JP2000073570A - Building construction in narrow site - Google Patents

Building construction in narrow site

Info

Publication number
JP2000073570A
JP2000073570A JP10246184A JP24618498A JP2000073570A JP 2000073570 A JP2000073570 A JP 2000073570A JP 10246184 A JP10246184 A JP 10246184A JP 24618498 A JP24618498 A JP 24618498A JP 2000073570 A JP2000073570 A JP 2000073570A
Authority
JP
Japan
Prior art keywords
brace
foundation
wall
base
temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10246184A
Other languages
Japanese (ja)
Other versions
JP3468408B2 (en
Inventor
Keiichi Tomiyama
惠一 冨山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP24618498A priority Critical patent/JP3468408B2/en
Publication of JP2000073570A publication Critical patent/JP2000073570A/en
Application granted granted Critical
Publication of JP3468408B2 publication Critical patent/JP3468408B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a building construction method in a narrow site which can move an external wall body by a stable reaction body. SOLUTION: In this building construction method in a narrow site, a ground sill is fixed on a foundation provided in a narrow site put between right and left adjacent area boundary lines, and a pair of right and left external wall bodies 2 is assembled on the ground sill at a position which moves back more inward than a foundation positioned on the side of right and left adjacent area boundary lines, and a stretchable brace beam 3 is set between these external wall bodies 2, and the external wall body 2 on one side is supported by a temporary brace 4 to form a reaction body, and the external wall body on the other side is moved above the foundation on the side of the adjacent boundary line by the stretch of the brace beam 3. The external wall body 2 is provided with an upper fixture exclusive for a brace 11 and the ground sill is provided with a lower fixture exclusive for the brace 12, and the upper and lower ends of the temporary brace 4 are detachably attached to the upper and lower fixture exclusive for the braces 11, 12 to form a reaction body.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、隣接境界線で挟ま
れた狭小地の施工現場において隣家に接するようにして
建物を建てる場合に採用される狭小地建築工法の改良に
関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an improvement in a narrow land construction method employed when a building is constructed so as to be in contact with a neighbor at a construction site on a narrow land sandwiched between adjacent boundaries.

【0002】[0002]

【従来の技術】狭小地用建築工法として、狭小地を挟む
左右の隣地境界線側に位置する基礎よりも内側に後退し
た位置で建物の左右両側の外壁体をそれぞれ立設した状
態で組み立て、一方の外壁体を反力体として利用するこ
とにより他方の外壁体を隣地境界線側の基礎まで移動さ
せるものが提案されている。
2. Description of the Related Art As a construction method for narrow land, assembling in a state where outer wall bodies on both left and right sides of the building are respectively erected at a position retracted inside from a foundation located on the left and right adjacent land boundary side sandwiching the narrow land, There has been proposed a method in which one outer wall is used as a reaction body to move the other outer wall to a foundation on the adjacent ground boundary line side.

【0003】[0003]

【発明が解決しようとする課題】しかし、外壁体を反力
体として利用する場合には、現場の余った長尺の木材を
ブレースとして用い、この長尺木材の両端を外壁体及び
基礎の土台に釘で固定するようにしていたので、長尺木
材の材質により割れ等が発生したり、釘打ちによる接合
部の強度不足といった事態を招いてブレースの効力を失
い、反力体としての機能が低下して作業の安全性が図れ
なくなるという問題があった。本発明は、上記従来の課
題に鑑みてなされたものであって、本発明の目的とする
ところは、安定した反力体によって外壁体を移動させる
ことができる狭小地建築工法を提供することにある。
However, when the outer wall is used as a reaction force body, the extra long wood at the site is used as a brace, and both ends of the long wood are attached to the outer wall and the foundation of the foundation. The nails are fixed to the nails, so the material of the long wood may cause cracks, etc. There has been a problem that work safety cannot be improved due to a decrease. The present invention has been made in view of the above-mentioned conventional problems, and an object of the present invention is to provide a narrow-land construction method capable of moving an outer wall by a stable reaction body. is there.

【0004】[0004]

【課題を解決するための手段】上記目的を達成するため
に、請求項1の発明の狭小地建築工法は、左右の隣地境
界線にて挟まれる狭小地に設けられる基礎に土台を固定
し、左右の隣地境界線側に位置する基礎よりも内側に後
退した位置の土台上で建物の左右一対の外壁体を組み立
て、これらの外壁体の間に伸長可能な控え梁を介在さ
せ、一方の外壁体を仮設ブレースにて支持して反力体を
形成し、控え梁の伸長により他方の外壁体を隣地境界線
側の基礎の上まで移動させる狭小地建築工法において、
外壁体にブレース専用上取付具を配設すると共に土台に
ブレース専用下取付具を配設し、仮設ブレースの上端及
び下端をブレース専用上取付具及びブレース専用下取付
具に着脱自在に取付けて反力体を形成することを特徴と
する。
In order to achieve the above object, a narrow land construction method according to the first aspect of the present invention comprises fixing a base to a foundation provided on a narrow land sandwiched between left and right adjacent land boundaries, Assemble a pair of left and right outer walls of the building on the base at a position recessed inward from the foundation located on the left and right adjacent land boundary side, interpose an extendable stay beam between these outer walls, and one outer wall In a narrow land construction method in which the body is supported by temporary braces to form a reaction body, and the other outer wall body is moved to the foundation on the adjacent land boundary side by extending the stay beam,
An upper bracket dedicated to the brace is provided on the outer wall, and a lower bracket dedicated to the brace is provided on the base. The upper and lower ends of the temporary brace are detachably attached to the upper brace and the lower brace. It is characterized by forming a force body.

【0005】請求項2の狭小地建築工法は、請求項1に
記載の狭小地建築工法において、柱に固定される取付具
本体にクランプを取付けて前記ブレース専用上取付具を
構成したことを特徴とする。
According to a second aspect of the present invention, there is provided a narrow-land construction method according to the first aspect, wherein a clamp is attached to a fixture main body fixed to a pillar to form the upper attachment dedicated to the brace. And

【0006】請求項3の狭小地建築工法は、請求項1又
は請求項2に記載の狭小地建築工法において、土台に固
定される取付具本体にクランプを取付けて前記ブレース
専用下取付具を構成したことを特徴とする。
According to a third aspect of the present invention, there is provided a narrow-field construction method according to the first or second aspect, wherein a clamp is attached to a fixture main body fixed to a base to form the lower attachment dedicated to the brace. It is characterized by having done.

