JP2000017630A - Fixing method of concrete sheet pile coping stone block and its structure - Google Patents

Fixing method of concrete sheet pile coping stone block and its structure

Info

Publication number
JP2000017630A
JP2000017630A JP10188352A JP18835298A JP2000017630A JP 2000017630 A JP2000017630 A JP 2000017630A JP 10188352 A JP10188352 A JP 10188352A JP 18835298 A JP18835298 A JP 18835298A JP 2000017630 A JP2000017630 A JP 2000017630A
Authority
JP
Japan
Prior art keywords
sheet pile
concrete sheet
stone block
bolt
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10188352A
Other languages
Japanese (ja)
Other versions
JP4099265B2 (en
Inventor
Teruo Murakami
輝雄 村上
Hiroshi Ito
弘 伊藤
Ryuichi Abe
隆逸 阿部
Youji Takahashi
膺志 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeta Concrete Industry Ltd
Original Assignee
Maeta Concrete Industry Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeta Concrete Industry Ltd filed Critical Maeta Concrete Industry Ltd
Priority to JP18835298A priority Critical patent/JP4099265B2/en
Publication of JP2000017630A publication Critical patent/JP2000017630A/en
Application granted granted Critical
Publication of JP4099265B2 publication Critical patent/JP4099265B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Revetment (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide the concrete sheet pile coping stone block capable of easily adjusting the fixing position of a coping stone block in response to the slippage of mutual height, before and behind, right and left directions of sheet piles produced at the time of placing of the concrete sheet pile. SOLUTION: The before and behind side wall face is sandwiched by a pair of clips 21 on the upper part of a concrete sheet pile 9 to set a sandwiching adjusting tool 18, and a height adjusting nut screwed on a vertical through bolt 20 of the sandwiching adjusting tool is rotated to adjust the set height of a coping stone block 10. The coping stone block is fitted on the upper part of the concrete sheet pile, the through bolt is inserted in the adjusting through hole 17 of the height adjusting tool 16 provided on the coping stone block, and the coping stone block is mounted on the upper part of the concrete sheet pile by tightening the fixing nut screwed on the through bolt.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、土留め工,漏水防
止工,護岸工等において使用されるコンクリート製矢板
の上部に笠石ブロックを固定する方法及びその固定構造
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for fixing a headstone block on top of a concrete sheet pile used in earth retaining works, water leakage prevention works, seawall works and the like, and a fixing structure therefor.

【0002】[0002]

【従来の技術】図11に示すように、コンクリート製の
矢板1は長方形状の平板構造で、下端1aを斜めに切除
して打設が容易な形状にしてあり、一方の側端面には長
手方向に沿って凸部1bが、他方の側端面には前記凸部
1bと嵌合する凹部1cがそれぞれ形成されている。そ
して、護岸工等において、打ち込んだ矢板1の凹部1c
にこれと隣接する他方の矢板1の凸部1bを嵌合せしめ
ながら打ち込むことにより順次連結して、隣接する矢板
1,1の間に隙間のない壁を構築している。
2. Description of the Related Art As shown in FIG. 11, a concrete sheet pile 1 has a rectangular flat plate structure, a lower end 1a of which is cut off obliquely to make it easy to be cast. A convex portion 1b is formed along the direction, and a concave portion 1c fitted with the convex portion 1b is formed on the other side end surface. And in the revetment, etc., the recessed portion 1c of the driven sheet pile 1
The adjacent sheet piles 1 and 1 are successively connected by being driven while being fitted with the projection 1b of the other sheet pile 1 adjacent thereto, thereby forming a wall having no gap between the adjacent sheet piles 1 and 1.

【0003】しかし、コンクリート製の矢板1は、横断
面Ωとした鋼矢板と異なり平板形状であること、鋼矢板
による壁の構築に際しては、これを一個置きに前後面を
逆向きにして打ち込み、しかもこの打ち込みに際して、
鋼矢板の両端部にそれぞれ設けた爪を互いに噛合させな
がら行うものであるため、鋼矢板同士のずれを抑止する
効果が得られるが、コンクリート製の矢板1にあって
は、相互は凸部1bと凹部1cとの嵌合だけで連結され
ているので、鋼矢板のようなズレの抑止効果は期待する
ことができない。
However, the sheet pile 1 made of concrete has a flat plate shape unlike a steel sheet pile having a cross section of Ω. When constructing a wall with steel sheet pile, every other piece is driven with its front and rear faces reversed. Moreover, in this driving,
Since the nails provided at both ends of the steel sheet pile are engaged with each other, the effect of suppressing the displacement of the steel sheet piles can be obtained. However, in the case of the concrete sheet pile 1, the projections 1b are mutually formed. And the recess 1c are connected only by fitting, so that the effect of suppressing displacement such as steel sheet pile cannot be expected.

