IT1253210B - Method for the consolidation of ground damaged from controlled horizontal drilling - Google Patents

Method for the consolidation of ground damaged from controlled horizontal drilling

Info

Publication number
IT1253210B
IT1253210B ITVR910086A ITVR910086A IT1253210B IT 1253210 B IT1253210 B IT 1253210B IT VR910086 A ITVR910086 A IT VR910086A IT VR910086 A ITVR910086 A IT VR910086A IT 1253210 B IT1253210 B IT 1253210B
Authority
IT
Italy
Prior art keywords
horizontal drilling
consolidation
controlled horizontal
conduit
cement
Prior art date
Application number
ITVR910086A
Other languages
Italian (it)
Inventor
Guido Auriemma
Original Assignee
Guido Auriemma
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guido Auriemma filed Critical Guido Auriemma
Priority to ITVR910086A priority Critical patent/IT1253210B/en
Publication of ITVR910086A0 publication Critical patent/ITVR910086A0/en
Publication of ITVR910086A1 publication Critical patent/ITVR910086A1/en
Application granted granted Critical
Publication of IT1253210B publication Critical patent/IT1253210B/en

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

This is a method intended to be used primarily during the emplacement of conduits for the underground crossing of a stream or canal A, it consists in laying, near the conduit 4 and by using known equipment 1 for controlled horizontal drilling, which is also used to make the pilot borehole of the conduit itself, one or more pipes 2, each one formed by a succession of "wash pipe" shafts and through which is injected, into the surrounding ground, a cement grout or a ternary mixture of water with bentonite with cement, intended to fill the fractures produced during the preceding work phase. <IMAGE>
ITVR910086A 1991-10-15 1991-10-15 Method for the consolidation of ground damaged from controlled horizontal drilling IT1253210B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ITVR910086A IT1253210B (en) 1991-10-15 1991-10-15 Method for the consolidation of ground damaged from controlled horizontal drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ITVR910086A IT1253210B (en) 1991-10-15 1991-10-15 Method for the consolidation of ground damaged from controlled horizontal drilling

Publications (3)

Publication Number Publication Date
ITVR910086A0 ITVR910086A0 (en) 1991-10-15
ITVR910086A1 ITVR910086A1 (en) 1993-04-15
IT1253210B true IT1253210B (en) 1995-07-11

Family

ID=11427407

Family Applications (1)

Application Number Title Priority Date Filing Date
ITVR910086A IT1253210B (en) 1991-10-15 1991-10-15 Method for the consolidation of ground damaged from controlled horizontal drilling

Country Status (1)

Country Link
IT (1) IT1253210B (en)

Also Published As

Publication number Publication date
ITVR910086A1 (en) 1993-04-15
ITVR910086A0 (en) 1991-10-15

Similar Documents

Publication Publication Date Title
CN108678130A (en) A kind of non-digging drag pipe construction method
CN209604016U (en) Shallow embedding layer of sand tunnel shielding portal end soil body ruggedized construction
CN106522243A (en) Fissure-contained rock soil stratum prestressed anchor cable grouting and anchoring construction method
CN105909265A (en) Heaving-prevention retrusive deep-hole grouting system and method for passing through existing shield tunnel
CN101749028B (en) Cross-pulling construction method for soft soil zone with high ground water level
CN107130980A (en) A kind of construction method of tunnel bad geological section consolidation by grouting
CN111577355A (en) Extra-soft rock stratum tunnel interval secondary arch frame long anchor cable locking foot composite construction method
IT1253210B (en) Method for the consolidation of ground damaged from controlled horizontal drilling
CN101141054A (en) Compaction grouting method for preventing land subsidence after non-digging horizontal drilling
GR930300042T1 (en) Method for guiding a digging tool during the excavation of a trench wall, and digging tool to be used in the method.
RU2074925C1 (en) Method for construction of vertical drainage
Lees Grouting–for groundwater control and mitigation of ground movements
RU2075000C1 (en) Method of trenchless laying of pipe lines in ground
JPS5516172A (en) Excavation work method and apparatus for preventing landslide at ditch scooping
Kumar et al. A Review on Trenchless Technology
JPH0426680B2 (en)
White et al. UK microscope- new scene, new laws
Winney Microtunnel river crossing
Yan et al. The application of grouting technology for governance of mined-out area under large channel
TW239175B (en) Construction process of penetrating continuous wall on underground barrier
Liu et al. Tunnelling underneath a large diameter water main in Shanghai
JPS5771927A (en) Construction of underground columnar structure
SU1563323A1 (en) Method for breaking underground &#34;warm&#34; pipeline in permafrost, weak soil in case of melting
CN108589741A (en) Across the well formula excavation method of underground existing buildings on a kind of
CN108411924A (en) Construction method for mine pit wall safety protection

Legal Events

Date Code Title Description
0001 Granted