JP2000073438A - Burying method for sewer pipe - Google Patents
Burying method for sewer pipeInfo
- Publication number
- JP2000073438A JP2000073438A JP10246915A JP24691598A JP2000073438A JP 2000073438 A JP2000073438 A JP 2000073438A JP 10246915 A JP10246915 A JP 10246915A JP 24691598 A JP24691598 A JP 24691598A JP 2000073438 A JP2000073438 A JP 2000073438A
- Authority
- JP
- Japan
- Prior art keywords
- pipe
- branch
- laying
- foundation
- rib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Sewage (AREA)
- Rigid Pipes And Flexible Pipes (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、管外周面に環状リ
ブが管軸方向に対して所定間隔で設けられた合成樹脂製
リブパイプによる下水道管の埋設工法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of burying a sewer pipe using a synthetic resin rib pipe in which annular ribs are provided at predetermined intervals in the pipe axial direction on the outer peripheral surface of the pipe.
【0002】[0002]
【従来の技術】従来から下水道管の埋設配管は次のよう
にして行われている。即ち、図3に断面図で示した如
く、地面を掘り起こして形成した掘削溝Aの底部を地均
しして採石,栗石,砂利等を敷き詰めて基礎を形成し、
本管1を敷設する。そこで、図4に示した如く、この本
管1の側壁に分岐サドル継手5を接続し、該分岐サドル
継手5に曲がり管6aを介して枝管6を接続すると共
に、枝管6を敷設する掘削溝Bの底部には砂を敷き詰め
て基礎を形成していた。2. Description of the Related Art Conventionally, sewer pipes are buried as follows. That is, as shown in the sectional view of FIG. 3, the bottom of the excavation groove A formed by excavating the ground is leveled, and quarries, chestnut stones, gravel, etc. are spread to form a foundation,
The main pipe 1 is laid. Therefore, as shown in FIG. 4, a branch saddle joint 5 is connected to the side wall of the main pipe 1, a branch pipe 6 is connected to the branch saddle joint 5 via a bent pipe 6a, and the branch pipe 6 is laid. Sand was spread on the bottom of the excavation groove B to form a foundation.
【0003】この埋設配管では、本管1には管外周面に
環状リブ11が管軸方向に対して所定間隔で設けられた
合成樹脂製リブパイプが使用され、曲がり管6aと枝管
6には環状リブを有しない通常の合成樹脂管が使用され
ていた。In this buried pipe, a synthetic resin rib pipe in which annular ribs 11 are provided at predetermined intervals in the pipe axial direction on the outer peripheral surface of the pipe is used for the main pipe 1, and the bent pipe 6 a and the branch pipe 6 are used for the bent pipe 6 a and the branch pipe 6. An ordinary synthetic resin tube having no annular rib has been used.
【0004】[0004]
【発明が解決しようとする課題】ところが、近年海砂や
川砂等の目の細かい砂が不足しており、枝管6を敷設す
る掘削溝Bの底部に目の細かい砂を敷き詰めることがで
きなくなっている。そこで、この砂に代えて採石,栗
石,砂利等が用いられているが、これらの比較的目の粗
い石を敷き詰めた場合には、土圧や輪荷重が合成樹脂管
の上面に作用したとき、石の角が管表面に当たって亀裂
が発生したり、破損する危険性があった。However, in recent years, there is a shortage of fine sand such as sea sand and river sand, which makes it impossible to spread fine sand on the bottom of the excavation groove B where the branch pipe 6 is laid. ing. Therefore, instead of this sand, quarries, rubble stones, gravel, etc. are used, but when these relatively coarse stones are spread, when earth pressure or wheel load acts on the upper surface of the synthetic resin pipe There was a risk that the corners of the stone would hit the pipe surface, causing cracks or breakage.
【0005】本発明はかかる課題を解決したものであっ
て、採石等の比較的目の粗い石を敷き詰めて埋設溝の基
礎を形成できると共に、土圧や輪荷重が枝管の上面に作
用しても枝管に亀裂が生じたり、破損することのない下
水道管の埋設工法を提供するものである。The present invention has been made to solve the above-mentioned problem, and it is possible to form a foundation of a buried groove by laying relatively coarse stones such as quarries and the like, and earth pressure and a wheel load act on an upper surface of a branch pipe. It is intended to provide a method of burying a sewer pipe without causing cracks or breakage in the branch pipe.