【0004】したがって、コンクリート製の矢板1によ
る壁では、鋼矢板の壁よりも前後左右のズレが大きく生
じてしまうことになり、また各コンクリート製の矢板1
の地表面に露出した上部の高さが不揃となって景観を損
なうことになること等から、コンクリート製矢板1の壁
の上部に笠石コンクリートブロックを装着することによ
り、景観の向上を図っている。
[0004] Therefore, in the wall made of the concrete sheet pile 1, the front, rear, left and right deviations are larger than those of the steel sheet pile wall.
Since the height of the upper part exposed on the ground surface of the concrete will be uneven and damage the landscape, etc. I have.

【0005】図12は特開平3−286012号公報に
開示された従来例で、コンクリート製の矢板2の上部の
一側面には溝形形状の固定金具3の一端がボルト4によ
り固定されて水平状態に支持されており、他側面の上端
には山形形状の支持金具5の一端がボルト6により直立
状態に固定されている。そこで、断面コ字形状の笠石部
材7をその開口部から矢板2の上部に被嵌するようにし
て装着すると、該笠石部材7の天壁部は直立状態の前記
支持金具5の他端で所定高さに支持され、側壁部は前記
水平状態の固定金具3の他端にボルト8止めすることに
よりコンクリート製の矢板2の上部に固定される。
FIG. 12 shows a conventional example disclosed in Japanese Patent Application Laid-Open No. 3-286012, in which one end of a groove-shaped fixing bracket 3 is fixed to one side of an upper part of a concrete sheet pile 2 by bolts 4 to be horizontal. One end of a chevron-shaped support member 5 is fixed to the upper end of the other side surface by a bolt 6 in an upright state. Then, when the cap member 7 having a U-shaped cross section is mounted so as to be fitted on the upper part of the sheet pile 2 from the opening thereof, the top wall portion of the cap member 7 is fixed at the other end of the support fitting 5 in an upright state. It is supported at the height, and the side wall is fixed to the upper part of the concrete sheet pile 2 by fixing the bolt 8 to the other end of the horizontal fixing bracket 3.

【0006】[0006]

【発明が解決しようとする課題】しかし、前記特開平3
−286012号公報に開示された従来例では、支持金
具5は単に笠石部材7を支えるだけであり、また固定金
具3は笠石部材7を固定するだけの構造であるため、笠
石部材7は隣接するコンクリート製の矢板2の上部に対
して、高さ位置の調整および前後左右の移動調整を全く
行うことができないという問題点があった。
However, Japanese Patent Application Laid-Open No.
In the conventional example disclosed in Japanese Unexamined Patent Application Publication No. 286012, the supporting metal member 5 only supports the head stone member 7 and the fixing metal member 3 has a structure that only fixes the head stone member 7, so that the head stone member 7 is adjacent. There has been a problem that the height of the upper part of the concrete sheet pile 2 and the adjustment of the front, rear, left and right movements cannot be performed at all.

【0007】[0007]

