Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Frenger GunnarfiledCriticalFrenger Gunnar
Priority to IS644ApriorityCriticalpatent/IS339B6/is
Publication of IS644A7publicationCriticalpatent/IS644A7/is
Publication of IS339B6publicationCriticalpatent/IS339B6/is