JP2000153506A - Apparatus for manufacture of frame and manufacture of frame using it - Google Patents

Apparatus for manufacture of frame and manufacture of frame using it

Info

Publication number
JP2000153506A
JP2000153506A JP10328584A JP32858498A JP2000153506A JP 2000153506 A JP2000153506 A JP 2000153506A JP 10328584 A JP10328584 A JP 10328584A JP 32858498 A JP32858498 A JP 32858498A JP 2000153506 A JP2000153506 A JP 2000153506A
Authority
JP
Japan
Prior art keywords
frame
nailing
transport
temporarily assembled
members
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10328584A
Other languages
Japanese (ja)
Other versions
JP3999381B2 (en
Inventor
Masaaki Nojima
正明 野島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP32858498A priority Critical patent/JP3999381B2/en
Publication of JP2000153506A publication Critical patent/JP2000153506A/en
Application granted granted Critical
Publication of JP3999381B2 publication Critical patent/JP3999381B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide an apparatus for manufacturing a frame capable of conducting a shop assembly and a nailing work in the case of manufacturing the frame for a wooden panel, and of assembling and nailing the frame without taking space. SOLUTION: The apparatus 100 for manufacturing a frame assembled in a square frame state with lateral and longitudinal sash bars comprises a shop assembling device 8 for shop assembling the frame by assembling the lateral and longitudinal bars, a nailing unit 9A for striking nails from a side end face of the shop assembled frame to connect the bars perpendicularly disposed, and a conveyor 9B for conveying the frame shop assembled by the assembling device 8 to the unit 9A. In this case, the assembling device 8 is provided above the conveyor 9B.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、縦横の框材によっ
て矩形枠状に組まれた枠体と、この枠体の内部に少なく
とも横方向に組まれて配設された棧材とからなる木製パ
ネル用枠組の枠体製造装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a wooden frame comprising a frame framed in a rectangular frame shape by vertical and horizontal frame members, and a support member arranged at least in a horizontal direction inside the frame frame. The present invention relates to a frame manufacturing apparatus for a panel frame.

【0002】[0002]

【背景の技術】一般に、木質系のプレハブ住宅等にあっ
ては、壁や床あるいは屋根等を、合板等からなる木製パ
ネルによって施工する手段が実施されている。このよう
なプレハブ住宅の施工に適用される木製パネルPとして
は、例えば図19に示すような構造のものがある。この
木製パネルPは、縦框及び横框を構成する縦横の棧材
(框材)1、2によって四角枠状に組まれた枠体3の内
側に縦、横に延在する縦横の棧材4、5を配して枠組6
とし、さらに、これら縦横の棧材4、5と縦横の框材
1、2に囲まれた内部にグラスウール等の断熱材(図示
略)を充填するとともに、上記枠組6の表裏両面もしく
は片面(図においては片面)に、それぞれ合板からなる
面材7、7を貼設したものである。
2. Description of the Related Art Generally, in a wooden prefabricated house or the like, means for constructing a wall, a floor, a roof or the like with a wooden panel made of plywood or the like is implemented. As a wooden panel P applied to the construction of such a prefabricated house, for example, there is one having a structure as shown in FIG. The wooden panel P is vertically and horizontally extended inside a frame body 3 formed into a rectangular frame by vertical and horizontal members (frame members) 1 and 2 constituting vertical and horizontal frames. 4 and 5 are arranged and framework 6
Further, the inside surrounded by the vertical and horizontal supporting members 4 and 5 and the vertical and horizontal frame members 1 and 2 is filled with a heat insulating material (not shown) such as glass wool, and the front and back surfaces or one surface (see FIG. , One surface of the plywood).

【0003】従来、木製パネルPに用いられている上記
枠組6を製造する枠組製造装置としては、例えば、特開
平7−329021号に開示の枠組製造装置がある。こ
の枠組製造装置は、製造すべき枠組6の縦の框材1及び
棧材4に沿ってそれぞれ設けられ、かつ、仮組みされた
枠組6(框材1、2及び棧材4、5が釘等により接合さ
れていない状態の枠組6)を搬送する搬送路を有する搬
送装置と、該搬送装置に搬送される仮組みされた枠組6
の框材1、2及び棧材4、5を釘打ちして互いに接合す
る釘打ち装置とを備えている。
Conventionally, as a frame manufacturing apparatus for manufacturing the above-mentioned frame 6 used for the wooden panel P, for example, there is a frame manufacturing apparatus disclosed in JP-A-7-329021. This frame manufacturing apparatus is provided along a vertical frame member 1 and a frame member 4 of a frame 6 to be manufactured, and a temporarily assembled frame member 6 (the frame members 1 and 2 and the group members 4 and 5 are nailed). And a transport device having a transport path for transporting the framework 6) that is not joined by the transport device, and the temporarily assembled framework 6 transported to the transport device.
And a nailing device for nailing the frame members 1 and 2 and the supporting members 4 and 5 and joining them together.

【0004】[0004]

【発明が解決しようとする課題】ところで、上記公報に
開示の枠組製造装置は、釘を打つ前に、上記搬送装置の
搬送路で框材1、2及び棧材4、5からなる枠組の仮組
を行ってから上記釘打ち装置に搬送するものであり、上
記釘打ち装置に枠組を搬送する搬送路上で仮組を行うの
で、該搬送路で仮組みされた枠組を釘打ち機に搬送して
いる間は、仮組を行うことが出来ず、生産能率が下がっ
てしまう。また、搬送路上で仮組を行ない、該搬送路に
より仮組みされた枠組6を上記釘打ち装置に搬送して枠
組を製造しているので、上記搬送路上で枠組を仮組をす
るスペースと、仮組みされた枠組を上記釘打ち装置に搬
送するスペースとが必要となり、その分広い作業スペー
スが必要となる。この枠組製造装置が占めるスペースを
コンパクトにすることができれば、工場などにおいて、
その分作業空間を広く取ることが可能となり、他の作業
を行いやすくなる。
By the way, the frame manufacturing apparatus disclosed in the above-mentioned gazette has a structure in which the frame including the frame members 1 and 2 and the supporting members 4 and 5 is temporarily moved in the conveying path of the conveying device before nailing. The assembly is performed and then transported to the nailing device.Since the temporary assembly is performed on a transport path that transports the framework to the nailing device, the temporarily assembled frame is transported to the nailing machine on the transport path. During this time, the temporary assembly cannot be performed, and the production efficiency decreases. Further, since the temporary assembly is performed on the transport path, and the frame 6 temporarily assembled by the transport path is transported to the nailing device to manufacture the framework, a space for temporarily assembling the frame on the transport path, A space for transporting the temporarily assembled framework to the nailing device is required, and a large work space is required accordingly. If the space occupied by this framework manufacturing device can be made compact,
The work space can be widened accordingly, and other work can be easily performed.

【0005】本発明は、上記事情に鑑みてなされたもの
であり、特に、木製パネル用枠体を製造する際の仮組作
業と釘打ち作業とを並行して行うことが出来るととも
に、スペースをとらずに、枠体の仮組および釘打ちを行
うことができる枠体製造装置を提供することを目的とす
るものである。
The present invention has been made in view of the above circumstances, and in particular, a temporary assembling operation and a nailing operation when manufacturing a wooden panel frame can be performed in parallel, and a space is saved. It is an object of the present invention to provide a frame manufacturing apparatus capable of performing temporary assembly and nailing of a frame without taking the same.

【0006】[0006]

【課題を解決するための手段】以上の課題を解決すべく
請求項1記載の発明は、例えば、図1に示すように、縦
横の棧材によって四角枠状に組まれた枠体を製造する枠
体製造装置100であって、上記縦横の棧材1,2を組
んで上記枠体の仮組みを行う仮組装置8と、仮組みされ
た上記枠体3の側端面から釘を打ち込むことで直角に配
置された棧材どうしを接合する釘打ち装置9Aと、上記
仮組装置8で仮組みされた上記枠体を上記釘打ち装置9
Aに搬送する搬送装置9Bとを具備してなり、上記仮組
装置8は上記搬送装置9Bの上部に設けられているもの
である。
According to the first aspect of the present invention, as shown in FIG. 1, for example, as shown in FIG. 1, a frame body which is assembled into a rectangular frame by vertical and horizontal members is manufactured. A frame manufacturing apparatus 100 for temporarily assembling the vertical and horizontal supporting members 1 and 2 and temporarily assembling the frame, and driving nails from side end surfaces of the temporarily assembled frame 3; A nailing device 9A for joining the members arranged at right angles with each other, and the frame body temporarily assembled by the temporary assembling device 8 to the nailing device 9
A, and a temporary assembling device 8 is provided above the transport device 9B.

【0007】上記枠体は縦横の棧材(例えば、框材)
1,2により四角枠状に組まれていればどの様に構成さ
れていてもよく、例えば、その内部に棧材を縦や横方向
に棧材を配設して枠組とした構成も含む。上記搬送装置
9Bは、仮組みされた枠体3を釘打ち装置9Aに輸送す
るものであるならば、どの様に構成されていてもよく、
例えば、ベルトコンベアや、搬送方向に沿って周回する
ベルトまたは搬送チェーンなどを一組平行に離間して配
置し、これら一組のベルトや搬送チェーンのそれぞれに
掛け渡すように仮組みされた枠体を設置する構成する等
である。このような構成の場合、離間して配置されたこ
れらベルトや搬送チェーンの間隔を変更可能に構成する
と、仮組みされた枠体の大きさに対応することができ
る。
[0007] The frame body is a vertical and horizontal material (for example, a frame material)
Any structure may be used as long as it is assembled in a rectangular frame shape by 1 and 2. For example, a structure in which the material is arranged vertically and horizontally in the inside to form a frame is also included. The transporting device 9B may have any configuration as long as it transports the temporarily assembled frame 3 to the nailing device 9A.
For example, a belt conveyor, a belt or a transport chain that circulates in the transport direction, and a set of parallel spaced apart sets, and a frame body temporarily assembled so as to extend over each of the set of belts and the transport chain And so on. In the case of such a configuration, if the interval between these belts and transport chains that are arranged apart can be changed, it is possible to correspond to the size of the temporarily assembled frame.

【0008】上記釘打ち装置9Aは、上記枠体の側端面
から釘を打ち込んで直角に配置された棧材どうしを接合
するものであり、この釘打ち装置により少なくとも四角
枠状に組まれた縦横の棧材1,2は隣接する棧材にそれ
ぞれ接合された状態となる。上記仮組装置8は上記搬送
装置9Bの上部に配置されているものであるならば、ど
のように構成されていてもよい。
[0008] The nailing device 9A is for driving nails from the side end surfaces of the frame body and joining the members arranged at right angles to each other. The nailing device 9A is vertically and horizontally assembled in at least a rectangular frame shape. The first and second support members are joined to the adjacent support members, respectively. The temporary assembling device 8 may have any configuration as long as it is disposed above the transport device 9B.

【0009】この枠体製造装置100では、上記仮組装
置8において縦横の棧材1,2を四角枠状に組んで枠体
3の仮組を行い、この仮組みされた枠体3が上記仮組装
置8の下部の上記搬送装置9Bにより上記釘打ち装置9
Aに輸送され、仮組みされた上記枠体3の側端面から釘
を打ち込むことで直角に配置された棧材どうしを接合し
て枠体を製造することができる。
In the frame manufacturing apparatus 100, the temporary assembling device 8 assembles the vertical and horizontal supporting members 1 and 2 into a rectangular frame to form a temporary assembly of the frame 3, and the temporarily assembled frame 3 is The nailing device 9 is moved by the transfer device 9B below the temporary assembly device 8.
By transporting the nails from the side end surfaces of the frame body 3 which has been transported to A and temporarily assembled, the frame members can be manufactured by joining the members arranged at right angles to each other.

【0010】上記のような請求項1記載の枠体製造装置
100によれば、上記仮組装置8で仮組みされた上記枠
体3を上記釘打ち装置9Aに搬送する搬送装置9Bが上
記仮組装置8の下部に設けられているので、仮組を行う
スペースを別に確保する必要がないので、工場などにお
いて、作業空間を、その分広くすることができる。
According to the frame manufacturing apparatus 100 of the first aspect, the transport device 9B for transporting the frame 3 temporarily assembled by the temporary assembling device 8 to the nailing device 9A includes the temporary device 9B. Since it is provided at the lower part of the assembling device 8, it is not necessary to secure a separate space for performing the temporary assembling.

【0011】また、上記搬送装置9Bにより仮組された
上記枠体を釘打ち装置9Aに搬送し、該釘打ち装置9A
により、仮組みされた上記枠体の側端面から釘を打ち込
むことで直角に配置された棧材どうしを接合している際
に、上部の仮組装置8で、別の枠体の仮組を行うことが
できる。このように枠体の仮組と釘打ちを同時に行うこ
とができるので枠体を製造する際の生産性の向上を図る
ことができる。
Further, the frame temporarily assembled by the transfer device 9B is transferred to the nailing device 9A, and the nailing device 9A
By joining nails arranged at right angles by driving a nail from the side end surface of the temporarily assembled frame body, a temporary assembly of another frame body is performed by the temporary assembly apparatus 8 on the upper side. It can be carried out. Since the temporary assembly of the frame and the nailing can be performed at the same time, productivity in manufacturing the frame can be improved.

【0012】請求項2記載の発明は、請求項1記載の枠
体製造装置において、例えば、図2に示すように、上記
仮組装置8には、仮組みされた上記枠体を仮組みされた
状態で下部の搬送装置9Bに移送する移送手段10が設
けられているものである。
According to a second aspect of the present invention, in the frame manufacturing apparatus according to the first aspect, for example, as shown in FIG. 2, the temporarily assembled frame is temporarily assembled in the temporary assembling device 8. In this state, a transfer means 10 is provided for transferring the sheet to the lower transfer device 9B in a state in which the transfer device 9B is in a lowered state.

【0013】移送手段10は、仮組みされた上記枠体を
仮組みされた状態で下部の上記搬送装置9Bに移送する
ものであれば、どのように構成されていてもよく、例え
ば、上下方向に進退移動可能なピストンロッドを有する
シリンダと、このシリンダのピストンロッドの先端部に
接合され、かつ四角枠状に配置される縦横の棧材を該棧
材の外側面および下面でそれぞれ受ける断面L字状の棧
材受け部とを備え、このL字状の棧材受け部を構成す
る、上記棧材を下方から支持している底板部が先のシリ
ンダとは別のシリンダにより外方に移動可能に設けられ
ている構成などが挙げられる。なお、このシリンダは油
圧式のものでも良いが、エアシリンダであることが好ま
しい。
The transfer means 10 may be of any configuration as long as it can transfer the temporarily assembled frame to the lower transfer device 9B in a temporarily assembled state. A cylinder having a piston rod capable of moving forward and backward, and a cross section L which is joined to the tip of the piston rod of the cylinder and receives longitudinal and lateral supporting members arranged in a rectangular frame shape on the outer surface and the lower surface of the supporting member, respectively. And a bottom plate supporting the above-mentioned material from below is moved outward by a cylinder different from the previous cylinder, which constitutes the L-shaped material receiving portion. A configuration provided as possible is given. This cylinder may be a hydraulic cylinder, but is preferably an air cylinder.

【0014】請求項2記載の枠体製造装置によれば、請
求項1記載の発明と同様の効果を得ることができるとと
もに、上記仮組装置8には、仮組みされた枠体を仮組み
された状態で下方の搬送装置9Bに移送する移送手段1
0が設けられているので、上記仮組装置8で仮組みされ
た上記枠体を容易に上記搬送装置9Bに移送させること
ができ、また、下方に移送するだけであるので、移送時
間も短く、枠体製造における生産性の向上を図ることが
できる。例えば、上述したようにシリンダを用いた構成
とすれば、製作コストの削減を図ることができる。
According to the frame manufacturing apparatus of the second aspect, the same effects as those of the first aspect can be obtained, and the temporarily assembled frame is temporarily assembled by the temporary assembling apparatus 8. Transfer means 1 for transferring to the lower transfer device 9B in the state of being
0, the frame temporarily assembled by the temporary assembling device 8 can be easily transferred to the transfer device 9B, and since it is only transferred downward, the transfer time is short. Thus, it is possible to improve the productivity in manufacturing the frame. For example, if a configuration using a cylinder is used as described above, manufacturing costs can be reduced.

【0015】請求項3記載の発明は、請求項1又は2記
載の枠体製造装置100において、例えば、図4〜図6
に示すように、上記仮組装置8は、上記枠体を構成する
縦横の棧材をそれぞれ載置して仮組を行う棧材受け部1
1〜14を備え、これら棧材受け部11〜14のうち少
なくとも1つ12,14が、対向する棧材受け部11,
13に対して接離可能に構成されているものである。
According to a third aspect of the present invention, in the frame manufacturing apparatus 100 according to the first or second aspect, for example, FIGS.
As shown in the figure, the temporary assembling device 8 comprises a longitudinal member receiving portion 1 on which the vertical and horizontal structural members constituting the frame body are placed and temporarily assembled.
1 to 14, and at least one of the support members 11 to 14 is provided with at least one of the support members 11 and 14 facing each other.
13 is configured so as to be able to approach and separate.

【0016】請求項3記載の枠体製造装置100によれ
ば、請求項1または2に記載の発明と同様の効果を得る
ことができるとともに、上記仮組装置8は、上記木製パ
ネル用枠組の枠体を構成する縦横の棧材1,2をそれぞ
れ載置して仮組を行う棧材受け部11〜14を備え、こ
れら棧材受け部11〜14のうち少なくとも1つ(例え
ば、第2の縦框材支持部12や右側横框材支持部14)
が、対向する棧材受け部(例えば、第1の縦框材支持部
11や左側横框材支持部13)に対して接離可能に構成
されているので、この接離可能に構成されている棧材受
け部(例えば、第2の縦框材支持部12や右側横框材支
持部14)を、対向する棧材受け部(例えば、第1の縦
框材支持部11や左側横框材支持部13)に接離させる
ことにより、これら棧材受け部に載置される縦横の棧材
により仮組みされる四角枠状の枠体の大きさを変更する
ことができる。したがって、平面視形状、様々な大きさ
の枠体の仮組を行うことができ、これにより、様々な大
きさの枠体を製造することができる。
According to the frame manufacturing apparatus 100 of the third aspect, the same effect as that of the first or second aspect of the invention can be obtained, and the temporary assembling apparatus 8 can use the wooden panel frame assembly. There is provided a pair of support members 11 to 14 on which the vertical and horizontal support members 1 and 2 constituting the frame are placed and for temporary assembly, respectively, and at least one of these support members 11 to 14 (for example, Vertical frame support 12 and right horizontal frame support 14)
Are configured to be able to contact and separate from opposing support members (for example, the first vertical frame support 11 and the left horizontal frame support 13). The supporting member receiving portion (for example, the first vertical frame member supporting portion 11 or the left horizontal frame member) such as the second vertical frame member supporting portion 12 or the right side horizontal frame member supporting portion 14 The size of the rectangular frame-shaped frame temporarily assembled by the vertical and horizontal supporting members placed on the supporting member receiving portions can be changed by being brought into contact with and separated from the supporting members 13). Therefore, it is possible to perform temporary assembly of frames having various shapes in plan view and various sizes, and thus it is possible to manufacture frames having various sizes.

【0017】上記枠体を構成する縦横の棧材1,2をそ
れぞれ載置して仮組を行う棧材受け部11〜14のうち
少なくとも1つが、対向する棧材受け部11、13に対
して接離可能に構成されているものとしているので、上
記枠体を構成する縦横の棧材1,2をそれぞれ載置して
仮組を行う棧材受け部11〜14のうち2つ以上の棧材
受け部12,24が、それぞれの棧材受け部に対向する
棧材受け部11,13に対して接離可能に構成されてい
ても良い。
At least one of the support members 11 to 14 for temporarily setting the longitudinal and horizontal support members 1 and 2 constituting the frame is placed on the opposing support member receiving portions 11 and 13. And two or more of the support members 11 to 14 for mounting the vertical and horizontal support members 1 and 2 constituting the frame and temporarily assembling the support members, respectively. The support members 12 and 24 may be configured to be able to contact and separate from the support members 11 and 13 facing the respective support members.

【0018】2つの棧材受け部12,14が、対向する
棧材受け部11,13に対してそれぞれ接離可能に構成
されている場合、それぞれの接離方向は直交する方向と
なるように構成されていることが好ましい。つまり、縦
および横のそれぞれの棧材が載置される棧材受け部をそ
れぞれの棧材受け部の対向する棧材受け部に対して接離
可能に設けられている構成である。このように構成され
ていれば、仮組みされる枠体の横の長さ、縦の長さが変
更された場合でも、それぞれに対応することができ、上
記枠体の形状のバリエーションが一層多くなる。
When the two support members 12 and 14 are configured to be able to contact and separate from the opposing support members 11 and 13, respectively, the contact and separation directions are orthogonal to each other. Preferably, it is configured. In other words, the configuration is such that the support members on which the vertical and horizontal support members are placed are provided so as to be able to contact and separate from the support member receiving portions of the corresponding support members. With this configuration, even when the horizontal length and the vertical length of the frame to be temporarily assembled are changed, it is possible to cope with each of them, and more variations in the shape of the frame are possible. Become.

【0019】請求項4記載の発明は、請求項1〜3のい
ずれかに記載の枠体製造装置において、例えば、図3に
示すように、上記搬送装置9Bには、仮組みされた上記
枠体を釘打ち装置9Aに搬送する搬送路の両側に、搬送
方向に沿ってそれぞれ周回する搬送ベルト47が設けら
れ、これら搬送ベルト47は、搬送方向と直交する方向
に移動可能に構成されているものである。
According to a fourth aspect of the present invention, in the frame manufacturing apparatus according to any one of the first to third aspects, for example, as shown in FIG. On both sides of the transport path for transporting the body to the nailing device 9A, transport belts 47 that respectively circulate in the transport direction are provided, and these transport belts 47 are configured to be movable in a direction orthogonal to the transport direction. Things.

【0020】請求項4記載の枠体製造装置によれば、請
求項1〜3のいずれかに記載の発明と同様の効果を得る
ことができるとともに、上記搬送装置9Bには、仮組み
された上記枠体を釘打ち装置9Aに搬送する搬送路の両
側に、搬送方向に沿ってそれぞれ周回しかつ、搬送方向
と直交する方向に移動可能に構成されている搬送ベルト
47,47が設けられているので、対向する上記搬送ベ
ルト47,47の上記搬送路側の内側面が、それぞれ上
記搬送路を通る仮組みされた上記枠体の両側端面に当接
する。したがって、仮組みされた上記枠体は上記搬送ベ
ルト47,47に両側から挟まれた状態で上記釘打ち装
置9Aに搬送されることになり、上記枠体を上記釘打ち
装置9Aに対して正しい向きで搬送することができる。
According to the frame manufacturing apparatus of the fourth aspect, it is possible to obtain the same effect as the invention of any one of the first to third aspects, and to temporarily assemble the transfer apparatus 9B. On both sides of a transport path for transporting the frame body to the nailing device 9A, transport belts 47, 47 are provided which are configured to circulate along the transport direction and move in a direction orthogonal to the transport direction. Therefore, the inner surfaces of the opposed conveyance belts 47, 47 on the side of the conveyance path abut on both side end faces of the temporarily assembled frame passing through the conveyance path. Therefore, the temporarily assembled frame is transported to the nailing device 9A while being sandwiched between the transport belts 47, 47 from both sides, and the frame is correctly positioned with respect to the nailing device 9A. It can be transported in any orientation.

【0021】請求項5記載の発明は、請求項1〜4のい
ずれかに記載の枠体製造装置を用いて上記枠体を製造す
る枠体製造方法であって、例えば、図1〜図3に示すよ
うに、上記仮組装置8で仮組みした枠体3を該仮組装置
8下部の搬送装置9Bによって上記釘打ち装置9Aに搬
送して上記釘打ち装置9Aにより釘が打ち込まれている
うちに、上記搬送装置9B上部の上記仮組装置8で、次
に製作する枠体の仮組をおこなうものである。
According to a fifth aspect of the present invention, there is provided a frame manufacturing method for manufacturing the frame using the frame manufacturing apparatus according to any one of the first to fourth aspects. As shown in the figure, the frame 3 temporarily assembled by the temporary assembling device 8 is transported to the nailing device 9A by the transporting device 9B below the temporary assembling device 8, and the nail is driven by the nailing device 9A. In the meantime, the temporary assembly of the frame to be manufactured next is performed by the temporary assembly device 8 above the transfer device 9B.

【0022】請求項5記載の枠体製造方法によれば、上
記仮組装置8で仮組みした木製パネル用枠体3を該仮組
装置8下部の搬送装置9Bによって上記釘打ち装置9A
に搬送して上記釘打ち装置9Aにより釘が打ち込まれて
いるうちに、上記仮組装置8で、次に製作する木製パネ
ル用枠体の仮組をおこなうので、枠体をラインで製造す
る際に、釘打ちと仮組とを同時に行うことが出来、枠体
製造の生産効率があがり、該枠体製造の生産性の向上を
図ることができる。
According to the frame manufacturing method of the fifth aspect, the wooden panel frame 3 temporarily assembled by the temporary assembling device 8 is transferred to the nailing device 9A by the transfer device 9B below the temporary assembling device 8.
While the nail is being driven by the nailing device 9A, the temporary assembly device 8 performs temporary assembly of the wooden panel frame to be manufactured next time. In addition, the nailing and the temporary assembly can be performed at the same time, the production efficiency of the frame production can be increased, and the productivity of the frame production can be improved.

【0023】[0023]

【発明の実施の形態】以下に、本発明に係る枠体製造装
置およびこれを用いた枠体製造方法の実施の形態例を図
1から図18に基づいて説明する。先ず、図1は本発明
を適用した一例としての枠体製造装置の概略構成を示す
概略正面図であり、図2は同枠体製造装置を構成する仮
組装置の概略平面図、図3は釘打ち装置および搬送装置
の概略構成を説明する枠組装置の概略平面図である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a frame manufacturing apparatus and a frame manufacturing method using the same according to the present invention will be described below with reference to FIGS. First, FIG. 1 is a schematic front view showing a schematic configuration of a frame manufacturing apparatus as an example to which the present invention is applied, FIG. 2 is a schematic plan view of a temporary assembly apparatus constituting the frame manufacturing apparatus, and FIG. It is a schematic plan view of the framework device explaining the schematic structure of a nailing device and a conveyance device.

【0024】なお、この実施の形態の枠体製造装置10
0の説明をするにあたって、この枠体製造装置100で
製造される枠体は木製パネル用枠組を構成するものであ
る。この木製パネル用の枠組6に関する説明について
は、上記従来例で用いた図19に示される枠組6を参照
して説明するとともに、その構成については説明を省略
する。
The frame manufacturing apparatus 10 of this embodiment
In describing 0, the frame manufactured by the frame manufacturing apparatus 100 constitutes a wooden panel framework. The description of the frame 6 for a wooden panel will be described with reference to the frame 6 shown in FIG. 19 used in the above-described conventional example, and the description of the configuration will be omitted.

【0025】つまり、この枠体製造装置100は、縦横
の棧材(図19においては框材)1、2によって四角枠
状に組まれた枠体3を製造することができるものである
が、以下ではこの枠体3と、この枠体3の内部に横方向
へ組まれて配設された横の棧材5もしくは枠体3の内部
に縦横に組まれた縦横の棧材4、5とからなる木製パネ
ル用の枠体(以下では便宜上枠組という。)6を製造す
ることができるものとして説明する。
That is, the frame manufacturing apparatus 100 is capable of manufacturing the frame 3 assembled in a rectangular frame shape by the vertical and horizontal supporting members (frame members in FIG. 19) 1 and 2. In the following, the frame 3 and the horizontal members 5 or 5 assembled horizontally and vertically inside the frame 3 or the horizontal members 4 and 5 assembled vertically and horizontally inside the frame 3 will be described. The following description will be made on the assumption that a wooden panel frame (hereinafter, referred to as a frame for the sake of convenience) 6 can be manufactured.

【0026】図1に示すように、本発明を適用した一例
の実施の形態における枠体製造装置100は、上述した
縦横の框材(棧材)1,2と棧材4,5とを組んで木製
パネル用枠組6(図19参照。)の仮組みをおこなう仮
組装置8と、仮組装置8の下部に設けられた枠組装置9
とから概略構成されており、枠組装置9は、仮組みされ
た木製パネル用枠組6の縦框材(棧材)1と横框材(棧
材)2及び縦框材(棧材)1と横棧材5どうしをそれぞ
れ釘により互いに結合する釘打ち装置9Aと、仮組装置
8で仮組みされた枠体3を仮組みされた状態で釘打ち装
置9Aに搬送する搬送装置9Bとを備えている。
As shown in FIG. 1, a frame manufacturing apparatus 100 according to an embodiment to which the present invention is applied is composed of the above-described vertical and horizontal frame members (jam members) 1 and 2 and the jaw members 4 and 5. A temporary assembly device 8 for temporarily assembling the wooden panel framework 6 (see FIG. 19), and a frame assembly device 9 provided below the temporary assembly device 8.
The frame assembly device 9 includes a vertical frame member 1 and a horizontal frame member 2 and a vertical frame member 1 of a temporarily assembled wooden panel frame 6. A nailing device 9A for connecting the horizontal members 5 to each other with nails; and a transport device 9B for transporting the frame 3 temporarily assembled by the temporary assembling device 8 to the nailing device 9A in a temporarily assembled state. ing.

【0027】また、仮組装置8には、仮組みされた上記
枠体3を仮組みされた状態で下方の搬送装置9Bに移送
する移送手段10が設けられており、仮組装置8で縦横
の框材1,2と、これら框材1,2を組み付けることよ
り構成された四角枠状の枠体3の内部に棧材4,5を配
設して枠体を仮組みし(図2の想像線で示す枠組6参
照。)、この仮組みされた枠組6を移送手段10により
該仮組装置8下部の搬送装置9Bに移送して、この搬送
装置9Bにより釘打ち装置9Aに搬送すること(図3参
照。)により枠組6の枠体3を構成する框材(棧材)
1,2の側端面から釘を打ち込み木製パネル用枠組6を
製造するものである。
The temporary assembling device 8 is provided with a transfer means 10 for transferring the temporarily assembled frame 3 to a lower transfer device 9B in a temporarily assembled state. The frame members 1 and 2 and the frame members 3 and 5 are disposed inside a rectangular frame 3 formed by assembling the frame members 1 and 2 to temporarily assemble the frames (FIG. 2). The tentatively assembled framework 6 is transferred to the transfer device 9B below the tentative assembly device 8 by the transfer means 10 and transferred to the nailing device 9A by the transfer device 9B. (See FIG. 3), the frame material (jam material) constituting the frame 3 of the framework 6
A nail 6 is manufactured by driving nails from the side end surfaces of the first and second side panels.

【0028】仮組装置8について図4〜図7を用いて説
明する。図4は本発明に係る枠体製造装置における仮組
装置8の平面図、図5は同仮組装置8の正面図、図6は
同仮組装置の側面図、図7は仮組装置が備える移動手段
を説明する棧材支持部を示す図である。
The temporary assembling device 8 will be described with reference to FIGS. 4 is a plan view of the temporary assembling device 8 in the frame manufacturing apparatus according to the present invention, FIG. 5 is a front view of the temporary assembling device 8, FIG. 6 is a side view of the temporary assembling device, and FIG. It is a figure which shows the support member supporting part explaining the moving means provided.

【0029】図4〜図6に示すように、上記仮組装置8
は、上記枠体3を構成する縦横の框材(棧材)1,2を
それぞれ載置して仮組を行う棧材受け部11,12,1
3,14と、棧材受け部11,12を上下方向に移動さ
せて、枠体3を仮組みされた状態で下方の搬送装置9B
に移送する移送手段10,10Aと、棧材受け部11,
12,13,14を支持するフレーム部15とから概略
構成されている。また、棧材受け部12は対向する棧材
受け部11に対して接離可能に構成され、棧材受け部1
4は対向する棧材受け部13に対して接離可能に構成さ
れている。
As shown in FIG. 4 to FIG.
Are the supporting members 11, 12, 1 on which the vertical and horizontal frame members (support members) 1, 2 constituting the frame body 3 are mounted and temporarily assembled.
3 and 14 and the support members 11 and 12 are moved in the up-down direction, and the frame 3 is temporarily assembled and the lower conveying device 9B is moved.
Transfer means 10 and 10A for transferring to
And a frame portion 15 for supporting 12, 13, and 14. In addition, the accommodation member receiving portion 12 is configured to be able to come into contact with and separate from the opposing accommodation member receiving portion 11.
Numeral 4 is configured to be able to approach and separate from the facing material receiving portion 13.

【0030】フレーム部15は、該仮組装置8の上部を
形成する、平面視手前側(作業者側)が開口した平面視
コ字状の基枠部16と、該基枠部16を所定の高さで支
持する脚部17とから概略構成されている。コ字状の基
枠部16内に、框材および棧材を載置してこれらを組み
付けて仮組を行う棧材受け部11,12,13,14が
設けられており、これら棧材受け部11,12,13,
14の配置は、桟材受け部12,14の移動により製造
される枠組の大きさに対応して、つまり仮組される枠組
の平面形状の大きさに合わせて変更可能となるように形
成されている。
The frame part 15 forms a base frame part 16 forming an upper part of the temporary assembling device 8 and having a U-shape in a plan view and having an open front side (operator side). And a leg 17 which is supported at a height. The U-shaped base frame portion 16 is provided with the supporting members 11, 12, 13, and 14 for placing the frame material and the supporting member and assembling them to form a temporary assembly. Parts 11, 12, 13,
The arrangement of 14 is formed so as to be changeable in accordance with the size of the frame manufactured by moving the beam receiving portions 12 and 14, that is, in accordance with the size of the planar shape of the temporarily assembled frame. ing.

【0031】棧材受け部11,12,13,14は、枠
組6を構成する縦横の框材(棧材)1,2により仮組さ
れる平面視四角形状の枠体3を四方から支持するように
構成されており、以下では、便宜上、仮組される枠組6
(枠体3)の縦框材1を支持する、長尺の棧材受け部1
1,12をそれぞれ第1および第2の縦框材支持部とい
い、枠組6(枠体3)の横框材2を支持し、第1及び第
2の縦框材支持部11,12と直交するように配置され
ている棧材受け部13,14をそれぞれ左右側横框材支
持部という。
The support members 11, 12, 13, and 14 support the frame 3 having a rectangular shape in a plan view, which is temporarily assembled by vertical and horizontal frame members (support members) 1 and 2 constituting the frame assembly 6. In the following, for the sake of convenience, a temporarily assembled framework 6 will be described.
A long support member 1 for supporting the vertical frame material 1 of the (frame body 3).
1 and 12 are referred to as first and second vertical frame material support portions, respectively, support the horizontal frame material 2 of the frame 6 (frame body 3), and have the first and second vertical frame material support portions 11 and 12. The support members 13 and 14 arranged orthogonally are respectively referred to as left and right side frame support members.

【0032】第1の縦框材支持部11はコ字状の基枠部
16の両端部16a,16b間に、該基枠部16内を塞
ぐように配置され、上下方向及び外側方向に移動可能と
なるように構成されている。すなわち、この第1の縦框
材支持部11は、基枠部16内側に仮組される縦框材1
の外側の側端面に当接する当接面110aを備えた側面
部110と、先端側が該側面部110下部で水平方向に
内側に突出し、仮組される縦框材1の底面に当接して、
該縦框材1が載置される底板部112とを有している。
(図6及び図7参照。)これら側面部110および底板
部112は、載置される縦框材に対応して長尺のものと
なっている。なお、図5では、この第1の縦框材支持部
11に関する構成は省略している。
The first vertical frame support 11 is disposed between both ends 16a and 16b of the U-shaped base frame 16 so as to cover the inside of the base frame 16, and moves vertically and outwardly. It is configured to be possible. That is, the first vertical frame material supporting portion 11 is a vertical frame material 1 temporarily assembled inside the base frame portion 16.
A side surface portion 110 provided with a contact surface 110a that abuts on an outer side end surface, and a front end side protrudes inward in the horizontal direction below the side surface portion 110 to abut against the bottom surface of the temporarily assembled vertical frame member 1,
And a bottom plate portion 112 on which the vertical frame material 1 is placed.
(See FIGS. 6 and 7.) The side surface portion 110 and the bottom plate portion 112 are long corresponding to the vertical frame material to be placed. In FIG. 5, the configuration relating to the first vertical frame material supporting portion 11 is omitted.

【0033】側面部110は、図4、図6及び図7に示
すように、基枠部16の両端部16a,16bの内側に
設けられた固定部材18に固定されたエアシリンダ11
4より下方に進退するピストンロッド115の先端部1
15aに固定された固定部116に設けられ、ピストン
ロッド115の進退移動に連動して上下方向に移動可能
に構成されている。これらエアシリンダ114および第
1の縦框材支持部11によって移送手段10を構成して
いる。また、この固定部116には側面部110の背部
(図4では手前側)にエアシリンダ117が、該エアシ
リンダ117により可動するピストンロッド118が側
面部110の後方に進退するように固定されている。
As shown in FIG. 4, FIG. 6, and FIG. 7, the air cylinder 11 is fixed to a fixing member 18 provided inside both ends 16a and 16b of the base frame 16, as shown in FIGS.
The tip part 1 of the piston rod 115 which advances and retreats below 4
It is provided on a fixing portion 116 fixed to 15a, and is configured to be movable in the vertical direction in conjunction with the forward and backward movement of the piston rod 115. The air cylinder 114 and the first vertical frame material support 11 constitute the transfer means 10. An air cylinder 117 is fixed to the fixed portion 116 on the back (front side in FIG. 4) of the side surface portion 110 so that a piston rod 118 movable by the air cylinder 117 advances and retreats behind the side surface portion 110. I have.

【0034】底板部112は、外方の基端部112aに
鉛直方向に立設された後板112bを有し、この後板1
12bには、固定部116に固定されているエアシリン
ダ117のピストンロッド118の先端部118aが接
合されている。
The bottom plate portion 112 has a rear plate 112b which is provided upright at an outer base end portion 112a.
The distal end portion 118a of the piston rod 118 of the air cylinder 117 fixed to the fixing portion 116 is joined to 12b.

【0035】さらに、底板部112には、固定部116
に取り付けられたレール119に嵌合して摺動するスラ
イド部材119aが設けれられている。このスライド部
材119aがガイドとなって、固定部116に固定され
ているエアシリンダ117のピストンロッド118の進
退移動により、底板部112が水平方向に移動し、平面
視して、側面部110の当接面110aから出没するよ
うになっている。(図4及び図7参照。)
Further, a fixing portion 116 is attached to the bottom plate portion 112.
Is provided with a slide member 119a that fits and slides on a rail 119 attached to the rail. The slide member 119a serves as a guide, and the bottom plate 112 moves in the horizontal direction by the reciprocating movement of the piston rod 118 of the air cylinder 117 fixed to the fixing portion 116, and the bottom plate 112 moves in contact with the side surface 110 in plan view. It protrudes from the contact surface 110a. (See FIGS. 4 and 7)

【0036】第2の縦框材支持部12は、コ字状の基枠
部16を構成している対向する側枠部16A,16B間
に第1の縦框材支持部11に対して接離可能に設けられ
ている。つまり第1の縦框材支持部11方向に、該縦框
材支持部11と平行な状態で移動可能に設けられた移動
フレーム部20に取り付けられている。
The second vertical frame member support portion 12 is in contact with the first vertical frame member support portion 11 between the opposed side frame portions 16A and 16B constituting the U-shaped base frame portion 16. It is provided detachably. That is, it is attached to the moving frame unit 20 movably provided in the direction of the first vertical frame member support 11 in a state parallel to the vertical frame member support 11.

【0037】ここで、移動フレーム部20について説明
する。移動フレーム部20は、両端部20a,20bに
側枠部16A,16Bの延在方向に沿って摺動するよう
に構成された摺動部材21,21が設けられている。こ
れら摺動部材21,21は、下面に側枠部16A,16
Bに該側枠部16A,16Bの延在方向に設けられたレ
ール22,22に嵌合して摺動するスライド部材23,
…が設けられ、側枠部16A,16Bの外側に張り出し
た部分には、該側枠部16A,16Bに沿って回動可能
に配設されたネジ部25に螺合され、該ネジ部25に沿
って移動するナット26が固定された状態で取り付けら
れている。
Here, the moving frame unit 20 will be described. The movable frame portion 20 is provided with sliding members 21 and 21 configured to slide along both ends 20a and 20b along the extending direction of the side frame portions 16A and 16B. These sliding members 21 and 21 have side frames 16A and 16
B, slide members 23 that slide by fitting on rails 22, 22 provided in the direction in which the side frame portions 16A, 16B extend.
Are provided, and a portion protruding outside the side frame portions 16A, 16B is screwed to a screw portion 25 rotatably disposed along the side frame portions 16A, 16B. The nut 26 that moves along is fixed.

【0038】ネジ部25,25は、それぞれ側枠部16
A、16Bのそれぞれ外側に該側枠部16A,16Bに
沿って、これら側枠部16A,16Bのそれぞれと平行
に延在するようにネジ固定部材27,…を介して回動可
能に配置され、それぞれの側枠部16A,16Bの外側
に配置されたネジ部25,25は奥側の端部25a,2
5aでギアボックス28内のギア及び、主軸部29を介
して連動するように接続されている。
The screw portions 25, 25 are respectively
A and 16B are rotatably disposed outside the respective frame members 16A and 16B via screw fixing members 27 so as to extend in parallel with the respective side frame members 16A and 16B. The screw portions 25, 25 arranged outside the respective side frame portions 16A, 16B are the rear end portions 25a, 2b.
The gear 5a is connected so as to be linked with the gear in the gear box 28 and the main shaft 29 at 5a.

【0039】この主軸部29の両端部はそれぞれギアボ
ックス28内に設けられているギア(図示省略。)に接
続され、コ字状の基枠部16を構成する奥側の奥側枠部
16Cの外側に、該奥側枠部16Cに沿って配置されて
いる。そしてこの主軸部29のほぼ中央部には、モータ
30に接続されたピニオン30aが設けられている。
Both ends of the main shaft portion 29 are connected to gears (not shown) provided in the gear box 28, respectively, to form a U-shaped base frame portion 16. Outside and along the rear side frame portion 16C. A pinion 30 a connected to the motor 30 is provided substantially at the center of the main shaft 29.

【0040】つまり、このモータ30を駆動させること
により主軸部29が回転し、この回転によって左右の側
枠部16A,16Bに取り付けられたそれぞれのネジ部
25が回転する。これらネジ部25の回転により、ネジ
部25にそれぞれ螺合されているナット26,26を介
してそれぞれの摺動部材21,21が平行に手前側に移
動する。またモータ30を逆に回転させれば、摺動部材
21,21の移動方向を逆方向(奥行き方向)に変更す
ることができる。このように構成されているので、これ
ら摺動部材21,21が移動することにより移動フレー
ム部20が第1の縦框材支持部11方向に移動可能とな
っている。
That is, when the motor 30 is driven, the main shaft portion 29 is rotated, and the rotation rotates the respective screw portions 25 attached to the left and right side frame portions 16A, 16B. Due to the rotation of the screw portions 25, the respective sliding members 21 and 21 move toward the near side in parallel via nuts 26 and 26 screwed to the screw portions 25, respectively. If the motor 30 is rotated in the reverse direction, the moving direction of the sliding members 21 and 21 can be changed in the reverse direction (depth direction). With such a configuration, the moving frame portion 20 can move in the direction of the first vertical frame member supporting portion 11 by moving these sliding members 21 and 21.

【0041】この移動フレーム部20に取り付けられて
いる第2の縦框材支持部12は、上述した第1の縦框材
支持部11とほぼ同様に構成されているものであり、仮
組される縦框材1の側面に当接する鉛直面120aを備
えた側面部120と、先端側が該側面部120下部で水
平方向に内側に突出し、仮組される縦框材の底面に当接
して、該縦框材1が載置される底板部122とを有して
いる。なお、この構成は第1の縦框材支持部11とほぼ
同様の構成であるので、同様の構成には同名称を用いて
説明する。
The second vertical frame support 12 attached to the moving frame 20 is substantially the same as the first vertical frame support 11 described above, and is temporarily assembled. A side surface portion 120 having a vertical surface 120a abutting on a side surface of the vertical frame material 1 and a front end side protruding inward in a horizontal direction below the side surface portion 120 and abutting against a bottom surface of the temporarily assembled vertical frame material, And a bottom plate portion 122 on which the vertical frame material 1 is placed. Note that this configuration is substantially the same as that of the first vertical frame member support portion 11, and thus the same configuration will be described using the same name.

【0042】すなわち、側面部120は移動フレーム部
20に固定されたエアシリンダ124より下方に進退す
るピストンロッド125の先端部125aに固定された
固定部126に設けられ、ピストンロッド125の可動
に追従して上下方向に移動可能に構成されている。この
エアシリンダ124と第2の縦框材支持部12とで移送
手段10Aを形成している。
That is, the side surface portion 120 is provided on a fixed portion 126 fixed to a tip end portion 125a of a piston rod 125 which advances and retreats below an air cylinder 124 fixed to the moving frame portion 20, and follows the movement of the piston rod 125. It is configured to be vertically movable. The air cylinder 124 and the second vertical frame member support portion 12 form the transfer means 10A.

【0043】また、この固定部126には側面部120
の背部(図4では奥側)にエアシリンダ127が、該エ
アシリンダ127により可動するピストンロッド128
が側面部120の後方に進退するように固定されてい
る。
The fixing portion 126 has a side surface portion 120.
An air cylinder 127 is provided at the back (rear side in FIG. 4) of the piston rod 128 which is movable by the air cylinder 127.
Is fixed so as to advance and retreat to the rear of the side surface portion 120.

【0044】底板部122は、外側の基端部に鉛直方向
に立設された後板122aを有し、この後板122aに
は、固定部126に固定されているエアシリンダ127
のピストンロッド128の先端部が接合されている。ま
た、底板部122には、該底板部122の延在方向に所
定間隔を開けて、上述した底板部112と同様に、固定
部126に取り付けられたレール129に嵌合して摺動
するスライド部材129aが設けれられている。つま
り、ピストンロッド128の進退移動により、底板部1
22が水平方向に移動し、平面視して、側面部120の
内側面から出没するようになっている。(図4の矢印N
参照。) この底板部122は縦框材1を支持するため長尺となっ
ている。なお、この底板部122は、対向する第1の縦
框材支持部11の底板部112と同一の平面上に配置さ
れるものであり、その平面は水平面としている。
The bottom plate portion 122 has a rear plate 122a vertically erected at an outer base end portion. The rear plate 122a has an air cylinder 127 fixed to a fixing portion 126.
Of the piston rod 128 is joined. Further, the bottom plate portion 122 is provided with a predetermined interval in the extending direction of the bottom plate portion 122 and, similarly to the above-described bottom plate portion 112, fits on a rail 129 attached to the fixing portion 126 and slides. A member 129a is provided. That is, the bottom plate portion 1 is moved by the reciprocation of the piston rod 128.
The reference numeral 22 moves in the horizontal direction so as to protrude and retract from the inner side surface of the side surface portion 120 in plan view. (Arrow N in FIG. 4)
reference. This bottom plate portion 122 is long to support the vertical frame material 1. The bottom plate portion 122 is arranged on the same plane as the bottom plate portion 112 of the first vertical frame member supporting portion 11 facing the first frame portion, and the plane is a horizontal plane.

【0045】左側横框材支持部13も、上述した第1の
縦框材支持部11とほぼ同様に構成されているものであ
り、前後方向(図4の矢印M方向)に移動可能に設けら
れているものである。すなわち、左側横框材支持部13
は、仮組される横框材2の側面に当接する鉛直面130
aを有する側面部130と、先端側が該側面部130下
部で水平方向に内側に突出し、仮組される横框材2の底
面に当接して、該横框材2が載置される底板部132と
を有している。
The left side frame support 13 is also substantially the same as the first vertical frame support 11 described above, and is provided so as to be movable in the front-rear direction (the direction of arrow M in FIG. 4). It is what is being done. That is, the left side frame support 13
Is a vertical surface 130 abutting on the side surface of the side frame material 2 to be temporarily assembled.
and a bottom plate portion on which the leading end side projects inward in the horizontal direction below the side surface portion 130, abuts against the bottom surface of the temporarily assembled horizontal frame material 2, and the horizontal frame material 2 is placed thereon. 132.

【0046】側面部130は、該側面部130が内側に
突出するように左側枠部16Aに固定部材131を介し
て固定され、固定部材131には側面部130の背部
(図では側枠部16A側)にエアシリンダ133が固定
され、該エアシリンダ133により可動するピストンロ
ッド134が側面部130の後方(側枠部16A側)に
進退するように固定されている。
The side surface portion 130 is fixed to the left frame portion 16A via a fixing member 131 so that the side surface portion 130 projects inward. The fixing member 131 has a back portion (the side frame portion 16A in the drawing) of the side surface portion 130. The air cylinder 133 is fixed to the side (side), and the piston rod 134 movable by the air cylinder 133 is fixed so as to advance and retreat to the rear of the side surface portion 130 (toward the side frame portion 16A).

【0047】底板部132は、基端部に鉛直方向に立設
された後板132aを介してエアシリンダ133のピス
トンロッド134の先端部134aが接合されている。
さらに、底板部132には、固定部材131に取り付け
られた2つのレール136にそれぞれ嵌合して摺動する
スライド部材137が設けれられている。つまり、ピス
トンロッド134の進退移動により、底板部132が水
平方向に移動し、平面視して、側面部130の内側の鉛
直面130aから出没するようになっている。
The bottom plate portion 132 is joined to a distal end portion 134a of a piston rod 134 of an air cylinder 133 via a rear plate 132a which is provided upright at a base end portion.
Further, a slide member 137 that fits and slides on each of the two rails 136 attached to the fixed member 131 is provided on the bottom plate portion 132. In other words, the bottom plate 132 moves in the horizontal direction due to the reciprocation of the piston rod 134, and comes into and out of the vertical surface 130a inside the side surface 130 in plan view.

【0048】右側横框材支持部14は、左側横框材支持
部13とほぼ同様に構成され、仮組される横框材2の側
面に当接する鉛直面140aを有する側面部140と、
先端側が該側面部140下部で水平方向に内側に突出
し、仮組される横框材の底面に当接して、該横框材2が
載置される底板部142とを有している。
The right side frame supporting portion 14 has substantially the same configuration as the left side frame supporting portion 13 and has a side surface portion 140 having a vertical surface 140a abutting on the side surface of the temporarily assembled horizontal frame material 2.
The front end side has a bottom plate portion 142 that projects inward in the horizontal direction below the side surface portion 140, abuts against the bottom surface of the temporarily assembled horizontal frame material, and on which the horizontal frame material 2 is placed.

【0049】側面部140は、該側面部140が内側に
突出するように、右側枠部16Bの内側で、該右側枠部
16Bに沿って延在し、かつ、仮組装置8の長手方向に
移動可能に構成されている移動フレーム部32の手前側
端部32aに固定部材141を介して固定されている。
この固定部材141には側面部140の背部(図では側
枠部16B側)にエアシリンダ143が固定され、該エ
アシリンダ143により可動するピストンロッド144
が側面部140の後方向(側枠部16B側方向)に進退
するように固定されている。また、この固定部材141
により底板部142は、対向する左横框材支持部13の
底板部132と同一平面上に位置可能に構成され、その
平面は水平面となっている。
The side surface portion 140 extends along the right side frame portion 16B inside the right side frame portion 16B so that the side surface portion 140 projects inward, and extends in the longitudinal direction of the temporary assembly device 8. It is fixed via a fixing member 141 to the front end 32a of the movable frame part 32 which is configured to be movable.
An air cylinder 143 is fixed to the fixing member 141 at the back of the side surface portion 140 (the side frame portion 16B side in the figure), and a piston rod 144 movable by the air cylinder 143 is provided.
Is fixed so as to advance and retreat in the rear direction of the side surface portion 140 (in the direction of the side frame portion 16B). Also, the fixing member 141
Accordingly, the bottom plate portion 142 is configured to be able to be positioned on the same plane as the bottom plate portion 132 of the opposing left horizontal frame member support portion 13, and the plane is a horizontal plane.

