JP2000110350A - Method and device for execution state drawing output and record medium - Google Patents

Method and device for execution state drawing output and record medium

Info

Publication number
JP2000110350A
JP2000110350A JP10280832A JP28083298A JP2000110350A JP 2000110350 A JP2000110350 A JP 2000110350A JP 10280832 A JP10280832 A JP 10280832A JP 28083298 A JP28083298 A JP 28083298A JP 2000110350 A JP2000110350 A JP 2000110350A
Authority
JP
Japan
Prior art keywords
construction
time
information
building
reference plane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10280832A
Other languages
Japanese (ja)
Other versions
JP3892593B2 (en
Inventor
Takeshi Takao
全 高尾
Koji Ichikawa
浩司 市川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP28083298A priority Critical patent/JP3892593B2/en
Publication of JP2000110350A publication Critical patent/JP2000110350A/en
Application granted granted Critical
Publication of JP3892593B2 publication Critical patent/JP3892593B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To show an execution state so as to save the discussion and confirmation of the execution plan of construction work. SOLUTION: When a reference crossing the three-dimensional execution space of a construction and the output of an execution state drawing with regard to the reference face is designated in a specified time within an execution period, a member and a temporarily set material existing in a display range (the range shown by being surrounded in (A) by a broken line) having prescribed width in the direction of including and intersecting the reference face is extracted within the specified time on the basis of information expressing the execution time of the information and a member or the use period of the temporarily set material expressing the disposition position of each member constituting the construction and each temporarily set material used during execution, and an execution state drawing showing the extracted member and the temporarily set material at a position corresponding a projection position for a projection face substantially parallel with the reference face as a diagram corresponding to the kind of the individual member or the temporarily set material is output (referring to (C) and (D).

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は施工状況図出力方
法、装置及び記録媒体に係り、特に、建設物の施工期間
内の施工状況を示す施工状況図を出力する施工状況図出
力方法、該施工状況図出力方法を適用可能な施工状況図
出力装置、及び前記施工状況図出力方法をコンピュータ
で実行させるためのプログラムが記録された記録媒体に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction status diagram output method, apparatus, and recording medium, and more particularly to a construction status diagram output method for outputting a construction status diagram showing the construction status of a construction during the construction period. The present invention relates to a construction situation diagram output device to which a situation diagram output method can be applied, and a recording medium on which a program for causing a computer to execute the construction situation diagram output method is recorded.

【0002】[0002]

【従来の技術及び発明が解決しようとする課題】建設工
事の施工時に、使用する掘削機や揚重機等の建設工事用
機器や各種の仮設物が当初予定していた位置に物理的に
配置可能か否か、施工時の安全性を確保できるか否か、
並行して実施される作業同士が干渉しないか否か等を事
前に検討・確認することは、建設工事の施工計画の立案
における非常に重要な作業であり、施工期間内の各時期
における施工現場内の状況を容易に確認できるようにす
ることは、建設工事の施工計画の検討・確認の省力化に
非常に有効である。
2. Description of the Related Art During construction work, construction equipment such as an excavator and a hoist used and various temporary objects can be physically arranged at the originally planned positions. Whether or not safety at the time of construction can be ensured,
Examining and confirming in advance whether or not the work performed in parallel does not interfere with each other is a very important work in drafting the construction plan of the construction work, and the construction site at each time during the construction period To be able to easily confirm the situation inside the building is very effective for labor saving of study and confirmation of the construction plan of the construction work.

【0003】上記に基づき、本願出願人は、作業の順序
データ及び機器の配置データに基づいて、作業所の平面
図に機器及び仮設物を重ねて示した状況図を作成・表示
すると共に、状況図に示した機器及び仮設物の配置を変
更可能とした建設工事シミュレーション装置を提案して
いる(特許第 2664519号公報等参照)。
[0003] Based on the above, the applicant of the present invention creates and displays a situation diagram in which equipment and temporary objects are superimposed on a plan view of a work place based on work sequence data and equipment arrangement data, and There has been proposed a construction work simulation apparatus that allows the arrangement of the equipment and temporary objects shown in the figure to be changed (see Japanese Patent No. 2664519).

【0004】しかしながら、上記のシミュレーション装
置は、作業所の平面図を状況図として示すものであり、
基礎工事等のように平面的な工事を実施している際の施
工現場内の状況については容易に把握可能であるが、地
下工事や躯体工事等のように上方から見て部材が重なっ
て配置されたり、異なる高さ位置で作業が並列に進行す
る工事における施工現場内の状況を、高さ方向の位置情
報が表現されない平面図によって把握することは困難で
あり、地下工事や躯体工事等における施工状況の把握に
は不向きである。また平面図や側面図は、上方又は側方
から見て部材が重なって配置されている場合に、奥側に
位置している部材が、図上では手前側に位置している部
材の背後に隠れることになり、奥側に位置している部材
を確認することが困難である、という不具合もある。
[0004] However, the above simulation apparatus shows a plan view of a work place as a situation diagram,
It is easy to grasp the situation inside the construction site when performing flat construction such as foundation work, but members are placed overlapping when viewed from above, such as underground construction and skeleton construction It is difficult to grasp the situation inside the construction site in the construction where the work progresses in parallel at different height positions from the ground plan where the position information in the height direction is not represented. It is not suitable for grasping the construction status. Also, in the plan view and side view, when the members are arranged overlapping when viewed from above or from the side, the member located on the back side is behind the member located on the near side in the figure. There is also a drawback that it is difficult to check the members located on the back side because they are hidden.

【0005】このため、地下工事や躯体工事等における
施工状況の把握には、垂直断面図や水平断面図を用いる
ことが考えられる。しかし、3次元CAD等における断
面図は、或る断面線に沿って切断したときの切断面に接
している部材のみを示した図であることが殆どであり、
作成された断面図に現われている情報量が少ないという
問題がある。
[0005] Therefore, it is conceivable to use a vertical sectional view or a horizontal sectional view for grasping the construction status in underground construction, frame construction and the like. However, a cross-sectional view in a three-dimensional CAD or the like is almost always a view showing only a member that is in contact with a cut surface when cut along a certain cross-sectional line.
There is a problem that the amount of information appearing in the created sectional view is small.

【0006】特に地下工事では、山留壁、仮設杭、支保
工(切梁)、アースアンカ等の多数の仮設物を用いて作
業が行われるので、地下工事の施工計画の検討・確認に
おいては、各種の仮設物や躯体を構成する各部材の相互
の位置関係の把握が非常に重要であるが、3次元CAD
等で作成された単一の断面図に、各種の仮設物や、躯体
を構成する各部材の位置が全て現れていることは稀であ
り、断面線の位置を変更しながら断面図を繰り返し作成
させる必要があると共に、作成された多数の断面図に基
づき、断面図相互の比較等を行うことで、各種の仮設物
や各部材相互の位置関係を把握する必要がある。従っ
て、単に断面図を表示するようにしただけでは、地下工
事や躯体工事等の施工計画の検討・確認の省力化を実現
できない。
[0006] In particular, in the underground construction work is performed using a large number of temporary structures such as a retaining wall, a temporary pile, a shoring (cutting beam), an earth anchor, and the like. It is very important to grasp the mutual positional relationship between the various members constituting the temporary object and the skeleton.
It is rare that all the positions of various temporary objects and the members that make up the skeleton appear in a single cross-sectional view created by the above procedure. In addition, it is necessary to grasp the positional relationship between various temporary objects and each member by comparing the cross-sectional views based on a large number of the prepared cross-sectional views. Therefore, simply displaying a cross-sectional view cannot save labor for studying and confirming construction plans such as underground construction and skeleton construction.

【0007】本発明は上記事実を考慮して成されたもの
で、建設工事の施工計画の検討・確認が省力化されるよ
うに施工状況を図示できる施工状況図出力方法、施工状
況図出力装置、及び記録媒体を得ることが目的である。
The present invention has been made in view of the above facts, and a method and apparatus for outputting a construction status diagram capable of showing the construction status so as to save labor for studying and confirming the construction plan of the construction work. And a recording medium.

【0008】[0008]

【課題を解決するための手段】上記目的を達成するため
に請求項1記載の発明に係る施工状況図出力方法は、建
設物を構成する各部材及び前記建設物の施工時に使用さ
れる各資材について各々設定された、前記部材又は資材
の種類を表す種類情報、前記建設物の施工時の3次元施
工空間内における前記部材又は資材の配置位置を表す位
置情報、及び前記部材の施工時期又は前記資材の使用期
間を表す時期情報を各々記憶しておき、前記施工空間を
横切る基準面が指定され、前記建設物の施工期間内の特
定時期における、前記基準面に関する施工状況図の出力
が指示されると、前記各部材及び各資材の前記位置情報
及び前記時期情報に基づいて、前記特定時期に、前記基
準面を含みかつ前記基準面と交差する方向に幅を有する
特定範囲内に存在している部材及び資材を抽出し、前記
抽出した部材及び資材の前記種類情報及び位置情報に基
づいて、抽出した部材及び資材を、前記基準面と略平行
な投影面への投影位置に対応する位置に、個々の部材又
は資材の種類に応じた図形として示した施工状況図を出
力する。
According to a first aspect of the present invention, there is provided a method for outputting a construction situation diagram according to the present invention, wherein each member constituting a building and each material used when the building is constructed. For each set, type information representing the type of the member or material, position information representing the arrangement position of the member or material in the three-dimensional construction space at the time of the construction of the construction, and the construction time of the member or the The time information indicating the use period of the material is stored, a reference plane crossing the construction space is designated, and at a specific time within the construction period of the building, an output of a construction status diagram relating to the reference plane is instructed. Then, based on the position information and the timing information of each member and each material, at the specific timing, the reference position includes the reference plane and exists in a specific range having a width in a direction intersecting with the reference plane. The extracted members and materials are extracted, and based on the extracted type information and position information of the extracted members and materials, the extracted members and materials are positioned at positions corresponding to projection positions on a projection plane substantially parallel to the reference plane. Then, a construction status diagram shown as a figure corresponding to the type of each member or material is output.

【0009】請求項1記載の発明では、建設物を構成す
る各部材及び建設物の施工時に使用される各資材につい
て、部材又は資材の種類を表す種類情報、建設物の施工
時の3次元施工空間内における部材又は資材の配置位置
を表す位置情報、及び部材の施工時期又は資材の使用期
間を表す時期情報が各々設定され、設定された情報を各
々記憶する。なお、建設物を構成する部材としては柱、
梁、床、壁等が挙げられ、建設物の施工時に使用される
資材としては、例えば地下工事で使用される山留壁、仮
設杭、構台、支保工、アースアンカや、泥水プラント、
鉄筋加工場、PC部品等のサイト工場、掘削機や揚重機
等の重機が挙げられる。種類情報は、対応する部材又は
資材が、上述したような各種の部材又は各種の資材の何
れであるかを表す情報である。
According to the first aspect of the present invention, for each member constituting the building and each material used at the time of constructing the structure, type information indicating the type of the member or the material, three-dimensional construction at the time of constructing the structure, Position information indicating the arrangement position of the member or the material in the space, and time information indicating the construction time of the member or the usage period of the material are set, and the set information is stored. In addition, pillars,
Materials such as beams, floors, walls, and the like, which are used at the time of construction of the structure include, for example, a mountain retaining wall, a temporary pile, a gantry, a shoring, an earth anchor, a muddy water plant, and the like used in underground construction.
Examples include a rebar processing plant, a site factory for PC parts and the like, and heavy equipment such as an excavator and a lifting machine. The type information is information indicating whether the corresponding member or material is any of the various members or various materials described above.

【0010】また、位置情報としては、部材又は資材の
3次元施工空間内における配置位置を、部材又は資材の
端点等の基準点の3次元座標値で表す情報を用いること
ができる。なお、建設物を構成する各部材の配置位置に
ついては、建設物の設計時に、建設物の構造計算等に利
用するために情報処理装置に入力されることが多く、設
計時に入力された各部材の配置位置を表す情報を部材の
位置情報として用いることも可能である。また、時期情
報については、建設物の施工計画に基づいて設定するこ
とができる。
Further, as the position information, information representing the arrangement position of the member or material in the three-dimensional construction space by three-dimensional coordinate values of reference points such as end points of the member or material can be used. It should be noted that the arrangement position of each member constituting the building is often input to the information processing device at the time of designing the building to be used for structural calculation of the building, etc. It is also possible to use information indicating the arrangement position of the member as the position information of the member. Further, the time information can be set based on the construction plan of the building.

【0011】ここで、施工空間を横切る基準面(施工空
間の鉛直方向に沿った面であってもよいし、施工空間の
水平方向に沿った面であってもよい)が指定され、建設
物の施工期間内の特定時期における、前記基準面に関す
る施工状況図の出力が指示されると、各部材及び各資材
の位置情報及び時期情報に基づいて、前記特定時期に、
前記基準面を含みかつ前記基準面と交差する方向に幅を
有する特定範囲内に存在している部材及び資材を抽出す
る。施工期間内の特定時期に施工空間内に存在している
部材は施工時期が特定時期以前の部材であり、施工期間
内の特定時期に施工空間内に存在している資材は特定時
期に使用されている資材(特定時期が使用期間内に含ま
れている部材)である。部材及び資材の抽出は、上記の
条件を満足し、かつ特定範囲内に一部又は全体が存在し
ている部材及び資材を検索することで行うことができ
る。
Here, a reference plane (which may be a plane along the vertical direction of the construction space or a plane along the horizontal direction of the construction space) crossing the construction space is designated, and At a specific time within the construction period, when the output of the construction status diagram relating to the reference plane is instructed, based on the position information and time information of each member and each material, at the specific time,
A member and a material that exist within a specific range including the reference plane and having a width in a direction intersecting with the reference plane are extracted. The members that exist in the construction space at a specific time during the construction period are members whose construction time is before the specific time, and the materials that exist in the construction space at the specific time during the construction period are used at the specific time. (Material whose specific period is included in the usage period). The extraction of members and materials can be performed by searching for members and materials that satisfy the above conditions and that partially or wholly exist within a specific range.