【0007】[0007]

【発明の実施の形態】以下、本発明の狭小地建築工法の
実施の形態を図面に従って説明する。まず、本工法の内
容について概説する。図1乃至図3に示すように、狭小
地Aに基礎1を設け、狭小地Aを挟む左右の隣地境界線
B側にそれぞれ位置する基礎1よりも内側に後退した基
礎1上で、左右一対の外壁体2,2を立設した状態で組
立てた後、外壁体2,2間に伸長可能な仮設用の控え梁
3を介在させると共に一方の外壁体2を仮設ブレース4
にて支持する。次に、図4及び図5に示すように、一方
の外壁体2を反力体として控え梁3を伸長させて他方の
外壁体2を隣地境界線B側の基礎1の上まで移動させた
後、他方の外壁体2を隣地境界線側の基礎1に固定し、
一方の外壁体2から仮設ブレース4を取り外すと共に、
他方の外壁体2に仮設ブレース4を取付ける。次に、他
方の外壁体2を反力体として控え梁3を伸長させて一方
の外壁体2を隣地境界線側の基礎1の上まで移動させ、
図6に示すように、一方の外壁体2を隣地境界線側の基
礎1に固定して外壁体2,2間に階梁5を架設する。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view of a construction method of a narrow land according to the present invention. First, the contents of this method will be outlined. As shown in FIGS. 1 to 3, a foundation 1 is provided on a narrow land A, and a pair of left and right sides is formed on the foundation 1 which is retreated inward from the foundation 1 located on the left and right adjacent ground boundary lines B sandwiching the narrow land A. After assembling with the outer wall bodies 2 and 2 standing upright, an extendable stay beam 3 is interposed between the outer wall bodies 2 and 2 and one outer wall body 2 is connected to the temporary brace 4.
Supported by Next, as shown in FIGS. 4 and 5, the stay beam 3 was extended using one outer wall body 2 as a reaction force body, and the other outer wall body 2 was moved onto the foundation 1 on the side of the adjacent ground boundary line B. After that, the other outer wall body 2 is fixed to the foundation 1 on the adjacent ground boundary line side,
While removing the temporary brace 4 from one outer wall 2,
The temporary brace 4 is attached to the other outer wall 2. Next, the stay beam 3 is extended using the other outer wall body 2 as a reaction force body to move one outer wall body 2 onto the foundation 1 on the adjacent ground boundary line side,
As shown in FIG. 6, one outer wall 2 is fixed to the foundation 1 on the boundary side of the adjacent ground, and a floor beam 5 is erected between the outer walls 2.

【0008】図11に示すように、控え梁3は、外壁体
2を構成する通し柱2Aに、控え梁接続具6、アダプタ
ー7及び梁接続具8を用いて接続されるようになってい
る。
[0010] As shown in FIG. 11, the stay beam 3 is connected to the through pillar 2 A constituting the outer wall body 2 by using a stay beam connector 6, an adapter 7 and a beam connector 8.

【0009】図13に示すように、控え梁3は、外管か
ら成る控え梁本体3aの内周に逆ねじとなった雌ねじ部
3b,3cをそれぞれ形成し、控え梁本体3aの両端か
ら挿入される左右一対の内管3dの各外周に逆ねじとな
った雄ねじ部3e,3fを形成し、内管3dの雄ねじ部
3e,3fを雌ねじ部3b,3cに螺合することにより
構成されている。また、各内管3cの先端にはアダプタ
ー7を固定するための止具孔3gを有する固定板3hが
取着されている。
As shown in FIG. 13, the stay beam 3 is formed with female threads 3b and 3c, which are reverse-threaded, on the inner periphery of a stay beam body 3a made of an outer tube, and inserted from both ends of the stay beam body 3a. A male screw portion 3e, 3f having a reverse thread is formed on each outer periphery of the pair of left and right inner tubes 3d, and the male screw portions 3e, 3f of the inner tube 3d are screwed to the female screw portions 3b, 3c. I have. A fixing plate 3h having a stopper hole 3g for fixing the adapter 7 is attached to the tip of each inner tube 3c.

【0010】控え梁接続具6は控え梁3を通し柱2Aの
脚部に接続するためのものであって、図14に示すよう
に、一対の接続板部61を平断面U字状の取付け部62
の正面側に取付けると共に一対の接続板部61の下端に
ジャッキ受け板63を取付けて構成されており、各接続
板部61の上縁には止具嵌合部61aを底部に有するV
字状の受け溝61bが形成され、受け溝61bの下方に
は後述する梁接続具8の止具孔81cと同間隔で3個の
止具孔61cが縦方向に設けられており、受け溝61b
の止具嵌合部61aと最上段の止具孔61cの間隔は止
具孔61cの間隔と同じに設定され、取付け部62には
止具孔62aが穿設されている。
The stay beam connecting device 6 is for connecting the stay beam 3 to the leg of the through column 2A, and as shown in FIG. 14, connects a pair of connecting plate portions 61 to a flat section U-shaped mounting portion. 62
And a jack receiving plate 63 attached to the lower ends of a pair of connecting plate portions 61, and a V having a fitting portion 61a at the bottom of the upper edge of each connecting plate portion 61.
A receiving groove 61b in the shape of a letter is formed, and below the receiving groove 61b, three stopper holes 61c are provided in the vertical direction at the same interval as a stopper hole 81c of the beam connector 8 described later. 61b
The distance between the stopper fitting portion 61a and the uppermost stopper hole 61c is set to be the same as the distance between the stopper holes 61c, and the attachment portion 62 is provided with a stopper hole 62a.

