IT1263665B - Procedimento per migliorare l'efficienza operativa di un impianto di generazione di energia elettrica a turbina a vapore durante variazionidella potenza d'uscita - Google Patents
Procedimento per migliorare l'efficienza operativa di un impianto di generazione di energia elettrica a turbina a vapore durante variazionidella potenza d'uscitaInfo
- Publication number
- IT1263665B IT1263665B ITPD930117A ITPD930117A IT1263665B IT 1263665 B IT1263665 B IT 1263665B IT PD930117 A ITPD930117 A IT PD930117A IT PD930117 A ITPD930117 A IT PD930117A IT 1263665 B IT1263665 B IT 1263665B
- Authority
- IT
- Italy
- Prior art keywords
- pressure
- transition
- valve
- point
- pulse chamber
- Prior art date
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01D—NON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
- F01D1/00—Non-positive-displacement machines or engines, e.g. steam turbines
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Control Of Turbines (AREA)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US07/891,338 US5333457A (en) | 1991-10-07 | 1992-05-29 | Operation between valve points of a partial-arc admission turbine |
Publications (3)
Publication Number | Publication Date |
---|---|
ITPD930117A0 ITPD930117A0 (it) | 1993-05-19 |
ITPD930117A1 ITPD930117A1 (it) | 1994-11-19 |
IT1263665B true IT1263665B (it) | 1996-08-27 |
Family
ID=25398008
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ITPD930117A IT1263665B (it) | 1992-05-29 | 1993-05-19 | Procedimento per migliorare l'efficienza operativa di un impianto di generazione di energia elettrica a turbina a vapore durante variazionidella potenza d'uscita |
Country Status (5)
Country | Link |
---|---|
JP (1) | JPH0811923B2 (ja) |
KR (1) | KR930023578A (ja) |
CA (1) | CA2097267A1 (ja) |
ES (1) | ES2088814B1 (ja) |
IT (1) | IT1263665B (ja) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4650298B2 (ja) | 2006-02-23 | 2011-03-16 | Tdk株式会社 | 複合電子部品 |
CN105134312B (zh) * | 2015-08-17 | 2016-10-26 | 西安西热节能技术有限公司 | 一种亚临界喷嘴配汽汽轮机运行阀位确定方法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4297848A (en) * | 1979-11-27 | 1981-11-03 | Westinghouse Electric Corp. | Method of optimizing the efficiency of a steam turbine power plant |
US4320625A (en) * | 1980-04-30 | 1982-03-23 | General Electric Company | Method and apparatus for thermal stress controlled loading of steam turbines |
US4888954A (en) * | 1989-03-30 | 1989-12-26 | Westinghouse Electric Corp. | Method for heat rate improvement in partial-arc steam turbine |
-
1993
- 1993-05-19 IT ITPD930117A patent/IT1263665B/it active IP Right Grant
- 1993-05-21 ES ES09301101A patent/ES2088814B1/es not_active Expired - Lifetime
- 1993-05-27 KR KR1019930009392A patent/KR930023578A/ko active IP Right Grant
- 1993-05-28 JP JP5127389A patent/JPH0811923B2/ja not_active Expired - Lifetime
- 1993-05-28 CA CA002097267A patent/CA2097267A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
ES2088814A2 (es) | 1996-09-16 |
ITPD930117A0 (it) | 1993-05-19 |
JPH0811923B2 (ja) | 1996-02-07 |
KR930023578A (ko) | 1993-12-21 |
ITPD930117A1 (it) | 1994-11-19 |
ES2088814B1 (es) | 1997-12-01 |
JPH0633704A (ja) | 1994-02-08 |
ES2088814R (ja) | 1997-05-16 |
CA2097267A1 (en) | 1993-11-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Nakamura | Experimental comparisons between McKibben type artificial muscles and straight fibers type artificial muscles | |
CN104632302B (zh) | 一种凝汽式汽轮机滑压运行曲线测试/实施方法 | |
EP1275822A3 (en) | Primary frequency regulation method in combined-cycle steam turbines | |
IT1255693B (it) | Metodo per prevedere la transizione ottimale tra un funzionamento a pressione costante e un funzionamento a pressione variabile | |
NO20031035D0 (no) | Öynettverk og fremgangsmåte for drift av et öynettverk | |
EP1036924A3 (en) | Gas turbine generator having reserve capacity controller | |
NO970586L (no) | Ultra-höyeffektiv kombinasjon av turbin og brenselcelle | |
IT1249905B (it) | Convertitore di potenza a modo incrementale, procedimento per il controllo del convertitore e sistemi di conversione di potenza comprendenti una pluralita' di tali convertitori | |
DK1595061T3 (da) | Dampturbinesystem | |
CN107237657B (zh) | 一种可调峰储能的燃气-蒸汽联合动力装置及其控制方法 | |
IT1263665B (it) | Procedimento per migliorare l'efficienza operativa di un impianto di generazione di energia elettrica a turbina a vapore durante variazionidella potenza d'uscita | |
CN1237079A (zh) | 轴耦合驻波加速管的能量开关 | |
ES484947A1 (es) | Mejoras en un sistema de generacion de energia y refrigera- cion. | |
US5333457A (en) | Operation between valve points of a partial-arc admission turbine | |
CN106208134B (zh) | 基于三相clc导抗变换器的光伏并网拓扑及功率控制方法 | |
SE0103180D0 (sv) | Power distribution system | |
CN112332831A (zh) | 一种提高微波脉冲压缩器系统效率的方法 | |
CN207083011U (zh) | 一种用于开关电源的软启动电路 | |
CN110071519A (zh) | 一种控制参数优化方法 | |
CN206874317U (zh) | 一种双缸蒸汽机 | |
CN218627825U (zh) | 实现蒸汽喷射真空泵互换水环真空泵的节能系统 | |
CN221442676U (zh) | 具备负荷调节能力的布雷顿循环系统 | |
CN117001651B (zh) | 一种采用高压电驱动的小型人工肌肉及其驱动方法 | |
CN215529355U (zh) | 一种感应加热功率调节控制电路 | |
Cantore et al. | The Cooling Air Influence on the Performance of the Gas-Steam Combined Cycle Power Plants with Multiple Expansion Reheating Gas Turbine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
0001 | Granted | ||
TA | Fee payment date (situation as of event date), data collected since 19931001 |
Effective date: 19970530 |