JP2000104222A - Construction method and device for bridge - Google Patents

Construction method and device for bridge

Info

Publication number
JP2000104222A
JP2000104222A JP10293045A JP29304598A JP2000104222A JP 2000104222 A JP2000104222 A JP 2000104222A JP 10293045 A JP10293045 A JP 10293045A JP 29304598 A JP29304598 A JP 29304598A JP 2000104222 A JP2000104222 A JP 2000104222A
Authority
JP
Japan
Prior art keywords
girder
bridge
block
lifting device
girder block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP10293045A
Other languages
Japanese (ja)
Inventor
Tadahiko Tawara
忠彦 田原
Ryoichi Yonezawa
良一 米沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Miike Machinery Co Ltd
Mitsui Miike Engineering Corp
Oriental Construction Co
Original Assignee
Mitsui Miike Machinery Co Ltd
Mitsui Miike Engineering Corp
Oriental Construction Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Miike Machinery Co Ltd, Mitsui Miike Engineering Corp, Oriental Construction Co filed Critical Mitsui Miike Machinery Co Ltd
Priority to JP10293045A priority Critical patent/JP2000104222A/en
Publication of JP2000104222A publication Critical patent/JP2000104222A/en
Withdrawn legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To lighten operation and reduce equipment cost by allowing a girder block in a suspended state to be lowered and connected to the end of an existing girder without an eccentric load being applied it when the girder block is revolved and dispense with a temporary receiving device to be provided on the end position of a traveling frame. SOLUTION: A bridge is constructed by arranging a revolving type lifting device 4 on an existing girder 2 installed on a stationary section 1 such as an abutment or a bridge pier and successively connecting a girder block 5 to the existing girder 2 by revolving the girder block 5 lifted up of the stationary section 1 side by the revolving type lifting device and moving it to the end of the existing girder 2. The girder block 5 lifted up and retained by the revolving type lifting device 4 is then revolved by centering the girder block 5.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、橋梁の架設工法お
よび架設装置、殊に張出し架橋工法についての橋梁の架
設工法および架設装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a bridge erection method and erection apparatus, and more particularly to a bridge erection method and an erection apparatus for an overhang bridge method.

【0002】[0002]

【従来の技術】海峡や河川において、水上の船舶の航行
を妨げることなしに橋梁を架橋する工法として張出し架
橋工法が知られており、トラベルクレーンやケーブルク
レーンを用いたものがある。
2. Description of the Related Art In a strait or river, an overhanging bridge construction method is known as a construction method for bridging a bridge without hindering the navigation of ships on water, and there are known methods using a travel crane or a cable crane.

【0003】このトラベルクレーンを用いた工法は、図
5に示したように、橋台または橋脚などの固定部1a側
から順次桁ブロック2aを張り出し、その張り出された
既設桁3a上にトラベルクレーン4aを設置し、このト
ラベルクレーン4aにより水上を運搬した桁ブロック2
aを吊り上げ、既設桁3aのレベルに吊持して既設桁3
aに連結していくものであり、ケーブルクレーンを用い
た工法は、図6に示すように、塔間1b,1bにケーブ
ル2bを張設し、このケーブル2bに吊持されるケーブ
ルクレーン3bにより桁ブロック4bを運搬し、既設桁
5bの端部に吊下げて連結していくものである。
In this construction method using a travel crane, as shown in FIG. 5, a girder block 2a is sequentially extended from a fixed portion 1a side such as an abutment or a pier, and a travel crane 4a is mounted on the existing girder 3a. And the girder block 2 transported over the water by the travel crane 4a
a and lift it at the level of the existing girder 3a.
In the construction method using a cable crane, as shown in FIG. 6, a cable 2b is stretched between towers 1b, 1b, and a cable crane 3b suspended by the cable 2b is used. The girder block 4b is carried, and is suspended and connected to an end of the existing girder 5b.

【0004】ところが、前記トラベルクレーンやケーブ
ルクレーンを用いた工法は、大型のクレーン設備を必要
とする。
However, the construction method using the travel crane or the cable crane requires large crane equipment.

【0005】そこで、前記トラベルクレーンやケーブル
クレーンを用いた工法に代わる好ましい張出し架橋工法
の一つとして特開平1−310002号公報に提示され
たものが知られている。
[0005] Therefore, as one of preferred overhanging bridge construction methods replacing the construction method using the travel crane or the cable crane, one disclosed in Japanese Patent Application Laid-Open No. 1-300022 is known.

【0006】この公報に提示された従来の架橋工法は、
図7に示すように、橋台または橋脚などの固定部1cに
設置された既設桁2c上に配置した走行フレーム3c上
に旋回式吊上装置4cを設置し、この旋回式吊上装置4
cにより固定部1c側から吊り上げた桁ブロック5cを
旋回して既設桁2cの先端部に移動するとともに、走行
フレーム3cに設けた仮受け装置6cに桁ブロック5c
を預けて既設桁2cに順次連結することにより橋梁を架
設するするものであり、小型で小重量の装置によって架
橋することができる。
[0006] The conventional crosslinking method presented in this publication is
As shown in FIG. 7, a swing type lifting device 4c is installed on a traveling frame 3c arranged on an existing girder 2c installed on a fixed portion 1c such as an abutment or a pier.
c, the girder block 5c lifted from the fixed portion 1c side is turned to move to the leading end of the existing girder 2c, and the girder block 5c is mounted on the temporary receiving device 6c provided on the traveling frame 3c.
And a bridge is erected by sequentially connecting the existing girder 2c to the existing girder 2c. The bridge can be bridged by a small and light-weight device.

【0007】しかしながら、前記特開平1−31000
2号公報に提示されている工法は、旋回式吊上装置4c
により固定部1c側から吊り上げた桁ブロック5cを旋
回して既設桁2cの先端部側に旋回するときに、旋回式
吊上装置4cに吊り下げられた桁ブロック5cの旋回時
における中心位置と旋回式吊上装置4cの旋回中心とが
偏心している。
However, Japanese Patent Application Laid-Open No.
The construction method disclosed in Japanese Unexamined Patent Publication No. 2 (1994) is a turning type lifting device 4c.
When the girder block 5c lifted from the fixed portion 1c side is turned to turn to the tip end side of the existing girder 2c, the center position and the turning of the girder block 5c hung by the turning type lifting device 4c at the time of turning. The center of rotation of the lifting device 4c is eccentric.

【0008】従って、桁ブロック5cを旋回するときに
桁ブロック5cが振られることになりその際に桁ブロッ
ク5cに偏心荷重が掛かる。そのため、桁ブロック5c
内部に歪が生じるなどの損傷を与える心配がある。ま
た、旋回した際に吊下げ位置がずれることがあり、これ
を走行フレーム3cに設けた仮受け装置6cに仮り受け
ることにより調整していた。
Therefore, the spar block 5c is swung when the spar block 5c is turned, and an eccentric load is applied to the spar block 5c. Therefore, the digit block 5c
There is a risk of damage such as distortion inside. In addition, the suspension position may be shifted when turning, and the suspension position is adjusted by temporarily receiving the suspension position on the temporary receiving device 6c provided on the traveling frame 3c.

【0009】[0009]

【発明が解決しようとする課題】本発明は前記実情に鑑
みてなされたものであって、橋台、橋脚などの固定部側
から吊り上げた桁ブロックを、既設桁の先端側へ旋回す
るときに、桁ブロックに偏心荷重が掛かる心配がなく、
また、旋回後に吊り上げ位置のずれを調整するために既
設桁の先端側に設けられる仮受け装置などを必要としな
い橋梁の架設工法および架設装置を提供することを課題
とするものである。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-described circumstances, and is intended for use in turning a girder block suspended from a fixed portion such as an abutment or a pier to a tip end of an existing girder. There is no worry that eccentric load will be applied to the girder block,
It is another object of the present invention to provide a bridge erection method and an erection method that do not require a temporary receiving device or the like provided on the tip side of an existing girder to adjust a shift of a lifting position after turning.

【0010】[0010]

【課題を解決するための手段】前記課題を解決するた
め、本発明である橋梁の架設工法は、橋台または橋脚な
どの固定部に設置された既設桁上に旋回式吊上装置を配
置し、この旋回式吊上装置により固定部側から吊り上げ
た桁ブロックを旋回して既設桁の先端部に移動して順次
連結することにより橋梁を架設する橋梁の架設工法にお
いて、前記旋回式吊上装置により吊上保持した桁ブロッ
クをこの桁ブロックを中心として旋回させるものであ
る。
Means for Solving the Problems In order to solve the above-mentioned problems, a bridge erection method according to the present invention comprises disposing a revolving type lifting device on an existing girder installed on a fixed part such as an abutment or a pier. In the method of erection of a bridge for erection of a bridge by turning a girder block lifted from a fixed part side by this turning type lifting device and moving to a tip end of an existing girder and sequentially connecting the same, the turning type lifting device The girder block held by lifting is turned around the girder block.

【0011】吊上保持した桁ブロックをこの桁ブロック
を中心として旋回させることにより、旋回式吊上装置に
吊り下げられた桁ブロックの旋回時における中心位置と
旋回式吊上装置の旋回中心とが重なり、桁ブロックを旋
回したときに桁ブロックが常に中心位置にあり、偏心荷
重が掛かることがない。また、旋回した際に吊下げ中心
がずれることがないので、そのままの状態で既設桁の先
端部に降下させて連結することができる。
By rotating the girder block held by lifting about this girder block, the center position of the girder block suspended by the revolving type lifting device at the time of turning and the turning center of the revolving type lifting device are adjusted. The girder block is always at the center position when the girder block is turned, so that no eccentric load is applied. Further, since the suspension center does not shift when turning, the suspension can be lowered and connected to the tip of the existing girder as it is.

【0012】また、本発明である橋梁の架設装置は、橋
台または橋脚などの固定部に設置された既設桁上に走行
可能に配置されているとももに適宜の位置で固定可能で
ある走行フレームと、この走行フレームの上方に設けら
れた旋回式吊上装置と、前記既設桁上でその長手方向に
桁ブロックを移送する桁ブロック移送手段とを備えた橋
梁の架設装置において、前記吊持装置を、吊持した桁ブ
ロックを中心として旋回可能とした。
Further, the bridge erection apparatus according to the present invention is a traveling frame that is movably disposed on an existing girder installed on a fixed part such as an abutment or a pier and can be fixed at an appropriate position. And a swing-type lifting device provided above the traveling frame, and a girder block transfer means for transferring a girder block on the existing girder in a longitudinal direction thereof. Can be turned around the suspended girder block.

【0013】[0013]

【発明の実施の形態】次に本発明の実施の形態について
図面を参照して説明する。
Embodiments of the present invention will now be described with reference to the drawings.

【0014】図1乃至図4は本発明の好ましい実施の形
態を示すものであり、架橋装置は、橋台または橋脚など
の固定部1に設置された既設桁2上にその長さ方向に延
設した短尺の第1走行レール21,21に嵌装して走行
可能に配置されているとももに第1走行レール21,2
1の適宜の位置で固定可能である走行フレーム3と、こ
の走行フレーム3上方に設けられて縦方向軸を中心とし
て旋回式吊上装置4と、前記既設桁2上に長手方向に向
けて配置した第2走行レール22,22に嵌装させた台
車61により桁ブロック5を移送する桁ブロック移送手
段6とを備えている。
FIGS. 1 to 4 show a preferred embodiment of the present invention, in which a bridging device is installed on an existing girder 2 installed on a fixed portion 1 such as an abutment or a pier in a longitudinal direction thereof. The first running rails 21 and 21 are fitted to the short first running rails 21 and 21 and can be run.
1, a traveling frame 3 which can be fixed at an appropriate position, a swing type lifting device 4 provided above the traveling frame 3 about a vertical axis, and disposed on the existing girder 2 in the longitudinal direction. And a girder block transfer means 6 for transferring the girder block 5 by a carriage 61 fitted on the second traveling rails 22, 22.

【0015】また、走行フレーム3上に設けられた旋回
式吊上装置4は、前記走行フレーム3に配置されたター
ンテーブル71上に設置された旋回装置7を有する基部
41と、この基部41の中心線上に垂設された支柱42
と、前記支柱42の頂部において前記基部41に沿って
水平に張り出した水平部43とを有しており、水平部4
3には昇降ウインチ44を吊り下げた走行台車45が軸
線方向に延びるレール46に走行可能に装備されてい
る。
The turning type lifting device 4 provided on the traveling frame 3 comprises a base 41 having a turning device 7 installed on a turntable 71 arranged on the traveling frame 3, Posts 42 suspended on the center line
And a horizontal portion 43 extending horizontally along the base portion 41 at the top of the support column 42.
3 is provided with a traveling carriage 45 on which a lifting winch 44 is suspended so as to be able to travel on a rail 46 extending in the axial direction.

【0016】殊に、昇降ウインチ44はその中心位置が
基部41に装備した旋回装置7の回転台71の中心位置
と合致する位置に移動可能とされている。
In particular, the lifting winch 44 can be moved to a position where the center position of the lifting winch 44 coincides with the center position of the turntable 71 of the turning device 7 mounted on the base 41.

【0017】尚、図面中、符号81は既設桁2に沿って
移動可能に装備される接着用足場、符号82は走行フレ
ーム3の先端下方に付設された緊張用足場である。
In the drawings, reference numeral 81 denotes a bonding scaffold movably provided along the existing spar 2, and reference numeral 82 denotes a tensioning scaffold provided below the tip of the running frame 3.

【0018】本実施の形態である架橋装置を用いて橋を
架設するには、最初に図4(A)に示すように、旋回式
吊上装置4を設置した走行フレーム3を既設桁2先端の
所定位置に移動固定させておき、既設桁2上に配置した
桁ブロック移送手段6を構成する台車61に桁ブロック
5を載せて第2走行レール22,22上を旋回式吊上装
置4方向へ移送する。
In order to construct a bridge using the bridge device according to the present embodiment, first, as shown in FIG. 4A, the traveling frame 3 on which the swing type lifting device 4 is installed is attached to the end of the existing girder 2. Is moved and fixed at a predetermined position, and the girder block 5 is placed on a carriage 61 constituting the girder block transfer means 6 disposed on the existing girder 2, and is moved on the second traveling rails 22, 22 in the direction of the rotary lifting device 4. Transfer to

【0019】このとき、旋回式吊上装置4は支柱42と
反対側、即ち、開放側を既設桁2の基端側、つまり、桁
ブロック移送手段6側に向けておくとともに、旋回式吊
上装置4の昇降ウインチ44は水平部43の開放側の端
部に位置させておく。
At this time, the revolving type lifting apparatus 4 keeps the opposite side of the column 42, that is, the open side toward the base end side of the existing girder 2, that is, the side of the girder block transfer means 6, and revolves the revolving type lifting apparatus. The lifting winch 44 of the device 4 is positioned at the open end of the horizontal portion 43.