【0011】アダプター7は、控え梁3を梁接続具8及
び控え梁接続具6に連結するのに用いられるものであっ
て、図15に示すように、一対のジョイント板部71を
取付け板72に取り付けて構成されている。各ジョイン
ト板部71には3個の止具孔71a,71b,71c
が、後述する梁接続具8の止具孔81c及び控え梁接続
具6の止具孔61cと同間隔で縦方向に列設されてい
る。中央の止具孔71bの孔径は上下の止具孔71a,
71cの孔径よりも大きくなるように設定されており、
外壁体2を隣地境界側外周基礎1に固定するためにジャ
ッキJで昇降させるときに、外壁体2の昇降に従って控
え梁3が上下に揺動して外壁体2の昇降が控え梁3によ
って邪魔されないようになっている。そして、アダプタ
ー7は、図11に示すように、控え梁3の両端の固定板
3hにボルト等の止具aにて固定されるようになってい
る。
The adapter 7 is used to connect the stay beam 3 to the beam connecting device 8 and the stay beam connecting device 6. As shown in FIG. It is configured to be attached to. Each joint plate 71 has three stopper holes 71a, 71b, 71c.
Are vertically arranged at the same interval as a stopper hole 81c of the beam connector 8 and a stopper hole 61c of the stay beam connector 6 described later. The hole diameter of the central stopper hole 71b is the upper and lower stopper holes 71a,
It is set to be larger than the hole diameter of 71c,
When the outer wall 2 is moved up and down with the jack J to fix the outer wall 2 to the adjacent boundary side outer foundation 1, the stay beam 3 swings up and down as the outer wall 2 moves up and down, and the up and down movement of the outer wall body 2 is obstructed by the stay beam 3. Not to be. Then, as shown in FIG. 11, the adapter 7 is fixed to fixing plates 3h at both ends of the stay beam 3 with fasteners a such as bolts.

【0012】梁接続具8は階梁5を通し柱2Aに接続す
るためのものであって、図10に示すように、一対の梁
接続板部81と取付け部82から成り、各梁接続板部8
1の上縁には止具嵌合部81aを底部に有するV字状の
切り欠き81bが形成され、切り欠き81bの下方には
3個の止具孔81cが縦方向に等間隔で列設されてお
り、切り欠き81bの止具嵌合部81aと最上段の止具
孔81cの間隔は、止具孔81c間の間隔と同じに設定
されている。梁接続具8は、階梁5を通し柱2Aに接続
する前は、控え梁3を通し柱2Aに接続するために使用
されるものであり、梁接続具8の取付け部82は止具a
1にて通し柱2Aに固定されるようになっている。
The beam connecting member 8 is for connecting the floor beam 5 to the through column 2A, and comprises a pair of beam connecting plate portions 81 and a mounting portion 82 as shown in FIG. 8
A V-shaped notch 81b having a stopper fitting portion 81a at the bottom is formed at the upper edge of the first member 1. Three stopper holes 81c are vertically arranged at equal intervals below the notch 81b. The distance between the stopper fitting portion 81a of the notch 81b and the uppermost stopper hole 81c is set to be the same as the distance between the stopper holes 81c. The beam connecting member 8 is used to connect the stay beam 3 to the through column 2A before connecting the floor beam 5 to the through column 2A.
1 is fixed to the through column 2A.

【0013】隣地境界線側の位置する基礎1よりも内側
に後退した場所で組み立てられた外壁体2は、図12に
示すレール9及び台車10によって隣地境界線側の基礎
1まで移動させる。レール9は、レール本体9aの両側
から側板部9bを垂設し、各側板部9cに長さ方向に一
定間隔で複数の係止孔9dをそれぞれ穿設して構成され
ている。台車10は、上面が外壁体2の土台2Bの載置
部10aとなった台車本体10bにローラ10cを取付
け、台車本体10bの後部から仮止片10dを立設し、
台車本体10bの両側から垂下板10eを垂設し、この
垂下板10eに係止孔10fを設けて構成されている。
The outer wall 2 assembled at a place retreated inside the foundation 1 located on the side of the adjacent land boundary is moved to the foundation 1 on the side of the adjacent land boundary by the rail 9 and the bogie 10 shown in FIG. The rail 9 is configured such that side plate portions 9b are suspended from both sides of a rail body 9a, and a plurality of locking holes 9d are formed in each side plate portion 9c at regular intervals in the length direction. The cart 10 has a roller 10c attached to a cart body 10b having an upper surface serving as a mounting portion 10a of the base 2B of the outer wall 2, and a temporary fixing piece 10d is erected from the rear of the cart body 10b.
A hanging plate 10e is provided from both sides of the bogie main body 10b, and the hanging plate 10e is provided with a locking hole 10f.

【0014】仮設ブレース4は金属パイプにて形成され
ており、図11に示すように、ブレース専用上取付具1
1及びブレース専用下取付具12を用いて外壁体2の通
し柱2A及び土台13に着脱自在に取付けられるように
なっている。図16及び図17に示すように、ブレース
専用上取付具11は水平棒11aの両端に左右一対のク
ランプ11bを固定すると共に、水平棒11aの中間部
から左右一対のブラケット11cを突設し、各ブラケッ
ト11cの先端に取付孔11dを穿設することにより構
成されている。図18に示すように、このブレース専用
上取付具11は、ブラケット11cを通し柱2Aに取付
けられる梁接続具8に重ねると共に、ブレース専用上取
付具11の取付孔11d及び梁接続具8の最下端の止具
孔81cに止具aを挿通して梁接続具8に取付けられる
ものであり、また、ブレース専用上取付具11は取付孔
11dを中心にして上下方向に揺動でき、仮設ブレース
4の角度に対応できるようになっている。そして、仮設
ブレース4の上端はブレース専用上取付具11のクラン
プ11bにて通し柱2Aに固定される。
The temporary brace 4 is formed of a metal pipe, and as shown in FIG.
1 and a brace-dedicated lower attachment 12 for detachably attaching to the through column 2A and the base 13 of the outer wall body 2. As shown in FIG. 16 and FIG. 17, the brace-specific upper fixture 11 fixes a pair of right and left clamps 11 b to both ends of a horizontal bar 11 a and projects a pair of left and right brackets 11 c from an intermediate portion of the horizontal bar 11 a. The bracket 11c is formed by drilling a mounting hole 11d at the tip of the bracket 11c. As shown in FIG. 18, the brace-specific upper fitting 11 overlaps the beam connecting tool 8 attached to the column 2A through the bracket 11c, and has the mounting hole 11d of the brace-specific upper fitting 11 and the lowermost end of the beam connecting tool 8. The upper bracket 11 for exclusive use of the brace can swing up and down around the mounting hole 11d, so that the temporary brace 4 It can correspond to the angle of. Then, the upper end of the temporary brace 4 is fixed to the through column 2A by the clamp 11b of the upper attachment 11 dedicated to the brace.

