JP2000110179A - Method for constructing underwater foundation - Google Patents

Method for constructing underwater foundation

Info

Publication number
JP2000110179A
JP2000110179A JP10280892A JP28089298A JP2000110179A JP 2000110179 A JP2000110179 A JP 2000110179A JP 10280892 A JP10280892 A JP 10280892A JP 28089298 A JP28089298 A JP 28089298A JP 2000110179 A JP2000110179 A JP 2000110179A
Authority
JP
Japan
Prior art keywords
drain
water
foundation
skirt portion
underwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10280892A
Other languages
Japanese (ja)
Other versions
JP3713981B2 (en
Inventor
Ryuichi Asai
隆一 浅井
Hideo Goto
英夫 後藤
Naoki Masui
直樹 増井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP28089298A priority Critical patent/JP3713981B2/en
Publication of JP2000110179A publication Critical patent/JP2000110179A/en
Application granted granted Critical
Publication of JP3713981B2 publication Critical patent/JP3713981B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To prevent the occurrence of trouble such as a hindrance to common use even when additional load, etc. work after construction. SOLUTION: A foundation body 10 manufactured on a manufacturing yard is transported up to the point of installation, and the transported foundation body 10 is settled into an underwater ground A by working ballast load or working a suction by decompression. Water absorption devices such as a drainage pump are installed on the upper end sides of drainage ditches 16 after collecting drain sections 14 mounted at the lower ends of skirt sections 12 reach a bearing ground layer C at that time, and pore water in the bearing ground layer C is pumped up and drained positively.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、水中基礎の構築
工法に関し、特に、スカート部を水底地盤中に貫入させ
る水中基礎の構築工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing an underwater foundation, and more particularly to a method for constructing an underwater foundation in which a skirt portion penetrates into the underwater ground.

【0002】[0002]

【従来の技術】水中に基礎構造物を構築する際、基礎構
造物が杭基礎の場合は、一般的に、押し込み力として打
撃や振動を用いて施工する。しかし、基礎構造物が大規
模で、建設地点が大深度の場合には、打撃や振動により
押し込むことには、限界があって、このような条件下で
の杭基礎の採用は、非常に難しくなる。
2. Description of the Related Art When constructing a substructure underwater, if the substructure is a pile foundation, it is generally constructed by using impact or vibration as a pushing force. However, when the foundation structure is large and the construction site is deep, there is a limit to the pushing in by hitting or vibration, and it is very difficult to adopt the pile foundation under such conditions. Become.

【0003】そこで、大規模な基礎構造物を水中の大深
度に構築する際には、スカート部を下端に一体に形成し
た基礎構造物を、自重に付加バラスト荷重を加えたり、
あるいは、サクションを作用させることなどにより、水
底地盤中に強制的に貫入する方法が採用されている。
[0003] Therefore, when constructing a large-scale substructure at a large depth in water, a substructure integrally formed with a skirt portion at a lower end is subjected to an additional ballast load on its own weight,
Alternatively, a method of forcibly penetrating into the underwater ground by applying suction or the like is employed.

【0004】ところが、このような水中基礎の構築工法
には、以下に説明する技術的な課題があった。
However, such an underwater foundation construction method has the following technical problems.

【0005】[0005]

【発明が解決しようとする課題】すなわち、スカート部
を水底地盤中に貫入させて基礎構造物を据え付けると、
据え付け後の構造物の追加荷重などにより、スカート部
が貫入している先端より下に粘性土層があると地盤が圧
密沈下を起こし、構造物の完成後も沈下が継続し、沈下
量が許容値以上になったり、傾斜するなどの不具合が発
生し、構造物の供用に支障が生じる恐れがあった。
That is, when the skirt portion is penetrated into the underwater ground and the substructure is installed,
Due to additional load of the structure after installation, if there is a viscous soil layer below the tip where the skirt part penetrates, the ground will cause consolidation settlement, settlement will continue even after the completion of the structure, and the amount of settlement is allowable There was a possibility that troubles such as exceeding the value or inclining would occur, which would hinder the operation of the structure.