【0020】そして、台車61に載せた桁ブロック5
を、前記昇降ウインチ44の真下に移動させるととも
に、昇降ウインチ44を降下させて桁ブロック5の上部
に固定し、再び昇降ウインチ44を上昇させて桁ブロッ
ク5を吊り上げる(図4(A)および(B)において2
点鎖線で示す状態)。
The girder block 5 placed on the carriage 61
Is moved directly below the elevating winch 44, the elevating winch 44 is lowered and fixed to the upper part of the girder block 5, and the elevating winch 44 is raised again to lift the girder block 5 (FIGS. 4A and 4B). In B) 2
The state shown by the dotted line).

【0021】次に、昇降ウインチ44を吊り下げた走行
台車45をレール46に沿って既設桁2の先端方向へ走
行させ、旋回式吊上装置4に吊り下げられた桁ブロック
5の旋回時における中心位置と旋回式吊上装置4の旋回
中心、即ち、走行フレーム3に配置されたターンテーブ
ル71の中心とが重なる位置において停止させる(図4
(B)参照)。
Next, the traveling carriage 45 with the lifting winch 44 suspended is moved along the rail 46 toward the tip of the existing girder 2, and when the girder block 5 suspended by the revolving lifting device 4 is turned. It stops at the position where the center position and the center of rotation of the swing type lifting device 4, that is, the center of the turntable 71 arranged on the traveling frame 3 overlap (FIG.
(B)).

【0022】次いで、旋回式吊上装置4を旋回台71を
中心として180°旋回させる(図4(C)参照)。こ
のとき、旋回式吊上装置4に吊り下げられた桁ブロック
5が旋回時を含めて常に中心位置にある。そのため、桁
ブロック5に旋回による偏心荷重が掛かることがなく、
また、旋回した際に吊下げ中心がずれることがないの
で、そのままの状態で桁ブロック5を既設桁2の先端部
に移動、降下させて連結することができる(図4(C)
において2点鎖線で示す状態)。
Next, the revolving type lifting device 4 is revolved 180 ° about the revolving base 71 (see FIG. 4C). At this time, the girder block 5 suspended by the revolving lifting device 4 is always at the center position including the time of revolving. Therefore, no eccentric load due to turning is applied to the girder block 5,
Further, since the suspension center does not shift when turning, the girder block 5 can be moved to the leading end of the existing girder 2 and moved down to be connected as it is (FIG. 4C).
In the state indicated by a two-dot chain line).

【0023】そして、桁ブロック5を既設桁2の先端部
に連結したならば、桁ブロック5と昇降ウインチ44と
の固着状態を解除して、前記と逆の手順によって最初の
図4(A)に示す状態に戻し、次の桁ブロック5を既設
桁2の先端部に順次架設していく。
When the girder block 5 is connected to the leading end of the existing girder 2, the fixed state between the girder block 5 and the elevating winch 44 is released, and the first procedure shown in FIG. And the next girder block 5 is sequentially erected on the leading end of the existing girder 2.

【0024】[0024]

【発明の効果】以上のように本発明は、既設桁上に配置
した旋回式吊上装置により既設桁の基端側から吊上保持
した桁ブロックをこの桁ブロックを中心として既設桁の
先端側へ旋回させることとしたので、従来の旋回式吊上
装置と異なり、吊り下げられた桁ブロックの旋回時にお
ける中心位置と旋回式吊上装置の旋回中心とが重なり、
桁ブロックを旋回したときに桁ブロックが常に中心位置
にある。そのため、吊り下げられた桁ブロックに偏心荷
重が掛かることがない。
As described above, according to the present invention, a girder block suspended from the base end side of an existing girder by a revolving type hoisting device arranged on the existing girder is disposed on the distal end side of the existing girder centering on this girder block. Since it was decided to turn to, unlike the conventional turning type lifting device, the center position of the suspended girder block when turning and the turning center of the turning type lifting device overlap,
When turning the girder block, the girder block is always in the center position. Therefore, no eccentric load is applied to the suspended girder block.

【0025】また、旋回した際に吊下げ中心がずれるこ
とがないので、そのままの状態で既設桁の先端部に降下
させて連結することができる。従って、従来のように走
行フレームの先端位置に仮受け装置を設ける必要もな
く、作業の軽減ならびに設備費の軽減を図ることができ
る。
Also, since the suspension center does not shift when turning, the suspension can be lowered and connected to the tip of the existing girder in the same state. Therefore, there is no need to provide a temporary receiving device at the distal end position of the traveling frame as in the related art, and it is possible to reduce work and equipment costs.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の好ましい実施の形態を示す側面概略
図。
FIG. 1 is a schematic side view showing a preferred embodiment of the present invention.

【図2】図1の平面概略図。FIG. 2 is a schematic plan view of FIG.

【図3】図1の正面概略図。FIG. 3 is a schematic front view of FIG. 1;

【図4】図1に示した実施の形態の施工手順を示す説明
図。
FIG. 4 is an explanatory view showing a construction procedure of the embodiment shown in FIG. 1;

【図5】従来例を示す説明図。FIG. 5 is an explanatory view showing a conventional example.

【図6】異なる従来例を示す説明図。FIG. 6 is an explanatory view showing a different conventional example.

【図7】更に異なる従来例を示す説明図。FIG. 7 is an explanatory view showing still another conventional example.

【符号の説明】[Explanation of symbols]

1 固定部 2 既設桁 3 走行フレーム 4 旋回式吊上装置 5 桁ブロック 6 ブロック移送手段 7 旋回装置 DESCRIPTION OF SYMBOLS 1 Fixed part 2 Existing girder 3 Traveling frame 4 Revolving type lifting device 5 Girder block 6 Block transfer means 7 Revolving device

───────────────────────────────────────────────────── フロントページの続き (72)発明者 米沢 良一 東京都中野区本町1丁目32番2号 オリエ ンタル建設株式会社東京支店内 Fターム(参考) 2D059 CC03 CC06 DD03  ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Ryoichi Yonezawa 1-32-2 Honcho, Nakano-ku, Tokyo Oriental Construction Co., Ltd. Tokyo Branch F-term (reference) 2D059 CC03 CC06 DD03

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 橋台または橋脚などの固定部に設置され
た既設桁上に旋回式吊上装置を配置し、この旋回式吊上
装置により固定部側から吊り上げた桁ブロックを旋回し
て既設桁の先端部に移動して順次連結することにより橋
梁を架設する橋梁の架設工法において、前記旋回式吊上
装置により吊上保持した桁ブロックをこの桁ブロックを
中心として旋回させることを特徴とする橋梁の架設工
法。
1. A swivel type lifting device is arranged on an existing girder installed on a fixed part such as an abutment or a pier, and the girder block lifted from the fixed part side is turned by the swivel type lifting device. A bridge construction method for constructing a bridge by moving to a tip end of the bridge and sequentially connecting the bridge, wherein the girder block suspended and held by the swing type lifting device is turned around the girder block. Erection method.
【請求項2】 橋台または橋脚などの固定部に設置され
た既設桁上に走行可能に配置されているとともに適宜の
位置で固定可能である走行フレームと、この走行フレー
ムの上方に設けられた旋回式吊上装置と、前記既設桁上
でその長手方向に桁ブロックを移送する桁ブロック移送
手段とを備えた橋梁の架設装置において、前記旋回式吊
上装置が、吊持した桁ブロックを中心として旋回可能で
あることを特徴とする橋梁の架設装置。
2. A traveling frame movably disposed on an existing girder installed on a fixed portion such as an abutment or a pier and capable of being fixed at an appropriate position, and a swing provided above the traveling frame. In a bridge erection device provided with a type lifting device and a girder block transfer means for transferring a girder block in the longitudinal direction on the existing girder, the swiveling type lifting device is arranged around the hung girder block. A bridge erection device characterized by being capable of turning.
JP10293045A 1998-09-30 1998-09-30 Construction method and device for bridge Withdrawn JP2000104222A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10293045A JP2000104222A (en) 1998-09-30 1998-09-30 Construction method and device for bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10293045A JP2000104222A (en) 1998-09-30 1998-09-30 Construction method and device for bridge

Publications (1)

Publication Number Publication Date
JP2000104222A true JP2000104222A (en) 2000-04-11

Family

ID=17789777

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10293045A Withdrawn JP2000104222A (en) 1998-09-30 1998-09-30 Construction method and device for bridge

Country Status (1)

Country Link
JP (1) JP2000104222A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009091816A (en) * 2007-10-09 2009-04-30 Jfe Engineering Kk Method and device for constructing bridge
JP2010047905A (en) * 2008-08-19 2010-03-04 Ihi Corp Apparatus and method for cantilever overhanging bridge
CN104131516A (en) * 2014-08-14 2014-11-05 江苏省交通工程集团有限公司 Bridge cast-in-cantilever method cradle counter-pressure construction method
CN108301331A (en) * 2018-04-02 2018-07-20 山东省路桥集团有限公司 Steel box-girder installation erection crane and steel box girder cantilever assembling and construction method
CN114277688A (en) * 2021-12-28 2022-04-05 中交路桥华南工程有限公司 Bridge erecting machine
JP7421434B2 (en) 2020-07-13 2024-01-24 株式会社ピーエス三菱 PCa board erection equipment and method for floor slabs

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009091816A (en) * 2007-10-09 2009-04-30 Jfe Engineering Kk Method and device for constructing bridge
JP2010047905A (en) * 2008-08-19 2010-03-04 Ihi Corp Apparatus and method for cantilever overhanging bridge
CN104131516A (en) * 2014-08-14 2014-11-05 江苏省交通工程集团有限公司 Bridge cast-in-cantilever method cradle counter-pressure construction method
CN108301331A (en) * 2018-04-02 2018-07-20 山东省路桥集团有限公司 Steel box-girder installation erection crane and steel box girder cantilever assembling and construction method
JP7421434B2 (en) 2020-07-13 2024-01-24 株式会社ピーエス三菱 PCa board erection equipment and method for floor slabs
CN114277688A (en) * 2021-12-28 2022-04-05 中交路桥华南工程有限公司 Bridge erecting machine
CN114277688B (en) * 2021-12-28 2024-02-02 中交路桥华南工程有限公司 Bridge girder erection machine

Similar Documents

Publication Publication Date Title
JP2000104222A (en) Construction method and device for bridge
JPH111910A (en) Bridge construction method by erection and replacement
CN110723658A (en) Bailey beam support dismantling device and method
JP2005002702A (en) Apparatus for erecting/removing saddle type monorail girder
JPH01223204A (en) Bridge girder replacement method and device thereof
JP3398616B2 (en) Girder moving device
JPH0692590A (en) Cable guide device for trolley of bridge crane
JPH08260571A (en) Rotary lift-up construction method for dome roof
JPH0678602B2 (en) Bridge erection equipment
JP2567560B2 (en) Bridge construction method using precast girders
CN211498527U (en) Bailey beam support dismantling device
JPH01310002A (en) Bridge building method and equipment thereof
JPH10131496A (en) Running carriage for erecting steel framed pillar and steel framed pillar erection method
JP3471248B2 (en) Portal crane
JP4124917B2 (en) Pillar building device and pillar building method
JPH01310003A (en) Bridge building method and device thereof
JPH02217505A (en) Bridge erecting construction and its apparatus
JPS5851084B2 (en) Construction methods and equipment for main towers such as suspension bridges and cable-stayed bridges
RU1786080C (en) Device for replacement of circular air pipeline
JPH0210107Y2 (en)
JPH0545725B2 (en)
JP2000320133A (en) Gondola device
SU1017657A1 (en) Bridge crane and method of mounting same
JPH10131127A (en) Moving carry-in device for bridge member
JPH07145607A (en) Portable scaffold for maintenance and inspection of bridge

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20060110