【0015】図19及び図20に示すように、ブレース
専用下取付具12は、土台13を跨ぐ断面コ字状の取付
具本体12aの上面板12bの左右両側に一対のクラン
プ取付体12cを固定し、この各クランプ取付体12c
の外側にクランプ12dを水平軸12eにて回転自在に
取付けて構成されている。また、取付具本体12aの上
面板12bにはアンカーボルト挿通孔12fが形成され
ている。図21に示すように、ブレース専用下取付具1
2は取付具本体12aを土台13に嵌め込むと共にアン
カーボルト挿通孔12fをアンカーボルト16に挿通し
て固定ナット19にてアンカーボルト16に固定され
る。そして、仮設ブレース4の下端はブレース専用下取
付具12のクランプ12dにて土台13に固定される。
As shown in FIGS. 19 and 20, the lower mounting bracket 12 for exclusive use of the brace has a pair of clamp mounting bodies 12c fixed to the left and right sides of an upper surface plate 12b of a mounting body 12a having a U-shaped cross section straddling a base 13. Then, each clamp mounting body 12c
A clamp 12d is rotatably mounted on a horizontal axis 12e on the outer side of the frame. An anchor bolt insertion hole 12f is formed in the upper surface plate 12b of the attachment body 12a. As shown in FIG.
In 2, the fixture main body 12 a is fitted into the base 13, and the anchor bolt insertion hole 12 f is inserted into the anchor bolt 16, and is fixed to the anchor bolt 16 by the fixing nut 19. Then, the lower end of the temporary brace 4 is fixed to the base 13 by the clamp 12d of the lower attachment 12 dedicated to the brace.

【0016】次に、隣地境界線Bで挟まれた狭小地Aの
施工現場において隣家Cに接するように二階建ての木造
建物を施工する場合の狭小地建築工法を、図1乃至図1
2に基づいて詳述する。まず、狭小地Aに建てられる建
物の基礎1の工事を行う。図1に示すように、左右の隣
地境界線Bに沿った狭小地Aの奥行き方向には隣地境界
側外周基礎1aを配設し、狭小地Aの間口部には間口側
外周基礎1bを配設し、狭小地Aの奥部には奥部側外周
基礎1cを配設し、左右の隣地境界側外周基礎1aの間
には間仕切り基礎1dを配設する。また、図11に示す
ように、基礎1には予めアンカーボルト16を埋設して
おく。
Next, a narrow-land construction method for constructing a two-story wooden building so as to be in contact with a neighbor C at a construction site on a narrow land A sandwiched between adjacent land boundaries B will be described with reference to FIGS.
2 will be described in detail. First, the construction of the foundation 1 of the building to be built on the narrow land A is performed. As shown in FIG. 1, an adjacent land boundary side outer peripheral foundation 1a is disposed in the depth direction of the narrow land A along the left and right adjacent land boundary lines B, and a frontage side outer peripheral foundation 1b is disposed at the frontage of the narrow land A. A deep-side outer foundation 1c is disposed in the deep part of the narrow land A, and a partition foundation 1d is disposed between the left and right adjacent land boundary-side outer foundations 1a. As shown in FIG. 11, anchor bolts 16 are embedded in the foundation 1 in advance.

【0017】次に、図2に示すように、間口側外周基礎
1b、奥部側外周基礎1c及び間仕切り基礎1dに土台
13を固定し、この土台13の両端部にレール9を止具
aにて固定することにより、レール9を外壁体2の組立
て場所から外周基礎1の手前まで延ばす。
Next, as shown in FIG. 2, the base 13 is fixed to the front-side outer foundation 1b, the rear-side outer foundation 1c, and the partition foundation 1d, and rails 9 are attached to both ends of the base 13 with the stoppers a. The rail 9 is extended from the place where the outer wall 2 is assembled to just before the outer peripheral foundation 1.

【0018】また、図2及び図7に示すように、補助レ
ール15の付いた仮設土台14を隣地境界側外周基礎1
aに載置することにより、仮設土台14を土台13と連
続させると共に、補助レール15をレール9と連続させ
る。
As shown in FIGS. 2 and 7, the temporary base 14 with the auxiliary rail 15 is connected to the outer peripheral foundation 1 on the boundary side of the adjacent land.
By mounting on the a, the temporary base 14 is connected to the base 13 and the auxiliary rail 15 is connected to the rail 9.

【0019】次に、図3及び図4に示すように、左右の
隣地境界側外周基礎1aよりも内側に約800mm後退し
たレール9上に台車10を位置させ、この台車10の上
で左右両側に位置する外壁体2,2の組み立て作業を行
う。このとき、図12に示すように、台車10の係止孔
10fをレール9のいずれかの係止孔9dと合致させて
係止孔10f,9dに係止ピンbを差し込むことにより
台車10を仮止めする。そして、図3及び図4に示すよ
うに、外壁体2,2の組立て場所の外側に外部足場Dを
組み、この外部足場Dを利用して外壁体2,2を組み立
てる。外壁体2を組み立てる場合には、図2に示すよう
に、外壁体2,2を構成する土台2Bを台車10に載せ
て台車10の仮止片10dに止具aにて仮止めした後、
図3に示すように、土台2Bの上に通し柱2Aや胴差し
2C等を組んで軸組を行い、図8及び図9に示すよう
に、この軸組に下地合板、防水シート、サッシ、外壁板
材2D、土台水切り2E等を取り付けて外壁体2を完成
させる。
Next, as shown in FIGS. 3 and 4, the carriage 10 is positioned on the rail 9 which is retracted by about 800 mm inside the outer peripheral foundation 1a on the left and right adjacent land boundary. Of the outer wall bodies 2 and 2 located at the position shown in FIG. At this time, as shown in FIG. 12, the bogie 10 is locked by aligning the locking holes 10f of the bogie 10 with any of the locking holes 9d of the rail 9 and inserting the locking pins b into the locking holes 10f and 9d. Temporarily fix. Then, as shown in FIG. 3 and FIG. 4, the external scaffold D is assembled outside the place where the outer wall bodies 2 and 2 are assembled, and the outer wall bodies 2 and 2 are assembled using the external scaffold D. When assembling the outer wall body 2, as shown in FIG. 2, the base 2 </ b> B constituting the outer wall bodies 2 and 2 is mounted on the bogie 10 and temporarily fixed to the temporary fixing pieces 10 d of the bogie 10 with the fasteners a.
As shown in FIG. 3, a through-column 2A, a trunk 2C, and the like are assembled on a base 2B to form a shaft assembly. As shown in FIGS. 8 and 9, this skeleton is attached to a base plywood, a waterproof sheet, a sash, and an outer wall. The outer wall 2 is completed by attaching the plate 2D, the base drainer 2E, and the like.

【0020】外壁体2,2の軸組作業の際には、図3に
示すように、左右両側に位置する外壁体2,2の通し柱
2A間に控え梁3を予め架設して外壁体2を支持すると
共に、外壁体2,2を仮設ブレース4にて支持する。具
体的には、図11に示すように、予め控え梁接続具6の
取付け部62を通し柱2Aの脚部に止具aにて固定し、
梁接続具8の取付け部82を階梁のレベルで通し柱2A
に止具にて固定する。そして、控え梁接続具6及び梁接
続具8を利用して控え梁3を通し柱2A間に架設する。
すなわち、アダプター7の一対のジョイント板部71の
上端の止具孔71aに止具aを予め挿着した後、この止
具aを通し柱2Aの梁接続具8の梁接続板部81の切り
欠き81bの止具嵌合部81aに落とし込んで控え梁3
を梁接続具8に仮止めし、次に、アダプター7のジョイ
ント板部71の残りの止具孔71b,71c及び梁接続
具8の最上段及び中段の止具孔81c,81cに止具a
を挿通して控え梁3を階梁5のレベルで通し柱2A間に
架設する。また、仮設ブレース4は、上述のように、ブ
レース専用上取付具11及びブレース専用下取付具12
にて外壁体2の通し柱2A及び土台13に取付ける。図
11に示すように、仮設ブレース4はブレース専用上取
付具11及びブレース専用下取付具12によって控え梁
3の両サイドに位置するので、控え梁3の邪魔にならな
い。
As shown in FIG. 3, when the outer wall members 2 and 2 are assembled, a retaining beam 3 is previously erected between the through columns 2A of the outer wall members 2 and 2 located on the left and right sides. And the outer walls 2 are supported by the temporary brace 4. Specifically, as shown in FIG. 11, the mounting portion 62 of the stay beam connecting tool 6 is previously fixed to the leg of the column 2A with the fastener a,
Attach the mounting portion 82 of the beam connector 8 at the level of the floor beam, and pass through the column 2A.
And fix it with the stopper. Then, the stay beams 3 are passed between the columns 2A by using the stay beam connecting members 6 and 8 to pass through the stay beams 3.
That is, after the fastener a is inserted in advance into the fastener hole 71a at the upper end of the pair of joint plate parts 71 of the adapter 7, the notch a is cut out of the beam connecting plate part 81 of the beam connecting tool 8 of the column 2A. 81b, and the retaining beam 3
Is temporarily fixed to the beam connector 8, and then the stopper a is inserted into the remaining stopper holes 71 b and 71 c of the joint plate portion 71 of the adapter 7 and the uppermost and middle stopper holes 81 c and 81 c of the beam connector 8.
To extend the stay beam 3 between the columns 2A at the level of the floor beam 5. Further, as described above, the temporary brace 4 includes a brace-specific upper fitting 11 and a brace-specific lower fitting 12.
Is attached to the through column 2A of the outer wall 2 and the base 13. As shown in FIG. 11, the temporary brace 4 is located on both sides of the stay beam 3 by the brace-specific upper attachment device 11 and the brace-specific lower attachment device 12, so that the temporary brace 4 does not interfere with the stay beam 3.

【0021】控え梁3の伸長寸法が長くなる場合には、
図11に示すように、控え梁3の座屈や垂れを防止する
ために支柱17にて支持し、かつ、この支柱17を仮設
ブレース4の近くから立設してトラス形式にすることに
より、反力体としての外壁体2を安定したものにでき
る。また、仮設ブレース4を交差させてX形に配設する
ことにより、更に安定したものにすることができる。な
お、支柱17は地盤や基礎1から立設するものとし、支
柱17と控え梁3とはクランプ18にて接続するように
する。
When the extension of the stay beam 3 becomes long,
As shown in FIG. 11, the support beam 17 is supported by a support post 17 in order to prevent buckling and drooping of the stay beam 3, and the support post 17 is erected from near the temporary brace 4 to form a truss type. The outer wall body 2 as a reaction force body can be made stable. Further, by arranging the temporary braces 4 so as to cross each other, the temporary braces 4 can be further stabilized. The support 17 is erected from the ground or the foundation 1, and the support 17 and the stay 3 are connected by a clamp 18.