【0006】[0006]
【課題を解決するための手段】本発明は、管外周面に環
状リブが管軸方向に対して所定間隔で設けられた合成樹
脂製リブパイプによる下水道管の埋設工法であって、掘
削溝の底部を地均しして採石等の比較的目の粗い石を敷
き詰めて基礎を形成してからリブパイプの本管を敷設
し、次いで本管の側壁に分岐サドル継手を接続して該分
岐サドル継手にリブパイプの枝管を接続するにあたり、
枝管を敷設する掘削溝の底部に採石等の比較的目の粗い
石を敷き詰めて基礎を形成してからリブパイプの枝管を
敷設して土砂等を埋め戻しすることを特徴とする。SUMMARY OF THE INVENTION The present invention relates to a method of burying a sewer pipe by using a synthetic resin rib pipe in which annular ribs are provided at predetermined intervals in the pipe axial direction on the outer peripheral surface of the pipe. Leveling the ground, laying relatively coarse stones such as quarries to form a foundation, laying the main pipe of the rib pipe, and then connecting a branch saddle joint to the side wall of the main pipe and connecting it to the branch saddle joint When connecting the branch pipe of the rib pipe,
The method is characterized in that relatively coarse stones such as quarries are laid at the bottom of the excavation groove for laying a branch pipe to form a foundation, and then a branch pipe of a rib pipe is laid to backfill soil and the like.
【0007】[0007]
【発明の実施の形態】以下、本発明の実施の形態を図面
に基づいて詳細に説明する。図1は本発明による下水道
管の埋設状態を示す一実施例の部分切断断面図、図2は
本管と枝管との接続状態を示す部分切断断面図であっ
て、図中A及びBは地面を掘り起こして形成した掘削
溝、1は本管、2は分岐サドル継手、3は枝管である。Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a partially cutaway sectional view of an embodiment showing a buried state of a sewer pipe according to the present invention, and FIG. 2 is a partially cutaway sectional view showing a connected state of a main pipe and a branch pipe. An excavation groove formed by excavating the ground, 1 is a main pipe, 2 is a branch saddle joint, and 3 is a branch pipe.
【0008】本管1及び枝管3は塩化ビニル樹脂等から
なる管の外周面に環状リブ11,31が管軸方向に対し
て所定間隔で設けられたリブパイプであって、本発明で
は本管1及び枝管3に合成樹脂製リブパイプを用いて埋
設配管を行うものである。掘削溝Aに本管1を敷設する
際、掘削溝Aの底部を地均しして採石,栗石,砂利等の
比較的目の粗い石を敷き詰めて基礎を形成し、本管1を
基礎の上に敷き並べて順次接続する。The main pipe 1 and the branch pipe 3 are rib pipes in which annular ribs 11 and 31 are provided at predetermined intervals in the pipe axis direction on the outer peripheral surface of a pipe made of vinyl chloride resin or the like. A buried pipe is formed by using a synthetic resin rib pipe for the first pipe 1 and the branch pipe 3. When laying the main pipe 1 in the excavation groove A, the bottom of the excavation groove A is leveled, and relatively coarse stones such as quarries, chestnut stones, and gravel are laid to form a foundation. Lay it on top and connect sequentially.
【0009】同様にして、枝管3を敷設する掘削溝Bの
底部を地均しして採石,栗石,砂利等の比較的目の粗い
石を敷き詰めて基礎を形成する。そこで、本管1の側壁
に分岐サドル継手2を接続し、該分岐サドル継手2に曲
がり管3aを介して枝管3を順次接続し、その他端をマ
ンホール等に接続する。この様にして、本管1及び枝管
3の敷設配管を行ってから掘り起こした土砂等を掘削溝
A及びBに投入して埋め戻しする。Similarly, the bottom of the excavation groove B in which the branch pipe 3 is laid is leveled, and relatively coarse stones such as quarries, stones and gravel are laid to form a foundation. Then, the branch saddle joint 2 is connected to the side wall of the main pipe 1, the branch pipe 3 is sequentially connected to the branch saddle joint 2 via the bent pipe 3a, and the other end is connected to a manhole or the like. In this way, the earth and sand excavated after laying the main pipe 1 and the branch pipe 3 are put into the excavation grooves A and B and backfilled.