【課題を解決するための手段】本発明は、上記のような
従来の問題点を解決するために成されたもので、コンク
リート製矢板の上部に装着する笠石ブロックの高さ位置
調整および前後左右の位置調整が可能となる構成とする
ことによって、笠石ブロックの施工時に、コンクリート
製矢板の打設時に生じる矢板相互の高さおよび前後左右
のズレに対応して、笠石ブロックの固定位置を容易に調
整することができるものを提供することを目的としたも
のであり、その要旨は、コンクリート製矢板の上部にそ
の前後の側壁面を一対のクリップで挟着して挟着調整具
を設置するとゝもに、該挟着調整具の直立する通しボル
トに螺合した高さ調整用ナットを回動して笠石ブロック
の設置高さを調整し、前記コンクリート製矢板の上部に
前記笠石ブロックを被嵌せしめてこの笠石ブロックに設
けた高さ等調整具の調整用通孔に前記通しボルトを挿通
し、該通しボルトに螺合した固定用ナットを締付けるこ
とにより、前記コンクリート製矢板の上部に笠石ブロッ
クを装着することを特徴とするコンクリート製矢板用笠
石ブロックの固定方法及びその固定構造にある。
SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned conventional problems, and has been made in order to adjust the height and adjust the height, front, rear, left, and right of a headstone block mounted on a concrete sheet pile. The position can be adjusted by adjusting the position of the heave stone block easily according to the height of the sheet piles and the front, rear, left and right misalignment that occur when placing the concrete sheet pile during construction of the heave stone block. The purpose of the present invention is to provide a device that can be adjusted, and the gist of the invention is to provide a clamping adjuster by clamping the front and rear side walls with a pair of clips on the upper part of a concrete sheet pile. In addition, a height adjusting nut screwed into an upright through bolt of the pinch adjusting tool is rotated to adjust the installation height of the hessac block, and the hessac block is placed on the upper part of the concrete sheet pile. By inserting the through bolt into the through hole for adjustment of the height adjustment tool provided on this headstone block after being fitted and tightening the fixing nut screwed into the through bolt, the upper part of the concrete sheet pile A fixing method and a fixing structure of a headdress block for concrete sheet pile characterized by mounting a headdress block.

【0008】[0008]

【発明の実施の形態】以下、本発明を図1乃至図10に
示す実施例に基づいて詳細に説明するに、図において、
9はコンクリート製の矢板で、10はその上部に装着す
る笠石ブロックである。この笠石ブロック10は、図5
に示すように、左右の側壁11,11と天井壁12とか
らなる下面を解放した所定長の門型形状のもので、前記
天井壁12の中央には長方形状の開口部13が設けられ
ており、該開口部13の長手方向には夫々梁部14を介
して左右の端部に開口する凹部15を形成した構成のも
のである。13aは前記天井壁12に形成した開口部1
3の長手方向で対向する内側面であり、15aは前記笠
石コンクリートブロック10の両端部に設けられた凹部
15の奥側面である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, the present invention will be described in detail with reference to the embodiments shown in FIGS.
Reference numeral 9 denotes a concrete sheet pile, and reference numeral 10 denotes a cap stone block mounted on the upper part thereof. This cap stone block 10 is shown in FIG.
As shown in the figure, the upper surface is formed of a left and right side walls 11 and 11 and a ceiling wall 12 and has a gate-shaped shape having a predetermined length, and a rectangular opening 13 is provided at the center of the ceiling wall 12. In addition, in the longitudinal direction of the opening 13, a concave portion 15 is formed at each of left and right ends via a beam portion 14. 13a is an opening 1 formed in the ceiling wall 12.
Reference numeral 15a denotes an inner side face facing in the longitudinal direction of 3;

【0009】16は平板からなる高さ等調整具で、前記
笠石コンクリートブロック10の奥側面15aからほゞ
水平に突出しており、該高さ等調整具16には後述する
通しボルト20を挿通する調整用通孔17が形成されて
いる。この調整用通孔17は前記笠石ブロック10の長
手方向と直行する方向に一致させた長穴であって、その
短径側の長さも前記通しボルト20の外径より大きく形
成されている。したがって、前記通しボルト20はこの
調整用通孔17内において前後,左右方向に移動可能と
なる構成としている。
Reference numeral 16 denotes a height adjusting device made of a flat plate, which protrudes almost horizontally from the inner side surface 15a of the hessian concrete block 10, and through which a through bolt 20 described later is inserted. An adjustment through hole 17 is formed. The adjusting hole 17 is a long hole that is aligned with a direction perpendicular to the longitudinal direction of the head stone block 10, and the length of the minor diameter side thereof is formed larger than the outer diameter of the through bolt 20. Therefore, the through bolt 20 is configured to be movable in the front, rear, left and right directions in the adjustment through hole 17.