【0022】また、図11に示すように、アダプター7
の一対のジョイント板部71の最上段の止具孔71aに
止具aを予め挿着した後、この止具aを通し柱2Aの控
え梁接続具6の接続板部61の受け溝61bの止具嵌合
部61aに落とし込んで控え梁3を控え梁接続具6に仮
止めし、次に、アダプター7のジョイント板部71の残
りの止具孔71b,71c及び控え梁接続具6の最上段
及び中段の止具孔61c,61cに止具aを挿通するこ
とにより、控え梁3を通し柱2A間に架設する。
Further, as shown in FIG.
After the stopper a is inserted in the uppermost stopper hole 71a of the pair of joint plate parts 71, the stopper a is passed through the stopper plate to stop the receiving groove 61b of the connecting plate part 61 of the stay beam connector 6 of the pillar 2A. The retaining beam 3 is dropped into the fitting portion 61a, and the retaining beam 3 is temporarily fixed to the retaining beam connecting device 6. Then, the remaining stopper holes 71b and 71c of the joint plate portion 71 of the adapter 7 and the uppermost step of the retaining beam connecting device 6. By inserting the stopper a into the stopper holes 61c, 61c in the middle stage, the stay beam 3 is passed between the columns 2A.

【0023】このようにして組立てられた外壁体2,2
は、次の要領で移動させる。図4に示すように、外部足
場Dを撤去すると共に、移動させる側の外壁体2の仮設
ブレース4を取り外すと共に、係止孔10f,9dから
係止ピンbを抜いて台車10の仮止めを解除し、残りの
外壁体2を反力体として控え梁3の控え梁本体3aを回
転させて内管3cを控え梁本体3aの端部から伸長させ
る。これにより、台車10がレール9上を移動し、外壁
体2は垂直性が保持された状態で水平移動する。そし
て、外壁体2を土台13から架設土台14の補助レール
15に移動させて架設土台14の補助レール15上で停
止させる。
The outer walls 2, 2 thus assembled
Is moved in the following manner. As shown in FIG. 4, the external scaffold D is removed, the temporary brace 4 of the outer wall 2 to be moved is removed, and the locking pin b is pulled out from the locking holes 10 f and 9 d to temporarily fix the carriage 10. The stay is released, and the stay beam main body 3a of the stay beam 3 is rotated using the remaining outer wall body 2 as a reaction force body to extend the inner tube 3c from the end of the stay beam body 3a. Thereby, the carriage 10 moves on the rail 9, and the outer wall body 2 moves horizontally while the verticality is maintained. Then, the outer wall 2 is moved from the base 13 to the auxiliary rail 15 of the erection base 14 and stopped on the auxiliary rail 15 of the erection base 14.

【0024】次に、隣地境界側外周基礎1aに外壁体2
をアンカーボルト16で固定する。すなわち、図8に示
すように、控え梁接続具6のジャッキ受け板63の下に
ジャッキJを設置し、外壁体2を上昇させて仮設土台1
4を抜き取ると共に台車10を外壁体2の土台2Bから
取り外す。外壁体2を昇降させる前に、アダプター7の
最下段に位置する止具孔71cに挿通された止具aを予
め抜き取っておく。アダプター7の大径の止具孔71b
と止具孔71bに挿通された止具aとの間に大きな隙間
が形成されているので、止具aを抜き取った状態では、
階梁レベルの控え梁3は、梁接続具8の切り欠き81b
の止具嵌合部81a内の止具aを中心にして当該隙間の
分だけ上下方向に揺動可能となる。また、通し柱2Aの
脚部レベルの控え梁3は、控え梁接続具6の受け溝61
b内の止具aを中心として当該隙間の分だけ上下方向を
揺動可能となる。これにより、図6及び図8に示すよう
に、外壁体2の昇降に伴って、控え梁3も外壁体2に対
して上下に揺動して外壁体2の昇降が可能となる。図8
中の符号J1はジャッキJの土台である。その後、外壁
体2の土台2Bを隣地境界側外周基礎1aのアンカーボ
ルト16に固定する。
Next, the outer wall 2 is attached to the outer peripheral foundation 1a on the adjacent land boundary side.
Is fixed with anchor bolts 16. That is, as shown in FIG. 8, the jack J is installed under the jack receiving plate 63 of the stay beam connecting device 6, and the outer wall body 2 is raised so that the temporary
4 and the carriage 10 is removed from the base 2B of the outer wall body 2. Before the outer wall 2 is raised and lowered, the stopper a inserted in the stopper hole 71c located at the lowermost stage of the adapter 7 is previously extracted. Large-diameter stopper hole 71b of adapter 7
Since a large gap is formed between the stopper a and the stopper a inserted through the stopper hole 71b, in a state where the stopper a is removed,
The stay beam 3 at the floor beam level has a notch 81b of the beam connecting device 8.
Can be swung up and down by the amount of the gap around the stopper a in the stopper fitting portion 81a. In addition, the stay beam 3 at the leg level of the through pillar 2A is connected to the receiving groove 61 of the stay beam connector 6.
It is possible to swing up and down by the amount of the gap around the stopper a in b. Thus, as shown in FIGS. 6 and 8, as the outer wall 2 moves up and down, the stay beam 3 also swings up and down with respect to the outer wall 2, so that the outer wall 2 can move up and down. FIG.
The symbol J1 in the inside is the base of the jack J. Thereafter, the base 2B of the outer wall body 2 is fixed to the anchor bolt 16 of the outer peripheral foundation 1a on the adjacent land boundary side.

【0025】次に、図5に示すように、残りの外壁体2
を、上記と同じ要領で移動させて隣地境界側外周基礎1
aに固定する。このとき、既に移動が完了して隣地境界
側外周基礎1aに固定された外壁体2に仮設ブレース4
を取り付けて反力体として機能させ、移動させる側の外
壁体2から仮設ブレース4を取り外すと共に、係止孔1
0f,9dから係止ピンbを抜いて台車10の仮止めを
解除する。
Next, as shown in FIG. 5, the remaining outer wall 2
Is moved in the same manner as above, and the outer peripheral foundation
a. At this time, the temporary brace 4 is attached to the outer wall body 2 which has already been moved and is fixed to the outer peripheral foundation 1a on the adjacent boundary side.
The temporary brace 4 is removed from the outer wall 2 on the side to be moved, and the locking hole 1 is attached.
The temporary stop of the carriage 10 is released by removing the locking pin b from 0f and 9d.