【0006】本発明は、このような従来の問題点に鑑み
てなされたものであって、その目的とするところは、構
築後に追加荷重などが作用しても、供用に支障を来すほ
どの不具合が発生することがない水中基礎の構築工法を
提供することにある。
The present invention has been made in view of such a conventional problem, and has as its object the purpose of the present invention being such that even if an additional load or the like is applied after construction, operation of the apparatus is hindered. An object of the present invention is to provide an underwater foundation construction method that does not cause any trouble.

【0007】[0007]

【課題を解決するための手段】上記目的を達成するため
に、本発明は、水中に設置される基礎本体の下端にスカ
ート部を一体に形成し、前記スカート部を水底地盤中に
貫入させる水中基礎の構築工法において、前記スカート
部の下端に集水ドレーン部を延設し、前記集水ドレーン
部に集められた水を、前記スカート部に設けられた排水
通路を介して、外部に排出するようにした。このように
構成した水中基礎の構築工法によれば、スカート部の下
端に集水ドレーン部を延設し、集水ドレーン部に集めら
れた水を、スカート部に設けられた排水通路を介して、
外部に排出するので、スカート部の下方部分の水底地盤
の圧密沈下が促進される。従って、基礎の構築後に追加
荷重などが作用しても、供用に支障を来すほどの沈下の
発生を防止することができる。前記集水ドレーン部は、
前記排水通路と連通し、外周面に貫通孔が設けられたド
レーン管と、このドレーン管内に設けられたフィルター
材と、前記ドレーン管内に充填された透水材とで構成す
ることができる。この構成によれば、フィルター材によ
り土砂の流入を防ぎつつ、圧密沈下を促進する排水を行
うことができる。
SUMMARY OF THE INVENTION In order to achieve the above object, the present invention provides an underwater body in which a skirt portion is integrally formed at a lower end of a base body installed in water, and the skirt portion penetrates into a submarine ground. In the foundation construction method, a water collecting drain portion is provided at the lower end of the skirt portion, and water collected in the water collecting drain portion is discharged outside through a drain passage provided in the skirt portion. I did it. According to the construction method of the underwater foundation configured as described above, the drainage drain portion is extended at the lower end of the skirt portion, and the water collected in the drainage drain portion is passed through a drain passage provided in the skirt portion. ,
Since the water is discharged to the outside, the consolidation settlement of the underwater ground in the lower part of the skirt portion is promoted. Therefore, even if an additional load or the like is applied after the foundation is constructed, it is possible to prevent the settlement from occurring so as to hinder service. The drainage drain section,
The drain pipe may be constituted by a drain pipe communicating with the drain passage and having a through hole formed in an outer peripheral surface thereof, a filter material provided in the drain pipe, and a water permeable material filled in the drain pipe. According to this configuration, it is possible to perform drainage for promoting consolidation settlement while preventing inflow of earth and sand by the filter material.

【0008】[0008]

【発明の実施の形態】以下、本発明の好適な実施の形態
について、添付図面を参照にして詳細に説明する。図1
から図4は、本発明にかかる水中基礎の構築工法の一実
施例を示している。
Preferred embodiments of the present invention will be described below in detail with reference to the accompanying drawings. FIG.
FIG. 4 to FIG. 4 show an embodiment of the construction method of the underwater foundation according to the present invention.

【0009】同図に示した水中基礎は、水中に設置され
る基礎本体10と、スカート部12とを備えている。基
礎本体10は、版状の上版10aと、この上版10aの
下端に一体に設けられた筒状の内,外側壁10b,10
cと、これらの内,外側壁10b,10cの下端を閉塞
するように設けられた版状の下版10dとを備えてい
る。
The underwater foundation shown in FIG. 1 includes a foundation body 10 installed underwater and a skirt portion 12. The base body 10 includes a plate-shaped upper plate 10a and cylindrical inner and outer walls 10b, 10 provided integrally with a lower end of the upper plate 10a.
c, and a plate-shaped lower plate 10d provided so as to close the lower ends of the inner and outer walls 10b and 10c.

【0010】このように構成された基礎本体10は、そ
の水平断面が円ないしは角形に形成され、内部には、
上,下版10a,10dと、内,外側壁10b,10c
とで隔成された隔室10eが設けられ、この隔室10e
内には、水中基礎を沈設する際にバラスト荷重となる海
水などが充填される。
The basic body 10 thus constructed has a horizontal or circular cross section formed therein.
Upper and lower plates 10a, 10d and inner and outer walls 10b, 10c
And a compartment 10e is provided.
The inside is filled with seawater which becomes a ballast load when the underwater foundation is laid.

【0011】下版10dは、本実施例の場合には、所定
の曲率で湾曲する曲面に形成されている。
In the case of the present embodiment, the lower plate 10d is formed to have a curved surface with a predetermined curvature.

【0012】スカート部12は、後述するように、水底
地盤中に貫入されるものであって、本実施例の場合に
は、基礎本体10の内,外側壁10b,10cの下端に
連なるように、内,外側壁10b,10cと同じ厚み
で、同じ直線上に位置するようにして、下方に向けて一
体に延設された複数の中実円筒体から構成されている。
As will be described later, the skirt portion 12 penetrates into the underwater ground. In this embodiment, the skirt portion 12 is connected to the lower ends of the inner and outer walls 10b and 10c of the foundation body 10. The inner and outer walls 10b and 10c are formed of a plurality of solid cylinders having the same thickness and located on the same straight line and extending integrally downward.

【0013】また、本実施例の場合には、スカート部1
2は、内,外側壁10b,10cの周方向に沿って、相
互に所定の間隔を隔てて複数配置されている。
In the case of this embodiment, the skirt 1
A plurality 2 are arranged at predetermined intervals from each other along the circumferential direction of the inner and outer walls 10b and 10c.

【0014】以上のような水中基礎としての基本的な構
成は、従来のこの種の基礎と同じであるが、本実施例の
水中基礎には、以下に説明する点に顕著な特徴がある。
The basic structure of the underwater foundation as described above is the same as that of a conventional foundation of this type, but the underwater foundation of this embodiment has remarkable features in the following points.

【0015】すなわち、本実施例の水中基礎には、スカ
ート部12の下端にそれぞれ集水ドレーン部14を延設
し、この集水ドレーン部14に集められた水を、スカー
ト部12に設けられた排水通路16を介して、外部に排
出するようにしている。
That is, on the underwater foundation of this embodiment, a water collecting drain portion 14 is provided at the lower end of the skirt portion 12, and the water collected by the water collecting drain portion 14 is provided on the skirt portion 12. The water is discharged to the outside through the drain passage 16.

【0016】この集水ドレーン部14の詳細を図3,4
に示している。同図に示した集水ドレーン部14は、ド
レーン管14aと、フィルター材14bと、透水材14
cとを備えている。
FIGS. 3 and 4 show details of the water collecting drain section 14. FIG.
Is shown in The drainage part 14 shown in the figure includes a drain pipe 14a, a filter material 14b, and a water permeable material 14b.
c.

【0017】ドレーン管14aは、下端が閉塞された円
筒ないしは角形,楕円形などの閉塞断面状の管体であっ
て、その側面には、多数のスリット孔14dが貫通形成
されている。各ドレーン管14aは、各スカート部12
の下端に嵌着固定された取付用鋼筒18に上端側が固設
されることにより支持されている。
The drain pipe 14a is a cylindrical body having a closed lower end, or a tubular body having a closed cross section such as a square or an ellipse, and a plurality of slit holes 14d are formed in the side surface thereof. Each drain pipe 14a is connected to each skirt 12
The upper end is supported by being fixedly attached to a mounting steel tube 18 fitted and fixed to the lower end of the cylinder.

【0018】各スカート部12内には、その上下方向に
沿って伸びる排水通路16が設けられていて、この排水
通路16とドレーン管14aの内部とが相互に連通する
ようになっている。
A drain passage 16 extending in the vertical direction is provided in each skirt portion 12, and the drain passage 16 and the inside of the drain pipe 14a communicate with each other.

【0019】排水通路16は、スカート部12内を上下
に貫通し、内,外側壁10b,10cの中間位置まで延
設され、上端側が上版10aの中心に垂設された合流管
17にバルブを介在させて連通接続されている。
A drain passage 16 extends vertically through the inside of the skirt portion 12, extends to an intermediate position between the inner and outer walls 10b and 10c, and has a valve connected to a junction pipe 17 whose upper end is vertically provided at the center of the upper plate 10a. Are connected to each other with an interposition.

【0020】各スカート部12の下端に取付けられたド
レーン管14aは、周および径方向に配置された連結材
18により相互に連結されている。フィルター材14b
は、各ドレーン管14aの内面側に設置され、水分のみ
を透過する機能を有する金網,合成樹脂網、不織布など
の筒体から構成されている。
The drain pipes 14a attached to the lower ends of the skirts 12 are mutually connected by connecting members 18 arranged in the circumferential and radial directions. Filter material 14b
Is provided on the inner surface side of each drain pipe 14a and is formed of a tubular body such as a wire mesh, a synthetic resin mesh, or a nonwoven fabric having a function of transmitting only moisture.

【0021】透水材14cは、中詰砂,砂利,砕石,合
成樹脂の小ブロックなどから構成され、フィルター材1
4bが設置されたドレーン管14a内に充填されてい
る。
The water permeable material 14c is made up of filled sand, gravel, crushed stone, a small block of synthetic resin, and the like.
4b is filled in the installed drain pipe 14a.

【0022】以上のように構成された水中基礎の構築方
法について説明する。基礎本体10は、スカート部12
および集水ドレーン部14を一体に取付けた状態で製作
ヤードで製作される。
A method of constructing the underwater foundation constructed as described above will be described. The base body 10 includes a skirt 12
And it is manufactured in a manufacturing yard in a state where the water collecting drain portion 14 is integrally attached.

【0023】製作された基礎本体10は、設置地点まで
曳航船などにより運搬する。設置地点まで運搬された基
礎本体10は、隔室10e内に海水などを注入すること
や、カウンターウエイトを載置するなどによりバラスト
荷重を作用させ、また、減圧によりサクションを作用さ
せることにより水底地盤A中に沈設させる。
The manufactured base body 10 is transported to an installation point by a towing ship or the like. The base body 10 transported to the installation point is subjected to a ballast load by injecting seawater or the like into the compartment 10e, placing a counterweight, or the like, and by applying a suction by depressurization to the underwater ground. Set aside in A.

【0024】この場合、集水ドレーン部14が支持地盤
層Cに到達した後、排水通路16の上端側の合流管17
に、排水ポンプなどの吸水装置を連通設置して、支持地
盤層Cの間隙水を積極的に揚水,排水する。
In this case, after the drainage portion 14 reaches the support ground layer C, the confluence pipe 17 on the upper end side of the drain passage 16 is formed.
In addition, a water absorption device such as a drain pump is connected and installed to positively pump and drain pore water in the supporting ground layer C.

【0025】なお、図1に示した実施例では、支持地盤
層Cは、砂質土層C1と粘性土層C2とが、交互に形成
されている。
In the embodiment shown in FIG. 1, the support ground layer C has a sandy soil layer C1 and a cohesive soil layer C2 formed alternately.

【0026】そして、このような排水処理を所定期間行
った後に、基礎本体10の上部側に橋脚などの追加構造
物22を構築する。
After performing such a drainage treatment for a predetermined period, an additional structure 22 such as a pier is constructed on the upper side of the foundation body 10.

【0027】さて、以上のようにして行う水中基礎の構
築工法によれば、スカート部12の下端に集水ドレーン
部14を延設し、集水ドレーン部14に集められた水
を、スカート部12に設けられた排水通路16を介し
て、外部に排出すると、排水により間隙水圧が低減し
て、水底地盤Aの支持地盤層Cに対するプレロード効果
が発揮され、スカート部12を支持している支持地盤層
C中の圧密沈下が促進される。
According to the construction method of the underwater foundation performed as described above, the drainage drain section 14 is provided at the lower end of the skirt section 12, and the water collected in the drainage drain section 14 is supplied to the skirt section. When the water is discharged to the outside through the drain passage 16 provided in the base 12, the pore water pressure is reduced by the drainage, the preload effect of the underground ground A on the supporting ground layer C is exerted, and the skirt portion 12 is supported. Consolidation settlement in the ground layer C is promoted.

【0028】従って、基礎の構築後に追加荷重などが作
用しても、供用に支障を来すほどの沈下の発生を防止す
ることができる。また、スカート部12を支持している
地盤層Cの圧密沈下を積極的に促進させると、早期に確
実な支持地盤が確保されるとともに、安定した基礎も早
期に確保することができる。
Therefore, even if an additional load or the like acts on the foundation after the foundation has been constructed, it is possible to prevent the occurrence of settlement that would hinder service. Also, if the consolidation settlement of the ground layer C supporting the skirt portion 12 is actively promoted, a reliable supporting ground can be secured early and a stable foundation can be secured early.

【0029】このような作用効果は、支持地盤層Cが、
砂質土層C1と粘性土層C2との互層状態であっても有
効に発揮され、粘性土層C2の圧密化を早期に起こすこ
とができる。
Such an operation and effect is as follows.
Even when the sandy soil layer C1 and the cohesive soil layer C2 are in an alternate layer state, the effect is effectively exerted, and the cohesive soil layer C2 can be compacted at an early stage.

【0030】また、本実施例の場合には、集水ドレーン
部14は、スカート部12に設けられた排水通路16と
連通し、外周面に貫通孔が設けられたドレーン管14a
と、このドレーン管14a内に設けられたフィルター材
14bと、ドレーン管14a内に充填された透水材14
cで構成しているので、フィルター材14bにより土砂
の流入を防ぎつつ、圧密沈下を促進する排水を行うこと
ができる。
In the case of the present embodiment, the water collecting drain portion 14 communicates with the drain passage 16 provided in the skirt portion 12 and has a drain pipe 14a having a through hole formed on the outer peripheral surface.
And a filter material 14b provided in the drain pipe 14a and a water permeable material 14 filled in the drain pipe 14a.
Since the filter material 14b is used, it is possible to prevent the inflow of earth and sand by the filter material 14b, and to perform drainage for promoting consolidation settlement.

【0031】[0031]

【発明の効果】以上、実施例で詳細に説明したように、
本発明にかかる水中基礎の構築方法によれば、構築後に
追加荷重などが作用しても、供用に支障を来すほどの不
具合が発生することがない。
As described above in detail in the embodiments,
ADVANTAGE OF THE INVENTION According to the construction method of the underwater foundation concerning this invention, even if an additional load etc. act after construction, the trouble which hinders service does not generate | occur | produce.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明にかかる水中基礎の構築工法の一実施例
を示す施工完了状態の説明図である。
FIG. 1 is an explanatory diagram of a completed construction state showing one embodiment of a method of constructing an underwater foundation according to the present invention.

【図2】図1のA−A線断面図である。FIG. 2 is a sectional view taken along line AA of FIG.

【図3】図1のB部拡大断面図である。FIG. 3 is an enlarged sectional view of a portion B in FIG. 1;

【図4】図2のC部拡大図である。FIG. 4 is an enlarged view of a portion C in FIG. 2;

【符号の簡単な説明】[Brief description of reference numerals]

10 基礎本体 12 スカート部 14 集水ドレーン部 16 排水通路 DESCRIPTION OF SYMBOLS 10 Foundation main body 12 Skirt part 14 Drainage part 16 Drainage passage

───────────────────────────────────────────────────── フロントページの続き (72)発明者 増井 直樹 東京都千代田区神田司町2−3 株式会社 大林組東京本社内 Fターム(参考) 2D043 CA04 CA12 DA04 DD09 DD18 EB05 2D046 DA63  ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Naoki Masui 2-3 Kandajimachi, Chiyoda-ku, Tokyo Obayashi Corporation Tokyo head office F-term (reference) 2D043 CA04 CA12 DA04 DD09 DD18 EB05 2D046 DA63

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 水中に設置される基礎本体の下端にスカ
ート部を一体に形成し、前記スカート部を水底地盤中に
貫入させる水中基礎の構築工法において、 前記スカート部の下端に集水ドレーン部を延設し、前記
集水ドレーン部に集められた水を、前記スカート部に設
けられた排水通路を介して、外部に排出することを特徴
とする水中基礎の構築工法。
1. A method of constructing an underwater foundation in which a skirt portion is integrally formed at a lower end of a base body installed in water and the skirt portion penetrates into a bottom of a water bottom, wherein a drainage drain portion is provided at a lower end of the skirt portion. A method for constructing an underwater foundation, wherein water collected in the water collecting drain portion is discharged to the outside through a drain passage provided in the skirt portion.
【請求項2】 前記集水ドレーン部は、前記排水通路と
連通し、外周面に貫通孔が設けられたドレーン管と、こ
のドレーン管内に設けられたフィルター材と、前記ドレ
ーン管内に充填された透水材とを有することを特徴とす
る請求項1記載の水中基礎の構築工法。
2. A drain pipe communicating with the drain passage and having a through hole formed in an outer peripheral surface thereof, a filter material provided in the drain pipe, and the drain pipe being filled in the drain pipe. The construction method of an underwater foundation according to claim 1, further comprising a water-permeable material.
JP28089298A 1998-10-02 1998-10-02 Construction method for underwater foundation Expired - Fee Related JP3713981B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28089298A JP3713981B2 (en) 1998-10-02 1998-10-02 Construction method for underwater foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28089298A JP3713981B2 (en) 1998-10-02 1998-10-02 Construction method for underwater foundation

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2005165056A Division JP4123248B2 (en) 2005-06-06 2005-06-06 Underwater foundation structure

Publications (2)

Publication Number Publication Date
JP2000110179A true JP2000110179A (en) 2000-04-18
JP3713981B2 JP3713981B2 (en) 2005-11-09

Family

ID=17631405

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28089298A Expired - Fee Related JP3713981B2 (en) 1998-10-02 1998-10-02 Construction method for underwater foundation

Country Status (1)

Country Link
JP (1) JP3713981B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015507111A (en) * 2012-02-10 2015-03-05 ユニバーサル ファウンデーション アクティーゼルスカブ Method for installing foundation on the seabed and the above seabed foundation
JP2020016073A (en) * 2018-07-25 2020-01-30 日立造船株式会社 Suction foundation and installation method of the same

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2592892B (en) * 2019-12-20 2023-02-01 Subsea 7 Norway As Hollow Subsea Foundations

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015507111A (en) * 2012-02-10 2015-03-05 ユニバーサル ファウンデーション アクティーゼルスカブ Method for installing foundation on the seabed and the above seabed foundation
US10113290B2 (en) 2012-02-10 2018-10-30 Universal Foundation A/S Method of installing a foundation in the sea bed and such foundation
JP2020016073A (en) * 2018-07-25 2020-01-30 日立造船株式会社 Suction foundation and installation method of the same
JP7022025B2 (en) 2018-07-25 2022-02-17 日立造船株式会社 Suction foundation and its installation method

Also Published As

Publication number Publication date
JP3713981B2 (en) 2005-11-09

Similar Documents

Publication Publication Date Title
JP4123248B2 (en) Underwater foundation structure
JPH0454004B2 (en)
CN104818711A (en) Anti-liquefaction three-dimensional drainage rigid pile and construction method thereof
WO2007129693A1 (en) Soil improvement method
US6178710B1 (en) Water permeable slab invention
CN208105281U (en) A kind of the Metro station excavation sealing and precipitation system of the sand-pebble layer containing rich water
CN212772481U (en) Anti earthquake liquefaction system of sand foundation building
CN109797764A (en) A kind of anti-liquefaction pile foundation suitable for easy liquefaction soil layers
CN201202114Y (en) Bearing pile
JP2000110179A (en) Method for constructing underwater foundation
CN112538860A (en) Construction method of high-water-level complex stratum bottom-seal-free concrete lock catch steel pipe pile cofferdam
JPH09316874A (en) Support pile as measure against liquefaction
KR100257083B1 (en) Dry method or rubber gasket apparatus of a pier of a bridge
JP2004092049A (en) Foundation structure for structure
CN212200511U (en) Deep foundation pit plugging device
CN211898431U (en) Deep foundation pit poured slope protection pile and anchor cable supporting system
KR20130000001U (en) Porosity and Nonporosity Cross-cylindrical tube with resin to form an underground water degradation process
JP4055184B2 (en) Volume reduction method for water-bottom soft ground
JP3848611B2 (en) Strengthening method of foundation foundation of structure
KR20040028222A (en) Drainage structure for basic improvement of soil of road using vertical drainage member
KR200194458Y1 (en) The structure improved outer layer of tender base for improveing constrution of the dredged soil tender base
JP3002188B1 (en) Ground excavation method
JPH08260499A (en) Anti-liquefaction pile and anti-liquefaction method for ground using the same
CN110565669B (en) Well pit water-intercepting and soil-retaining construction method
JP4348830B2 (en) Construction method for underwater foundation structures

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040316

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040511

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040712

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050412

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050606

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20050621

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050802

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050815

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080902

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090902

Year of fee payment: 4

LAPS Cancellation because of no payment of annual fees