【0010】18は挟着調整具で、長方形状の基板19
の上面から直立する通しボルト20と、前記基板19の
長手方向(前記コンクリート製矢板9の板厚方向)の両
端部から垂下する一対のクリップ21,21とから主に
構成されている。そして、前記通しボルト20は、前記
基板19の長手方向の一端側に寄った位置にあって、該
基板19の下面側においてその頭部20aを溶接により
固着することにより前記基板21の上面から直立状態で
装着されており、該通しボルト20には高さ調整用ナッ
ト22が装着されている。
Reference numeral 18 denotes a clamping adjustment tool, which is a rectangular substrate 19.
And a pair of clips 21 and 21 hanging down from both ends of the board 19 in the longitudinal direction (the thickness direction of the concrete sheet pile 9). The through bolt 20 is located at a position closer to one end in the longitudinal direction of the substrate 19, and its head 20 a is fixed to the lower surface side of the substrate 19 by welding so as to stand upright from the upper surface of the substrate 21. The through-bolt 20 is provided with a nut 22 for height adjustment.

【0011】また、前記クリップ21は、一本の鉄筋を
二箇所の折曲部21aにより折曲して偏平なリング状に
形成するとゝもに、その中央部分を前記基板19の下面
側に溶接により固定し、該基板19の両端部から突出す
る部分をその基部21bから90度下方に折り曲げて垂
設するとゝもに、前記折曲部21aと基部21bとの間
の部分を内側にくの字状にそれぞれ屈り曲げたくの字状
屈曲部21cを形成した構造のものである。なお、図中
23は固定用ナット、24は座金である。
The clip 21 is formed by bending a single reinforcing bar with two bent portions 21a to form a flat ring shape, and welding a central portion thereof to the lower surface of the substrate 19. Then, the portion protruding from both ends of the substrate 19 is bent downward by 90 degrees from the base 21b, and the portion between the bent portion 21a and the base 21b is bent inward. It has a structure in which a character-shaped bent portion 21c which is to be bent and bent in a character shape is formed. In the drawings, reference numeral 23 denotes a fixing nut, and reference numeral 24 denotes a washer.

【0012】そこで、前記コンクリート製矢板(壁)9
の上部に笠石ブロック10を装着するには、その装着前
に前記挟着調整具18をその両クリップ21,21で前
記コンクリート製矢板9の上部の前後の側壁面を挟着す
る。ここで、前記両クリップ21,21はコンクリート
製矢板9の側壁面と前記くの字状屈曲部21cの部分で
接触(点接触又は線接触)して挟持することになる。
Therefore, the concrete sheet pile (wall) 9
In order to mount the head block 10 on the upper part of the concrete sheet pile 9, the clip adjusting member 18 is clamped between the front and rear side walls of the upper part of the concrete sheet pile 9 by the clips 21 and 21 before the mounting. Here, the clips 21 and 21 come into contact (point contact or line contact) between the side wall surface of the concrete sheet pile 9 and the portion of the U-shaped bent portion 21c and are sandwiched.

【0013】したがって、前記両クリップ21,21の
弾性挟持力が強固にコンクリート製矢板9の両側壁面に
作用することになり、前記挟着調整具18は前記コンク
リート製矢板9に強固な弾性挟持力で固定される。その
後、水糸等を用いて通しボルト20に螺合した前記高さ
調整用ナット22を上下動して微調整することで、笠石
ブロック10の設置時の該ブロックの高さ位置を決定し
ておく。
Therefore, the elastic clamping force of the clips 21 and 21 strongly acts on both side walls of the concrete sheet pile 9, and the clamping adjuster 18 applies a strong elastic clamping force to the concrete sheet pile 9. Fixed at. Thereafter, the height adjustment nut 22 screwed to the through bolt 20 is vertically moved and finely adjusted using a water thread or the like to determine the height position of the hessian block 10 when the block is installed. deep.

【0014】次に、笠石ブロック10をクレーン等で持
ち上げ、その解放部10aをコンクリート製矢板9の上
部に被嵌するように降下させ、同時に前記挟着調整具1
8から直立している通しボルト20を、前記笠石ブロッ
ク10の凹部15の奥側面15aから水平に突出する前
記高さ等調整具16の調整用通孔17内に座金24を介
して挿通するとゝもに、前記調整用通孔17から突出し
た通しボルト20に座金24を介して固定用ナット23
を緩く螺合する。
Next, the cap block 10 is lifted by a crane or the like, and its release portion 10a is lowered so as to be fitted on the upper portion of the concrete sheet pile 9, and at the same time, the clamping adjuster 1 is moved.
When a through bolt 20 that stands upright from 8 is inserted through a washer 24 into an adjustment through hole 17 of the height adjustment tool 16 that projects horizontally from the rear side surface 15a of the concave portion 15 of the cap stone block 10, {circle around (1)}. A fixing nut 23 is fixed to a through bolt 20 protruding from the adjusting through hole 17 via a washer 24.
Screw loosely.

【0015】そして、前記通しボルト20と高さ等調整
具16との位置関係をその調整用通孔17内において前
後,左右に移動せしめて調整し、前記固定用ナット23
を座金24を介して締め付けることにより、コンクリー
ト製矢板9の上部に笠石ブロック10を固定する。ま
た、隣接する笠石ブロック10,10相互の連結は、一
端側面に形成した凸条部10bと他端面に形成した凹条
部10cとを嵌め合わせることで行なうととゝもに、例
えば水面側に位置する部分にあっては、図4に示すよう
に、笠石ブロック10の内方突起部10dとコンクリー
ト製矢板9との隙間にパッキン材25を設置して水密構
造とする。以上の諸工程を経た後、笠石ブロック10の
前記開口部13から現場打ちコンクリートを流し込んで
工事が完了する。
Then, the positional relationship between the through bolt 20 and the height adjusting tool 16 is adjusted by moving it back and forth and left and right in the adjusting through hole 17.
Is fixed via the washer 24, thereby fixing the headstone block 10 on the upper part of the concrete sheet pile 9. Further, the connection between the adjacent head stone blocks 10, 10 is performed by fitting a convex ridge 10b formed on one end side surface with a concave ridge portion 10c formed on the other end surface, and, for example, on the water surface side. As shown in FIG. 4, a packing material 25 is provided in a gap between the inwardly protruding portion 10 d of the headdress block 10 and the concrete sheet pile 9 to form a watertight structure. After passing through the above-mentioned various steps, the cast-in-place concrete is poured from the opening 13 of the cap stone block 10 to complete the construction.

【0016】図7乃至図10に示すものは他実施例で、
この笠石ブロック10は、幅方向の中心に沿って二分割
された分割笠石ブロック10A,10Bでそれぞれ構成
されており、その他の構成部品は前記実施例とほぼ同様
である。ただし、高さ等調整具16は一方の分割笠石ブ
ロック10Aか10Bの凹部15の奥側面15aに固定
されている。なお、図中26は連結プレート,27はボ
ルトである。
FIGS. 7 to 10 show another embodiment.
The headstone block 10 is composed of divided headstone blocks 10A and 10B which are divided into two along the center in the width direction, and other components are substantially the same as those of the above-described embodiment. However, the height adjustment tool 16 is fixed to the inner side surface 15a of the concave portion 15 of one of the divided headstone blocks 10A or 10B. In the drawing, reference numeral 26 denotes a connecting plate, and 27 denotes a bolt.

【0017】この分割笠石ブロック10A,10Bによ
る施工方法は、まず前記実施例と同様に、挟着調整具1
8のクリップ21でコンクリート製矢板9の上部を挟着
し、通しボルト20,高さ調整用ナット22,座金24
等を組み立てつつ、前記コンクリート製矢板9の上部に
前記挟着調整具18を装着する。
The construction method using the divided headstone blocks 10A and 10B is similar to that of the above-described embodiment.
8, the upper portion of the concrete sheet pile 9 is clamped by the clip 21, the through bolt 20, the height adjusting nut 22, and the washer 24.
The assembling adjustment tool 18 is mounted on the upper part of the concrete sheet pile 9 while assembling.

【0018】その後、受け台28をコンクリート製矢板
9の地盤G側に水糸等を用いて水平に設置し、該受け台
28の上に一方の分割笠石ブロック10Aの下端を載せ
て配設する。そして、他方の分割笠石ブロック10Bを
コンクリート製矢板9の他方の壁面側に設置し、同時に
前記挟着調整具18から直立している通しボルト20を
前記分割笠石ブロック10Bの凹部15の奥側面15a
から水平に突出する前記高さ等調整具16の調整用通孔
17内に座金24を介して挿通するとゝもに、前記調整
用通孔17から突出した通しボルト20に座金24を介
して固定用ナット23を緩く螺合する。
Thereafter, the pedestal 28 is placed horizontally on the ground G side of the concrete sheet pile 9 using a water thread or the like, and the lower end of one of the divided hessstone blocks 10A is placed on the pedestal 28. . Then, the other divided headdress block 10B is installed on the other wall surface side of the concrete sheet pile 9, and at the same time, the through bolt 20 standing upright from the clamping adjuster 18 is inserted into the inner side surface 15a of the recess 15 of the divided headdress block 10B.
When inserted through the washer 24 into the through hole 17 for adjustment of the height adjustment tool 16 protruding horizontally from the hole, it is fixed via the washer 24 to the through bolt 20 projecting from the through hole 17 for adjustment. The nut 23 is loosely screwed.

【0019】次いで、両分割笠石ブロック10A,10
Bの中間の凹部で形成される開口部13の長手方向の内
側面13a,13aの間に連結プレート26を当て、該
連結プレート26の両端部をボルト27で分割笠石ブロ
ック10A,10Bに夫々固定することにより、前記分
割笠石ブロック10A,10Bを一体的に形成する。以
後の作業工程は前記実施例と同様であるが、分割笠石ブ
ロック10A,10Bとすることにより全重量の軽減が
図られ、施工が容易となる。
Next, the two divided heseki blocks 10A, 10
A connecting plate 26 is applied between the inner surfaces 13a, 13a in the longitudinal direction of the opening 13 formed by the concave portion in the middle of B, and both ends of the connecting plate 26 are fixed to the divided headdress blocks 10A, 10B with bolts 27, respectively. By doing so, the divided headstone blocks 10A and 10B are integrally formed. Subsequent work steps are the same as those in the above-described embodiment. However, the use of the divided head blocks 10A and 10B reduces the total weight and facilitates construction.

【0020】[0020]

【発明の効果】本発明は上記のような構成であるから、
コンクリート製矢板の打設時に生じる矢板相互の高さお
よび前後左右方向のズレに対応して、その上部に設置す
る笠石ブロックの微調整を簡単に行うことができる。し
たがって、作業効率が大幅に向上するとゝもに、笠石ブ
ロックはコンクリート製の矢板に強固に固定され、構造
強度が大である、といった諸効果がある。
Since the present invention has the above configuration,
Fine adjustment of the headstone block installed on the upper part of the concrete sheet pile can be easily performed in accordance with the height of the sheet piles and the displacement in the front, rear, left and right directions when the concrete sheet piles are driven. Therefore, the work efficiency is greatly improved, and at the same time, there are various effects such that the heseki block is firmly fixed to the concrete sheet pile and the structural strength is large.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る笠石ブロックの固定構造の要部を
示す斜視図である。
FIG. 1 is a perspective view showing a main part of a fixing structure of a hessian block according to the present invention.

【図2】笠石ブロックの固定状態を示す平面図である。FIG. 2 is a plan view showing a fixed state of the cap stone block.

【図3】図2のII−II線断面図である。FIG. 3 is a sectional view taken along line II-II of FIG. 2;

【図4】図2のIII − III線断面図である。FIG. 4 is a sectional view taken along line III-III of FIG. 2;

【図5】笠石ブロックの斜視図である。FIG. 5 is a perspective view of a cap stone block.

【図6】図5のII−II線断面図である。FIG. 6 is a sectional view taken along line II-II of FIG.

【図7】笠石ブロックの他実施例を示す斜視図である。FIG. 7 is a perspective view showing another embodiment of a hematite block.

【図8】同笠石ブロックの固定状態を示す平面図であ
る。
FIG. 8 is a plan view showing a fixed state of the cap stone block.

【図9】図8のII−II線断面図である。FIG. 9 is a sectional view taken along line II-II of FIG.

【図10】図8のIII − III線断面図である。FIG. 10 is a sectional view taken along line III-III in FIG. 8;

【図11】鉄筋コンクリート製矢板の斜視図である。FIG. 11 is a perspective view of a reinforced concrete sheet pile.

【図12】従来の笠石ブロックの固定構造の要部を示す
側面図である。
FIG. 12 is a side view showing a main part of a conventional fixing structure for a head stone block.

【符号の説明】[Explanation of symbols]

9 コンクリート製矢板 10 笠石ブロック 11 側壁 12 天井壁 13 開口部 14 梁部 15 凹部 15a 奥側面 16 高さ等調整具 17 調整用通孔 18 挟着調整具 19 基板 20 通しボルト 21 クリップ 21c くの字状折曲部 22 高さ調整用ナット 23 固定用ナット 25 パッキン Reference Signs List 9 concrete sheet pile 10 headstone block 11 side wall 12 ceiling wall 13 opening 14 beam 15 recess 15a back side 16 height adjustment tool 17 adjustment through hole 18 clamping adjustment tool 19 board 20 through bolt 21 clip 21c square Folded part 22 Height adjusting nut 23 Fixing nut 25 Packing

フロントページの続き (72)発明者 阿部 隆逸 山形県酒田市上本町6番7号 前田製管株 式会社内 (72)発明者 高橋 膺志 宮城県仙台市青葉区錦町1−12−15 前田 製管株式会社仙台支店内 Fターム(参考) 2D018 BA15 2D049 BA16 DA03 DB06 Continued on the front page (72) Inventor Takayasu Abe 6-7 Uehonmachi, Sakata City, Yamagata Prefecture Inside Maeda Seisakusho Co., Ltd. (72) Inventor Takashi Takahashi 1-12-15 Maeda, Nishikicho, Aoba-ku, Sendai, Miyagi Prefecture Sendai Co., Ltd. Sendai branch F-term (reference) 2D018 BA15 2D049 BA16 DA03 DB06

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 コンクリート製矢板の上部にその前後の
側壁面を一対のクリップで挟着して挟着調整具を設置す
るとゝもに、該挟着調整具の直立する通しボルトに螺合
した高さ調整用ナットを回動して笠石ブロックの設置高
さを調整し、前記コンクリート製矢板の上部に前記笠石
ブロックを被嵌せしめてこの笠石ブロックに設けた高さ
等調整具の調整用通孔に前記通しボルトを挿通し、該通
しボルトに螺合した固定用ナットを締付けることによ
り、前記コンクリート製矢板の上部に笠石ブロックを装
着することを特徴とするコンクリート製矢板用笠石ブロ
ックの固定方法。
When a clamping adjuster is installed by clamping the front and rear side walls with a pair of clips on the upper part of a concrete sheet pile, the screw is screwed into an upright through bolt of the clamp adjuster. The height adjustment nut is rotated to adjust the installation height of the coping stone block, and the coping stone block is fitted on the upper part of the concrete sheet pile, and the adjusting tool for adjusting the height or the like provided on the coping stone block is adjusted. A method of fixing a headstone block for a concrete sheet pile, comprising: mounting a headstone block on the upper part of the concrete sheet pile by inserting the through bolt into the hole and tightening a fixing nut screwed into the through bolt. .
【請求項2】 コンクリート製矢板の上部に装着する両
側壁と天井壁とからなる門型の笠石ブロックと、該笠石
ブロックの両端部の天井壁に形成した凹部の奥壁面から
突出する高さ等調整具と、基板の両端部から垂下する前
記コンクリート製矢板の上部の前後の側壁面を挟着する
前後一対の挟着用クリップ及び前記基板から上方へ直立
する通しボルトとを夫々備えた挟着調整具とからなり、
前記通しボルトに螺合した高さ調整用ナットを介して前
記高さ等調整具に形成した調整用通孔に挿通した前記通
しボルトを、前記高さ等調整具の上面に螺合した固定用
ナットの締め付けにより固定する構成としたことを特徴
とするコンクリート製矢板用笠石ブロックの固定構造。
2. A gate-shaped cap stone block consisting of both side walls and a ceiling wall mounted on the upper part of a concrete sheet pile, and a height projecting from a back wall surface of a concave portion formed in a ceiling wall at both ends of the head stone block. Nipping adjustment including an adjusting tool, a pair of front and rear clamping clips for clamping front and rear side walls of the upper part of the concrete sheet pile hanging from both ends of the board, and a through bolt standing upright from the board, respectively. With the ingredients
The fixing bolt, which is screwed to the upper surface of the height adjustment tool, is inserted through the adjustment hole formed in the height adjustment tool via the height adjustment nut screwed to the through bolt. A structure for fixing a heave stone block for concrete sheet pile, wherein the structure is fixed by tightening a nut.
【請求項3】 高さ等調整具に形成した調整用通孔が、
通しボルトの径より大きく且つ笠石ブロックの長手方向
と直行する方向に一致させた長孔である構成としたこと
を特徴とする請求項2項記載のコンクリート製矢板用笠
石ブロックの固定構造。
3. The adjusting through-hole formed in the height adjusting device,
3. The fixing structure for a hemp stone block for a concrete sheet pile according to claim 2, wherein the elongated hole is configured to have an elongated hole that is larger than the diameter of the through-bolt and coincides with a direction perpendicular to the longitudinal direction of the headdress stone block.
【請求項4】 前後一対の挟着用クリップを、コンクリ
ート製矢板の上部の前後の側壁面と線接触又は点接触と
なるくの字状に屈曲した構成としたことを特徴とする請
求項2又は3記載のコンクリート製矢板用笠石ブロック
の固定構造。
4. The pair of front and rear clip clips are bent in a U-shape so as to make line contact or point contact with the front and rear side wall surfaces of the upper part of the concrete sheet pile. 3. The fixing structure of the hemp stone block for concrete sheet pile according to 3.
【請求項5】 笠石ブロックを幅方向の中心に沿って分
割した二個の分割笠石ブロックで構成するとゝもに、該
両分割笠石ブロックの組み立て時において、その両端部
の天井壁に凹部を形成する構成としたことを特徴とする
請求項2,3又は4記載のコンクリート製矢板用笠石ブ
ロックの固定構造。
5. A head stone block is constituted by two divided head stone blocks divided along the center in the width direction. In addition, when assembling the two divided head stone blocks, a concave portion is formed in a ceiling wall at both ends thereof. 5. The fixing structure for a heave stone block for a concrete sheet pile according to claim 2, 3 or 4, wherein:
JP18835298A 1998-07-03 1998-07-03 Fixing method and structure of the capstone block for concrete sheet pile Expired - Lifetime JP4099265B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18835298A JP4099265B2 (en) 1998-07-03 1998-07-03 Fixing method and structure of the capstone block for concrete sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18835298A JP4099265B2 (en) 1998-07-03 1998-07-03 Fixing method and structure of the capstone block for concrete sheet pile

Publications (2)

Publication Number Publication Date
JP2000017630A true JP2000017630A (en) 2000-01-18
JP4099265B2 JP4099265B2 (en) 2008-06-11

Family

ID=16222133

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18835298A Expired - Lifetime JP4099265B2 (en) 1998-07-03 1998-07-03 Fixing method and structure of the capstone block for concrete sheet pile

Country Status (1)

Country Link
JP (1) JP4099265B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013194485A (en) * 2012-03-22 2013-09-30 Kajima Corp Concrete structure and method of constructing the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013194485A (en) * 2012-03-22 2013-09-30 Kajima Corp Concrete structure and method of constructing the same

Also Published As

Publication number Publication date
JP4099265B2 (en) 2008-06-11

Similar Documents

Publication Publication Date Title
JP2000017630A (en) Fixing method of concrete sheet pile coping stone block and its structure
JPH01105867A (en) Wall formwork supporter
JP2889870B1 (en) Fixing method and structure of capping stone block for concrete sheet pile
JP2566470Y2 (en) Anchor bolt fixing device for construction
JP2896967B2 (en) Deck anchor bolt installation members
JP4119943B1 (en) Hardware for holding the base formwork spacing and anchor bolts
JPH0115774Y2 (en)
JP2001032370A (en) Joint structure of steel pipe column and steel frame beam, and its connection method
JPH11293919A (en) Retaining structure of form and method thereof
JP3339993B2 (en) Joining hardware for column base and base of wooden frame
JP3048924B2 (en) Adjustment jig for pillar
JPH0240687Y2 (en)
JP2939760B2 (en) Separator fixture for reinforced concrete casting formwork
JP2000291202A (en) Steel deck web girder
JPH0476117A (en) Supporting device for anchor bolt
JP3748136B2 (en) Wall panel mounting structure
JPH11172823A (en) Mounting structure of alc panel
JP2588653Y2 (en) Mounting brackets such as cosmetic louvers
JP4007907B2 (en) Separator bolt connector and connection structure
JP3156705U (en) H steel arm scaffolding frame
JPH10280692A (en) Slab erection frame body for steel-framed building
JP2003201717A (en) Connector for prefabricated block for civil-engineering construction structure
JPH0735002Y2 (en) Decorative wall board mounting structure
JP3040718U (en) Beam clamp
JPH086881Y2 (en) Joiner for large and small beams

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050621

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070223

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A132

Effective date: 20070828

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070928

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080219

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080317

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110321

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120321

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130321

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130321

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140321

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term