【0026】次に、図6に示すように、反力体として利
用された外壁体2から仮設ブレース4を取り外し、ま
た、両外壁体2,2から控え梁3及び控え梁接続具6を
それぞれ取り外し、外壁体2,2間に階梁5を架設す
る。図10は、外壁体2の通し柱2Aに階梁5の端部を
取付けるための作業説明図である。同図に示すように、
階梁5の端部には一対のスリット溝51及び4個の貫通
孔52,53が形成されており、階梁5の最上部の貫通
孔52には、取付け前に止具aを予め挿着しておく。そ
して、同図の矢印で示すように、階梁5のスリット溝5
1を梁接続具8の梁接続板部81に挿入すると共に、階
梁5の止具aを梁接続具8の梁接続板部81の切り欠き
81aに落とし込んで通し柱2Aに仮止めする。次に、
同図に示すピンa1を階梁5の残りの挿通孔53及び梁
接続板部81の止具孔81cに差し込むことにより、通
し柱2Aに階梁5の端部を取付ける。
Next, as shown in FIG. 6, the temporary brace 4 is removed from the outer wall body 2 used as a reaction body, and the stay beam 3 and the stay beam connector 6 are respectively removed from both outer wall bodies 2 and 2. Then, the floor beams 5 are erected between the outer walls 2 and 2. FIG. 10 is a work explanatory diagram for attaching the end of the floor beam 5 to the through pillar 2A of the outer wall body 2. As shown in the figure,
A pair of slit grooves 51 and four through holes 52, 53 are formed at the end of the floor beam 5, and a stopper a is previously inserted into the uppermost through hole 52 of the floor beam 5 before mounting. Wear it. Then, as shown by arrows in FIG.
1 is inserted into the beam connecting plate portion 81 of the beam connecting device 8, and the stopper a of the floor beam 5 is dropped into the notch 81a of the beam connecting plate portion 81 of the beam connecting device 8 and temporarily fixed to the through column 2A. next,
By inserting the pin a1 shown in the figure into the remaining insertion hole 53 of the floor beam 5 and the stopper hole 81c of the beam connecting plate portion 81, the end of the floor beam 5 is attached to the through column 2A.

【0027】[0027]

【発明の効果】以上説明したように、請求項1の発明の
狭小地建築工法によると、ブレース専用取付具にて仮設
ブレースを外壁体及び土台に取付けて反力体を形成する
ので、安定した構造の反力体を形成することができ、外
壁体を安定した状態で移動させることができて作業の安
全が図れ、外壁体を損傷させることもなくなる。
As described above, according to the narrow land construction method of the first aspect of the present invention, the temporary brace is attached to the outer wall and the base with the attachment dedicated to the brace, so that the reaction force body is formed. Since a reaction force body having a structure can be formed, the outer wall body can be moved in a stable state, work safety can be achieved, and the outer wall body is not damaged.

【0028】請求項2の発明の狭小地建築工法による
と、柱に固定される取付具本体にクランプを取付けてブ
レース専用上取付具を構成したので、仮設ブレースの着
脱が容易となって施工性が向上し、また、接合部の強度
上の信頼性が高くなる。
According to the narrow land construction method according to the second aspect of the present invention, the clamp is attached to the fixture body fixed to the pillar to form the upper bracket dedicated to the brace. And the reliability of the joint at the strength is enhanced.

【0029】請求項3の発明の狭小地建築工法による
と、土台に固定される取付具本体にクランプを取付けて
ブレース専用下取付具を構成したので、仮設ブレースの
着脱が容易となり、施工性が向上する。
According to the narrow land construction method according to the third aspect of the present invention, the clamp is attached to the fixture main body fixed to the base to form the lower fixture dedicated to the brace, so that the temporary brace can be easily attached and detached, and the workability is improved. improves.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施の形態を示す狭小地建築工法の一
工程を示す斜視図である。
FIG. 1 is a perspective view showing one step of a narrow land construction method showing an embodiment of the present invention.

【図2】同工法の一工程を示す斜視図である。FIG. 2 is a perspective view showing one step of the method.

【図3】同工法の一工程を示す正面図である。FIG. 3 is a front view showing one step of the method.

【図4】同工法の一工程を示す正面図である。FIG. 4 is a front view showing one step of the method.

【図5】同工法の一工程を示す正面図である。FIG. 5 is a front view showing one step of the method.

【図6】同工法の一工程を示す正面図である。FIG. 6 is a front view showing one step of the method.

【図7】同工法による外壁体の移動動作を示す正面図で
ある。
FIG. 7 is a front view showing a moving operation of the outer wall body by the same method.

【図8】同工法による外壁体の移動動作を示す正面図で
ある。
FIG. 8 is a front view showing a moving operation of the outer wall body by the same method.

【図9】同工法による外壁体の昇降動作を示す正面図で
ある。
FIG. 9 is a front view showing an elevating operation of the outer wall body by the same method.

【図10】通し柱への階梁の接続動作を示す斜視図であ
る。
FIG. 10 is a perspective view showing an operation of connecting a floor beam to a through pillar.

【図11】同工法の一工程を示す斜視図である。FIG. 11 is a perspective view showing one step of the method.

【図12】同工法に使用される台車の仮止め構造を示す
斜視図である。
FIG. 12 is a perspective view showing a temporary fixing structure of a bogie used in the method.

【図13】同工法に使用される控え梁を示す正面図であ
る。
FIG. 13 is a front view showing a stay beam used in the method.

【図14】同工法に使用される控え梁接続具の斜視図で
ある。
FIG. 14 is a perspective view of a stay beam connector used in the method.

【図15】同工法に使用される梁接続具の斜視図であ
る。
FIG. 15 is a perspective view of a beam connector used in the method.

【図16】同工法に使用されるブレース専用上取付具を
示す正面図である。
FIG. 16 is a front view showing a brace-specific upper fitting used in the method.

【図17】同ブレース専用上取付具の平面図である。FIG. 17 is a plan view of the upper attachment dedicated to the brace.

【図18】同ブレース専用上取付具の使用状態を示す斜
視図である。
FIG. 18 is a perspective view showing a use state of the brace-specific upper attachment.

【図19】同工法に使用されるブレース専用下取付具を
示す正面図である。
FIG. 19 is a front view showing a brace-specific lower fitting used in the method.

【図20】同ブレース専用下取付具の平面図である。FIG. 20 is a plan view of the lower attachment dedicated to the brace.

【図21】同ブレース専用下取付具の使用状態を示す斜
視図である。
FIG. 21 is a perspective view showing a use state of the brace-dedicated lower attachment.

【符号の説明】[Explanation of symbols]

A 狭小地 B 隣地境界線 1 基礎 2 外壁体 3 控え梁 4 仮設ブレース 11 ブレース専用上取付具 11b ブレース専用上取付具のクランプ 12 ブレース専用下取付具 12d ブレース専用下取付具のクランプ A Narrow land B Neighborhood boundary line 1 Foundation 2 Exterior wall 3 Stay beam 4 Temporary brace 11 Brace dedicated upper fitting 11b Brace dedicated upper fitting clamp 12 Brace dedicated lower fitting 12d Brace dedicated lower fitting clamp

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 左右の隣地境界線にて挟まれる狭小地に
設けられる基礎に土台を固定し、左右の隣地境界線側に
位置する基礎よりも内側に後退した位置の土台上で建物
の左右一対の外壁体を組み立て、これらの外壁体の間に
伸長可能な控え梁を介在させ、一方の外壁体を仮設ブレ
ースにて支持して反力体を形成し、控え梁の伸長により
他方の外壁体を隣地境界線側の基礎の上まで移動させる
狭小地建築工法において、 外壁体にブレース専用上取付具を配設すると共に土台に
ブレース専用下取付具を配設し、仮設ブレースの上端及
び下端をブレース専用上取付具及びブレース専用下取付
具に着脱自在に取付けて反力体を形成することを特徴と
する狭小地建築工法。
1. A base is fixed to a foundation provided on a narrow land sandwiched between left and right adjacent land boundary lines, and left and right of the building are located on a base which is recessed inward from a foundation located on the left and right adjacent land boundary lines. A pair of outer walls are assembled, an extendable stay is interposed between the outer walls, one of the outer walls is supported by a temporary brace to form a reaction force body, and the other outer wall is formed by extension of the stay. In a narrow-land construction method in which the body is moved onto the foundation on the border line of the adjacent land, an upper bracket dedicated to the brace is provided on the outer wall, and a lower bracket dedicated to the brace is provided on the base, and the upper and lower ends of the temporary brace A narrow ground construction method characterized by detachably attaching a brace to an upper bracket and a lower bracket to form a reaction body.
【請求項2】 柱に固定される取付具本体にクランプを
取付けて前記ブレース専用上取付具を構成したことを特
徴とする請求項1に記載の狭小地建築工法。
2. The method according to claim 1, wherein a clamp is attached to a fixture main body fixed to the pillar to form the upper bracket dedicated to the brace.
【請求項3】 土台に固定される取付具本体にクランプ
を取付けて前記ブレース専用下取付具を構成したことを
特徴とする請求項1又は請求項2に記載の狭小地建築工
法。
3. The method according to claim 1, wherein a clamp is attached to a fixture main body fixed to a base to form the lower attachment dedicated to the brace.
JP24618498A 1998-08-31 1998-08-31 Narrow land construction method Expired - Fee Related JP3468408B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24618498A JP3468408B2 (en) 1998-08-31 1998-08-31 Narrow land construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24618498A JP3468408B2 (en) 1998-08-31 1998-08-31 Narrow land construction method

Publications (2)

Publication Number Publication Date
JP2000073570A true JP2000073570A (en) 2000-03-07
JP3468408B2 JP3468408B2 (en) 2003-11-17

Family

ID=17144771

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24618498A Expired - Fee Related JP3468408B2 (en) 1998-08-31 1998-08-31 Narrow land construction method

Country Status (1)

Country Link
JP (1) JP3468408B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010285744A (en) * 2009-06-09 2010-12-24 Taniguchi:Kk Narrow site building method
CN113323409A (en) * 2021-07-13 2021-08-31 安徽宸翰建筑工程有限公司 Building assembly type construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010285744A (en) * 2009-06-09 2010-12-24 Taniguchi:Kk Narrow site building method
CN113323409A (en) * 2021-07-13 2021-08-31 安徽宸翰建筑工程有限公司 Building assembly type construction method

Also Published As

Publication number Publication date
JP3468408B2 (en) 2003-11-17

Similar Documents

Publication Publication Date Title
CN112593700B (en) Square upright column template mounting structure and mounting method thereof
CN115198889A (en) Assembled building beam column steel construction
CN107975251B (en) Assembled building wallboard joint support device
CN114045840B (en) Soft soil deep foundation pit combined supporting structure and construction method
CN111058647A (en) Assembled building wall and composite beam integrated supporting structure
JP2000073570A (en) Building construction in narrow site
JP3468410B2 (en) Reaction body structure for narrow land construction method
JP3468409B2 (en) Temporary fixing of outer wall for narrow land construction method
CN108756211B (en) Aluminum formwork for construction
JP3578643B2 (en) Temporary support for narrow land construction method and outer wall movement
JP2001200632A (en) Construction method for temporary structure
CN214247366U (en) Connecting channel support frame
CN115506480A (en) Bottom layer frame of light steel assembled house
JPS61290164A (en) Method and apparatus for supporting beam and slab
CN212271698U (en) Quick detach aluminum mould board bearing structure
CN210622679U (en) Wind-resistant gate of prefabricated factory of assembled
JPH11131810A (en) Construction method for use in narrow site
CN111927086A (en) Laminated slab early-dismantling aluminum formwork system and construction method thereof
CN111894308A (en) Quick-release aluminum formwork supporting structure and construction method thereof
CN217871708U (en) Construction platform for overhanging structural layer of high-rise building
JP3029324B2 (en) Temporary enclosures and foundations for temporary enclosures
CN213174769U (en) Beam plate post-cast strip formwork structure
CN218758739U (en) Supporting mechanism for stand column template
JP3210878B2 (en) Method and apparatus for installing horizontal structural members
CN220747742U (en) Temporary supporting device for building assembled wall

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090905

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120905

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees