Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Conveying And Assembling Of Building Elements In Situ
(AREA)
Abstract
Prefabricated modular buildings are made using a system comprising a plurality ot interlocking panels (13, 14, 15) each composed of two cladding layers (22, 23) of rigid material spaced by by an internal framework (25, 26, 27, 28, 29) of spacing frame members, in which at least one edge portion of each panel (13, 14, 15) is provided with a longitudinal channel (27a) defined by edge portions of the cladding layers (22a, 23a) projecting beyond an elongate spacing frame member (27) extending generally parallel to the said edge portion, in which, to interconnect the panels, the tongues (24a) of at least scme of the panels project orthogonally of the edge portions defining the longitudinal channels (27a).
JO19941796A1993-02-191994-02-19A system for constructing adismanteable prefalbricated modular building
JO1796B1
(en)
Soundproof cubicle with self-supporting frame - has Z=section uprights and cross-members with flanges at right angles to web and has panels filling in spaces supported by sealing components