Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by كونترول فلوديكس انكfiledCriticalكونترول فلوديكس انك
Priority to JO19831290ApriorityCriticalpatent/JO1290B1/en
Application grantedgrantedCritical
Publication of JO1290B1publicationCriticalpatent/JO1290B1/en
A toilet system comprising a bowl, a treating chamber, a trap connecting the bowl to the treating chamber, said trap containing a bypass to a waste pipe, a conductor connecting the treating chamber to the waste pipe, a macerator in the treating chamber for macerating effluent delivered into the treating chamber, a worm pump in the treating chamber for evacuating effluent from the bowl into the treating chamber and discharging the treated effluent into the waste pipe, a valve connected to bowl for supplying flush water thereto and control means operable to initiate operation of the pump followed by operation of the valve and stop the pump prior to closing of the valve and wherein, in the event the pump is disabled, discharge from the bowl can be effected through the bypass by delivery of fluid into the bowl
JO19831290A1983-11-281983-11-28improved water saving toilet system
JO1290B1
(en)