【0010】本管1及び枝管3に用いられるリブパイプ
の管外周面には、環状リブが設けられているため、管の
偏平化が効果的に防止される。このため、埋設配管後に
土圧や輪荷重が管の上面に作用しても亀裂が生じたり、
破損することもない。また、採石等を敷き詰めた基礎の
上に本管1及び枝管3を載置したとき、管外周面に所定
間隔で設けられた環状リブが採石等と接触して上方から
の荷重を支持する。このため、埋設配管後に土圧や輪荷
重が管の上面に作用しても、採石等の角が管表面に当た
って亀裂が発生したり、破損することもない。[0010] Since an annular rib is provided on the outer peripheral surface of the rib pipe used for the main pipe 1 and the branch pipe 3, flattening of the pipe is effectively prevented. For this reason, even if earth pressure or wheel load acts on the upper surface of the pipe after buried piping, cracks may occur,
No damage. When the main pipe 1 and the branch pipe 3 are placed on a foundation on which quarries and the like are spread, annular ribs provided at predetermined intervals on the outer peripheral surface of the pipe come into contact with quarries and the like to support a load from above. . For this reason, even if earth pressure or a wheel load acts on the upper surface of the pipe after the buried pipe, a corner such as quarry does not hit the pipe surface to cause cracks or breakage.
【0011】[0011]
【発明の効果】以上詳述した如く、本発明では、管外周
面に環状リブが管軸方向に対して所定間隔で設けられた
合成樹脂製リブパイプを用いて埋設配管を行なうので、
管外周面に所定間隔で設けられた環状リブによって管の
偏平化が防止される。また、土圧や輪荷重の外力が環状
リブによって支持されるため、採石等の角が管表面に当
たって亀裂が発生したり、破損することもない。近年、
海砂や川砂等の目の細かい砂が不足しているため、配管
の埋設工事に支障を来しているが、本発明の埋設工法に
よれば、どこでも手軽に入手できる採石等が使用できる
ため、埋設工事の工期短縮を図ることもできる。As described above in detail, in the present invention, the buried piping is performed by using a synthetic resin rib pipe having annular ribs provided on the outer peripheral surface of the pipe at predetermined intervals in the pipe axis direction.
Annular ribs provided at predetermined intervals on the outer peripheral surface of the pipe prevent the pipe from being flattened. Further, since external force such as earth pressure or wheel load is supported by the annular rib, cracks or breakage due to corners of quarry or the like hitting the pipe surface are prevented. recent years,
The lack of fine sand, such as sea sand and river sand, has hindered the burial of pipes.However, according to the burial method of the present invention, quarries and the like that can be easily obtained anywhere can be used. In addition, the construction period of burial work can be shortened.
【図1】図1は下水道管の埋設状態を示す本発明の一実
施例の部分切断断面図である。FIG. 1 is a partially cut-away sectional view of an embodiment of the present invention, showing a state where a sewer pipe is buried.
【図2】図2は本管と曲がり管との接続状態を示す部分
切断断面図である。FIG. 2 is a partially sectional view showing a connection state between a main pipe and a bent pipe.
【図3】図3は下水道管の埋設状態を示す従来例の部分
切断断面図である。FIG. 3 is a partially cut-away sectional view of a conventional example showing a buried state of a sewer pipe.
【図4】図4は本管と曲がり管との接続状態を示す従来
例の部分切断断面図である。FIG. 4 is a partial cross-sectional view of a conventional example showing a connection state between a main pipe and a bent pipe.
A,B 掘削溝 1 本管 2 分岐サドル継手 3 枝管 4 マンホール A, B Drilling groove 1 Main pipe 2 Branch saddle joint 3 Branch pipe 4 Manhole
Claims (1)
所定間隔で設けられた合成樹脂製リブパイプによる下水
道管の埋設工法であって、掘削溝の底部を地均しして採
石等の比較的目の粗い石を敷き詰めて基礎を形成してか
らリブパイプの本管を敷設し、次いで本管の側壁に分岐
サドル継手を接続して該分岐サドル継手にリブパイプの
枝管を接続するにあたり、枝管を敷設する掘削溝の底部
に採石等の比較的目の粗い石を敷き詰めて基礎を形成し
てからリブパイプの枝管を敷設して土砂等を埋め戻しす
ることを特徴とする下水道管の埋設工法。1. A method of burying a sewer pipe by means of a synthetic resin rib pipe having annular ribs provided on a pipe outer peripheral surface at predetermined intervals in a pipe axial direction, wherein the bottom of a digging groove is leveled and quarrying is performed. After laying the relatively coarse stones to form the foundation, laying the main pipe of the rib pipe, then connecting the branch saddle joint to the side wall of the main pipe and connecting the branch pipe of the rib pipe to the branch saddle joint A sewer pipe characterized by laying relatively coarse stones such as quarries at the bottom of a digging trench for laying a branch pipe to form a foundation, and then laying a branch pipe of a rib pipe to backfill soil and the like. Burial method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP24691598A JP3720989B2 (en) | 1998-09-01 | 1998-09-01 | Sewer pipe burial method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP24691598A JP3720989B2 (en) | 1998-09-01 | 1998-09-01 | Sewer pipe burial method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2000073438A true JP2000073438A (en) | 2000-03-07 |
JP3720989B2 JP3720989B2 (en) | 2005-11-30 |
Family
ID=17155653
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP24691598A Expired - Fee Related JP3720989B2 (en) | 1998-09-01 | 1998-09-01 | Sewer pipe burial method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3720989B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2016188494A (en) * | 2015-03-30 | 2016-11-04 | 大成建設株式会社 | Tube sewer construction method and underground flow channel |
-
1998
- 1998-09-01 JP JP24691598A patent/JP3720989B2/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2016188494A (en) * | 2015-03-30 | 2016-11-04 | 大成建設株式会社 | Tube sewer construction method and underground flow channel |
Also Published As
Publication number | Publication date |
---|---|
JP3720989B2 (en) | 2005-11-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3967473B2 (en) | Construction method of underground structure | |
JP2007169927A (en) | Earthquake resisting manhole structure and its manufacturing method | |
JP2000073438A (en) | Burying method for sewer pipe | |
KR100681843B1 (en) | Structure for laying hume pipe under the ground for road | |
JPH01278612A (en) | Method of taking countermeasure against liquefaction of linear structure buried in ground | |
JP2004278287A (en) | Permeable steel pipe earth-retaining type retaining wall structure | |
JP4863311B2 (en) | Excavation method | |
JP2009275358A (en) | Improvement structure of building bearing ground, and construction method | |
KR100688617B1 (en) | Drainpipe with a flat bottom | |
JP2985063B2 (en) | Caisson prefabricated manhole and its construction method | |
JPH01174729A (en) | Method for burying pipe | |
JP2008057188A (en) | Earthquake resisting manhole structure and its manufacturing method | |
JPH10183660A (en) | Foundation structure of building | |
JPH089867B2 (en) | Liquefaction countermeasure structure for buildings | |
JP7014629B2 (en) | Building installation structure and installation method | |
KR200194046Y1 (en) | A back filling structure for the paving road | |
KR0167035B1 (en) | Method of laying hume pipes | |
JPS6128772B2 (en) | ||
JP2022091053A (en) | Reinforcement body of earth retaining wall, and installation method of reinforcement body | |
KR200333115Y1 (en) | A Sewer Protected layer filling system using waste tire fragment | |
JP3352951B2 (en) | Installation method of invert and underground drainage in mountain tunnel | |
JP2524536B2 (en) | Foundation structure of underground structure | |
JPH01151621A (en) | Connecting method for underground conduit | |
KR100540455B1 (en) | Buried soil reinforcement device for sewer pipes buried under road and construction works | |
JPH03279516A (en) | Laying for underground buried pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050810 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050817 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20050909 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080916 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090916 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100916 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110916 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120916 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120916 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130916 Year of fee payment: 8 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130916 Year of fee payment: 8 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130916 Year of fee payment: 8 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130916 Year of fee payment: 8 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313113 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130916 Year of fee payment: 8 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
LAPS | Cancellation because of no payment of annual fees |