【0012】そして、抽出した部材及び資材を、抽出し
た部材及び資材の種類情報及び位置情報に基づいて、基
準面と略平行な投影面への投影位置に対応する位置に、
個々の部材又は資材の種類に応じた図形として示した施
工状況図(施工期間内の特定時期において、特定範囲内
に存在する部材や資材の配置を示す図)を出力する。な
お施工状況図の出力は、具体的には、例えばディスプレ
イ等の表示手段への施工状況図の表示であってもよい
し、紙等の記録媒体への施工状況図の印刷であってもよ
い。
[0012] Then, the extracted member and material are moved to a position corresponding to a projection position on a projection plane substantially parallel to the reference plane, based on the extracted type information and position information of the member and material.
A construction status diagram (a diagram showing the arrangement of members and materials existing within a specific range at a specific time during the construction period) shown as a graphic according to the type of each member or material is output. The output of the construction status diagram may be, for example, a display of the construction status diagram on a display unit such as a display or a printing of the construction status diagram on a recording medium such as paper. .

【0013】本発明に係る特定範囲は、指定された基準
面を含みかつ基準面と交差する方向に幅を有する範囲で
あるので、通常の断面図のように切断面に接している部
材のみを抽出・出力する場合と比較して、本発明に係る
施工状況図にはより多数の部材、資材が示される。ま
た、施工状況図による確認が必要な部材等の位置に応じ
て基準面の位置を指定することで、平面図や側面図等で
は前記確認が必要な部材を確認する際の障害となる部材
や資材(例えば所定方向から見て前記確認が必要な部材
の手前側に存在している部材や資材)が抽出されること
を防止することができ、施工状況図による確認が必要な
部材や資材が確実に確認可能なように施工状況図を図示
させることができる。このように、本発明に係る施工状
況図は、施工状況図上に現れている情報量が多いので、
施工期間内の特定時期における施工空間の特定範囲内に
おける施工状況の把握、施工計画の検討・確認を容易に
行うことができる。
The specific range according to the present invention is a range that includes the designated reference plane and has a width in a direction intersecting the reference plane. Therefore, only a member that is in contact with the cut surface as in a normal cross-sectional view is used. Compared with the case of extracting and outputting, a larger number of members and materials are shown in the construction status diagram according to the present invention. In addition, by specifying the position of the reference plane according to the position of the member or the like that needs to be confirmed by the construction status diagram, a member that becomes an obstacle when confirming the member that needs to be confirmed in a plan view or a side view. It is possible to prevent materials (for example, members and materials existing in front of the members that need to be checked when viewed from a predetermined direction) from being extracted. The construction status diagram can be illustrated so as to be surely confirmed. Thus, the construction status diagram according to the present invention has a large amount of information appearing on the construction status diagram,
It is possible to easily grasp the construction status within a specific range of the construction space at a specific time during the construction period, and examine and confirm a construction plan.

【0014】また、施工期間内のうち施工状況図として
出力すべき特定時期及び施工空間内のうち施工状況図と
して出力すべき特定範囲を変更しながら、施工状況図の
出力を繰り返し指示すれば、施工期間内の各時期におけ
る施工空間の各範囲内における施工状況図が各々出力さ
れるので、建設物の施工状況の推移も容易に把握するこ
とができる。従って、請求項1の発明によれば、建設工
事の施工計画の検討・確認が省力化されるように施工状
況を図示することができる。
Further, if the output of the construction status diagram is repeatedly instructed while changing the specific time to be output as the construction status diagram in the construction period and the specific range to be output as the construction status diagram in the construction space, Since the construction status diagram in each area of the construction space at each time in the construction period is output, the transition of the construction status of the building can be easily grasped. Therefore, according to the first aspect of the present invention, the construction status can be illustrated so that the examination and confirmation of the construction plan of the construction work is labor-saving.

【0015】なお、施工状況図に基づいて建設工事の施
工計画の検討・確認を行った結果、特定の部材又は資材
の配置位置、施工時期又は使用期間の修正が必要と判断
される可能性があることを考慮すると、特定の部材又は
資材の配置位置、施工時期又は使用期間の修正が指示さ
れた場合には、前記修正が指示された特定の部材又は資
材の位置情報又は時期情報を修正することが好ましい。
As a result of studying and confirming the construction plan of the construction work based on the construction situation diagram, there is a possibility that it may be determined that it is necessary to modify the arrangement position of a specific member or material, the construction time or the use period. In consideration of the fact that, when a modification of the arrangement position of a specific member or material, construction time or use period is instructed, the position information or time information of the specific member or material in which the modification is instructed is corrected. Is preferred.

【0016】ところで、施工状況図の出力に際し、基準
面と交差する方向に沿った特定範囲の適正な幅は、施工
状況図の出力対象の建設物の構造等によって異なってい
ることが多い。例えば施工空間を鉛直方向に沿って横切
る基準面を含む特定範囲内の施工状況図を出力する場
合、施工状況図上で建設物の柱や梁が重なって示されな
いようにするには、基準面と交差する方向に沿った特定
範囲の幅を、基準面と交差する方向に沿って並ぶ複数本
の柱や梁が特定範囲に各々含まれることがないように定
める必要があるが、特定範囲の幅を狭くすると施工状況
図上に現れる情報量が少なくなる。従って、上記のよう
な場合には、基準面と略直交する方向に沿った柱や梁の
間隔に応じて特定範囲の幅を定めることが望ましいが、
柱や梁の間隔は建設物の構造等によって異なっている。
By the way, when outputting the construction status diagram, the appropriate width of the specific range along the direction intersecting with the reference plane often differs depending on the structure of the construction to be output of the construction status diagram. For example, when outputting a construction status map within a specific range including a reference plane that crosses the construction space along the vertical direction, if you do not want the pillars and beams of the construction to be overlaid on the construction status map, It is necessary to determine the width of the specific range along the direction that intersects with the reference plane so that a plurality of columns and beams aligned along the direction that intersects the reference plane are not included in the specific range. When the width is reduced, the amount of information appearing on the construction status diagram decreases. Therefore, in the above case, it is desirable to determine the width of the specific range according to the interval between columns and beams along a direction substantially perpendicular to the reference plane,
The distance between columns and beams differs depending on the structure of the building.

【0017】このため、請求項2記載の発明は、請求項
1の発明において、前記特定範囲の前記基準面と交差す
る方向に沿った幅の変更が指示された場合には、指示に
応じて前記幅を変更した後に、前記幅を変更した特定範
囲内に存在している部材及び資材を抽出することを特徴
としている。請求項2記載の発明によれば、基準面と交
差する方向に沿った特定範囲の幅(施工状況図として示
される範囲の大きさ)が変更可能とされているので、施
工状況図の出力対象の建設物の構造等に応じて特定範囲
の幅を変更することが可能となり、建設物の構造等に応
じた適正な施工状況図を出力することが可能となる。
Therefore, in the invention according to claim 2, in the invention according to claim 1, when the change of the width of the specific range along the direction intersecting with the reference plane is instructed, the change in response to the instruction is performed. After the width is changed, members and materials existing in a specific range in which the width is changed are extracted. According to the invention described in claim 2, the width of the specific range (the size of the range shown as the construction status diagram) along the direction intersecting with the reference plane can be changed, so that the output target of the construction status diagram is output. It is possible to change the width of the specific range according to the structure of the building and the like, and it is possible to output an appropriate construction situation diagram according to the structure and the like of the building.

【0018】請求項3記載の発明に係る施工状況図出力
装置は、建設物を構成する各部材及び該建設物の施工時
に使用される各資材について、前記部材又は資材の種類
を表す種類情報、前記建設物の施工時の3次元施工空間
内における前記部材又は資材の配置位置を表す位置情
報、及び前記部材の施工時期又は前記資材の使用期間を
表す時期情報を各々設定するための設定手段と、前記設
定手段を介して各々設定された前記各部材及び各資材の
前記種類情報、前記位置情報及び前記時期情報を各々記
憶する記憶手段と、施工状況図の出力を指示するための
指示手段と、前記指示手段を介し、前記施工空間を横切
る基準面が指定され、前記建設物の施工期間内の特定時
期における、前記基準面に関する施工状況図の出力が指
示されると、前記各部材及び各資材の前記位置情報及び
前記時期情報に基づいて、前記特定時期に、前記基準面
を含みかつ前記基準面と交差する方向に幅を有する特定
範囲内に存在している部材及び資材を抽出する抽出手段
と、前記抽出手段によって抽出された部材及び資材の前
記種類情報及び位置情報に基づいて、前記抽出された部
材及び資材を、前記基準面と略平行な投影面への投影位
置に対応する位置に、個々の部材又は資材の種類に応じ
た図形として示した施工状況図を出力する出力手段と、
を含んで構成されているので、請求項1の発明と同様
に、建設工事の施工計画の検討・確認が省力化されるよ
うに施工状況を図示することができる。
According to a third aspect of the present invention, there is provided a construction status diagram output device, for each member constituting a construction and each material used at the time of construction of the construction, type information indicating the type of the member or the material; Setting means for setting position information representing the arrangement position of the member or material in a three-dimensional construction space at the time of construction of the structure, and time information representing the construction time of the member or the use period of the material, A storage unit for storing the type information, the position information, and the timing information of each member and each material set respectively via the setting unit; and an instruction unit for instructing output of a construction status diagram. A reference plane crossing the construction space is designated via the instruction means, and at a specific time within the construction period of the building, when the output of the construction status diagram relating to the reference plane is instructed, Based on the position information and the time information of the material and each material, at the specific time, the member and the material that exist in a specific range including the reference surface and having a width in a direction intersecting with the reference surface. Extracting means for extracting, based on the type information and position information of the members and materials extracted by the extracting means, the extracted members and materials at the projection position on a projection plane substantially parallel to the reference plane Output means for outputting a construction status diagram shown as a graphic corresponding to the type of each member or material at a corresponding position,
Therefore, as in the first aspect of the present invention, the construction status can be illustrated so that the examination and confirmation of the construction plan of the construction work can be saved.

【0019】請求項4記載の発明に係る記録媒体は、建
設物を構成する各部材及び前記建設物の施工時に使用さ
れる各資材について各々設定された、前記部材又は資材
の種類を表す種類情報、前記建設物の施工時の3次元施
工空間内における前記部材又は資材の配置位置を表す位
置情報、及び前記部材の施工時期又は前記資材の使用期
間を表す時期情報を各々記憶しておく第1のステップ、
前記施工空間を横切る基準面が指定され、前記建設物の
施工期間内の特定時期における、前記基準面に関する施
工状況図の出力が指示されると、前記各部材及び各資材
の前記位置情報及び前記時期情報に基づいて、前記特定
時期に、前記基準面を含みかつ前記基準面と交差する方
向に幅を有する特定範囲内に存在している部材及び資材
を抽出する第2のステップ、前記抽出した部材及び資材
の前記種類情報及び位置情報に基づいて、抽出した部材
及び資材を、前記基準面と略平行な投影面への投影位置
に対応する位置に、個々の部材又は資材の種類に応じた
図形として示した施工状況図を出力する第3のステップ
を含む処理をコンピュータに実行させるためのプログラ
ムが記録されている。
According to a fourth aspect of the present invention, there is provided a recording medium, wherein type information indicating the type of the member or the material is set for each member constituting the structure and each material used at the time of constructing the structure. A first information storing position information indicating an arrangement position of the member or the material in the three-dimensional construction space at the time of constructing the building, and a time information indicating a construction time of the member or a use period of the material. Steps,
A reference plane that crosses the construction space is specified, and at a specific time during the construction period of the building, when the output of a construction status diagram related to the reference plane is instructed, the position information of each member and each material and the position information A second step of extracting, at the specific time, the members and materials existing in a specific range including the reference plane and having a width in a direction intersecting with the reference plane, based on the time information, Based on the type information and the position information of the members and the materials, the extracted members and the materials are positioned at positions corresponding to the projection positions on the projection plane substantially parallel to the reference plane, according to the types of the individual members or the materials. A program for causing a computer to execute a process including a third step of outputting a construction situation diagram shown as a graphic is recorded.

【0020】請求項4記載の発明に係る記録媒体には、
上記の第1のステップ乃至第3のステップを含む処理、
すなわち請求項1の発明に係る施工状況図出力方法に係
る処理をコンピュータに実行させるためのプログラムが
記録されているので、コンピュータが前記記録媒体に記
録されているプログラムを読み出して実行することによ
り、請求項1の発明と同様に、建設工事の施工計画の検
討・確認が省力化されるように施工状況を図示すること
ができる。
The recording medium according to the fourth aspect of the present invention includes:
A process including the above first to third steps,
That is, since a program for causing a computer to execute the processing according to the construction situation diagram output method according to the first aspect of the present invention is recorded, the computer reads out and executes the program recorded on the recording medium, Similar to the first aspect of the present invention, the construction status can be illustrated so that the examination and confirmation of the construction plan of the construction work is labor-saving.

【0021】[0021]

【発明の実施の形態】以下、図面を参照して本発明の実
施形態の一例を詳細に説明する。図1には、本発明に係
る施工状況図出力装置として機能させることが可能なパ
ーソナルコンピュータ10が示されている。パーソナル
コンピュータ10は、コンピュータ本体12と、コンピ
ュータ本体12の入出力ポート20に接続される各種の
入出力機器と、から構成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below in detail with reference to the drawings. FIG. 1 shows a personal computer 10 that can function as a construction situation diagram output device according to the present invention. The personal computer 10 includes a computer main body 12 and various input / output devices connected to an input / output port 20 of the computer main body 12.

【0022】コンピュータ本体12は、CPU14、R
OM16、RAM18及び入出力ポート20を備えてお
り、これらがデータバス、アドレスバス、制御バス等の
バスによって互いに接続されて構成されている。本実施
形態では、入出力機器として、CD−ROMドライバ2
2、フロッピーディスクドライバ(FDD)24、キー
ボード26、マウス28、ディスプレイ30、プリンタ
32、及びハードディスク装置34が入出力ポート20
に各々接続されている。
The computer main unit 12 includes a CPU 14 and an R
An OM 16, a RAM 18, and an input / output port 20 are provided, and these are connected to each other by a bus such as a data bus, an address bus, and a control bus. In the present embodiment, the CD-ROM driver 2
2, a floppy disk driver (FDD) 24, a keyboard 26, a mouse 28, a display 30, a printer 32, and a hard disk drive 34
Are connected to each other.

【0023】パーソナルコンピュータ10を本発明に係
る施工状況図出力装置として機能させるためのプログラ
ム(以下、単に「施工状況図出力プログラム」という)
は、例えばハードディスク装置34に内蔵されているハ
ードディスク(図示省略)、又はCD−ROMドライバ
22に装填されるCD−ROM36、又はFDD24に
装填されるフロッピーディスク(FD)38の何れかに
記憶することができる。施工状況図出力プログラムの実
行が指示されると、施工状況図出力プログラムを記憶し
ている記憶媒体(ハードディスク又はCD−ROM36
又はFD38)から施工状況図出力プログラムが読み出
され、パーソナルコンピュータ10によって施工状況図
出力プログラムが実行される。これにより、パーソナル
コンピュータ10は施工状況図出力装置として機能す
る。なお、施工状況図出力プログラムを記憶している記
憶媒体(ハードディスク又はCD−ROM36又はFD
38)は請求項4に記載の記録媒体に対応している。
A program for causing the personal computer 10 to function as the construction status diagram output device according to the present invention (hereinafter, simply referred to as "construction status diagram output program").
Is stored in, for example, a hard disk (not shown) built in the hard disk device 34, a CD-ROM 36 loaded in the CD-ROM driver 22, or a floppy disk (FD) 38 loaded in the FDD 24. Can be. When execution of the construction status diagram output program is instructed, a storage medium (hard disk or CD-ROM 36) storing the construction status diagram output program is provided.
Alternatively, the construction status diagram output program is read from the FD 38), and the personal computer 10 executes the construction status diagram output program. Thereby, the personal computer 10 functions as a construction status diagram output device. In addition, a storage medium (hard disk or CD-ROM 36 or FD) storing the construction status diagram output program
38) corresponds to the recording medium according to claim 4.

【0024】キーボード26及びマウス28はオペレー
タが各種のデータやコマンドを入力するためのものであ
り、請求項3に記載の設定手段の一部を構成していると
共に、請求項3に記載の指示手段に対応している。ディ
スプレイ30は処理結果を表示するためのものであり、
CRTやLCD(液晶ディスプレイ)等の各種の表示手
段を適用できる。またプリンタ32は処理結果を紙やそ
の他の記録材料に印刷するためのものであり、レーザビ
ームプリンタ、ドットプリンタ、XYプロッタ等の各種
の印刷手段を適用できる。ディスプレイ30及びプリン
タ32は本発明の出力手段の一部を構成している。
The keyboard 26 and the mouse 28 are used by an operator to input various data and commands, and constitute a part of the setting means according to the present invention. It corresponds to the means. The display 30 is for displaying a processing result,
Various display means such as a CRT and an LCD (liquid crystal display) can be applied. The printer 32 is for printing the processing result on paper or other recording material, and various printing means such as a laser beam printer, a dot printer, and an XY plotter can be applied. The display 30 and the printer 32 constitute a part of the output means of the present invention.

【0025】次に本実施形態の作用を説明する。パーソ
ナルコンピュータ10が施工状況図出力プログラムを実
行することにより行われる処理は、前処理としての図2
に示す施工情報設定処理と、図3に示す施工状況図出力
処理と、で構成されている。以下では、まず図2のフロ
ーチャートを参照して施工情報設定処理について説明す
る。
Next, the operation of the present embodiment will be described. The processing performed by the personal computer 10 executing the construction status diagram output program is shown in FIG.
And a construction status diagram output process shown in FIG. Hereinafter, the construction information setting process will be described first with reference to the flowchart of FIG.

【0026】ステップ100では建設物モデルデータを
取り込み、ハードディスク装置34の内蔵ハードディス
クに記憶する。建設物モデルデータは、建設物の設計時
に建設物の構造計算等に利用するために生成(入力)さ
れるデータであり、例として図4(A)に簡易的に示す
ような3次元建物モデルを表している。建設物モデルデ
ータは、建設物を構成する柱、梁、床、壁等の各部材に
ついて、各部材の種類(柱/梁/床/壁等)を表すID
(種類情報)、建設物を含む3次元空間内における各部
材の配置位置を表す位置情報、及びその他の属性を表す
情報が各々設定されて構成されている。
In step 100, the building model data is fetched and stored in the internal hard disk of the hard disk device 34. The construction model data is data that is generated (input) for use in structural calculations of the construction when designing the construction, and is a three-dimensional building model as schematically illustrated in FIG. Is represented. The building model data is an ID representing the type of each member (column / beam / floor / wall, etc.) for each member such as a column, a beam, a floor, and a wall that constitute the building.
(Type information), position information indicating the arrangement position of each member in the three-dimensional space including the building, and information indicating other attributes are set and configured.

【0027】なお、各部材の配置位置を表す情報は、例
えば柱や梁等の線材については、線材の両端点(始点及
び終点)の位置を表す3次元座標値によって構成するこ
とができ、例えば床や壁等のような多角形の面材につい
ては、各端点(多角形の各頂点)の位置を表す3次元座
標値によって構成することができる。また、その他の属
性を表す情報としては、例えば各端点(線材であれば始
点及び終点、面材であれば多角形の各頂点)が何れの階
に位置しているかを表す階属性情報、各端点が何れの通
り(所謂通り芯)に位置しているかを表す通り属性情
報、断面積を表す情報や内部構造を表す情報を用いるこ
とができる。
The information indicating the arrangement position of each member can be constituted by three-dimensional coordinate values indicating the positions of both end points (start point and end point) of a wire, such as a column or a beam. A polygonal surface material such as a floor or a wall can be constituted by three-dimensional coordinate values representing the positions of the end points (vertexes of the polygon). Further, as information indicating other attributes, for example, floor attribute information indicating on which floor each end point (a starting point and an ending point in the case of a wire, and each vertex of a polygon in the case of a surface material); Attribute information, information indicating a cross-sectional area, and information indicating an internal structure can be used to indicate in which way the end point is located (so-called core).

【0028】また、通り芯は柱や梁等の部材の配置を簡
易に表現するための仮想線であり、例として図4(A)
に示すX1通り、X2通り、Y2通り、Y2通りの各通
り芯の位置と、各柱や各梁の配置と、を比較しても明ら
かなように、柱は通り芯の交差位置に配置され、梁は通
り芯の交差位置の間に通り芯に沿って配置される。なお
本実施形態では、図4(A)に示すように、建設物を含
む3次元空間(3次元施工空間)内において、各々水平
でかつ互いに直交する2方向をX方向及びY方向、垂直
方向をZ方向と称している。
The wick is an imaginary line for simply expressing the arrangement of members such as columns and beams, for example, as shown in FIG.
As can be clearly seen by comparing the positions of the respective cores in X1, X2, Y2, and Y2 and the arrangements of the columns and beams, the columns are arranged at the intersections of the cores. , The beams are arranged along the street between the intersections of the street. In this embodiment, as shown in FIG. 4A, in a three-dimensional space (three-dimensional construction space) including a building, two directions that are horizontal and orthogonal to each other are defined as an X direction, a Y direction, and a vertical direction. Is called the Z direction.

【0029】上記の建設物モデルデータは、CD−RO
M36やFD38等の情報記憶媒体に記憶されていても
よいし、通信回線及び他の情報処理装置を介してパーソ
ナルコンピュータ10と接続された記憶装置に記憶され
ていてもよい。ステップ100では、CD−ROM36
やFD38等の情報記憶媒体から読み出すか、或いは他
の情報処理装置から受信することによって建設物モデル
データを取得し、取得した建設物モデルデータをハード
ディスク装置34の内蔵ハードディスクに記憶する。こ
のように、ステップ100は請求項3に記載の設定手段
に対応しており、ハードディスク装置34の内蔵ハード
ディスクは請求項3に記載の記憶手段に対応している。
The above construction model data is stored in a CD-RO
It may be stored in an information storage medium such as M36 or FD38, or may be stored in a storage device connected to the personal computer 10 via a communication line and another information processing device. In step 100, the CD-ROM 36
The building model data is obtained by reading from an information storage medium such as the FD 38 or receiving from another information processing device, and the obtained building model data is stored in the internal hard disk of the hard disk device 34. As described above, step 100 corresponds to the setting means described in claim 3, and the internal hard disk of the hard disk device 34 corresponds to the storage means described in claim 3.

【0030】次のステップ102では、建設物モデルデ
ータが表す3次元建物モデルを用いて、該建物モデルが
表す建設物を施工する際の各工区の範囲及び各工区の名
称を設定するようオペレータに要請するメッセージをデ
ィスプレイ30に表示する。本実施形態では、建設物モ
デルの平面図又は軸組図をディスプレイ30に表示して
いる状態で、オペレータは工区範囲及び工区名称を設定
させる。このため、ステップ102では、工区範囲及び
工区名称の設定を要請すると共に、表示すべき建設物モ
デル図の種類(平面図/軸組図)を選択するよう要請
し、次のステップ104において、オペレータによって
選択された建設物モデル図の種類を判定する。
In the next step 102, the operator uses the three-dimensional building model represented by the construction model data to set the range of each construction section and the name of each construction section when constructing the construction represented by the building model. The request message is displayed on the display 30. In the present embodiment, the operator sets the work area range and the work area name while the plan view or the frame diagram of the building model is displayed on the display 30. For this reason, in step 102, a request is made for setting of the work area range and the work area name, and a request is made to select the type of the construction model drawing (plan view / frame drawing) to be displayed. The type of the construction model diagram selected by the above is determined.

【0031】表示すべき建設物モデル図として平面図が
選択された場合には、ステップ104からステップ10
6へ移行し、平面図として表示すべき階の設定をオペレ
ータに要請するメッセージをディスプレイ30に表示す
る。また、次のステップ108ではオペレータによる階
の設定が完了する迄待機する。平面図として表示すべき
階が設定されると、ステップ108の判定が肯定されて
ステップ110へ移行し、建設物モデルデータのうち、
各部材の配置位置を表す情報に基づいて、設定された階
に配置される部材を全て抽出する。
If the floor plan is selected as the construction model diagram to be displayed, step 104 to step 10
The process proceeds to step S6, and a message requesting the operator to set a floor to be displayed as a plan view is displayed on the display 30. In the next step 108, the process waits until the floor setting by the operator is completed. When the floor to be displayed as the floor plan is set, the determination in step 108 is affirmed and the process proceeds to step 110, where the building model data
Based on the information indicating the arrangement position of each member, all members arranged on the set floor are extracted.

【0032】そして次のステップ112では、ステップ
110で抽出した各部材を、部材の各端点のX座標値及
びY座標値に基づいて、水平な投影面(Z平面)上への
投影位置に対応するディスプレイ30の表示面上の所定
位置に、部材IDに対応する形状の図形(例えば梁は長
尺状の矩形、柱は断面形状に対応する形状の矩形等)と
して各々表示し、ステップ122へ移行する。これによ
り、オペレータが設定した階における建設物モデルの平
面図がディスプレイ30に表示される。
In the next step 112, each member extracted in step 110 is mapped to a projection position on a horizontal projection plane (Z plane) based on the X coordinate value and Y coordinate value of each end point of the member. At a predetermined position on the display surface of the display 30 to be displayed, a graphic having a shape corresponding to the member ID (for example, a beam is an elongated rectangle, and a column is a rectangle having a shape corresponding to a cross-sectional shape) is displayed. Transition. As a result, a plan view of the building model on the floor set by the operator is displayed on the display 30.

【0033】例えば、図4(A)に示す3次元建物モデ
ルに対し、オペレータが、平面図として表示すべき階と
して「3階」を設定した場合には、端点(線材では終
点)の階属性が3の部材が全て抽出され、例として図4
(B)に示すように、3次元建物モデルのうち2階から
立ち上がっている部分の平面図がディスプレイ30に表
示される。
For example, when the operator sets “3rd floor” as the floor to be displayed as a plan view with respect to the three-dimensional building model shown in FIG. 3 are all extracted, as an example in FIG.
As shown in (B), a plan view of a portion of the three-dimensional building model rising from the second floor is displayed on the display 30.

【0034】一方、表示すべき建設物モデル図として軸
組図が選択された場合には、ステップ104からステッ
プ114へ移行し、軸組図として表示すべき通り芯の設
定をオペレータに要請するメッセージをディスプレイ3
0に表示する。また、次のステップ116ではオペレー
タによる通り芯の設定が完了する迄待機する。軸組図と
して表示すべき通り芯が設定されると、ステップ116
の判定が肯定されてステップ118へ移行し、建設物モ
デルデータのうち、各部材の配置位置を表す情報に基づ
いて、設定された通り芯に接する部材を全て抽出する。
On the other hand, when the frame diagram is selected as the construction model diagram to be displayed, the process proceeds from step 104 to step 114, and a message requesting the operator to set the core to be displayed as the frame diagram. The display 3
Display at 0. In the next step 116, the process stands by until the setting of the center line by the operator is completed. When the core to be displayed as the framing diagram is set, step 116 is executed.
Is affirmed, the process proceeds to step 118, and all the members in contact with the set core are extracted from the building model data based on the information indicating the arrangement position of each member.

【0035】そして次のステップ120では、ステップ
118で抽出した各部材を、部材の各端点のY座標値及
びZ座標値(X方向の通り芯の場合)、又はX座標値及
びZ座標値(Y方向の通り芯の場合)に基づいて、設定
された通り芯に平行な投影面(X平面又はY平面)上へ
の投影位置に対応するディスプレイ30の表示面上の所
定位置に、部材IDに対応する形状の図形(例えば設定
された通り芯に平行な梁、及び柱は長尺状の矩形、設定
された通り芯に垂直な梁は断面形状に対応する形状の矩
形等)として各々表示し、ステップ122へ移行する。
これにより、オペレータが設定した通り芯における建設
物モデルの軸組図がディスプレイ30に表示される。
In the next step 120, each member extracted in step 118 is converted into a Y coordinate value and a Z coordinate value of each end point of the member (in the case of a center line in the X direction) or an X coordinate value and a Z coordinate value ( Based on the Y-direction core, the member ID is assigned to a predetermined position on the display surface of the display 30 corresponding to the projection position on the projection plane (X plane or Y plane) parallel to the set core. (For example, a beam parallel to the set core and a column is a long rectangle, and a beam perpendicular to the set core is a rectangle having a shape corresponding to the cross-sectional shape). Then, the process proceeds to step 122.
As a result, the frame diagram of the construction model at the street set by the operator is displayed on the display 30.

【0036】例えば、図4(A)に示す3次元建物モデ
ルに対し、オペレータが、軸組図として表示すべき通り
芯として「X2通り」を設定した場合には、端点(線材
では終点)のX方向通り属性が2の部材が全て抽出さ
れ、例として図4(C)に示すように、3次元建物モデ
ルのうちX2通りの軸組図がディスプレイ30に表示さ
れる。また、オペレータが、軸組図として表示すべき通
り芯として「Y3通り」を設定した場合には、端点(線
材では終点)のY方向通り属性が3の部材が全て抽出さ
れ、例として図4(D)に示すように、3次元建物モデ
ルのうちX2通りの軸組図がディスプレイ30に表示さ
れる。
For example, in the case where the operator sets “X2 ways” for the three-dimensional building model shown in FIG. All the members having the attribute “2” in the X direction are extracted. As an example, as shown in FIG. Further, when the operator sets “Y3 ways” as a center line to be displayed as a frame diagram, all members having the attribute “3” in the Y direction at the end point (end point in the case of the wire) are extracted. As shown in (D), X2 kinds of framing diagrams of the three-dimensional building model are displayed on the display 30.

【0037】上記のようにしてディスプレイ30に表示
された建設物モデルの平面図又は軸組図を参照すること
により、オペレータは、建設物内の各部材の配置を容易
に把握することができ、建設物の施工における作業単位
である各工区の範囲の設定を、例えば同一工区に属する
部材を各部材を単位としてディスプレイ30上で指定す
る等によって容易に行うことができると共に、各工区の
名称の設定を容易に行うことができる。
By referring to the plan view or the framing diagram of the construction model displayed on the display 30 as described above, the operator can easily grasp the arrangement of each member in the construction. The setting of the range of each section, which is a unit of work in the construction of a building, can be easily performed by, for example, designating members belonging to the same section on a display 30 with each member as a unit. Setting can be easily performed.

【0038】ステップ122では、ディスプレイ30に
表示した平面図又は軸組図に対し、オペレータによって
工区範囲及び工区名称が設定されたか否か判定し、判定
が肯定される迄待機する。オペレータがキーボード26
やマウス28を操作して工区範囲及び工区名称を設定す
ると、ステップ122の判定が肯定されてステップ12
4へ移行し、設定された工区に対応する部材に、設定さ
れた工区名称を属性情報として設定・記憶する。次のス
テップ126では、工区の設定が完了したか否か判定す
る。3次元建物モデルを構成する全ての部材について工
区名称が設定される迄の間はステップ126の判定は否
定されてステップ102に戻り、ステップ102〜12
6が繰り返される。これにより、3次元建物モデルを構
成する全ての部材について、何れの工区に属しているか
が属性情報として各々設定されることになる。
In step 122, it is determined whether or not the operator has set a section range and a section name with respect to the plan view or the frame diagram displayed on the display 30, and the process waits until the determination is affirmed. The operator operates the keyboard 26
And the mouse 28 are operated to set the work section range and the work section name, the determination in step 122 is affirmed, and the
Then, the process proceeds to step 4, where the set section name is set and stored as attribute information in the member corresponding to the set section. In the next step 126, it is determined whether or not the setting of the work section has been completed. Until the construction section names are set for all members constituting the three-dimensional building model, the determination in step 126 is denied and the process returns to step 102, and steps 102 to 12 are performed.
6 is repeated. As a result, with respect to all members constituting the three-dimensional building model, which section belongs to which construction section is set as attribute information.

【0039】ステップ126の判定が肯定されるとステ
ップ128へ移行し、オペレータに対し、工区単位での
施工順序及び施工時期の設定を要請する。なお、施工順
序及び施工時期は、既に建設物の施工計画が策定されて
いるのであれば、該施工計画に従って設定することがで
きるが、施工計画が策定されていない場合には、特に施
工時期の設定に際しては各工区毎の施工数量を把握する
必要がある。これは、オペレータが手計算によって求め
るようにしてもよいが、各部材の属性情報として、施工
数量を表す情報(例えば配筋量、型枠面積、コンクリー
トの打設量等)を記憶しておき、各工区毎に施工数量を
積算して表示するようにしてもよい。これにより工区単
位での施工時期の設定をオペレータが容易に行うことが
できる。また、各種作業毎の歩掛を記憶しておき、設定
された施工順序に基づいて各工区の施工時期(施工開始
日及び施工終了日)を自動的に演算・設定することも可
能である。
If the determination in step 126 is affirmative, the process moves to step 128, and requests the operator to set the construction order and construction time in each section. The construction order and construction time can be set in accordance with the construction plan if the construction plan for the construction has already been formulated. When setting, it is necessary to grasp the construction quantity for each construction section. This may be obtained by manual calculation by the operator, but information indicating the construction quantity (for example, the amount of reinforcement, the area of the formwork, the amount of concrete poured, etc.) is stored as attribute information of each member. Alternatively, the construction quantity may be integrated and displayed for each construction section. This allows the operator to easily set the construction time in each section. It is also possible to store the steps for each type of work and automatically calculate and set the construction time (construction start date and construction end date) for each section based on the set construction order.

【0040】次のステップ130では、工区単位での施
工順序及び施工時期がオペレータによって設定されたか
否か判定し、判定が肯定される迄待機する。オペレータ
がキーボード26やマウス28(請求項3に記載の設定
手段に対応)を操作して施工順序及び施工時期を設定す
ると、ステップ130の判定が肯定されてステップ13
2へ移行し、設定された工区単位での施工順序及び施工
時期を記憶すると共に、設定された各工区の施工時期
を、各工区に属する各部材の施工時期情報として各々設
定・記憶する。
In the next step 130, it is determined whether or not the construction order and the construction time for each construction section have been set by the operator, and the process waits until the determination is affirmed. When the operator operates the keyboard 26 and the mouse 28 (corresponding to the setting means according to claim 3) to set the construction order and the construction time, the judgment in step 130 is affirmed, and the decision in step 130 is made.
Then, the procedure goes to 2 to store the set construction order and construction time for each work section, and to set and store the set work time of each work section as the work time information of each member belonging to each work section.

【0041】ステップ134では、建設物の施工時に使
用する各仮設物(例えば地下工事に使用する山留壁、仮
設杭、構台、支保工や、掘削機、揚重機等の重機:本発
明に係る施工時に使用される資材に相当)について、各
仮設物の種類を表すID情報(種類情報)、3次元施工
空間内における各仮設物の配置位置を表す位置情報、各
仮設物の使用期間(設置期間)を表す時期情報等の各種
情報の設定をオペレータに要請するメッセージをディス
プレイ30に表示する。これにより、オペレータは、建
設物の施工時に使用する各仮設物について、上述した各
種情報を各々設定する。
In step 134, each temporary object used in the construction of the building (for example, a heavy machine such as a retaining wall, a temporary pile, a gantry, a shoring, an excavator, a lifting machine, etc. used in underground work): ID information (type information) indicating the type of each temporary object, position information indicating the arrangement position of each temporary object in the three-dimensional construction space, and the use period of each temporary object (equivalent to materials used during construction) A message is displayed on the display 30 requesting the operator to set various kinds of information such as time information indicating the period. Thereby, the operator sets the above-mentioned various information for each temporary object used at the time of constructing the structure.

【0042】なお、地下工事に使用する各仮設物につい
ては、地下工事の何れの段階(根切り次数)で設置され
るかを表す作業属性情報も設定される。また、上記の情
報のうち位置情報については、例えば建設物を構成する
各部材の位置情報と同様に、端点の3次元座標値によっ
て構成することができる。また、各仮設物の使用期間を
表す時期情報については、リースにより仮設物を用意す
る場合には総リース費用の算出等に利用することも可能
である。
For each temporary object used for underground construction, work attribute information indicating at which stage (root cutting order) the underground construction is installed is also set. Further, the position information of the above information can be constituted by three-dimensional coordinate values of the end points, for example, similarly to the position information of each member constituting the building. In addition, the time information indicating the use period of each temporary object can be used for calculating the total lease cost when preparing the temporary object by leasing.

【0043】次のステップ136では、オペレータによ
る仮設物に関する情報の設定が完了したか否か判定し、
判定が肯定される迄待機する。オペレータがキーボード
26やマウス28(請求項3に記載の設定手段に対応)
を操作して仮設物に関する各種の情報を設定すると、ス
テップ136の判定が肯定されてステップ138へ移行
し、オペレータによって設定された仮設物に関する情報
をハードディスク装置34の内蔵ハードディスクに記憶
して、施工情報設定処理を終了する。このように、ハー
ドディスク装置34の内蔵ハードディスクは請求項3に
記載の記憶手段に対応している。
In the next step 136, it is determined whether or not the setting of information on the temporary object by the operator has been completed.
It waits until the determination is affirmed. The operator operates the keyboard 26 or the mouse 28 (corresponding to the setting means according to claim 3).
Is operated to set various information on the temporary object, the determination in step 136 is affirmed, and the process proceeds to step 138, where the information on the temporary object set by the operator is stored in the internal hard disk of the hard disk device 34, and The information setting process ends. As described above, the internal hard disk of the hard disk device 34 corresponds to the storage unit according to the third aspect.

【0044】次に図3のフローチャートを参照し、施工
状況図出力処理について説明する。ステップ150で
は、表示すべき施工状況図の種類(断面図/平面図)の
選択を促すメッセージをディスプレイ30に表示し、表
示すべき施工状況図の種類が断面図か平面図かを判定す
る。表示すべき施工状況図として平面図が選択された場
合にはステップ152へ移行し、表示すべき施工状況図
の平面図の種類及び施工状況図の平面図の表示条件の設
定をオペレータに要請するメッセージをディスプレイ3
0に表示する。
Next, the construction status diagram output processing will be described with reference to the flowchart of FIG. In step 150, a message prompting the user to select the type of construction status diagram to be displayed (cross section / plan view) is displayed on the display 30, and it is determined whether the type of construction status diagram to be displayed is a cross section or a plan view. When the floor plan is selected as the construction status diagram to be displayed, the process proceeds to step 152, and the operator is requested to set the type of the floor plan of the construction status diagram to be displayed and the display condition of the floor plan of the construction status diagram. Display message 3
Display at 0.

【0045】本実施形態では、施工状況図の平面図とし
て、特定の階又は根切り次数の施工時に施工される部材
及び作業属性として特定の階又は根切り次数が設定され
ている仮設物(特定の階又は根切り次数の施工時に設置
される仮設物)のみを表示する平面図(以下便宜的に
「第1の平面図」という)、特定の階又は根切り次数の
施工時に施工される部材及び特定の階又は根切り次数の
施工時に設置される仮設物に加えて、特定の階又は根切
り次数の施工時に存在している(施工済又は設置済の)
部材及び仮設物も表示する平面図(以下便宜的に「第2
の平面図」という)、及び第2の平面図によって表示さ
れる部材及び仮設物のうち特定の高さ範囲内に位置して
いる部材及び仮設物のみを表示する平面図(以下便宜的
に「第3の平面図」という)の何れかを選択的に表示可
能とされている。
In the present embodiment, as a plan view of the construction situation diagram, a member to be constructed at the time of construction of a specific floor or root cutting order and a temporary object (specific floor or root cutting degree) set as a work attribute are specified. Plan (hereinafter referred to as "first plan view" for convenience) that displays only temporary floors or temporary constructions installed at the time of construction of the root cutting order, and members constructed at the time of construction of a specific floor or root cutting order. In addition to temporary objects installed at the time of construction at a specific floor or root cutting order, existing at the time of construction at a specific floor or root cutting order (constructed or installed)
A plan view that also displays members and temporary objects (hereinafter referred to as “second
Plan view), and a plan view showing only members and temporary objects located within a specific height range among members and temporary objects displayed by the second plan view (hereinafter, for convenience, " 3rd plan view ”) can be selectively displayed.

【0046】次のステップ154では、平面図の種類及
び表示条件が設定されたか否か判定し、判定が肯定され
る迄待機する。オペレータは、前記メッセージがディス
プレイに表示されると、キーボード26やマウス28を
操作し、表示すべき施工状況図の平面図の種類(第1の
平面図乃至第3の平面図の何れか)を選択すると共に、
選択した平面図に関して表示条件(階又は根切り次数
(及び高さ範囲))を設定する。これにより、ステップ1
54の判定が肯定されてステップ156へ移行し、設定
された平面図の種類及び表示条件に基づいて、施工状況
図の平面図として表示すべき部材及び仮設物を検索する
ための検索条件を設定する。
In the next step 154, it is determined whether the type of the plan view and the display conditions have been set, and the process waits until the determination is affirmed. When the message is displayed on the display, the operator operates the keyboard 26 and the mouse 28 to specify the type of the plan view (any one of the first to third plan views) of the construction status diagram to be displayed. Select and
The display conditions (floor or root cutting order (and height range)) are set for the selected plan view. Thus, step 1
When the determination at 54 is affirmative, the process proceeds to step 156 to set search conditions for searching for members and temporary objects to be displayed as the plan view of the construction status diagram based on the set plan view type and display conditions. I do.

【0047】例えば、表示すべき平面図の種類として第
1の平面図が設定され、該第1の平面図に関する表示条
件として、特定の施工時期、すなわち特定の階又は根切
り次数(の施工時期)が設定された場合には、設定され
た階又は根切り次数の施工時に施工される部材を検索す
ると共に、設定された階又は根切り次数の施工時に設置
される仮設物を検索する検索条件を設定する。
For example, a first floor plan is set as the type of floor plan to be displayed, and as a display condition for the first floor plan, a specific construction time, that is, a specific floor or root cut order (construction time) ) Is set, the search condition is to search for the members to be constructed at the time of construction of the set floor or root cutting order, and to search for the temporary object installed at the time of construction of the set floor or root cutting order. Set.

【0048】また、例えば表示すべき平面図の種類とし
て第2の平面図が設定され、該第2の平面図に関する表
示条件として、特定の施工時期、すなわち特定の階又は
根切り次数(の施工時期)が設定された場合には、設定
された特定の階又は根切り次数の施工時又はそれ以前に
施工される部材を検索すると共に、前記設定された特定
の階又は根切り次数の施工時又はそれ以前に設置(使
用)される仮設物を検索する検索条件を設定する。
Further, for example, a second plan view is set as the type of plan view to be displayed, and as a display condition for the second plan view, a specific construction time, that is, a specific floor or root cut order (construction degree) is set. When the time) is set, at the time of construction of the set specific floor or root cutting order or search for members to be constructed before that, and at the time of construction of the specified specific floor or root cutting order Alternatively, a search condition for searching for a temporary object installed (used) before that is set.

【0049】また、例えば表示すべき平面図の種類とし
て第3の平面図が設定され、該第3の平面図に関する表
示条件として、特定の施工時期、すなわち特定の階又は
根切り次数(の施工時期)が設定されると共に、表示す
べき部材及び仮設物の高さ範囲が設定された場合には、
前記設定された特定の階又は根切り次数の施工時又はそ
れ以前に施工され、かつ設定された高さ範囲内に位置し
ている部材を検索すると共に、前記設定された特定の階
又は根切り次数の施工時又はそれ以前に設置(使用)さ
れ、かつ設定された高さ範囲内に位置している仮設物を
検索する検索条件を設定する。
Further, for example, a third plan is set as the type of plan to be displayed, and as a display condition for the third plan, a specific construction time, that is, a specific floor or root cut order Time) is set, and when the height range of the members to be displayed and the temporary object is set,
Searching for members located at or before the set specific floor or root cutting order and located within the set height range, and setting the specific floor or root cutting A search condition for searching for a temporary object that is installed (used) at or before the construction of the order and located within the set height range is set.

【0050】次のステップ158では、各部材及び各仮
設物の時期情報(及び位置情報)をステップ156で設
定した検索条件と照合することにより、検索条件に合致
する部材及び仮設物を全て抽出する。そして、次のステ
ップ160では、抽出した各部材及び各仮設物を、部材
及び仮設物のID及び位置情報(各端点のX座標値及び
Y座標値)に基づいて、水平な投影面(Z平面)上への
投影位置に対応するディスプレイ30の表示面上の所定
位置に、部材ID又は仮設物IDに対応する形状の図形
として各々表示し、ステップ190へ移行する。これに
より、オペレータによって設定された種類及び表示条件
に対応する施工状況図の平面図がディスプレイ30に表
示される。
In the next step 158, all the members and temporary objects that match the search conditions are extracted by comparing the time information (and position information) of each member and each temporary object with the search conditions set in step 156. . Then, in the next step 160, the extracted members and temporary objects are converted into a horizontal projection plane (Z plane) based on the IDs and position information (X coordinate values and Y coordinate values of each end point) of the members and temporary objects. ) At each predetermined position on the display surface of the display 30 corresponding to the upward projection position, a graphic having a shape corresponding to the member ID or the temporary object ID is displayed, and the process proceeds to step 190. Thereby, the plan view of the construction status diagram corresponding to the type and the display condition set by the operator is displayed on the display 30.

【0051】例えば建設物の地下工事において、0次根
切り施工時には、図5(A)に示すように山留壁及び仮
設杭が打設され(山留壁は実際には四方に打設される
が、図では二方向についてのみ示す)、1次根切り施工
時には、図5(B)に示すように所定レベル(1次根切
りレベル)迄掘削されると共に一対の仮設杭上に構台が
架設され、2次根切り施工時には、図5(C)に示すよ
うに1次根切りレベルよりも低い所定レベル(2次根切
りレベル)迄掘削されると共に対向する山留壁の間に支
保工が架け渡される場合を考える。
For example, in the underground construction of a construction, at the time of the 0th root excavation, a retaining wall and a temporary pile are driven as shown in FIG. 5A (the retaining wall is actually driven in all directions). However, in the figure, only two directions are shown.) At the time of primary excavation, as shown in FIG. 5 (B), excavation is performed to a predetermined level (primary excavation level) and a gantry is mounted on a pair of temporary piles. During the secondary excavation, it is excavated to a predetermined level (secondary excision level) lower than the primary excision level as shown in FIG. Consider the case where the work is suspended.

【0052】ここで、表示すべき施工状況図の平面図の
種類として第1の平面図が設定され表示条件(施工時
期)として0次根切りが設定された場合、0次根切り施
工時に施工される部材は存在していないので、0次根切
り施工時に設置される仮設物である山留壁と仮設杭のみ
が抽出され、図6(A)に示すような平面図が表示され
る。また、表示すべき平面図の種類として第1の平面図
が設定され表示条件(施工時期)として1次根切りが設
定された場合、1次根切り施工時に施工される部材も無
いので、1次根切り施工時に設置される仮設物である構
台のみが抽出され、図6(B)に示すような平面図が表
示される。更に、表示すべき平面図の種類として第1の
平面図が設定され表示条件(施工時期)として2次根切
りが設定された場合、2次根切り施工時に設置される仮
設物である支保工のみが抽出され、図6(C)に示すよ
うな平面図が表示される。
Here, when the first floor plan is set as the type of the floor plan of the construction status diagram to be displayed and the zero-order root cutting is set as the display condition (construction time), the construction is performed at the time of the zero-order root cutting. Since there is no member to be removed, only the retaining wall and the temporary pile, which are temporary objects to be installed at the time of the 0th root excavation, are extracted, and a plan view as shown in FIG. 6A is displayed. When the first plan view is set as the type of plan view to be displayed and the primary root cutting is set as the display condition (construction time), there is no member to be constructed at the time of the primary root cutting, so Only the gantry, which is a temporary object installed during the next excavation, is extracted, and a plan view as shown in FIG. 6B is displayed. Further, when the first plan view is set as the type of plan view to be displayed and the secondary excavation is set as the display condition (construction time), the shoring work which is a temporary object installed at the time of the secondary excavation construction Is extracted, and a plan view as shown in FIG. 6C is displayed.

【0053】また、表示すべき平面図の種類として第2
の平面図が設定され表示条件(施工時期)として0次根
切りが設定された場合の平面図(図7(A)参照)につ
いては第1の平面図(図6(A))と略同じであるが、表
示すべき平面図の種類として第2の平面図が設定され表
示条件(施工時期)として1次根切りが設定された場合
には、1次根切り施工時には山留壁と仮設杭が既に設置
されているので、表示すべき仮設物として山留壁、仮設
杭及び構台が各々抽出され、図7(B)に示すような平
面図が表示される。更に、表示すべき平面図の種類とし
て第2の平面図が設定され表示条件(施工時期)として
2次根切りが設定された場合には、表示すべき仮設物と
して山留壁、仮設杭、構台及び支保工が各々抽出され、
図7(C)に示すような平面図が表示される。なお、第
2の平面図では設定された施工時期には既に撤去されて
いる仮設物については表示されない。
The type of the plan view to be displayed is the second
Is substantially the same as the first plan view (FIG. 6 (A)) when the zero-order root cut is set as the display condition (construction time) (see FIG. 7 (A)). However, when the second plan view is set as the type of plan view to be displayed and the primary excavation is set as the display condition (construction time), the temporary retaining wall and the temporary construction are set at the time of the primary excavation construction. Since the pile has already been installed, the retaining wall, the temporary pile, and the gantry are respectively extracted as temporary objects to be displayed, and a plan view as shown in FIG. 7B is displayed. Further, when the second floor plan is set as the type of the floor plan to be displayed and the secondary root cutting is set as the display condition (construction time), the temporary retaining wall, the temporary pile, Gantry and shoring are each extracted,
A plan view as shown in FIG. 7C is displayed. Note that, in the second plan view, a temporary object that has already been removed at the set construction time is not displayed.

【0054】また、表示すべき平面図の種類として第3
の平面図が設定され、表示条件のうちの施工時期として
0次根切りが、高さ範囲として0次根切り施工時の作業
範囲が設定された場合の平面図(図8(A)参照)につ
いては、第1の平面図(図6(A))及び第2の平面図
(図7(A))と略同じであるが、表示すべき平面図の種
類として第3の平面図が設定され、表示条件のうちの施
工時期として1次根切りが、高さ範囲として1次根切り
施工時の作業範囲が設定された場合には、1次根切り施
工時に既に設置されている山留壁と仮設杭が1次根切り
施工時の作業範囲内に存在しているので、第2の平面図
と同様に、表示すべき仮設物として山留壁、仮設杭及び
構台が抽出され、図8(B)に示すような平面図が表示
される。
The type of plan view to be displayed is the third
Is set, and the 0th order root cutting is set as the construction time in the display conditions, and the work range at the time of the 0th order cutting is set as the height range (see FIG. 8A). Is substantially the same as the first plan view (FIG. 6A) and the second plan view (FIG. 7A), but the third plan view is set as the type of plan view to be displayed. When the primary excavation is set as the construction time in the display conditions and the work range at the time of the primary excavation is set as the height range, the ridges already installed at the time of the primary excavation are set. Since the wall and the temporary pile are present in the working range at the time of the primary excavation, the retaining wall, the temporary pile, and the gantry are extracted as the temporary objects to be displayed, as in the second plan view. A plan view as shown in FIG. 8 (B) is displayed.

【0055】更に、表示すべき平面図の種類として第3
の平面図が設定され、表示条件のうちの施工時期として
2次根切りが、高さ範囲として2次根切り施工時の作業
範囲が設定された場合には、2次根切り施工時に既に設
置されている山留壁と仮設杭については2次根切り施工
時の作業範囲内に存在しているものの、同じく2次根切
り施工時に既に設置されている構台については、その位
置情報(Z座標値)から2次根切り施工時の作業範囲か
ら外れていると判断されて抽出されず、表示すべき仮設
物として山留壁、仮設杭及び支保工が抽出され、図8
(C)に示すような平面図が表示される。なお、第3の
平面図においても、設定された施工時期には既に撤去さ
れている仮設物については表示されない。
Further, the type of the plan view to be displayed is
Is set up, and the secondary excavation is set as the construction time in the display conditions, and the work range for the secondary excision is set as the height range. Although the retaining wall and the temporary pile that are set are within the working range at the time of secondary excavation, the position information (Z coordinate) of the gantry that is already installed at the time of secondary excavation 8) is not extracted because it is determined to be out of the work range at the time of the secondary excavation, and the retaining wall, the temporary pile, and the shoring are extracted as temporary objects to be displayed, and FIG.
A plan view as shown in (C) is displayed. Note that, in the third plan view as well, a temporary object that has already been removed at the set construction time is not displayed.

【0056】上記では地下工事の施工状況図の平面図の
表示を例に説明したが、地上工事(各階の施工時)の施
工状況図の平面図についても同様に表示可能であり、こ
の場合には、各階の施工時に施工される部材や既に施工
された部材(第2の平面図及び第3の平面図)が表示さ
れる。また、第2の平面図及び第3の平面図の表示にお
いて、設定された施工時期に施工又は設置される部材、
仮設物と、設定された施工時期には既に施工又は設置さ
れている部材、仮設部と、を異なる表示色で表示するよ
うにしてもよい。
In the above description, the display of the plan view of the construction status diagram of the underground construction has been described as an example. However, the plan view of the construction status diagram of the ground construction (at the time of construction of each floor) can be similarly displayed. Indicates members to be constructed at the time of construction of each floor and members already constructed (the second plan view and the third plan view). In addition, in the display of the second plan view and the third plan view, members to be constructed or installed at the set construction time,
The temporary object and the members or the temporary parts already constructed or installed at the set construction time may be displayed in different display colors.

【0057】オペレータは、表示すべき施工状況図の平
面図の種類及び表示条件を選択することにより、上述し
た種々の平面図を表示させることができるので、建設工
事の施工期間内の各時期における平面的な施工状況を各
々確認することができる。
The operator can display the various plan views described above by selecting the type of plan view and the display condition of the construction status diagram to be displayed. The two-dimensional construction status can be confirmed.

【0058】一方、表示すべき施工状況図として断面図
が選択された場合には、ステップ150からステップ1
70へ移行し、3次元施工空間内のうち、施工状況図の
断面図として表示すべき範囲を規定する基準面(3次元
施工空間内を横切る面)の位置の指定を要請するメッセ
ージをディスプレイ30に表示する。次のステップ17
2では基準面位置が指定されたか否か判定し、判定が肯
定される迄待機する。
On the other hand, when the sectional view is selected as the construction status diagram to be displayed, Step 150 to Step 1 are performed.
The display 30 displays a message requesting designation of the position of a reference plane (a plane crossing the three-dimensional construction space) that defines a range to be displayed as a sectional view of the construction situation diagram in the three-dimensional construction space. To be displayed. Next Step 17
At 2, it is determined whether or not the reference plane position has been designated, and the process waits until the determination is affirmed.

【0059】そして、オペレータがキーボード26やマ
ウス28を操作することで、座標値等によって基準面の
位置が指定されると、ステップ172の判定が肯定され
てステップ174へ移行し、予め設定・記憶されている
施工状況図の断面図の表示範囲幅を表す情報を取り込
む。そして次のステップ178では、オペレータによっ
て指定された基準面位置及びステップ176で取り込ん
だ表示範囲幅に基づいて、施工状況図の断面図として表
示すべき表示範囲を、 基準面を含み、かつ基準面と直
交する方向に、取り込んだ表示範囲幅に相当する幅を有
するように設定する。
Then, when the operator operates the keyboard 26 or the mouse 28 to specify the position of the reference plane by the coordinate value or the like, the determination in step 172 is affirmed, and the process proceeds to step 174 to set and store in advance. The information representing the display range width of the cross-sectional view of the construction status diagram is taken in. Then, in the next step 178, based on the reference plane position designated by the operator and the display range width taken in step 176, the display range to be displayed as a cross-sectional view of the construction status diagram includes the reference plane and the reference plane. Are set so as to have a width corresponding to the captured display range width in a direction orthogonal to

【0060】例えば図9(A)に示すように基準面位置
(図9(A)では基準面を「断面」と表記している)と
して座標値Y=20,000が設定され、取り込んだ表示範囲
幅が図9(A)に示すように±6,000 であった場合、単
位が[mm]であるので、基準面位置Y=20,000を基準と
してY方向に前後 6,000[mm]の範囲(図9(A)に破
線で囲んで示す範囲)が表示範囲として設定されること
になる。なお、上記は基準面がY平面の場合であるが、
基準面はX平面であってもよい。また、オペレータによ
る基準面位置の指定を容易にするため、オペレータが基
準面位置を指定する際には、図9(A)に示すような平
面図をディスプレイ30に表示することが好ましい。
For example, as shown in FIG. 9A, a coordinate value Y = 20,000 is set as a reference plane position (in FIG. 9A, the reference plane is described as “cross section”), and the captured display range width is set. Is ± 6,000 as shown in FIG. 9 (A), since the unit is [mm], a range of 6,000 [mm] in the Y direction with respect to the reference plane position Y = 20,000 (see FIG. 9 (A)). ) Is set as the display range. The above is the case where the reference plane is the Y plane,
The reference plane may be an X plane. Further, in order to facilitate the designation of the reference plane position by the operator, when the operator designates the reference plane position, it is preferable to display a plan view as shown in FIG.

【0061】次のステップ178では、建設物の施工期
間のうち施工状況図の断面図として表示すべき時期(表
示時期)を指定するようオペレータに要請するメッセー
ジをディスプレイ30に表示する。ステップ180では
オペレータによって表示時期が指定されたか否か判定
し、判定が肯定される迄待機する。オペレータがキーボ
ード26やマウス28を操作することによって表示時期
が指定されると(日付によって指定しても、階又は根切
り次数(の施工時期)で指定してもよい)、ステップ1
80の判定が肯定されてステップ182へ移行し、先の
ステップ176で設定した表示範囲内に、オペレータに
よって指定された表示時期に存在している部材及び仮設
物を検索する検索条件を設定し、各部材及び各仮設物の
位置情報及び時期情報を設定した検索条件と照合するこ
とにより、検索条件に合致する部材及び仮設物を抽出す
る。
In the next step 178, a message is displayed on the display 30 requesting the operator to designate a time (display time) to be displayed as a sectional view of the construction status diagram in the construction period of the construction. In step 180, it is determined whether or not the display time has been designated by the operator, and the process waits until the determination is affirmed. When the display time is specified by the operator operating the keyboard 26 or the mouse 28 (may be specified by date, or may be specified by floor or root cutting order) (step 1).
When the determination at 80 is affirmative, the process proceeds to step 182, and a search condition for searching for members and temporary objects existing at the display time designated by the operator within the display range set at the previous step 176 is set, By comparing position information and time information of each member and each temporary object with the set search condition, members and temporary objects that match the search condition are extracted.

【0062】なおステップ182は請求項1に記載の
「特定時期に、基準面を含みかつ基準面と交差する方向
に幅を有する特定範囲内に存在している部材及び資材を
抽出」することに対応していると共に、請求項3に記載
の抽出手段に対応している。
Step 182 is to extract the members and materials existing in a specific range including the reference plane and having a width in a direction crossing the reference plane at a specific time. This corresponds to the extracting means according to the third aspect.

【0063】そして、次のステップ184では、抽出し
た各部材及び各仮設物を、部材及び仮設物のID及び位
置情報に基づいて、基準面と平行な投影面(X平面又は
Y平面)上への投影位置に対応するディスプレイ30の
表示面上の所定位置に、部材ID又は仮設物IDに対応
する形状の図形(例えば投影面(及び基準面)と略平行
に配置される線材は側面形状に対応する形状(例えば長
尺状)の矩形、投影面と略平行に配置される面材は底面
形状に対応する形状の矩形、投影面と略垂直に配置され
る線材は断面形状に対応する形状の矩形、投影面と略垂
直に配置される面材は側面形状に対応する形状の矩形
等)として各々表示する。
In the next step 184, each extracted member and each temporary object are placed on a projection plane (X plane or Y plane) parallel to the reference plane based on the IDs and position information of the members and the temporary object. At a predetermined position on the display surface of the display 30 corresponding to the projection position, a figure having a shape corresponding to the member ID or the temporary object ID (for example, a wire arranged substantially parallel to the projection surface (and the reference surface) has a side shape). A rectangle of a corresponding shape (for example, a long shape), a surface material arranged substantially parallel to the projection surface is a rectangle of a shape corresponding to the bottom surface shape, and a wire material arranged substantially perpendicular to the projection surface is a shape corresponding to the cross-sectional shape. , And the surface material arranged substantially perpendicular to the projection plane are respectively displayed as rectangles having a shape corresponding to the side surface shape).

【0064】なお、各部材や各仮設物に対応する図形の
表示位置は、基準面がX平面であれば端点のY座標値及
びZ座標値に基づいて判断することができ、基準面がY
平面であれば端点のX座標値及びZ座標値に基づいて判
断することができる。
The display position of the figure corresponding to each member or each temporary object can be determined based on the Y coordinate value and the Z coordinate value of the end point if the reference plane is the X plane.
If it is a plane, it can be determined based on the X coordinate value and the Z coordinate value of the end point.

【0065】これにより、例として図9(C)にも示す
ように、オペレータによって設定された表示時期に、オ
ペレータによって指定された基準面位置を基準として設
定した表示範囲内に存在する部材及び仮設物が示された
施工状況図の断面図がディスプレイ30に表示される。
なお、ステップ184は、後述するステップ190、1
92と共に、請求項1に記載の「抽出した部材及び資材
を、基準面と略平行な投影面への投影位置に対応する位
置に、個々の部材又は資材の種類に応じた図形として示
した施工状況図を出力する」ことに対応していると共
に、請求項3に記載の出力手段に対応している。
As a result, as shown in FIG. 9 (C), for example, at the display time set by the operator, the members existing within the display range set based on the reference plane position designated by the operator and the temporary members A cross-sectional view of the construction situation diagram showing the object is displayed on the display 30.
Step 184 includes steps 190 and 1 described below.
92 together with the description “Claims showing extracted members and materials as figures according to the types of the individual members or materials at positions corresponding to the projection positions on the projection plane substantially parallel to the reference plane. Outputting a situation diagram "and the output means according to the third aspect.

【0066】図9(C)に示す施工状況図の断面図は、
図9(A)に4個の平面図で示した0次根切り乃至3次
根切りの各作業が完了した際の、図9(A)に破線で示
す表示範囲内を図示した図であるが、この断面図を、図
9(B)に示す基準面についての通常の断面図(表示範
囲幅=0の断面図)と比較しても明らかなように、図9
(C)に示す表示範囲幅>0の断面図では、通常の断面
図では現れていない基準面と平行な方向に沿って延びる
支保工及びアースアンカが図示されている。このよう
に、本実施形態に係る施工状況図の断面図は、通常の断
面図と比較して断面図上に現れている情報量が多いの
で、設定された表示時期における基準面位置及びその近
傍での施工状況の把握、施工計画の検討・確認を容易に
行うことができる。
FIG. 9 (C) is a sectional view of the construction situation diagram.
FIG. 10A is a diagram illustrating a display range indicated by a broken line in FIG. 9A when the respective operations of the 0th to 3rd root cutting shown in four plan views in FIG. 9A are completed. However, as apparent from comparison of this cross-sectional view with a normal cross-sectional view (cross-sectional view with display range width = 0) of the reference plane shown in FIG.
In the cross-sectional view with the display range width> 0 shown in (C), a support and an earth anchor extending along a direction parallel to the reference plane not shown in the normal cross-sectional view are illustrated. As described above, since the cross-sectional view of the construction status diagram according to the present embodiment has a larger amount of information appearing on the cross-sectional view than the normal cross-sectional view, the reference plane position at the set display time and its vicinity It is possible to easily understand the construction status and examine and confirm the construction plan.

【0067】なお、図9(C)に示した施工状況図の断
面図は、表示時期が3次根切り作業完了時、すなわち躯
体工事を開始する前であるため、建設物を構成する各部
材は図示されていないが、表示時期として施工期間内の
より後側の時期、具体的には切梁(支保工)を1段撤去
して躯体工事が開始された後の時期における施工状況の
断面図を表示したとすると、例として図9(D)に示す
ような断面図が表示される。図9(D)に示す断面図に
おける表示範囲は図9(C)に示す断面図と同一である
が、図9(C)に示す断面図と比較して、建設物を構成
する部材(ハッチングで示す部分)が図示されていると
共に、下段側の切梁(支保工)及びアースアンカが撤去
されていることが極めて容易に認識することができる。
In the sectional view of the construction status diagram shown in FIG. 9C, since the display time is at the time of completion of the tertiary excavation work, that is, before the start of the framing work, each member constituting the construction is shown. Although not shown, the cross-section of the construction status at the later stage in the construction period as the indication period, specifically, the stage after the frame work was started by removing one step of the beam (shoring) When the figure is displayed, a cross-sectional view as shown in FIG. 9D is displayed as an example. The display range in the cross-sectional view shown in FIG. 9D is the same as the cross-sectional view shown in FIG. 9C, but compared to the cross-sectional view shown in FIG. ), And it can be very easily recognized that the lower cutting beam (support) and the earth anchor have been removed.

【0068】次のステップ186では、表示範囲幅を変
更して施工状況図の断面図を再表示するか否かをオペレ
ータに確認するメッセージをディスプレイ30に表示
し、表示範囲幅の変更が指示されたか否か判定する。判
定が否定された場合にはステップ190へ移行するが、
判定が肯定された場合には、ステップ188で表示範囲
幅を変更した後にステップ174に戻り、変更された表
示範囲幅に基づいて施工状況図の断面図を再表示する。
なお、ステップ188は請求項2に記載の「指示に応じ
て幅を変更」することに対応しており、ステップ188
を行った後のステップ174以降の処理は、請求項2に
記載の「幅を変更した特定範囲内に存在している部材及
び資材を抽出する」ことに対応している。
In the next step 186, a message is displayed on the display 30 asking the operator whether to change the display range width and redisplay the sectional view of the construction status diagram, and an instruction to change the display range width is issued. Is determined. If the determination is negative, the process proceeds to step 190,
If the determination is affirmative, the process returns to step 174 after changing the display range width in step 188, and re-displays the sectional view of the construction status diagram based on the changed display range width.
Step 188 corresponds to “changing the width according to the instruction” described in claim 2.
The processing of step 174 and subsequent steps after the step corresponds to "extracting members and materials existing in a specific range whose width has been changed".

【0069】これにより、当初設定されていた表示範囲
幅の値が適切でなく、施工状況図の断面図上で特定の部
材が重なって表示されていたり、或いは確認したい部材
が図示されていない等の場合にも、オペレータが表示範
囲幅を変更・調整することで、所望の施工状況図の断面
図を表示させることができる。
As a result, the initially set value of the display range width is not appropriate, and specific members are displayed overlapping on the sectional view of the construction status diagram, or the member to be checked is not shown. In this case, the operator can change and adjust the display range width to display a cross-sectional view of a desired construction status diagram.

【0070】上記のようにして所望の施工状況図(平面
図又は断面図)がディスプレイ30に表示されると、ス
テップ190において、表示している施工状況図を紙等
に印刷するか否をオペレータに確認するメッセージをデ
ィスプレイ30に表示し、紙等の記録材料への施工状況
図の印刷が指示されたか否かを判定する。判定が否定さ
れた場合にはステップ194へ移行するが、印刷が指示
された場合にはステップ192へ移行し、ディスプレイ
30に表示している施工状況図を記録材料に印刷するた
めのデータをプリンタ32に出力し、記録材料への施工
状況図の印刷をプリンタ32に指示した後にステップ1
94へ移行する。ステップ194では、部材又は仮設物
の属性情報の変更が指示されたか否かを判定し、判定が
否定された場合には何ら処理を行うことなく施工状況図
出力処理を終了する。
When the desired construction status diagram (plan view or sectional view) is displayed on the display 30 as described above, in step 190, the operator determines whether or not to print the displayed construction status diagram on paper or the like. Is displayed on the display 30, and it is determined whether or not printing of the construction status diagram on a recording material such as paper is instructed. If the determination is denied, the process proceeds to step 194. If the printing is instructed, the process proceeds to step 192, and the data for printing the construction status diagram displayed on the display 30 on the recording material is printed. 32, and instructs the printer 32 to print the construction status diagram on the recording material, and then proceeds to step 1
Move to 94. In step 194, it is determined whether or not a change in the attribute information of the member or the temporary object has been instructed. If the determination is negative, the construction status diagram output processing ends without performing any processing.

【0071】オペレータは、表示すべき施工状況図の種
類、施工状況図として表示すべき時期、施工状況図とし
て表示すべき範囲の少なくとも1つを変更して、施工状
況図出力処理を実行させることを繰り返し、各回の実行
においてディスプレイ30に表示された施工状況図、又
はプリンタ32によって記録材料に印刷された施工状況
図を参照し、建設工事の施工時に各種の仮設物が当初予
定していた位置に物理的に配置可能か否か、施工時の安
全性を確保できるか否か、並行して実施される作業同士
が干渉しないか否か等を検討・確認することを繰り返
す。これにより、当初に策定した施工計画が適正か否か
を検討する。そして、何れかの部材又は何れかの仮設物
の配置位置、施工時期又は使用期間等の変更が必要と判
断した場合には、施工計画の変更、すなわち特定の部材
又は仮設物の属性情報の変更を指示する。
The operator changes at least one of the type of the construction status diagram to be displayed, the timing to be displayed as the construction status diagram, and the range to be displayed as the construction status diagram, and causes the execution of the construction status diagram output process. Is repeated, and referring to the construction status diagram displayed on the display 30 in each execution or the construction status diagram printed on the recording material by the printer 32, the positions where various temporary objects were originally planned at the time of construction work. It is repeated to examine and confirm whether or not it can be physically arranged, whether or not safety during construction can be ensured, and whether or not operations performed in parallel do not interfere with each other. In this way, it is examined whether the construction plan originally formulated is appropriate. If it is determined that it is necessary to change the arrangement position, construction time, or use period of any member or any temporary object, the construction plan is changed, that is, the attribute information of the specific member or temporary object is changed. Instruct.

【0072】これにより、先に説明したステップ194
の判定が肯定されてステップ196へ移行し、オペレー
タからの指示に応じて、指示された特定の部材又は仮設
物の属性情報を変更する。これにより、施工状況図出力
処理が再度実行されたときには、属性情報の変更、すな
わち施工計画の変更が反映された施工状況図が表示され
ることになる。
Thus, step 194 described above is performed.
Is affirmed, the process proceeds to step 196, and the attribute information of the specified specific member or temporary object is changed according to the instruction from the operator. Thereby, when the construction status diagram output process is executed again, the construction status diagram reflecting the change in the attribute information, that is, the change in the construction plan is displayed.

【0073】なお、上記では建設物を構成する各部材の
種類情報及び位置情報を、建設物の設計時に建設物の構
造計算等に利用するために生成(入力)された建設物モ
デルデータを取り込むことで取得していたが、これに限
定されるものではなく、各部材の種類情報及び位置情報
をオペレータが各々設定するようにしてもよい。
In the above description, the construction model data generated (input) is used to use the type information and the position information of each member constituting the construction for the structural calculation of the construction when designing the construction. However, the present invention is not limited to this, and the operator may set the type information and the position information of each member.

【0074】また、上記では本発明に係る基準面をX平
面又はY平面(3次元施工空間の鉛直方向に沿った面)
とし、基準面に関する施工状況図として、基準面として
のX平面又はY平面を含む範囲を表示範囲とする垂直断
面図を表示するようにしていたが、本発明に係る基準面
をZ平面(3次元施工空間の水平方向に沿った面)と
し、基準面に関する施工状況図として、基準面としての
Z平面を含む範囲を表示範囲とする水平断面図を表示す
るようにしてもよい。
In the above description, the reference plane according to the present invention is defined as an X plane or a Y plane (a plane along the vertical direction of the three-dimensional construction space).
As a construction status diagram relating to the reference plane, a vertical cross-sectional view having a display range including the X plane or the Y plane as the reference plane is displayed. However, the reference plane according to the present invention is displayed on the Z plane (3). (A plane along the horizontal direction of the three-dimensional construction space), and as a construction status diagram relating to the reference plane, a horizontal cross-sectional view having a display range including a Z plane as the reference plane may be displayed.

【0075】また、上記では施工状況図の断面図の表示
に際し、設定された基準面の位置が中心となるように表
示範囲を設定していたが、これに限定されるものではな
く、表示範囲(本発明に係る特定範囲)は、設定された
基準面の位置を基準にして任意に設定可能である。
In the above description, the display range is set so that the position of the set reference plane is the center when displaying the sectional view of the construction status diagram. However, the display range is not limited to this. (Specific range according to the present invention) can be arbitrarily set based on the position of the set reference plane.

【0076】更に、上記では本発明に係る記録媒体とし
て、ハードディスク装置34の内蔵ハードディスク又は
CD−ROM36又はFD38を例に説明したが、本発
明はこれに限定されるものではなく、例えばCD−R等
の光ディスク、MO等の光磁気ディスク、メモリカー
ド、ICカード等の各種の情報記憶媒体を、本発明に係
る記録媒体として適用可能であることは言うまでもな
い。
In the above description, the recording medium according to the present invention has been described by taking the built-in hard disk of the hard disk drive 34 or the CD-ROM 36 or the FD 38 as an example. However, the present invention is not limited to this. It is needless to say that various information storage media such as an optical disc such as an optical disc, a magneto-optical disc such as an MO, a memory card, and an IC card can be applied as the recording medium according to the present invention.

【0077】[0077]

【発明の効果】以上説明したように請求項1及び請求項
3記載の発明は、建設物を構成する各部材及び施工時に
使用される各資材について各々設定された種類情報、位
置情報及び時期情報を各々記憶しておき、施工空間を横
切る基準面が指定され、施工期間内の特定時期における
施工状況図の出力が指示されると、特定時期に、基準面
を含みかつ基準面と交差する方向に幅を有する特定範囲
内に存在している部材及び資材を抽出し、抽出した部材
及び資材を、基準面と略平行な投影面への投影位置に対
応する位置に、個々の部材又は資材の種類に応じた図形
として示した施工状況図を出力するようにしたので、建
設工事の施工計画の検討・確認が省力化されるように施
工状況を表示することができる、という優れた効果を有
する。
As described above, according to the first and third aspects of the present invention, the type information, the position information, and the timing information set for each of the members constituting the building and the materials used at the time of construction are respectively provided. When a reference plane crossing the construction space is designated and the output of the construction situation diagram at a specific time during the construction period is instructed, the direction including the reference plane and intersecting with the reference plane at the specific time is stored. The members and materials existing within the specific range having the width are extracted, and the extracted members and materials are placed at positions corresponding to the projection positions on the projection plane substantially parallel to the reference plane. Since the construction status diagram shown as a figure according to the type is output, the construction status can be displayed so that the examination and confirmation of the construction plan of the construction work can be saved. .

【0078】請求項2記載の発明は、基準面と交差する
方向に沿った特定範囲の幅の変更が指示された場合に
は、指示に応じて前記幅を変更した後に、前記幅を変更
した特定範囲内に存在している部材及び資材を抽出する
ようにしたので、上記効果に加え、建設物の構造等に応
じた適正な施工状況図を表示することが可能となる、と
いう効果を有する。
According to a second aspect of the present invention, when a change in the width of a specific range along a direction intersecting with the reference plane is instructed, the width is changed after the width is changed in accordance with the instruction. Since the members and materials existing within the specific range are extracted, in addition to the above-described effects, it is possible to display an appropriate construction situation diagram according to the structure of the building or the like. .

【0079】請求項4記載の発明は、建設物を構成する
各部材及び施工時に使用される各資材について各々設定
された種類情報、位置情報及び時期情報を各々記憶する
第1のステップ、施工空間を横切る基準面が指定され、
施工期間内の特定時期における施工状況図の出力が指示
されると、特定時期に、基準面を含みかつ基準面と交差
する方向に幅を有する特定範囲内に存在している部材及
び資材を抽出する第2のステップ、抽出した部材及び資
材を、基準面と略平行な投影面への投影位置に対応する
位置に、個々の部材又は資材の種類に応じた図形として
示した施工状況図を出力する第3のステップを含む処理
をコンピュータに実行させるためのプログラムを記録媒
体に記録したので、建設工事の施工計画の検討・確認が
省力化されるように施工状況を出力することができる、
という優れた効果を有する。
According to a fourth aspect of the present invention, there is provided a first step of storing type information, position information, and timing information set for each member constituting a building and each material used during construction, respectively, a construction space. The reference plane crossing is specified,
When the output of the construction status diagram at a specific time during the construction period is instructed, at a specific time, the members and materials existing within a specific range including the reference plane and having a width in a direction crossing the reference plane are extracted. In the second step, the extracted members and materials are output at a position corresponding to a projection position on a projection plane substantially parallel to the reference plane as a drawing corresponding to the type of each member or material. Since the program for causing the computer to execute the process including the third step is recorded on the recording medium, the construction status can be output so that the examination and confirmation of the construction plan of the construction work can be saved.
It has an excellent effect.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る施工状況図出力装置として機能さ
せることが可能な本実施形態に係るパーソナルコンピュ
ータの概略構成を示すブロック図である。
FIG. 1 is a block diagram illustrating a schematic configuration of a personal computer according to an embodiment that can function as a construction status diagram output device according to the invention.

【図2】本実施形態に係る施工情報設定処理の内容を示
すフローチャートである。
FIG. 2 is a flowchart showing the contents of a construction information setting process according to the embodiment.

【図3】本実施形態に係る施工状況図出力処理の内容を
示すフローチャートである。
FIG. 3 is a flowchart illustrating the contents of a construction status diagram output process according to the embodiment.

【図4】(A)は3次元建物モデルの一例を示す斜視
図、(B)は建設物モデル図の平面図の一例、(C)及
び(D)は建設物モデル図の軸組図の一例を各々示すイ
メージ図である。
4A is a perspective view showing an example of a three-dimensional building model, FIG. 4B is an example of a plan view of a building model diagram, and FIGS. 4C and 4D are framing diagrams of the building model diagram. It is an image figure which shows an example each.

【図5】(A)乃至(C)は、各種の施工状況図を説明
するための建設物の地下工事の施工過程の一例を示す斜
視図である。
5 (A) to 5 (C) are perspective views showing an example of a construction process of an underground construction of a construction for explaining various construction situation diagrams.

【図6】(A)乃至(C)は、特定の階又は根切り次数
の施工時に施工される部材及び特定の階又は根切り次数
の施工時に設置される仮設物のみを表示する平面図の一
例を示すイメージ図である。
6 (A) to 6 (C) are plan views showing only members to be constructed at the time of construction at a specific floor or root cutting order and temporary objects installed at the time of construction at a specific floor or root cutting order. It is an image figure showing an example.

【図7】(A)乃至(C)は、特定の階又は根切り次数
の施工時に施工される部材及び特定の階又は根切り次数
の施工時に設置される仮設物に加えて、特定の階又は根
切り次数の施工時には施工済又は設置済の部材及び仮設
物も表示する平面図の一例を示すイメージ図である。
7 (A) to 7 (C) show specific floors in addition to members to be constructed at the time of construction at a specific floor or root cutting order and temporary objects installed at the time of construction at a specific floor or root cutting order. Alternatively, it is an image diagram showing an example of a plan view that also displays the installed or installed members and temporary objects at the time of the root cutting order.

【図8】(A)乃至(C)は、図7に示した平面図によ
って表示される部材及び仮設物のうち特定の高さ範囲内
に位置している部材及び仮設物のみを表示する平面図の
一例を示すイメージ図である。
8A to 8C are planes showing only members and temporary objects located within a specific height range among members and temporary objects displayed by the plan view shown in FIG. 7; It is an image figure showing an example of a figure.

【図9】(A)は施工状況図の断面図を表示する際の基
準面位置、表示範囲幅、表示範囲の一例を示すイメージ
図、(B)は表示範囲幅=0の従来の断面図、(C)及
び(D)は本発明に係る表示範囲幅>0の断面図の一例
を示すイメージ図である。
9A is an image diagram illustrating an example of a reference plane position, a display range width, and a display range when displaying a cross-sectional view of a construction status diagram, FIG. 9B is a conventional cross-sectional view in which a display range width = 0, (C) and (D) are image diagrams showing an example of a cross-sectional view according to the present invention with a display range width> 0.

【符号の説明】[Explanation of symbols]

10 パーソナルコンピュータ 22 CD−ROMドライバ 24 FDD 26 キーボード 28 マウス 34 ハードディスク装置 36 CD−ROM 38 FD DESCRIPTION OF SYMBOLS 10 Personal computer 22 CD-ROM driver 24 FDD 26 Keyboard 28 Mouse 34 Hard disk device 36 CD-ROM 38 FD

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 建設物を構成する各部材及び前記建設物
の施工時に使用される各資材について各々設定された、
前記部材又は資材の種類を表す種類情報、前記建設物の
施工時の3次元施工空間内における前記部材又は資材の
配置位置を表す位置情報、及び前記部材の施工時期又は
前記資材の使用期間を表す時期情報を各々記憶してお
き、 前記施工空間を横切る基準面が指定され、前記建設物の
施工期間内の特定時期における、前記基準面に関する施
工状況図の出力が指示されると、前記各部材及び各資材
の前記位置情報及び前記時期情報に基づいて、前記特定
時期に、前記基準面を含みかつ前記基準面と交差する方
向に幅を有する特定範囲内に存在している部材及び資材
を抽出し、 前記抽出した部材及び資材の前記種類情報及び位置情報
に基づいて、抽出した部材及び資材を、前記基準面と略
平行な投影面への投影位置に対応する位置に、個々の部
材又は資材の種類に応じた図形として示した施工状況図
を出力する施工状況図出力方法。
1. A method according to claim 1, wherein each member constituting the building and each material used at the time of constructing the building are set.
Type information indicating the type of the member or the material, position information indicating the arrangement position of the member or the material in the three-dimensional construction space at the time of the construction of the building, and indicating the construction time of the member or the usage period of the material Each time information is stored, a reference plane crossing the construction space is designated, and at a specific time within the construction period of the building, when the output of the construction status diagram relating to the reference plane is instructed, the respective members And extracting, based on the position information and the time information of each material, members and materials that exist in a specific range including the reference plane and having a width in a direction intersecting with the reference plane at the specific time. Based on the type information and the position information of the extracted members and materials, the extracted members and materials are individually placed at positions corresponding to projection positions on a projection surface substantially parallel to the reference surface. Construction status view output method of outputting the construction status diagram showing a figure corresponding to the type of material is.
【請求項2】 前記特定範囲の前記基準面と交差する方
向に沿った幅の変更が指示された場合には、指示に応じ
て前記幅を変更した後に、前記幅を変更した特定範囲内
に存在している部材及び資材を抽出することを特徴とす
る請求項1記載の施工状況図出力方法。
2. When a change in the width of the specific range along the direction intersecting with the reference plane is instructed, the width is changed in accordance with the instruction, and then, within the specific range in which the width is changed. 2. The construction status diagram output method according to claim 1, wherein existing members and materials are extracted.
【請求項3】 建設物を構成する各部材及び該建設物の
施工時に使用される各資材について、前記部材又は資材
の種類を表す種類情報、前記建設物の施工時の3次元施
工空間内における前記部材又は資材の配置位置を表す位
置情報、及び前記部材の施工時期又は前記資材の使用期
間を表す時期情報を各々設定するための設定手段と、 前記設定手段を介して各々設定された前記各部材及び各
資材の前記種類情報、前記位置情報及び前記時期情報を
各々記憶する記憶手段と、 施工状況図の出力を指示するための指示手段と、 前記指示手段を介し、前記施工空間を横切る基準面が指
定され、前記建設物の施工期間内の特定時期における、
前記基準面に関する施工状況図の出力が指示されると、
前記各部材及び各資材の前記位置情報及び前記時期情報
に基づいて、前記特定時期に、前記基準面を含みかつ前
記基準面と交差する方向に幅を有する特定範囲内に存在
している部材及び資材を抽出する抽出手段と、 前記抽出手段によって抽出された部材及び資材の前記種
類情報及び位置情報に基づいて、前記抽出された部材及
び資材を、前記基準面と略平行な投影面への投影位置に
対応する位置に、個々の部材又は資材の種類に応じた図
形として示した施工状況図を出力する出力手段と、 を含む施工状況図出力装置。
3. For each member constituting the building and each material used at the time of construction of the building, type information indicating the type of the member or the material, in a three-dimensional construction space at the time of construction of the building. Setting means for setting position information indicating the arrangement position of the member or the material, and time information indicating the construction time of the member or the use period of the material; and each of the setting information via the setting means A storage unit for storing the type information, the position information, and the timing information of each member and each material; an instruction unit for instructing the output of a construction situation diagram; and a reference crossing the construction space via the instruction unit. Surface is specified, at a specific time during the construction period of the building,
When the output of the construction status diagram regarding the reference plane is instructed,
Based on the position information and the time information of each member and each material, at the specific time, including the reference surface and a member that exists in a specific range having a width in a direction intersecting the reference surface, Extracting means for extracting a material, and projecting the extracted member and material on a projection plane substantially parallel to the reference plane based on the type information and the position information of the member and material extracted by the extracting means. Output means for outputting, at a position corresponding to the position, a construction status diagram shown as a graphic corresponding to the type of each member or material, a construction status diagram output device.
【請求項4】 建設物を構成する各部材及び前記建設物
の施工時に使用される各資材について各々設定された、
前記部材又は資材の種類を表す種類情報、前記建設物の
施工時の3次元施工空間内における前記部材又は資材の
配置位置を表す位置情報、及び前記部材の施工時期又は
前記資材の使用期間を表す時期情報を各々記憶しておく
第1のステップ、 前記施工空間を横切る基準面が指定され、前記建設物の
施工期間内の特定時期における、前記基準面に関する施
工状況図の出力が指示されると、前記各部材及び各資材
の前記位置情報及び前記時期情報に基づいて、前記特定
時期に、前記基準面を含みかつ前記基準面と交差する方
向に幅を有する特定範囲内に存在している部材及び資材
を抽出する第2のステップ、 前記抽出した部材及び資材の前記種類情報及び位置情報
に基づいて、抽出した部材及び資材を、前記基準面と略
平行な投影面への投影位置に対応する位置に、個々の部
材又は資材の種類に応じた図形として示した施工状況図
を出力する第3のステップを含む処理をコンピュータに
実行させるためのプログラムが記録された記録媒体。
4. Each member constituting the building and each material used at the time of construction of the building are set.
Type information indicating the type of the member or the material, position information indicating the arrangement position of the member or the material in the three-dimensional construction space at the time of the construction of the building, and indicating the construction time of the member or the usage period of the material A first step of storing time information, a reference plane crossing the construction space is designated, and at a specific time within the construction period of the building, output of a construction status diagram relating to the reference plane is instructed; Based on the position information and the time information of each member and each material, at the specific time, a member that includes the reference surface and exists in a specific range having a width in a direction intersecting with the reference surface. And a second step of extracting the material, based on the type information and the position information of the extracted member and the material, projecting the extracted member and the material onto a projection surface substantially parallel to the reference surface. Recording medium having a program recorded thereon for the corresponding position, to be executed by the third computer processing including the steps of outputting the construction status diagram showing a figure corresponding to the type of individual members or materials in.
JP28083298A 1998-10-02 1998-10-02 Construction status diagram output device and recording medium Expired - Fee Related JP3892593B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28083298A JP3892593B2 (en) 1998-10-02 1998-10-02 Construction status diagram output device and recording medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28083298A JP3892593B2 (en) 1998-10-02 1998-10-02 Construction status diagram output device and recording medium

Publications (2)

Publication Number Publication Date
JP2000110350A true JP2000110350A (en) 2000-04-18
JP3892593B2 JP3892593B2 (en) 2007-03-14

Family

ID=17630615

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28083298A Expired - Fee Related JP3892593B2 (en) 1998-10-02 1998-10-02 Construction status diagram output device and recording medium

Country Status (1)

Country Link
JP (1) JP3892593B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8249909B2 (en) 2008-10-31 2012-08-21 Hitachi-Ge Nuclear Energy, Ltd. System and method for visualizing the construction progress of scaffolding utilizing 3D CAD models

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06266807A (en) * 1993-03-16 1994-09-22 Fujitsu Ten Ltd Parts interference inspecting device and cad system
JPH0953324A (en) * 1995-08-15 1997-02-25 Takenaka Komuten Co Ltd Device for supporting construction work
JPH09268760A (en) * 1996-03-28 1997-10-14 Shimizu Corp Schedule control support system
JPH10115096A (en) * 1996-10-09 1998-05-06 Toshiba Corp Plant construction supporting system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06266807A (en) * 1993-03-16 1994-09-22 Fujitsu Ten Ltd Parts interference inspecting device and cad system
JPH0953324A (en) * 1995-08-15 1997-02-25 Takenaka Komuten Co Ltd Device for supporting construction work
JPH09268760A (en) * 1996-03-28 1997-10-14 Shimizu Corp Schedule control support system
JPH10115096A (en) * 1996-10-09 1998-05-06 Toshiba Corp Plant construction supporting system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8249909B2 (en) 2008-10-31 2012-08-21 Hitachi-Ge Nuclear Energy, Ltd. System and method for visualizing the construction progress of scaffolding utilizing 3D CAD models

Also Published As

Publication number Publication date
JP3892593B2 (en) 2007-03-14

Similar Documents

Publication Publication Date Title
KR100435296B1 (en) 3-dimensional structure design system, method of designing 3-dimensional structure and computer readable medium for recording a program for executing the said method
JP5656041B2 (en) Construction drawing system
JP6468962B2 (en) Crane interference check system, bridge erection simulation system, and 3D construction planning system equipped with them
JP3337207B2 (en) Construction system support system
JP3772814B2 (en) Structural design support system
JP3892593B2 (en) Construction status diagram output device and recording medium
JP2015052912A (en) Device and method for supporting concrete placement planning and program
JP2007149062A (en) Cad data display device
JP4672811B2 (en) CAD data display device
CN114781031B (en) Design method of truss modular combined type temporary supporting device based on BIM
JP2000048061A (en) Method for aiding design of temporary scaffold, system for realizing the method and recording medium recording program
JP4648547B2 (en) CAD system for unit building
CN116561850B (en) BIM-based deep foundation pit inner box culvert protection construction method, device and storage medium
JP7393276B2 (en) How to manage the finished shape of anchor insertion holes in seismic reinforcement work
JP3375043B2 (en) Input display method of beam on computer screen
JP3001297B2 (en) Drawing equipment for PC parts
JP2002123573A (en) Estimating method for structure and storage medium
JPH07150577A (en) Basement building construction method on narrow site
JPH09297780A (en) Structure analysis method for building
JP3001295B2 (en) Drawing equipment for PC parts
JPH0660154A (en) Cad for drawing automatically landslide protection wall plan diagram
JP2003208451A (en) Method of calculating quantity of civil-engineering structure by three-dimensional cad, and checking method therefor
JP4738575B2 (en) Ground analysis device for building site
JP2024038544A (en) Retaining wall 3D calculation device and retaining wall 3D calculation program
JP2791198B2 (en) Prefabricated construction process control device

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060912

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061110

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20061205

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20061207

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091215

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101215

Year of fee payment: 4

LAPS Cancellation because of no payment of annual fees