3
が付設されている。したがって、打設管2の土中への打
設方向に対してファイバードレーン材1はアンカー3に
よって係止され、また、打設管2の先端にはセンサー5
が設けられて被感知材であるアンカー3の存在が検知さ
れている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The embodiments of the present invention will be described below with reference to the drawings, in which a fiber drain is used. In FIG. 1, a fiber drain material 1 penetrates a casting pipe 2 that is driven into a ground G by a driving machine 10, and an anchor 3 is attached to a tip of the fiber drain material 1.
Is attached. Therefore, the fiber drain material 1 is locked by the anchor 3 in the direction of the casting of the casting pipe 2 into the soil.
Is provided to detect the presence of the anchor 3 which is the material to be detected.

【0014】また、打設機10にはファイバードレーン
材1の他端側が折畳まれて積載されており、リール1
5、テンションローラ16及び回転計11を介して打設
管2へ垂下されている。そして図示のように回転計11
はドレーン材1の送りガイド用ローラ−に装着され、ロ
ーラの回転からドレーン材1の送り長さ及び戻り長さを
検出する。なお、ローラには例えば歯等を設けてスリッ
プを防止するのが好ましい。そしてテンションローラ1
6はドレーン材1を側方から押圧して張力を付加し、ま
たローラの動きからドレーン材1の共上りを検出するこ
ともできる。さらに打設管2を連結するワイヤ7の送り
から打設管2の深度を計測する深度計12が設けられて
いる。
The other end of the fiber drain material 1 is folded and loaded on the driving machine 10, and the reel 1
5, hanging down to the casting pipe 2 via the tension roller 16 and the tachometer 11. Then, as shown in FIG.
Is attached to a feed guide roller of the drain material 1 and detects a feed length and a return length of the drain material 1 from rotation of the roller. It is preferable that the rollers are provided with, for example, teeth to prevent slippage. And tension roller 1
Numeral 6 applies the tension by pressing the drain material 1 from the side, and it is also possible to detect the rise of the drain material 1 from the movement of the roller. Further, a depth gauge 12 for measuring the depth of the casting pipe 2 from the feed of the wire 7 connecting the casting pipe 2 is provided.

【0015】そして打設機10上には、ドレーン材の残
置深度、残置長、共上り発生の有無等のデータを収集し
管理する管理装置20が搭載されている。
On the placing machine 10, there is mounted a management device 20 for collecting and managing data such as the remaining depth of the drain material, the remaining length, and the presence / absence of a rise.

【0016】次に、図3には、引抜開始時残置確認手段
21の構成を示すブロック図が示されている。打設管2
の先端に設けられたセンサー5から共上り判定手段24
に信号が送られて共上り有無を判定しており、共上り有
と判定した場合には再打設手段23に出力して引抜開始
時のドレーン材残置を確認管理している。
Next, FIG. 3 is a block diagram showing the structure of the pulling-out start remaining confirmation means 21. As shown in FIG. Casting pipe 2
From the sensor 5 provided at the tip of the
To determine whether there is a rise, and when it is determined that there is a rise, the signal is output to the re-laying means 23 to check and manage the remaining drain material at the time of starting the drawing.

【0017】すなわち、引抜き開始に際し、アンカー3
が打設管2から離れた瞬間にセンサー5からオフ信号が
発信され、共上りを発生することなくアンカー3が地中
に残置ったことが確認でき、打設管2の引抜きが開始さ
れてもセンサー5がアンカー3の存在を検知してオン信
号が発信され続けた場合は、共上りが発生しており、た
だちに再打設の対応がとられる。
That is, at the start of pulling, the anchor 3
At the moment when the rod 3 is separated from the casting pipe 2, an off signal is transmitted from the sensor 5, and it can be confirmed that the anchor 3 has been left in the ground without generating a rise and the pulling out of the casting pipe 2 is started. Also, when the sensor 5 detects the presence of the anchor 3 and the ON signal is continuously transmitted, a co-up has occurred, and a response to re-installation is taken immediately.

【0018】また、センサー5は、後記のドレーン材巻
き戻しの際にも巻き戻し終了の検出に使用される。
The sensor 5 is also used to detect the completion of rewinding in the later-described rewinding of the drain material.

【0019】そして、図4には、引抜時残置確認手段2
2の構成を示すブロック図が示されている。打設機10
に装備された回転計11と深度計12とから共上り判定
手段25へ出力されており、引抜開始時残置確認手段2
1でアンカー3の残置が確認できた時点から回転計11
によるドレーン材1の送り長さと戻り長さとから残置長
を求めて連続的に管理し、その残置長と深度計12のデ
ータとで共上りの有無の判定を連続的に行っている。そ
して、共上り発生が検知されると再打設手段23へ出力
される。
FIG. 4 shows a residual check means 2 at the time of extraction.
2 is a block diagram showing the configuration of FIG. Casting machine 10
Is output from the tachometer 11 and the depth gauge 12 provided to the co-up determination means 25, and the residual confirmation means 2 at the time of starting the drawing.
The tachometer 11 starts from the time when the remaining anchor 3 is confirmed in 1.
The remaining length is obtained from the feed length and the return length of the drain material 1 and continuously managed, and the determination of the presence / absence of co-up is continuously performed based on the remaining length and the data of the depth gauge 12. Then, when the occurrence of rising is detected, it is output to the re-placement means 23.

【0020】次に、図2のフローチャートによって本発
明の工程を説明する。まず、ステップS1にて所定値で
ある設計残置深度を設定して管理装置20に記憶し、そ
して貫入を開始し、深度計12の測定によりリアルタイ
ムで打設深度を表示する(ステップS2)。次に、ステ
ップS3で設計残置深度に達しているか判定し、Noで
あればステップS2に戻り、Yesになったらステップ
S4に進む。
Next, the steps of the present invention will be described with reference to the flowchart of FIG. First, in step S1, a design remaining depth, which is a predetermined value, is set and stored in the management device 20, and then the penetration is started, and the driving depth is displayed in real time by the measurement of the depth gauge 12 (step S2). Next, it is determined in step S3 whether or not the design remaining depth has been reached. If No, the process returns to step S2, and if Yes, the process proceeds to step S4.

【0021】ステップS4では設計残置深度に達したこ
とを例えば警報手段でオペレータに知らせ、実測残置深
度を記録する。次にステップS5で必要残置長を記憶
し、残置長の検出を開始する。そして打設管2の引抜き
を開始し(ステップS6)、引抜開始時残置確認手段2
1でアンカー3の残置を確認し(ステップS7)、NG
であればステップS13に進み、OKであればステップ
S8に進む。
In step S4, the operator is notified that the design remaining depth has been reached, for example, by alarm means, and the measured remaining depth is recorded. Next, in step S5, the necessary remaining length is stored, and detection of the remaining length is started. Then, the pulling out of the casting pipe 2 is started (step S6), and the remaining confirmation means 2 at the time of starting the pulling out.
1 to confirm the remaining anchor 3 (step S7), NG
If yes, go to step S13; if OK, go to step S8.

【0022】ステップS8では深度計12の測定により
リアルタイムで引抜深度を表示し、ステップS9に進
み、引抜時残置確認手段22で残置長を満足しているか
(共上り有無を)逐次判定し、NGであればステップS
13に進み、OKであればステップS10に進む。そし
て、ステップS10では残置長を満足していることを表
示し、ステップS11で必要残置長に達したか判定し、
NoであればステップS8に戻り、Yesであればステ
ップS12に進んで必要残置長の達成をオペレータに知
らせて打設作業を終了する。
In step S8, the withdrawal depth is displayed in real time by the measurement of the depth gauge 12, and the flow advances to step S9. The withdrawal-remaining confirmation means 22 sequentially determines whether or not the remaining length is satisfied (whether or not co-up), and NG. If so, step S
The process proceeds to step S13, and if OK, the process proceeds to step S10. Then, at step S10, it is displayed that the remaining length is satisfied, and at step S11, it is determined whether or not the required remaining length has been reached,
If No, the process returns to Step S8. If Yes, the process proceeds to Step S12, where the operator is notified that the required remaining length has been achieved, and the casting operation is completed.

【0023】また、ステップS13に進んだ場合は、後
記の再打設工程に進んで設計残置深度や又はそれよりも
深い位置まで打戻してステップS4にもどる。
When the process proceeds to step S13, the process proceeds to the re-installation process described later, and the process returns to the design remaining depth or a position deeper than that, and returns to step S4.

【0024】再打設工程は図5にフローチャートで示さ
れている。前記ステップS7またはS9で共上り発生が
検出されると(ステップS21)、打設管2の引抜きを
停止する(ステップS22)。そしてステップS23で
ドレーン材1の巻き戻しを行い、ステップS24でセン
サー5がアンカー3を検出したか判定し、Noであれば
ステップS23に戻る。Yesであれば、アンカー3が
打設管2の先端まで巻き戻されているのでドレーン材1
の巻戻しを停止し(ステップS25)、ステップS26
に進み再貫入を開始する。そして、ステップS27で引
抜開始深度である所定残置深度に達したか判定し、No
であればステップS26に戻り、Yesであれば図1の
ステップS4に戻って再度打設管2の引抜きを行う。な
お、本発明の実施に際して陸上における埋立地のドレー
ン材の打設について説明したが水底の軟弱地盤の改良に
際しても同様に実施できることは明らかである。
The recasting process is shown in the flowchart of FIG. When the occurrence of the upward climb is detected in step S7 or S9 (step S21), the drawing of the casting pipe 2 is stopped (step S22). Then, in step S23, the drain material 1 is rewound. In step S24, it is determined whether the sensor 5 has detected the anchor 3, and if No, the process returns to step S23. If Yes, the drain material 1 is used because the anchor 3 has been rewound to the tip of the casting pipe 2.
Is stopped (step S25), and step S26 is stopped.
Proceed to start re-penetration. Then, in step S27, it is determined whether or not a predetermined remaining depth, which is the drawing start depth, has been reached.
If it is, the procedure returns to step S26, and if Yes, the procedure returns to step S4 in FIG. 1 to pull out the casting pipe 2 again. Although the practice of the present invention has been described with respect to the placement of drain materials in landfills on land, it is apparent that the same can be practiced when improving soft ground on the water floor.

【0025】[0025]

【発明の効果】本発明は以上説明したように構成され、
打設管の引抜開始時及び引抜時にドレーン材の残置が確
認され、共上りが検出された場合は再打設が行われて確
実に所定残置深度にドレーン材が打設され、この間の各
工程は一貫して管理されて確実に施工できる。
The present invention is configured as described above,
At the start and at the time of pulling out of the casting pipe, it is confirmed that the drain material remains, and if a rise is detected, re-placement is performed and the drain material is reliably driven to a predetermined remaining depth. Can be managed consistently and reliably.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明のファイバードレーン打設装置の全体構
成図。
FIG. 1 is an overall configuration diagram of a fiber drain driving device of the present invention.

【図2】本発明のファイバードレーン打設工法のフロー
チャート図。
FIG. 2 is a flowchart of a fiber drain driving method according to the present invention.

【図3】引抜開始時残置確認手段の構成を示すブロック
図。
FIG. 3 is a block diagram illustrating a configuration of a withdrawal start remaining confirmation unit.

【図4】引抜時残置確認手段の構成を示すブロック図。FIG. 4 is a block diagram showing a configuration of a withdrawal remaining confirmation unit.

【図5】再打設高低を示すフローチャート図。FIG. 5 is a flowchart showing the height of re-placement.

【符号の説明】[Explanation of symbols]

1・・・ファイバードレーン材 2・・・打設管 3・・・アンカー 5・・・センサー 10・・・打設機 11・・・回転計 12・・・深度計 15・・・リール 16・・・テンションローラ DESCRIPTION OF SYMBOLS 1 ... Fiber drain material 2 ... Casting pipe 3 ... Anchor 5 ... Sensor 10 ... Casting machine 11 ... Tachometer 12 ... Depth gauge 15 ... Reel 16 ..Tension rollers

───────────────────────────────────────────────────── フロントページの続き (72)発明者 磯 田 知 広 千葉県千葉市花見川区朝日ケ丘町3273−2 −15−102 Fターム(参考) 2D043 DA09 DC14 DC15  ────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Tomohiro Isoda 3273-2-15-102 Asahigaoka-cho, Hanamigawa-ku, Chiba-shi, Chiba F-term (reference) 2D043 DA09 DC14 DC15

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 ドレーン材を打設管に係止して土中に貫
入し、そのドレーン材を所定残置深度に残して打設管を
引抜くドレーン打設工法において、ドレーン材に接触回
転してそのドレーン材の送り長さ及び戻り長さを測定す
る回転計と打設管の深度を測定する深度計とを設け、前
記打設管にドレーン材を貫通しその先端にアンカーを付
設して打設管に係止し、打設管と共にドレーン材を土中
に貫入し、所定残置深度に達し打設管引抜きを開始する
際にアンカーの残置を検出する引抜開始時残置確認工程
と、引抜き時にドレーン材の残置を検出する引抜時残置
確認工程とを有していることを特徴とするドレーン打設
工法。
1. A drain casting method in which a drain material is engaged with a casting pipe and penetrates into the soil, and the drain material is pulled out while leaving the drain material at a predetermined remaining depth. A tachometer for measuring the feed length and return length of the drain material and a depth gauge for measuring the depth of the casting pipe are provided, and the drain material is penetrated through the casting pipe and an anchor is attached to the tip thereof. A pull-out start-residue confirmation process that locks to the cast-in pipe, penetrates the drain material together with the cast-in pipe into the soil, and detects the remaining anchor when the cast-out pipe starts to reach a predetermined remnant depth. A drain placement method, which sometimes includes a step of confirming the remaining of the drain material at the time of drawing.
【請求項2】 前記引抜開始時残置確認工程は打設管の
先端にアンカーを検出するセンサーを設け、打設管引抜
きを開始してもアンカーを検出し続けた場合にアンカー
共上りと判断する工程である請求項1に記載のドレーン
打設工法。
2. The pulling start start remaining confirmation step is provided with a sensor for detecting an anchor at the tip of the casting pipe, and if the anchor continues to be detected even after starting the pulling of the casting pipe, it is determined that the anchor is going up. The draining method according to claim 1, which is a step.
【請求項3】 前記引抜時残置確認工程は前記深度計に
よる打設管深度と回転計によるドレーン材の送り長さ及
び戻り長さとからドレーン材共上りを判断する工程であ
る請求項1または2に記載のドレーン打設工法。
3. The method according to claim 1, wherein the step of confirming the remaining at the time of pulling out is a step of judging whether the drain material rises from the casting pipe depth by the depth gauge and the feed length and return length of the drain material by the tachometer. Draining method described in 4.
【請求項4】 引抜開始時残置確認工程でのアンカーの
共上りまたは引抜時残置確認工程でのドレーン材の共上
りを検知したら引抜きを中止し、打設管先端のセンサー
がアンカーを検出するまでドレーン材と打設管とを相対
的に移動させ、その時点から打設管を引抜き開始深度ま
で再貫入し、再度打設管引抜きを開始する工程である請
求項1ないし3のいずれかに記載のドレーン打設工法。
4. When the rise of the anchor in the removal confirmation process at the start of drawing or the rise of the drain material in the removal confirmation process at the time of removal is detected, the drawing is stopped and the sensor at the tip of the casting pipe detects the anchor. 4. The process according to claim 1, further comprising the step of relatively moving the drain material and the casting pipe, re-penetrating the casting pipe to a drawing start depth from that point, and starting drawing of the casting pipe again. Drain construction method.
【請求項5】 ドレーン材を打設管に係止して土中に貫
入し、そのドレーン材を所定残置深度に残して打設管を
引抜くドレーン打設装置において、ドレーン材に接触回
転してそのドレーン材の送り長さ及び戻り長さを測定す
る回転計と打設管の深度を測定する深度計とを設け、前
記ドレーン材は打設管を貫通しその先端にアンカーを付
設して打設管に係止しており、打設管の先端にセンサー
を設けて打設管引抜き開始時にアンカーの残置を検出す
る引抜開始時残置確認手段と、前記回転計と深度計との
測定値から引抜時のドレーン材残置を検出する引抜時残
置確認手段とを設けたことを特徴とするドレーン打設装
置。
5. A drain casting device for locking a drain material into a casting pipe to penetrate into the soil and pulling out the casting pipe while leaving the drain material at a predetermined remaining depth. A tachometer for measuring the feed length and return length of the drain material and a depth gauge for measuring the depth of the casting pipe are provided, and the drain material penetrates the casting pipe and has an anchor attached to the tip thereof. It is locked to the casting pipe, a sensor is provided at the tip of the casting pipe to detect the remaining anchor at the time of starting the pulling of the casting pipe. A drain placement device for detecting a drain material remaining at the time of pulling out of the drainage device.
JP10342790A 1998-12-02 1998-12-02 Drain casting method and device Expired - Fee Related JP3139706B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10342790A JP3139706B2 (en) 1998-12-02 1998-12-02 Drain casting method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10342790A JP3139706B2 (en) 1998-12-02 1998-12-02 Drain casting method and device

Publications (2)

Publication Number Publication Date
JP2000160544A true JP2000160544A (en) 2000-06-13
JP3139706B2 JP3139706B2 (en) 2001-03-05

Family

ID=18356527

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10342790A Expired - Fee Related JP3139706B2 (en) 1998-12-02 1998-12-02 Drain casting method and device

Country Status (1)

Country Link
JP (1) JP3139706B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013096217A (en) * 2011-11-07 2013-05-20 Toa Harbor Works Co Ltd Installation device of drain member and installation method of drain member
JP5602965B1 (en) * 2014-02-18 2014-10-08 株式会社不動テトラ Extension device for ground improvement and ground improvement device
KR101575751B1 (en) 2014-03-14 2015-12-09 윤성순 The Measurement Apparatus and Method Measuring the Depth of the Ground that has been Drilled Using a Mandrel Perforating Apparatus

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013096217A (en) * 2011-11-07 2013-05-20 Toa Harbor Works Co Ltd Installation device of drain member and installation method of drain member
JP5602965B1 (en) * 2014-02-18 2014-10-08 株式会社不動テトラ Extension device for ground improvement and ground improvement device
KR101575751B1 (en) 2014-03-14 2015-12-09 윤성순 The Measurement Apparatus and Method Measuring the Depth of the Ground that has been Drilled Using a Mandrel Perforating Apparatus

Also Published As

Publication number Publication date
JP3139706B2 (en) 2001-03-05

Similar Documents

Publication Publication Date Title
JP3437108B2 (en) Management method of ground improvement method and management device of ground improvement machine
US8956083B2 (en) Method and apparatus for injecting material into soil
JP3139706B2 (en) Drain casting method and device
JP2004270212A (en) Execution management device of pile driving method
JP3583307B2 (en) Construction management system in ground improvement method
JP3675164B2 (en) Support ground position detection method and support ground position detection device for ground improvement machine
JP2869604B2 (en) Top measuring device for cast concrete
CN212896513U (en) Hole bottom sediment thickness measuring device after secondary hole cleaning during cast-in-place pile construction
JPS6145917A (en) Measuring device for subsidence of ground
JP3205697B2 (en) AE generation position measuring device
JP2018131735A (en) Construction status confirmation method for high pressure jet agitation work, method for creating soil improvement body using the same, and construction status information measuring device for high pressure jet agitation work
JPS61246417A (en) Monitoring/management device for paper drain driving work
JP3188424B2 (en) Filling device and filling method for backfilling tunnel
JP3002075B2 (en) Excavator rope replacement alarm
JP2002155526A (en) Method of managing drive stop of board drain, and board drain constructing machine
JP3405656B2 (en) Ground improvement equipment
JPS6323466Y2 (en)
Karunaratne et al. Installation stress in prefabricated vertical drains
CN219244669U (en) CFG pile machine construction parameter monitored control system
JPH018582Y2 (en)
JPH0714418Y2 (en) Improved ground sampling device
JPH0532532B2 (en)
JP3326731B2 (en) Injection pressure measuring device
JP2009221662A (en) Excavation data management system for all-casing construction method
JPH06128958A (en) Measuring equipment for top end of placed concrete

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091215

Year of fee payment: 9

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091215

Year of fee payment: 9

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091215

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101215

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101215

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111215

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111215

Year of fee payment: 11

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111215

Year of fee payment: 11

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111215

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121215

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121215

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131215

Year of fee payment: 13

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees