JP2000145390A - Invert-forming method and block in existing mountain tunnel - Google Patents

Invert-forming method and block in existing mountain tunnel

Info

Publication number
JP2000145390A
JP2000145390A JP10323104A JP32310498A JP2000145390A JP 2000145390 A JP2000145390 A JP 2000145390A JP 10323104 A JP10323104 A JP 10323104A JP 32310498 A JP32310498 A JP 32310498A JP 2000145390 A JP2000145390 A JP 2000145390A
Authority
JP
Japan
Prior art keywords
groove
invert
block
forming
blocks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10323104A
Other languages
Japanese (ja)
Other versions
JP3403345B2 (en
Inventor
Yukio Kakiuchi
幸雄 垣内
Hideo Kamiyama
英雄 神山
Akira Nishimaki
朗 西間木
Yoshihiro Yasukawa
良博 安川
Mitsuo Masuda
光雄 益田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kumagai Gumi Co Ltd
Original Assignee
Kumagai Gumi Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kumagai Gumi Co Ltd filed Critical Kumagai Gumi Co Ltd
Priority to JP32310498A priority Critical patent/JP3403345B2/en
Publication of JP2000145390A publication Critical patent/JP2000145390A/en
Application granted granted Critical
Publication of JP3403345B2 publication Critical patent/JP3403345B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a method for installing an invert in the batholith of an existing mountain tunnel without interrupting general traffic in a short period of time. SOLUTION: In order to form an invert in the ground under pavement that regulates a road surface in an existing mountain tunnel 10, on both sides of one and the other one side part of the road surface, the formation of a groove 66 intersecting the part, the formation of a half invert 22 by arranging a plurality of blocks 38, 40, 42, 68, 70, 72 in the groove, and the back filling operation of the groove and pavement to the back filled surface are executed successively. One of blocks disposed in the groove formed in advance has a raised part, and the raised part works to prevent not only the ground from collapsing at the other one side part, but also a back filling material of the groove formed in advance from collapsing.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、既設の山岳トンネ
ルの底盤中にインバートを形成する方法およびこれに用
いられるブロックに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for forming an invert in a bottom of an existing mountain tunnel and a block used for the method.

【0002】[0002]

【従来の技術】一般交通の用に供されている既設の山岳
トンネルに盤ぶくれが生じたとき、前記山岳トンネルの
底盤の補強のため、前記盤ぶくれの発生箇所またはその
近傍を前記底盤の幅方向の全部にわたって開削し、その
開削跡に前記山岳トンネルの覆工の両側壁に連なるイン
バートを形成することが行われている。
2. Description of the Related Art When an existing mountain tunnel that is used for general traffic is swelled, the place where the swelling occurs or the vicinity thereof is sunk in order to reinforce the bottom of the mountain tunnel. Is cut in the entire width direction of the mountain tunnel, and inverts are formed on the cut marks at both ends of both sides of the lining of the mountain tunnel.

【0003】しかし、この方法では、前記山岳トンネル
における一般交通の遮断を余儀なくされるという問題が
ある。
[0003] However, this method has a problem in that general traffic must be cut off in the mountain tunnel.

【0004】この問題を解消する方法として、前記山岳
トンネル内の路面の片側部分の双方のいずれか一方を一
般交通の用に供する間に他方についてインバートの形成
作業を行い、今度は、該作業が終了した片側部分を一般
交通の用に供しながら前記一方の片側部分においてイン
バートの形成作業を完了することが考えられる。
[0004] As a method of solving this problem, an invert formation operation is performed on one side of the road surface in the mountain tunnel while the other is used for general traffic. It is conceivable that the invert forming operation is completed in the one side while the completed one side is used for general traffic.

【0005】この方法は、片側交通を確保することによ
り全面通行止めを回避し得る点で有利であるが、その反
面、一般交通の通行制限を伴うため、インバートの形成
に要する時間を短くすることが望ましい。
[0005] This method is advantageous in that it is possible to avoid one-sided traffic by securing one-sided traffic, but on the other hand, it involves restrictions on the traffic of general traffic, so that the time required for forming the invert can be shortened. desirable.

【0006】[0006]

【発明が解決しようとする課題】本発明の目的は、既設
の山岳トンネルの底盤中に、一般交通を遮断することな
くかつ短時間でインバートを設置するための方法を提供
することにある。
SUMMARY OF THE INVENTION An object of the present invention is to provide a method for installing an invert in the bottom of an existing mountain tunnel in a short time without interrupting general traffic.

【0007】[0007]

【課題を解決するための手段】本発明は、既設の山岳ト
ンネル内の路面を規定する舗装下の地盤中にインバート
を形成する方法であって、前記路面の一方の片側部分に
これを横断する第1の溝を形成すること、前記第1の溝
内に立ち上がり部を有する1のブロックを含む複数のブ
ロックを配置し、これにより、前記1のブロックの立ち
上がり部でこれを土止め手段として他方の片側部分の地
盤を支保しかつ前記インバートの半分を形成すること、
前記第1の溝を埋め戻し、埋め戻し後の表面を舗装する
こと、その後、前記1のブロックの立ち上がり部で前記
埋め戻しの材料を支保する間に、前記路面の他方の片側
部分にこれを横断する第2の溝を形成すること、前記第
2の溝内に複数のブロックを配置し、これにより、前記
インバートの残りの半分を形成すること、前記第2の溝
を埋め戻し、埋め戻し後の表面を舗装することを含む。
各溝は、好ましくは、形成予定のインバートの半分の底
面の曲面にほぼ一致する曲面からなる底面を有する。
SUMMARY OF THE INVENTION The present invention is a method for forming an invert in a ground under a pavement defining a road surface in an existing mountain tunnel, the invert being traversed on one side of the road surface. Forming a first groove, arranging a plurality of blocks including one block having a rising portion in the first groove, whereby the rising portion of the one block uses the other as a retaining means; Supporting one side of the ground and forming half of the invert,
Backfilling the first groove and paving the backfilled surface, and then supporting the backfill material at the rising portion of the one block on the other side of the road surface; Forming a second transverse groove, arranging a plurality of blocks in the second groove, thereby forming the other half of the invert, backfilling and backfilling the second groove; Including paving the subsequent surface.
Each groove preferably has a bottom surface consisting of a curved surface that substantially matches the curved surface of the bottom surface of the half of the invert to be formed.

【0008】また、本発明は、前記インバートの形成方
法に用いられるブロックであって、前記第1の溝の伸長
方向へ伸びる本体と、該本体に連なる立ち上がり部であ
って前記本体と協同して他方の片側部分の地盤を支保す
るための一面を有する板状の立ち上がり部とを備える。
前記ブロックは、さらに、前記立ち上がり部に設けられ
その一面の一部をなす、設置予定の排水管の一部を受け
入れるための半円筒面と、前記立ち上がり部その一面か
ら他面に貫通しかつ前記半円筒面に開放する孔とを有す
るものとすることができる。
Further, the present invention is a block used in the method of forming the invert, wherein the main body extends in the direction in which the first groove extends, and a rising portion connected to the main body, which cooperates with the main body. And a plate-shaped rising portion having one surface for supporting the ground of the other one side portion.
The block is further provided on the rising portion and forms a part of one surface thereof, a semi-cylindrical surface for receiving a part of a drainage pipe to be installed, and the rising portion penetrates from one surface to another surface and And a hole opened in the semi-cylindrical surface.

【0009】[0009]

【発明の作用および効果】本発明によれば、トンネル内
の路面の片側部分の双方について、順次、前記片側部分
を横切る溝の形成、該溝内への複数のブロックの配置に
よるインバートの半分の形成、前記溝の埋め戻しおよび
舗装からなる工程を行うことから、前記インバートの形
成の間、路面の片側部分のうちのいずれか一方と舗装後
における他の一方の片側部分とを交互に一般交通の用に
供することができる。また、各溝の底面および前記ブロ
ックについて、形成予定のインバートの半分の底面の曲
面にほぼ一致する曲面とすることにより、前記溝内への
ブロックの配置による各インバートの半分の形成に要す
る時間をより短縮することができる。
According to the present invention, a groove is formed on one side of a road surface in a tunnel in order to cross the one side, and a half of an inversion by arranging a plurality of blocks in the groove. Since the steps of forming, backfilling the groove, and pavement are performed, during formation of the invert, general traffic alternates between one of the one side portions of the road surface and the other one side portion after the pavement. It can be used for In addition, by making the bottom surface of each groove and the block a curved surface substantially matching the curved surface of the bottom surface of the half of the invert to be formed, the time required for forming each half of the invert by disposing the block in the groove is reduced. It can be shorter.

【0010】また、本発明にあっては、最初に片側交通
の用に供される部分の地盤の支保すなわち土留めについ
て、前記インバートの一部をなすブロックを用いて行う
ことから、一般に行われる土留板の設置およびその撤去
に要する時間および労力を軽減することができる。この
ため、前記インバートの形成の間における片側通行の時
間を低減することができる。
In the present invention, since the ground is firstly supported or soil-retained at a portion provided for one-sided traffic using a block forming a part of the invert, it is generally performed. The time and labor required for installing and removing the earth retaining plate can be reduced. For this reason, the time for one-way traffic during the formation of the invert can be reduced.

【0011】[0011]

【発明の実施の形態】図1を参照すると、本発明の適用
対象である、一般交通の用に供されている既設の山岳ト
ンネルが全体に符号10で示されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Referring to FIG. 1, an existing mountain tunnel for general traffic, to which the present invention is applied, is indicated by the reference numeral 10 as a whole.

【0012】山岳トンネル(以下「トンネル」と略述す
る。)10は、人や車両のための通行用空間を規定する
馬蹄形断面の覆工12および舗装14を有する。路面を
規定する舗装14は路床16上に施されたアスファルト
舗装、コンクリート舗装等からなる。
The mountain tunnel (hereinafter abbreviated as “tunnel”) 10 has a lining 12 and a pavement 14 having a horseshoe-shaped cross section that define a space for traffic for people and vehicles. The pavement 14 that defines the road surface includes an asphalt pavement, a concrete pavement, and the like provided on the subgrade 16.

【0013】供用中のトンネル10には、舗装14、路
床16および該路床下の地盤18を含む底盤20の1ま
たは複数の箇所に盤ぶくれ(図示せず)が生じることが
あり、その補修のため、地盤18中にインバート22
(図4参照)が形成される。
In the tunnel 10 in operation, a swelling (not shown) may occur at one or a plurality of locations on the bottom 20 including the pavement 14, the subgrade 16, and the ground 18 under the subgrade. Invert 22 in ground 18 for repair
(See FIG. 4) is formed.

【0014】インバート22は下方に凸に湾曲した全体
形状を有し、その周方向における両端部において、覆工
12の両側部24の下端26にそれぞれ接している。
The invert 22 has an overall shape convexly curved downward, and is in contact with lower ends 26 of both sides 24 of the lining 12 at both ends in the circumferential direction.

【0015】インバート22の形成のため、まず、前記
路面における一方の片側部分28にこれを横断する溝
(第1の溝)30を形成する(図2)。溝30は、好ま
しくは、形成予定のインバート22の底面32(図4)
の半分(溝30の長さ方向における半分)の曲面にほぼ
一致する曲面からなる底面34を有するものとする。
In order to form the invert 22, a groove (first groove) 30 crossing the one side portion 28 on the road surface is first formed (FIG. 2). The groove 30 is preferably formed on the bottom surface 32 (FIG. 4) of the invert 22 to be formed.
(A half in the longitudinal direction of the groove 30).

【0016】溝30は、前記盤ぶくれの発生箇所または
その近傍において、トレンチャ、削岩機、バックホー等
を用いて底盤14(舗装14、路床16および地盤1
8)を掘り下げることにより形成することができる。こ
のとき、底盤14中の両側溝36の一方を破砕しまたは
破砕することなしに、撤去する。溝30の形成により、
覆工12の両側部24の下端26の一部が露出する。
The groove 30 is formed on the bottom 14 (paving 14, the roadbed 16 and the ground 1) by using a trencher, a rock drill, a backhoe or the like at or near the place where the bulging occurs.
8) can be formed by digging down. At this time, one of the side grooves 36 in the bottom plate 14 is removed without crushing or crushing. By forming the groove 30,
A part of the lower end 26 of both sides 24 of the lining 12 is exposed.

【0017】次に、溝30内に複数のブロック38,4
0,42を直列に配置する(図2および図3)。
Next, a plurality of blocks 38, 4 are provided in the groove 30.
0 and 42 are arranged in series (FIGS. 2 and 3).

【0018】これらのブロック38,40,42は、そ
れぞれ、インバート22の半分の底面の曲面、したがっ
て溝30の底面34の曲面にほぼ一致する曲面を有する
底面を備え、これらのブロック38,40,42の底面
の直列方向長さの総和はほぼ溝30の底面34の長さ寸
法に等しい。また、各ブロックは溝30の幅寸法(トン
ネルの軸線方向に関する長さ寸法)と同じ幅寸法a(図
5)、例えば50〜100cmの幅寸法を有する。
Each of these blocks 38, 40, 42 has a bottom surface having a curved surface on the bottom surface of the half of the invert 22, and thus a curved surface substantially matching the curved surface of the bottom surface 34 of the groove 30. The sum of the in-series lengths of the bottom surfaces of 42 is approximately equal to the length dimension of the bottom surface 34 of the groove 30. Each block has the same width dimension a (FIG. 5) as the width dimension of the groove 30 (length in the axial direction of the tunnel), for example, 50 to 100 cm.

【0019】溝30およびブロック38,40,42
は、これらの底面の曲面がインバート22の半分の底面
の曲面と一致しないものとしてもよいが、これに比べ、
図示の例のように一致するものとすることにより、溝内
30にブロック30,40,42を配置するだけで、イ
ンバート22の半分が容易にまた短時間のうちに形成さ
れる。
The groove 30 and the blocks 38, 40, 42
May be such that the curved surfaces of these bottom surfaces do not coincide with the curved surfaces of the half bottom surface of the invert 22.
As shown in the illustrated example, the half of the invert 22 can be formed easily and in a short time only by arranging the blocks 30, 40, and 42 in the groove 30.

【0020】このとき、溝30の一端側に位置するブロ
ック38は、溝30の掘削により生じた、該溝の一端を
規定する地肌、すなわち前記路面の他の一方の片側部分
45の一部をなす地盤18の垂直面44に接し、また、
溝30の他端側に位置するブロック42は覆工の一方の
側部の下端26に接する。
At this time, the block 38 located at one end of the groove 30 is used to remove a portion of the ground that defines one end of the groove, that is, a part of the other one side portion 45 of the road surface, which is generated by excavation of the groove 30. In contact with the vertical surface 44 of the ground 18 to be formed,
A block 42 located at the other end of the groove 30 contacts the lower end 26 on one side of the lining.

【0021】ところで、ブロック38は、他の2つのブ
ロック40,42が互いに同じ厚さ寸法の板状体からな
るのに対し、ブロック40と同じ厚さ寸法を有しかつ該
ブロックに接する板状の本体46と、該本体に連なる板
状の立ち上がり部48とからなる。
The block 38 has the same thickness as that of the block 40 and has the same thickness as the block 40, whereas the other two blocks 40 and 42 are made of plate-like bodies having the same thickness. And a plate-shaped rising portion 48 connected to the main body.

【0022】ブロック38の本体46と立ち上がり部4
8とは、互いに協同して規定する平坦な一面50を有
し、また、立ち上がり部48は一面50に相対する平坦
な他面52を有する。ブロック38は、その一面50に
おいて、地盤の垂直面44に接している。このことか
ら、ブロック38は地盤18の垂直面44に対する土留
作用をなし、これを支保する。これにより、垂直面44
の崩壊を防止することができる。したがって、溝30に
はブロック38を配置した後にブロック40,42を順
次に配置することが望ましい。インバートの一部をなす
ブロック38をもって垂直面44に対する土留手段とし
たことから、別途土留壁を構築する労力および時間を不
要とすることができ、これにより、インバート22の形
成に要する時間を節減することができる。
The main body 46 of the block 38 and the rising portion 4
8 has a flat surface 50 defined in cooperation with each other, and the rising portion 48 has a flat other surface 52 facing the one surface 50. The block 38 is in contact with the vertical surface 44 of the ground on one side 50 thereof. For this reason, the block 38 performs a retaining action on the vertical surface 44 of the ground 18 to support the same. Thereby, the vertical surface 44
Can be prevented from collapsing. Therefore, it is desirable to arrange the blocks 40 and 42 sequentially in the groove 30 after the block 38 is arranged. Since the block 38 forming a part of the invert is used as the retaining means for the vertical surface 44, the labor and time for separately constructing the retaining wall can be eliminated, thereby reducing the time required for forming the invert 22. be able to.

【0023】ブロック38,40,42の配置に先立ち
溝の底面34上にモルタル(図示せず)を敷き、また、
ブロック38,40,42相互間の隙間と、ブロック4
2および覆工の下端26相互間の隙間とをコンクリート
(図示せず)で埋める。これにより、溝の底面34のわ
ずかな不陸を調整し、また、ブロック38,40,42
相互を接続しかつブロック42および覆工の下端26相
互を接続してこれらを一体とすることができる。
Prior to the arrangement of the blocks 38, 40 and 42, a mortar (not shown) is laid on the bottom surface 34 of the groove.
The gap between the blocks 38, 40 and 42 and the block 4
2 and the gap between the lower ends 26 of the lining are filled with concrete (not shown). This adjusts the slight unevenness of the groove bottom surface 34 and also blocks 38, 40, 42
The blocks 42 and the lower end 26 of the lining may be connected together to make them integral.

【0024】ブロック38の立ち上がり部48には、半
円筒面54と、1の孔56とが設けられている。半円筒
面54は一面50に開放し、本体46に近接してその幅
方向(トンネルの軸線方向)へ伸びている。また、孔5
6はその両端においてそれぞれ半円筒面54と他面52
とに開放している。1の孔56に代えて、複数の孔を前
記幅方向に互いに間隔をおいて配置することができる。
The rising portion 48 of the block 38 is provided with a semi-cylindrical surface 54 and one hole 56. The semi-cylindrical surface 54 is open to one surface 50 and extends in the width direction (axial direction of the tunnel) in the vicinity of the main body 46. Hole 5
6 has a semi-cylindrical surface 54 and another surface 52 at both ends, respectively.
And open to the public. Instead of one hole 56, a plurality of holes can be arranged at intervals in the width direction.

【0025】半円筒面54は、地下水を受け入れかつこ
れを排出するために後に配置される穴あき管58(図
4)を保持し、また、孔56はその周囲の地下水を穴あ
き管58に導く。
The semi-cylindrical surface 54 holds a perforated tube 58 (FIG. 4) which is subsequently positioned to receive and drain groundwater, and a hole 56 directs surrounding groundwater to the perforated tube 58. Lead.

【0026】インバートの一部を形成した後、ブロック
38の本体46およびブロック40,42上に土砂、砕
石等(埋め戻し材料)60を投入する。これにより、路
面の他方の片側部分45の地盤の頂面の高さ位置すなわ
ちブロック38の立ち上がり部48の頂面の高さ位置ま
で、溝30を埋め戻す。
After forming a part of the invert, earth and sand, crushed stones (backfilling material) 60 are put on the main body 46 of the block 38 and the blocks 40 and 42. As a result, the groove 30 is buried back to the height position of the top surface of the ground at the other side portion 45 of the road surface, that is, the height position of the top surface of the rising portion 48 of the block 38.

【0027】その後、埋め戻し材料60の頂面上に例え
ば砕石からなる路床62を形成し、さらに、路床62に
アスファルト舗装やコンクリート舗装からなる舗装64
を施す。
Thereafter, a subgrade 62 made of, for example, crushed stone is formed on the top surface of the backfill material 60, and a pavement 64 made of asphalt pavement or concrete pavement is formed on the subgrade 62.
Is applied.

【0028】舗装64の施工が完了するまで、他方の片
側部分45を一般通行の用に供することができ、これに
より、トンネル10内の全面通行止めを回避することが
できる。
Until the construction of the pavement 64 is completed, the other side portion 45 can be used for general traffic, so that the entire traffic in the tunnel 10 can be avoided.

【0029】次に、インバート22の残りの半分を形成
する。インバート22の残りの半分の形成は、先に行っ
たインバート22の前記半分の形成とほぼ同様にして行
う。
Next, the other half of the invert 22 is formed. The formation of the other half of the invert 22 is performed in substantially the same manner as the above-described formation of the half of the invert 22.

【0030】すなわち、他方の片側部分45にこれを横
切る溝66を形成し(図3)、溝66内に複数の他のブ
ロック68,70,72を配置し、その後、溝66を埋
め戻し材料74で埋め戻し、埋め戻し材料74の表面上
に路床76を形成し、路床76上に舗装78を施す。こ
の間、補修が完了している一方の片側部分28を一般交
通の用に供する。これにより、補修の全期間を通して、
トンネル10内の通行が維持される。
That is, a groove 66 crossing the other side portion 45 is formed (FIG. 3), a plurality of other blocks 68, 70, 72 are arranged in the groove 66, and then the groove 66 is filled with backfill material. A backfill is formed at 74, a subgrade 76 is formed on the surface of the backfill material 74, and a pavement 78 is provided on the subgrade 76. During this time, one of the repaired one side portions 28 is used for general traffic. As a result, throughout the repair period,
The traffic in the tunnel 10 is maintained.

【0031】溝66は、先に形成された溝30に連な
り、溝30と同じ幅寸法を有する。溝66は、前記した
と同様の理由から、インバート22の残りの半分のイン
バートの底面の曲面にほぼ一致する曲面からなる底面8
0を有する。溝66は、溝34と同様にして掘削するこ
とができる。
The groove 66 is continuous with the previously formed groove 30 and has the same width as the groove 30. For the same reason as described above, the groove 66 is formed on the bottom surface 8 of a curved surface substantially matching the curved surface of the bottom surface of the other half of the invert 22.
Has zero. The groove 66 can be excavated in the same manner as the groove 34.

【0032】複数のブロック68,70,72は、それ
ぞれ、板状体からなり、また、前記したと同様の理由か
ら溝66の底面80の曲面にほぼ一致する曲面を有す
る。これらのブロック68,70,72はこれらが溝6
6内に直列に配置されるときに互いに接し、また、1の
ブロック68が、先に配置されたブロック38の本体4
6に接しかつ他の1のブロック覆工の他方の側部の下端
26に接する。したがって、これらのブロック68,7
0,72は協同してインバート22の残りの半分を構成
する。
Each of the plurality of blocks 68, 70, and 72 is formed of a plate-like body, and has a curved surface substantially matching the curved surface of the bottom surface 80 of the groove 66 for the same reason as described above. These blocks 68, 70, 72 are formed by
6 are in contact with each other when arranged in series, and one block 68 is the body 4 of the previously arranged block 38.
6 and the lower end 26 of the other side of the other block lining. Therefore, these blocks 68,7
0,72 cooperate to form the other half of the invert 22.

【0033】同様に、ブロック68,70,72の配置
に先立ち、溝の底面80上にモルタル(図示せず)を敷
き、さらに、これらのブロック相互間の隙間、ブロック
68およびブロックの本体46相互間の隙間、および、
ブロック72および覆工の他方の下端26相互間の隙間
をコンクリート(図示せず)で埋める。
Similarly, prior to the arrangement of the blocks 68, 70, 72, mortar (not shown) is laid on the bottom surface 80 of the groove, and the gap between these blocks, the block 68 and the body 46 of the block are formed. Gaps between, and
The gap between the block 72 and the other lower end 26 of the lining is filled with concrete (not shown).

【0034】同様に、溝66の埋め戻しは、先に配置さ
れたブロック38の立ち上がり部48の頂面まで行う。
埋め戻し材料66上への路床76および舗装78の形成
も前記したと同様にして行い、これにより、インバート
22の形成を完了する。
Similarly, the backfilling of the groove 66 is performed up to the top surface of the rising portion 48 of the block 38 arranged earlier.
The formation of the subgrade 76 and the pavement 78 on the backfill material 66 is performed in the same manner as described above, thereby completing the formation of the invert 22.

【0035】なお、埋め戻し材料66による埋め戻しに
先立ち、先に配置されたブロック38の半円筒面54に
穴あき管58を通し、該穴あき管の両端部をそれぞれ既
設の排水管(図示せず)に接続する。
Prior to backfilling with the backfill material 66, a perforated pipe 58 is passed through the semi-cylindrical surface 54 of the block 38 disposed earlier, and both ends of the perforated pipe are respectively connected to the existing drain pipe (see FIG. (Not shown).

【0036】他方の片側部分45における溝66の掘削
から該溝の埋め戻しまでの間、先に充填された溝30内
の埋め戻し材料60は、ブロック30の立ち上がり部4
7により堰き止められ、その崩壊が防止される。
Between the excavation of the groove 66 in the other side portion 45 and the backfilling of the groove, the backfill material 60 in the groove 30 previously filled is filled with the rising portion 4 of the block 30.
7 prevents the collapse.

【0037】前記したブロックは、それぞれ、図示の例
のプレキャストコンクリート製のもの外、例えば鋼製、
FRP製等のものを用いることができる。また、ブロッ
ク38,40,42およびブロック68,70,72
は、それぞれ、これらの数量を3とする図示の例に代え
て、2または4以上とすることができる。
Each of the above-mentioned blocks is made of, for example, steel, other than the precast concrete one shown in the figure.
Those made of FRP or the like can be used. Also, blocks 38, 40, 42 and blocks 68, 70, 72
Can be 2 or 4 or more, respectively, instead of the illustrated example in which these quantities are 3.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明が適用される既設の山岳トンネルの概略
的な横断面図である。
FIG. 1 is a schematic cross-sectional view of an existing mountain tunnel to which the present invention is applied.

【図2】一方の片側部分に溝を掘削し、該溝に1のブロ
ックを配置した状態における図1と同様の横断面図であ
る。
FIG. 2 is a cross-sectional view similar to FIG. 1 in a state where a groove is excavated on one side portion and one block is arranged in the groove.

【図3】他方の片側部分に溝を掘削した状態における図
1と同様の横断面図である。
FIG. 3 is a cross-sectional view similar to FIG. 1 in a state where a groove is excavated in the other one side portion.

【図4】インバートが形成されて状態における図1と同
様の横断面図である。
FIG. 4 is a cross-sectional view similar to FIG. 1 in a state where an invert is formed.

【図5】1のブロックの拡大背面図である。FIG. 5 is an enlarged rear view of one block.

【符号の説明】[Explanation of symbols]

10 既設の山岳トンネル 14 舗装 18 地盤 28,45 路面の一方の片側部分および他方の片側部
分 30,66 溝 32 インバートの底面 34,80 溝の底面 38,46,48 ブロック、その本体および立ち上が
り部 40,42,68,70,72 ブロック
10 Existing mountain tunnel 14 Pavement 18 Ground 28,45 One side part and the other side part of road surface 30,66 Groove 32 Bottom of invert 34,80 Bottom of groove 38,46,48 Block, its main body and rising portion 40 , 42,68,70,72 blocks

───────────────────────────────────────────────────── フロントページの続き (72)発明者 西間木 朗 東京都新宿区津久戸町2番1号 株式会社 熊谷組東京本社内 (72)発明者 安川 良博 東京都新宿区津久戸町2番1号 株式会社 熊谷組東京本社内 (72)発明者 益田 光雄 東京都新宿区津久戸町2番1号 株式会社 熊谷組東京本社内 Fターム(参考) 2D055 BB02 CA08 KB04 KB13 LA03 LA16  ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Akira Nishimaki 2-1 Tsukudo-cho, Shinjuku-ku, Tokyo Kumagaya Gumi Tokyo Head Office (72) Inventor Yoshihiro Yasukawa 2-1 Tsukudo-cho, Shinjuku-ku, Tokyo Kumagai Gumi Tokyo Main Office (72) Inventor Mitsuo Masuda 2-1 Tsukudo-cho, Shinjuku-ku, Tokyo F-term (reference) 2D055 BB02 CA08 KB04 KB13 LA03 LA16

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】既設の山岳トンネル内の路面を規定する舗
装下の地盤中にインバートを形成する方法であって、前
記路面の一方の片側部分にこれを横断する第1の溝を形
成すること、前記第1の溝内に立ち上がり部を有する1
のブロックを含む複数のブロックを配置し、これによ
り、前記1のブロックの立ち上がり部で他方の片側部分
の地盤を支保しかつ前記インバートの半分を形成するこ
と、前記第1の溝を埋め戻し、埋め戻し後の表面を舗装
すること、その後、前記1のブロックの立ち上がり部で
前記埋め戻しの材料を支保する間に、前記路面の他方の
片側部分にこれを横断する第2の溝を形成すること、前
記第2の溝内に複数のブロックを配置し、これにより、
前記インバートの残りの半分を形成すること、前記第2
の溝を埋め戻し、埋め戻し後の表面を舗装することを含
む、インバートの形成方法。
1. A method for forming an invert in a ground under a pavement defining a road surface in an existing mountain tunnel, comprising: forming a first groove crossing one side of the road surface on one side portion thereof. Having a rising portion in the first groove.
Arranging a plurality of blocks including the block of the above, thereby supporting the ground of the other side portion at the rising portion of the one block and forming half of the invert, backfilling the first groove, Paving the backfilled surface, and then forming a second groove across the other side of the road surface while supporting the backfill material at the rise of the one block. That a plurality of blocks are arranged in the second groove,
Forming the other half of the invert, the second
A method of forming an invert, comprising backfilling the groove of the above and paving the backfilled surface.
【請求項2】各溝および前記ブロックは、形成予定の前
記インバートの半分の底面の曲面にほぼ一致する曲面か
らなる底面を有する、請求項1に記載の方法。
2. The method according to claim 1, wherein each groove and said block have a bottom surface consisting of a curved surface that substantially matches the curved surface of the bottom surface of the half of the invert to be formed.
【請求項3】請求項1または2に記載の方法に用いられ
るブロックであって、前記第1の溝の伸長方向へ伸びる
本体と、該本体に連なる立ち上がり部であって前記本体
と協同して他方の片側部分の地盤を支保するための一面
を有する板状の立ち上がり部とを備える、ブロック。
3. A block used in the method according to claim 1 or 2, wherein the main body extends in a direction in which the first groove extends, and a rising portion connected to the main body and cooperates with the main body. A plate-shaped rising portion having one surface for supporting the ground of the other one side portion.
【請求項4】さらに、前記立ち上がり部に設けられその
一面の一部をなす、設置予定の排水管の一部を受け入れ
るための半円筒面と、前記立ち上がり部その一面から他
面に貫通しかつ前記半円筒面に開放する孔とを有する、
請求項3に記載のブロック。
4. A semi-cylindrical surface provided on the rising portion and forming a part of one surface thereof for receiving a part of a drainage pipe to be installed, wherein the rising portion penetrates from one surface to another surface and Having a hole opened in the semi-cylindrical surface,
The block according to claim 3.
JP32310498A 1998-11-13 1998-11-13 Invert formation method and block in existing mountain tunnel Expired - Fee Related JP3403345B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP32310498A JP3403345B2 (en) 1998-11-13 1998-11-13 Invert formation method and block in existing mountain tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP32310498A JP3403345B2 (en) 1998-11-13 1998-11-13 Invert formation method and block in existing mountain tunnel

Publications (2)

Publication Number Publication Date
JP2000145390A true JP2000145390A (en) 2000-05-26
JP3403345B2 JP3403345B2 (en) 2003-05-06

Family

ID=18151132

Family Applications (1)

Application Number Title Priority Date Filing Date
JP32310498A Expired - Fee Related JP3403345B2 (en) 1998-11-13 1998-11-13 Invert formation method and block in existing mountain tunnel

Country Status (1)

Country Link
JP (1) JP3403345B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322273A (en) * 2011-05-20 2012-01-18 中国矿业大学 A kind of roadway floor anchor is annotated integrated reinforcement means
JP2014111861A (en) * 2012-12-05 2014-06-19 East Nippon Expressway Co Ltd Invert construction method in road tunnel, and invert
JP2015048628A (en) * 2013-08-30 2015-03-16 東日本高速道路株式会社 Invert construction method of existing tunnel
CN110130958A (en) * 2019-05-16 2019-08-16 中国神华能源股份有限公司 A kind of control method of gob side entry retaining pucking
JP2020117928A (en) * 2019-01-23 2020-08-06 鉄建建設株式会社 Tunnel repairing method and repairing device for existing tunnel

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322273A (en) * 2011-05-20 2012-01-18 中国矿业大学 A kind of roadway floor anchor is annotated integrated reinforcement means
JP2014111861A (en) * 2012-12-05 2014-06-19 East Nippon Expressway Co Ltd Invert construction method in road tunnel, and invert
JP2015048628A (en) * 2013-08-30 2015-03-16 東日本高速道路株式会社 Invert construction method of existing tunnel
JP2020117928A (en) * 2019-01-23 2020-08-06 鉄建建設株式会社 Tunnel repairing method and repairing device for existing tunnel
JP7248236B2 (en) 2019-01-23 2023-03-29 鉄建建設株式会社 Tunnel repair method and equipment for existing tunnels
CN110130958A (en) * 2019-05-16 2019-08-16 中国神华能源股份有限公司 A kind of control method of gob side entry retaining pucking

Also Published As

Publication number Publication date
JP3403345B2 (en) 2003-05-06

Similar Documents

Publication Publication Date Title
CN113308953B (en) Construction method for widening embankment by utilizing foam concrete of existing retaining wall
KR20180118009A (en) Duplex tunnel construction method
KR20070075506A (en) Construction method of underground structure using concrete filled pipe roof and concrete wall
KR20190079588A (en) Construction Method of Duplex Tunnel
JP5843413B1 (en) Lowering method of existing tunnel
JP3893056B2 (en) Construction method of underground structure
CN113529752A (en) Construction method for ecologically treating tunnel entrance and exit structure by using foam concrete
JP2000145390A (en) Invert-forming method and block in existing mountain tunnel
JP2019124019A (en) Invert construction method to existing tunnel
JP3366580B2 (en) How to install an invert in the bottom of an existing mountain tunnel
JP3125288B2 (en) Construction method of tunnel invert and precast plate for tunnel invert
JP3403346B2 (en) Repair members and repair methods for the bottom of existing mountain tunnels
CN108729468A (en) One kind increasing processing method for rock foundation road barricade
JP3856791B2 (en) How to lay an overhanging sidewalk
KR100436896B1 (en) Construction method for back-fill area of abutment
JP3352951B2 (en) Installation method of invert and underground drainage in mountain tunnel
JP3581332B2 (en) Earth retaining equipment and open-cutting method using it
JP3101371B2 (en) Temporary backfill method
CN116537188A (en) Construction method for removing steel sheet piles for excavation and support of drift sand stratum grooves
JP2587309B2 (en) Protective structure of concrete underground structure and its construction method
KR100609125B1 (en) Corrugated steel culverts and manufacturing method therof
JP2000136692A (en) Construction of tunnel for underground railway
JP2003147712A (en) Road surface lining execution method
JP4319122B2 (en) Branch and junction structure of branching tunnel and its construction method
JP2000257389A (en) Method for forming invert in base ground of existing mountain tunnel

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20030212

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080229

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090228

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100228

Year of fee payment: 7

LAPS Cancellation because of no payment of annual fees