【0050】底板部142は、外側の基端部に鉛直方向
に立設された後板142aを介してエアシリンダ143
のピストンロッド144の先端部144aが接合されて
いる。さらに、底板部142には、固定部材141に取
り付けられた2つのレール146にそれぞれ嵌合して摺
動するスライド部材147が2つ設けれられている。つ
まり、ピストンロッド144の進退移動により、底板部
142が水平方向に移動し、平面視して、側面部140
の内側の鉛直面140aから出没するようになってい
る。
The bottom plate 142 is connected to the air cylinder 143 via a rear plate 142a which is vertically provided on the outer base end.
The distal end 144a of the piston rod 144 is joined. Further, the bottom plate portion 142 is provided with two slide members 147 that fit and slide on the two rails 146 attached to the fixed member 141, respectively. In other words, the bottom plate 142 moves in the horizontal direction due to the reciprocation of the piston rod 144, and the side surface 140
And emerges from the vertical surface 140a inside.

【0051】移動フレーム部32は、側枠部16Aと平
行な状態で、上述した第1及び第2の縦框材支持部1
1,12のそれぞれの延在方向に移動可能に構成されて
いるものであり、該移動フレーム部32の奥側端部32
bには、基枠部16の奥側枠部16Cの上面を、該奥側
枠部16Cの延在方向に摺動する移動部材33が接続さ
れている。この移動部材33は、下部に、奥側枠部16
Cの中央部に形成された長手方向に延在する開口部16
dに内嵌し、該奥側枠部16Cの開口部16dに回動可
能に設けられたネジ部34に螺合するナットを備えたナ
ット部34Aと、該ナット部34Aを挟んで奥側枠部1
6Cの上面に該奥側枠部16Cの延在方向に形成された
2本のレール36,36にそれぞれ嵌合して摺動するス
ライド部材36A,36Aとを有している。ネジ部34
はモータ35の軸に接続されており、モータ35の回転
により回動するものである。
The moving frame part 32 is parallel to the side frame part 16A, and the first and second vertical frame material supporting parts 1
The movable frame portion 32 is configured to be movable in the respective extending directions.
A moving member 33 that slides on the upper surface of the rear frame portion 16C of the base frame portion 16 in the extending direction of the rear frame portion 16C is connected to b. The moving member 33 is provided on the lower side
A longitudinally extending opening 16 formed in the center of C
d, and a nut portion 34A including a nut screwed into a screw portion 34 rotatably provided in the opening 16d of the rear frame portion 16C, and a rear frame sandwiching the nut portion 34A. Part 1
A sliding member 36A, 36A that fits and slides on two rails 36, 36 formed on the upper surface of 6C in the extending direction of the rear frame 16C, respectively. Screw part 34
Is connected to the shaft of the motor 35, and is rotated by the rotation of the motor 35.

【0052】このように構成されているのでモータ35
を回転させることによりネジ部34が回転し、このネジ
部34の回転に伴い、該ネジ部34に螺合されているナ
ットを有するナット部34Aが移動する。すると移動部
材33も移動し、この移動部材33に接合されている移
動フレーム部32が、側枠部16A,16Bと平行な状
態で、側枠部16A方向に移動する、つまり、この移動
フレーム部32は図5に示すように矢印O方向に移動可
能となっている。
With this configuration, the motor 35
By rotating the screw portion 34, the screw portion 34 rotates, and with the rotation of the screw portion 34, the nut portion 34A having the nut screwed to the screw portion 34 moves. Then, the moving member 33 also moves, and the moving frame portion 32 joined to the moving member 33 moves in the direction of the side frame portion 16A in a state parallel to the side frame portions 16A and 16B, that is, the moving frame portion Reference numeral 32 is movable in the direction of arrow O as shown in FIG.

【0053】これにより、移動フレーム部32に固定さ
れている右側横框材支持部14が、対向する左側横框材
支持部13に接離可能となる。なおモータ30の駆動は
任意に行うものである。なお、左右側横框材支持部1
3,14の底板部132,142は、上述した第1及び
第2の縦框材支持部11,12の底板部112,122
と、同一平面上に配置可能な構成となっている。これに
より、これら第1および第2の縦框材支持部11,12
および左右側横框材支持部13,14に縦横の框材1,
2を載せて仮組を行う場合、仮組を行い易くなってい
る。
As a result, the right side frame supporting member 14 fixed to the moving frame portion 32 can be brought into contact with and separated from the left side frame supporting member 13 opposed thereto. The driving of the motor 30 is arbitrarily performed. The left and right side frame support 1
The bottom plate portions 132 and 142 of the third and fourth bottom frame portions 112 and 122 of the first and second vertical frame member support portions 11 and 12 are respectively provided.
And can be arranged on the same plane. Thereby, the first and second vertical frame support members 11 and 12 are provided.
In addition, the vertical and horizontal frame members 1 and
In the case where the temporary assembly is performed with the 2 on, it is easy to perform the temporary assembly.

【0054】次にこのように構成されている仮組装置8
の作用を説明する。このように構成されている仮組装置
8において、まず、製造する枠体3若しくは枠組6の平
面形状に合わせて、第2の縦框材支持部12と右側横框
材支持部14を移動させる。
Next, the temporary assembly device 8 configured as described above
The operation of will be described. In the temporary assembly device 8 configured as described above, first, the second vertical frame support 12 and the right horizontal frame support 14 are moved according to the planar shape of the frame 3 or the frame 6 to be manufactured. .

【0055】そして、第1及び第2の縦框材支持部1
1,12および左右側横框材支持部13,14にそれぞ
れ、枠体3を構成する縦横の框材1,2を配置して、ス
テープル等を接合部の仮止めに用いて仮組を行う。この
とき枠体3内に配置される縦横の棧材4,5,5も所定
の位置に配置してステープル等で、端面が当接する框材
1,2に仮止めを行う。十字に組まれる縦の棧材4と横
の棧材5とは合い欠き加工により接合する。
Then, the first and second vertical frame supporting members 1
The vertical and horizontal frame members 1 and 2 constituting the frame 3 are arranged on the frame members 1 and 12 and the left and right horizontal frame member support portions 13 and 14, respectively, and a temporary assembly is performed using staples or the like for temporary fixing of the joint. . At this time, the vertical and horizontal members 4, 5, and 5 arranged in the frame 3 are also arranged at predetermined positions, and are temporarily fixed to the frame members 1 and 2 whose end surfaces are in contact with staples or the like. The vertical supporting member 4 and the horizontal supporting member 5 assembled in a cross are joined by a notch process.

【0056】また、上方に開口するように合い欠きの溝
が形成された棧材を下側にした場合は、下側にした棧材
の端部のみをステープル等で両端面が当接する框材に仮
止めするだけでよい。さらに、仮組の際、それぞれの框
材支持部11〜14の鉛直面110a,120a,13
0a,140aに、それぞれ配置される縦横の框材1,
2の側面を当接させることにより、これら当接面110
a,120a,130a,140aが框材1,2を配置
する際のガイドとなり、仮組みされる枠体3を正確な形
状とすることができる。
In the case where the supporting member having a notched groove formed so as to open upward is placed on the lower side, only the end of the lower supporting member is stapled with a frame member whose both end surfaces abut. Only need to be temporarily fixed. Furthermore, at the time of temporary assembly, the vertical surfaces 110a, 120a, 13 of the respective frame member support portions 11 to 14 are provided.
0a, 140a, the vertical and horizontal frame materials 1,
2 are brought into contact with each other so that these contact surfaces 110
The a, 120a, 130a, and 140a serve as guides for arranging the frame members 1 and 2, and the frame 3 to be temporarily assembled can be formed in an accurate shape.

【0057】そして、左右側横框材支持部13、14の
底板部132,142を、それぞれの上部に位置する鉛
直面130a,140aから外側に移動させて、つま
り、平面視して鉛直面130a,140aから引っ込め
て、第1及び第2のエアシリンダ114,124のピス
トンロッド115,125を伸ばすことにより、仮組み
された枠組6を仮組みされた状態で下方に移動させ、次
いで、仮組装置8の下部に配置されている搬送装置9B
に接近した地点で、第1及び第2の縦框材支持部11,
12の底板部112,122をそれぞれの鉛直面110
a,120aより外側に移動させることにより、つま
り、平面視して当接面110a,120aから引っ込め
ることにより、下方の搬送装置9Bに仮組みされた枠組
6が仮組みされたそのままの状態で形を崩さずに移送さ
れる。
Then, the bottom plates 132 and 142 of the left and right side frame members supporting portions 13 and 14 are moved outward from the vertical surfaces 130a and 140a located on the respective upper portions, that is, the vertical surfaces 130a and , 140a to extend the piston rods 115, 125 of the first and second air cylinders 114, 124, thereby moving the temporarily assembled framework 6 downward in a temporarily assembled state, The transfer device 9B arranged below the device 8
At the point approaching the first and second vertical frame supporters 11,
Twelve bottom plate portions 112 and 122 are respectively
a, 120a, that is, by retracting from the abutting surfaces 110a, 120a in plan view, the frame 6 temporarily assembled to the lower conveying device 9B is formed as it is temporarily assembled. Is transported without breaking.

【0058】次に、図8〜図10を参照して枠組装置9
について説明する。図8は本実施の形態の枠体製造装置
における枠組装置9の概略構成を説明する枠組装置9の
概略平面図、図9は同概略正面図、図10は同概略側面
図である。
Next, referring to FIG. 8 to FIG.
Will be described. FIG. 8 is a schematic plan view of the frame assembly device 9 illustrating the schematic configuration of the frame assembly device 9 in the frame manufacturing apparatus of the present embodiment, FIG. 9 is a schematic front view thereof, and FIG. 10 is a schematic side view thereof.

【0059】枠組装置9は、上部の仮組装置8から仮組
みされた木製パネル用枠組6を仮組みされた状態で搬送
する搬送装置9Bと、搬送装置9Bの搬送方向に設けら
れた釘打ち装置9Aとを有している。まず釘打ち装置9
Aに仮組みされた木製パネル用枠組6を仮組みされた状
態で搬送する搬送装置9Bについて説明する。
The frame assembly device 9 includes a transport device 9B for transporting the wooden panel frame 6 temporarily assembled from the upper temporary assembly device 8 in a temporarily assembled state, and nail driving provided in the transport direction of the transport device 9B. Device 9A. First, nailing device 9
A transport device 9B that transports the wooden panel frame 6 temporarily assembled in A in a temporarily assembled state will be described.

【0060】搬送装置9Bは、図8〜図10に示すよう
に並列して配置された2本の搬送部37,37Aと、こ
れら搬送部37,37Aにその長さ方向に沿って周回す
るように搬送チェーンが掛けられるスプロケット38,
38a,…と、この搬送チェーンの外周側に搬送部3
7,37Aの長さ方向に沿って一列に配置された搬送プ
レート39(図10参照。)と、搬送部37,37A上
で搬送される仮組みされた木製パネル用枠組6を両側か
ら挟んだ状態で、搬送方向に搬送する横送り部40,4
0Aとを有している。これら搬送部37,37Aの上方
が搬送路を形成している。
The transfer device 9B has two transfer sections 37 and 37A arranged in parallel as shown in FIGS. 8 to 10, and the transfer sections 37 and 37A are circulated along the length direction thereof. 38 on which the conveyor chain is hung
, 38a,...
The transport plates 39 (see FIG. 10) arranged in a row along the length direction of the first and the second panel 37 and the temporarily assembled wooden panel frame 6 transported on the transport sections 37 and 37A are sandwiched from both sides. In the state, the horizontal feeding units 40 and 4 which convey in the conveyance direction
0A. The upper part of these transport parts 37 and 37A forms a transport path.

【0061】搬送部37(37A)は、図8に示すよう
に、上面でチェーンの回動を案内する長尺の案内部41
と、この案内部41の両端部に、それぞれ設けられたス
プロケット38,38aとを有する。これら搬送部3
7,37Aは両搬送部とも同様に構成されており、対向
して配置され、それぞれ対向する搬出側のスプロケット
38aは、図8に示すようにチェーン(図示略)介して
電動モータ(図示略)に接続された一つの回転軸42に
嵌挿され、電動モータが作動することによって回転軸4
2が回転し、搬出側の全てのスプロケット38a,38
aが同じ速度で回転し、これにより各搬送チェーンは、
搬出側のスプロケット38aと搬入側のスプロケット3
8との間をそれぞれ同じ速度で周回し、結果として各搬
送部37上(以下、搬送路という)をそれぞれ同じ速度
で走行するものとなっている。
As shown in FIG. 8, the transport section 37 (37A) has a long guide section 41 for guiding the rotation of the chain on the upper surface.
And sprockets 38 and 38a provided at both ends of the guide portion 41, respectively. These transport units 3
7, 37A have the same configuration in both transporting units, are arranged to face each other, and the sprockets 38a on the unloading side facing each other are connected to an electric motor (not shown) via a chain (not shown) as shown in FIG. Is inserted into one of the rotating shafts 42 connected to the rotating shaft 4 and the rotating shaft 4 is driven by the operation of the electric motor.
2 rotates, and all the sprockets 38a, 38 on the carry-out side are rotated.
a rotate at the same speed, so that each transport chain
Outgoing sprocket 38a and incoming sprocket 3
8 travel at the same speed, and consequently run on the respective transport sections 37 (hereinafter referred to as transport paths) at the same speed.

【0062】これら搬送部37,37Aのうち奥側の搬
送部37Aは、内側方向に移動自在に、つまり対向する
搬送部37に対して接離可能に設けられているものであ
り、搬送部37の搬入側および搬出側端部の下方でそれ
ぞれに架設されたネジ部43,43により手前側の搬送
部37に連結されている。
The transport section 37A on the far side of the transport sections 37, 37A is provided so as to be movable inward, that is, so as to be able to approach and separate from the opposite transport section 37. Are connected to the transport section 37 on the near side by screw sections 43, 43 respectively provided below the end sections on the carry-in side and the carry-out side.

【0063】これらネジ部43,43はいずれも手前側
の搬送部37を固定端とし奥側の搬送部を可動端とした
もので、奥側の搬送部37Aの下端部には、ネジ部に螺
合するナットが固定されているナット部43a,43a
がそれぞれ取り付けられている。
Each of these screw portions 43, 43 has a front-side transport section 37 as a fixed end and a rear-side transport section as a movable end. The lower end of the rear-side transport section 37A has a screw section. Nut portions 43a, 43a to which nuts to be screwed are fixed
Are attached.

【0064】また、ネジ部43,43は、奥側の搬送部
37Aの下方に配設されたシャフト44を介して連動す
るように構成されており、このシャフト44のほぼ中央
部には、ピニオン44aが設けられ、このピニオン44
aは駆動モータ44bの軸44cに設けられたピニオン
44dに歯合されている。
The screw portions 43, 43 are configured to interlock with each other via a shaft 44 disposed below the transport portion 37A on the far side, and a substantially central portion of the shaft 44 has a pinion. The pinion 44a is provided.
a is meshed with a pinion 44d provided on a shaft 44c of the drive motor 44b.

【0065】このモータ44bの可動によりシャフト4
4が回転し、このシャフト44の回転に伴って搬入側お
よび搬出側のネジ部43,43が回転する。ネジ部4
3,43が回転することにより、該ネジ部43,43に
螺合されているナットが固定されているナット部43a
が設けられている奥側の搬送部37Aが搬送方向と直交
する方向に移動するように構成されている。なお、この
奥側の搬送部37Aの移動を円滑に行うため、搬送部3
7,37A間には、ガイドレール43d,43dが設け
られ、奥側の搬送部37Aの下端には、ガイドレール4
3dに沿って摺動するスライド部材(図示しない。)が
設けられている。
The movement of the motor 44b causes the shaft 4 to move.
4 rotates, and the screw portions 43 on the carry-in side and the carry-out side rotate with the rotation of the shaft 44. Screw part 4
When the nuts 43, 43 are rotated, the nuts 43a to which the nuts screwed into the screw portions 43, 43 are fixed.
Is configured to move in the direction perpendicular to the transport direction. In order to smoothly move the transport unit 37A on the back side, the transport unit 3A is used.
Guide rails 43d, 43d are provided between the guide rails 7 and 37A.
A slide member (not shown) that slides along 3d is provided.

【0066】このように搬送部37,37Aは、該搬送
部37,37Aの離間距離を変更可能に構成されている
ので、これら搬送部37,37Aの上面に仮組みされた
枠組を載せて、該搬送部37,37Aにより釘打ち装置
9Aに搬送する際、様々な平面視形状の大きさの枠組に
対応することができ、様々な大きさの枠体や枠組を搬送
することができるようになっている。よって、製造され
る枠組や枠体の大きさに合わせた搬送装置9Bを用意す
る必要がなく、一つの搬送装置9Bで多種類の大きさの
枠組や枠体を仮組みされた状態で搬送することができ、
コストの低廉をはかることができるようになっている。
As described above, the transport units 37 and 37A are configured so that the distance between the transport units 37 and 37A can be changed. Therefore, the temporarily assembled frame is placed on the upper surfaces of the transport units 37 and 37A. When transported to the nailing device 9A by the transport units 37 and 37A, it is possible to cope with frames having various sizes in plan view and to transport frames and frameworks having various sizes. Has become. Therefore, there is no need to prepare a transport device 9B according to the size of the frame or frame to be manufactured, and a single transport device 9B transports frames and frames of various sizes in a temporarily assembled state. It is possible,
The cost can be reduced.

【0067】また、搬送部37,37Aはそれぞれ脚部
45,…により支持されており、搬入側には搬送路上を
それぞれ外側から内側に出没自在となるように設けられ
た横送り部40,40Aが取り付けられている。なお、
これら横送り部40,40Aは対向して配置されてお
り、同一構成であるので、送り部40の説明のみを行い
横送り部40Aの説明は省略する。
The transport sections 37, 37A are supported by legs 45,..., Respectively, and are provided on the carry-in side such that the transport sections 37, 37A are provided on the transport path so as to be able to protrude from the outside to the inside, respectively. Is attached. In addition,
Since these lateral feed portions 40 and 40A are arranged to face each other and have the same configuration, only the description of the feed portion 40 will be made and the description of the lateral feed portion 40A will be omitted.

【0068】横送り部40(40A)は、鉛直軸を中心
に回転する一対のプーリ46,46と、プーリ46,4
6に巻回するベルト(搬送ベルト)47とを有し、それ
ぞれの搬送部37,37Aにおいて、ベルト47,47
の内側の面が搬送路を搬送する木製パネル用枠組6の側
端面に当接するものである。つまり、搬送路の両側に搬
送方向に沿って周回するようにベルト47が設けられた
状態となっている。(図1〜図3、図9参照。図8では
省略。)
The lateral feed section 40 (40A) includes a pair of pulleys 46, 46 that rotate about a vertical axis, and pulleys 46, 4
And a belt (conveying belt) 47 wound around the belt 6.
Is in contact with the side end surface of the wooden panel framework 6 that conveys on the conveyance path. That is, the belt 47 is provided on both sides of the transport path so as to circulate along the transport direction. (See FIGS. 1 to 3 and FIG. 9; omitted in FIG. 8.)

【0069】プーリ46,46はそれぞれ搬送方向に延
在するプーリ支持材46aの両端部に立設され、このプ
ーリ支持材46aは、搬送路の外側に配設されたエアシ
リンダ48のピストンロッド48aの先端部に接続部4
8bを介して接続されており、該エアシリンダ48の駆
動により進退移動するピストンロッド48aによって、
ベルト47,47は搬送路側、つまり搬送方向と直交す
る方向に進退可能(移動可能)に構成されている。な
お、これらエアシリンダ48は該エアシリンダ48を固
定する固定板(図示省略)を介して案内部41の外側面
に固定されている。
The pulleys 46 are erected at both ends of a pulley supporting member 46a extending in the conveying direction. The pulley supporting member 46a is connected to a piston rod 48a of an air cylinder 48 disposed outside the conveying path. Connection part 4 at the tip of
8b, and a piston rod 48a which moves forward and backward by driving the air cylinder 48,
The belts 47, 47 are configured to be able to move (movable) in the conveying path side, that is, in the direction orthogonal to the conveying direction. The air cylinders 48 are fixed to the outer surface of the guide portion 41 via fixing plates (not shown) for fixing the air cylinders 48.

【0070】上記エアシリンダ48,…の駆動により対
向しているベルト47の上記搬送路側の内側面が、それ
ぞれ上記搬送路を通る仮組みされた枠組6の両側端面、
つまり縦框材1の両側端面にそれぞれ当接する。したが
って、仮組みされた枠組6はベルト47,47に両側か
ら挟まれた状態で釘打ち装置9Aに搬送されることにな
り、枠組6を釘打ち装置9Aに対して正しい向きで搬送
することができる。
The inner surfaces of the belts 47 facing each other by the driving of the air cylinders 48,... On the side of the transport path are the both end faces of the temporarily assembled frame 6 passing through the transport path.
In other words, it comes into contact with both side end surfaces of the vertical frame material 1 respectively. Therefore, the temporarily assembled framework 6 is transported to the nailing device 9A while being sandwiched between the belts 47, 47 from both sides, and the framework 6 can be transported in the correct direction with respect to the nailing device 9A. it can.

【0071】このように構成された搬送装置9Bの搬出
側端部には、該搬送装置9Bの搬送路に搬送される仮組
みされた枠組を構成する框材や棧材どうしを接合する釘
打ち装置9Aが配置されている。
At the unloading end of the transporting apparatus 9B thus constructed, nailing for joining the frame members and the battens which constitute the temporarily assembled frame transported to the transporting path of the transporting apparatus 9B is provided. The device 9A is arranged.

【0072】この釘打ち装置9Aは、仮組みされた木製
パネル用枠組6を該木製パネル用枠組6の縦框材1の搬
送方向外側の両側端面(外側端面)から釘を圧入して、
框材や棧材どうしを接合するものであり、対向して設け
られた、釘を打ち込む釘打ち機90,90をそれぞれ備
えた釘打ち設備90A、90Bを備えている。
In the nailing device 9A, nails are pressed into the temporarily assembled wooden panel framework 6 from both end faces (outer end faces) of the vertical frame material 1 of the wooden panel framework 6 on the outside in the transport direction.
It is used for joining frame members and bedding members, and includes nailing equipments 90A and 90B provided oppositely provided with nailing machines 90 and 90 for driving nails, respectively.

【0073】これら釘打ち設備90A.90Bは、搬送
装置9Bを挟んで、該搬送装置9Bの搬送路の外側に対
向してそれぞれ設けられており、それぞれの釘打ち設備
90A.90Bが備える釘打ち機90,90も対向して
配置された状態となっている。つまり、それぞれの釘打
ち機90,90の釘打ち方向が一致している。
The nailing equipment 90A. 90B are provided opposite to the outside of the transport path of the transport device 9B with the transport device 9B interposed therebetween. The nailing machines 90, 90 included in 90B are also arranged to face each other. That is, the nailing directions of the nailers 90, 90 are the same.

【0074】そして、釘打ち設備90Aは搬送部37の
搬出側の外側端部と、また釘打ち設備90Bは搬送部3
7Aの搬出側の外側端部とそれぞれ接続されており、奥
側の搬送部37A側に設けられている釘打ち設備90B
は、搬送部37Aの移動に追従して移動するものであ
る。(図10参照。)つまり、奥側の搬送部37Aが手
前側の搬送部37側に移動すると、釘打ち装置9Aも搬
送部37側に移動するように構成されており、搬送装置
9Bによって搬送される仮組みされた枠組6の大きさに
対応して、釘を圧入することができるように構成されて
いる。
The nailing equipment 90A is connected to the outside end of the transport section 37 on the unloading side, and the nailing equipment 90B is
The nailing equipment 90B is connected to the outer end of the carry-out side of 7A, and is provided on the side of the transport section 37A on the back side.
Moves following the movement of the transport section 37A. (See FIG. 10.) In other words, when the transport section 37A on the rear side moves toward the transport section 37 on the near side, the nailing device 9A also moves toward the transport section 37, and is transported by the transport apparatus 9B. According to the size of the temporarily assembled frame 6, the nail can be press-fitted.

【0075】ここで、これら釘打ち設備90A,90B
を詳細に述べる。なお、手前側の搬送部37に設けられ
ている釘打ち設備90Aと、奥側の搬送部37Aに設け
られている釘打ち設備90Bとは、同様に構成されてい
るものであるので、ここでは手前側の釘打ち設備90A
の説明のみを行い、奥側の搬送部37Aに設けられてい
る釘打ち設備90Bの説明は同符号を付して省略する。
図11は、図8における釘打ち装置9Aの有する釘打ち
設備90Aの平面図、図12は同釘打ち設備90Aの概
略背面図である。
Here, the nailing equipment 90A, 90B
Is described in detail. Note that the nailing equipment 90A provided in the transport unit 37 on the front side and the nailing equipment 90B provided in the transport unit 37A on the back side have the same configuration. Nail driving equipment 90A on the front side
And the description of the nailing equipment 90B provided in the transport section 37A on the back side will be omitted by attaching the same reference numerals.
FIG. 11 is a plan view of the nailing equipment 90A of the nailing device 9A in FIG. 8, and FIG. 12 is a schematic rear view of the nailing equipment 90A.

【0076】図8〜図11に示すように、この釘打ち設
備90Aは、釘を圧入する釘打ち機90と、釘打ち機9
0の上方に配置され、搬送路上の縦框材1に接合される
横棧材5や横框材2を支持する固定機構50と、釘打ち
機90の両サイドに設けられ、搬送装置9Bの搬送部3
7,37Aにより搬送された木製パネル用枠組6の釘を
打ち込む側端面側から固定する側面押さえ部150(1
50A,150B)と、釘を打ち込む木製パネル用枠組
6の搬送方向の前端面の角部を押さえて所定の釘打ち位
置に位置決め固定する前側端面押さえ部160と、同様
の後端面の角部を押さえて所定の釘打ち位置に位置決め
固定する後側端面押さえ部160Aと、これら釘打ち機
90、固定機構50、側端面押さえ部150および前後
側端面押さえ部160,160Aを支持し、搬送部37
に接続されて該搬送部37と一体に形成された状態とな
っている基台部101とから概略構成されている。
As shown in FIGS. 8 to 11, the nailing equipment 90A includes a nailing machine 90 for press-fitting a nail and a nailing machine 9
0, and a fixing mechanism 50 for supporting the horizontal frame member 5 and the horizontal frame member 2 joined to the vertical frame member 1 on the transport path, and provided on both sides of the nailing machine 90, Transport unit 3
7 and 37A, the side panel pressing portion 150 (1) for fixing the wooden panel frame 6 from the side where the nails are driven into the nails.
50A, 150B), and a front end face holding section 160 for holding and fixing the corner of the front end face in the transport direction of the wooden panel frame 6 for driving nails to a predetermined nailing position, and a similar rear end face corner. A rear end pressing portion 160A that presses and positions and fixes the nailing position at a predetermined nailing position, and supports the nailing machine 90, the fixing mechanism 50, the side end pressing portion 150, and the front and rear side end pressing portions 160 and 160A, and the transport portion 37.
And a base unit 101 connected to the base unit 101 and integrally formed with the transport unit 37.

【0077】釘打ち機90は、基台部101上を搬送方
向と直交する方向に水平移動する移動板102に載置固
定され、この移動板102に追従して、搬送部37の外
側方から釘打ち方向に沿って移動自在に設けられてい
る。この釘打ち機90については後述する。
The nailing machine 90 is mounted and fixed on a moving plate 102 which horizontally moves on a base 101 in a direction perpendicular to the conveying direction, and follows the moving plate 102 from the outside of the conveying section 37. It is provided movably along the nailing direction. The nailing machine 90 will be described later.

【0078】この釘打ち機90の構成を説明する前に、
該釘打ち機90により釘打ちされる木製パネル用枠組6
の縦横の框材1,2、棧材5を押さえるそれぞれの押さ
え部150.160およびそれぞれを固定する固定機構
50について説明する。先ず、基台部101に、搬送路
に沿って該搬送路に面するように固定された固定機構5
0について図13〜図16を参照して説明する。図13
〜図15は釘打ち設備90Aの固定機構50を示す正面
図、図16は同固定機構の後ろ側要部を示す平面図であ
る。
Before explaining the configuration of the nailing machine 90,
Wooden panel framework 6 nailed by the nailing machine 90
The respective holding portions 150.160 for holding the vertical and horizontal frame members 1 and 2 and the holding member 5 and the fixing mechanism 50 for fixing the respective members will be described. First, a fixing mechanism 5 fixed to the base 101 along the transport path so as to face the transport path.
0 will be described with reference to FIGS. FIG.
15 to 15 are front views showing a fixing mechanism 50 of the nailing equipment 90A, and FIG. 16 is a plan view showing a main part on the rear side of the fixing mechanism.

【0079】この固定機構50は、仮組みされる枠組6
の横框材2および横棧材5を挾持して釘打ち線上に移動
して位置決め固定するものである。
The fixing mechanism 50 is used for the temporarily assembled frame 6
The horizontal frame member 2 and the horizontal line member 5 are sandwiched and moved on the nailing line to be positioned and fixed.

【0080】この固定機構50は、図13ないし図16
に示すように、前部固定機構51と該前部固定機構51
よりも搬送装置9Bの搬出側に設けられた後部固定機構
52とからなり、それぞれの背部に配置されているエア
シリンダにより、これら第一の固定機構50の前部固定
機構51と後部固定機構52は、搬送路の外側から内側
に移動するように設けられている。
This fixing mechanism 50 is shown in FIGS.
As shown in the figure, the front fixing mechanism 51 and the front fixing mechanism 51
And a rear fixing mechanism 52 provided on the carry-out side of the transport device 9B. The front fixing mechanism 51 and the rear fixing mechanism 52 of the first fixing mechanism 50 are formed by air cylinders disposed on the respective backs. Is provided so as to move from the outside of the transport path to the inside.

【0081】すなわち、上記前部固定機構51及び後部
固定機構52は、手前側の搬送部37に沿って垂直に配
置された第一の支持板58と、該第一の支持板58の内
面の前部に搬送部37に沿って水平に配置された第一の
ガイドレール59と、該第一のガイドレール59に沿っ
て移動可能に第一のガイドレール59に嵌合された第二
の支持板60と、上記第一の支持板58の内面後部に水
平に取り付けられ、かつピストンロッド61を第二の支
持板60に接続したエアシリンダ62と、上記第二の支
持板60の内面に垂直に設けられた第二のガイドレール
63(図15及び図16に図示)と、上記第二のガイド
レール63に沿って移動可能に、第二のガイドレール6
3に嵌合された挟持部材64と、上記第二の支持板60
の上部に垂直に接続され、そのピストンロッド65が挟
持部材64に接続されたエアシリンダ66とからなるも
のである。
That is, the front fixing mechanism 51 and the rear fixing mechanism 52 are composed of a first support plate 58 disposed vertically along the transport section 37 on the near side and an inner surface of the first support plate 58. A first guide rail 59 horizontally disposed along the transporting section 37 at a front portion, and a second support fitted to the first guide rail 59 so as to be movable along the first guide rail 59. A plate 60, an air cylinder 62 horizontally attached to the rear of the inner surface of the first support plate 58, and having a piston rod 61 connected to the second support plate 60, and an air cylinder 62 perpendicular to the inner surface of the second support plate 60. And a second guide rail 6 (shown in FIGS. 15 and 16) provided on the second guide rail 6 so as to be movable along the second guide rail 63.
3 and the second support plate 60
And an air cylinder 66 whose piston rod 65 is connected to the holding member 64.

【0082】第1の支持板58の両端部58aの背部に
は、それぞれ固定板75に載置固定されているエアシリ
ンダ76に接続されている移動板77が設けられてい
る。(図16参照。)
At the back of both ends 58 a of the first support plate 58, there are provided moving plates 77 connected to air cylinders 76 mounted and fixed on fixed plates 75, respectively. (See FIG. 16)

【0083】固定板75は、基台部101上面に立設さ
れた支持部台部103を介して所定の高さ位置で固定さ
れているのものであり、この固定板75に載置固定され
ているエアシリンダ76は、該エアシリンダ76により
作動するピストンロッド76aが水平方向に搬送路側に
向かって進退移動するように固定されている。
The fixing plate 75 is fixed at a predetermined height via a support base 103 erected on the upper surface of the base 101, and is mounted and fixed on the fixing plate 75. The air cylinder 76 is fixed so that a piston rod 76a operated by the air cylinder 76 moves forward and backward in the horizontal direction toward the transport path.

【0084】この移動板77には、エアシリンダ76が
載置固定されている固定板75に形成されたレール75
a沿ってスライド移動する移動部材77aが設けられて
いる。このように第1の支持板58の背面の両側端部で
は、エアシリンダ76が接続され、このエアシリンダ7
6,76のピストンロッド78,78の進退移動によ
り、固定機構50が、搬送路の内側方向に移動したり、
外側方向に移動することが出来る。
The movable plate 77 has rails 75 formed on a fixed plate 75 on which an air cylinder 76 is mounted and fixed.
A moving member 77a that slides along a is provided. As described above, the air cylinders 76 are connected to both end portions on the rear surface of the first support plate 58,
The fixing mechanism 50 moves in the inward direction of the transport path due to the reciprocation of the piston rods 78, 78 of
Can move outward.

【0085】そして、上記挟持部材64は、図13に示
すように、裏面に第二のガイドレール63に摺動自在に
嵌合する嵌合部材67a(図16に図示)が設けられた
矩形の本体部67と本体部67後方に延出して上記ピス
トンロッド65が接続される接続部68と、上記本体部
67の前部に突出するとともに下方に延出した挟持部6
9とからなるものである。
As shown in FIG. 13, the holding member 64 has a rectangular shape provided with a fitting member 67a (shown in FIG. 16) which is slidably fitted on the second guide rail 63 on the back surface. A connecting portion 68 extending to the rear of the main body portion 67 and connected to the piston rod 65; and a holding portion 6 protruding to the front of the main body portion 67 and extending downward.
9.

【0086】そして、挟持部69の前縁は垂直に形成さ
れ、挟持部69の後縁は挟持部69の先端部に向かうに
つれて細くなるようにテーパーが付けられている。ま
た、上記後部固定機構52の第一の支持板58の前端部
分には、エアシリンダ71が垂直に取り付けられ、該エ
アシリンダ71のピストンロッド72が下方に延出自在
とされるとともに該ピストンロッド72の先端には、手
前側の搬送部37上の縦の框材1を搬送部37上面に押
圧して保持するためのパッドが取り付けられている。
The front edge of the holding section 69 is formed vertically, and the rear edge of the holding section 69 is tapered so as to become thinner toward the front end of the holding section 69. An air cylinder 71 is vertically attached to a front end portion of the first support plate 58 of the rear fixing mechanism 52, and a piston rod 72 of the air cylinder 71 is allowed to extend downward. A pad for pressing and holding the vertical frame material 1 on the transport unit 37 on the near side to the upper surface of the transport unit 37 is attached to the tip of 72.

【0087】そして、以上のような構成の固定機構50
は、前部固定機構51と後部固定機構52とが所定の間
隔をあけて対向配置され、まず、図13に示す状態から
後部固定機構52の第二の支持板60がエアシリンダ6
2により前方に移動するとともに、上記挟持部材64が
エアシリンダ66により下方に移動して、図14に示す
状態となる。そして、上記挟持部69の前縁部が搬送装
置9Bの搬送路上を搬送される仮組みされた枠組6の横
の框材2もしくは横の棧材5の前面に配置されるように
なっている。
Then, the fixing mechanism 50 having the above-described configuration is used.
The front fixing mechanism 51 and the rear fixing mechanism 52 are arranged facing each other at a predetermined interval, and first, the second support plate 60 of the rear fixing mechanism 52 is moved from the state shown in FIG.
2, the holding member 64 is moved downward by the air cylinder 66, and the state shown in FIG. 14 is obtained. The front edge of the holding section 69 is arranged on the front side of the frame member 2 or the horizontal member 5 next to the temporarily assembled frame 6 to be transported on the transport path of the transport device 9B. .

【0088】次いで、上記前部固定機構51の第二の支
持板60がエアシリンダ62により前方に移動するとと
もに、上記挟持部材64がエアシリンダ66により下方
に移動するようになっている。そして、図15に示すよ
うに、上記後部固定機構52の挟持部69との間に枠組
6の横の框材2もしくは横の棧材5を挟んだ状態になる
ように前部固定機構51の挟持部69が前方に移動し、
上記二つの挟持部材64の挟持部69により横の框材2
もしくは横の棧材5が挟まれた状態で維持されるように
なっている。
Next, the second support plate 60 of the front fixing mechanism 51 is moved forward by the air cylinder 62, and the holding member 64 is moved downward by the air cylinder 66. Then, as shown in FIG. 15, the front fixing mechanism 51 is positioned so that the frame member 6 or the horizontal member 5 of the frame 6 is sandwiched between the holding member 69 of the rear fixing mechanism 52. The holding portion 69 moves forward,
The horizontal frame member 2 is held by the holding portions 69 of the two holding members 64.
Alternatively, the horizontal member 5 is held in a sandwiched state.

【0089】また、上記二つの挟持部材64により横の
框材2もしくは横の棧材5が挟持された状態で第一の固
定機構のエアシリンダ71のピストンロッド72が下方
に移動して、ピストンロッド72の先端のパッドが手前
側の搬送部13の上縦の框材1を下方に押圧して固定す
るようになっている。
Further, the piston rod 72 of the air cylinder 71 of the first fixing mechanism moves downward while the horizontal frame member 2 or the horizontal support member 5 is held by the two holding members 64, and the piston The pad at the tip of the rod 72 presses down and fixes the upper vertical frame member 1 of the transport unit 13 on the near side.

【0090】また、上記固定機構50により横の框材2
及び横の棧材4が挟持される位置は、対向する釘打ち機
を結んだ線上となっている。また、上記固定機構50
は、図示しない制御装置に制御されており、上記搬送装
置9Bの搬送プレートの位置に対応して移動する横の框
材2もしくは横の棧材5の位置が、上記対向する釘打ち
機の手前に達した時点で、上記後部固定機構52の挟持
部材64が前方に移動するとともに下方に移動して、横
の棧材5及び横の框材2を挟持する位置に移動するよう
になっている。
Further, the horizontal frame member 2 is fixed by the fixing mechanism 50.
The position where the horizontal member 4 is sandwiched is on a line connecting the opposing nailers. Further, the fixing mechanism 50
Is controlled by a control device (not shown), and the position of the horizontal frame member 2 or the horizontal ridge member 5 that moves in accordance with the position of the transport plate of the transport device 9B is set in front of the opposing nailing machine. At this point, the holding member 64 of the rear fixing mechanism 52 moves forward and downward, and moves to a position for holding the horizontal member 5 and the horizontal frame member 2. .

【0091】そして、横の框材2もしくは横の棧材5の
前面が上記後部固定機構52の挟持部69の前縁に当接
する状態で、上記搬送プレート39の位置が光センサに
検知されて搬送装置9Bの搬送チェーン(図示省略。)
が停止するとともに、上述のように前部固定機構51の
挟持部69が前方に移動するとともに下方に移動して、
上記前部固定機構51の挟持部69との間に横の框材2
もしくは横の棧材5を挟持するようになっている。
The position of the transport plate 39 is detected by an optical sensor in a state where the front surface of the horizontal frame member 2 or the horizontal support member 5 is in contact with the front edge of the holding portion 69 of the rear fixing mechanism 52. The transport chain of the transport device 9B (not shown).
Stops, and the holding portion 69 of the front fixing mechanism 51 moves forward and downward as described above,
A horizontal frame member 2 between the front fixing mechanism 51 and the holding portion 69.
Alternatively, the horizontal member 5 is sandwiched.

【0092】そして、以上のように制御されることで、
例えば、搬送装置9B上において仮組みされた框材1、
2及び棧材4、5の正確な配置位置を上記固定機構50
により、位置決めできるようになっており、仮組みする
際に、横の框材2及び横の棧材5が正確に固定されてい
ない状態でも良い。
Then, by being controlled as described above,
For example, the frame material 1 temporarily assembled on the transport device 9B,
2 and the exact positions of the members 4 and 5 are determined by the fixing mechanism 50.
Therefore, the horizontal frame member 2 and the horizontal ridge member 5 may not be fixed accurately at the time of provisional assembly.

【0093】次に、側面押さえ部150(150A,1
50B)について説明する。側面押さえ部150は、図
11に主に図示されるように、基台部101上面に配置
されたエアシリンダ151の作動ロッド152の先端部
152aに接続され、エアシリンダ151により、内側
に、言い換えれば搬送路側に進退可能に設けられている
ものある。
Next, the side holding portion 150 (150A, 1
50B) will be described. As shown mainly in FIG. 11, the side holding portion 150 is connected to the distal end portion 152 a of the operating rod 152 of the air cylinder 151 disposed on the upper surface of the base 101, and is inwardly moved by the air cylinder 151. For example, some are provided to be able to advance and retreat on the side of the transport path.

【0094】このエアシリンダ151は、釘打ち機90
の両側で、基台部101上面に鉛直に取り付けられた固
定板104に、エアシリンダ151の作動ロッド152
が、搬送方向と直交する方向にかつ、搬送路に向かって
伸縮するように取り付けられている。この作動ロッド1
52は、該作動ロッド152の延在方向に沿って設けら
れた固定板104に取り付けられている案内部105を
摺動するスライド部106を有している。
[0094] The air cylinder 151 is
On both sides of the air cylinder 151, the operating rod 152 of the air cylinder 151 is
Are mounted so as to expand and contract in a direction perpendicular to the transport direction and toward the transport path. This operating rod 1
52 has a slide portion 106 that slides on a guide portion 105 attached to a fixed plate 104 provided along the extending direction of the operation rod 152.

【0095】側面押さえ部150(便宜上、以下では、
この側面押さえ部150のうち釘打ち機90を挟んで左
側のものを左側面押さえ部150A、右側のものを右側
面押さえ部150Bという。)は、それぞれ作動ロッド
152の先端部152aに取り付けられ、これら先端部
152aからそれぞれ釘打ち機90側に屈曲した屈曲部
150bと、屈曲部150bの先端部から搬送方向と直
交する方向に延出した移動杆150cと、この移動杆1
50cの先端部に設けられ、木製パネル用枠組の縦框材
1の側面に当接して、該側面側から押圧する押圧部材1
50dとを有している。
The side pressing portion 150 (for convenience, hereinafter,
The left side of the side pressing portion 150 with the nailing machine 90 interposed therebetween is referred to as a left side pressing portion 150A, and the right side of the side pressing portion 150 is referred to as a right side pressing portion 150B. ) Are attached to the distal end portions 152a of the operating rods 152, and are bent from these distal end portions 152a toward the nailing machine 90, respectively, and extend from the distal end portions of the bent portions 150b in a direction orthogonal to the transport direction. Moving rod 150c and the moving rod 1
A pressing member 1 provided at the tip of 50c and abutting against the side surface of the vertical frame material 1 of the wooden panel framework and pressing from the side surface side
50d.

【0096】移動杆150cと作動ロッド152は平行
となるように形成されており、作動ロッド152が移動
すると、移動杆152cが搬送方向と直交する方向に進
退移動するものとなっている。そして、この押圧部材1
50dには、縦框材1の側端面に当接する、搬送方向と
平行な当接面が設けられている。
The moving rod 150c and the operating rod 152 are formed so as to be parallel to each other. When the operating rod 152 moves, the moving rod 152c moves forward and backward in a direction perpendicular to the transport direction. And this pressing member 1
50d is provided with a contact surface that is in contact with the side end surface of the vertical frame material 1 and that is parallel to the transport direction.

【0097】これら左右側面押さえ部150A,150
Bは、対向する奥側の釘打ち設備90Bにも同様な構成
で設けられているものであり、両釘打ち設備90A,9
0Bにそれぞれ設けられている左右側面押さえ部150
A,150Bは、互いに対向して配置された状態となっ
ている。
These left and right side pressing portions 150A, 150
B is also provided in the opposite nailing equipment 90B on the opposite side in the same configuration, and the nailing equipment 90A, 9
Left and right side pressing portions 150 provided on each of OBs
A and 150B are in a state of being arranged facing each other.

【0098】つまり、釘打ちする際に、対向して設けら
れている釘打ち設備90A,90Bの左右側面押さえ部
150A,150Bをそれぞれ内側に突出させることに
より、釘打ちされる木製パネル用枠組6を両側から固定
した状態となり、釘打ち機90により釘を圧入し易くす
る。図11に実線で記されている左右側面押さえ部15
0A,150Bは、それぞれもっとも後退した状態のも
のであり、想像線Aでそれぞれ示されている部分が最も
進んだ状態(搬送路側に突出した状態)を示している。
That is, when nailing, the left and right side pressing portions 150A and 150B of the opposing nailing equipment 90A and 90B are protruded inward, respectively, so that the wooden panel frame 6 to be nailed is formed. Are fixed from both sides, and the nailing machine 90 makes it easier to press-fit the nail. Left and right side pressing portions 15 indicated by solid lines in FIG.
0A and 150B are the most retracted states, respectively, and the portions indicated by the imaginary lines A indicate the most advanced states (states protruding toward the transport path side).

【0099】これら左右押さえ部150A,150Bを
作動させる2つのエアシリンダ151,151の外側に
は、釘を打ち込む木製パネル用枠組6の搬送方向の前端
面の角部を押さえて固定する前側端面押さえ部160と
後側端面押さえ部160Aとを搬送路上にそれぞれ移動
させるエアシリンダ162、162Aが配置されてい
る。
Outside the two air cylinders 151 and 151 for operating these left and right holding parts 150A and 150B, there is a front end face holding means for holding and fixing the corners of the front end face in the transport direction of the wooden panel frame 6 for driving nails. Air cylinders 162 and 162A for moving the unit 160 and the rear end pressing unit 160A on the transport path are arranged.

【0100】上記前側端面押さえ部160は、釘打ち位
置より搬出側に設けられ、搬送路と直交する方向に延在
し、仮組みされた枠組6の前側端面に当接する前部当接
面部161を有し、この前部当接面161が所定の位置
で搬送方向と直交する方向に位置するように構成されて
いる。また、上記後側端面押さえ部160Aは、釘打ち
位置より搬入側に位置するように設けられ、搬送路と直
交する方向に延在し、仮組みされた枠組の後ろ側端面に
当接する後部当接面161Aを有している。
The front end surface pressing portion 160 is provided on the carry-out side from the nailing position, extends in a direction perpendicular to the transport path, and comes into contact with the front end surface of the temporarily assembled frame 6. The front contact surface 161 is configured to be located at a predetermined position in a direction orthogonal to the transport direction. Further, the rear end surface pressing portion 160A is provided so as to be located on the carry-in side from the nailing position, extends in a direction orthogonal to the transport path, and comes into contact with the rear end surface of the temporarily assembled framework. It has a contact surface 161A.

【0101】これら前後側端面押さえ部160,160
Aは、それぞれエアシリンダ162,162Aにより作
動するピストンロッド163,163Aにより、搬送路
上に位置させたり、ピストンロッド163,163Aを
後退させることで、搬送路から外側に位置させることが
できるように構成されている。
The front and rear end face pressing portions 160, 160
A is configured such that it can be positioned on the transport path by piston rods 163 and 163A operated by air cylinders 162 and 162A, respectively, or can be positioned outside the transport path by retracting the piston rods 163 and 163A. Have been.

【0102】これらエアシリンダ162,162Aは、
釘打ち機90の釘打ち方向を中心に左右対称に配設され
た固定板164,164Aに固定されており、これら固
定板164,164Aは、先端部164a,164aが
釘打ち位置に向かうように基台部101に固定されてい
る。これにより、ピストンロッド163,163Aは釘
打ち位置に向かって進退移動するものとなっている。ま
た、この固定板164,164Aの先端側にはピストン
ロッド163,163Aに設けられたスライド部材16
5,165Aが摺動するガイドレール166,166A
が取り付けられている。
The air cylinders 162 and 162A are
The nailers 90 are fixed to fixing plates 164, 164A arranged symmetrically with respect to the nailing direction of the nailing machine 90. These fixing plates 164, 164A are arranged such that the tips 164a, 164a are directed toward the nailing position. It is fixed to the base 101. Thereby, the piston rods 163 and 163A move forward and backward toward the nailing position. Further, the slide members 16 provided on the piston rods 163 and 163A are provided on the distal ends of the fixed plates 164 and 164A.
Guide rails 166 and 166A on which 5,165A slides
Is attached.

【0103】図17は、本発明に係る実施の形態の枠体
製造装置における釘打ち装置9Aの有する釘打ち設備を
示す側面図であり、(a)は釘打ち動作前の釘打ち設備
を示す図であり、(b)は釘を打つ際の釘打ち設備をし
めす図である。釘打ち機90は、エアシリンダ95によ
り釘打ち先端部91から釘を押し出すものであり、釘打
ち設備90Aの基台部101に釘打ち方向、つまり搬送
路と直交する方向に移動可能に設けられている移動板1
02に載置固定され、支持されている。
FIG. 17 is a side view showing the nailing equipment included in the nailing device 9A in the frame manufacturing apparatus according to the embodiment of the present invention. FIG. 17A shows the nailing equipment before the nailing operation. It is a figure and (b) is a figure which shows the nailing equipment at the time of nailing. The nailing machine 90 pushes out the nail from the nailing tip 91 by the air cylinder 95, and is provided on the base 101 of the nailing equipment 90A so as to be movable in the nailing direction, that is, the direction orthogonal to the transport path. Moving plate 1
02 is fixed and supported.

【0104】この移動板102の下面には、基台部10
1上に形成された釘打ち方向に延在する2本のレール1
70,170に嵌合して摺動するスライド部材171,
171と、基台部101上のこれら2本のレール17
0,170間に、該レール170と平行に形成されたス
リット172に内嵌されて移動する移動片173の上端
部が接合されている。
On the lower surface of the moving plate 102, the base 10
Two rails 1 formed on the nail 1 and extending in the nailing direction
70, 170, slide members 171,
171 and these two rails 17 on the base 101.
The upper end of a moving piece 173 that is fitted and moved in a slit 172 formed in parallel with the rail 170 is joined between 0 and 170.

【0105】この移動片173は、基台部101下面の
下方に配置されたエアシリンダ174により搬送方向と
直交する方向に移動可能となるピストンロッド175の
先端部175aに接合固定されているものであり、ピス
トンロッド175の進退移動に伴いスリット172に沿
って移動することで、上部に接合されている移動板10
2も移動するように構成されている。よって、エアシリ
ンダ174は、釘打ちに際して、移動板102を前進、
後退させることができ、これにより釘打ち機90の釘打
ち先端部91を框材の側面に押圧することができる。
(図17参照。)なお、移動板102下面に設けられる
スライド部材171,…は、該移動板102下面の四隅
に取り付けられ、2つずつ同一レール170を摺動する
ようになっている。
The moving piece 173 is joined and fixed to the distal end 175a of a piston rod 175 which can be moved in a direction perpendicular to the conveying direction by an air cylinder 174 disposed below the lower surface of the base 101. The moving plate 10 joined to the upper portion by moving along the slit 172 as the piston rod 175 advances and retreats.
2 is also configured to move. Therefore, the air cylinder 174 moves the moving plate 102 forward when nailing.
The nailing tip 91 of the nailing machine 90 can be pressed against the side surface of the frame material.
(See FIG. 17.) The slide members 171 provided on the lower surface of the moving plate 102 are attached to the four corners of the lower surface of the moving plate 102, and slide on the same rail 170 two by two.

【0106】また、移動板102に支持されている釘打
ち機90は、後部で釘が上下に2本供給され前部で該釘
を打ち出す釘打ち先端部91と、先端が釘打ち先端部9
1の後部に挿入され、該後部内の釘で押圧して、前部に
押し出す2本の押し出しロッド92,92と、該押し出
しロッド92,92の基端部92a,92aに接続さ
れ、これら2本のロッド92,92を上下に接続して支
持する支持部93と、該支持部93に先端部94aが接
続されたピストンロッド94と、このピストンロッド9
4を釘打ち方向に移動させるエアシリンダ95とから概
略構成されている。
The nailing machine 90 supported by the moving plate 102 has a nailing tip 91 for feeding two nails up and down at the rear and driving the nail at the front, and a nailing tip 9 for the nail.
1, two push rods 92, 92, which are inserted into the rear part of the push rod and are pushed out to the front part by being pushed by a nail in the rear part, and connected to the base ends 92a, 92a of the push rods 92, 92. A support portion 93 for vertically connecting and supporting the rods 92, 92, a piston rod 94 having a distal end 94 a connected to the support portion 93, and a piston rod 9.
And an air cylinder 95 for moving the cylinder 4 in the nailing direction.

【0107】エアシリンダ95と釘打ち先端部91は移
動板102に固定されており、支持部93は下部に、該
エアシリンダ95と釘打ち先端部91との間に設けられ
たガイドレール96に摺動可能に嵌合されたスライド部
材97が設けられている。つまり、エアシリンダ95に
よりピストンロッド94が進退移動を行うと、支持部9
3がガイドレール96に沿って移動し、支持部93の上
下に配置されている押し出しロッド92,92が釘打ち
先端部91内に挿入され該釘打ち先端部91から同時に
2本の釘を押し出すものである。
The air cylinder 95 and the nailing tip 91 are fixed to the moving plate 102, and the support portion 93 is provided on the lower part on a guide rail 96 provided between the air cylinder 95 and the nailing tip 91. A slide member 97 slidably fitted is provided. That is, when the piston rod 94 moves forward and backward by the air cylinder 95, the support portion 9
3 moves along the guide rail 96, and push rods 92, 92 arranged above and below the support portion 93 are inserted into the nailing tip 91, and simultaneously push out two nails from the nailing tip 91. Things.

【0108】釘打ち装置9Aで釘打ちを行う際は、釘打
ち装置9Aにおいて、仮組みされた枠組6を搬送する搬
送路を挟んで対向して設けられた釘打ち設備90A,9
0Bのそれぞれの移動板102,102を搬送路方向に
移動させることにより、移動板102に載置固定されて
いる釘打ち機90,90のそれぞれの釘打ち先端部9
1,91を枠組6の両側端面に当接して釘を圧入し、直
角に配置されている縦框材1と横框材2、縦框材1と横
棧材5とをそれぞれ接合する。(図17(a)、(b)
参照。)枠組6の一度に両側で釘による接合を行うこと
ができるので、枠組の製造時間を短縮できるとともに、
圧入により釘が打ち込まれているので、衝撃によって打
ち込まれた場合より、釘の曲がりや、跳ね返りが生じに
くい。
When nailing is performed by the nailing device 9A, the nailing devices 90A and 9A are provided in the nailing device 9A so as to be opposed to each other with the transport path for transporting the temporarily assembled framework 6 interposed therebetween.
By moving each of the moving plates 102, 102B in the direction of the transport path, the respective nailing tips 9 of the nailing machines 90, 90 mounted and fixed on the moving plate 102 are moved.
The nails 1, 91 are brought into contact with both side end surfaces of the framework 6 and press-fitted with nails, and the vertical frame material 1 and the horizontal frame material 2 and the vertical frame material 1 and the horizontal frame material 5 arranged at right angles are respectively joined. (FIGS. 17A and 17B)
reference. ) The nails can be joined on both sides of the framework 6 at a time, so that the manufacturing time of the framework can be reduced,
Since the nail is driven by press-fitting, bending and rebound of the nail are less likely to occur than when driven by impact.

【0109】なお、この釘打ち機90には、検知手段が
設けられている。例えば、ピストンロッド94のエンド
を検出するセンサーが取り付けられており、このセンサ
ーによりピストンロッド94のエンドを検出することに
より、釘打ち先端部91の先端が部材に当接しているか
どうかを検知することができる。この検知情報により、
ピストンロッド94が釘打ち先端部内の釘を押圧して、
外部に押し出し、框材に釘が完全に圧入されているか否
かを検知することができる。このような検知手段によ
り、釘が曲がったり、また框材に圧入されなかった場合
を検知することができ、これにより釘打ち動作が停止す
るようになっている。
The nailing machine 90 is provided with a detecting means. For example, a sensor for detecting the end of the piston rod 94 is attached, and by detecting the end of the piston rod 94 with this sensor, it is possible to detect whether or not the tip of the nailing tip 91 is in contact with the member. Can be. With this detection information,
The piston rod 94 presses the nail in the nailing tip,
It is possible to detect whether or not the nail is completely pressed into the frame material by pushing out to the outside. With such a detecting means, it is possible to detect a case where the nail is bent or not pressed into the frame material, whereby the nailing operation is stopped.

【0110】このように構成されている釘打ち装置9A
の釘打ち設備90A,90B間に仮組みされた枠組6が
搬送装置9Bにより搬送されると、釘打ち設備90A,
90Bがそれぞれ備えた、固定機構50、側面押さえ部
150、前側端面押さえ部160あるいは後端面押さえ
部160Aにより、釘打ち位置、つまり、釘打ち機9
0,90のの釘打ち方向に配置される位置となるよう
に、仮組みされた枠組6を位置決め固定する。
The nailing device 9A thus configured
When the frame 6 temporarily assembled between the nailing facilities 90A and 90B is transported by the transport device 9B, the nailing facilities 90A and 90B
The fixing mechanism 50, the side pressing part 150, the front end pressing part 160 or the rear end pressing part 160A provided in each of the nailing positions 90B of the nailing machine 9B.
The temporarily assembled framework 6 is positioned and fixed so as to be located at positions of 0 and 90 in the nailing direction.

【0111】この例を図18に示す。図18は、木製パ
ネル用枠組6において釘を打つ際に、釘打ち設備90A
のそれぞれの位置決め固定手段により、所定の釘打ち箇
所に枠組を位置決め固定した状態を示す図であり、
(a)は枠組の枠体の前側の角部を構成する縦框材1と
横框材2との接合部分を示す図であり、(b)は、縦框
材と横棧材との接合部分を示す図、(c)は枠組の枠体
の後側の角部を構成する縦框材1と横框材2との接合部
分を示す図である。
FIG. 18 shows this example. FIG. 18 shows nailing equipment 90A when driving nails in the wooden panel framework 6.
It is a diagram showing a state where the framework is positioned and fixed at a predetermined nailing location by each of the positioning and fixing means,
(A) is a figure which shows the joining part of the vertical frame material 1 and the horizontal frame material 2 which comprise the front corner part of the frame of a frame, and (b) is the junction of the vertical frame material and the horizontal member. FIG. 3C is a view showing a joint portion between a vertical frame member 1 and a horizontal frame member 2 constituting a rear corner of the frame body of the framework.

【0112】図18(a)に示すように搬送方向に送ら
れてきた仮組みされた縦横の框材1,2により構成され
る枠組の前側端面に、前側端面押さえ部160を当接さ
せ、横框材2を固定機構50の挟持部69で挟み、釘打
ち線上に配置し、側面押さえ部150,150により縦
框材1の側端面を押圧して、対向して配置されている釘
打ち設備90Bの側面押さえ部150(図示省略。)と
ともに仮組みされた枠組6を固定する。図18(b)は
固定機構50の挟持部69により横棧材5を挟んで所定
の位置(釘打ち位置)に移動して、側面側押さえ部15
0,150により枠組6を所定の位置で固定する。
As shown in FIG. 18 (a), the front end face holding portion 160 is brought into contact with the front end face of the frame composed of the temporarily assembled vertical and horizontal frame members 1 and 2 sent in the transport direction. The horizontal frame member 2 is sandwiched by the holding portions 69 of the fixing mechanism 50, is arranged on the nailing line, and the side end surfaces of the vertical frame member 1 are pressed by the side holding portions 150, 150, so that the nailing members are arranged to face each other. The temporarily assembled framework 6 is fixed together with the side pressing portion 150 (not shown) of the equipment 90B. FIG. 18B shows a state in which the holding member 69 of the fixing mechanism 50 sandwiches the horizontal member 5 and moves to a predetermined position (a nailing position).
The framework 6 is fixed at a predetermined position by 0,150.

【0113】図18(c)は搬送方向に送られてきた仮
組みされた縦横の框材1,2により構成される枠組の後
側端面に後側端面押さえ部160Aを当接させ、横框材
2を固定機構50の挟持部69で挟み、釘打ち線上に配
置し、側面押さえ部150,150により縦框材1の側
端面を押圧して、対向して配置されている釘打ち設備9
0Bの側面押さえ部150(図示省略。)とともに仮組
みされた枠組6を固定する。
FIG. 18 (c) shows a rear end holding member 160A abutting against a rear end of a frame composed of temporarily assembled vertical and horizontal frame members 1 and 2 sent in the transport direction. The material 2 is sandwiched between the holding portions 69 of the fixing mechanism 50 and is arranged on the nailing line, and the side end surfaces of the vertical frame material 1 are pressed by the side holding portions 150, 150, so that the nailing equipment 9 which is arranged opposite to the nailing device 9.
The temporarily assembled frame 6 is fixed together with the side pressing portion 150 (not shown) of 0B.

【0114】このように搬送装置9Bにより搬送された
仮組みされた枠組6を所定の位置で固定して釘を打ちや
すくしている。
The temporarily assembled framework 6 thus transported by the transport device 9B is fixed at a predetermined position to facilitate nailing.

【0115】上記構成の実施の形態における枠体製造装
置100によれば、仮組装置8で仮組みされた枠体3を
含む木製パネル用枠組6を釘打ち装置9Aに搬送する搬
送装置9Bが仮組装置8の下部に設けられているので、
仮組を行うスペースを別に確保する必要がないので、枠
体3を含む木製パネル用枠組6を製造する作業スペース
を、その分広することができる。
According to the frame manufacturing apparatus 100 in the above-described embodiment, the transport device 9B for transporting the wooden panel frame 6 including the frame 3 temporarily assembled by the temporary assembly device 8 to the nailing device 9A is provided. Since it is provided below the temporary assembly device 8,
Since there is no need to secure a separate space for performing the temporary assembly, the work space for manufacturing the wooden panel framework 6 including the frame 3 can be increased accordingly.

【0116】また、搬送装置9Bにより仮組された枠体
3を含む木製パネル用枠組6を釘打ち装置9Aに搬送
し、該釘打ち装置9Aにより、仮組みされた枠体3を含
む木製パネル用枠組6の側端面から釘を打ち込むことで
直角に配置された棧材どうしを接合している際に、上部
の仮組装置8で、別の枠体3を含む木製パネル用枠組6
の仮組を行うことができる。このように枠体3を含む木
製パネル用枠組6の仮組と釘打ちを同時に行うことがで
きるので枠体3を含む木製パネル用枠組6を製造する際
の生産性の向上を図ることができる。
Further, the wooden panel frame 6 including the frame 3 temporarily assembled by the transporting device 9B is transported to the nailing device 9A, and the wooden panel including the frame 3 temporarily assembled by the nailing device 9A. At the time of joining the members arranged at right angles with each other by driving nails from the side end surfaces of the framework 6, the temporary panel assembly 8 on the upper side uses the wooden panel framework 6 including another frame 3.
Can be performed. As described above, the temporary assembly of the wooden panel framework 6 including the frame 3 and the nailing can be performed simultaneously, so that the productivity in manufacturing the wooden panel framework 6 including the frame 3 can be improved. .

【0117】また、上記実施の形態の枠体製造装置10
0によれば、仮組装置8には、仮組みされた木製パネル
用枠組を仮組みされた状態で下方の搬送装置9Bに移送
する移送手段が設けられているので、仮組手段で仮組み
された枠体3を含む木製パネル用枠組6を容易に搬送装
置9Bに移送させることができ、下方に移送するだけで
あるので、移送時間も短い。例えば、上述したようにシ
リンダを用いた構成とすれば、製作コストの削減を図る
ことができる。
Further, the frame manufacturing apparatus 10 according to the above embodiment is used.
According to No. 0, the temporary assembling device 8 is provided with transfer means for transferring the temporarily assembled wooden panel frame to the lower transfer device 9B in a temporarily assembled state. The wooden panel framework 6 including the frame 3 thus obtained can be easily transferred to the transfer device 9B, and is simply transferred downward, so that the transfer time is short. For example, if a configuration using a cylinder is used as described above, manufacturing costs can be reduced.

【0118】さらに、仮組装置8は木製パネル用枠組6
の枠体3を構成する縦横の棧材をそれぞれ載置して仮組
を行う縦横の框材支持部11〜14を備え、これら縦横
の框材支持部11〜14のうち第2の縦框材支持部12
と、右側横框材支持部14とが、それぞれ対向する第1
の縦框材支持部11、左側横框材支持部13に対して接
離可能に構成されているので、この接離可能に構成され
ている第2の縦框材支持部12、右側横框材支持部14
を、対向する第1の縦框材支持部11、左側横框材支持
部13に接離させることにより、これら縦横の框材支持
部11〜14に載置される縦横の框材(棧材)により仮
組みされる四角枠状の枠体の大きさを変更することがで
きる。したがって、図示された形状の枠組6にかぎら
ず、平面視形状、様々な大きさの枠組や枠体の仮組を行
うことができ、これにより、様々な大きさの枠体を製造
することができる。
Further, the temporary assembling device 8 includes the wooden panel frame 6.
And vertical and horizontal frame material supporting portions 11 to 14 for mounting the vertical and horizontal frame members constituting the frame body 3 and performing temporary assembly, respectively, and the second vertical frame of the vertical and horizontal frame material supporting portions 11 to 14 is provided. Material support 12
And the right side frame support portion 14 is opposed to the first
Of the vertical frame material supporting portion 11 and the left horizontal frame material supporting portion 13 of the second vertical frame material supporting portion 12 and the right horizontal frame Material support 14
Is brought into contact with and separated from the first vertical frame material support 11 and the left horizontal frame material support 13 facing each other, so that the vertical and horizontal frame materials placed on these vertical and horizontal frame material supports 11 to 14 are formed. The size of the square frame-shaped frame temporarily assembled can be changed according to ()). Therefore, not only the frame 6 of the illustrated shape but also a plan view shape, a frame of various sizes and a temporary assembly of the frame can be performed, and thereby, frames of various sizes can be manufactured. it can.

【0119】さらに、仮組装置8で仮組みした木製パネ
ル用枠組を該仮組装置8下部の搬送装置9Bによって釘
打ち装置9Aに搬送して釘打ち装置9Aにより釘が打ち
込まれているうちに、仮組装置8で、次に製作する木製
パネル用枠組6の仮組をおこなうので、枠体3を含む木
製パネル用枠組6をラインで製造する際に、釘打ちと仮
組とを同時に行うことが出来、枠組製造の生産効率があ
がり、該枠組製造の生産性の向上を図ることができる。
Further, the wooden panel frame temporarily assembled by the temporary assembling device 8 is transported to the nailing device 9A by the transporting device 9B below the temporary assembling device 8, and while the nail is being driven by the nailing device 9A. Since the temporary assembling device 8 performs the temporary assembling of the wooden panel framework 6 to be manufactured next, the nailing and the temporary assembling are performed simultaneously when the wooden panel framework 6 including the frame 3 is manufactured in a line. As a result, the production efficiency of the frame production is increased, and the productivity of the frame production can be improved.

【0120】[0120]

【発明の効果】以上のように、請求項1記載の発明に係
る枠体製造装置によれば、仮組みされた上記枠体を上記
釘打ち装置に搬送する搬送装置の上部に、上記枠体の仮
組を行う上記仮組装置が設けられているので、枠体を製
造する際に、釘打ち作業を行う釘打ち装置とは別に、仮
組を行うスペースを確保する必要がないので、工場等に
おいて、作業スペースをその分広くすることができる。
また、上記搬送装置により仮組された上記枠体を釘打ち
装置に搬送し、該釘打ち装置により、仮組みされた上記
枠体の側端面から釘を打ち込むことで直角に配置された
棧材どうしを接合している際に、上部の仮組装置で、別
の枠体の仮組を行うことができるので、上記枠体の仮組
と釘打ちを並行して行うことができ、枠体を製造する際
の生産性の向上を図ることができる。
As described above, according to the frame manufacturing apparatus according to the first aspect of the invention, the frame body is temporarily mounted on the upper portion of the transporting device for transporting the frame body to the nailing device. Since the temporary assembling device for performing the temporary assembling is provided, it is not necessary to secure a space for performing the temporary assembling separately from the nailing device for performing the nailing operation when manufacturing the frame body. For example, the work space can be widened accordingly.
In addition, the frame body temporarily assembled by the conveyance device is transported to a nailing device, and the nailing device is used to drive a nail from a side end surface of the temporarily assembled frame body, thereby forming a pillar material arranged at a right angle. When the two members are joined together, a temporary assembly of another frame can be performed by the temporary assembly device on the upper side, so that the temporary assembly of the frame and nailing can be performed in parallel, Can be improved at the time of manufacturing.

【0121】請求項2記載の発明に係る枠体製造装置に
よれば、請求項1記載の発明と同様の効果を得ることが
できるとともに、上記仮組装置には、仮組みされた木製
パネル用枠組を仮組みされた状態で下方の搬送装置に移
送する移送手段が設けられているので、上記仮組手段で
仮組みされた上記枠体を容易に上記搬送装置に移送させ
ることができ、また、下方に移送するだけであるので、
移送時間も短い。例えば、エアシリンダを用いた構成と
すれば、製作コストの削減を図ることができる。
According to the frame manufacturing apparatus according to the second aspect of the present invention, the same effects as those of the first aspect of the invention can be obtained, and the temporary assembling apparatus includes a temporarily assembled wooden panel. Since the transfer means for transferring the framework to the lower transport device in a temporarily assembled state is provided, the frame temporarily assembled by the temporary assembly means can be easily transported to the transport device, , Just transfer it down,
The transfer time is short. For example, if a configuration using an air cylinder is used, manufacturing costs can be reduced.

【0122】請求項3記載の発明に係る枠体製造装置に
よれば、請求項1または2に記載の発明と同様の効果を
得ることができるとともに、上記仮組装置は、上記木製
パネル用枠組の枠体を構成する縦横の棧材をそれぞれ載
置して仮組を行う棧材受け部を備え、これら棧材受け部
のうち少なくとも1つが、対向する棧材受け部に対して
接離可能に構成されているので、この接離可能に構成さ
れている棧材受け部を、対向する棧材受け部に接離させ
ることにより、これら棧材受け部に載置される縦横の棧
材により仮組みされる四角枠状の枠体の大きさを変更す
ることができる。したがって、平面視形状、様々な大き
さの枠体の仮組を行うことができ、これにより、様々な
大きさの枠体を製造することができる。
According to the frame manufacturing apparatus according to the third aspect of the present invention, the same effects as those of the first or second aspect can be obtained, and the temporary assembling apparatus can use the wooden panel framework. And a pair of horizontal and vertical arranging members constituting the frame body are placed on each other to form a temporary assembly, and at least one of these arranging member receiving portions is capable of coming in contact with and separating from the opposing arranging member receiving portion. Therefore, by making the tangible material receiving portion which is configured to be able to come into contact with and separate from the opposing tangling material receiving portion, the longitudinal and horizontal tangling materials placed on these The size of the temporarily assembled rectangular frame can be changed. Therefore, it is possible to perform temporary assembly of frames having various shapes in plan view and various sizes, and thus it is possible to manufacture frames having various sizes.

【0123】請求項4記載の発明に係る枠体製造装置に
よれば、請求項1〜3のいずれかに記載の発明と同様の
効果を得ることができるとともに、上記搬送装置には、
仮組みされた上記枠体を釘打ち装置に搬送する搬送路の
両側に、搬送方向に沿ってそれぞれ周回しかつ、搬送方
向と直交する方向に移動可能に構成されている搬送ベル
トが設けられているので、対向する上記搬送ベルトの上
記搬送路側の内側面が、それぞれ上記搬送路を通る仮組
みされた上記枠体両側端面に当接する。したがって、仮
組みされた上記枠体は上記搬送ベルトに両側から挟まれ
た状態で上記釘打ち装置に搬送されることになり、上記
枠体を上記釘打ち装置に対して正しい向きで搬送するこ
とができる。
According to the frame manufacturing apparatus according to the fourth aspect of the present invention, the same effects as those of the first aspect of the present invention can be obtained.
On both sides of the transport path for transporting the temporarily assembled frame to the nailing device, a transport belt configured to be wrapped around the transport direction and to be movable in a direction orthogonal to the transport direction is provided. Therefore, the inner surfaces of the opposing conveyor belts on the side of the conveyor path abut the end faces on both sides of the temporarily assembled frame body passing through the conveyor path. Therefore, the temporarily assembled frame is transported to the nailing device while being sandwiched between the transport belts from both sides, and the frame is transported in a correct direction with respect to the nailing device. Can be.

【0124】請求項5記載の発明に係る枠体製造方法に
よれば、上記仮組装置で仮組みした木製パネル用枠体を
該仮組装置下部の搬送装置によって上記釘打ち装置に搬
送して上記釘打ち装置により釘が打ち込まれているうち
に、上記仮組装置で、次に製作する木製パネル用枠組の
仮組をおこなうので、枠体をラインで製造する際に、釘
打ちと仮組とを同時に行うことが出来、枠体製造の生産
効率があがり、該枠体製造の生産性の向上を図ることが
できる。
According to the frame manufacturing method of the fifth aspect of the present invention, the wooden panel frame temporarily assembled by the temporary assembling device is transported to the nailing device by the transport device below the temporary assembling device. While the nail is being driven by the nailing device, a temporary assembly of the wooden panel frame to be manufactured next is performed by the temporary assembly device. Therefore, when the frame is manufactured on a line, the nailing and the temporary assembly are performed. Can be performed at the same time, the production efficiency of the frame production increases, and the productivity of the frame production can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明を適用した一例としての枠体製造装置の
概略構成を示す概略正面図である。
FIG. 1 is a schematic front view showing a schematic configuration of a frame manufacturing apparatus as an example to which the present invention is applied.

【図2】本発明を適用した一例としての枠体製造装置を
構成する仮組装置の概略平面図である。
FIG. 2 is a schematic plan view of a temporary assembling apparatus constituting a frame manufacturing apparatus as an example to which the present invention is applied.

【図3】本発明を適用した一例としての枠体製造装置に
おける釘打ち装置および搬送装置の概略構成を説明する
枠組装置の概略平面図である。
FIG. 3 is a schematic plan view of a framework device illustrating a schematic configuration of a nailing device and a transport device in a frame manufacturing apparatus as an example to which the present invention is applied.

【図4】本発明に係る枠体製造装置における仮組装置8
の平面図である。
FIG. 4 is a temporary assembly device 8 in the frame manufacturing apparatus according to the present invention.
FIG.

【図5】本発明に係る枠体製造装置における仮組装置8
の正面図である。
FIG. 5 is a temporary assembly device 8 in the frame manufacturing apparatus according to the present invention.
FIG.

【図6】本発明に係る枠体製造装置における仮組装置8
の側面図である。
FIG. 6 is a temporary assembly apparatus 8 in the frame manufacturing apparatus according to the present invention.
FIG.

【図7】仮組装置が備える移動手段を説明する棧材支持
部を示す図である。
FIG. 7 is a view showing a supporting member supporting portion for explaining moving means provided in the temporary assembling device.

【図8】本実施の形態の枠体製造装置における枠組装置
9の概略構成を説明する枠組装置9の概略平面図であ
る。
FIG. 8 is a schematic plan view of the frame assembly device 9 illustrating a schematic configuration of the frame assembly device 9 in the frame body manufacturing apparatus of the present embodiment.

【図9】本実施の形態の枠体製造装置における枠組装置
9の概略構成を説明する枠組装置9の概略正面図であ
る。
FIG. 9 is a schematic front view of the frame assembly device 9 illustrating a schematic configuration of the frame assembly device 9 in the frame manufacturing apparatus according to the present embodiment.

【図10】本実施の形態の枠体製造装置における枠組装
置9の概略構成を説明する枠組装置9の概略側面図であ
る。
FIG. 10 is a schematic side view of the frame setting device 9 for explaining a schematic configuration of the frame setting device 9 in the frame manufacturing apparatus of the present embodiment.

【図11】図8における釘打ち装置の有する釘打ち設備
90Aの平面図である。
11 is a plan view of the nailing equipment 90A of the nailing device in FIG.

【図12】図8における釘打ち装置の有する釘打ち設備
の概略背面図である。
FIG. 12 is a schematic rear view of the nailing equipment of the nailing device in FIG. 8;

【図13】釘打ち設備90Aの固定機構50を示す正面
図である。
FIG. 13 is a front view showing a fixing mechanism 50 of the nailing equipment 90A.

【図14】釘打ち設備90Aの固定機構50を示す正面
図である。
FIG. 14 is a front view showing a fixing mechanism 50 of the nailing equipment 90A.

【図15】釘打ち設備90Aの固定機構50を示す正面
図である。
FIG. 15 is a front view showing a fixing mechanism 50 of the nailing equipment 90A.

【図16】釘打ち設備90Aの固定機構50の後ろ側要
部を示す平面図である。
FIG. 16 is a plan view showing a main part on the rear side of a fixing mechanism 50 of the nailing equipment 90A.

【図17】本発明に係る実施の形態の枠体製造装置にお
ける釘打ち装置の有する釘打ち設備を示す側面図であ
る。
FIG. 17 is a side view showing nailing equipment of the nailing device in the frame manufacturing apparatus according to the embodiment of the present invention.

【図18】木製パネル用枠組6において釘を打つ際に、
釘打ち設備90Aのそれぞれの位置決め固定手段によ
り、所定の釘打ち箇所に枠組を位置決め固定した状態を
示す図である。
FIG. 18 shows a case where a nail is driven in the wooden panel framework 6;
It is a figure which shows the state which positioned and fixed the framework to the predetermined nailing location by each positioning fixing means of 90 A of nailing equipment.

【図19】枠体製造装置において製造される枠体を用い
た木製パネルを示す一部を切り欠きした斜視図である。
FIG. 19 is a partially cutaway perspective view showing a wooden panel using a frame manufactured by the frame manufacturing apparatus.

【符号の説明】[Explanation of symbols]

1 縦框材(棧材) 2 横框材(棧材) 3 枠体 4 縦棧材 5 横棧材 6 木製パネル用枠組 8 仮組装置 9A釘打ち装置 9B搬送装置 10 移送手段 11 第1の縦框材支持部(桟材受け部) 12 第2の縦框材支持部(桟材受け部) 13 左側横框材支持部(桟材受け部) 14 右側横框材支持部(桟材受け部) 100 枠体製造装置 114 エアシリンダ(移送手段) 124 エアシリンダ(移送手段) P 木製パネル DESCRIPTION OF SYMBOLS 1 Vertical frame material (yellow material) 2 Horizontal frame material (yellow material) 3 Frame 4 Vertical yellow material 5 Horizontal yoke material 6 Frame for wooden panel 8 Temporary assembly device 9A nailing device 9B transport device 10 Transfer means 11 First Vertical frame material support (beam receiving portion) 12 Second vertical frame material supporting portion (beam receiving portion) 13 Left side frame material supporting portion (beam receiving portion) 14 Right side frame material supporting portion (beam receiving Part) 100 Frame manufacturing apparatus 114 Air cylinder (transfer means) 124 Air cylinder (transfer means) P Wooden panel

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 縦横の棧材によって四角枠状に組まれた
枠体を製造する枠体製造装置であって、 上記縦横の棧材を組んで上記枠体の仮組みを行う仮組装
置と、 仮組みされた上記枠体の側端面から釘を打ち込むことで
直角に配置された棧材どうしを接合する釘打ち装置と、 上記仮組装置で仮組みされた上記枠体を上記釘打ち装置
に搬送する搬送装置とを具備してなり、 上記仮組装置は上記搬送装置の上部に設けられているこ
と、 を特徴とする枠体製造装置。
1. A frame manufacturing apparatus for manufacturing a frame assembled in a rectangular frame shape by vertical and horizontal members, and a temporary assembling device for temporarily assembling the frame by assembling the vertical and horizontal members. A nailing device for joining the members arranged at right angles by driving a nail from a side end surface of the temporarily assembled frame body; and the nailing device for joining the frame body temporarily assembled by the temporary assembly device And a transport device for transporting the temporary assembly, wherein the temporary assembly device is provided above the transport device.
【請求項2】 請求項1記載の枠体製造装置において、 上記仮組装置には、仮組みされた上記枠体を仮組みされ
た状態で下方の搬送装置に移送する移送手段が設けられ
ていること、 を特徴とする枠体製造装置。
2. The frame manufacturing apparatus according to claim 1, wherein the temporary assembling device is provided with transfer means for transferring the temporarily assembled frame to a lower transfer device in a temporarily assembled state. A frame manufacturing apparatus.
【請求項3】 請求項1又は2記載の枠体製造装置にお
いて、 上記仮組装置は、上記枠体を構成する縦横の棧材をそれ
ぞれ載置して仮組を行う棧材受け部を備え、 これら棧材受け部のうち少なくとも1つが、対向する棧
材受け部に対して接離可能に構成されていること、 を特徴とする枠体製造装置。
3. The frame manufacturing apparatus according to claim 1, wherein the temporary assembling device includes a longitudinal member receiving portion that places the vertical and horizontal structural members constituting the frame and performs temporary assembly. A frame manufacturing apparatus, characterized in that at least one of the support members is configured to be able to approach and separate from the opposing support members.
【請求項4】 請求項1〜3のいずれかに記載の枠体製
造装置において、 上記搬送装置には、上記仮組みされた枠体を釘打ち装置
に搬送する搬送路の両側に、搬送方向に沿ってそれぞれ
周回する搬送ベルトが設けられ、 これら搬送ベルトは、搬送方向と直交する方向に移動可
能に構成されていること、 を特徴とする枠体製造装置。
4. The frame manufacturing apparatus according to claim 1, wherein the transport device includes a transport direction on both sides of a transport path that transports the temporarily assembled frame to a nailing device. And a transport belt that circulates along the transport belt, and the transport belts are configured to be movable in a direction orthogonal to the transport direction.
【請求項5】 請求項1〜4のいずれかに記載の枠体製
造装置を用いて上記枠体を製造する枠体製造方法であっ
て、 上記仮組装置で仮組みした枠体を該仮組装置下部の搬送
装置によって上記釘打ち装置に搬送して上記釘打ち装置
により釘が打ち込まれているうちに、上記搬送装置上部
の上記仮組装置で、次に製作する枠体の仮組をおこなう
こと、 を特徴とする枠体製造方法。
5. A frame manufacturing method for manufacturing the frame using the frame manufacturing apparatus according to claim 1, wherein the frame temporarily assembled by the temporary assembling device is provided. While the nail is driven by the nailing device by being transported to the nailing device by the transporting device at the lower part of the assembling device, the temporary assembly of the frame to be manufactured next is performed by the temporary assembly device at the upper part of the transporting device. Performing a method for manufacturing a frame.
JP32858498A 1998-11-18 1998-11-18 Frame manufacturing apparatus and frame manufacturing method using the same Expired - Fee Related JP3999381B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP32858498A JP3999381B2 (en) 1998-11-18 1998-11-18 Frame manufacturing apparatus and frame manufacturing method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP32858498A JP3999381B2 (en) 1998-11-18 1998-11-18 Frame manufacturing apparatus and frame manufacturing method using the same

Publications (2)

Publication Number Publication Date
JP2000153506A true JP2000153506A (en) 2000-06-06
JP3999381B2 JP3999381B2 (en) 2007-10-31

Family

ID=18211919

Family Applications (1)

Application Number Title Priority Date Filing Date
JP32858498A Expired - Fee Related JP3999381B2 (en) 1998-11-18 1998-11-18 Frame manufacturing apparatus and frame manufacturing method using the same

Country Status (1)

Country Link
JP (1) JP3999381B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7423395B2 (en) 2002-07-08 2008-09-09 Kabushiki Kaisha Yaskawa Denki Sensorless vector control method for alternating-current motor and control apparatus therefor
CN109702828A (en) * 2019-02-02 2019-05-03 佛山市恒途机械有限公司 A kind of doorframe Frame assembling machine and doorframe group frame method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7423395B2 (en) 2002-07-08 2008-09-09 Kabushiki Kaisha Yaskawa Denki Sensorless vector control method for alternating-current motor and control apparatus therefor
CN109702828A (en) * 2019-02-02 2019-05-03 佛山市恒途机械有限公司 A kind of doorframe Frame assembling machine and doorframe group frame method
CN109702828B (en) * 2019-02-02 2023-09-05 佛山市恒途机械有限公司 Door frame assembling machine and door frame assembling method

Also Published As

Publication number Publication date
JP3999381B2 (en) 2007-10-31

Similar Documents

Publication Publication Date Title
US4133097A (en) System for assembling framed wall sections
KR101446007B1 (en) Wood pallet manufacturing systems
JP2000153506A (en) Apparatus for manufacture of frame and manufacture of frame using it
US20010039721A1 (en) Automated apparatus for feeding and positioning strips in machines for making rectangular frames
JP2000153503A (en) Nailing machine, nailing facility having it, nailing apparatus and manufacture of frame
JPS61131835A (en) Press device for panel core material frame
CN211541623U (en) Automatic positioning and claw nail beating system and automatic claw nail beating production line
JP3421131B2 (en) Frame manufacturing equipment
JP2003340657A (en) Box body assembling method
JP3004705B2 (en) Equipment for manufacturing wooden panel frames
JPH01321129A (en) Panel fabricating device
JP3004706B2 (en) Equipment for manufacturing wooden panel frames
JP2535447B2 (en) Wood panel manufacturing work equipment
JPH0569404A (en) Cut-working device
JP2960529B2 (en) Equipment for manufacturing wooden panel frames
GB2393205A (en) A method of manufacturing wall and floor panels and roof trusses for a timber framed building.
JP2532757B2 (en) Equipment for pasting surface materials for wooden panels
JPH05212635A (en) Apparatus for manufacturing triangular panel
JPH09103926A (en) Frame manufacture device
JP2540246B2 (en) Frame frame for wooden panels
JPH04171132A (en) Manufacturing device of framework for wooden panel
JP2636209B2 (en) Panel manufacturing method
JPH05212634A (en) Apparatus for manufacturing triangular panel
JPH05212636A (en) Apparatus for manufacturing triangular panel
JPH05212633A (en) Apparatus for manufacturing triangular panel

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20051102

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070727

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070807

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070809

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100817

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100817

Year of fee payment: 3

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100817

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100817

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110817

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110817

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120817

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120817

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130817

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees